...

PONY ZERO S.R.L.- P.IVA/CF 10944790012 - R.E.A.

by user

on
Category: Documents
37

views

Report

Comments

Transcript

PONY ZERO S.R.L.- P.IVA/CF 10944790012 - R.E.A.
P O N Y Z E R O S . R . L . - P. I VA / C F 1 0 9 4 4 7 9 0 0 1 2 - R . E . A . T O 1 1 7 4 9 2 0 - V i a P o 5 2 , 1 0 1 2 3 To r i n o
PonyZero
Pony Zero is the leading company in last mile green logistics, providing a solution to the problem of
urban deliveries by combining the agility of bicycles in built-up areas and Pony Zero’s management
software. It provides the fastest and most efficient city delivery service with zero environmental
impact, managing to ensure an average of 15 deliveries an hour and to deal with sudden surges in
shipments. This perfect blend of tradition and technology makes Pony Zero an indispensable partner
for major distribution players, who precisely in urban deliveries suffer their greatest losses of efficiency.
PROBLEMS
Inefficiency
all traditional couriers in
urban area
LIMITS
to access all restricted
traffic areas
IMPOSSIBILITY
in evading traffic
VERY HIGH COSTS OF FLEET
with INSURANCE, FINES AND FUEL
POLLUTION
Environmental pollution
IN TIME
Delivery in time < 90%
SOLUTION
B i k e s
-
m a n a g e m e n t
s o f t w a r e
Evading the Traffic + Access to
all restricted traffic areas
Zero CO2 emissions for
the social balance
Breakdown of the fix
fleet costs
LAST MILE
LOGITICS
M A N Y
T O
O N E
O N E
0 - 5KG
volume weight
HUB
T O
M A N Y
HUB
Highlights
15
Time/Courier Delivery
FLEXIBILITY
Management of peaks for sudden deliveries
CO2
SOCIAL BALANCE
EFFICIENT
COST RESTRAINT
%
8
9 E
M
I
T
N
I
OPERATIONAL
AREA
ALL THE CITY
CITY CENTERS AND HIGH DENSITY RESIDENTIAL
WE DELIVER
0 - 5KG
VOLUME WEIGHT
OPERATIONAL
TIMELINE
60
arrival of
packages at HUB
hour 0
initial check
15 min
60
1st wave
2nd wave
3rd wave
45 min
1 hour
3 hours
return to HUB
3,5 hours
final check
4 hours
cashier and
returned goods
4,5 hours
FAULTS
MANAGEMENT
BIKE REPLACEMENT REPLACEMENT IN 30 MIN
01
BIKE DAMAGE
02
DELIVERY
DELAY
SUPPORT WITH MEANS OF
TRANSPORTATION AND BIKERS
03
SOFTWARE
DAMAGE
DISASTER RECOVERYDISPATCHING EXCE
Software
App
P O N Y Z E R O
S A F E T Y F I R S T
THE PARTNERSHIP
Together to give a secure future for the bicycle green deliveries.
The partnership ensures continuous monitoring and protection of the bike, the
goods and the rider.
Last mile smart logistics developed by Pony Zero – geared to environmental
sustainability and integration with urban smart services – joins forces with managed
security tools, linked to the Axitea Control Centre.
Axitea, operative 24 hours a day 365 days a year, track the routes taken by the
riders, geolocalize and protect the goods, and guarantee quality of service to the
end users.
SATELLITE
CONTROL
Control of all vehicles in the fleet
GPS tracking system in real time
Localization is scheduled at specified intervals and tracking position programmable at
hourly intervals.
SATELLITE
CONTROL
Check the fixed road maps and tracking of the routes
Real-time communication with the drivers by receiving and sending of
messages
Journey control: Bound trip in terms of covered distance, automated security
with control at the starting point, loading – unloading point
SAFE
THE VEHICLE
aluminum frame
Velo
Saddle
Change Hub
Alfine 8 speed
Hydraulic Disc Brakes
Shimano Alfine
Satellite Control
Center Stand
SAFE
GOODS
SECURITY
LIVELLO
IPX0
RESISTENZA
No protection
IPX1
Protected against the vertical falling
of water drops
IPX2
Protected against the falling of
water drops tilted at 15°
IPX3
Protected against the rain
IPX4
Protected by splash
IPX5
Protected against water jets
IPX6
Protected from waves
IPX7
Protected from temporary
immersion
IPX8
RESEARCH AND DEVELOPMENT:
BOX DESIGNED AND MANUFACTURED EXCLUSIVELY BY
PONYZERO
Lightness and strength make it the most suitable for the carriage of
packages through a cargo bike.
Protected against continuous
immersion
Material: Aluminum
Thickness: 1.5 mm
Impermeability and resistance to water (IPX6 International Trademark
Protection)
SATELLITE S
ECURITY
THE BACKPACK
Technical features:
height: 50 cm
width: 39 cm
depth: 23 cm
weight: 1250g
capacity: 49 L
Material: coated polyester and Cordura
Water resistance: IP53 Certified
Customization: on request
SAFE
RESISTANCE
WATER RESISTANCE CERTIFIED
COMPARATIVE
TEST
UNSAFE
UNSAFE - SAFE
SAFE
Tricycle with front load
Type: Tricycle
Cargo Material : forex /
lightweight plastic
Stability in the street: Poor
Agility in traffic: Poor
Cargo security: not guaranteed
Cargo bikes with front load
Tricycle with rear load
Type: Tricycle
Cargo Material: plastic
Stability in the street: Poor
Agility in traffic: Very Poor
Cargo security: not guaranteed
Type: Cargo
Cargo Material: anodized aluminum
(higher security than the sheet metal
of a van)
Stability in the street: excellent
Agility in traffic: excellent
Cargo security: certified UFO Lock.
BOX LOCK
UNSAFE
Boxes with a lock not burglar-proof
SAFE
Pony Zero Boxes with Ufo Lock
B R A N D I N G
Branding tailor made
BRANDING
TAILOR MADE
YOUR BRAND
CLOTHING
YOUR BRAND
A B O U T
U S
THE CERTIFICATIONS
DUVRI
TRANSPORTATIONS
FOR THIRD PARTIES
DURC
INSURANCES
DOCUMENTO UNICO DI REGOLARITÀ CONTRIBUTIVA
PER ATTESTAZIONE SOA / ISCRIZIONE ALBO FORNITORI
-
Rilasciato a datore di lavoro
Protocollo documento n°
35427675
del
Codice Identificativo Pratica (C.I.P.)
(da citare sempre nella corrispondenza)
12/05/2015
Spett.le PONY ZERO SRL
[email protected]
20151968798711
Impresa
PONY ZERO SRL
Sede legale
CORSO FRANCIA 62/D 10143 TORINO (TO)
Sede operativa/Ind attività VIA PO 52 10123 TORINO (TO)
e-mail
vbaronchelli@cmserviceweb.
e-mail PEC
it Codice Fiscale
10944790012
C.C.N.L. applicato
L'impresa dichiara di applicare il Contratto Collettivo Nazionale di Lavoro,stipulato dalle organizzazioni sindacali
comparativamente più rappresentative, del seguente settore: COMMERCIO
[email protected] Con il presente documento si dichiara che l'Impresa RISULTA REGOLARE ai fini del DURC in quanto:
X I.N.A.I.L. - Sede di TORINO CENTRO
X È assicurata con Codice Ditta n° 19289290
Risulta regolare con il versamento dei premi e accessori al 12/05/2015
Il responsabile del procedimento GAMBINO MARINA
X I.N.P.S. - Sede di TORINO
X È iscritta con Matricola Azienda n° 8143544715
Risulta regolare con il versamento dei contributi al 12/05/2015
Il responsabile del procedimento TAMBORRINO GIOVANNI
DURC valido 120 giorni dalla data di emissione, non utilizzabile per appalti pubblici e lavori edili privati soggetti a DIA o a permesso di costruire.
IL PRESENTE CERTIFICATO NON PUÒ ESSERE PRODOTTO AGLI ORGANI DELLA PUBBLICA AMMINISTRAZIONE O AI PRIVATI GESTORI DI
SERVIZI PUBBLICI.
Il certificato viene rilasciato in base alle risultanze dello stato degli atti e non ha effetti liberatori per l'Impresa. Rimane pertanto impregiudicata l'azione per
l'accertamento ed il recupero di eventuali somme che successivamente risultassero dovute.
Emesso dall' INPS in data 14/05/2015
Per INAIL-INPS
Il Responsabile dello Sportello Unico Previdenziale
CAPANO ANNA
Per verifica www.sportellounicoprevidenziale.it
Pag 1 di 1
-
n° 2015/03/2223382
n° 2015/10/2835664
MADE WITH REALE
MUTUA
ROAD MAP
Operative Cities
TURIN
MILAN
Volume Attainable
10.000
Packages day/City
Next Opening
ROME
BOLOGNA
GENOA
60 Days
Time to StartUp in new city
FINANCIAL
STABILITY
BUSINESS ANGEL
CLUB DIGITALE
VENTURE CAPITALIST
WORKING MEMBERS
MANAGEMENT
TEAM
davide
fuggetta
alessandro
mohammadi
cto & founder
chief strategy
officer
paola lombardi
CHIEF marketing
OFFICER
Alessandro mina
marco actis
ceo &
founder
CHIEF BRAND
OFFICER
dario montagnese
chief financial
officer
P O N Y Z E R O S . R . L . - P. I VA / C F 1 0 9 4 4 7 9 0 0 1 2 - R . E . A . T O 1 1 7 4 9 2 0 - V i a P o 5 2 , 1 0 1 2 3 To r i n o
Fly UP