Comments
Description
Transcript
nhxm phase a: the people - ASDC
Il programma NHXM sviluppato dall'ASI Ing. Mauro Piermaria New Hard X-Ray Mission Workshop Nazionale 12 e 13 novembre 2009 – ASDC, Frascati PRESENTATION TOPICS 12-13 novembre 2009 DEVELOPMENTS OF THE ASI NHXM PROGRAM NHXM PHASE A: THE PEOPLE NHXM PHASE A: PRODUCT TREE NHXM PHASE A: INDUSTRIAL ORGANISATION NHXM PHASE A: DETAILED ACTIVITIES NHXM PHASE A: THE COMMON PLATFORM SIMBOL-X MAIN CARACHTERISTICS EXIT-SAT: MAIN SPECIFICATIONS EXIT-SAT: CONFIGURATION CONCLUSIONS New Hard X-ray Mission Workshop; ASDC, Frascati Ing. Mauro Piermaria 2 DEVELOPMENTS OF THE ASI NHXM PROGRAM NHXM is the ASI program with the aim to launch a new mission for Hard X-ray observations Pre-phase A study, in the NHXM frame, mainly relevant to the Simbol-X collaboration has been conducted; 9/2006 – 1/2007. NHXM phase A contract with Mirror technological development, MSC satellite of Simbol-X development and Exit-Sat Satellite development started in 7/2007. First change with deeper analysis on mirror technology (Ni-Co electroforming, Multilayer deposition) Second change with the development of a common platform for MSC and DSC (to be used also for EXIT-SAT) Conclusion of the NHXM phase A (Simbol-X and Exit-Sat phase A), 1/2009. Initial duration of 13 months, extended to 18 months. A further technological study (only on X-rays multilayer mirrors), continuation of the work performed during the NHXM phase A, has been initiated in 3/2009, and still on going. 12-13 novembre 2009 New Hard X-ray Mission Workshop; ASDC, Frascati Ing. Mauro Piermaria 3 NHXM PHASE A: THE PEOPLE Continuous collaboration with CNES on Simbol-X program, while only Italian involvement on EXIT-SAT mission. Continuous improvement of the knowledge by confrontation with our program partners Conclusion of the ASI-CNES collaboration on Simbol-X Program, 4/2009. Internal Agency resources (8+1 persons). INAF resources (from different locations and institute) Industrial resources (TAS-I, MLT, BCV, TPZ, INAF-OAB) Large but efficient integrated team working on NHXM for almost 2 years. Once again, demonstrated ability for such a team, to deal and interact productively with other international partners. 12-13 novembre 2009 New Hard X-ray Mission Workshop; ASDC, Frascati Ing. Mauro Piermaria 4 NHXM PHASE A: PRODUCT TREE 12-13 novembre 2009 New Hard X-ray Mission Workshop; ASDC, Frascati Ing. Mauro Piermaria 5 NHXM PHASE A: INDUSTRIAL ORGANISATION ASI NHXM Prime Contractor TAS- AAS-I I (ex AAS- I) Prime - Study Coordinator - Reference versus ASI Optical Payload MLT MLT - Optical P/L Mng - Multilayer tech. dev. - MM Integration INAF-OAB - Mandrel Development - Technology Dev. - CfA & MPE Collab. - Scientific Coordination BCV - Structural Analysis - Therm.Struct. Analysis 12-13 novembre 2009 Simbol-X AAS-I AAS-I - System Analises - MSC system/sub. defi. - I/F Definition & Budget - Design & Dev. plan - Sub-Contractor Coord. Telespazio - Ground Segment def. Customer Agenzia Spaziale Italiana Hexit-Sat AAS-I AAS-I -Hexit-Sat syst./sub. defi. - I/F Definition - Design & Dev. - Sub-Contractor Coord. Telespazio - Ground Segment def. AAS-I technical Support to ASI for JPO New Hard X-ray Mission Workshop; ASDC, Frascati Ing. Mauro Piermaria 6 NHXM PHASE A: DETAILED ACTIVITIES MIRROR MODULE Materials and optimization process SIMBOL X- HEXITSAT MSC SVM Design definition Preliminary HexitSat Design I/F Design definition (MSCDSC and MSC - Soyuz) Ground Segment preliminary implementation Mirror shells electroforming and replication Mechanical Models MM scientific liaison Ground Segment network structure and functions implementation Mission architecture Operations Strategy Implementation HXMT evaluation MM engineering Design T/M analysis Structural design & analysis Prototypes production and delivery of Mandrels and multilayered sample shells Technology Assessment 12-13 novembre 2009 and Thermal Operations Implementation Strategy Frozen Final Architecture Mission Model Philosophy definition Engineering Support to ASI (JPO) Cost evaluation New Hard X-ray Mission Workshop; ASDC, Frascati Compatibility Ing. Mauro Piermaria 7 NHXM PHASE A: THE COMMON PLATFORM DSC HXMT HEXITSAT SIMBOL-X MSC 12-13 novembre 2009 New Hard X-ray Mission Workshop; ASDC, Frascati Ing. Mauro Piermaria 8 SIMBOL-X MAIN CARACHTERISTICS Concept: high-energy new generation telescope, spectral range from classical X-rays to hard X-rays (0.5-80 keV); 2 orders of magnitude better in sensibility and spatial resolution. Long focal length using Formation Flying. Mirror and Detector mounted on two different spacecrafts in Formation Flying. High elliptical orbit (20.000-180.000 km) Field-of-View 12 arcmin Absolute pointing Mirror Satellite 20 arcsec Line-of-Sight Reconstruction Optics: 4.7 arcsec Shells mechanics from of Italian know how Reflecting material: multilayer to increase the field of view and the spectral bandwidth Detector Satellite Focal plane: Passive collimator with active anticoincidence Two superposed spectro-imager (Low Energy 0.5–20 keV; High Energy CdTe 15–100 keV) 12-13 novembre 2009 New Hard X-ray Mission Workshop; ASDC, Frascati +/-1 cm Ing. Mauro Piermaria 9 EXIT-SAT: MAIN SPECIFICATIONS Four Mirror modules (12 mirror each), multilayer optics. Four detectors, each aligned with the corresponding mirror Focal distance 8-10m (deployable truss) 1000-1500Kg /600 W Satellite class Near circular equatorial orbit, 600 Km altitude (Beppo-sax like). Utilisation of the Malindi Station 12-13 novembre 2009 New Hard X-ray Mission Workshop; ASDC, Frascati Ing. Mauro Piermaria 10 EXIT-SAT: CONFIGURATION Focal Plane Assembly Deployable Truss Folded configuration, in the VEGA Launcher fairing Solar Array Service Module 12-13 novembre 2009 New Hard X-ray Mission Workshop; ASDC, Frascati Ing. Mauro Piermaria 11 CONCLUSIONS During the last period, ASI made big efforts to pursue the NHXM Program (financial and HR). We envisaged a broad involvement by the Italian community, either scientific and industrial. The Simbol-X project, and the collaboration with the French partners, unfortunately stopped, brought a lot of experience on this kind of mission, for both scientific and engineering issues. Feasibility of Exit-Sat and Simbol-X missions at the end of the projects phase A has been proved. By the way, some Items of Exit-Sat mission need to be further investigated. ASI (and the collaboration network) has availability of know how, results and documentation on the above mentioned projects. 12-13 novembre 2009 New Hard X-ray Mission Workshop; ASDC, Frascati Ing. Mauro Piermaria 12