Comments
Transcript
Jim Krawczyk Construction Manager City of Salem
Jim Krawczyk Construction Manager City of Salem Erosion Control Program Manager Jim Bonnet, City Engineer Erosion Control Inspector Stormwater Permit Compliance Jon Nottage Construction Site Management Environmental Services Jim Krawczyk Jeanne Miller Construction Site Inspectors: 6 positions Source Control Inspectors: 5 positions Salem Revised Code Chapter 75 provides authority to administer the Erosion Control Program* “City policy requires that temporary and permanent measures be taken for all construction and land development projects and ground disturbing activities to prevent the adverse effects of site erosion and sediment runoff.” Chapter 75 is currently undergoing revision. Revisions will be complete and implemented by January 1st 2014, in accordance with the renewal of our MS4 Permit. Revisions will include enforcement plan and a sliding scale of penalties for infractions. Developer submits application Application entered into tracking system Construction Site Managers notified Corrective Measures, if necessary Project Completion: stabilized site Periodic site inspections conducted Salem Permit, License, & Application Services Home On line permit services site. Available at: cityofsalem.net Offering: permit application, inspection scheduling, payment options. Construction Site and Source Control Inspectors Public Input: Complaints City of Salem Employee notifications Automated stream monitoring stations City has added 2 new stations for monitoring flow Wet season: October 15 through April 30 ESTABLISHMENT DATE NO LATER THAN OCTOBER 15 Additional measures may be required Dry Season: May 1 through October 14 Site must be prepared for any event Dust control Pollution-generating activities, such as debris, fuel, oil and pesticide management … RESPONSIBILITY OF YOUR SITE RESTS SOLELY ON YOUR SHOULDERS! 1200C permits have specific paper work requirements. We may ask to review your documentation during site visits. Resources Provided: Erosion Prevention and Sediment Control Plan (EPSCP) Technical Guidance Handbook Erosion and Sediment Control Standard Plans for Single Family Housing