Comments
Transcript
The installation and interconnection of cryomagnets
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005 AB/BT equipmentGeneral in PS complex situation SPC 13:39 beam at the end of TI 8, some 2.5 km away, at first attempt • length of newly tested part ~ 2.5 km beam tests 23./24.10.04 6./7.11.04 • over 400 magnets MQI chamber beam tests 8.9.03 TI 8 LHC SPS TI 2 TI 2 upstream part commissioning (w/o beam) possible as of Q2/2005 TI 8 commissioning / V.Mertens / TCC, 29.10.2004 L.R. Evans – EDMS Document No. 521217 CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 3 2 Beam parameters obtained from the central frequency measurements, averaged over the data obtained from the horizontal and vertical planes. CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 3 Results of TI8 test CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 4 End of civil engineering works in Point 5 (1st February 2005) CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 5 Superconducting cable 1 CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 6 Superconducting cable 2 CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 7 Dipole cold masses CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 8 230 220 210 200 190 180 170 160 150 140 130 120 110 100 90 80 70 60 50 40 30 20 10 0 02 03 n o tr ea c h ed 7 6 5 4 3 2 1 01 0 Number of cryo-dipoles Number of quenches to reach 8,33 T at the first cooldown (560 dipoles) Num be r of que nche s to r e ach 8.33T CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 9 LHC Dipoles: integrated field Cold mass Firm 1 Firm 2 Firm 3 40 upper limit for single magnet (3 sigma) 10.13 20 10.11 0 10.09 -20 Units Int transf func (Tm/kA) 10.15 lower limit for single magnet (3 sigma) 10.07 -40 0 100 200 300 400 500 600 Magnet progressive number CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 700 AT-MAS 10 Dipole field quality: average b3 b3 integral (units) Cold mass Firm 1 Firm 2 Firm 3 10 5 upper limit for systematic 0 lower limit for systematic -5 Cross-section 2 -10 0 100 Cross-section 3 200 300 400 500 Magnet progressive number CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 600 700 AT-MAS & MTM 11 Arc quadrupole cold masses CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 12 MSCB sextupole dipole correctors CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 13 Cryodipole overview CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 14 SSS overview CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 15 Magnet Installation • Installation is progressing in sectors 8-1 and 4-5. More than 100 superconducting magnets have been installed. The installation rate must now ramp up to 20 magnets per week (16 dipoles and 4 SSSs) in the next few weeks. • At the end of October, sector 7-8 will be liberated for magnetic installation. From then on there will be no shortage of slots. CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 16 First cryodipole lowered on 7 March 2005 CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 17 First SSS lowered on 19 April 2005 CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 18 Transport in the tunnel with an optical guided vehicle CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 19 Transfer on jacks CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 20 Preparation of interconnect CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 21 Interconnection of beam tubes CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 22 Interconnect in sector 8-1: in progress in subsectors C and F CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 23 Pre-assembly of first low-beta triplet (hall 181) CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 24 CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 25 UA47: Quench protection & Power converters CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 26 CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 27 Cryogenics overview CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 28 2400 W @ 1,8 K in the UX85 cavern 1.8K refrigeration units 1st Pump-down in final LHC configuration P8 - 7 April 2005 0.50 2500 0.40 Installed mode 2400 W @ 1.8 K 0.35 0.30 2000 1500 0.25 0.20 Suction Pressure 0.15 Set point 0.10 0.05 Pump-down 15 mbar 1.8K Cooling Power 0.00 7:12 1000 Cooling Power [W] Suction Pressure [B] 0.45 500 0 8:24 9:36 10:48 12:00 Time CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 29 Repair of QRL modules CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 30 Repair of special QRL elements at CERN CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 31 Cryogenic distribution line CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 32 QRL CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 33 Reinstallation of QRL in 7-8 • Sub-sectors A and B (600 m) have been cooled down on Wednesday 14th September. • After the cold tests, the inner triplet will be installed, cooled down and powered whilst the rest of the line is being installed. CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 34 First cooldown of 600 m cryogenic LHC line sector 13-14 September 2005 LHe line Th.screen line He in He out Pump. line 20 K line Conclusions • • • • • • • Main objectives: – terminate installation in February 2007 – first collisions in summer 2007 The industrial production of standard components is compatible with this objective. The ramping up of QRL activities and magnet installation is critical to maintain this schedule. Additional actions have been implemented to ensure proper QRL production and installation rates. The installation and interconnection of cryomagnets have started in the tunnel. The commissioning of technical systems will take place in two adjacent sectors in parallel. Main next actions: – partial test of sector 7-8 in autumn 2005 – commissioning test of the two first sectors (7-8 and 8-1) in summer 2006 – find external collaborators to help with commissioning. => many thanks to INFN for its support ! CERN L.Evans & C.Wyss INFN CSN1 Napoli September 2005 36