Comments
Description
Transcript
CSA07_Ezio
Metrica CSA07 1. Neil Geddes CSA07 Meeting 1 Nov 2007 Reconstruct events at the Tier-0 at greater than 100 Hz for 30 day a) The target is 24 hr/day, threshold 20 hrs/day 5 days a week Output Rate to CASTOR 1.400 1.200 1.000 <GB/sec> Target: 100 Hz ~ 500 MB/s Otput Rate to Castor 0.800 Output Rate 0.600 Target 0.400 0.200 0.000 1 4 7 10 13 16 19 22 25 28 Challenge Day 2. Transfer data between CERN and the Tier-1 centers at agg. rate of 300MB/s a) Each Tier-1 site should have a successful transfer on 95% of the challenge days b) Each Tier-1 should reach their fraction of 300MB/s on 50% of the challenge days T0-T1 transfer c) The threshold rate is 200MB/s 1000% % of nominal rate CERN->ASGC CERN->CNAF 100% CERN->FNAL CERN->FZK CERN->IN2P3 10% CERN->PIC CERN->RAL 1% 1 4 7 10 13 16 19 22 25 28 Challenge Day 3. Transfer data from a Tier-1 to any Tier-2 centers with 12 hour bursts between 20200MB/s depending on the link a) The threshold is 10MB/s for 12 hour bursts at 75% of the Tier-2 sites > 1 Tier-1 4. Transfer data from Tier-2 to associated Tier-1 at a sustained rate of 10MB/s a). Threshold goal is 50% of the participating Tier-2 centers • 45 “Active” T2 sites during CSA07 • As of last week (DDT) • 31 sites have commissioned uplinks • 30 sites have commissioned downlinks • 12 sites have no commissioned links •T2 sites transferring >430GB from a T1 in a day = • 12 for production data (27%) BUT 36 for debug (80%) •Number of T2 sites doing this from more than 1 T1 = • 4 for production data (9%) BUT 26 for debug =(62%) • T2 sites transferring >430GB to a T1 in a day = • 0 for production data (no data to transfer) • 29 sites (64%) for debug data Legnaro e‘ tra i 36 siti sopra soglia in download in modalita’ Debug e’ tra i 29 siti sopra soglia in upload in modalita’ Debug In modalita’ Production non sono stati ricevuti files dalla CSA07 e sono stati inviati dati MC sotto il valore di soglia. 5. Demonstrate the execution of skimming and reprocessing jobs at Tier-1 centers a). Target from the computing model is 25k jobs/day. Threshold goal is 10k jobs/day 6. Demonstrate analysis processing at Tier-2 centers driven by user submissions a).The target is 75k jobs per day. The threshold goal is 50k 7. Simulate 50M events per month using the Tier-2 centers a). Threshold goal is 30M events per month Stato CSA07 Ezio Torassa Padova 1/10/07 La CSA07 prevede il processamento di due gruppi di dataset 1) CSA07 Cocktail ~ 100 M di eventi di “fondi” Min bias (20 Mevt) QCD jets (25 Mevt) photon+jets (5 Mevt) Drell-Yan and Onia (10 Mevt) Electrons/muons enrich. (mostly from b-decays) (20 Mevt) W/Z (plus jets) (20 Mevt) Top (1 Mevt) 2) CSA07 Signal ~ 100 M di eventi di segnali e “fondi” H->ZZ, H->WW, qqH, VVH , H->2g , SUSY, Z’, altri EWK Ogni gruppo verrà suddiviso in 7 Primary Dataset (raggruppamenti di stream HLT): Electron, Muon, Tau, bJet, JetMET, Photon, JetMETCa Stato CSA07 – CSA07 Cocktail Ilaria Segoni EWK meeting 6/11/07 Preparation of three soups: - ALPGEN “Chowder” To Be Re-done - PYTHIA with Filters “Stew” Done - PYTHIA without Filters “Gumbo” To be done – Dividsion of each samples in 6+1 Primary Datasets based on HLT: Electron, Muon, JetMET, BJet, Tau, Gamma, AllEvent done for available soups (Chowder & Stew) ALPGEN “Chowder” (La zuppa di pesce) – ttbar+Jets (up to – W+Jets (up to 5 Jets) – Z/g*+Jets (up to 5 Jets) • /CSA07Muon/CMSSW_1_6_4-CSA07-Tier0-A2-Chowder/RECO /Wmunu/CMSSW_1_6_7-CSA07-1192835438/RECO …………… /Zmumu/CMSSW_1_6_7-CSA07-1192835913/RECO The Status: – The AllEvent PD was RECO’ed and Skimmed, but the RECO step included the HCAL bug it will be re-done (note that due to computing problems it would have had to be re-done anyways) PYTHIA with Filters “Stew” (lo stufato) • The Samples: /CSA07Muon/CMSSW_1_6_7-CSA07-Tier0-A2-Stew/RECO – BbartoJpsi – BtoJpsi – bbe_Pt_170_up, bbe_Pt_50_170, bbe_Pt_5_50 – QCD_Pt_0_15 – Charmonium_Pt_20_inf, Charmonium_Pt_0_20 – Bottomonium_Pt_20_inf, Bottomonium_Pt_0_20 – Electron_ppEleX – Muon_ppMuX • The Status: – Split in 6+1 Primary Datasets: Done – RECO (with CMSSW_167, HCAL BUG fixed release): Ongoing – Skimming: Starting PYTHIA without Filters “Gumbo” (la zuppa densa) • The Samples: – QCD di-jets (Pt_hat >15 GeV) – MinBias – Gamma+Jets – DY (ee,mm,tt), only 10GeV <M_ll <40GeV bin (M_ll already included form Alpgen Z/g*+Jets) • The Status: to be done CSA07 Signal The Status: GEN-SIM: Started in September (almost done for Pythia, started last week for Alpgen as a new release, 149, was needed to include all new phase space grids and input files) DIGI & DIGI To Raw HLT RECO Ongoing for samples already GEN-SIM’ed DBS2 12/11/07 ore 11 Mh=120 No GEN-SIM-DIGI-RAW-HLT-RECO /H130_WW_2l/CMSSW_1_6_7-CSA07-1194126306/RECO cmssrm.fnal.gov dpm01.ifca.es - srm.grid.sinica.edu.tw /H140_WW_2l/CMSSW_1_6_7-CSA07-1192835331/RECO ccsrm.in2p3.fr dpm01.ifca.es 80% /H150_WW_2l/CMSSW_1_6_7-CSA07-1194126384/RECO cmssrm.fnal.gov dpm01.ifca.es - - srm.grid.sinica.edu.tw /H160_WW_2l/CMSSW_1_6_7-CSA07-1192836764/RECO 80% 80% 80% srm.cern.ch - /H165_WW_2l/CMSSW_1_6_7-CSA07-1194126460/RECO ccsrm.in2p3.fr cmssrm.fnal.gov dpm01.ifca.es srm.cern.ch - /H170_WW_2l/CMSSW_1_6_7-CSA07-1194126536/RECO cmssrm.fnal.gov dpm01.ifca.es Mh=180 srm.grid.sinica.edu.tw No GEN-SIM-DIGI-RAW-HLT-RECO /H190_WW_2l/CMSSW_1_6_7-CSA07-1194126661/RECO -cmssrm.fnal.gov dpm01.ifca.es srm.grid.sinica.edu.tw /H200_WW_2l/CMSSW_1_6_7-CSA07-1192835385/RECO ccsrm.in2p3.fr dpm01.ifca.es 5% - Stato CNAF (da Daniele Bonaccorsi, 12/11/07 ore 10:55): “Ci sono dei problemi strutturali su Castor che al momento bloccano interamente le attivita' (e non hanno certo facilitato le operazioni in CSA07). Ne stiamo discutendo ora con i responsabili storage”. Stato Legnaro: Sottoscritti i primi due skim elencati di seguito. I dati sono attualmente a PIC ed il link verso tale Tier-1 per Legnaro non e’ attivo, servira’ un trasferimento ponte. Request 15801 (12/11/07 ore 10:44) /CSA07Muon/CMSSW_1_6_7-CSA07-Stew-P1-PDMuon-Skims0-wToMuNu_Filter/USER Creato da: Sridhara Dasu Files: 103 Bytes: 97.6 GB Sottoscritto da: Ezio Torassa Request 15802 (12/11/07 ore 10:56) /CSA07Muon/CMSSW_1_6_7-CSA07-Stew-P1-PDMuon-Skims0-zToMuMu/USER Creato da: Nicola De Filippis Sottoscritto da: Ezio Torassa Files: 540 Bytes: 691.5 GB Ian Fisk CSA07 meeting 8/11/07 • La CSA07 si considera conclusa Martedí 6 Novembre. • La conclusione si riferisce allo studio della metrica, i processi previsti (skim, trasferimenti ai Tier-2, analisi dei dati) continueranno fuori dalla CSA07 Stato Analysis Notes Presentazioni di E. Di Marco e J. Alcaraz ai Physics Days 25 Ottobre Sections Editors The CMS Detector Yves Sirois Monte Carlo Datasets G. Gomez-Ceballos, F. Stoeckli Trigger Selection and Event Skimming E. Torassa Reconstruction and Selection of Isolated Leptons E. Di Marco, E. Delmeire Central Jet Veto and Missing Transverse Energy J. Weng Event Selection and Kinematics F. Stoeckli, C. Rovelli Control of Background Rates From Data Systematics Mass Hypothesis Dependent Analysis using Sequential Cuts F. Stoeckli, P. Govoni, C. Rovelli Analysis Using Multivariate Techniques G. Gomez-Ceballos Deadlines Analysis Notes • Primo Draft 18 Ottobre • Aggiornamenti (presentazioni o pre-approval) 20 Novembre • Approvazione finale 10-14 Dicembre (CMS week) oppure 22-24 Gennaio (Physics Days)