This page left blank intentionally Thursday, July 14, 2016
This page left blank intentionally
Thursday, July 14, 2016
Page 1 of 22
Production or LDCA Month: September 2016
FPID / FM#
431106.1
Project Description
Extra Description
SR-804/EAST OCEAN AVENUE OVER ICWW BRIDGE PAINTING
Daniel Gonzalez
County:
Milestone
BRIDGE #930370
PALM BEACH
Float
(Days) Milestone
Exec PDE
Exec Design
Float
(Days) Milestone
09/23/2015A
-
Public Hear.
Initial Engin.
Sub FHWA
Constructability 02/22/2016A
-
LDCA
Utilities Clear
03/17/2016A
-
Contract Class:
7 - DISTRICT CONTRACT
Permits Clear
11/06/2015A
-
Work Mix:
BRIDGE - PAINTING
R/W Certified
04/19/2016A
-
Biddability
06/03/2016A
-
Mile Post From:
9.474
Mile Post To:
9.540
Project Length:
0.066
Federal Oversight
432154.1
SR-800/SPANISH RIVER BLVD. OVER ICWW
Daniel Gonzalez
Contract Class:
Work Mix:
Mile Post From:
County:
PH
2016
32
2017
52
2017
62
SEQ
01
Federal Oversight
Mile Post To:
0.403
Project Length:
FY
PH
2015
SEQ
11/07/2016
-1
Letting
01/06/2017
-1
Tot Float
Biddability Environmental Final Impact Review
Not Started
20
6/10/2016
7/8/2016
-20
FP
Review Biddability Plans and Submit Comments to PM
In Progress
5
7/5/2016
7/11/2016
-4
--
EM
Environmental Certification
Not Started
1
7/11/2016
7/11/2016
-20
$496,962
--
PM
Prepare Contract Plans Package
In Progress
27
7/12/2016
8/17/2016
-20
$104,784
--
PM
Update Production Cost Estimate
Not Started
1
8/18/2016
8/18/2016
-20
Resp.
$96,644
BRRP
$96,644
--
EM
$3,554,634
BRRP
$3,554,634
--
$617,121
BRRP
$15,375
BRRP
DDR
Critical Path Activity
Exec PDE
Exec Design
Public Hear.
Initial Engin.
Sub FHWA
Constructability 03/24/2016A
-
LDCA
Utilities Clear
03/10/2016A
-
Permits Clear
11/02/2015A
-
R/W Certified
05/03/2016A
-
Biddability
06/20/2016A
-
09/11/2015A
-
Production
09/06/2016
-3
TLH or PSU
11/06/2017
0
Letting
01/05/2018
0
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Review Biddability Plans and Submit Comments to PM
In Progress
10
7/6/2016
7/19/2016
-3
EM
Biddability Environmental Final Impact Review
Not Started
20
6/21/2016
7/19/2016
-13
--
CE
Level II Contamination Testing
Not Started
60
4/25/2016
7/19/2016
-53
$20,000
--
EM
Environmental Certification
Not Started
1
7/20/2016
7/20/2016
-53
$196,211
--
PM
Receive Biddability Eng Comments
Not Started
1
7/20/2016
7/20/2016
-13
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
32
$16,054
BRRP
$16,054
--
FP
2016
32
$122,007
BRRP
$122,007
--
2018
52
$2,783,688
BRRP
$2,783,688
2018
62
$216,211
BRRP
BRRP
01
TLH or PSU
Late Fin
Date
Fed Aid
0.092
* Project is no longer an APP project, since the
county is doing a project in the area PRIOR to this.
-2
Late Start
Date
Fund(PDC)
BRIDGE REHABILITATION
0.311
09/06/2016
Rem Dur
Fund Code
BRIDGE #930154, #930226 REPLACE SPAN LOCKS, SPALL REPAIR, OVERCOAT
STRUCTURAL STEEL, AND APPLY CLASS 5 FINISH TO CONCRETE SURFACES.
PALM BEACH
Production
Status
Phase Total
7 - DISTRICT CONTRACT
Production Meeting Comments:
Thursday, July 14, 2016
FY
Float
(Months)
Critical Path Activity
Page 2 of 22
Production or LDCA Month: September 2016
FPID / FM#
432883.2
Project Description
Extra Description
ADAPTIVE TRAFFIC CONTROL SYSTEM - SR-786/PGA BLVD.
Robert Lopes
County:
1 - TO BE LET
Work Mix:
ATMS - ARTERIAL TRAFFIC MGMT
Mile Post From:
3.891
Production Meeting Comments:
2015 MPO #5-LI LIMITS: AVENUE OF CHAMPIONS TO US-1 LIAISON: ACKERT
STIPENDS $ TO BE DELETED DURING NEXT DEVELOPMENT CYCLE COORDINATE
WITH PALM BEACH COUNTY TRAFFIC FOR SCOPE. T.W.O. FOR PRELIMINARY
ENGINEERING
PALM BEACH
Contract Class:
Mile Post To:
8.647
Project Length:
Float
(Days) Milestone
Float
(Days) Milestone
Float
(Months)
Exec PDE
Exec Design
Production
09/06/2016
-1
Public Hear.
Initial Engin.
TLH or PSU
11/28/2016
0
Sub FHWA
Constructability
Letting
02/22/2017
0
LDCA
Utilities Clear
08/29/2016
15
Permits Clear
06/03/2016A
-
R/W Certified
06/01/2016A
-
Biddability
06/15/2016A
-
4.756
* Utility cert tied to Production.
FY
PH
2016
32
SEQ
2017
2017
2017
32
52
62
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Review Biddability Eng Cost Estimate
Not Started
5
7/8/2016
7/14/2016
-1
FP
Review Biddability/ Constructability Plans and Submit
Comments to PM
Not Started
20
6/16/2016
7/14/2016
-16
PM
Receive Biddability/Constructability Plans Comments
Not Started
1
7/15/2016
7/15/2016
-16
PM
Respond to Comments and Prepare Contract Plans
Package
Not Started
10
7/18/2016
7/29/2016
-16
PM
Pre-Production Meeting with FP
Not Started
1
8/1/2016
8/1/2016
-1
Fund Code
Fund(PDC)
Fed Aid
Resp.
$366,857
DDR
$37,334
--
ES
DS
$329,523
--
DS
$15,000
--
$15,000
01
Status
Phase Total
Federal Oversight
Thursday, July 14, 2016
Milestone
$1,474,917
CM
$507,943
1281-036-P
01
SA
$57,645
1281-036-P
01
SU
$909,329
1281-036-P
SU
$41,000
1281-036-P
SU
$185,638
1281-036-P
$226,638
Critical Path Activity
Page 3 of 22
Production or LDCA Month: September 2016
FPID / FM#
433109.4
Project Description
Extra Description
SR-9/I-95 FROM BROW/PALM BCH CO LINE TO SOUTH OF GLADES
RD.
Vanita Saini
County:
PALM BEACH
Contract Class:
9 - DESIGN BUILD
Work Mix:
ADD SPECIAL USE LANE
Mile Post From:
0.000
Production Meeting Comments:
Federal Oversight
Thursday, July 14, 2016
Mile Post To:
2.719
Project Length:
Milestone
CDC ON SEGMENT 433109-1 ; PALM BEACH COUNTY (3B-1) PHC210=
CONTAMINATION & LEVEL II TESTING PHC240= MITIGATION PH5A01= MILESTONE
BONUS PH5301= PTO PURCHASE/TURNPIKE TOLL EQUIPMENT PH6240= MATERIAL
LAB TESTING (OFF-SIGHT) PH5601= CONSTRUCTION UTILITY PH5801= FHP PH5701=
RAIL COORDINATION PH3601= DESIGN UTILITY
Lead Project:
433108.6
Let Together:
433108.6
Float
(Days) Milestone
Float
(Days) Milestone
Exec PDE
Exec Design
Public Hear.
Initial Engin.
04/25/2016A
-
Sub FHWA
Constructability
08/19/2016
-35
LDCA
Utilities Clear
08/15/2016
5
08/15/2016
5
Float
(Months)
Production
09/06/2016
-2
TLH or PSU
10/04/2016
-40
Letting
04/12/2017
-4
Permits Clear
R/W Certified
433109.4
Biddability
2.719
* Adjusted score D/B template.
* Project was on APP. Phase 52 advanced from FY
2019 to FY 2017.
FY
PH
2017
2017
SEQ
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Review and Approve Pavement Design Package
In Progress
1
5/11/2016
5/11/2016
-41
PM
Review and Approve Typical Section Package
In Progress
1
5/11/2016
5/11/2016
-41
Not Started
20
4/14/2016
5/11/2016
-60
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
32
$181,478
DI
$181,478
--
PM
36
$200,000
DI
$200,000
--
Critical Path Activity
$41,834,369
ACNP
$41,834,369
0951-694-I
DR
Review and Accept Concept Plans and Conceptual
Drainage Report
56
$1,000,000
DI
$1,000,000
--
EM
Environmental Impact Review of Draft RFP
Not Started
10
5/19/2016
6/2/2016
-55
2016
57
$50,000
DI
$50,000
--
ES
Review Draft RFP Cost Estimate
Not Started
15
5/12/2016
6/2/2016
-60
2017
57
$200,000
DI
$200,000
--
2018
58
$150,000
DI
$150,000
--
2019
5A
$700,000
ACNP
$700,000
0951-694-I
2020
5A
$1,050,000
ACNP
$1,050,000
0951-694-I
2017
62
$5,287,472
ACNP
$5,287,472
0951-694-I
2018
62
$250,000
ACNP
$250,000
0951-694-I
2017
52
2017
01
Page 4 of 22
Production or LDCA Month: October 2016
FPID / FM#
425960.4
Project Description
PALM BEACH COUNTY PUSH-BUTTON CONTRACT FOR
SIGNALIZATION
Jose Guerrero
County:
Float
(Days) Milestone
TRAFFIC OPS PUSH-BUTTON CONTRACT
Exec PDE
Exec Design
Production
10/03/2016
2
Public Hear.
Initial Engin.
TLH or PSU
12/05/2016
0
Sub FHWA
Constructability
Letting
02/03/2017
0
LDCA
Utilities Clear
PALM BEACH
4 - MISCELLANEOUS
Permits Clear
Work Mix:
TRAFFIC CONTROL DEVICES/SYSTEM
R/W Certified
Federal Oversight
Thursday, July 14, 2016
Mile Post To:
Float
(Months)
Milestone
Contract Class:
Mile Post From:
Float
(Days) Milestone
Extra Description
Biddability
Project Length:
FY
PH
SEQ
Phase Total
Fund Code
Fund(PDC)
Fed Aid
2017
52
01
$1,000,000
DS
$1,000,000
--
2017
62
$144,775
DS
$144,775
--
Page 5 of 22
Production or LDCA Month: November 2016
FPID / FM#
434273.2
Project Description
Extra Description
I-95/SR-9 FR C-18 TO PALM BEACH/ MARTIN COUNTYLINE
Betsy Jeffers
County:
Contract Class:
1 - TO BE LET
Work Mix:
RESURFACING
Milestone
LET WITH 434273-1 32-02 FOR DESIGN/PAVEMENT DATA REQUIEMENTS **SEE WP45
FOR ADDITIONAL PROJECT COMMENTS**
PALM BEACH
Lead Project:
434273.1
Let Together:
434273.1
434273.2
Float
(Days) Milestone
Exec PDE
Exec Design
11/07/2014A
-
Public Hear.
Initial Engin.
Sub FHWA
Constructability 03/17/2016A
-
LDCA
Utilities Clear
06/22/2016A
-
Permits Clear
06/20/2016A
-
R/W Certified
06/10/2016A
-
07/28/2016
3
Biddability
Mile Post From:
44.005
Federal Oversight
Thursday, July 14, 2016
Mile Post To:
46.018
Project Length:
Float
(Days) Milestone
Float
(Months)
Production
11/07/2016
0
TLH or PSU
12/27/2016
0
Letting
02/22/2017
0
2.013
FY
PH
2015
32
2016
32
2017
52
2017
62
SEQ
01
Phase Total
Fund Code
Fund(PDC)
Fed Aid
$162,960
DDR
$9,159
--
DDR
$153,801
--
$7,267
DDR
$7,267
--
$4,836,921
ACNP
$4,836,921
0952-156-I
$367,659
ACNP
$367,659
0952-156-I
Page 6 of 22
Production or LDCA Month: December 2016
FPID / FM#
229664.4
Project Description
Extra Description
SR-7 FROM SR-704/OKEECHOBEE BLVD TO 60TH STREET
Fausto Gomez
County:
Contract Class:
1 - TO BE LET
Work Mix:
ADD LANES & RECONSTRUCT
Mile Post From:
0.058
Mile Post To:
Production Meeting Comments:
SOUTH PROJECT 2015 MPO PRIORITY #2; EXISTING 2 LANE TO 4 LANE DIVIDED
HWY PH6203=MATERIALS TESTING; 60 DAY AD EXCEPTION APPROVED BY
PH6203=MATERIALS TESTING BRIAN BLANCHARD 1/14/16, SINCE LETTING MOVED
FY 2016 TO 2017 60 DAY AD REQUIRED
PALM BEACH
4.486
Project Length:
* Back to 60 day Advertisement.
* Environmental cert waiting on approval from
agencies.
LYONS ROAD FROM NORTE LAGO TO PINE SPRINGS DRIVE
County:
Exec PDE
Exec Design
Public Hear.
Initial Engin.
03/18/2015A
Sub FHWA
Constructability 07/30/2015A
LDCA
Utilities Clear
10/21/2015A
-
Permits Clear
06/17/2016
-30
R/W Certified
12/16/2015A
-
Biddability
10/21/2015A
-
01/30/2017
-2
Letting
04/26/2017
-3
In Progress
15
5/26/2016
6/16/2016
-30
PM
Issue SFWMD/SJRWMD ERP Permit
In Progress
8
6/7/2016
6/16/2016
-30
4751-171-P
DR
All Permits Clear
Not Started
1
6/17/2016
6/17/2016
-30
$46,215
4751-171-P
PM
Receive Permit Clear Letter
Not Started
1
6/20/2016
6/20/2016
-30
ACSU
$261,871
4751-171-P
PM
Project Kickoff Meeting/Plans in District (Revival)
Not Started
1
6/21/2016
6/21/2016
-30
SU
$100,000
4751-171-P
SU
$1,780,612
4751-171-P
Fed Aid
Resp.
2017
52
01
$13,754,382
ACSU
$5,131,974
4751-171-P
PM
01
DDR
$218,223
4751-171-P
01
SU
$8,404,185
ACSU
62
$2,188,698
Critical Path Activity
Exec PDE
Exec Design
11/26/2014A
-
Production
12/05/2016
-5
Public Hear.
Initial Engin.
10/07/2015A
-
TLH or PSU
01/30/2017
-6
Sub FHWA
Constructability 03/09/2016A
-
Letting
03/29/2017
-5
LDCA
Utilities Clear
07/20/2016
-23
Permits Clear
06/03/2016A
-
06/09/2016A
-
08/08/2016
-89
MISCELLANEOUS CONSTRUCTION
Biddability
Mile Post From:
1.810
0.693
* Add LFA hammock after implementing SCR to
move Production to 12/16 and Letting 03/2017.
* UWHC LF Agreement under phase 52-02. Will
encumber with letting. No activities added, per K.
McLean.
FY
PH
2015
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
LFA Process Starts (Use LFA Checklist)
Not Started
0
3/4/2016
3/4/2016
-89
PM
Obtain Commitment Letter from Agency
Not Started
1
3/4/2016
3/4/2016
-89
9048-149-C
PM
Prepare LFA Package
Not Started
5
3/7/2016
3/11/2016
-89
$1,691,247
9048-150-C
PM
Obtain LFA Scope Approval from Program Management
Engineer
Not Started
5
3/14/2016
3/18/2016
-89
SA
$1,664,303
9048-150-C
PM
Submit Complete LFA Package to JC / CC
Not Started
1
3/21/2016
3/21/2016
-89
02
LF
$26,207
--
03
LF
$40,567
--
HSP
$233,852
9048-150-C
SA
$50,000
9048-150-C
SA
$137,883
9048-150-C
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
32
$365,127
HSP
$365,127
9048-149-C
PM
2016
32
$37,872
SA
$37,872
9048-149-C
2017
32
$13,487
SA
$13,487
2017
52
$3,422,324
CM
01
2017
Thursday, July 14, 2016
TLH or PSU
-
Issue COE Permit
Fund(PDC)
Work Mix:
Federal Oversight
-
Tot Float
Fund Code
1 - TO BE LET
Production Meeting Comments:
-2
Late Fin
Date
Phase Total
Contract Class:
Project Length:
12/05/2016
Late Start
Date
SEQ
R/W Certified
2.503
Production
Rem Dur
PH
NPV=9041611 RECONSTRUCT THE ROADWAY TO PROVIDE ADEQUATE
SUPERELEVATION TO THE CURVES. D4-022 PROPOSED REF#. SHSP = #4 -LANE
DEPARTURE CRASHES PH5202: PALM BEACH COUNTY LFA UTILITY WORK BY
HIGHWAY CONTRACTOR. PH5203: PALM BEACH COUNTY LFA FOR TURN LANE
ADDITION
PALM BEACH
Mile Post To:
Float
(Months)
Status
FY
2017
Thuc Le
Float
(Days) Milestone
4.428
Federal Oversight
435101.1
Float
(Days) Milestone
Milestone
62
SEQ
01
$421,735
Critical Path Activity
Page 7 of 22
Production or LDCA Month: January 2017
FPID / FM#
Thursday, July 14, 2016
Project Description
Extra Description
Milestone
Float
(Days) Milestone
Float
(Days) Milestone
Float
(Months)
Page 8 of 22
229664.3
SR-7 FROM 60TH STREET TO NORTH LAKE BLVD.
Fausto Gomez
Contract Class:
County:
(NORTH PROJECT) 2015 MPO PRIORITY #1; NEW ALIGNMENT, 4 LANE DIVIDED HWY
PALM BEACH
1 - TO BE LET
Work Mix:
NEW ROAD CONSTRUCTION
Mile Post From:
4.486
Production Meeting Comments:
Mile Post To:
8.589
Project Length:
Exec Design
Production
01/03/2017
-1
Public Hear.
Initial Engin.
03/16/2015A
-
TLH or PSU
02/27/2017
-1
Sub FHWA
Constructability 05/04/2016A
-
Letting
05/24/2017
-2
LDCA
Utilities Clear
09/12/2016
-6
Permits Clear
09/12/2016
32
R/W Certified
12/14/2016
34
Biddability
09/29/2016
-6
4.103
* Changed to a 60 day advertisement as
REQUIRED by Central Office for all Add Lanes after
1/2015.
FY
PH
2014
32
SEQ
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Receive Color-Coded Plans and Schedules
Not Started
40
6/30/2016
8/25/2016
-6
PM
Receive Signed Agreement from UAO
Not Started
40
6/30/2016
8/25/2016
-6
Not Started
10
8/26/2016
9/9/2016
-6
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
$246,633
DDR
$56,274
--
PM
DEMW
$55,809
--
Federal Oversight
Critical Path Activity
DEMW
$134,550
--
UT
Receive and Review Utility Certification Pkg for
Completeness
2015
32
$456,597
DDR
$456,597
--
UT
Utilities Certified
Not Started
1
9/12/2016
9/12/2016
-6
2015
41
$3,706
SU
$3,706
4752-035-P
PM
Receive Utilities Certification Letter
Not Started
1
9/13/2016
9/13/2016
-6
2016
41
$6,575
SU
$6,575
4752-035-P
2017
41
$27,718
DIH
$18,000
4752-035-P
SU
$9,718
4752-035-P
2017
43
$358,000
DDR
$358,000
4752-035-P
2018
43
$389,025
DS
$239,025
4752-035-P
SU
$150,000
4752-035-P
2019
43
$126,876
SU
$126,876
4752-035-P
2020
43
$217,938
DDR
$217,938
4752-035-P
2021
43
$371,436
SU
$371,436
4752-035-P
2015
4B
$16,131
SU
$16,131
4752-035-P
2016
4B
$26,254
DDR
$3,867
4752-035-P
SU
$22,387
4752-035-P
DDR
$14,002
4752-035-P
SU
$24,501
4752-035-P
$34,000
SU
$34,000
4752-035-P
$42,534,427
ACSU
$1,859,763
4752-036-P
01
DDR
$4,291,766
4752-036-P
01
DS
$21,979,622
4752-036-P
01
SA
$9,958,955
4752-036-P
01
SU
$4,444,321
4752-036-P
DDR
$76,875
--
DDR
$152,000
--
DDR
$2,661,987
--
DS
$2,806,022
--
2017
4B
2018
4B
2017
52
2017
Thursday, July 14, 2016
Exec PDE
62
$38,503
01
$5,696,884
Page 9 of 22
Production or LDCA Month: January 2017
FPID / FM#
233166.2
Project Description
Extra Description
SR-808/GLADES ROAD FROM SR-7 TO SR-5/US-1
Anson Sonnett
County:
Contract Class:
1 - TO BE LET
Work Mix:
INTERSECTION IMPROVEMENT
Mile Post From:
0.000
Production Meeting Comments:
Federal Oversight
Thursday, July 14, 2016
TSM PROJECT. ADDITIONAL WESTBOUND LANE FROM I-95 TO AIRPORT ROAD
DELETED WHICH INCLUDED 2015 MPO PRIORITY #5 PER MPO REQUEST-5-18-16
PALM BEACH
Mile Post To:
7.615
Project Length:
Exec PDE
05/13/2011A
-
Float
(Days) Milestone
Exec Design
04/30/2015A
Public Hear.
Initial Engin.
Sub FHWA
Constructability
LDCA
7.615
* Exception granted for Central Office to let this
project even though it is state funded for Phase 5X.
Float
(Days) Milestone
Milestone
Float
(Months)
-
Production
01/03/2017
-1
05/06/2016A
-
TLH or PSU
02/27/2017
-1
07/21/2016
-18
Letting
04/26/2017
-1
Utilities Clear
09/29/2016
6
Permits Clear
09/29/2016
57
R/W Certified
09/29/2016
29
Biddability
10/11/2016
-18
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Prepare and Distribute Plans with Matrix to UAO
In Progress
3
7/8/2016
7/12/2016
-1
DR
Review and Accept Drainage Report
Not Started
20
6/14/2016
7/12/2016
-18
0761-018-P
PM
Constructability/Submit Plans to PM
Not Started
1
7/13/2016
7/13/2016
-18
$25,377
0761-018-P
PM
PM Reviews Constructability Plans for Completeness
Not Started
5
7/14/2016
7/20/2016
-18
SA
$5,700
0761-018-P
PM
Constructability Plans to Reviewers
Not Started
1
7/21/2016
7/21/2016
-18
$4,832,053
DS
$4,832,053
--
57
$10,000
DDR
$10,000
--
62
$375,754
DDR
$25,625
--
DS
$350,129
--
FY
PH
2011
SEQ
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
22
$2,683,586
SU
$2,683,586
0761-016-P
PM
2012
22
$12,005
DDR
$12,005
--
2015
32
$1,304,260
SU
$1,304,260
2016
32
$25,377
ACSU
2017
32
$5,700
2017
52
2016
2017
01
Critical Path Activity
Page 10 of 22
Production or LDCA Month: January 2017
FPID / FM#
434427.1
Project Description
Extra Description
SR-80/US-98 FROM R/R TRACKS TO CR-880
Auraliz Benitez
County:
Contract Class:
1 - TO BE LET
Work Mix:
RESURFACING
Mile Post From:
3.439
Production Meeting Comments:
Federal Oversight
2015 MPO PRIORITY #12-LI FOR POSSIBLE LIGHTING AT CR-880 32-02 FOR LIGHTING
ANALYSIS AT CR-880
PALM BEACH
Mile Post To:
18.246
Project Length:
Float
(Days) Milestone
Float
(Days) Milestone
Exec PDE
Exec Design
Public Hear.
Initial Engin.
02/12/2016A
Sub FHWA
Constructability
07/21/2016
LDCA
Utilities Clear
09/22/2016
-24
Permits Clear
12/17/2015A
-
R/W Certified
09/22/2016
43
Biddability
10/04/2016
-24
14.807
Float
(Months)
Production
01/03/2017
-2
-
TLH or PSU
05/30/2017
0
1
Letting
07/26/2017
0
* APP project, advance Letting to 5/2017.
FY
PH
2015
2016
2018
Thursday, July 14, 2016
Milestone
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Utility Design Conference
Not Started
1
6/6/2016
6/6/2016
-24
PM
Prepare and Distribute Last Prints to UAO
Not Started
5
6/7/2016
6/13/2016
-24
--
PM
Review and Approve Pavement Design Package
In Progress
1
7/8/2016
7/8/2016
-1
$60,572
--
PM
Constructability/Submit Plans to PM
Not Started
1
7/11/2016
7/11/2016
-1
DDR
$6,055,797
--
RL
Prepare Rail Agreement
Not Started
15
7/12/2016
8/1/2016
-1
01
DS
$474,834
--
01
SA
$7,037,209
--
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
32
$169,616
DDR
$169,616
--
PM
32
$101,359
DDR
$14,917
--
DDR
$25,870
DDR
52
SEQ
01
$13,567,840
2017
56
$25,000
DDR
$25,000
--
2016
57
$20,000
DDR
$20,000
--
2018
62
$2,236,638
DDR
$45,645
--
DDR
$2,190,993
--
Critical Path Activity
Page 11 of 22
Production or LDCA Month: January 2017
FPID / FM#
435144.1
Project Description
Extra Description
SR-708/BLUE HERON FR. 200FT W. OF AVENUE "S" TO 200FT E.
OF AVENUE "S"
Scott Thurman
County:
PALM BEACH
Contract Class:
7 - DISTRICT CONTRACT
Work Mix:
INTERSECTION IMPROVEMENT
Mile Post From:
1.980
Production Meeting Comments:
Federal Oversight
Mile Post To:
2.056
Project Length:
* Deleting Phase 56 funding.
* BDI for Letting.
INTERSECTION IMPROVEMENTS INCLUDING RECONSTRUCTION OF SIDEWALK AND
EDGE OF PAVEMENT TO INCREASE CORNER RADII TO ACCOMODATE HEAVY
VEHICLE TURNING PATHS & REDUCE PED CONFLICT ON SIDEWALK IN ALL 4
QUADRANTS. INCLUDES RELOCATING SIGNAL CONTROLLER BOX, UPGRADE
SIGNAL POLES TO MAST ARMS, INSTALL PED SIGNALS ON ALL 4 CORNERS &
RESURFACE ENTIRE INTERSECTION
Float
(Days) Milestone
Float
(Months)
Exec PDE
Exec Design
06/18/2014A
-
Production
01/03/2017
-2
Public Hear.
Initial Engin.
11/25/2014A
-
TLH or PSU
03/06/2017
-2
Sub FHWA
Constructability 07/22/2015A
-
Letting
05/05/2017
-2
LDCA
Utilities Clear
09/06/2016
5
Permits Clear
11/20/2014A
-
R/W Certified
12/09/2016
-38
Biddability
09/16/2016
5
0.076
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
Critical Path Activity
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
32
$263,735
DDR
$263,735
--
RW
Acquisition Agent Prepares Suit Information and Submits
to Coordinator
Not Started
30
5/16/2016
6/14/2016
-56
2015
32
$5,103
DS
$5,103
--
RW
Suit Coordinator Sends Suit Pkg to Legal Department
Not Started
20
6/15/2016
7/13/2016
-39
2015
41
$4,808
DIH
$4,808
--
RW
Legal Department Reviews Suit Pkg
Not Started
14
7/14/2016
8/2/2016
-39
2016
41
$29,421
DIH
$29,421
--
RW
Suit Filed
Not Started
1
8/3/2016
8/3/2016
-39
2017
41
$20,938
DIH
$20,938
--
RW
Order of Taking (Docketed)
Not Started
55
8/24/2016
11/9/2016
-39
2016
43
$20
DDR
$20
--
2017
43
$84,980
DDR
$84,980
--
2018
43
$263,428
DDR
$263,428
--
2019
43
$51,274
DDR
$51,274
--
2015
4B
$74,590
DDR
$74,590
--
2016
4B
$39,975
DDR
$39,975
--
2017
4B
$160,435
DDR
$160,435
--
2017
52
$573,962
DS
$573,962
--
2017
62
$131,153
DDR
$1,538
--
DDR
$20,500
--
DDR
$73,842
--
DS
$35,273
--
DS
$250
--
FY
PH
2014
2015
Thursday, July 14, 2016
Float
(Days) Milestone
Milestone
C8
SEQ
01
$250
Page 12 of 22
Production or LDCA Month: January 2017
FPID / FM#
437165.1
Project Description
Extra Description
SR-804/BOYNTON BEACH BLVD AT WINCHESTER PARK BLVD
Brent Lee-Shue-Ling
County:
Milestone
REPLACE SIGNAL AT INTERSECTION WITH MAST ARMS
PALM BEACH
Float
(Days) Milestone
Float
(Days) Milestone
Exec PDE
Exec Design
Public Hear.
Initial Engin.
Sub FHWA
Constructability
07/21/2016
7
LDCA
Utilities Clear
09/30/2016
1
Contract Class:
7 - DISTRICT CONTRACT
Permits Clear
11/23/2015A
-
Work Mix:
TRAFFIC SIGNAL UPDATE
R/W Certified
02/28/2017
37
Biddability
10/04/2016
1
Mile Post From:
6.918
Production Meeting Comments:
Federal Oversight
Thursday, July 14, 2016
Mile Post To:
6.919
Project Length:
0.001
Float
(Months)
Production
01/03/2017
0
TLH or PSU
03/06/2017
0
Letting
05/05/2017
0
* RW tied to Ship.
FY
PH
2015
SEQ
Phase Total
Fund Code
Fund(PDC)
Fed Aid
32
$24,003
DDR
$24,003
--
2016
32
$7,173
DDR
$7,173
--
2016
41
$12,132
DIH
$12,132
--
2017
41
$41,867
DIH
$41,867
--
2016
43
$1,336
DDR
$1,336
--
2017
43
$30,663
DDR
$30,663
--
2018
43
$30,847
DDR
$30,847
--
2015
4B
$23,895
DS
$23,895
--
2016
4B
$11,317
DS
$11,317
--
2017
4B
$171,787
DS
$171,787
--
2017
52
$384,099
DS
$384,099
--
2017
62
$100,259
DS
$100,259
--
01
Page 13 of 22
Production or LDCA Month: February 2017
FPID / FM#
413265.1
Project Description
Extra Description
SR-9/I-95 @ PGA BOULEVARD/CENTRAL BOULEVARD
Bing Wang
County:
Float
(Days) Milestone
Milestone
IMR - INTERCHANGE MODIFICATION REPORT IJR - INTERCHANGE JUSTIFICATION
REPORT PH2202=VALUE ENGINEERING WORKSHOP
PALM BEACH
Exec PDE
Float
(Days) Milestone
05/17/2013A
-
Exec Design
06/11/2016
Public Hear.
09/20/2016
-23
Initial Engin.
Sub FHWA
12/12/2016
-57
Constructability
LDCA
02/10/2017
-57
-96
Production
10/05/2020
0
03/05/2018
13
TLH or PSU
05/15/2023
0
12/09/2019
190
Letting
08/30/2023
0
Utilities Clear
06/05/2020
318
Contract Class:
1 - TO BE LET
Permits Clear
04/30/2020
170
Work Mix:
INTERCHANGE - ADD LANES
R/W Certified
04/30/2020
169
Biddability
06/09/2020
173
Mile Post From:
36.753
Production Meeting Comments:
Mile Post To:
38.763
Project Length:
2.010
* Project is no longer APP for Phase 32.
* Project is APP for Phase 5X on 2/2021.
* Needs to be discovered with consultant and PM.
FY
PH
2013
2016
SEQ
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Negotiations (Design)
Not Started
1
4/6/2016
4/6/2016
-96
PO
Staff/Prices Set (Design)
Not Started
1
4/29/2016
4/29/2016
-96
--
PM
Value Engineering Study
Not Started
10
4/28/2016
5/11/2016
-50
Fund Code
Fund(PDC)
Fed Aid
Resp.
22
$1,397,625
DDR
$1,397,625
--
PO
22
$167,789
DS
$28,756
--
DS
$139,033
Critical Path Activity
2016
32
$2,500,000
DDR
$2,500,000
--
PO
Revised AFP (Design)
Not Started
1
5/13/2016
5/13/2016
-96
2021
41
$180,000
DIH
$180,000
--
EM
Review Draft Endg Species Biol Assessment
Not Started
20
4/20/2016
5/17/2016
-56
2021
43
$10,023,567
DDR
$10,023,567
--
2021
4B
$313,500
DDR
$313,500
--
2024
52
$64,167,905
DI
$6,077,290
--
STED
$58,090,615
--
01
01
Thursday, July 14, 2016
Status
Phase Total
Federal Oversight
Float
(Months)
2024
56
$50,000
DI
$50,000
--
2024
62
$9,599,196
DI
$778,737
--
DI
$8,820,459
--
Page 14 of 22
Production or LDCA Month: February 2017
FPID / FM#
427938.1
Project Description
Extra Description
SR-7/US-441 FROM BROWARD/PB CO/LINE TO SR-808/GLADES
ROAD
Brent Lee-Shue-Ling
County:
PALM BEACH
Contract Class:
1 - TO BE LET
Work Mix:
BIKE LANE/SIDEWALK
Mile Post From:
0.000
Production Meeting Comments:
Federal Oversight
Mile Post To:
2.600
Project Length:
TRANSIT/NEPA PD&E STUDY; PREVIOUSLY 425063-3 2015 MPO PRIORITY #4
3204=GEOTECH SERVICES CONSTRUCT BUFFERED BIKE LANES, SHARED USE
PATH & SIDEWALKS SIGNAL, TRANSIT, AND INTERSECTION IMPROVEMENTS.
PH3203= UTILITY COORDINATION PH6203=COMMERCIAL MATERIAL TESTING
Exec PDE
03/31/2011A
-
Float
(Days) Milestone
Exec Design
Float
(Months)
Production
02/06/2017
-2
Public Hear.
Initial Engin.
10/20/2015A
-
TLH or PSU
03/27/2017
-2
Sub FHWA
Constructability
08/01/2016
4
Letting
05/24/2017
-2
LDCA
Utilities Clear
11/15/2016
-16
Permits Clear
10/10/2016
-34
R/W Certified
10/10/2016
51
Biddability
11/17/2016
-20
2.600
* APP project advanced to FY 2017.
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
Critical Path Activity
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
22
$1,760,634
SU
$1,760,634
4751-137-P
DR
File SFWMD/SJRWMD ERP Permit Application Package
In Progress
13
5/20/2016
6/8/2016
-34
2012
22
$6,003
DDR
$6,003
--
PM
Constructability/Submit Plans to PM
Not Started
1
6/10/2016
6/10/2016
-20
2015
32
$361,924
SU
$7,013
4752-037-P
PM
Constructability TIP/STIP Compliance Check
Not Started
5
6/13/2016
6/17/2016
-20
SU
$18,607
4752-037-P
PM
Prepare and Submit Subsurface Utility Locations Request In Progress
4
6/23/2016
6/28/2016
-11
SU
$24,675
4752-037-P
PM
Prepare and Distribute Plans with Matrix to UAO
10
6/16/2016
6/29/2016
-16
SU
$311,629
4752-037-P
ACSU
$10,371
4752-037-P
ACSU
$105,109
4752-037-P
DDR
$3,402,899
--
01
DS
$3,563,369
--
01
SU
$1,741,408
--
FY
PH
2011
2016
2017
Thursday, July 14, 2016
Float
(Days) Milestone
Milestone
SEQ
32
52
$115,480
01
$8,707,676
2017
56
$35,000
DDR
$35,000
--
2017
62
$1,293,936
DS
$20,500
--
DS
$24,395
--
DS
$1,249,041
--
In Progress
Page 15 of 22
Production or LDCA Month: April 2017
FPID / FM#
428718.1
Project Description
Extra Description
SR-5/US-1 FROM S OF BEACH ROAD TO JUST N OF COUNTYLINE
ROAD
Robert Lopes
County:
Contract Class:
1 - TO BE LET
Work Mix:
RESURFACING
Mile Post From:
11.011
Production Meeting Comments:
Federal Oversight
PALM BEACH
Mile Post To:
12.411
Project Length:
PH5202= TRANSPORTATION ALTERNATIVE (TAP) FUNDING (2015 MPO TAP
PRIORITY #2) TO THE VILLAGE OF TEQUESTA --- ADDED TO THE FDOT RRR
JOB.THIS FUNDING INCLUDES CONSTRUCTION OF SIDEWALKS,CROSSWALKS,BIKE
LANES, AND PEDESTRIAN LIGHTING. LANE ELIMINATION
Float
(Days) Milestone
Exec PDE
Exec Design
Public Hear.
Initial Engin.
Sub FHWA
LDCA
Float
(Days) Milestone
05/02/2012A
-
Constructability
08/29/2016
-26
Utilities Clear
11/07/2016
-22
Permits Clear
11/07/2016
83
R/W Certified
11/07/2016
-19
Biddability
12/20/2016
-20
Float
(Months)
Production
04/03/2017
-2
TLH or PSU
05/30/2017
-2
Letting
07/26/2017
-2
1.400
* Project is no longer APP, as of 4/2015.
* 3R lane mile target reductions moved project's
funding out.
* MPO requesting bike lanes.
* Lane elimination.
* LFA needed with Village of Tequesta.
* Adding turn lane.
* Phase 36 & 56 to be added.
* Adding UWHC.
FY
PH
2012
2016
SEQ
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Prepare Constructability Roadway Plans
In Progress
20
5/12/2016
6/9/2016
-40
GT
Review and Accept Structures Geotech Report
Not Started
20
5/12/2016
6/9/2016
-40
In Progress
4
6/17/2016
6/22/2016
-15
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
32
$304,827
DDR
$304,827
--
PM
32
$206,290
DDR
$191,856
--
Critical Path Activity
DS
$14,434
--
PM
Obtain LFA Scope Approval from Program Management
Engineer
2017
32
$46,735
DDR
$46,735
--
PM
Submit Complete LFA Package to JC / CC
Not Started
1
6/23/2016
6/23/2016
-15
2017
41
$10,000
DIH
$10,000
--
PI
Generate Mailing List/Labels (Public Info Office)
Not Started
30
5/18/2016
6/29/2016
-36
2018
52
$2,833,670
DDR
$2,143,280
--
TALU
$690,390
4854-087-P
DS
$21,949
--
DS
$582,763
--
01
02
2018
Thursday, July 14, 2016
Milestone
62
$604,712
Page 16 of 22
Production or LDCA Month: April 2017
FPID / FM#
433109.5
Project Description
Extra Description
SR-9/I-95 FROM SOUTH OF GLADES RD. TO SOUTH OF LINTON
BLVD.
Vanita Saini
County:
PALM BEACH
Contract Class:
9 - DESIGN BUILD
Work Mix:
ADD SPECIAL USE LANE
Mile Post From:
2.405
Production Meeting Comments:
Federal Oversight
Mile Post To:
3B-2 PHC210= CONTAMINATION & LEVEL II TESTING PHC240= MITIGATION PH5A01=
MILESTONE BONUS PH5301= PTO PURCHASE/TURNPIKE TOLL EQUIPMENT PH6240=
MATERIAL LAB TESTING (OFF-SIGHT) PH5601= CONSTRUCTION UTILITY PH5701=
RAIL COORDINATION PH3601= DESIGN UTILITY PH5801= FHP
Float
(Days) Milestone
Float
(Days) Milestone
Exec PDE
Exec Design
Public Hear.
Initial Engin.
11/16/2016
Sub FHWA
Constructability
03/03/2017
LDCA
Utilities Clear
02/15/2017
36
02/15/2017
49
Float
(Months)
Production
04/03/2017
-2
-21
TLH or PSU
02/26/2018
151
-31
Letting
09/05/2018
0
Permits Clear
R/W Certified
Biddability
8.100
Project Length:
5.695
* Project is APP for Phases 36, 52, 56, 57, 58 and
62. Phase 52 could advance to 9/2017.
FY
PH
2019
SEQ
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Prepare NEPA Re Evaluation for Preliminary Eng
Not Started
60
6/23/2016
9/16/2016
-11
PM
Prepare Draft RFP Package and Concept Plans
Not Started
100
5/25/2016
10/14/2016
-31
0951-695-I
PM
Draft RFP to DOT PM
Not Started
1
10/17/2016
10/17/2016
-31
$50,354,131
0951-695-I
PM
Prepare and Submit Subsurface Utility Locations Request Not Started
5
10/18/2016
10/24/2016
-31
EM
FHWA Reviews NEPA Re Evaluation for Preliminary Eng
40
9/19/2016
11/14/2016
-11
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
32
$225,620
DI
$225,620
--
EM
2018
36
$300,000
DDR
$300,000
--
2019
52
$80,000,000
ACNP
$29,645,869
DI
01
01
2019
56
$1,000,000
DI
$1,000,000
--
2019
57
$450,000
DI
$450,000
--
2020
57
$175,000
DI
$175,000
--
2019
58
$100,000
GMR
$100,000
--
2020
58
$100,000
DI
$100,000
--
2021
58
$100,000
DS
$100,000
--
2020
5A
$200,000
ACNP
$200,000
0951-695-I
2022
5A
$2,000,000
SA
$2,000,000
0951-695-I
2019
62
$8,420,002
ACNP
$60,000
0951-695-I
ACNP
$7,356,148
0951-695-I
DS
$1,003,854
0951-695-I
ACNP
$240,000
0951-695-I
2020
Thursday, July 14, 2016
Milestone
62
$240,000
Critical Path Activity
Not Started
Page 17 of 22
Production or LDCA Month: June 2017
FPID / FM#
429250.2
Project Description
Extra Description
Milestone
PALM BEACH COUNTY PAVEMENT MARKING AND SIGNING
Jose Guerrero
County:
PALM BEACH
Float
(Days) Milestone
Exec Design
Production
06/05/2017
1
Public Hear.
Initial Engin.
TLH or PSU
08/07/2017
0
Sub FHWA
Constructability
Letting
10/06/2017
0
LDCA
Utilities Clear
4 - MISCELLANEOUS
Permits Clear
Work Mix:
SIGNING/PAVEMENT MARKINGS
R/W Certified
Federal Oversight
Thursday, July 14, 2016
Mile Post To:
Float
(Months)
Exec PDE
Contract Class:
Mile Post From:
Float
(Days) Milestone
Biddability
Project Length:
FY
PH
SEQ
Phase Total
Fund Code
Fund(PDC)
Fed Aid
2018
52
01
$374,331
DDR
$374,331
--
2018
62
$80,551
DDR
$80,551
--
Page 18 of 22
Production or LDCA Month: July 2017
FPID / FM#
434948.2
Project Description
Extra Description
NORTHWOOD CONNECTION FROM CSX MAINLINE TO FEC
MAINLINE
Casey Graham
County:
Milestone
TIGER GRANT 2013 NEW SEGMENT CONNECTION FROM CSX SEGMENT 93929001
MP 967.84 TO FEC SEGMENT 93929015 MP 297.43 (SOUTH)
PALM BEACH
Float
(Days) Milestone
Float
(Days) Milestone
Exec PDE
Exec Design
Public Hear.
Initial Engin.
Sub FHWA
Constructability 06/10/2016A
LDCA
Utilities Clear
02/20/2017
58
-
Contract Class:
1 - TO BE LET
Permits Clear
02/20/2017
27
Work Mix:
RAIL CAPACITY PROJECT
R/W Certified
05/31/2017
-49
Biddability
03/09/2017
27
Mile Post From:
967.839 Mile Post To:
Production Meeting Comments:
968.087 Project Length:
0.248
Production
07/03/2017
-2
TLH or PSU
08/28/2017
-3
Letting
10/25/2017
-2
* Co-project manager = Marjorie Hilaire
FY
PH
2014
32
SEQ
2015
2016
2017
32
32
32
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
FDOT Initial RE Offer
Not Started
1
5/11/2016
5/11/2016
-74
RW
Initiation of Negotiations
Not Started
14
4/28/2016
5/11/2016
-74
--
RW
FDOT Initial RE Offer
Not Started
1
6/7/2016
6/7/2016
-47
$255,866
--
RW
Initiation of Negotiations
Not Started
14
5/25/2016
6/7/2016
-47
TRIP
$11,495
--
RW
Acquisition Agent Prepares Suit Information and Submits
to Coordinator
Not Started
30
10/8/2016
11/6/2016
-74
DPTO
$117,076
--
DPTO
$147,865
--
DS
$173,450
--
DPTO
$201,391
--
DS
$48,609
--
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
$189,500
DDR
$94,003
--
RW
DPTO
$19,803
--
DS
$75,694
DS
Federal Oversight
$267,361
$438,391
$250,000
2014
41
$765
DIH
$765
--
2015
41
$45,198
DIH
$45,198
--
2016
41
$109,288
DIH
$109,288
--
2017
41
$15,888
DIH
$15,888
--
2018
41
$13,200
DIH
$13,200
--
2019
41
$26,660
DIH
$26,660
--
2015
42
$393,239
DPTO
$393,239
--
2016
42
$23,624
DPTO
$23,624
--
2017
42
$150,003
DS
$150,003
--
2019
42
$8,636
TRIP
$8,636
--
2016
43
$2,525,639
DPTO
$269,888
--
GMR
$1,354,000
--
TRIP
$901,751
--
DPTO
$1,029,513
--
TRIP
$2,874,735
--
2017
Thursday, July 14, 2016
Float
(Months)
43
$3,904,248
2018
43
$827,153
TRIP
$827,153
--
2019
43
$2,820,913
TRIP
$2,820,913
--
2020
43
$616,247
TRIP
$616,247
--
Critical Path Activity
Page 19 of 22
2017
$430,000
DPTO
$170,000
--
GMR
$130,000
--
TRIP
$130,000
--
2015
4B
$303,123
DPTO
$303,123
--
2016
4B
$381,656
DPTO
$175,785
--
TRIP
$205,871
--
DPTO
$88,500
--
DS
$306,663
--
TRIP
$327,220
--
$10,464,310
TRIP
$10,464,310
--
$3,138,343
DS
$338,345
--
GMR
$224,763
--
TIGR
$972,046
--
TRIP
$1,603,189
--
2017
Thursday, July 14, 2016
45
4B
2018
52
2015
56
$722,383
01
2017
57
$160,000
TRIP
$160,000
--
2018
62
$1,164,787
TRIP
$1,164,787
--
Page 20 of 22
Production or LDCA Month: August 2017
FPID / FM#
427516.1
Project Description
Extra Description
SR-9/I-95 FROM THE L30 CANAL TO N. OF GATEWAY BLVD
Carl Dorvil
County:
Contract Class:
1 - TO BE LET
Work Mix:
RESURFACING
Mile Post From:
0.000
Federal Oversight
Thursday, July 14, 2016
SB LIMITS= FROM THE L30 CANAL TO N. OF GATEWAY BLVD. NB LIMITS= FROM S.
OF BOYNTON BCH BLVD TO N. OF GATEWAY BLVD I-95 PAVEMENT REPAIR
LANDSCAPING WAS REMOVED FROM THE PROJECT ESTIMATE ON 5/1/12 **SEE
WP45 FOR ADDITIONAL PROJECT COMMENTS** NORTHBOUND I-95 FROM MP 14.400
TO MP 16.415 AND SB I-95 FROM MP 11.476 TO MP 16.415. THE LIMITS INCLUDES
RAMPS NUMBERS__ 025, 026, 027, 028 AT WOOLBRIGHT ROAD; 029, 030, 031, 032 AT
BOYNTON BCH BLVD; AND 137, 138, 139 AND 140 AT GATEWAY BLVD. PH 3201=FOR
SURVEY DEPT. ONLY; 3202=PVMT CORING-MAT LAB
PALM BEACH
Mile Post To:
16.415
Project Length:
Milestone
Float
(Days) Milestone
Float
(Days) Milestone
Float
(Months)
Exec PDE
Exec Design
09/30/2015A
-
Production
08/07/2017
-1
Public Hear.
Initial Engin.
09/02/2016
-10
TLH or PSU
10/09/2017
-1
Sub FHWA
Constructability
02/15/2017
21
Letting
12/06/2017
-1
LDCA
Utilities Clear
04/27/2017
-10
Permits Clear
04/27/2017
74
R/W Certified
04/27/2017
70
Biddability
05/09/2017
-10
7.598
FY
PH
2011
SEQ
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
Request Structures and/or Roadway Geotech Report
from LAB
Not Started
1
6/27/2016
6/27/2016
-9
PM
Review and Approve Typical Section Package
In Progress
5
6/24/2016
6/30/2016
-10
--
PM
Prepare Initial Eng Roadway Plans and RRR Report
In Progress
5
6/27/2016
7/1/2016
-9
$23,729
0951-636-I
PM
Receive Approved Design Survey (Update Survey)
Not Started
1
7/1/2016
7/1/2016
-5
DS
$644,116
--
PM
Order Utilities Designates
Not Started
5
7/13/2016
7/19/2016
-3
DS
$76,750
0951-636-I
$9,603,666
ACNP
$9,603,666
--
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
32
$267,474
DDR
$267,474
0951-636-I
PM
2012
32
$32,109
DDR
$32,109
0951-636-I
2016
32
$771,557
DDR
$26,962
DDR
2018
52
01
2017
57
$20,000
ACNP
$20,000
--
2018
62
$1,261,053
ACNP
$833,393
--
DDR
$75,000
--
DS
$352,660
--
Critical Path Activity
Page 21 of 22
Production or LDCA Month: October 2017
FPID / FM#
434722.1
Project Description
Extra Description
SR-9/I-95 @ SR-806/ATLANTIC AVENUE INTERCHANGE
Thuc Le
County:
Milestone
NEW SIS/NHS CONNECTOR PROJECT. FROM I-95 PALM BEACH COUNTY
INTERCHANGE MASTER PLAN #432785-1-22-01. C220=CULTURAL RESOURCES
WORK / C210=CONTAMINATION
PALM BEACH
Float
(Days) Milestone
Float
(Days) Milestone
Exec PDE
Exec Design
06/06/2014A
Public Hear.
Initial Engin.
Sub FHWA
Constructability
LDCA
-
Production
10/02/2017
-3
05/04/2015A
-
TLH or PSU
11/27/2017
-3
03/27/2017
73
Letting
02/28/2018
-3
Utilities Clear
07/17/2017
-46
49
Contract Class:
1 - TO BE LET
Permits Clear
06/15/2017
Work Mix:
INTERCHANGE - ADD LANES
R/W Certified
09/14/2017
0
Biddability
07/19/2017
-46
Mile Post From:
0.170
Federal Oversight
Thursday, July 14, 2016
Mile Post To:
7.632
Project Length:
0.964
FY
PH
2014
SEQ
Phase Total
Fund Code
Fund(PDC)
Fed Aid
Resp.
22
$62,197
ACNP
$62,197
0951-670-I
UT
2014
32
$1,071,362
NHPP
$1,071,362
0951-666-I
LG
2015
32
$47,745
DDR
$47,745
--
2016
41
$332
DIH
$332
--
2017
41
$109,667
DIH
$109,667
--
2018
41
$34,000
DIH
$34,000
--
2016
42
$239,575
DDR
$239,575
--
2017
43
$478,304
DS
$478,304
--
2018
43
$842,000
DDR
$815,034
--
DS
$26,966
--
2019
43
$1,549,765
DS
$1,549,765
--
2016
4B
$175,025
DS
$175,025
--
2017
4B
$541,475
DS
$541,475
--
2018
4B
$200,000
DS
$200,000
--
2018
52
$4,130,895
ACNP
$4,130,895
0951-681-I
2018
56
$1,393,048
ACNP
$1,393,048
0951-681-I
2017
57
$450,000
DDR
$450,000
--
2018
62
$612,558
ACNP
$31,194
0951-681-I
ACNP
$488,622
0951-681-I
DS
$92,742
0951-681-I
01
Float
(Months)
Critical Path Activity
Status
Rem Dur
Late Start
Date
Late Fin
Date
Tot Float
DUO Receives and Prepares Compensable
Not Started
Interest/Sends to RW Mapping
Legal Reviews Titles /Provides Determination to DUO
Not Started
and Mapping
DUO/Mapping Receives Determination and Notifies Utility
Not Started
Coordinator/PM
5
5/4/2016
5/10/2016
-46
30
5/11/2016
6/22/2016
-46
1
6/23/2016
6/23/2016
-46
UT
DUO Submit Draft Reimbursable Agreement
Not Started
10
6/24/2016
7/8/2016
-46
PM
Conduct Subsurface Utility Location Survey
Not Started
25
6/30/2016
8/4/2016
-6
UT
Page 22 of 22