Comments
Description
Transcript
at FLORIDA WORK WORK 2016
FLORIDA at WORK FLORIDA at WORK 2016 Legislative Transportation Briefing The Mission of the Florida Department of Transportation (FDOT) is to provide a safe transportation system that ensures the mobility of people and goods, enhances economic prosperity, and preserves the quality of our environment and communities. Florida House District 83 Representative Gayle B. Harrell Our MISSION KEY TRANSPORTATION FACILITIES Transportation improvements result in tangible benefits. Airports: Your BENEFITS Witham Field JOBS $1 billion invested in transportation projects supports about 28,000 jobs. ECONOMY Over the next five years, planned improvements will grow Florida’s Gross State Product (GSP) by an estimated $11 billion in increased productivity. RETURN ON INVESTMENT (ROI) Every dollar invested in transportation is estimated to result in a return of $4.40 in user and economic benefits to Florida’s residents and business. Highways: US 1, I 95 Rail: Florida East Coast Waterways: St. Lucie Inlet, Okeechobee Waterway From Gulf Intracoastal Waterway To Atlantic Intracoastal Waterway, Atlantic Intracoastal Waterway From Miami Harbor Channel To St. Johns River FDOT DISTRICT CONTACTS COUNTY LIST District 4 Gerry GerryO'Reilly, O'Reilly,P.E. P.E. FDOT District Secretary Work (954) 954-486-1400 777-4411 Cell Cell (954) (954) 214-1915 214-1915 [email protected] *HUU\25HLOO\#GRWVWDWHIOXV Martin St. Lucie Jim Boxold 605 Suwannee Street Tallahaseee, FL 32399 Phone: (850) 414-4100 Phone: (850) 414-5205 Cell: (850) 509-2685 [email protected].fl.us Mike Dew Chief of Staff Phone: (850) 414-5208 Cell: (850) 841-9577 [email protected].fl.us Tom DiGiacomo Director of Intergovernmental Affairs Cell: (850)694-3617 [email protected].fl.us Our PERFORMANCE COMPETITIVENESS Transportation investments are prioritized to strengthen and support our economy. Cargo valued at $83 billion passes through Florida’s seaports, 83 million tons of freight travel our railroads, and aviation contributes $114 billion to our economy every year. SAFETY Fatality and crash rates are decreasing on Florida’s highways, protecting our most valuable asset - our people. Safety belt usage is now at 89% - an all time high. A new statewide initiative to improve safety for pedestrians and cyclists is now underway. PRESERVATION Maintenance, pavement, and bridge conditions are meeting or exceeding performance targets. FDOT has met or exceeded its maintenance standards since 1994. Transportation projects require multi-year funding. FDOT STATEWIDE CONTACTS Central Office Transportation investment highlights are found statewide. Our FUNDING CASH FLOW VS. COMMITMENTS FDOT currently has over $7 billion of secured funding commitments to transportation contractors and partners with a projected cash balance between $200-to-$250 million. For detailed information on transportation performance in Florida see: WWW.DOT.STATE.FL.US/PLANNING/PERFORMANCE Transportation Improvements ± ³ U V 91 ± ³ 609A Florida at Work 605 FLORIDA HOUSE DISTRICT 83 95 ¦ ¨ § 709 Project Type ± ³ 1 ¬ ( St Lucie River Aviation, Seaport, Transit & Intermodal Port Saint Lucie ¬ ( 5 SC XF Florida Transportation Vision for the 21st Century Bridge 6 ¬ ( Capacity Long Creek Diversion Canal ITS & Information Systems 716 T S 7 707 3 ¬ ( ± ³ ¬ ( Planning, Engineering, Etc. AT LA N TI C OCEAN 732 S T Rail Resurfacing, Rehab, Etc. Safety, Utility, Etc. 707 T S 8 ¬ ( ± ³ 723 p St Lucie River A1A S T U V í Sewall's Point Stuart 91 Transportation Facilities Indian River FEC o North Fork St Lucie River n ¤ n £ Witham Field 4 ¬ ( 2 714 S T ! # ± ³ 722 ± ³ FDOT District Map: 1 £ ¤ ± ³ ! 1 MAJOR PROJECTS ! 1. CROSSTOWN PARKWAY New Bridge Construction Phase: ROW From: Manth Ln To: SR-5/US-1 FY: 2016-2020 Totals: $12,541,522 ! 2. SR-76/KANNER HWY Add Lanes & Reconstruct Phase: PDE/PE/ROW/CON From: Lost River Rd To: Monterey Rd 3. GATLIN BLVD Park and Ride Lots Phase: PE/CON From: Brescia St To: Edgarce St FY: 2016/2020 FY: 2016-2017 Totals: $3,128,459 Phase Key: ! 3 2 Totals: $2,022,839 ! 4 4. WITHAM FIELD Aviation Capacity Project Phase: GRA Sidewalk Phase: PE/CON From: Port St. Lucie Blvd FY: 2017 FY: 2016 PDE = Project Development & Environment To: MacKenzie St Totals: $988,473 PE = Preliminary Engineering 6 6. CAMEO BLVD Sidewalk Taxiway "A" Improvements Totals: $1,500,000 ! 5 5. DEL RIO BLVD Freight Intermodal Station Railway A1A ! Bus Station County Highway ± ³ ± ³ 95 Passenger Intermodal Station Other US or State Highway 76A ¦ ¨ § Deepwater Seaport Major US or State Highway Willoughby Creek South Fork St Lucie River Major Airport Interstate Highway 714 609 Public Airport Phase: PE/CON ! 7. TULIP BLVD Sidewalk Phase: PE/CON From: College Park Rd FY: 2016 FY: 2016/2018 Totals: $967,461 ROW = Right-of-Way CON = Construction ! 8 7 From: Port St. Lucie Blvd To: Crosstown Parkway Indian River To: Cherry Hill Rd Totals: $847,311 GRA = Grant 8. PORT ST. LUCIE BLVD Add Lanes & Reconstruct Phase: PE/ROW From: Paar Dr To: Darwin Blvd FY: 2016-2017 Totals: $684,226 House District 83 Representative: Gayle B. Harrell Amended Work Program July, 2015 ® 0 0.5 1 2 Miles State of Florida Department of Transportation