...

at FLORIDA WORK WORK 2016

by user

on
Category: Documents
16

views

Report

Comments

Transcript

at FLORIDA WORK WORK 2016
FLORIDA at WORK
FLORIDA at WORK 2016
Legislative Transportation Briefing
The Mission of the Florida Department of Transportation
(FDOT) is to provide a safe transportation system that ensures
the mobility of people and goods, enhances economic
prosperity, and preserves the quality of our environment and
communities.
Florida House District 32
Representative Larry Metz
Our
MISSION
KEY TRANSPORTATION FACILITIES
Transportation improvements
result in tangible benefits.
Leesburg International Airport
Highways:
US 441, US 27, US 192
Rail:
Seaboard Coast Line, Florida Midland, Florida Central
Transportation investment highlights
are found statewide.
FDOT DISTRICT CONTACTS
COUNTY LIST
District 5
Noranne Downs, P.E.
FDOT District Secretary
Work 386-943-5474
Cell (386) 801- 1905
[email protected]
Lake
605 Suwannee Street
Tallahaseee, FL 32399
Phone: (850) 414-4100
Phone: (850) 414-5205
Cell: (850) 509-2685
[email protected].fl.us
Mike Dew
Chief of Staff
Phone: (850) 414-5208
Cell: (850) 841-9577
[email protected].fl.us
Tom DiGiacomo
Director of Intergovernmental
Affairs
Cell: (850)694-3617
[email protected].fl.us
Our
PERFORMANCE
COMPETITIVENESS
Transportation investments are prioritized to strengthen and support our
economy. Cargo valued at $83 billion passes through Florida’s seaports, 83 million
tons of freight travel our railroads, and aviation contributes $114 billion to our
economy every year.
SAFETY
Fatality and crash rates are decreasing on Florida’s highways, protecting our
most valuable asset - our people. Safety belt usage is now at 89% - an all time high.
A new statewide initiative to improve safety for pedestrians and cyclists is now
underway.
PRESERVATION
Maintenance, pavement, and bridge conditions are meeting or exceeding
performance targets. FDOT has met or exceeded its maintenance standards since 1994.
Transportation projects require
multi-year funding.
FDOT STATEWIDE CONTACTS
Jim Boxold
BENEFITS
JOBS
$1 billion invested in transportation projects supports about 28,000 jobs.
ECONOMY
Over the next five years, planned improvements will grow Florida’s Gross State Product
(GSP) by an estimated $11 billion in increased productivity.
RETURN ON INVESTMENT (ROI)
Every dollar invested in transportation is estimated to result in a return of $4.40 in
user and economic benefits to Florida’s residents and business.
Airports:
Central Office
Your
Our
FUNDING
CASH FLOW VS. COMMITMENTS
FDOT currently has over $7 billion of secured funding commitments to transportation
contractors and partners with a projected cash balance between $200-to-$250 million.
For detailed information on transportation performance in Florida see:
WWW.DOT.STATE.FL.US/PLANNING/PERFORMANCE
44
T
S
Fruitland Park
±
³
±
³
±
³
£
¤
4
¦
¨
§
44 8 A
Orlando
Apopka
Airport
T
S
Apopka
±
³
#
482
S
T
P u blic A irpo rt
M ajo r A irp o rt
D ee pw a ter S ea po rt
P a sse n ge r In term od al S ta tion
B u s S tatio n
F reig h t Inte rm o da l S tatio n
In tersta te H igh w a y
Belle
Isle
M ajo r U S o r S ta te H ig hw a y
O the r U S o r S ta te H ig hw a y
528
±
³
535
Conway
52 8 A
482
±
³
¬
(
Sawgrass
Lake
42 3
Big
Sand
Lake
Little
n
¤
£
n
³
±
±
³
Lake
Tibet
506
±
³
439
±
³
PVTX
527
27
2
±
³±
³
±
³
C ou nty H igh w a y
R ailw ay
±
³
527
±
³
474 47 4
±
³
±
³
536
S
T
535
S
T
±
³
522
530
S
T
530
192
£
¤
!
1
BRIDGE REPLACEMENT
Phase: PE/ROW/CON
LITTLE LK HARRIS
BR #110026
FY: 2016 - 2017/2019
Totals: $48,370,004
!
!
3
2
2. SR 25 (US27)
ADD LANES & RECONSTRUCT
Phase: PE/CON
3. LEESBURG INTL AIRPORT
AIRPORT IMPROVEMENTS
Phase: GRA
FROM N OF BOGGY MARSH RD
TO N OF LAKE LOUISA RD
FY: 2016/2018
Totals: $43,897,214
P ha se K e y:
!
4
4. SR 25 (US 27)
FROM HERNANDO COUNTY LINE
Totals: $9,467,957
TO N OF O'BRIEN RD
FY: 2016/2018
Totals: $8,523,213
P D E = P ro je ct D e ve lo pm e nt & E n viro n m e n t
5. WEST SR 50
Phase: PDE/PE
Phase: PE/CON
!
5
CORRIDOR/SUBAREA PLANNING
RESURFACING
FROM CR 561
FY: 2016 - 2020
!
TO CR 33 LAKE COUNTY
FY: 2017/2020
Totals: $4,510,000
P E = P re lim in a ry E ng ine e rin g
6
6. SR 44
RESURFACING
Phase: PE/CON
FROM SR25/US27/14TH ST
TO SR 500 (US 441)
FY: 2016 - 2017
Totals: $3,152,622
R O W = R ig h t-o f-W a y
C O N = C o n stru ctio n
525
±
³
579
±
³
MAJO R
PROJECTS
í
527
T
S
Lake
423
p
o
91
Tra n sp o rta tio n F a cilitie s
7
¬
(
Dade
City
1. SR 19
526
±
³
91
S
T
27
¤
£
545
56 1
41
Lake
Down
±
³
LAKE
LOUISA
561
T
S
!
Lake
Nellie
Pretty
Lake
471
471
50 9 8
±
³
33
575
50
54 5
33
T
S
575
T
S
50
T
S
±
³
±
³
98
£
¤
301
£
¤
±
³
565B
±
³
98
£
¤
424
±
³
±
³
56 5 B
A ce
E xp e diters
Johns
Lake
56 5 A
50
S
T
52 7
42 4 A
±
³
50
565A
56 5
416
500
T
S
±
³
50
S
T
Lake
±
³
565
¬
(
416
S
T
S a fe ty, U tility, E tc.
Winter Park
±
³
±
³
50
T
S
441
431
R esu rfacin g, R eh ab , E tc.
Eatonville
£
¤
438
±
³
301
£
¤
43 8 A
438
T
S
438
8
±
³
75
¦
¨
§
414
±
³
±
³
±
³
±
³
50
R ail
414
S
T
Minneola
50
T
S
¬
(
±
³
4
47 8
±
³
478
Lake
Lucy
5
±
³
±
³
±
³
³
±
³±
±
³
±
³
47 8 A
±
³
±
³
±
³
±
³
±
³
46 9
673
429
P la nn in g, E n gin ee rin g, E tc.
427
42 4 8
429
S
T
LAKE
APOPKA
561A 56 1 A
¬
(
469
480
436
43 7 A
33
47 6 B
Saint
San Leo
Antonio
±
³
±
³
437
33
476
436
S
T
455
91
±
³
±
³
91
T
S
47 6 A
IT S & Info rm a tio n S yste m s
42 4 7
436
T
S
±
³
48
578
41 4 3
436
48
S
T
C ap acity
42 4 2
±
³
19
48
575
B ridg e
42 3 9
500
500
±
³
19
T
S
42 4 3
±
³
448A
45 5
Avia tion , S ea p ort, Tra nsit
& Interm od al
±
³
441
±
³
471
F lorida Tra nsp orta tion Vision
fo r the 2 1st C en tury
42 3 7
Bob White
Field
Howey
In The Hills
471
S
T
P ro je ct Type
43 1 B
42 2 0 4220
³³
±
±
CSXT
46
44 8
¬
(
±
³
±
³
48
46
435
1
475
¦
¨
§
452
FLORIDA HOUSE DISTRICT 32
46
T
S
±
³
19
T
S
25
T
S
75
448
±
³
8
FC
EN
50 0 A
Tavares
Seaplane
Base
LAKE
HARRIS
¬
(
301
£
¤
LAKE DORA
44C
±
³
¬
(
19A
Florida at Work
46A
±
³
6
46 A
±
³
±
³
25A
E
KE
FF
Withlacoochee
River
!
441
500
T
S
500
19
T
S
£
¤
Transportation Improvements
Mid Florida
Air Service
Airport
±
³
O
AS
468
±
³
N
PA
±
³
39A
Leesburg
International
Airport
3
44
S
T
Coleman
473
"
±
³
±
³ ³
±
±
³
KE
LA
T
S
Lake
Deaton
LAKE
EUSTIS
±
³
±
³±
³
91
91
44
±
³
±
³
44A
470
47 0
±
³
44
T
S
LAKE
GRIFFIN
46 6 A
25
S
T
25
T
S
!
7. SR 33
BRIDGE REPLACEMENT
Phase: PE/ROW/CON
GREEN SWAMP
BR #110002
FY: 2016 - 2019
Totals: $2,868,002
G R A = G ra n t
!
8
7
8. SR 50/SR 33
PRELIM ENG FOR FUTURE CAPACITY
Phase: PDE/PE
FROM CR 565 (VILLA CITY)
TO CR 565A (MONTEVISTA)
FY: 2016
Totals: $263,276
FDOT District Map:
House District 32
Representative:
Larry Metz
Amended Work Program
July, 2015
®
0 1.25 2.5
5
State of Florida
Department of Transportation
M iles
Fly UP