RICH - Indico
RICH
INFN Perugia
INFN Firenze
CERN
•Separate pions from muons <1% level between 15 and 35 GeV/c
•Track time at 100 ps level
•Partecipate in the L0 trigger
17 m
Beam Pipe
PM lodging disk
• Neon as Cherenkov radiator
• mosaic of mirrors (17 m focal length)
• two spots with PM (1000 PM per spot)
• beam pipe passing through
M.Lenti
Mirrors
NIM A593 (2008) 314-318
NIM A621 (2010) 205-211
RICH prototype results
15 GeV/c
35 GeV/c
m suppression: 0.7%
( 15<p<35 GeV/c)
12.9.2011
M.Lenti
2
Milestones:
• Design for mirror support:
30.06.2011
• Vessel installation ready:
30.04.2012
• Mirror and PM installation complete: 2.12.2012
Vessel (CERN): vacuum proof !
Gas system simplified: make vacuum, then inject pure Neon
12.9.2011
M.Lenti
4
Vessel tender not submitted yet
(CERN responsibility)
12.9.2011
M.Lenti
5
Photomultipliers
• 1944 PM available (quality test ongoing)
• 2000 HV divider in preparation (custom made)
PM mechanics
in fabrication
FE electronics in preparation
12.9.2011
M.Lenti
6
RICH PMs
PM Time resolution measurements made in Perugia
12.9.2011
M.Lenti
7
PM HV dividers
SOLDERED HV+ (GND)
TOP AND BOTTOM SMD
COMPONENTS
SIG OUT COAX
COAX SHIELD AND HV+ SOLDERED
TOGETHER
SOLDERED HV- CONNECTION
12.9.2011
M.Lenti
8
HV Filter board
BRACKET TO FIX
BOARD TO THE 9U
EMPTY CHASSIS
SHV CONNECTOR FROM
CAEN HV-PS
32 CH HV TO PMT
SPACERS SUPPORT FOR SECURITY COVER
12.9.2011
M.Lenti
9
Electronics chain
VME RICH FE 32 CH BOARD
PRE_NINO
BIPOLAR
HV CABLE
GAIN
NINO_CHIP
VHDCI CONN
TELL 62
DIFF
PMT
RG174
50 OHM
TERMINATOR
12.9.2011
PCB MICROSTRIP
50-52 OHM DIFFERENTIAL
FOR NINO CHIP MATCHING
M.Lenti
PCB MICROSTRIP
130 OHM DIFFERENTIAL
FOR CABLE MATCHING
MADISON
UNIVERSAL TM CABLE
FOR 130 OHM
DIFFERENTIAL
FOR LVDS SIGNAL
10
FE340board
mm
MAX. 220 mm
MIN. 120 mm
32 CHANNEL FRONT-END AREA
360 mm
32 LEMO COAX
SIGNAL FROM PMT
8CH
NINO
CHIP
DC/DC
CONVERTER
3.3 TO 2.5V
J1 VME
CONNECTOR
8CH
NINO
CHIP
32 CH VHDCI
CONNECTOR
TO TELL62
G
8CH
NINO
CHIP
4CH MULTIPLICITY
TO TELL62
8CH
NINO
CHIP
I2C
CAN BUS
CONNECTORS
CAN
12.9.2011
M.Lenti
CUSTOMIZABLE
FRONT END (“FE”)AREA
“DAQ”
AREA
11
DAQ
•
•
•
•
TEL62 board equipped with 4 HPTDC: 512 ch
4 TEL62 for all PM (2000 ch)
1 TEL62 for “multiplicity” trigger (250 ch)
Perugia group works on the TEL62 fimware
and trigger
• See M.Sozzi report for details
12.9.2011
M.Lenti
12
Mirrors
•
•
•
All mirrors ready (18 hex + 2 semi-hex),
now at CERN
Quality test made in Italy in may 2011
Coating to be done at CERN
Mirror support system with a “dummy” mirror:
• hung at the center
• aligned with micrometric piezo.motors
V.Carassiti will engeneerize
the mirror support system
In the fall 2011
12.9.2011
M.Lenti
13
Lab’s
Optical Measurements Lab 12.4.2011
Dummy Mirror in Clean Room 12.4.2011
12.9.2011
M.Lenti
14
Hex10
Hex10 in Box3 (28.04.2011)
Hex10 in box (29.04.2011)
Hex10 in Optics Lab (29.04.2011)
12.9.2011
M.Lenti
15
Horiz. Sigma
Vert. Sigma
Horiz.*Vert. Sigma(2)
Hex10
Dist Laser-Mirror: 33.875 m
Dist Mirror-Diode: 33.985 m
Minimum: +0.6 cm
R = (33.875+33.985+0.006)/2 = 33.933 m
F = R/2 = 16.967 m
σX(min) = 0.20 mm
σy(min) = 0.13 mm
√(σX*σY)(min) = 0.12 mm
Fx-Fy: +4.2 cm
12.9.2011
M.Lenti
16
A. Cassese
12.9.2011
M.Lenti
17
Mirror Support
The Mirror is supported through one
hole in the back where a dowel
is inserted.
The Mirror is falling: the dowel is
touching the mirror not in the barycenter
Actuating ribbon works against g and gives
vertical axis alignment
A second actuating ribbon at 90 deg gives
the horizontal axis alignment
Piezo motors are used to pull the ribbons
System heavily tested in Lab in Firenze
12.9.2011
M.Lenti
18
Mirror Support Panel
Goal: engeneer project
by the end of 2011, then
go for tender
(INFN responsibility)
12.9.2011
M.Lenti
19
Milestones RICH 2012
• Installazione dei PM e dell'elettronica di FE
• Installazione degli specchi
12.9.2011
M.Lenti
31.08.2012
31.08.2012
20
RICH Schedule V8.4 (baseline)
07/2010
RICH
Assumes Rich vessel in time for TR
today 01/2012
12/2010
07/2011
07/2012
Mirror Wall Tender + Contract Preparation
Design for Mirror Supports and Wall Completed
Mirror Support Wall Order
Mirror Support Wall Fabrication
Vessel Tender and Contract preparation
Mirror Wall Design
Mirror Wall Tender
Design for Mirror Supports and
Wall Completed
Mirror Support Wall Order
Mirror Support Wall Fabrication
Vessel Tender
Vessel order
Vessel order
Vessel Fabrication
Vessel Fabrication
RICH Vessel Installation
Vessel Installation Completed
RICH Vessel Installation
Very short time window
To get ready for the TR
Vessel Installation Completed
Temp. setup for TR
Temp. setup for TR
Filling Gas
Filling Gas
Mirror Support Installation
Mirror Support Installation
Mirror Installation
Mirror Installation
Mirror Laser Alignment
Mirror Laser Alignment
Temp. Beam Pipe Installation
Temp. Beam Pipe Installation
Beam Pipe Installation
Temp. installation…
Beam Pipe Installation
Photodetector Installation
Photodetector Installation
Cooling + cabling of PM's
Cooling + cabling of PM's
Mirror and PM Installation
complete
Commissioning without Beam
Mirror and PM Installation complete
Commissioning without Beam
12.9.2011
01/2013
Mirror Support Design
Mirror Support Design
Mirror Wall Design
TR
M.Lenti
21
RICH Schedule V8.42 (back-up)
Non-conform with baseline planning
today
RICH
07/2010
12/2010
07/2011
01/2012
07/2012
01/2013
TR
TR
Prolongation ???
Mirror Support Design
Mirror Support Design
Mirror Wall Design Mirror Wall Design
Mirror Wall Tender + Contract Preparation
Design for Mirror Supports and Wall Completed
Mirror Wall Tender
Design for Mirror Supports
and Wall Completed
Mirror Support Wall Order
Mirror Support Wall Order
Mirror Support Wall
Fabrication
Mirror Support Wall Fabrication
Vessel Tender and Contract preparation
Vessel Tender
Vessel order
Vessel order
Vessel Fabrication
Vessel Fabrication
Vessel Installation Completed
Vessel Installation Completed
Temp. setup for TR
Temp. setup for TR
Filling Gas
Filling Gas
Temp. Beam Pipe Installation
12.9.2011
Outside beam
periods
RICH Vessel Installation
RICH Vessel Installation
Temp. Beam Pipe Installation
M.Lenti
22
In this scenario the RICH could only be used if there is a window to prolong the TR in 2013 !
Conclusions
• Lot of progress on many items of RICH
• Vessel production (CERN responsibility)
delayed
• Mirror support system to be finalized
• The RICH is on the critical path for september
2012 technical run
12.9.2011
M.Lenti
23
Richieste Firenze 2012
INTERNO
Totale: 10.00
1. Riunioni con gli altri gruppi italiani di NA62 e riunioni del gruppo RICH
10.00
ESTERO
Totale: 64.00
1. meeting di analisi e collaborazione al CERN: 8 MU
32.00
2. Installazione al CERN del rivelatore RICH: 4 MU
16.00
3. Technical run di NA62: 4 MU
16.00
CONSUMO
Totale: 153.00
1. Electronic Pool del CERN: noleggio moduli di elettronica
20.00
2. Common Fund della collaborazione NA62
100.00
3. Metabolismo
10.00
4. Installazione al CERN del rivelatore RICH
20.00
5. Noleggio auto al CERN per l'installazione ed il technical run
3.00
APPARATI
Totale: 25.00
1. Installazione e test dell'elettronica di front-end del rivelatore RICH (CORE 2012) 25.00
Totale NA62 Firenze
12.9.2011
252.00
M.Lenti
24
Richieste Perugia 2012
INTERNO
Totale: 18.00
1. Riunioni e attività in Italia per RICH e TDAQ (Firenze, Pisa, Frascati)
12.00
2. Riunioni in Italia
6.00
ESTERO
Totale: 76.00
1. Installazione rivelatori (RICH, TDAQ): 4 m.u.
16.00
2. Commissioning run: : 6 m.u. (previsione durata run: 6 settimane)
24.00
3. Riunioni di analisi e di collaborazione (7 riunioni) al CERN o presso altre istituzioni estere,
riunioni e "working group" sul rivelatore e per la preparazione del commissioning run (9 m.u.)
36.00
CONSUMO
Totale: 32.50
1. Installazione rivelatori al CERN
10.00
2. Metabolismo ricerca
10.00
3. Attività TDAQ (1 PC x sviluppo firmware L0: 2k€; 2 schede di rete 10Gbit: 1k€; TDAQ spare:
1 Tel62: 3.5k€; 2 TDCB nuova produzione con cavi: 3k€; consumo di laboratorio per riutilizzo
elettronica esistente di NA62 per lettura CHOD di NA48 nel commissioning run 2012: 3k€)
12.50
TRASPORTI
Totale:
1.00
1. Trasporto materiale ordinato
1.00
LICENZE-SW
Totale: 2.00
1. Licenze Software Altera (convenzione Università)
2.00
APPARATI
Totale: 25.00
1. Completamento HV RICH (residuo CORE)
25.00
SPSERVIZI
Totale: 6.00
1. Spese consumo per servizi
6.00
12.9.2011
Totale NA62 Perugia
M.Lenti
25
160.50