Comments
Description
Transcript
of FDOT 2014 DESIGN STANDARDS
1. For Sections D-D, E-E, & F-F see Index Nos. 20612, 20614, 20618, 20620, 20624 or 20630 for applicable concrete pile size and Pile Splice Reinforcement Details. Prestressing strands, spiral ties and/or reinforcement are not shown for clarity. »¿ ˘ " (appl i 2. 3. In cases where pile splices are desired due to length limitations in shipping and/or handling, the "Drivable Preplanned Prestressed Precast Splice Detail" shall be used. Mechanical Pile Splices contained on the Qualified Products List (QPL) may also be used. 4. When preformed dowel holes are utilized, the 1" spiral tie pitch shall be continued to 4’-0" below the head of the pile, See Index Nos. 20618, 20620 & 20624. Preformed holes shall utilize either removable preforming material or stay-in-place corrugated galvanized steel ducts. Stay-in-place ducts shall be fabricated from galvanized sheet b"( final thickness) NOTES: Form to retain steel meeting the requirements of ASTM A653, Coating Designation G90, 26 gauge. Ducts shall be 2" diameter with a minimum corrugation (rib) height of 0.12 in. Ducts shall epoxy compound be fabricated with either welded or interlocked seams. Galvanizing of welded seams will not be required. Full epoxy compound joint Gasket 5. For tension piles where top of Prestressed Pile is less than 3 feet below Pile Cut-off Elevation, extend No. 10 Dowels into cap beyond Pile Cut-off Elevation to achieve development as approved by the Engineer. DETAIL A 1" Cover Top of E Build-up section Splice or Dowel extension required No. 10 Dowels Full epoxy compound joint See 4’ -0" Detail A F F Preformed holes, Epoxy compound to fill hole with dowels in place 1 " Drilled or preformed holes (see Splice Details) 4’-2" long, in driven pile (see Note No. 4) Dowel extension 10’ -6" 2’ -6" ( Typ. ) Detail A Driven prestressed pile See Note 5. See Dowel extension Elevation; Detail A Driven prestressed pile Pile cut-off 2’ -6" ( Typ. ) Cap/ Footing to See Dowel extension Dowel Em bedm ent Extended into Driven prestressed pile No. 10 Dowels flat surface E Prestressed Pile 7: 54: 06 PM Auxiliary reinforcing steel cast with pile. See Section F-F. TYPICAL SPLICE BEFORE BONDING UNFORESEEN NONDRIVABLE UNFORESEEN DRIVABLE UNFORESEEN DRIVABLE PREPLANNED REINFORCED C-I-P REINFORCED PRECAST PRESTRESSED PRECAST PRESTRESSED PRECAST PILE BUILD-UP DETAIL PILE BUILD-UP DETAIL PILE SPLICE DETAIL PILE SPLICE DETAIL LAST REVISION 07/01/13 REVISIO N 6/24/2013 E No chamfer, " E Dowels 10’ -6" Dowels No. 10 Plus 2" D No. 10 Dowel Extension D 21’ -0" M inim um Splice Section Build-up Driven prestressed pile 2’ -6" ( Typ. ) Full length of Splice section Build-up D D Pile Build-up C-I-P Pile 5-0" M ax. Elevation sm 970re C: \d\projects\standards\structures\current\ready4release\2014BOOK\20601-1of1. dgn Pile Cut-off No. 10 Dowels 10’ -6" or Footing 21’ -0" M inim um Splice Section Bent Cap, Pile Cap Splice section C-I-P Concrete 4’ -0" M inim um , 21’ -0" M axim um Pile Build-up at End DESCRIPTION: INDEX FDOT 2014 DESIGN STANDARDS SQUARE PRESTRESSED CONCRETE PILE SPLICES NO. 20601 SHEET NO. 1of 1