ITS upgrade
Meeting Gruppi INFN
V. Manzari – CERN, 6 Novembre 2012
Upgrades: status
On September 27 after the third round of discussions with ALICE, the
LHCC has endorsed our Upgrade LoI and ITS CDR. Minutes are not out
yet, but there is a statement which we can quote issued by the LHCC
chair:
“There is an interest amongst the collider experiments (ALICE, ATLAS and CMS)
for a continued heavy ion programme that gives access to rare final states. This
programme will extend well into the 20ies assuming the current HI running mode of
one month per year.
The physics programmes of the two general purpose detectors and ALICE are
complementary: while the former may focus on selected hard probes ALICE will be
optimized for particle identification at low transverse momenta. The experiments
are hence sensitive to different ”messenger“ signals and phases of the evolution of
the quark gluon plasma.
This increase in sensitivity for ALICE entails an upgrade of the rate capability of
the TPC, a high resolution ITS, and a major upgrade of the online system and the
read-out electronics.
The LHCC commends this joint approach to heavy ion physics and endorses the
upgrade plans of the ALICE collaboration. The committee is looking forward to the
seeing detailed technical solutions presented in the respective TDRs..”
Upgrades: next steps
RRB 29 Oct -1 Nov
o
o
Extension of the construction MoU
General Endorsement of the Upgrade
TDRs to be prepared in O(1 year)
Will define the construction design
o Will contain the specific commitments of the Institutions to the
projects
o Followed by MoU addendum (or addenda)
o
R&D
Will have to continue vigorously throughout the process, with
substantial funding, agreed within each project
o
Target date for ITS TDR August 2013 for submission to LHCC in
September 2013
Running scenario after the upgrades
• Pb–Pb
•
•
•
•
int. luminosity per year 2.85 nb-1 (peak L = 7x1027 cm-2s-1)
needed int. luminosity 10 nb-1, statistics 8x1010 events
3.5 month of running
+1 month of special run at low field for dileptons
• p–Pb
• max event rate 200 kHz, flat (L = 1029 cm-2s-1)
• needed int. luminosity 50 nb-1, statistics 1011 events
• 0.5 month of dedicated p–Pb run
• pp
• max event rate 200 kHz, flat (L = 3x1030 cm-2s-1)
• needed int. luminosity 6 pb-1, statistics 4x1011 events
• 2 month of dedicated pp run, assumed in 1 year
The list above fulfills the ALICE physics program as presented in the LoI.
A run with lower mass nuclei (e.g. Ar) could be considered in addition, if a
physics case for it would emerge.
Upgrades: a possible running scheme
• ALICE plans to run 6 years with upgraded detector, i.e. until 2026
(assuming start in 2019 and 2 years break of LS3)
• Possible scenario:
• 2019 – Pb–Pb 2.85 nb-1
• 2020 – Pb–Pb 2.85 nb-1 (low magnetic field)
• 2021 – pp reference run
• 2022 – LS3
• 2023 – LS3
• 2024 – Pb–Pb 2.85 nb-1
• 2025 – ½ Pb–Pb 1.42 nb-1 + ½ p–Pb 50 nb-1
• 2026 – Pb–Pb 2.85 nb-1
• This would not require pp running during high-luminosity runs, only a
short time before a heavy-ion run for setting up and commissioning.
Organization, Timeline and Cost
Participating Institutes (subject to funding)
•
•
•
•
•
•
•
•
•
•
•
Upgrade Timeline

2012–2014
R&D

•
•
2012
2013
2014
evaluation of technologies & prototyp
selection of technologies, eng. Design, TDR
final design and validation
•
2015-18
Construction and Installation
•
2015-16
production, construction and test of detector
modules
assembly and pre-commissioning
installaiton in the cavern
•
•
Contribution of Institutes
CERN
to be defined within
China (Wuhan, SINAP)
the next 8 months
Czech Republic (Prague)
France IN2P3-CNRS (Strasbourg)
Italy INFN (Bari, Cagliari, Catania, Frascati, Legnaro, Padova, Roma, Torino, Trieste)
Korea (Yonsei University Seoul)
Pakistan (Islamabad COMSATS)
Russia (St. Petersburg)
 Already members of ITS project
Slovakia (Kosice IEP)
 New members of ITS project
UK STFC (Univ. of Birmingham, Daresbury Lab, RAL)
Ukraine (Kharkov, Kiev)
2017
2018
Cost Estimate (Option A and B) (*)
 R&D
4 MCHF
 Option A (All pixels)
10 MCHF
 Option B (pixels + strips) 16 MCHF
(*)
detailed cost breakdown
in Table 6.2 of CDR
ITS Upgrade
Breakdown of the CORE Cost Estimate
Option 1:
7 layers of monolithic pixel
detectors, which would provide
excellent standalone tracking
efficiency and pt resolution, but
limited PID capability.
Option 2:
a combination of 3 innermost
layers of hybrid pixel detectors
and 4 outermost layers of strip
detectors, which would provide
better PID capability but worse
standalone tracking efficiency
and momentum resolution.
V. Manzari - INFN Bari
CSN III – 18 Settembre 2012
7
ITS Upgrade
Timeline
V. Manzari - INFN Bari
CSN III – 18 Settembre 2012
8
ALICE Upgrade
CORE Cost Estimates
 Overall cost estimate for the major upgrade projects
 Detector components and production costs
 Upgrade items and Common Project
-
ZDC included in “Trigger Detectors”, EMCal and HMPID require minor funds
The Offline cost is the investment needed for the offline central services at CERN
V. Manzari - INFN Bari
CSN III – 18 Settembre 2012
9
ALICE Upgrade
Spending Profile
 Memorandum of Understanding
 An Addendum for each Project to the ALICE MoU
 Addendum for the Common Projects including M&O A
V. Manzari - INFN Bari
CSN III – 18 Settembre 2012
10
Cost Estimate
ALICE
Upgrade
INFN Estimated Contributions
 Overall cost estimate: ≈ 60 MCHF
 Italian Contribution: ≈ 10 MCHF
V. Manzari - INFN Bari
Detector
Cost (KCHF)
ITS
6000
VHMPID
1000
TOF
600
Muon
600
ZDC
100
CommonFunds
1000
CSN III – 20 Marzo 2012
11
Estimate
ContributoCost
INFN
all’upgrade
 Partecipazione INFN in ALICE: “Scientist” 107/574 (19%)
 Costo Totale Upgrade ALICE: 36 - 42 MCHF  30 - 35 M€
 Costo Totale Upgrade ITS: 10 - 16 MCHF (+ 4 MCHF per R&D)
 Contributo INFN per upgrade ITS: 4.7 - 6.7 MCHF (33%)  3.9 - 5.6 M€
 Common Projects: 0.9 M€
 TOF: 0.6 M€
 Muon: 1.8 M€ x 0.2  0.4 M€
 Stima finanziamento globale INFN per upgrade ALICE:
5.8 M€ spalmato su 5-6 anni
Cost gruppi
Estimate INFN
Contributi
 Consultazione in corso con i vari gruppi che hanno espresso interesse a
partecipare all’upgrade dell’ITS per definire contributi e responsabilità in base
alle risorse disponibili (finanziarie, personale e infrastrutture) 
 Discussione all’IB meeting durante la mini-week in Dicembre
 Come procediamo?






Individuare attività/sotto-progetti di interesse comune
Salvaguardare contributi, specificità e visibilità dei vari gruppi
Leadership in alcuni sotto-progetti
Sviluppi tecnologici
Utilizzo delle infrastrutture esistenti
Negoziazione delle risorse locali con i rispettivi Direttori di Sez/Lab:
tecnici, tecnologi e servizi.
List of activities
Activities
Development, design and production of
front-end electronics
Front-end wafer probing
Sensor development and production (in case
of hybrid pixels and/or μstrips)
Wafer thinning &dicing
Detector interconnect technologies (bump-,
tab-, wire-bonding, BGA, other)
Development and fabrication of test systems
Characterization and mass production tests
of individual detector components
Power and Signal on-detector buses
On-detector readout and interface
electronics
Radiation tests
Design and production of the Stave
mechanical support
People
Activities
Design and production of the Integration and
Installation mechanics
On-detector cooling
Cooling plant
Stave assembly
Barrel assembly and integration
Power Supply System
Detector Control and Interlock System
Construction Database
Off-detector readout electronics
Power and Signal Connections
Beam tests (hardware, software, analysis)
Online software (monitoring, DAQ, HLT)
Offline (MC, calibration and reconstruction)
Physics performance studies
People
Backup
V. Manzari - INFN Bari
CSN III – 20 Marzo 2012
16
Link a Presentazioni Precedenti
 Riunione CSN3 28-29/03/2011
• R&D activities for the ALICE inner tracker upgrade 
 http://agenda.infn.it/conferenceDisplay.py?confId=3202
 Riunione CSN3 13-14/06/2011
• ALICE Inner Tracking System Upgrade 
 http://agenda.infn.it/conferenceDisplay.py?confId=3203
 Riunione CSN3 19-20/03/2012
• ALICE Upgrade 
 http://agenda.infn.it/conferenceDisplay.py?confId=4296
 Referee meeting 9/05/2012:
• Novità ITS e R&D status 
 http://agenda.infn.it/conferenceDisplay.py?confId=5002
 Referee meeting 20/07/2012:
• ITS upgrade: consuntivo e richieste 
 http://agenda.infn.it/conferenceDisplay.py?confId=5291
V. Manzari - INFN Bari
CSN III – 18 Settembre 2012
17
Link a Documenti su Upgrade
 Web pages:
• Inner Tracking System 
 http://aliceinfo.cern.ch/ITS/
• Inner Tracking System Upgrade 
 http://aliceinfo.cern.ch/ITSUpgrade/
 Conceptual Design Report for the Upgrade of the ALICE ITS – Version:
CDR-0, CERN-LHCC-2012-05 / LHCC-G-159; March 6, 2012 
 https://aliceinfo.cern.ch/ITSUpgrade/sites/aliceinfo.cern.ch.ITSUpgrade/files/d
ocuments/AliceITSupgrade-CDR-0_1.pdf
 Progress report on the Conceptual Design Report for the Upgrade of the
ALICE ITS; June 18, 2012 
 https://aliceinfo.cern.ch/ITSUpgrade/sites/aliceinfo.cern.ch.ITSUpgrade/files/
documents/progress_report.pdf
V. Manzari - INFN Bari
CSN III – 18 Settembre 2012
18
Link a Documenti su Upgrade
 Upgrade of the ALICE Experiment – Letter of Intent; September 7, 2012 
CERN-LHCC-2012-012 / LHCC-I-022 
https://cdsweb.cer.ch/record/1475243/files/LHCC-I-022.pdf
 Upgrade of the ALICE Inner Tracking System – Conceptual Design
Report; CERN-LHCC-2012-013 / LHCC-P-005; September 11, 2012 
 http://cdsweb.cern.ch/record/1475244/files/LHCC-P-005.pdf
V. Manzari - INFN Bari
CSN III – 18 Settembre 2012
19
Link alla Pagina Web ITS Upgrade
V. Manzari - INFN Bari
CSN III – 18 Settembre 2012
20
P.T. 2013-2015 (draft di piano finanziario, CSN3 30/1/2012)
Upgrades : nostre previsioni presentata da Nico in CSN3
 Nel 2011-12 per R&D (ITS, VHMPID) : 131, 194.5 K€ (77.5 +117 s.j.)
Previsioni costo upgrades (MB e CB meetings del 12/1/2012):
ITS : 14 MCHF (CERN, INFN, IN2P3, UK, COMSATS, BMBF, Ukraina, Russia, China,
Slovakia, Czech Republic)
2012-2014 R&D e prototipi
Contributo INFN old ITS 49.1%
2014-2016 Costruzione
2016-2017 Integrazione e commissioning in laboratorio
2017-2018 Installazione e commissioning
VHMPID : 3 (- 4) MCHF (USA, INFN, India, Mexico, Korea, Brazil, Hungary)
2011-2012 R&D e prototipi
2013-2016 Costruzione e commissioning in lab./testbeam
2017-2018 Installazione e commissioning
Contributo INFN old HMPID 57.4%
Possibile contributo INFN (circa 16.7 %) : 500 KCHF tra 2013 e 2017
(100 KCHF nel 2013, 150 nel 2014, 150 nel 2015)
Nuova strategia di upgrade del Central Barrel (MB e CB meetings del 12/1/2012):
Stime approssimative dei costi per rivelatori con contributo INFN:
TOF : 600 KCHF (100% INFN) → (72 schede DRM) 500 kEuro
Muon Trigger : 604 KCHF (IN2P3, INFN) → 160 (rivel.) + 30 (sistema gas) = 190 kEuro
Muon Tracking : 967 KCHF (IN2P3, INFN, India?, Russia?) → 200 – 250 kCHF
ZDC 70 kEuro (100% INFN)
Contributo INFN old MUON 9.2% ……
1 Marzo 2012