Comments
Description
Transcript
RICH - Indico
RICH INFN Perugia INFN Firenze CERN •Separate pions from muons <1% level between 15 and 35 GeV/c •Track time at 100 ps level •Partecipate in the L0 trigger 17 m Beam Pipe PM lodging disk • Neon as Cherenkov radiator • mosaic of mirrors (17 m focal length) • two spots with PM (1000 PM per spot) • beam pipe passing through M.Lenti Mirrors NIM A593 (2008) 314-318 NIM A621 (2010) 205-211 RICH prototype results 15 GeV/c 35 GeV/c m suppression: 0.7% ( 15<p<35 GeV/c) 12.9.2011 M.Lenti 2 Milestones: • Design for mirror support: 30.06.2011 • Vessel installation ready: 30.04.2012 • Mirror and PM installation complete: 2.12.2012 Vessel (CERN): vacuum proof ! Gas system simplified: make vacuum, then inject pure Neon 12.9.2011 M.Lenti 4 Vessel tender not submitted yet (CERN responsibility) 12.9.2011 M.Lenti 5 Photomultipliers • 1944 PM available (quality test ongoing) • 2000 HV divider in preparation (custom made) PM mechanics in fabrication FE electronics in preparation 12.9.2011 M.Lenti 6 RICH PMs PM Time resolution measurements made in Perugia 12.9.2011 M.Lenti 7 PM HV dividers SOLDERED HV+ (GND) TOP AND BOTTOM SMD COMPONENTS SIG OUT COAX COAX SHIELD AND HV+ SOLDERED TOGETHER SOLDERED HV- CONNECTION 12.9.2011 M.Lenti 8 HV Filter board BRACKET TO FIX BOARD TO THE 9U EMPTY CHASSIS SHV CONNECTOR FROM CAEN HV-PS 32 CH HV TO PMT SPACERS SUPPORT FOR SECURITY COVER 12.9.2011 M.Lenti 9 Electronics chain VME RICH FE 32 CH BOARD PRE_NINO BIPOLAR HV CABLE GAIN NINO_CHIP VHDCI CONN TELL 62 DIFF PMT RG174 50 OHM TERMINATOR 12.9.2011 PCB MICROSTRIP 50-52 OHM DIFFERENTIAL FOR NINO CHIP MATCHING M.Lenti PCB MICROSTRIP 130 OHM DIFFERENTIAL FOR CABLE MATCHING MADISON UNIVERSAL TM CABLE FOR 130 OHM DIFFERENTIAL FOR LVDS SIGNAL 10 FE340board mm MAX. 220 mm MIN. 120 mm 32 CHANNEL FRONT-END AREA 360 mm 32 LEMO COAX SIGNAL FROM PMT 8CH NINO CHIP DC/DC CONVERTER 3.3 TO 2.5V J1 VME CONNECTOR 8CH NINO CHIP 32 CH VHDCI CONNECTOR TO TELL62 G 8CH NINO CHIP 4CH MULTIPLICITY TO TELL62 8CH NINO CHIP I2C CAN BUS CONNECTORS CAN 12.9.2011 M.Lenti CUSTOMIZABLE FRONT END (“FE”)AREA “DAQ” AREA 11 DAQ • • • • TEL62 board equipped with 4 HPTDC: 512 ch 4 TEL62 for all PM (2000 ch) 1 TEL62 for “multiplicity” trigger (250 ch) Perugia group works on the TEL62 fimware and trigger • See M.Sozzi report for details 12.9.2011 M.Lenti 12 Mirrors • • • All mirrors ready (18 hex + 2 semi-hex), now at CERN Quality test made in Italy in may 2011 Coating to be done at CERN Mirror support system with a “dummy” mirror: • hung at the center • aligned with micrometric piezo.motors V.Carassiti will engeneerize the mirror support system In the fall 2011 12.9.2011 M.Lenti 13 Lab’s Optical Measurements Lab 12.4.2011 Dummy Mirror in Clean Room 12.4.2011 12.9.2011 M.Lenti 14 Hex10 Hex10 in Box3 (28.04.2011) Hex10 in box (29.04.2011) Hex10 in Optics Lab (29.04.2011) 12.9.2011 M.Lenti 15 Horiz. Sigma Vert. Sigma Horiz.*Vert. Sigma(2) Hex10 Dist Laser-Mirror: 33.875 m Dist Mirror-Diode: 33.985 m Minimum: +0.6 cm R = (33.875+33.985+0.006)/2 = 33.933 m F = R/2 = 16.967 m σX(min) = 0.20 mm σy(min) = 0.13 mm √(σX*σY)(min) = 0.12 mm Fx-Fy: +4.2 cm 12.9.2011 M.Lenti 16 A. Cassese 12.9.2011 M.Lenti 17 Mirror Support The Mirror is supported through one hole in the back where a dowel is inserted. The Mirror is falling: the dowel is touching the mirror not in the barycenter Actuating ribbon works against g and gives vertical axis alignment A second actuating ribbon at 90 deg gives the horizontal axis alignment Piezo motors are used to pull the ribbons System heavily tested in Lab in Firenze 12.9.2011 M.Lenti 18 Mirror Support Panel Goal: engeneer project by the end of 2011, then go for tender (INFN responsibility) 12.9.2011 M.Lenti 19 Milestones RICH 2012 • Installazione dei PM e dell'elettronica di FE • Installazione degli specchi 12.9.2011 M.Lenti 31.08.2012 31.08.2012 20 RICH Schedule V8.4 (baseline) 07/2010 RICH Assumes Rich vessel in time for TR today 01/2012 12/2010 07/2011 07/2012 Mirror Wall Tender + Contract Preparation Design for Mirror Supports and Wall Completed Mirror Support Wall Order Mirror Support Wall Fabrication Vessel Tender and Contract preparation Mirror Wall Design Mirror Wall Tender Design for Mirror Supports and Wall Completed Mirror Support Wall Order Mirror Support Wall Fabrication Vessel Tender Vessel order Vessel order Vessel Fabrication Vessel Fabrication RICH Vessel Installation Vessel Installation Completed RICH Vessel Installation Very short time window To get ready for the TR Vessel Installation Completed Temp. setup for TR Temp. setup for TR Filling Gas Filling Gas Mirror Support Installation Mirror Support Installation Mirror Installation Mirror Installation Mirror Laser Alignment Mirror Laser Alignment Temp. Beam Pipe Installation Temp. Beam Pipe Installation Beam Pipe Installation Temp. installation… Beam Pipe Installation Photodetector Installation Photodetector Installation Cooling + cabling of PM's Cooling + cabling of PM's Mirror and PM Installation complete Commissioning without Beam Mirror and PM Installation complete Commissioning without Beam 12.9.2011 01/2013 Mirror Support Design Mirror Support Design Mirror Wall Design TR M.Lenti 21 RICH Schedule V8.42 (back-up) Non-conform with baseline planning today RICH 07/2010 12/2010 07/2011 01/2012 07/2012 01/2013 TR TR Prolongation ??? Mirror Support Design Mirror Support Design Mirror Wall Design Mirror Wall Design Mirror Wall Tender + Contract Preparation Design for Mirror Supports and Wall Completed Mirror Wall Tender Design for Mirror Supports and Wall Completed Mirror Support Wall Order Mirror Support Wall Order Mirror Support Wall Fabrication Mirror Support Wall Fabrication Vessel Tender and Contract preparation Vessel Tender Vessel order Vessel order Vessel Fabrication Vessel Fabrication Vessel Installation Completed Vessel Installation Completed Temp. setup for TR Temp. setup for TR Filling Gas Filling Gas Temp. Beam Pipe Installation 12.9.2011 Outside beam periods RICH Vessel Installation RICH Vessel Installation Temp. Beam Pipe Installation M.Lenti 22 In this scenario the RICH could only be used if there is a window to prolong the TR in 2013 ! Conclusions • Lot of progress on many items of RICH • Vessel production (CERN responsibility) delayed • Mirror support system to be finalized • The RICH is on the critical path for september 2012 technical run 12.9.2011 M.Lenti 23 Richieste Firenze 2012 INTERNO Totale: 10.00 1. Riunioni con gli altri gruppi italiani di NA62 e riunioni del gruppo RICH 10.00 ESTERO Totale: 64.00 1. meeting di analisi e collaborazione al CERN: 8 MU 32.00 2. Installazione al CERN del rivelatore RICH: 4 MU 16.00 3. Technical run di NA62: 4 MU 16.00 CONSUMO Totale: 153.00 1. Electronic Pool del CERN: noleggio moduli di elettronica 20.00 2. Common Fund della collaborazione NA62 100.00 3. Metabolismo 10.00 4. Installazione al CERN del rivelatore RICH 20.00 5. Noleggio auto al CERN per l'installazione ed il technical run 3.00 APPARATI Totale: 25.00 1. Installazione e test dell'elettronica di front-end del rivelatore RICH (CORE 2012) 25.00 Totale NA62 Firenze 12.9.2011 252.00 M.Lenti 24 Richieste Perugia 2012 INTERNO Totale: 18.00 1. Riunioni e attività in Italia per RICH e TDAQ (Firenze, Pisa, Frascati) 12.00 2. Riunioni in Italia 6.00 ESTERO Totale: 76.00 1. Installazione rivelatori (RICH, TDAQ): 4 m.u. 16.00 2. Commissioning run: : 6 m.u. (previsione durata run: 6 settimane) 24.00 3. Riunioni di analisi e di collaborazione (7 riunioni) al CERN o presso altre istituzioni estere, riunioni e "working group" sul rivelatore e per la preparazione del commissioning run (9 m.u.) 36.00 CONSUMO Totale: 32.50 1. Installazione rivelatori al CERN 10.00 2. Metabolismo ricerca 10.00 3. Attività TDAQ (1 PC x sviluppo firmware L0: 2k€; 2 schede di rete 10Gbit: 1k€; TDAQ spare: 1 Tel62: 3.5k€; 2 TDCB nuova produzione con cavi: 3k€; consumo di laboratorio per riutilizzo elettronica esistente di NA62 per lettura CHOD di NA48 nel commissioning run 2012: 3k€) 12.50 TRASPORTI Totale: 1.00 1. Trasporto materiale ordinato 1.00 LICENZE-SW Totale: 2.00 1. Licenze Software Altera (convenzione Università) 2.00 APPARATI Totale: 25.00 1. Completamento HV RICH (residuo CORE) 25.00 SPSERVIZI Totale: 6.00 1. Spese consumo per servizi 6.00 12.9.2011 Totale NA62 Perugia M.Lenti 25 160.50