...

Document 2824683

by user

on
Category: Documents
56

views

Report

Comments

Transcript

Document 2824683
£
¤
19
¦
¨
§
75
!
4
41
!
8
2£
3
¤
¦£
¨
¤
§§
¦
¨
275 75
£
¤
19
£
¤
92
408
301
2
3
618A
417
417
528
98
£
¤
17
¦
¨
3§
2
2
3
570
1
5
2
33
2
2
2 3
3
£
¤
41
£
¤
!
441
0
1
£
¤
589
£
¤
4
2
3
528
!
£
¤
2
192
0
1
570
£
¤
27
¦
¨
§
175
¦£
¨
§
¤
95
¤
£
¤£
41 301
1
2§
3
¦
¨
¦§
¨
679
275
75
¦
¨
§
£
¤
98
95
£
¤
1
£
¤
41
£
¤
17
£
¤
98
£
¤
27
¦
¨
§
75
£
¤
£
¤
98
No rth Pa lm Bea ch
Lake P ark
Riv ie r a B e ac h
441
Pal m B each Sh ores
Mango ni aP ark
We s t P al m Be a ch
Pa lm Be ach
Roy al Palm Beac h
Have rhi l
Lake C lark eS hores
Pa lm S pr ing s
La k e W o r th
At l ant i s
0
1
Sout h P alm Be ach
Lant an a
Hyp ol uxo
Bo y n to n B e ac h Oce
an Ri dg e
Gu lf S tr ea m
D elr a y Be a ch
!
! £¤
7
3
2
3
93
¦
¨
§
75
Map Area
27
2
3
869
595
41
836
395
195
MAJOR
PROJECTS
6
FLORIDA'S TURNPIKE
ENTERPRISE
Florida Transportation Vision
for the 21st Century
Aviation, Seaport, Transit
& Intermodal
Bridge
Capacity
!
!
!
1
95
3
2
¦
¨
¦§
¨
2§
3
924
£
¤
§
¦
¨
¦
¨
§
Florida at Work: Transportation Improvements
1. SR 821 (Turnpike)
FY 2015/2016 through FY 2019/2020
Add Lanes and Reconstruct
2. SR 91 (Turnpike Mainline)
3. SR 821 (Turnpike)
4. Suncoast Parkway II
Add Lanes and Reconstruct
Add Lanes and Reconstruct
New Road Construction
Phase - ENV/PE/ROW/CST
Phase - ENV/PE/DSB
Phase - PE/ROW/CST
Phase - PE/DSB
From - SR 836
From - Beachline Expressway
From - NW 57th Avenue
From - US 98
To - I-75
To - US 192/US 441
To - Miramar Toll Plaza
To - SR 44
FY - 2016 - 2020
FY - 2016, 2017, 2019
FY - 2017
FY - 2016-2018
Totals - $324,976,640
Totals - $226,548,844
Totals - $94,893,499
Totals - $255,663,820
ITS & Information Systems
Planning, Engineering, Etc.
Rail
Resurfacing, Rehab, Etc.
®
Safety, Utility, Etc.
0
15
30
Miles
60
5. SR 417 (Seminole Expressway)
6. Campbell Drive
7. SR 869 (Turnpike Sawgrass)
8. SR 528 (Beachline Expressway)
Add Lanes and Reconstruct
Interchange Ramp (New)
Add Lanes and Reconstruct
Add Lanes and Reconstruct
Phase - ENV/DSB
Phase - DSB
Phase - PE/DSB
Phase - ENV/PE/CST
From - Aloma Avenue
From - Campbell Drive
From - Sunrise Boulevard
From - Turpike Mainline
To - SR 434
To - SR 821 (Turnpike)
To - Coral Ridge Drive
To - McCoy Road
FY - 2016, 2018
FY - 2016
FY - 2016, 2018
FY - 2016, 2018
Totals - $103,116,948
Totals - $17,324,223
Totals - $119,405,717
Totals - $50,820,591
Phase Key: ENV = Environmental DSB = Design and Build PE = Preliminary Engineering ROW = Right-of-Way CST = Construction RRU = Railroad and Utilities
Florida’s Turnpike Enterprise
Florida’s Turnpike Enterprise, part of the Florida Department of Transportation, owns a 483-mile system of limited access
toll highways. The Turnpike Mainline/SR 91 is a 320-mile, multi-lane facility extending from Florida City in Miami-Dade
County northward to Wildwood in Sumter County.
IN ADDITION TO THE TURNPIKE MAINLINE,
THE TURNPIKE SYSTEM INCLUDES:
SOUTH FLORIDA
• 23-mile Sawgrass Expressway/Toll 869
CENTRAL FLORIDA
• 18-mile Seminole Expressway/Toll 417
• 6-mile Southern Connector Extension/Toll 417
•11-mile Western Beltway/Toll 429
•22-mile Beachline East/Toll 528
WEST CENTRAL FLORIDA
• 15-mile Veterans Expressway/Toll 589
• 42-mile Suncoast Parkway/Toll 589
• 25-mile Polk Parkway/Toll 570
• 1-mile I-4 Connector
TURNPIKE IS WITHIN
• 5 of 7 FDOT Districts
• 52 of 120 House Districts
• 23 of 40 Senate Districts
TURNPIKE FUNDING
In fiscal year (FY) 2015, Florida’s Turnpike Enterprise will invest $1.128 Billion in Florida’s T
Including the eight major projects shown on the reverse-side map, the Florida’s Turnpike Enterprise
• Florida’s Turnpike System is financed with toll and concession revenues rather than gas taxes.
• Turnpike revenues are used to:
o Repay principal and interest on outstanding revenue bonds
o Pay for ongoing opera ons and maintenance costs
o Pay for preserva on (e.g. resurfacing) needs
o Pay for minor capital improvements
• Major capital improvements with an asset life of 30 years or greater are typically bond and cash funded.
TURNPIKE CONTACTS
Diane Gut
Exe
(407) 264-3100
Diane.Scacce @dot.state.fl.us
Tom Martinelli
Government Affairs Liaison
(305) 470 -5483
Fly UP