Phare twinning project BG/2004/IB/EY/01
ENERGY AUDIT
on New University of Plovdiv Building - Block A
Case studies work by STE Expert team
in collaboration with Bulgarian EEA
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Blocco A
A
entrata
Block A ( wing on left side ) :
1. Individual heating sub-station ( database )
2. Utilization ( representative )
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Plant ground area
LBA
Heated floor
Gross Volume
Net heated Volume
m²
m²
m²
m³
m³
5.467
3.115
5.293
22.198
15.538,6
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Parete verticale
1. Intonaco
2. Pannello
cemento
3. Pannello pietra
Vetrate
1. vetro
2. camera
2,42
1,60
Institutional Building at the Energy Efficiency Agency
3. vetro
Phare twinning project BG/2004/IB/EY/01
Cornice verticale
1. ponte termico:
2. teoria delle alette
3. Keq. = 1,91 W/ mq*K
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Solaio interrato
1. Solaio cemento
2. Camera d’aria
3. Basamento
Solaio a cielo
1. Solaio cemento
2. Camera d’aria
3. Isolante in fibra
4. Solaio cemento
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
A2
Rs
A3
e3
R3
LT
Rs
A4
i3
R2
R4
Rs
Rs
i2
i4
θe
Rs
e2
θu
i2
θs
Rs
Rs
i1
2. Risultati in linea con
riferimenti generali
R2,
A2
θsi
Rs
δвс
e1
1. Analoghi risultati della
EEA in Mladost
R1
A1
Rs
e3
2
Rs
e1
θ
R1,
A1
Applicazione del modello
resistivo:
R3,
A3
i3
i
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Centrale termica:
1. Bassa temperatura entrata
( 60 °C contro i 80 °C)
1. Cattive condizioni dello scambiatore
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Radiatori:
1. Con copertura in legno
si abbassa l’efficienza di
emissione
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Sistema di condizionamento:
1. Tipologie differenti di potenza e
vetustà
2. Presenti solo in alcuni ambienti
3. ( studi dei professori )
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Sistema di illuminazione
1. Lampade a medio
consumo
2. Utilizzo consistente degli
apparati dato
l’ombreggiamento degli
edifici a corte
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
distribuzione dei consumi per tipologia
Distribution of Energy expenses
Electricity
Heating
69%
31%
Distribution of Electricity demands
Lighting
Climatization
10%
12%
Power station
Office appliances
17%
61%
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Consumi reali nel periodo 2003-2006
Electricity consumption
400.000
300.000
200.000
100.000
0
2003
2004
2005
2006
Electricity expenses (BGN) 2003-2006
60.000
40.000
20.000
0
2003
2004
2005
2006
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
2003-2006
Average monthly
temperatur
e of
external air
Central heating
Electric Energy (1)
Month
Substation “A”
consumption
from D.H.
network
Water supply
Room heating
UHW (2)
M
оС
Day Degree
2003
2.551
2004
2.416
2005
2006
МWh
317,45
BGN
MWh
BGN
MWh
BG
N
W
h
W
h
BGN
39.363
366,65
28.965
6
474
369.14
51.670
393,54
34.666
6
528
2.664
350,56
45.274
394,24
31.145
6
474
2.483
297,73
36.918
348,04
27.495
6
430
m3
Valori medi 2003-2006
gradigiorno 2500;energia elettrica 333 MWh; termica 376 MWh
Institutional Building at the Energy Efficiency Agency
BGN
Phare twinning project BG/2004/IB/EY/01
Provincia autonoma di Bolzano
Software casaclima
1. Semplicità di confronto
con altri software
2. Open source quindi
confrontabile assieme a
terzi ( EEA )
3. Aggiornato su fabbisogni
di raffrescamento ed
energia primaria ( forma
semplificata )
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Provincia autonoma di Bolzano
Software casaclima
1. Inserimento dati
dimensionali
2. dati
climatici
a database
Institutional
Building at the Energy
Efficiency
Agency
Phare twinning project BG/2004/IB/EY/01
Inserimento di
1. Tipologie costruttive 2. superfici di scambio termico
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Inserimento di
1. Dettagli caratteristiche tecniche ( spessori- trasmittanze termiche )
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Provincia autonoma di Bolzano
Output
1. Fabbisogni
specifici
2. Potenze
specifiche
3. Classificazione
su protocollo
casaclima
( Bolzano e località
riferita )
Phare twinning project BG/2004/IB/EY/01
Provincia autonoma di Bolzano
Input
1. Caratteristiche
impianti elettrici
2. raffrescamento
Correzione
1. Su dati reali i
calcoli sono stati
integrati
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Provincia autonoma di Bolzano
Output
1. Fabbisogni
specifici
2. Potenze
specifiche
3. Classificazione
su protocollo
casaclima
( Bolzano e località
riferita )
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Misure correttive di efficienza energetica proposte
Energy Efficiency
Measures
Existing
situation
Proposed
situation
Profitability analysis (1)
Savings
Costs
savings
kWh
kWh
kWh
%
BGN
BGN
Payback
time
1
Wall insulation (heat)
683.371
414.627
268.774
39,3
138.900,00
23.649,00
5,9
2
Replacement of woodwork
(heat)
683.371
577.615
105.756
15,5
253.678,00
9.306,00
27,3
374.530
54,8
392.578
32.955
11,9
TOTAL (heat)
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Misure correttive di efficienza energetica proposte
Energy Efficiency
Measures
Profitability analysis
Existing
situation
Proposed
situation
kWh
kWh
kWh
%
375.600
300.480
75.121
20
Savings
Costs
BGN
savings
BGN
Payback
time
3
Heat exch. Station
refurbishing (heat)
4
Heat exch. Station
refurbishing
(electric)
13.140
11.856
1.284
9,7
5
Dismantling of
radiator’s wooden
case (heat)
165.000
156.750
8.250
5
2.800
726,00
3,9
6
Thermostatic valves
installation (heat)
168.000
142.800
25.200
15
6.300
2.218,00
2,8
7
Lighting plant
refurbishing
(electric)
117.383
54.057
63.326
54
48.315
8.866,00
5,4
TOTAL (heat)
108.571
n.d.
n.d.
9.554,00
n.d.
TOTAL (electric)
64.610
n.d.
n.d.
9.046,00
n.d.
6.610,00
25.750
3,8
180,00
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Conclusioni e suggerimenti
1. Sul profilo tecnico la conoscenza e il potenziale utilizzo di più
software aumentano la qualità del risultato finale riducendo la
probabilità di errore umano che nel caso di raccolta ed elaborazione
dati è significativo
2. Gli interventi di efficienza energetica, contestualizzati nell’ambito
territoriale ( costi energetici della Bulgaria ) si evidenziano
comunque come interessanti sul profilo economico finanziario oltre
che ambientale ( isolamento a cappotto, valvole termostatiche,..)
3. La competenza in materia energetica dovrebbe essere vincolante in
fase progettuale poiché ai casi come questo, concorrente alle
aspettative architettoniche ( in cui la EEA è in grado di svolgere un
ruolo di riferimento istituzionale )
Institutional Building at the Energy Efficiency Agency
Phare twinning project BG/2004/IB/EY/01
Si ringraziano tutti i membri della EEA per
l’ospitalità e la disponibilità ricevuta
Institutional Building at the Energy Efficiency Agency
Fly UP