Comments
Description
Transcript
Document 2820504
STATE OF FLORIDA CHIPLEY 10 INDEX OF STRUCTURE PLANS 95 75 TALLAHASSEE DEPARTMENT OF TRANSPORTATION SHEET NO. SHEET DESCRIPTION 10 FORT WALTON PENSACOLA JACKSONVILLE BEACH 295 LAKE CITY PANAMA CITY ST AUGUSTINE GAINESVILLE Example 1 Precast Two-Column Pier Sheet 1 of 4 Pier Details Sheet 2 of 4 Pier Details DAYTONA BEACH OCALA DELAND 4 Sheet 3 of 4 Pier Details Sheet 4 of 4 Pier Details PREFABRICATED BRIDGE ELEMENTS AND ORLANDO BEE LINE EXPRESSWAY MELBOURNE COCOA NEW PORT RICHEY 75 Example 2 Precast Two-Column Pier Sheet 1 of 3 Column Details Sheet 2 of 3 Column Details Sheet 3 of 3 Column Details SYSTEMS (PBES) CONCEPTUAL DRAWINGS 4 F L O TAMPA LAKELAND BARTOW ST PETERSBURG R I D A T U S R N P I K E 275 SARASOTA - FT PIERCE 75 BRADENTON 95 Prefabricated Bridge Elements and Systems (PBES) are structural components of a bridge built offsite Example 3 Hybrid C.I.P./Precast Hammerhead Pier Sheet 1 of 6 Pier Details Sheet 2 of 6 Pier Details Sheet 3 of 6 Pier Details Sheet 4 of 6 Pier Details Sheet 5 of 6 Pier Details Sheet 6 of 6 Pier Details Example 4 or in a near site casting yard in order to reduce onsite construction time as compared to conventional WEST PALM BEACH FT MYERS construction methods. PBES components and details will vary from project to project. These drawings 75 are not standards or preferred details; these drawings are concepts intended to assist the Designer in NAPLES FT LAUDERDALE 75 the development of project specific components and details. Notes to Designers have been provided as MIAMI boxed text in the drawings. The information presented in this document should not be relied upon for specific application without competent professional examination and verification of accuracy, suitability, and applicability by a licensed Professional Engineer. Precast Pier Footing KEY WEST Sheet 1 of 3 Pier Footing Details Sheet 2 of 3 Pier Footing Details Sheet 3 of 3 Pier Footing Details Example 5 Precast Bent Cap Sheet 1 of 2 Pile Cap Details STRUCTURE SHOP DRAWINGS Sheet 2 of 2 Pile Cap Details TO BE SUBMITTED TO: Example 6 Precast Bent Cap Sheet 1 of 2 Bent Details Sheet 2 of 2 Bent Details NOT FOR CONSTRUCTION Example 7 Sheet 1 of 1 Example 8 Precast Slab Units with Topping Superstructure Details CONCEPT ONLY PLANS PREPARED BY: Closure Pour Sheet 1 of 3 Connection Details Sheet 2 of 3 Connection Details Sheet 3 of 3 Connection Details ISOMETRIC DRAWINGS PREPARED BY: REFERENCED MANUALS, STANDARDS AND SPECIFICATIONS: Florida Department of Transportation, 2015 Structures Manual Volume 2, Chapter 25 Florida Department of Transportation, 2015 Design Standards Index Drawings: 420, 423, 821, 926, and 21110 NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION. Florida Department of Transportation, 2015 Standard Specifications for Road and Bridge Construction Sections: 400-9 and 926-1 AASHTO LRFD Bridge Design Specifications, Sixth Edition with 2013 Interims Section 5.14.2.4.2 FISCAL YEAR SHEET NO. INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. 1 2" Grout Joint Match-Cast Dowels for insertion into Epoxy Joint Grouted Sleeve Coupler 1 2" Grout Joint Dowels for insertion into Couplers Mechanical Grouted Coupler Reinforcing Coupler System BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE Sleeve System BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 1 OF 4 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 1 - PRECAST TWO-COLUMN PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Require Shop Drawings and Erection Plan. See Structures Consider tolerances and means of The Transfer Template is based on the Prefabricated Precast Pier Cap and provides Detailing Manual, Chapter 25, for items to be included. adjustment for Precast Pedestals. orientation of bar placement in the C.I.P. Footings and orientation of Columns relative to each other for Multi-Column Piers. Use of the optional Closure Pour in the Precast Cap allows construction of the C.I.P. Footing prior to precasting the Pier Cap. ¡ Bridge Precast Pier Cap Optional Closure Pour See Detail "B" ½" Grout Joint (Typ.) A A Grouted Joint accommodates Cap-to-Column fabrication ¡ Column ¡ Column Grouted Joints at Cap-Column Require Contractor to supply interface and Column-Footing three-dimensional transfer template for interface accommodate column proper Footing-to-Column connection placement tolerance. Match-Cast reinforcement placement within C.I.P. Footing. Two-Faced Epoxy Joints are Epoxy Joint (Match-Cast) See Detail "A" used for Column Segments. Precast Colum n Segm ents ( Typ. ) and construction tolerances. Grouted Joint accommodates Column-to-Footing fabrication and construction tolerances. See Detail "B" ½" Grout Joint (Typ.) Provide C.I.P. Footing flatness and elevation tolerances for Column interface. ¡ Pier Prestressed ¡ Column Concrete Piles (Typ.) SECTION A-A ELEVATION NOTES: 1. For Detail "A" at Match-Cast Joint see Sheet 3 of 4. 2. For Detail "B" at ½" Grout Joint see Sheet 4 of 4. 3. For Precast Column Segments, see Sheet 3 of 4. Require one full-scale mock-up of each unique grouted joint. Require component-to-component fit-up in the casting INFORMATION SHOWN IS FOR CONCEPT ONLY. 4. For Precast Pier Cap Details, see Sheet 4 of 4. yard of all components prior to shipping to the erection site. In lieu of component-to-component fit-up, the contractor APPLICATION IS DESIGNER'S RESPONSIBILITY. may demonstrate interfacing elements or precast components do not conflict through the use of a transfer template. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 2 OF 4 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 1 - PRECAST TWO-COLUMN PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS H-Section reduces lifting weights. ¡ Column ¡ Column A ¡ Column A " H" Alignment Key Mechanical Coupler System See Detail 'A' B B Key for alignment of adjacent Precast Column Section at Match-Cast Joint. Match-Cast Joint SECTION A-A SECTION B-B ELEVATION (Typ. @ all Match-Cast Joints) Oversize Couplers two bar sizes to provide ± 12" construction tolerance. Mechanical Couplers ¡ Mechanical Couplers Inside Face Grout Tube (Typ.) C C Grout Tube (Typ.) Couplers and Ties must Match-Cast Joint meet cover requirements. DETAIL 'A' AT MATCH-CAST JOINT INFORMATION SHOWN IS FOR CONCEPT ONLY. SECTION C-C APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 3 OF 4 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 1 - PRECAST TWO-COLUMN PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Optional Closure Pour ¡ Bridge A B C C Size Cap elements for construction B equipment and boom reach using site D specific construction access assessment. D A For over-land projects, include haul route assessment for element sizing. ¡ Pier U-Shape Pier Cap See PBES Example 8 for reduces lifting weight. closure pour concepts. Grout Bed requires highly ELEVATION skilled workers in order to place grout properly. ¡ Column ¡ Pier Grout Tubes Stirrups and Couplers Mechanical must meet cover Coupler requirements. ¡ Pier Mechanical Coupler System See Detail 'B' E E Grout Shim (Typ.) SECTION B-B SECTION D-D SECTION A-A Specify non-metallic shims (left in place) and ¡ Pier DETAIL 'B' maximum shim height. Specialty Engineer is to provide shim placement and loads as part of the Erection Plan requirements. Specify APL approved non-shrink Grout and Saturated Surface Dry (SSD) condition of both interfacing surfaces. Require surfaces and curing be prepared by Manufacturer's recommendations. INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. VIEW C-C BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE SECTION E-E BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 4 OF 4 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 1 - PRECAST TWO-COLUMN PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. Pre-Cast Column Grouted Sleeve Coupler 1 2" Grout Joint with Shim for Grade Control A Modified Special Provision is required for top-of-shaft elevation tolerances and C.I.P. connection reinforcement placement tolerances. Pre-Cast Column Grouted Sleeve Coupler Drilled Shaft Connection Dowels (Plan Location) Inner Cage for Grout Sleeve Connection to Column Drilled Shaft Rebar Cage BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION STRUCTURES DESIGN OFFICE CHECKED BY: CENTRAL OFFICE Tallahassee, Florida 32399-0450 COLUMN DETAILS DEPARTMENT OF TRANSPORTATION SHEET 1 OF 3 XXX MM-YY DESIGNED BY: 605 Suwannee Street, MS 33 REF. DWG. NO. STATE OF FLORIDA XXX MM-YY ROAD NO. COUNTY FINANCIAL PROJECT ID PROJECT NAME: SHEET NO. XXX MM-YY CHECKED BY: XXX MM-YY EXAMPLE 2 - PRECAST TWO-COLUMN PIER PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS A Modified Special Provision Oversize Couplers two bar sizes to Specify APL approved non-shrink is required for top-of-shaft provide ± 12" construction tolerance. Grout and Saturated Surface Dry elevation tolerances and (SSD) condition for both interfacing reinforcement placement surfaces. Require surfaces be tolerances. prepared and cured according to Grout Manufacturer's recommendations. Precast Column Lifting Point (Typ.) Place on Centerline ¡ Column of Column Grouted Splice Grout Ports Coupler (Typ.) (Typ.) Top of Column Grouted Splice Coupler (Typ.) 1 2" Foundation Grout Joint Shim Dowels Specify non-metallic shims (left in place) and maximum shim height. Specialty Engineer to provide shim placement and loads as part of GROUTED SPLICE COUPLER DETAIL SECTION A-A Erection Plan requirements. PRECAST COLUMN NOTE: Reinforcement shown as A A are connected to Drilled Shaft or Footing. Grouted Splice Coupler (Typ.) Column Ties around Couplers must meet Foundation to cover requirements. Precast Column Column Connection Grouted Splice Coupler (Typ.) Joint 1 2" Grout See Detail A Grouted Splice Coupler (Typ.) Top of Foundation Grout Bed requires highly skilled workers Shim for Grade Control 1 2" Foundation to place grout properly. Grout Joint Foundation DETAIL A COLUMN ELEVATION FOUNDATION TO COLUMN CONNECTION (INSIDE FACE OF COLUMN SHOWN) INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: COLUMN DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 2 OF 3 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 2 - PRECAST TWO-COLUMN PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Require the Contractor to supply a three-dimensional transfer template for Column-to-Foundation Connection Reinforcement placement within the C.I.P. Foundation. The Transfer Template provides orientation of bar placement within the Foundation and orientation of Columns in Multi-Column Piers. In the case of a Multi-Column Pier with a Precast Cap, the Column spacing and orientation is critical to ensure fit-up. The critical connection is the Precast Column to Precast Cap; therefore, the Transfer Template for the Foundation is based on the Precast Cap. In this case, the Foundation is cast following the fabrication of the Precast Cap due to the need of a Transfer Template. Using a C.I.P. Cap or segmenting the Precast Cap between Columns and using an optional closure pour to connect the Cap segments allows the Foundation to be cast prior to fabrication of the Precast Cap. ¡ Column & Drilled Shaft Proposed Finished Ground A ¡ Column & Foundation A 1 2" Dia. Grout Joint Top of Drilled Shaft A Modified Special Provision is required for top-of-shaft elevation tolerances and reinforcement placement tolerances. Size top-of-shaft ¡ Pier confinement reinforcement B for non-contact lap splice B (LRFD 5.11.5.2) Length as required by design Grouted Splice Coupler (Typ.) Drilled Shaft diameter sized to accommodate SECTION A-A inner Column Reinforcement placed inside Drilled Shaft Reinforcement Cage. Specify PRECAST COLUMN tolerances in Modified Special Provisions. ¡ Foundation Theoretical plan location of outer Drilled Shaft Cage Place Inner Cage Drilled Shaft Cage placement per plan location tolerance as specified ¡ Pier Bottom of Drilled Shaft Dia. Dia. SECTION B-B DRILLED SHAFT ELEVATION DRILLED SHAFT (SHOWING CONVENTIONAL PIER COLUMN REINFORCING) INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN IN BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: COLUMN DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 3 OF 3 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 2 - PRECAST TWO-COLUMN PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS ¡ Pier (Symm.) A A Pseudo Match-Cast Surface (Typ.) Cast-In-Place Hammerhead Pier Column and Pier Head PT Ducts Dowels for Rebar Grouted Sleeve Couplers Shear Keys B B Dowels for Rebar Grouted Sleeve Couplers ELEVATION INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. NOTE: For Pseudo Match-Cast Process, see Sheet 5 of 7. SECTION B-B BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 1 OF 6 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS C D E Cast-In-Place Hammerhead Pier See Pseudo Match-Cast Process on Sheet 5 of 6. Incorporate Transfer Template into Pseudo Pier Head Form for proper reinforcement placement within C D E C.I.P. Head. See Sheet 5 of 6 for Guide locations. VIEW A-A PT Duct (Typ.) PT Duct (Typ.) PT Duct (Typ.) PT Bar (Typ.) PT Bar (Typ.) PT Bar (Typ.) Pseudo Match-Cast Surface VIEW C-C VIEW D-D VIEW E-E INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 2 OF 6 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 3 - HYBRID C.I.P,/PRECAST HAMMERHEAD PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Temporary PT Bar Ducts Size Precast Pier Wing for construction equipment and boom reach using site specific construction access assessment. For over-land Grouted Rebar projects, include haul route assessment for element sizing. ECI 6- 19 Sleeve Couplers ECI 6- 19 PT Ducts Shear Keys Grouted Rebar Coupler PLAN Temporary Framing (Strongback or similar) for Grouted alignment of Pier Wing during placement to Rebar F G H Coupler minimize damage to reinforcing bar extensions. J Grouted Rebar ECI6-19 Sleeve Couplers ECI6-19 Two-Face Epoxy at Pseudo 19 ECI6- Match-Cast Joint interface Oversize Couplers two bar sized to allow ± 12" construction tolerance F G Grouted Rebar H Coupler J ELEVATION A Temporary PT System (Temporary PT Bars shown) provides a compressive stress across the Pseudo Match-Cast Joint until the epoxy has cured. See LRFD 5.14.2.4.2 for requirements. Temporary PT Bars INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. PT Anchorage Blockouts BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 3 OF 6 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS PT Duct PT Duct (Typ.) PT Duct (Typ.) Anchorage (Typ.) PT Bar (Typ.) PT Bar (Typ.) PT Bar (Typ.) Provide gap between Grouted Rebar Couplers to facilitate VIEW F-F SECTION G-G coupling of PT Bars during placement of Pier Wings. SECTION H-H PT Duct (Typ.) Grouted Rebar Coupler (Typ.) PT Bar (Typ.) The PT Bars shown are temporary and used To eliminate mild reinforcing at the Joint for maintaining a compressive stress and improve fit-up, consider utilizing across the joint until the epoxy has cured. Permanent Post Tensioning such that zero Additional temporary PT Bars may be tension is maintained at the joint in the required in the lower section of the Joint final configuration. to meet AASHTO LRFD 5.14.2.4.2 requirements. Grouted Rebar Coupler (Typ.) VIEW J-J INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 4 OF 6 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Left Pseudo Pier Stage 1 Notes: Temporary PT Bar Ducts Head Form 1. Manufacture two identical Steel Bulkheads (left and right). 2. Pour a Precast Template using a Steel Bulkhead. 3. Precast Template to remain in casting yard for Stage 2. 4. Steel Bulkheads go to the erection site for forming the C.I.P. Hammerhead Pier Column. Provide Shear Keys per AASHTO LRFD Permanent PT Tendon Ducts Bridge Design Specifications 5.14.2.4.2. Left Steel Bulkhead Shear Key Require one full-scale mock-up of Pseudo Match-Cast Grouted Rebar Coupler Joint prior to Pier construction. Stress across test Guides (Typ.) joint and check for spalls and uniform epoxy squeeze. Formwork STEEL BULKHEAD PRECAST TEMPLATE See AASHTO LRFD Bridge Design Specifications 5.14.2.4.2 STAGE 1 for uniform compression requirements across joint. (PSEUDO MATCH-CAST PROCESS) 24'-0" 1'-0" Stage 2 Notes: 1. Precast the required number of Match-Cast Wings using a Pseudo Pier Head Form. 2. Submit a Pseudo Match-Casting Process and Mock-Up Test Procedure to the Engineer for review and approval. A Mock-Up Test of the Joint shall be performed successfully prior to beginning installation. The Mock-Up shall consist of the following: a. Same surface area and shear keys as depicted in the final constructed Joint. b. Two-faced epoxy. c. Provide a stress of 40 psi uniform compression across Joint. d. Measure stress at joint interface (6 locations) using pressure cells. Pseudo Pier Head Form e. All measured stresses shall be between XXX psi and XXXX psi. Provide a report documenting the process and results. If measured stress falls outside of the XXX-XXXX psi range, resubmit revised Pseudo Match-Casting Process and Mock-Up Test Procedure to the Engineer for review and approval. Repeat the process on a new test specimen until test requirements are met. Formwork STAGE 2 (PSEUDO MATCH-CAST PROCESS) INFORMATION SHOWN IS FOR CONCEPT ONLY. LEFT PRECAST CANTILEVER SHOWN; RIGHT PRECAST CANTILEVER SIMILAR APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 5 OF 6 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Information shown is for concept only. Application is Designer's responsibility. Notes to Designer are shown as boxed text. Install Second Coordinate work operations with Temporary Traffic Control Plans to eliminate over-traffic work. Match-Cast Wing Couple and Stress Temporary PT Bars Pour C.I.P. Pier using Steel Bulkheads Grout Rebar Sleeve Couplers at Match-Cast Joints Grout Rebar Sleeve Couplers at Match-Cast Joints Contractor may utilize 2 ft. closure pour in lieu of pseudo match-cast joints. LANE LANE NIGHT CLOSURE CLOSURE CLOSURE STAGE 1 STAGE 3 Incorporate Segmental Specification for Hybrid C.I.P./Precast Hammerhead Pier construction. Modify for pseudo match-cast process. Install Permanent PT Tendons Install and Stress Temporary PT Bars Install Permanent PT Tendons Install Match-Cast Wing Grout PT Tendons Size Precast Cap Wing for construction equipment and boom reach using Site Specific Construction Access Assessment. NIGHT LANE LANE CLOSURE CLOSURE CLOSURE STAGE 2 STAGE 4 DRAWN BY: REVISIONS DATE BY DESCRIPTION DATE SHEET TITLE: BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 6 OF 6 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 3 - HYBRID C.I.P./PRECAST HAMMERHEAD PIER CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. Vent PVC Pipes Closure Pour Rebar Cage/Plug for Pile/Cap Connection Cast-In-Place Column Connection Square Prestressed Concrete Pile Shear Key Pattern Pile Void Pre-Cast Foundation Plug Plug BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER FOOTING DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 1 OF 3 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 4 - PRECAST PIER FOOTING CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Require Shop Drawings and Erection Plan. See Structures Size Foundation for construction equipment and Detailing Manual, Chapter 25, for items to include. boom reach using site specific construction access assessment. For over-land projects, include haul route assessment for element sizing. B ¡ Column ¡ Pier (Symm. About) A A ¡ Column ¡ Pier Require Full-Scale Mock-Up of a Single Pile-Cap Connection. B HALF PLAN (BOTTOM REINFORCING) HALF PLAN (TOP REINFORCING) PILE CAP REINFORCING PLAN NOTES: 1. Remove forms after concrete obtains a minimum strength of XXXX psi. 2. Use high range water reducer and X" max. aggregate size for Class V Concrete (Spec). 3. Locate pick-up points symmetrical about center lines of Column and Pier (Footing). Vent PVC Pipe INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. PILE COLLAR DETAIL NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER FOOTING DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 2 OF 3 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 4 - PRECAST PIER FOOTING CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS ¡ Column C C Form Shear Key with removable Specify shrinkage reducing corrugated pipe for transfer of admixture and seven day shear without need for moist cure. Vent PVC Pipes ¡ Pile Grout and cover reinforcement through plug-cap Vents after use. interface. Use hard pocket former with compressible (e.g. rubber) Column liner to reduce shrinkage cracks. Rebar Cage ¡ Pile (Typ.) Specify minimum SHEAR KEY DETAIL gap between top of Pile and Cap Hole surface to ensure concreting Square Pile with circular hole Vent pipe to minimize of oversized pocket provides bearing area for Cap. potential for trapped and to accommodate air and honeycombing. ±3" pile placement tolerance E E See Pile Collar Detail Two-phase pour consisting of Horizontal area for Shims Pile grouting to seal, SECTION A-A Use non-metallic shims (to be Seal left in place). Specify maximum shim height. Specialty Engineer ¡ Column F to provide shim placement and F loads as part of the erection to minimize potential for Class VI Concrete w/silica fume trapped air and (XXXX psi) (Min.) honeycombing. Also plan requirements. then monolithic concrete pour. Inclined surface typical D facilitates concrete infill D placement around Pile. Pile Void Hole Size hole Square Prestressed Concrete Pile diameter for ±3" pile placement tolerance. Plug ¡ Pile SECTION E-E ¡ Pile SECTION F-F PILE CONNECTION DETAIL ¡ Pile & Void ¡ Column Prepare interfacing concrete surfaces prior to concrete pour: 1. Sand or water blast interfacing surfaces. ¡ Pier 2. Seal and fill void with potable water for 4 to 5 hours. 3. Remove water to achieve SSD condition prior to pouring concrete. Void Class VI Concrete w/silica fume (XXXX psi) (Min.) SECTION B-B SECTION C-C INFORMATION SHOWN IS FOR CONCEPT ONLY. SECTION D-D APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PIER FOOTING DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 3 OF 3 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 4 - PRECAST PIER FOOTING CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. Pedestal Cast Monolithically with Plug Closure Friction Collar not shown. Require friction collars on piles to support cap prior to grouting. Do not use shims to support cap due to the small bearing area they provide and because they tend to block the flow of grout resulting in an insufficiently grouted interface. 1 2" Pre-Cast Grout Joint Cap Rebar Cage * Fiction Collar not shown for clarity Plug Step 5: Presoak 5 hours to SSD condition. Cast Plug and Pedestal. Step 4: Field Bend Pedestal Bars High Capacity Square Prestressed Concrete Piles Step 3: Insert Cage/Plug Step 2: Set Pre-Cast Cap on bed of grout and friction collar at desired elevation, displacing excess grout. Step 1: Cut Piles to prescribed elevations (Modified Special Provision) BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PILE CAP DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 1 OF 2 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 5 - PRECAST BENT CAP CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Require Shop Drawings and Erection Plan. See Structures Require one full-scale Taper hole to transfer shear Detailing Manual, Chapter 25, for items to include. mock-up of a single and to minimize potential for ¡ Pile & Pier Cap trapped air and honeycombing. Pile-to-Cap Connection. Cast-In-Place Pedestal (Typ.) See Detail 1 C ELEVATION C Precast Concrete Cap Cap installation procedure: DETAIL 1 1. Cut piles to top of pile elevations. 2. Insert rebar cage in Cap and Pile. 3. Erect Cap on Temporary Supports or Friction Collar to appropriate elevations. Install Form around top of Pile and under Cap (if necessary). Ensure the surface of Cap and Pile are prepared in accordance with Specification 400-9. 1 2" Aligning Beams and Piles allows Pedestals to 4. Use high range water reducer and X" Max. aggregate size Grout Joint be cast monolithically with plug. Monolithically for Class V Concrete (Spec). 5. Remove Forms at top of Pile after concrete obtains a cast Pedestals also offer protection against Two-Phase Grout Joint/Concrete water intrusion through Cap/Pile interface. Plug placement consisting of minimum strength of XXXX psi. D D (1) a grout bed using APL approved non-shrink grout and Prepare all interfacing concrete (2) a monolithic concrete pour. surfaces prior to concrete pour Cast-In-Place as follows: Pedestal (Typ.) 1. Sand or water blast Class V Concrete (Spec) (6000 psi) interfacing surfaces. A 2. Seal and fill void with potable B water for 4 to 5 hours. Specify shrinkage reducing admixture 3. Remove water to a SSD and seven day moist cure. condition prior to pouring concrete. High Capacity Square Prestressed Concrete Pile A B ¡ Pile (Typ.) Seal Plug Size Cap based on equipment and ELEVATION PILE CONNECTION DETAIL boom reach using site specific NOTE: Reinforcing symmetrical about ¡ Pier Hole diameter allows for ±3" construction access assessment. Pile placement tolerance. Pile For over-land projects include haul placement is shown at route assessment for cap sizing. theoretical center. Require friction collars on piles to support cap prior to grouting. Do not use ¡ Pile & Pier Cap shims to support cap due to the small bearing area they provide and because they ¡ Pier Cap ¡ Pile & Void tend to block the flow of grout resulting in an insufficiently grouted interface. ¡ Pier Cap ¡ Pier Cap ¡ Beam SECTION A-A SECTION B-B PLAN NOTE: Pile connection and Pedestal SECTION D-D ELEVATION PEDESTAL DETAILS reinforcing not shown SECTION C-C (PEDESTALS LESS THAN 1'-0" IN HEIGHT) INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: PILE CAP DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 2 OF 2 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 5 - PRECAST BENT CAP CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Shear Key is formed with a removable ¡ Pier & Cap corrugated pipe. Shear is transferred without need for reinforcement through ¡ Pier & Cap C.I.P./Precast interface. Use hard pocket former with a compressible liner (e.g. rubber) to minimize shrinkage cracks. Require one full-scale mock-up of a single Pile-to-Cap Connection. ¡ Concrete Prestressed Pile (Type I) (Typ.) SECTION B-B SHEAR KEY DETAIL ¡ Concrete Prestressed Pile (Type I) (Typ.) SECTION A-A VIEW C-C CAP/PILE INTERFACE REINFORCEMENT NOT SHOWN FOR CLARITY Size Cap for construction equipment and boom reach using site specific construction access assessment. Require friction collars on piles to support cap For over-land projects, include haul route prior to grouting. Do not use shims to support cap assessment for element sizing. due to the small bearing area they provide and Hole ¡ Concrete Prestressed Pile (Type I) (Typ.) because they tend to block the flow of grout resulting in an insufficiently grouted interface. D C D A B ¡ Pier & Cap C B ¡ Concrete Prestressed Pile (Type I) (Typ.) VIEW D-D STIRRUPS AND CAP/PILE INTERFACE REINFORCEMENT NOT SHOWN FOR CLARITY NOTE: Work this sheet with Bent Details Sheet 2 of 2. Require Shop Drawings and Erection Plan submittal. See Structures Detailing Manual, Chapter 25, for items to include. A INFORMATION SHOWN IS FOR CONCEPT ONLY. ELEVATION APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: BENT DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 1 OF 2 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 6 - PRECAST BENT CAP CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Cap installation procedure: ¡ Pile & Void Class VI (8500psi) 1. Cut piles to Top of Pile Elevations. Concrete * 2. Insert rebar cage in Cap and Pile. 3. Erect Cap on temporary supports to appropriate elevations. Install Form around top of Pile and Size hole diameter for ±3" pile under Cap (if necessary). Ensure the surface of Cap and Pile are prepared in accordance with placement tolerance. Use hard Specification 400-9. pocket former with a 4. Use two-phase pour sequence. compressible (e.g. rubber) liner Phase one - use grout and friction collar to level Cap. Specify shrinkage reducing to mitigate shrinkage cracks. Phase two - place concrete in Cap and Pile. admixture and seven day 5. Contractor shall vibrate concrete to reduce the potential of trapping air in concrete. moist cure. 6. After concrete reaches a strength of XXXX psi, remove Form at top of Pile. 7. Place zero slump grout at all locations not fully concreted in previous operations. All concrete Require friction collars on surfaces shall be wetted to Saturated Surface Dry (SSD) conditions prior to grouting. piles to support cap prior to 1 2" grouting. Do not use shims to Grout Joint support cap due to the small bearing area they provide and because they tend to block the Top of Pile EL. flow of grout resulting in an insufficiently grouted interface. A A Optional Plug Construction Joint Surface preparation of void: 1. Sand/water blast 2. Seal void and fill with potable ¡ Pile & Void Vent Hole water for 4 to 5 hours. 3. Remove water to SSD ¡ Pile & Void conditions. Two-Phase Grout Joint/Concrete Plug placement consisting of a Grout Bed using (1) APL approved non-shrink grout and (2) a monolithic concrete pour. Require one full-scale mock-up of a single Pile-to-Cap Connection. SECTION A-A Seal Plug NOTES: ¡ Concrete Prestressed Pile & Void 1. Work this sheet with Bent Details Sheet 1 of 2. 2. Venting of the voided piles shall be provided by the use of 1" Ø PVC conduit & shall remain open. Contractor shall provide a galvanized steel wire cloth with 12" x12" mesh and 0.063" diameter wires over the vent pipes to prevent vermin and debris from entering the void. PILE CAP CONNECTION DETAIL (PILE HEAD CUT OFF) INFORMATION SHOWN IS FOR CONCEPT ONLY. * C.I.P. Plug shall utilize an approved concrete mix, which contains #XX coarse APPLICATION IS DESIGNER'S RESPONSIBILITY. aggregate (pea gravel) and has a minimum compressive strength of XXXX psi. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: BENT DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 2 OF 2 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 6 - PRECAST BENT CAP CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Require Shop Drawings and Erection Plan submittal. See Structures Detailing Manual, Chapter 25, for items to include. £ Survey & PGL 32" F-Shape Traffic Railing - Index 420 (Modified) & 32" Vertical Shape Traffic Pedestrian/Bicycle Railing - Index 423 (Modified) Railing w/Post "C" Index 821 Require 5-Hour presoaking Require shrinkage-reducing & Pedestrian/Bicycle Railing Saturated Surface Dry (SSD) admixture in concrete mix. w/Post "C" - Index 821 condition prior to topping pour. PGP Construction Joint � � � � Construction Joint � � � � � Prestressed Slab Beam See Pocket Detail (PSB) (Typ.) SUPERSTRUCTURE SECTION Inset Bearing and include End Pour to facilitate Expansion Joint fit-up. Provide adequate Hooked-Bar development length. Add connection reinforcing to eliminate conflicts during Unit placement. Traffic Railing Reinforcement (Typ.) FFBW C.I.P. Composite Detail Bars to avoid conflict with adjacent Topping Poured Joint C.I.P. Composite Topping Units and for vertical placement of Unit. with Backer Rod Index 21110 EPS C.I.P. Concrete Beam Seat Expandable Foam PSB and Backer Rod ¡ Bearing Prestressed Strands Section Bearing Pad TYPICAL SECTION JOINT DETAIL AT BEGIN/END BRIDGE Space Units and provide flexibility in Bearing Design to better accommodate shrinkage of POCKET DETAIL Topping. Specify gap distance greater than combined construction plus fabrication tolerances. INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN IN BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: SUPERSTRUCTURE DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 1 OF 1 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 7 - PRECAST SLAB UNITS WITH TOPPING CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS Headed Bars ELEVATION Staggered Hooks to facilitate placement Staggered Hooks/ Headed Bars to PLAN facilitate placement "U" Bar Stirrups Shear Keys formed by Lapped Corrugated Metal Forms Closure Pour tolerance dictated by Hook Length and Hook Development Lengths READY FOR CLOSURE INFORMATION SHOWN IS FOR CONCEPT ONLY. APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE CHECKED BY: CENTRAL OFFICE DESIGNED BY: CONNECTION DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. FINANCIAL PROJECT ID COUNTY SHEET 1 OF 3 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 EXAMPLE 8 - CLOSURE POUR CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS ST986KD 12/17/2014 1:39:00 PM S:\Public\SpecialProjects\StructuresManual\2015StructuresManual\2015StructuresManual\Ima "U" Bar Stirrup Pairs (Lapped) Combination of Hooked Bars and Couplers STEP 1 Place Precast Segments. reduce bar congestion at closure pour. STEP 2 Field cut Link Bar. Place Couplers with removable stops or pins on Link Bar. Place Link Bar in position and slide Coupler to splice Link Bar to Dowels. Quality control of Coupler positioning is required. Secure Coupler according to Manufacturer's recommendations. See sketch below. STEP 3 Install "U" shaped Rebar (Top and Bottom). STEP 4 Install "U" Bar Stirrup Pairs (Lapped). "U" Shaped Rebar (Top and Bottom) "U" Bar Stirrup Pairs (Lapped) Hooked Bars are used in conjunction with Link Bars and Double Couplers "U" Shaped Rebar in order to develop several planes (Top and Bottom) of reinforcement across the closure pour. If all bars are developed with Hook and Headed Bars, the heads and hook tails will conflict when elements are lowered vertically into place. Coupler Connections Link Bar Dowels for Coupler Connection Tolerance of Closure Pour determined by gap Hooked Bars between Hooked Bars, Hook Bar development length, and fit of "U" Shaped Rebar. INFORMATION SHOWN IS FOR CONCEPT ONLY. CONNECTION POINT APPLICATION IS DESIGNER'S RESPONSIBILITY. READY FOR CLOSURE POUR NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: CONNECTION DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 2 OF 3 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 8 - CLOSURE POUR CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS D D/2 D/2 ¡ Precast Element/ ¡ Closure Pour U-Shaped Rebar C.I.P. Closure Pour P. Closure Pour I. C. ¡ Precast Elem ent/ (Top and Bottom) Dowels from Dowels from Dowels from A Precast Element Precast Element Precast Element 2" Chamfer (Typ.) U-Shaped Bar Stirrup Pairs Coupler (Typ.) (Lapped) ¡ Precast Dowels from Precast Element Rotate Bars as required A Precast Element U-Shaped Rebar Precast Element Dowels from (Top and Bottom) Precast Element Shear Keys formed by DOUBLE COUPLER SPLICE Corrugated Metal Forms SECTION A-A Apply Bonding Agent meeting Specification 926 (Type A) ¡ Closure Pour to Construction Joint before Closure Pour. (Measured along ¡ Precast Element) D ¡ Precast Element/ Dimension "D" determined D/2 D/2 C.I.P. Closure Pour by Hook Splice length. 2" Chamfer (Typ.) Bars from Precast P. Closure Pour I. C. ¡ Precast Elem ent/ B Dowels from Dowels from Precast Element Stagger Hooks to Precast Element facilitate placement ¡ Arch Rib Bars from Precast B Provide additional Confinement Steel for Non-Contact Lap Splice. SECTION B-B INFORMATION SHOWN IS FOR CONCEPT ONLY. OVERLAP SPLICE APPLICATION IS DESIGNER'S RESPONSIBILITY. NOTES TO DESIGNER ARE SHOWN AS BOXED TEXT. BY DESCRIPTION DATE SHEET TITLE: DRAWN BY: REVISIONS DATE BY DESCRIPTION CHECKED BY: CENTRAL OFFICE DESIGNED BY: CONNECTION DETAILS DEPARTMENT OF TRANSPORTATION ROAD NO. COUNTY FINANCIAL PROJECT ID SHEET 3 OF 3 PROJECT NAME: SHEET NO. 605 Suwannee Street, MS 33 Tallahassee, Florida 32399-0450 REF. DWG. NO. STATE OF FLORIDA STRUCTURES DESIGN OFFICE EXAMPLE 8 - CLOSURE POUR CHECKED BY: PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS