Session 9
Tom Andres
FDOT Central Office Structures Design
Graves Avenue Bridge over I-4: How-To Manual
Topic Description
Possible implementation Self Propelled Modular Transporters (SPMT’s) strategies on future FDOT projects.
Speaker Biography
BSCE University of Florida
20 years experience with the Florida Department of Transportation. Currently Area Engineer for Districts 4, 7 and Turnpike.
Self-Propelled Modular
Transporters (SPMT)
Possible Future Strategies
Possible SPMT Future Strategies
ƒ Strategy 1: Composite Dead Load
Designs
ƒ Strategy 2: Span Reuse Concepts
1
SPMT: Strategy 1 –
Composite Dead Load Designs
Turnpike Over I-595
151’ AASHTO Type V
SPMT: Strategy 1 –
Composite Dead Load Designs
Turnpike Over I-595
151’ AASHTO Type V
2
Strategy 1 – Composite Dead
Load Designs
SPMT: Strategy 1 –
Composite Dead Load Designs
Example - Possible Benefits
%Diff :=
σ2 :=
σ2
σ1
( σ2 − σ1)
σ1
M
S
LL
+
bc
M
⋅ 100
DL
S
⎛ σ2
%Diff := ⎜
⎝ σ1
σ1 :=
b
⎛ MLL M DL ⎞
⎜
⎟
+
⎜ S bc
S ⎟
b ⎠
⎝
:=
M LL+ M DL
σ2
σ1
M
⎞
− 1 ⎟ ⋅ 100
⎠
LL
+M
S
DL
bc
S ⎞
⎛
⎜ M + M ⋅ bc ⎟
DL S ⎟
⎜ LL
b ⎠
⎝
:=
(MLL + MDL)
S bc
σ2
σ1
S
M
⎛⎜
DL bc ⎞
⎟
1+
⋅
⎜
M
S ⎟
LL
b ⎠
⎝
:=
M
1+
DL
M
Tension at
Bottom of Beam
LL
M
S ⎞
⎡⎛
⎤
⎢ ⎜ 1 + DL ⋅ bc ⎟ ⎥
M
S ⎟
⎢ ⎜⎝
⎥
LL
b ⎠
%Diff := ⎢
− 1⎥ ⋅ 100
M
DL
⎢
⎥
⎢ 1+ M
⎥
LL
⎣
⎦
3
SPMT: Strategy 1 – Composite Dead
Load Designs
SPMT: Strategy 1 – Composite Dead
Load Designs
Span Length (L)
L/2
L/2
Concrete Deck
Jacks
Typ.
Prestressed Beam
Deck Closure
Pour
Temporary Shoring
Typ.
4
SPMT: Strategy 1 – Composite Dead
Load Designs
Jacks
Typ.
1
2
3
Differential Settlement Between Temporary Supports
1
2
3
Consider Preloading Temporary Shoring
SPMT: Strategy 1 –
Composite Dead Load Designs
Considerations:
ƒ Beam Stability
ƒOff-site Fabrication vs On-site
ƒTemporary Bracing
ƒ Temporary Supports
ƒGeometry Control
ƒDifferential Settlement
ƒ Shear Requirements May Govern
ƒ Site Access Issues
5
SPMT: Strategy 2 – Span Reuse Concepts
Florida is Predicted to
Replace New York as the
Third Largest State by 2030.
Urban Bridges in Florida are
Replaced Based on Highway
Capacity Needs Well Before
They Have Reached Their
Useful Life.
We Recycle Bridges
SPMT
SPMT: Strategy 2 – Span Reuse Concepts
Interstate Widening Example
Braided Ramps
6
SPMT: Strategy 2 – Span Reuse Concepts
Interstate Widening Example
Construct New
Piers and End
Bents
Construct New
Piers and End
Bents
SPMT: Strategy 2 – Span Reuse Concepts
Interstate Widening Example
Move Braided Ramps OutOutward to Make Room For
Interstate Widening
7
SPMT: Closure Pour & Diaphragm
Details
Control Joint
Hard Points
Up-ward
Thrust
Deflected Shape
SPMT: Closure Pour & Diaphragm
Details
B
Mild Reinf.
Formed Thru
Holes
Level
Neoprene Pad
B
Section Thru Intermediate Girder
8
SPMT: Closure Pour & Diaphragm
Details
Prefab. Span
CIP
Control Joints
Partial Height
Diaphragm
Long. Reinforcing
Steel
Closure
SDG
4.2.6
Compressible Material
Epoxy Grout
Strand Protection
Section B-B
Bars 3D1
& 3D2
Optional
Splice
Epoxy Grout
2” CL
Future I-4 Widening Project
ƒ Incentive – Disincentive (I/D) to
Reduce Construction Time and Traffic
Impacts
ƒ Cassadaga Road
– I/D $7,500/day up to $150,000 max.
– Bonus - $200,000
ƒ Total Project Completion
– I/D $15,500/day up to $2,000,000 max.
ƒ SPMT Contractor Alternates
ƒ Span Installation Plan
ƒ Composite Dead Load Design
9
SPMT- Another Useful Tool in the Toolbox
SPMT
SPMT: Questions