Comments
Description
Transcript
The research - WordPress.com
Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) 22nd Plenary Meeting, 8th – 10th November 2012 - Rome Building Information Modeling (BIM) applied for the management of historical and monumental building heritage Supervisor: Prof. Ing. Pietro Capone Prof. Ing. Carlo Biagini Department of Civil and Enviroment Engineering (DICeA) University of Florence Ing. Vincenzo Donato Department of Civil and Enviroment Engineering (DICeA) University of Florence Prof. Ing. Manfred Krafczyk Institute for Computational Modeling in Civil Engineering (IRMB) Technische Universität of Braunschweig Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) Introduction Last presentation: What is B.I.M. ? Builder Manufacturers Contractors and owners Architects BIM BIM Computer Graphics and Marketing Engineer The term Building Information Modeling (BIM) has different meanings: B.I.M. is a technology for the exchange information between several professional (non only with documents and papers but also with an available data format and between different systems) - tridimensional model: typically produced using a 3d‐dimensional building modeling software; - database: include geometry, properties, quantities, spatial and functional relationships of building components; - procedure: it is the process of generating and managing building data during its life cycle (LCA). The main goal of BIM is reduce the risk of failure of a project Vincenzo Donato PhD Candidate - DICeA TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) The research project OBJECTIVE: develop an interoperability procedure for achieve an Existing Informative Model used as base for the Programming phase of the Building Process. Building Process Plannig Programming Design Production Costruction Closeout Commission Maintenance Disposal FOCUS Type of different semantic information are subdivided in: -Visual representation (document and drawings); -Artificial language and structured representation (IFC / BIM – XML language); FIELD: building process, acquiring data, topography and survey Vincenzo Donato Dottorando - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) Schedule Interoperability mainly used inside the work team; 2d and 3d drawings; Collaboration between several professionals; Architectural design; Adoption of BIM in the early design phase. - Interoperability between several semantic field; - Development of the procedure for the research “point zero of design”; - Study in detail the IFC and its structure; - Implementation of the IFC. February 2012 Visiting Researcher GMP Architekten Hamburg 22nd Plenary Meeting 21st Plenary Meeting Internship Decision for the date of final dissertation November 2012 TODAY 6 months 6 months SOBE School of the Built Environment Manchester Last development May 2013 24th Plenary Meeting - 23rd Plenary Meeting TOPIC: November 2013 ? Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) Internship experience gmp Architekten von Gerkan, Marg und Partner Activities undertaken: - Architectural design projects through several level of detail; - Use of the BIM technology; - Application of an experimental interoperable procedures of work. Research aspects: - Understanding of difficulties in a complex working environment; - How to manage the high level of precision held by the the parametric software also during the early phase of design; Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) Internship experience CONTEXT: A. Project for the Susa’s High Speed Train Station - Type: competition under invitation Level required: preliminary B. Project for the Padua’s Conference Center - Type: tender for the construction Level required: definitive Level of design phase required by Italian law: - Preliminary design phase - Definitive design phase - Executive phase - Construction phase (Design variation) - As-Built phase (End of works) (Competition / Tender) Curtsey of GMP Architekten Design: Volkwin Marg and Jürgen Hillmer with Robert Friedrichs Co-operation with: 5+1AA, Genua Project leader: Stephanie Joebsch, Robert Friedrichs Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Claudia Schultze, Vincenzo Donato A. Susa’s High Speed Train Station BIM was: ① used as a communicative tool between the design actor involved during the project; ② applied to valuate the different configuration for: a. Urban (study of the several altitude level for roads) b. Architectural (facilitate the understating of intersection of volumes) c. Structural (several solution were studied to achieve the better solution) Curtsey of GMP Architekten Design: Volkwin Marg and Jürgen Hillmer with Robert Friedrichs Co-operation with: 5+1AA, Genua Project leader: Stephanie Joebsch, Robert Friedrichs Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Claudia Schultze, Vincenzo Donato A. Susa’s High Speed Train Station BIM was: ① used as a communicative tool between the design actor involved during the project; ② applied to valuate the different configuration for: a. Urban (study of the several altitude level for roads) b. Architectural (facilitate the understating of intersection of volumes) c. Structural (several solution were studied to achieve the better solution) Curtsey of GMP Architekten Design: Volkwin Marg and Jürgen Hillmer with Robert Friedrichs Co-operation with: 5+1AA, Genua Project leader: Stephanie Joebsch, Robert Friedrichs Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Claudia Schultze, Vincenzo Donato A. Susa’s High Speed Train Station BIM was: ① used as a communicative tool between the design actor involved during the project; ② applied to valuate the different configuration for: a. Urban (study of the several altitude level for roads) b. Architectural (facilitate the understating of intersection of volumes) c. Structural (several solution were studied to achieve the better solution) Curtsey of GMP Architekten B. Padua’s Conference Center Design: Volkwin Marg Project leader: Stephanie Joebsch, Robert Friedrichs Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo Donato ① BIM was used to create bi-dimensional documents, modified with CAD in the second step; ② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building; ③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects; ④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer. foyer “IT WAS REQUIRED BY THE ADMINISTRATION THE PROTECTION AND THE RESTORATION OF THE SCULTURAL GATE AND THE RESTABILSHMENT OF THE MEMORY OF THE OLD BUIDLING” Main hall “Palazzo delle Nazioni” (Building to be refurbished) Connection to the trade fair auditorium Connection to the trade fair Curtsey of GMP Architekten PRINCIPAL AXEX OF THE TRADE FAIR B. Padua’s Conference Center Design: Volkwin Marg Project leader: Stephanie Joebsch, Robert Friedrichs Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo Donato ① BIM was used to create bi-dimensional documents, modified with CAD in the second step; ② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building; ③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects; ④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer. Curtsey of GMP Architekten B. Padua’s Conference Center Design: Volkwin Marg Project leader: Stephanie Joebsch, Robert Friedrichs Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo Donato ① BIM was used to create bi-dimensional documents, modified with CAD in the second step; ② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building; ③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects; ④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer. Curtsey of GMP Architekten B. Padua’s Conference Center Design: Volkwin Marg Project leader: Stephanie Joebsch, Robert Friedrichs Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo Donato ① BIM was used to create bi-dimensional documents, modified with CAD in the second step; ② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building; ③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects; ④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer. Curtsey of GMP Architekten B. Padua’s Conference Center Design: Volkwin Marg Project leader: Stephanie Joebsch, Robert Friedrichs Staff (design): Alessia Spezzano, Achim Wangler, Bernd Kottsieper, Vincenzo Donato ① BIM was used to create bi-dimensional documents, modified with CAD in the second step; ② BIM applied for valuate the potential of a hypothetic refurbishment of the existing building; ③ BIM was applied to verified the interference between several field such as architectural, structural, plants projects; ④ Elaboration of a optimized procedure for obtaining rendering and a real model form the 3d printer. Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research THE RESEARCH AND DEVELOPMENT ACHIEVED: Developed procedures to facilitate the design process, especially in the early design phase. 1) CAD to BIM to CAD: an interoperable procedure to obtain 2d drawing towards the dialog with a parametric 3d model; 2) BIM to 3Ddprinter: it was develop an optimized procedure which takes into account the level of detail (LOD) of the model; 3) Pictures to BIM: a simply procedure to obtain a conceptual 3d model from pictures where conduce solar simulation; Note 1: Next development could be to realize a procedure for the automatic realization of report document connected to the spaces or geometry (especially for a tender. Note 2: It was developed also a procedure for the realization of rendering. Note 3: Pictures to BIM was published an article on the international conference “EGRAPHIA 2012”. Note 4: All the procedure were also acquired in the GMP system. They are interested because the company doesn't use BIM technology, especially in the early design phase. Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research THE RESEARCH AND DEVELOPMENT ACHIEVED: Developed procedures to facilitate the design process, especially in the early design phase. 1) CAD to BIM to CAD: an interoperable procedure to obtain 2d drawing towards the dialog with a parametric 3d model; 2) BIM to 3Ddprinter: it was develop an optimized procedure which takes into account the level of detail (LOD) of the model; 3) Pictures to BIM: a simply procedure to obtain a conceptual 3d model from pictures where conduce solar simulation; Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research 1) CAD TO BIM TO CAD DESIGN PROCESS The BIM technology was used to compare several design solution. The procedure was based for the production of 2d documents drawings and the parametric environment was use only like a tool to facilitate the decision making process. The decision making process was based on: - Subjective observation (perspective view); - Collection of data (solar analysis and shading simulation). PHASE: Concept Design ACTIVITIES: OUTPUT: 2D CAD Generic Scheme of Design Process INPUT: 2D CAD Vincenzo Donato PhD Candidate - DICeA Elaboration of: 1. Hand drawings 2. Architectural study models 3. CAD drawings BIM model 3D Elaboration of: 1. 3d model base on parametric object 2. Perspective representation Check Design Solution 2d document Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research 1) CAD TO BIM TO CAD ORGANIZATION Entry requirements: - Criteria for the classification of the name of file; - Subdivision of the Building in: - - Functional department; - Architectural / Structural compounds. Congruent coordinates system for all the file cad; Interoperable Process Grid (Raster) 2d document INPUT: 2D CAD OUTPUT: 2D CAD OUTPUT: Plot drawing Vincenzo Donato PhD Candidate - DICeA Criteria of evaluation: 1. Visual reason; 2. Functional aspects; 3. Intersections (ARC/STR/MEP) 3d model CAD Block 2d drawing BIM ENVIRONMENT CAD ENVIRONMENT Check Design Solution Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research 1) CAD TO BIM TO CAD SEMANTIC CAD ENVIRONMENT EACH CIRLE REPRESENT A CAD FILE LINKED TO THE OTHER WITH A SPECIFIC HIERACHICAL RELATION Level 0 Level 0 - Foyer Level 0 - Auditorium Level 0 – Hall Level 1 Levels Level 1 - Foyer Level 2 Level 1 - Auditorium Level 1 – Hall Sections Level 3 ENVIRONMENT FUNCTIONAL SUBDIVISION (WHEN IS POSSIBLE) BUILDING Elevations OUTPUT 2D FILE (.DWG) model 3d LINK OF 2D CAD TOWORDS THE PARAMETRIC ENVIROMENT Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research Semantic structure CAD Block : levels Project Navigator identical to the BIM structure Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research CAD Block It is an external reference Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) The research CAD Block : Auditorium TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research 1) CAD TO BIM TO CAD SEMANTIC BIM ENVIRONMENT INPUT 2D FILE (.DWG) Level 0 Architectural Model (Container) Check Design Solution Level 1 Structural Model Level 2 MEP Model Level 3 Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research CAD Block liked to the Revit file Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research Bidirectional verification of drawings cad and parametric model Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research Architectural element Structural element Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) The research 1) CAD TO BIM TO CAD Level 0 BUILDING Level 1 OUTPUT 2D FILE (.DWG) Level 2 Elevations Sections Levels 3d Architectural Model (Container) Level 3 OUTPUT PRINTING Physical Document UPDATIONG AND CORRENCTION OF 2D DRAWING Vincenzo Donato PhD Candidate - DICeA Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) Visiting research at SOBE School of the Built Environment Manchester ACTIVITIES AT SOBE: - Master Degree course in distributed intelligence in design phase; - Generative/computational design, - Augmented/mixed reality applications in design; - Emergent design strategies and techniques in architectural and Urban Design; - Courses based on teaching B.I.M. (B.Eng. and M.eng.); REASON AND EXPECTED OBJECTIVE: - The use of B.I.M. will be made mandatory on all the government projects within five years (right now, in UK, B.I.M. is mandatory for which recommended BIM being used on projects over £50m); - IFC specialist knowledge; - Application on B.I.M. and early design phase; - Application on B.I.M. and laser scanner. Not last: - Gain more international experience and improving the languages … Università degli Studi di Firenze Dottorato Internazionale Congiunto (MIUR) TU “Carolo Wilhelmina” zu Braunschweig Internationales Graduiertenkolleg 802 (DFG) 22nd Plenary Meeting, 8th – 10th November 2012 – Rome Building Information Modeling (BIM) applied for the management of historical and monumental building heritage Thank you