...

at FLORIDA WORK WORK 2016

by user

on
Category: Documents
25

views

Report

Comments

Transcript

at FLORIDA WORK WORK 2016
FLORIDA at WORK
FLORIDA at WORK 2016
Legislative Transportation Briefing
The Mission of the Florida Department of Transportation
(FDOT) is to provide a safe transportation system that ensures
the mobility of people and goods, enhances economic
prosperity, and preserves the quality of our environment and
communities.
Florida House District 38
Representative Danny Burgess
Our
MISSION
KEY TRANSPORTATION FACILITIES
Transportation improvements
result in tangible benefits.
Airports:
Zephyrhills Municipal Airport, Tampa North Aero Park
Highways:
US 98, US 301, I 75, I 275
Rail:
CSX Transportation
FDOT DISTRICT CONTACTS
COUNTY LIST
LIST
COUNTY
Pasco
[email protected]
Jim Boxold
605 Suwannee Street
Tallahaseee, FL 32399
Phone: (850) 414-4100
Phone: (850) 414-5205
Cell: (850) 509-2685
[email protected].fl.us
Mike Dew
Chief of Staff
Phone: (850) 414-5208
Cell: (850) 841-9577
[email protected].fl.us
Tom DiGiacomo
Director of Intergovernmental
Affairs
Cell: (850)694-3617
[email protected].fl.us
Our
PERFORMANCE
COMPETITIVENESS
Transportation investments are prioritized to strengthen and support our
economy. Cargo valued at $83 billion passes through Florida’s seaports, 83 million
tons of freight travel our railroads, and aviation contributes $114 billion to our
economy every year.
SAFETY
Fatality and crash rates are decreasing on Florida’s highways, protecting our
most valuable asset - our people. Safety belt usage is now at 89% - an all time high.
A new statewide initiative to improve safety for pedestrians and cyclists is now
underway.
PRESERVATION
Maintenance, pavement, and bridge conditions are meeting or exceeding
performance targets. FDOT has met or exceeded its maintenance standards since 1994.
Transportation projects require
multi-year funding.
FDOT STATEWIDE CONTACTS
Central Office
BENEFITS
JOBS
$1 billion invested in transportation projects supports about 28,000 jobs.
ECONOMY
Over the next five years, planned improvements will grow Florida’s Gross State Product
(GSP) by an estimated $11 billion in increased productivity.
RETURN ON INVESTMENT (ROI)
Every dollar invested in transportation is estimated to result in a return of $4.40 in
user and economic benefits to Florida’s residents and business.
Transportation investment highlights
are found statewide.
District 7
Paul J. Steinman, P.E.
FDOT District Secretary
Work 813-975-6039
Your
Our
FUNDING
CASH FLOW VS. COMMITMENTS
FDOT currently has over $7 billion of secured funding commitments to transportation
contractors and partners with a projected cash balance between $200-to-$250 million.
For detailed information on transportation performance in Florida see:
WWW.DOT.STATE.FL.US/PLANNING/PERFORMANCE
484
±
³
±
³
485
±
³
445
±
³
550
¦
¨
§
98
£
¤
19
£
¤
±
³
597
75
301
£
¤
Florida at Work
50
S
T
±
³
585
565
±
³
50
S
T
Transportation Improvements
50
S
T
±
³
587
50
S
T
Project Type
±
³
572
±
³
589
98
£
¤
±
³
±
³
±
³
575
PVTX
574
595
Florida Transportation Vision
for the 21st Century
575
S
T
301
£
¤
Hernando
County
Airport
FLORIDA HOUSE DISTRICT 38
±
³
576
Aviation, Seaport, Transit
& Intermodal
6
¬
(
41
£
¤
Bridge
471
S
T
Capacity
ITS & Information Systems
±
³
41
Planning, Engineering, Etc.
±
³
581
Rail
±
³
CSX
T
577
Resurfacing, Rehab, Etc.
Dade
City
±
³
578
Safety, Utility, Etc.
±
³
578A
Pilot
Country
Airport
¬
(
San Antonio
7
Transportation Facilities
¬
(
1
±
³
52A
52
S
T
o
3
±
³
579A
±
³
583
¬
(
p
41
£
¤
98
£
¤
±
³
35A
±
³
579
530
±
³
75
¦
¨
§
5
¬
(
£
¤
2
¬
(
54
±
³
301
54
T
S
589
S
T
54A
±
³
45
T
S
35
T
S
1
MAJOR
PROJECTS
!
1. SR 52 EXTENSION
NEW ROAD CONSTRUCTION
Phase: PE/ROW/CON
From: E of McKendree Rd
To: E of US 301
FY: 2016-2019
Totals: $65,246,656
!
ADD LANES & REHAB. PVMNT
Phase: PE/ROW/CON
From: CR 577/Curley Rd
To: CR 579/Morris Brdg Rd
FY: 2016-2017
Totals: $55,788,520
Phase Key:
Bus Station
Passenger Intermodal Station
Freight Intermodal Station
Interstate Highway
Major US or State Highway
Zephyrhills
Other US or State Highway
8
County Highway
Railway
39
T
S
FDOT District Map:
!
!
3
2
2. SR 54
n
¤
£
n
#
597
S
T
!
Deepwater Seaport
¬
( !
41
T
S
Major Airport
í
"
4
Public Airport
3. SR 52 (SCHRADER HWY)
ADD LANES & RECONSTRUCT
Phase: PE/ROW/CON
From: E of US 41 (SR 45)
To: E of Old Pasco Rd
FY: 2016/2020
Totals: $24,992,447
!
4
4. US 301 (SR 41/GALL)
ADD LANES & RECONSTRUCT
Phase: PE/ROW
From: SR 39
To: S of CR 54
FY: 2016-2020
Totals: $22,588,617
PDE = Project Development & Environment
!
5
5. US 301 (SR 39)
RESURFACING
From: N of Geiger Road
FY: 2016
Totals: $6,168,705
PE = Preliminary Engineering
6. SR 471
RESURFACING
Phase: PE/CON
To: N of Kossik Road
6
Phase: PE/CON
From: S of Unnamed Canal
To: S of Little Withlacoochee River
FY: 2016/2018
Totals: $5,449,151
ROW = Right-of-Way
CON = Construction
!
!
8
7
7. SR 52
RESURFACING
Phase: PE/CON
From: E of Driver Ln
To: E of CR 583/Ehren Cutoff
FY: 2016/2018
Totals: $3,941,954
GRA = Grant
8. ZEPHYRHILLS AIRPORT
RUNWAY 05/23 REHAB/OVERLAY
AVIATION PRESERVATION PROJECT
Phase: GRA
FY: 2016
Totals: $3,646,000
House District 38
Representative:
Danny Burgess
Amended Work Program
July, 2015
®
0
1
2
State of Florida
Department of Transportation
4
Miles
Fly UP