...

at FLORIDA WORK WORK 2016

by user

on
Category: Documents
13

views

Report

Comments

Transcript

at FLORIDA WORK WORK 2016
FLORIDA at WORK
FLORIDA at WORK 2016
Legislative Transportation Briefing
The Mission of the Florida Department of Transportation
(FDOT) is to provide a safe transportation system that ensures
the mobility of people and goods, enhances economic
prosperity, and preserves the quality of our environment and
communities.
Florida House District 83
Representative Gayle B. Harrell
Our
MISSION
KEY TRANSPORTATION FACILITIES
Transportation improvements
result in tangible benefits.
Airports:
Your
BENEFITS
Witham Field
JOBS
$1 billion invested in transportation projects supports about 28,000 jobs.
ECONOMY
Over the next five years, planned improvements will grow Florida’s Gross State Product
(GSP) by an estimated $11 billion in increased productivity.
RETURN ON INVESTMENT (ROI)
Every dollar invested in transportation is estimated to result in a return of $4.40 in
user and economic benefits to Florida’s residents and business.
Highways:
US 1, I 95
Rail:
Florida East Coast
Waterways:
St. Lucie Inlet, Okeechobee Waterway From Gulf Intracoastal Waterway To Atlantic Intracoastal
Waterway, Atlantic Intracoastal Waterway From Miami Harbor Channel To St. Johns River
FDOT DISTRICT CONTACTS
COUNTY LIST
District 4
Gerry
GerryO'Reilly,
O'Reilly,P.E.
P.E.
FDOT District Secretary
Work (954)
954-486-1400
777-4411
Cell
Cell (954)
(954) 214-1915
214-1915
[email protected]
*HUU\25HLOO\#GRWVWDWHIOXV
Martin
St. Lucie
Jim Boxold
605 Suwannee Street
Tallahaseee, FL 32399
Phone: (850) 414-4100
Phone: (850) 414-5205
Cell: (850) 509-2685
[email protected].fl.us
Mike Dew
Chief of Staff
Phone: (850) 414-5208
Cell: (850) 841-9577
[email protected].fl.us
Tom DiGiacomo
Director of Intergovernmental
Affairs
Cell: (850)694-3617
[email protected].fl.us
Our
PERFORMANCE
COMPETITIVENESS
Transportation investments are prioritized to strengthen and support our
economy. Cargo valued at $83 billion passes through Florida’s seaports, 83 million
tons of freight travel our railroads, and aviation contributes $114 billion to our
economy every year.
SAFETY
Fatality and crash rates are decreasing on Florida’s highways, protecting our
most valuable asset - our people. Safety belt usage is now at 89% - an all time high.
A new statewide initiative to improve safety for pedestrians and cyclists is now
underway.
PRESERVATION
Maintenance, pavement, and bridge conditions are meeting or exceeding
performance targets. FDOT has met or exceeded its maintenance standards since 1994.
Transportation projects require
multi-year funding.
FDOT STATEWIDE CONTACTS
Central Office
Transportation investment highlights
are found statewide.
Our
FUNDING
CASH FLOW VS. COMMITMENTS
FDOT currently has over $7 billion of secured funding commitments to transportation
contractors and partners with a projected cash balance between $200-to-$250 million.
For detailed information on transportation performance in Florida see:
WWW.DOT.STATE.FL.US/PLANNING/PERFORMANCE
Transportation Improvements
±
³
U
V
91
±
³
609A
Florida at Work
605
FLORIDA HOUSE DISTRICT 83
95
¦
¨
§
709
Project Type
±
³
1
¬
(
St
Lucie
River
Aviation, Seaport, Transit
& Intermodal
Port Saint Lucie
¬
(
5
SC
XF
Florida Transportation Vision
for the 21st Century
Bridge
6
¬
(
Capacity
Long
Creek
Diversion
Canal
ITS & Information Systems
716
T
S
7
707
3
¬
(
±
³
¬
(
Planning, Engineering, Etc.
AT LA N TI C
OCEAN
732
S
T
Rail
Resurfacing, Rehab, Etc.
Safety, Utility, Etc.
707
T
S
8
¬
(
±
³
723
p
St
Lucie
River
A1A
S
T
U
V
í
Sewall's
Point
Stuart
91
Transportation Facilities
Indian
River
FEC
o
North
Fork
St
Lucie
River
n
¤
n
£
Witham Field
4
¬
(
2
714
S
T
!
#
±
³
722
±
³
FDOT District Map:
1
£
¤
±
³
!
1
MAJOR
PROJECTS
!
1. CROSSTOWN PARKWAY
New Bridge Construction
Phase: ROW
From: Manth Ln
To: SR-5/US-1
FY: 2016-2020
Totals: $12,541,522
!
2. SR-76/KANNER HWY
Add Lanes & Reconstruct
Phase: PDE/PE/ROW/CON
From: Lost River Rd
To: Monterey Rd
3. GATLIN BLVD
Park and Ride Lots
Phase: PE/CON
From: Brescia St
To: Edgarce St
FY: 2016/2020
FY: 2016-2017
Totals: $3,128,459
Phase Key:
!
3
2
Totals: $2,022,839
!
4
4. WITHAM FIELD
Aviation Capacity Project
Phase: GRA
Sidewalk
Phase: PE/CON
From: Port St. Lucie Blvd
FY: 2017
FY: 2016
PDE = Project Development & Environment
To: MacKenzie St
Totals: $988,473
PE = Preliminary Engineering
6
6. CAMEO BLVD
Sidewalk
Taxiway "A" Improvements
Totals: $1,500,000
!
5
5. DEL RIO BLVD
Freight Intermodal Station
Railway
A1A
!
Bus Station
County Highway
±
³
±
³
95
Passenger Intermodal Station
Other US or State Highway
76A
¦
¨
§
Deepwater Seaport
Major US or State Highway
Willoughby
Creek
South
Fork
St
Lucie
River
Major Airport
Interstate Highway
714
609
Public Airport
Phase: PE/CON
!
7. TULIP BLVD
Sidewalk
Phase: PE/CON
From: College Park Rd
FY: 2016
FY: 2016/2018
Totals: $967,461
ROW = Right-of-Way
CON = Construction
!
8
7
From: Port St. Lucie Blvd
To: Crosstown Parkway
Indian
River
To: Cherry Hill Rd
Totals: $847,311
GRA = Grant
8. PORT ST. LUCIE BLVD
Add Lanes & Reconstruct
Phase: PE/ROW
From: Paar Dr
To: Darwin Blvd
FY: 2016-2017
Totals: $684,226
House District 83
Representative:
Gayle B. Harrell
Amended Work Program
July, 2015
®
0 0.5 1
2
Miles
State of Florida
Department of Transportation
Fly UP