...

Appendix – Attachment #1 Transportation Intersection Results – Detailed Tables

by user

on
Category: Documents
45

views

Report

Comments

Transcript

Appendix – Attachment #1 Transportation Intersection Results – Detailed Tables
Appendix – Attachment #1
Transportation Intersection
Results – Detailed Tables
Dulles Corridor Study June 14, 2013
Appendix ‐ Table 1.1
Existing (2013) AM
Storage and 50th Percentile Queuing by Movement
1
Inter. ID #
Major Street
Cross Street
LOS
EBL
150
225
100
520
0
0
240
160
0
215
260
0
0
290
290
270
210
450
EBT
EBR
WBL
WBT
Storage
WBR
NBL
150
400
205
370
465
305
420
0
500
0
155
215
400
0
0
0
185
650
220
435
0
0
50
645
0
480
0
380
165
500
1
D
Sunrise Valley Drive Frying Pan Rd
2
Frying Pan Rd
D
155
310
3
Coppermine Rd
C
200
355
4
Sunrise Valley
E
285
Centreville Road
5
DTR EB On/Off ramps
C
365
0
6
DTR WB On/Off ramps
0
0
D
7
Sunrise Valley
F
275
245
8
DTR EB On/Off ramps
F
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
F
0
185
10
Spring St
C
0
11
Sunrise Valley
E
0
155
12
DTR EB On/Off ramps
F
400
0
13
DTR WB On/Off ramps
F
0
0
Reston Pkwy
14
Sunset Hills
F
275
550
15
Bluemont Way
C
0
0
16
New Dominion Pkwy
E
275
95
17
Sunrise Valley
D
18
DTR EB On/Off ramps
C
450
0
0
Wiehle Avenue
19
DTR WB On/Off ramps
C
20
Sunset Hills
442
385
477
0
D
21
Sunrise Valley
C
430
670
22
DTR EB On/Off ramps
B
0
65
0
0
Hunter Mill Road
23
DTR WB On/Off ramps
D
0
0
0
0
24
Sunset Hills
0
370
D
Notes:
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 50th percentile queue is the maximum back of queue on a typical cycle.
~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.
2
NBT
NBR
SBL
390
435
0
0
400
640
0
235
SBT
375
375
280
290
0
340
325
0
415
625
0
470
550
445
720
0
0
300
390
205
435
0
250
250
0
206
0
320
0
0
120
0
0
0
SBR
425
0
0
395
0
670
550
430
0
0
445
285
65
0
120
220
0
0
230
EBL
~468
276
229
122
366
EBT
173
244
27
140
299
~403
363
EBR
WBL
0
0
95
32
97
0
2
33
~460
92
106
46
127
165
~329
29
18
34
~422
221
495
1
335
296
228
69
321
55
0
105
205
286
98
43
124
45
211
142
22
203
203
124
201
77
0
175
162
0
Queue Length (ft) ‐ 50th Percentile
WBT
WBR
NBL
NBT
361
23
111
49
235
246
48
0
73
339
203
0
181
366
123
~477
299
70
278
~279
~390
73
~1247
~910
~1251
39
459
~311
241
213
147
75
954
354
214
~2159
180
1035
180
0
458
389
29
598
67
291
12
408
112
188
498
118
203
181
66
217
184
254
314
270
40
114
~2
143
369
151
30
NBR
190
83
SBL
12
26
35
241
162
124
0
~875
225
0
53
0
~482
~2276
0
0
214
0
179
228
119
0
~433
24
182
314
128
SBT
130
73
184
542
454
477
436
68
483
305
~2320
205
467
276
435
160
60
292
132
59
439
SBR
0
58
8
~821
10
70
0
58
87
14
16
2
50
17
5
0
0
0
44
Appendix ‐ Table 1.2
Existing (2013) PM
Storage and 50th Percentile Queuing by Movement
1
Inter. ID #
Major Street
Cross Street
LOS
EBL
150
225
100
520
0
EBT
EBR
WBL
WBT
Storage
WBR
NBL
150
400
205
370
465
305
420
0
500
0
155
215
400
0
0
185
650
220
435
1
F
Sunrise Valley Drive Frying Pan Rd
2
Frying Pan Rd
C
155
310
3
Coppermine Rd
C
200
355
4
Sunrise Valley
E
0
285
Centreville Road
5
DTR EB On/Off ramps
B
365
0
6
DTR WB On/Off ramps
E
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
D
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
E
185
10
Spring St
B
215
11
Sunrise Valley
F
260
0
155
12
DTR EB On/Off ramps
F
400
13
DTR WB On/Off ramps
F
50
Reston Pkwy
14
Sunset Hills
F
290
275
550
0
15
Bluemont Way
C
290
0
0
0
16
New Dominion Pkwy
D
270
275
95
165
17
Sunrise Valley
C
210
18
DTR EB On/Off ramps
B
450
450
Wiehle Avenue
19
DTR WB On/Off ramps
C
20
Sunset Hills
F
442
385
477
0
21
Sunrise Valley
C
430
670
22
DTR EB On/Off ramps
B
65
Hunter Mill Road
23
DTR WB On/Off ramps
D
24
Sunset Hills
370
D
Notes:
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
NBT
NBR
SBL
SBT
390
435
0
0
375
375
280
290
0
425
0
0
400
640
340
325
395
0
670
550
430
415
625
720
645
480
380
500
470
550
445
300
390
205
235
435
320
SBR
0
250
250
445
285
65
120
220
206
EBL
186
146
280
391
144
EBT
637
257
60
234
315
181
287
EBR
WBL
101
52
123
48
294
0
143
98
300
530
219
148
332
186
323
111
~151
147
272
90
221
14
252
122
89
184
121
68
0
324
0
143
242
~1503
369
73
262
~476
1
141
83
~650
213
~382
33
120
~290
230
120
0
Queue Length (ft) ‐ 50th Percentile
WBT
WBR
NBL
NBT
~1271
18
120
0
102
61
41
0
28
88
129
~490
27
363
176
298
368
~433
328
547
~792
76
~1509
~680
~698
107
723
143
264
335
~765
27
567
253
262
~475
401
450
464
463
211
781
12
541
153
245
156
283
264
336
597
122
217
197
171
161
383
206
587
119
0
147
~4
179
273
53
39
NBR
51
87
SBL
95
9
67
~343
200
37
14
273
96
6
0
0
330
30
0
15
119
21
186
348
195
2
26
0
51
343
45
SBT
320
276
307
14
~903
~1477
460
402
357
~1143
~3027
~1201
262
497
234
163
73
329
SBR
~2055
125
0
54
108
206
0
0
1
304
3
6
19
482
0
0
143
79
~310
0
0
2
The 50th percentile queue is the maximum back of queue on a typical cycle.
~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.
1
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.3
Existing (2013) AM
Storage and 95th Percentile Queuing by Movement
Inter. ID #
Major Street
Cross Street
LOS
EBL
EBT
EBR
WBL
WBT
1
150
D
Sunrise Valley Drive Frying Pan Rd
D
2
Frying Pan Rd
225
155
310
C
3
Coppermine Rd
100
200
355
4
Sunrise Valley
E
520
285
Centreville Road
C
5
DTR EB On/Off ramps
0
365
0
0
0
0
6
DTR WB On/Off ramps
D
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
F
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
F
0
0
185
10
Spring St
C
215
0
11
Sunrise Valley
E
260
0
155
12
DTR EB On/Off ramps
F
0
400
0
13
DTR WB On/Off ramps
F
0
0
0
Reston Pkwy
14
Sunset Hills
F
290
275
550
C
15
Bluemont Way
290
0
0
16
New Dominion Pkwy
E
270
275
95
D
210
17
Sunrise Valley
C
18
DTR EB On/Off ramps
450
450
0
Wiehle Avenue
C
19
DTR WB On/Off ramps
442
385
477
20
Sunset Hills
D
C
21
Sunrise Valley
430
B
22
DTR EB On/Off ramps
0
65
0
Hunter Mill Road
D
23
DTR WB On/Off ramps
0
0
0
0
370
24
Sunset Hills
D
Notes:
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 95th percentile queue is the maximum back of queue with 95th percentile traffic volumes.
# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Storage1
WBR
NBL
150
400
205
370
465
305
420
0
500
0
155
215
400
0
0
0
185
650
220
435
0
0
50
645
0
480
0
380
165
500
0
0
670
0
0
NBT
NBR
SBL
390
435
0
0
400
640
0
235
SBT
375
375
280
290
0
340
325
0
415
625
0
470
550
445
720
0
0
300
390
205
435
0
250
250
0
206
0
320
0
0
120
0
0
0
SBR
425
0
0
395
0
670
550
430
0
0
445
285
65
0
120
220
0
0
230
EBL
#598
#364
264
165
#492
#380
#528
EBT
173
#422
43
188
EBR
31
28
WBL
153
52
143
0
#487
38
142
#706
160
153
77
204
223
#460
54
43
66
#566
296
#590
9
#503
403
310
113
#441
103
0
175
#371
355
155
117
174
80
300
190
52
285
280
199
273
125
68
#308
#312
74
Synchro Queue Length (ft) ‐ 95th Percentile 2
WBT
WBR
NBL
NBT
NBR
#589
69
158
100
#382
298
20
72
29
m92
391
#271
86
#282
421
288
48
0
#720
#465
m116
445
#400
#630
110
#1377
222
#1036
71
#1502
66
535
m#277
m198
#293
#353
112
1062
128
446
m0
303
#2432
236
980
233
62
m405
m352
m#1436
66
720
96
m1
400
61
#482
131
13
278
#883
m141
m0
281
253
90
349
243
#427
347
#613
#430
202
m678
m44
#184
m140
394
m191
m37
SBL
36
64
71
#313
m173
#1013
#347
m231
#297
m10
257
#505
196
#362
424
#284
SBT
142
110
155
m592
562
564
573
m#108
#615
m165
#2295
244
406
342
487
259
80
347
m192
m48
#679
SBR
#137
1
11
#1077
41
196
m0
148
m37
m27
m2
7
90
38
12
0
0
m0
98
Appendix ‐ Table 1.4
Existing (2013) PM
Storage and 95th Percentile Queuing by Movement
Inter. ID #
Major Street
Cross Street
LOS
EBL
EBT
EBR
WBL
WBT
1
F
150
Sunrise Valley Drive Frying Pan Rd
C
2
Frying Pan Rd
225
155
310
C
3
Coppermine Rd
100
200
355
4
Sunrise Valley
E
520
0
285
Centreville Road
B
5
DTR EB On/Off ramps
0
365
0
6
DTR WB On/Off ramps
E
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
D
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
E
185
10
Spring St
B
215
11
Sunrise Valley
F
260
0
155
12
DTR EB On/Off ramps
F
400
13
DTR WB On/Off ramps
F
Reston Pkwy
14
Sunset Hills
F
290
275
550
C
290
0
0
15
Bluemont Way
16
New Dominion Pkwy
D
270
275
95
C
210
17
Sunrise Valley
B
18
DTR EB On/Off ramps
450
450
Wiehle Avenue
C
19
DTR WB On/Off ramps
20
Sunset Hills
F
442
385
477
C
430
21
Sunrise Valley
B
22
DTR EB On/Off ramps
65
Hunter Mill Road
D
23
DTR WB On/Off ramps
370
24
Sunset Hills
D
Notes:
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 95th percentile queue is the maximum back of queue with 95th percentile traffic volumes.
# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Storage1
NBL
150
400
205
370
465
305
420
0
500
0
155
215
400
0
0
185
650
220
435
WBR
50
0
0
165
0
670
NBT
NBR
SBL
SBT
390
435
0
0
375
375
280
290
0
425
0
0
400
640
340
325
395
0
670
550
430
415
625
720
645
480
380
500
470
550
445
300
390
205
235
435
320
SBR
0
250
250
445
285
65
120
220
206
EBL
EBT
EBR
WBL
245
191
333
#506
214
837
367
83
298
167
110
198
74
#418
#417
#263
356
0
250
169
423
#789
285
#224
#520
235
#419
155
195
207
334
148
266
38
#366
176
149
#358
165
116
0
#507
0
195
334
#1772
464
121
370
#609
7
200
140
#899
290
#593
109
120
#475
230
2
#247
75
Synchro Queue Length (ft) ‐ 95th Percentile 2
WBT
WBR
NBL
NBT
#1533
45
174
35
m103
m112
60
30
55
152
177
#724
51
421
230
421
#594
#647
374
#696
#1050
115
#1630
m551
#927
m87
m689
m148
m295
#436
#1024
51
660
m325
370
#705
#546
447
561
#729
m#288
m#849
42
m581
m169
331
218
#412
307
473
#969
171
298
273
212
211
#525
#272
#743
193
103
#644
#133
#247
355
m81
m52
NBR
88
231
SBL
150
m17
120
#465
m181
82
m10
#387
m68
m17
42
m0
m151
m53
m0
37
m163
52
267
269
294
m13
m32
m0
99
#791
m67
SBT
705
280
393
m58
#1042
#1575
m473
#667
453
m331
m#2934
m710
395
378
293
478
185
386
SBR
#2324
226
43
135
196
255
53
41
m0
m263
m8
13
50
552
9
0
m211
m62
#520
m0
40
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.5
Existing (2013) AM
Storage and Volume by Movement
Inter. ID #
Major Street
Cross Street
LOS
EBL
150
225
100
520
0
0
240
160
0
215
260
0
0
290
290
270
210
450
EBT
EBR
WBL
WBT
1
D
Sunrise Valley Drive Frying Pan Rd
D
2
Frying Pan Rd
155
310
C
3
Coppermine Rd
200
355
4
Sunrise Valley
E
285
Centreville Road
C
5
DTR EB On/Off ramps
365
0
0
0
6
DTR WB On/Off ramps
D
7
Sunrise Valley
F
275
245
8
DTR EB On/Off ramps
F
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
F
0
185
10
Spring St
C
0
11
Sunrise Valley
E
0
155
12
DTR EB On/Off ramps
F
400
0
13
DTR WB On/Off ramps
F
0
0
Reston Pkwy
14
Sunset Hills
F
275
550
C
15
Bluemont Way
0
0
16
New Dominion Pkwy
E
275
95
D
17
Sunrise Valley
C
18
DTR EB On/Off ramps
450
0
Wiehle Avenue
C
19
DTR WB On/Off ramps
442
385
477
20
Sunset Hills
D
C
21
Sunrise Valley
430
B
22
DTR EB On/Off ramps
0
65
0
Hunter Mill Road
D
23
DTR WB On/Off ramps
0
0
0
0
370
24
Sunset Hills
D
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
Storage1
WBR
NBL
150
400
205
370
465
305
420
0
500
0
155
215
400
0
0
0
185
650
220
435
0
0
50
645
0
480
0
380
165
500
0
NBT
SBL
390
435
0
0
400
640
0
235
0
670
0
0
NBR
375
375
280
290
0
340
325
0
415
625
0
470
550
445
720
0
0
300
390
205
435
0
250
250
0
206
0
320
0
0
120
0
0
0
SBT
SBR
425
0
0
395
0
670
550
430
0
0
445
285
65
0
120
220
0
0
230
Volumes by Movement
WBR
NBL
182
102
264
43
157
259
362
EBL
1,485
606
305
250
382
EBT
919
284
72
250
8
EBR
WBL
62
71
38
551
110
50
213
WBT
651
243
107
408
445
815
519
1
29
371
887
73
6
332
385
418
116
109
352
4
1,077
148
102
559
401
142
8
354
84
287
352
123
825
112
43
14
36
957
442
1,053
1
255
593
2
390
211
18
197
2
327
22
248
254
1,044
148
0
135
808
344
142
1
392
366
231
1
127
852
74
685
277
145
215
191
NBT
NBR
116
14
560
551
376
335
933
590
157
682
438
570
1,181
1,647
1,208
1,018
1,340
1,640
2,276
2,934
2,421
1,529
1,508
2,002
1,231
1,176
736
SBL
22
30
38
521
324
158
633
1,178
1,471
755
244
344
109
655
239
595
714
555
397
682
314
NBT
NBR
113
28
234
891
SBL
141
10
76
550
402
94
180
350
364
323
328
183
208
220
319
214
611
1,244
16
140
301
3
137
987
393
634
338
402
227
SBT
579
613
849
1,881
1,265
1,101
2,157
2,406
2,259
818
1,749
1,770
1,417
1,727
1,149
1,122
1,173
919
545
548
586
SBR
372
263
417
970
93
681
329
505
332
489
192
88
64
95
522
0
139
112
564
144
260
Appendix ‐ Table 1.6
Existing (2013) PM
Storage and Volume by Movement
1
Inter. ID #
Major Street
Cross Street
LOS
EBL
150
225
100
520
0
EBT
EBR
WBL
WBT
1
F
Sunrise Valley Drive Frying Pan Rd
C
2
Frying Pan Rd
155
310
C
3
Coppermine Rd
200
355
4
Sunrise Valley
E
0
285
Centreville Road
B
5
DTR EB On/Off ramps
365
0
6
DTR WB On/Off ramps
E
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
D
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
E
185
10
Spring St
B
215
11
Sunrise Valley
F
260
0
155
12
DTR EB On/Off ramps
F
400
13
DTR WB On/Off ramps
F
Reston Pkwy
14
Sunset Hills
F
290
275
550
C
15
Bluemont Way
290
0
0
16
New Dominion Pkwy
D
270
275
95
C
17
Sunrise Valley
210
B
18
DTR EB On/Off ramps
450
450
Wiehle Avenue
C
19
DTR WB On/Off ramps
20
Sunset Hills
F
442
385
477
C
21
Sunrise Valley
430
B
22
DTR EB On/Off ramps
65
Hunter Mill Road
D
23
DTR WB On/Off ramps
370
24
Sunset Hills
D
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
Storage
WBR
NBL
150
400
205
370
465
305
420
0
500
0
155
215
400
0
0
185
650
220
435
50
0
0
165
0
670
NBT
NBR
SBL
SBT
SBR
390
435
0
0
375
375
280
290
0
425
0
0
400
640
340
325
415
625
720
395
0
670
550
430
645
480
380
500
470
550
445
300
390
205
445
285
65
235
435
320
0
250
250
120
220
206
EBL
392
330
370
794
150
EBT
847
299
155
416
1
EBR
WBL
226
260
119
124
141
76
578
WBT
962
281
90
275
419
511
381
198
162
609
456
1
550
318
185
111
155
605
113
564
12
216
273
3
261
383
111
324
480
2
365
109
192
907
430
374
3
683
844
10
210
380
454
583
8
221
941
321
363
435
521
16
511
200
322
409
533
361
423
1,303
1,064
1,175
284
340
523
3
157
285
253
706
523
626
256
412
188
435
406
726
1
149
421
528
408
102
676
365
367
45
161
735
255
120
230
339
727
828
1,073
1,735
1,477
1,712
2,463
2,603
2,582
953
1,586
1,571
1,765
2,014
1,502
660
415
350
310
Volumes by Movement
WBR
NBL
39
52
140
56
59
529
55
262
70
209
559
127
30
242
194
19
160
833
476
93
101
805
112
SBT
1,268
1,377
1,402
1,850
1,645
1,788
2,308
2,007
1,849
1,679
2,272
2,546
1,461
1,437
820
1,776
1,920
950
895
591
485
SBR
1,472
586
242
260
379
408
572
226
112
753
771
52
57
73
1,250
453
137
420
125
211
Attachment ‐ #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.7
Existing (2013) AM
Level of Service and Seconds of Delay by Movement
Inter. ID #
Major Street
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Sunrise Valley Drive
Centreville Road
Fairfax County Pkwy
Reston Pkwy
Wiehle Avenue
Hunter Mill Road
Cross Street
Frying Pan Rd
Frying Pan Rd
Coppermine Rd
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Spring St
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Bluemont Way
New Dominion Pkwy
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Int. Delay (sec/veh) LOS
38.7
37.9
28
56.4
20
45.3
106
117
179.8
26.7
64.4
235.5
126.8
93.3
28
59
41.6
25.7
20.5
47.6
32
13.9
42.9
52.8
D
D
C
E
C
D
F
F
F
C
E
F
F
F
C
E
D
C
C
D
C
B
D
D
Int. Delay (sec/veh) LOS
190.2
33.7
25.1
76.1
16.1
58.2
100.7
48.8
67
19.5
86.1
340.2
148.5
125.2
27.9
44.6
31.3
18.3
20.1
89
29.1
13.7
41.2
36.4
F
C
C
E
B
E
F
D
E
B
F
F
F
F
C
D
C
B
C
F
C
B
D
D
EBL
E
E
D
E
E
EBT
A
E
D
E
F
F
F
EBR
WBL
A
A
E
C
E
WBT
E
E
E
E
NBT
NBR
A
F
F
F
F
C
C
D
A
C
F
F
B
A
D
B
D
C
A
B
B
B
C
A
D
E
A
B
F
B
C
A
NBT
NBR
A
F
F
F
F
A
B
E
B
C
F
C
D
A
E
A
B
E
A
C
E
E
B
A
D
D
C
B
C
A
A
C
C
F
F
F
F
D
D
F
D
F
F
F
D
E
E
F
F
F
B
E
C
E
E
LOS by Movement
WBR
NBL
A
C
E
B
E
B
F
E
F
C
F
F
D
F
F
A
F
F
E
E
E
B
C
C
C
E
F
F
E
E
E
F
E
D
E
D
E
D
D
F
A
A
D
E
B
E
E
B
A
F
E
A
A
F
F
A
A
F
F
F
D
D
D
B
B
F
B
A
SBL
D
E
E
E
E
F
B
D
D
D
SBT
B
B
C
B
C
C
C
A
C
C
F
C
C
C
D
B
A
D
SBR
C
A
A
F
A
A
A
A
A
A
A
A
C
A
98.5
154.6
EBT
67.6
39.8
71.6
EBR
4.3
6.8
5.3
A
A
WBL
65.2
32.3
61.7
0.6
113.7
24.5
29.1
97.3
96.8
41.6
48.2
92.1
44
0.1
140
101.3
91.6
51.9
77.5
58.9
89.6
94
121.5
19.5
63.4
94.9
64.6
22.1
30.4
20.7
31
58.8
61.6
56.9
12.6
56
105.2
83.4
75.8
62.5
A
A
A
A
E
EBL
57.3
67.2
43.1
70.5
80
17.6
59.9
38
15.7
74.1
99.5
12.4
Seconds of Delay by Movement
WBT
WBR
NBL
NBT
61.7
9
64.8
32.2
79.4
20.2
57.9
11.1
60.7
31.4
74.6
11.7
85.3
39.9
7
100
57.9
25.8
24.6
159.9
150.4
105.2
95.4
237.2
1118
48.7
16.5
81.1
6.6
113.2
56.6
100.8
54.6
10.6
56.1
519.5
101.1
43.9
58
8
84.1
30.7
107.1
108.3
2.9
73.6
8.1
130.8
18.7
48.2
38
18
64.3
61.5
54.9
11.4
44.4
75.8
33
49.7
12.3
12.6
156.5
17.7
23
101.5
3.2
NBR
17
2.5
SBL
46.4
75.4
69.2
79
60.1
15.6
5.9
287.1
62.2
1.6
8.5
0.1
123
258.4
0.2
1.7
145.6
80.3
110.9
42.7
36.3
1.1
47.2
2.2
51
48.8
52.6
SBT
18.6
15.5
21.6
18.5
30.5
29.5
23.5
8.7
32.8
21.2
484.4
20.1
26.7
23.3
45.6
11
5.3
48.1
SBR
23.9
4.1
1.3
102
6.2
6.7
0.7
7.8
4.7
5.5
1.7
3.1
21.4
1.2
1
0.6
5.8
6.7
55.3
1.2
8.3
Appendix ‐ Table 1.8
Existing (2013) PM
Level of Service and Seconds of Delay by Movement
Inter. ID #
Major Street
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Sunrise Valley Drive
Centreville Road
Fairfax County Pkwy
Reston Pkwy
Wiehle Avenue
Hunter Mill Road
Cross Street
Frying Pan Rd
Frying Pan Rd
Coppermine Rd
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Spring St
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Bluemont Way
New Dominion Pkwy
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
EBL
E
E
D
E
F
EBT
C
E
D
D
F
F
F
EBR
WBL
C
B
E
C
F
WBT
F
E
E
E
A
E
D
E
F
E
F
D
E
F
F
F
F
F
E
E
E
E
F
F
B
E
F
D
D
F
F
F
F
F
C
D
F
A
F
F
F
A
E
C
F
D
B
E
F
E
E
E
E
E
F
D
F
D
E
E
E
E
D
E
D
C
E
F
B
B
B
SBL
C
D
E
F
F
B
A
F
C
A
A
F
A
A
A
F
F
F
C
D
A
A
B
C
F
F
LOS by Movement
WBR
NBL
C
B
E
A
E
F
E
F
A
4
D
D
D
SBT
D
C
D
A
E
E
B
D
C
E
F
F
F
C
C
A
A
D
SBR
F
B
A
B
B
B
A
A
A
C
A
A
B
B
EBT
33.1
69.8
42.2
51.1
121.9
341.5
108.2
EBR
WBL
23.6
12.1
73.8
32.8
88.9
0.1
58.2
48
A
A
65.9
128.1
42.5
63
111.6
88.1
0.3
91.1
94.3
119.7
67.5
63.4
72.4
66.1
84.2
106.9
16.7
77.3
94.4
0.2
505.3
49.6
18.5
80.1
49.2
49.6
56.6
29.7
75.7
113
68
65.8
75.5
A
A
A
B
F
EBL
63.9
60
45.3
72.2
80.4
289.5
66.5
74.8
21.2
101.1
83
12.7
Seconds of Delay by Movement
WBT
WBR
NBL
NBT
239.7
24.8
56
11.8
56.6
6.1
55.9
8.8
72.4
16.1
58.6
167.8
72.4
60.8
13.4
65.5
87.9
141.1
20.5
112.1
171.7
122.4
123.6
29.6
328.3
27.1
48.7
45.7
10
83.7
185.8
88
67.3
6
75.7
125.2
93.6
11.3
57.7
53.2
91.8
58.9
66.8
95.4
3.8
97.3
39.7
99.9
20.4
54.5
26.3
13.3
71.1
69.3
58.3
4.2
64.5
72.9
53.2
48.8
10.9
13.2
87.7
36.6
20.1
26.4
3.4
NBR
10.1
11.2
SBL
33.9
50.6
65.2
168.6
84.9
18.2
3.5
117.6
24.3
1.7
9.2
0
84.5
6.6
0.2
2.3
111.1
90.3
99.5
30.6
40.9
1.4
4.1
0.4
40.8
41.2
42
SBT
39.4
23.9
48.8
1.9
71.1
66
12
36.3
23.4
59.7
586.3
295.5
94.9
27.5
33.4
9.7
8.8
49.5
SBR
301.3
12
1.5
18
14
14.7
2.8
2.9
0.4
20.8
3.7
5.5
10.5
15.7
1.7
0.3
7.5
16.1
93.3
1.3
3.3
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.9
COG Round 8 (2030) AM
Storage and 50th Percentile Queuing by Movement
1
Inter. ID #
Major Street
Cross Street
LOS
EBL
EBT
EBR
WBL
WBT
1
Frying Pan Rd
F
Sunrise Valley Drive
2
Frying Pan Rd
F
225
155
310
3
Coppermine Rd
C
100
200
355
4
Sunrise Valley
F
520
0
285
Centreville Road
5
DTR EB On/Off ramps
D
0
365
0
6
DTR WB On/Off ramps
E
0
0
0
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
F
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
F
0
0
185
215
0
10
Spring St
D
11
Sunrise Valley
F
260
0
155
12
DTR EB On/Off ramps
C
0
400
0
13
DTR WB On/Off ramps
F
0
0
0
Reston Pkwy
14
Sunset Hills
F
290
275
550
15
Bluemont Way
D
290
0
0
16
New Dominion Pkwy
F
270
275
95
17
Sunrise Valley
F
210
C
450
450
0
18
DTR EB On/Off ramps
Wiehle Avenue
19
DTR WB On/Off ramps
C
20
Sunset Hills
E
442
385
477
21
Sunrise Valley
E
430
0
0
C
65
22
DTR EB On/Off ramps
Hunter Mill Road
23
DTR WB On/Off ramps
C
0
0
0
24
Sunset Hills
E
0
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 50th percentile queue is the maximum back of queue on a typical cycle.
~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.
Storage
WBR
NBL
400
370
305
0
0
215
0
0
2
NBT
NBR
SBL
390
435
0
0
0
400
640
0
220
0
50
0
0
165
205
465
420
500
155
400
0
185
650
435
0
645
480
380
500
415
625
0
470
550
445
720
0
0
300
390
205
0
235
435
0
250
250
0
206
0
0
670
320
0
0
0
0
120
0
0
SBT
375
375
280
290
0
340
325
0
SBR
0
425
0
0
0
395
0
670
550
430
0
0
445
285
65
0
120
220
0
230
EBL
~1392
~627
383
~271
~566
EBT
~861
~527
35
~372
~404
~341
~473
EBR
20
0
WBL
125
129
58
144
0
11
~352
~561
161
140
63
263
199
~1033
67
30
71
~518
275
~1187
33
~968
382
283
111
514
112
0
194
~324
372
56
171
350
155
249
~314
61
281
252
199
261
116
19
~258
~305
0
Queue Length (ft) ‐ 50th Percentile
WBT
WBR
NBL
NBT
~383
0
192
96
~363
271
68
58
76
452
~368
111
~268
426
160
~552
392
103
399
~539
~626
186
~1476
~1123
~1368
62
493
~462
201
~430
~771
101
1035
378
249
~2315
239
1058
368
45
~558
431
66
822
159
369
69
~603
221
275
~1331
200
267
235
78
435
227
~366
319
25
~440
277
687
0
177
294
187
33
NBR
0
0
299
144
SBL
36
46
71
315
225
189
89
~970
224
82
0
~604
~2425
0
44
~254
20
261
271
180
0
~544
86
~452
48
~214
SBT
19
124
146
209
592
524
641
220
~778
~735
344
961
268
554
356
489
189
99
335
~546
248
92
~560
SBR
0
22
2
~986
21
~1875
0
112
240
99
46
23
5
82
30
19
0
86
Appendix ‐ Table 1.10
COG Round 8 (2030) PM
Storage and 50th Percentile Queuing by Movement
1
Inter. ID #
Major Street
Cross Street
LOS
EBL
EBT
EBR
WBL
WBT
1
Frying Pan Rd
F
Sunrise Valley Drive
2
Frying Pan Rd
E
225
155
310
3
Coppermine Rd
C
100
200
355
4
Sunrise Valley
F
520
0
285
Centreville Road
5
DTR EB On/Off ramps
C
0
365
0
6
DTR WB On/Off ramps
E
0
0
0
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
F
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
F
0
0
185
215
0
10
Spring St
C
11
Sunrise Valley
F
260
0
155
12
DTR EB On/Off ramps
B
400
13
DTR WB On/Off ramps
F
Reston Pkwy
14
Sunset Hills
F
290
275
550
15
Bluemont Way
F
290
0
0
16
New Dominion Pkwy
E
270
275
95
17
Sunrise Valley
D
210
18
DTR EB On/Off ramps
C
450
450
0
Wiehle Avenue
19
DTR WB On/Off ramps
C
20
Sunset Hills
F
442
385
477
21
Sunrise Valley
E
430
D
65
22
DTR EB On/Off ramps
Hunter Mill Road
23
DTR WB On/Off ramps
E
24
Sunset Hills
D
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 50th percentile queue is the maximum back of queue on a typical cycle.
~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.
Storage
WBR
NBL
400
370
305
0
0
215
0
0
220
205
465
420
500
155
400
0
185
650
435
2
NBT
NBR
SBL
390
435
0
0
0
400
640
0
375
375
280
290
0
340
325
0
415
625
720
SBT
SBR
0
425
0
0
0
395
0
670
550
430
50
0
0
165
645
480
380
500
470
550
445
300
390
205
445
285
65
0
235
435
0
250
250
0
0
670
320
0
120
220
206
EBL
290
~347
~514
~747
268
EBT
~915
~757
93
390
~1268
220
~572
EBR
380
172
WBL
81
~257
58
~476
0
~503
129
356
~742
257
~184
~504
209
~485
151
~296
~332
346
117
306
17
~636
165
118
~346
222
117
0
~534
0
181
437
~2231
~1121
346
292
~569
16
186
107
~913
243
~956
~187
120
~407
230
5
~159
0
Queue Length (ft) ‐ 50th Percentile
WBT
WBR
NBL
NBT
~797
0
19
242
16
152
146
68
49
49
168
168
~852
49
467
204
356
~551
~615
321
~769
~1020
113
~1806
~2206
~803
124
~1101
169
491
~553
~1458
60
649
338
292
~849
436
408
520
~660
~310
~826
18
~634
170
286
263
~389
335
451
761
143
250
223
193
161
~822
~252
~665
23
239
218
502
0
~245
229
77
69
NBR
0
23
129
~136
SBL
205
24
86
~449
226
56
64
~424
107
7
0
~417
31
0
90
188
58
297
~620
238
0
46
8
83
233
62
SBT
19
467
293
327
30
~962
~1808
490
~674
390
~1254
124
~1204
~1043
801
379
365
260
372
538
318
94
~411
SBR
~2004
184
7
68
142
247
0
0
1
0
307
22
12
36
475
0
0
0
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.11
COG Round 8 (2030) AM
Storage and 95th Percentile Queuing by Movement
1
Inter. ID #
Major Street
Cross Street
LOS
2
Storage
EBL
EBT
EBR
WBL
WBT
1
Frying Pan Rd
F
Sunrise Valley Drive
2
Frying Pan Rd
F
225
155
310
3
Coppermine Rd
C
100
200
355
Centreville Road
4
Sunrise Valley
F
520
0
285
5
DTR EB On/Off ramps
D
0
365
0
6
DTR WB On/Off ramps
E
0
0
0
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
F
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
F
0
0
185
10
Spring St
215
0
D
11
Sunrise Valley
F
260
0
155
12
DTR EB On/Off ramps
C
0
400
0
13
DTR WB On/Off ramps
F
0
0
0
Reston Pkwy
14
Sunset Hills
F
290
275
550
15
Bluemont Way
D
290
0
0
16
New Dominion Pkwy
F
270
275
95
17
Sunrise Valley
F
210
18
DTR EB On/Off ramps
C
450
450
0
Wiehle Avenue
C
19
DTR WB On/Off ramps
20
Sunset Hills
E
442
385
477
21
Sunrise Valley
E
430
0
0
22
DTR EB On/Off ramps
C
65
Hunter Mill Road
C
0
0
0
23
DTR WB On/Off ramps
24
Sunset Hills
E
0
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 95th percentile queue is the maximum back of queue with 95th percentile traffic volumes.
# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
WBR
Synchro Queue Length (ft) ‐ 95th Percentile
NBL
400
370
305
0
0
215
0
0
NBT
NBR
SBL
390
435
0
0
0
400
640
0
SBT
220
0
50
0
0
165
205
465
420
500
155
400
0
185
650
435
0
645
480
380
500
415
625
0
470
550
445
720
0
0
300
390
205
0
235
435
0
250
250
0
206
0
0
670
320
0
0
0
0
120
0
0
375
375
280
290
0
340
325
0
SBR
0
425
0
0
0
395
0
670
550
430
0
0
445
285
65
0
120
220
0
230
EBL
EBT
#1527
#761
#545
#388
#797
#1001
#764
64
#498
#535
#462
#607
EBR
WBL
WBT
WBR
61
39
#237
203
102
196
#508
#293
99
#493
0
162
104
#266
#561
m89
#381
#797
#283
#789
#675
#623
#874
m130
240
#1623
m44
m#297
143
0
57
#547
195
101
#456
264
#1182
103
63
119
#652
384
#1275
70
#1213
516
398
171
#647
172
NBL
0
#327
#563
#1027
347
#435
106
#480
347
451
117
499
#394
#2585
138
338
#254
351
294
57
313
#519
#500
135
278
488
206
142
#1598
306
m443
#1159
#742
361
293
113
#490
#653
103
#435
#483
96
85
m183
250
NBT
321
m379
484
113
m426
#1600
m#745
m306
m172
1148
m401
1045
m381
194
247
m172
523
401
340
#1105
m283
36
NBR
SBL
SBT
SBR
0
23
493
725
74
91
123
#416
m224
0
61
25
#1257
305
m42
m#1060
m206
39
169
111
193
m589
674
m695
m208
m#708
#829
m375
830
m316
576
375
541
172
m0
m#694
m#1946
m3
69
m#365
49
#407
#567
256
m0
#772
278
#667
95
m#409
233
127
395
#687
m264
m66
#789
65
m#2048
m0
233
m255
33
m67
m33
19
131
48
56
m0
150
Appendix ‐ Table1. 12
COG Round 8 (2030) PM
Storage and 95th Percentile Queuing by Movement
Inter. ID #
Major Street
Cross Street
LOS
Storage1
EBL
EBT
EBR
WBL
WBT
1
Frying Pan Rd
F
Sunrise Valley Drive
2
Frying Pan Rd
E
225
155
310
3
Coppermine Rd
C
100
200
355
4
Sunrise Valley
F
520
0
285
Centreville Road
5
DTR EB On/Off ramps
C
0
365
0
6
DTR WB On/Off ramps
E
0
0
0
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
F
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
F
0
0
185
10
Spring St
215
0
C
11
Sunrise Valley
F
260
0
155
12
DTR EB On/Off ramps
B
400
13
DTR WB On/Off ramps
F
Reston Pkwy
14
Sunset Hills
F
290
275
550
15
Bluemont Way
F
290
0
0
16
New Dominion Pkwy
E
270
275
95
17
Sunrise Valley
D
210
18
DTR EB On/Off ramps
C
450
450
0
Wiehle Avenue
19
DTR WB On/Off ramps
C
20
Sunset Hills
F
442
385
477
21
Sunrise Valley
E
430
22
DTR EB On/Off ramps
D
65
Hunter Mill Road
23
DTR WB On/Off ramps
E
24
Sunset Hills
D
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 95th percentile queue is the maximum back of queue with 95th percentile traffic volumes.
# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
WBR
Synchro Queue Length (ft) ‐ 95th Percentile2
NBL
400
370
305
0
0
215
0
0
220
205
465
420
500
155
400
0
185
650
435
NBT
NBR
SBL
390
435
0
0
0
400
640
0
SBT
375
375
280
290
0
340
325
0
415
625
720
SBR
0
425
0
0
0
395
0
670
550
430
50
0
0
165
645
480
380
500
470
550
445
300
390
205
445
285
65
0
235
435
0
250
250
0
0
670
320
0
120
220
206
EBL
EBT
#386
#473
#889
#884
#439
#1057
#991
135
#505
#1405
#337
#710
EBR
WBL
WBT
WBR
532
275
142
#435
97
#605
#935
#363
91
224
0
63
83
#1103
m157
m67
80
#541
#1003
#541
#916
#781
#1284
m#831
#189
#1034
m69
m140
96
0
#736
#226
#331
#295
#738
260
#626
204
#382
#536
#462
183
358
45
#861
230
187
#547
277
193
0
#771
#696
#1727
408
#704
41
#276
408
608
56
391
#677
#1098
#917
330
#1210
342
#964
55
309
0
239
#658
#2503
#1398
430
#1255
6
133
#353
#377
#394
#606
#307
359
#1150
#619
m#362
m#681
#517
171
120
230
NBL
84
57
m#280
110
NBT
NBR
SBL
SBT
SBR
38
m137
m277
#575
289
453
#1918
m657
m666
m378
#795
m294
424
m736
m184
390
0
m25
186
#1105
#349
m38
151
#579
m208
#2244
249
51
166
108
m23
#547
m58
39
#823
269
482
m64
#1100
#1905
m450
#780
495
#1391
m39
m425
m#954
858
434
m189
8
#820
284
#850
m244
103
56
m0
#551
m52
m0
129
m#214
107
#480
#727
292
m7
m52
56
#174
326
m83
608
367
433
#680
m163
m77
#615
247
303
90
49
m2
m0
m133
m34
40
73
647
52
m1
47
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.13
COG Round 8 (2030) AM
Storage and Volume by Movement
Inter. ID #
Major Street
Cross Street
LOS
EBL
EBT
EBR
WBL
WBT
1
Frying Pan Rd
F
Sunrise Valley Drive
2
Frying Pan Rd
F
225
155
310
C
100
200
355
3
Coppermine Rd
Centreville Road
4
Sunrise Valley
F
520
0
285
D
0
365
0
5
DTR EB On/Off ramps
6
DTR WB On/Off ramps
E
0
0
0
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
F
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
F
0
0
185
10
Spring St
215
0
D
11
Sunrise Valley
F
260
0
155
12
DTR EB On/Off ramps
C
0
400
0
13
DTR WB On/Off ramps
F
0
0
0
Reston Pkwy
14
Sunset Hills
F
290
275
550
D
290
0
0
15
Bluemont Way
16
New Dominion Pkwy
F
270
275
95
17
Sunrise Valley
F
210
18
DTR EB On/Off ramps
C
450
450
0
Wiehle Avenue
C
19
DTR WB On/Off ramps
20
Sunset Hills
E
442
385
477
21
Sunrise Valley
E
430
0
0
22
DTR EB On/Off ramps
C
65
Hunter Mill Road
C
0
0
0
23
DTR WB On/Off ramps
24
Sunset Hills
E
0
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
Storage1
WBR
NBL
400
370
305
0
0
215
0
0
NBT
NBR
SBL
390
435
0
0
0
400
640
0
220
0
50
0
0
165
205
465
420
500
155
400
0
185
650
435
0
645
480
380
500
415
625
0
470
550
445
720
0
0
300
390
205
0
235
435
0
250
250
0
206
0
0
670
320
0
0
0
0
120
0
0
SBT
375
375
280
290
0
340
325
0
SBR
0
425
0
0
0
395
0
670
550
430
0
0
445
285
65
0
120
220
0
230
EBL
1,950
1,000
500
500
500
EBT
1,450
450
100
500
25
EBR
0
100
100
100
650
550
900
600
25
50
450
200
200
650
850
200
15
450
100
25
75
1,050
550
1,750
25
500
700
15
200
1,050
150
850
50
300
250
400
350
WBL
150
150
100
300
WBT
700
400
150
600
950
125
15
500
450
25
150
450
450
400
50
250
10
600
50
300
350
450
200
0
15
450
50
300
10
WBL
100
250
100
750
WBT
1,150
500
150
350
700
550
15
650
400
400
300
300
300
Volumes by Movement
WBR
NBL
NBT
250
0
0
150
350
1,250
100
200
2,050
650
450
1,350
1,100
450
150
1,400
500
275
1,800
2,400
1,150
175
3,150
900
2,450
550
150
1,600
1,550
1,100
200
2,050
250
750
1,300
0
600
1,550
200
750
1,000
1,200
1,550
450
200
1,850
150
700
850
50
400
700
850
400
350
650
700
450
NBR
50
150
25
650
650
SBL
50
50
75
600
450
450
450
1,000
650
400
250
700
1,300
50
200
300
350
15
200
1,050
500
700
0
850
450
50
300
SBT
50
650
700
900
1,950
1,350
1,200
2,700
2,950
2,700
900
1,800
1,800
1,500
1,800
1,250
1,200
1,250
1,000
450
700
700
650
SBR
700
350
500
1,050
150
1,250
400
600
400
600
250
150
75
150
600
200
150
600
200
300
Appendix ‐ Table 1.14
COG Round 8 (2030) PM
Storage and Volume by Movement
1
Inter. ID #
Major Street
Cross Street
LOS
EBL
EBT
EBR
WBL
WBT
1
Frying Pan Rd
F
Sunrise Valley Drive
2
Frying Pan Rd
E
225
155
310
C
100
200
355
3
Coppermine Rd
Centreville Road
4
Sunrise Valley
F
520
0
285
C
0
365
0
5
DTR EB On/Off ramps
6
DTR WB On/Off ramps
E
0
0
0
7
Sunrise Valley
F
240
275
245
8
DTR EB On/Off ramps
F
160
220
0
Fairfax County Pkwy
9
DTR WB On/Off ramps
F
0
0
185
10
Spring St
215
0
C
11
Sunrise Valley
F
260
0
155
12
DTR EB On/Off ramps
B
400
13
DTR WB On/Off ramps
F
Reston Pkwy
14
Sunset Hills
F
290
275
550
15
Bluemont Way
F
290
0
0
16
New Dominion Pkwy
E
270
275
95
17
Sunrise Valley
D
210
C
450
450
0
18
DTR EB On/Off ramps
Wiehle Avenue
C
19
DTR WB On/Off ramps
20
Sunset Hills
F
442
385
477
21
Sunrise Valley
E
430
22
DTR EB On/Off ramps
D
65
Hunter Mill Road
23
DTR WB On/Off ramps
E
24
Sunset Hills
D
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
Storage
WBR
NBL
400
370
305
0
0
215
0
0
220
205
465
420
500
155
400
0
185
650
435
50
0
0
165
0
0
670
NBT
NBR
SBL
415
625
720
645
480
380
500
470
550
445
300
390
205
445
285
65
235
435
0
250
250
0
0
375
375
280
290
0
340
325
0
SBR
0
425
0
0
0
395
0
670
550
430
320
390
435
0
0
0
400
640
0
SBT
EBL
700
700
600
1,150
250
EBT
1,450
600
250
600
25
EBR
50
500
400
200
250
1,050
600
600
350
200
750
500
450
350
400
1,200
200
300
750
150
750
15
400
350
15
120
220
350
450
200
230
225
206
400
150
10
450
150
250
250
750
700
450
500
800
15
200
0
900
15
250
500
400
800
0
25
750
50
500
10
200
850
400
450
120
7
600
325
Volumes by Movement
WBR
NBL
NBT
50
0
50
100
200
800
100
100
1,150
700
100
1,300
1,850
500
500
1,550
600
150
1,900
3,150
750
450
3,350
450
3,150
950
100
1,050
1,650
550
350
1,650
650
450
1,800
15
500
2,050
300
600
1,550
1,000
1,350
350
450
1,150
600
500
1,250
50
250
550
800
200
400
600
350
800
NBR
150
150
50
350
1,000
SBL
250
25
100
650
500
125
250
450
450
100
250
650
150
50
300
400
300
50
250
1,200
550
150
0
300
150
250
150
SBT
50
1,400
1,450
1,450
1,900
1,700
2,000
2,450
2,200
1,900
1,750
2,300
2,550
2,000
2,000
1,150
2,100
2,250
1,000
700
950
650
550
SBR
2,600
650
300
350
450
500
650
300
150
850
850
100
100
100
1,300
550
200
500
150
300
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.15
COG Round 8 (2030) AM
Level of Service and Seconds of Delay by Movement
Inter. ID #
Major Street
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Sunrise Valley Drive
Centreville Road
Fairfax County Pkwy
Reston Pkwy
Wiehle Avenue
Hunter Mill Road
Cross Street
Frying Pan Rd
Frying Pan Rd
Coppermine Rd
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Spring St
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Bluemont Way
New Dominion Pkwy
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Int. Delay (sec/veh) LOS
321.3
92
31.7
89.3
42.5
60.1
156.4
98.6
232.3
53.3
174.5
29.8
146.8
148.8
38.8
101.2
87.4
28.5
23.7
79.8
77
34.7
31.3
78.5
F
F
C
F
D
E
F
F
F
D
F
C
F
F
D
F
F
C
C
E
E
C
C
E
Int. Delay (sec/veh) LOS
297
76.3
34.5
135.7
26.4
79.3
209.2
205.9
143.4
23.3
160.8
13.6
83.3
211.6
86.7
73.2
49.7
23.7
22.8
183.5
56
43.2
68.4
48.2
F
E
C
F
C
E
F
F
F
C
F
B
F
F
F
E
D
C
C
F
E
D
E
D
EBL
F
F
E
F
F
EBT
F
F
D
F
F
F
F
EBR
B
A
WBL
E
E
C
E
WBT
F
F
E
F
A
C
F
F
F
F
F
D
D
F
E
F
F
F
E
F
E
F
F
F
C
E
D
E
E
LOS by Movement
WBR
NBL
A
D
F
C
D
D
F
F
F
C
F
F
D
F
F
A
F
F
F
F
E
A
D
D
D
E
F
F
F
E
E
F
F
E
E
E
E
D
D
F
B
B
F
F
F
F
F
E
C
E
D
F
F
B
F
F
C
B
C
F
NBT
NBR
A
A
C
C
D
B
D
F
F
C
A
E
B
E
D
A
C
C
A
SBL
D
E
E
F
E
B
A
F
E
A
A
F
F
A
A
F
F
F
D
C
C
B
D
D
E
B
A
A
NBT
D
B
C
F
B
C
F
F
F
B
F
A
A
E
A
C
NBR
A
A
B
A
F
D
D
B
A
A
F
A
F
F
F
SBT
D
C
C
C
D
D
D
B
E
F
B
C
C
C
D
D
B
A
D
F
B
C
F
SBR
A
A
A
F
A
F
A
B
B
A
B
A
A
C
A
EBL
651.4
231.7
56.3
112.8
152.6
EBT
221.1
183.7
40.3
165.1
130.9
104.9
146.1
EBR
12.3
5.7
0.8
26.2
149.4
120.6
120.1
46.4
51.6
138.5
64.7
0.2
591.4
104.6
80.2
55.4
105.7
62.4
303.9
101.6
385.6
22.3
68
117.9
119.3
44.9
47.7
37.6
39.6
68.4
61.8
67.3
9.3
57.7
165.1
86.8
108.6
65.9
A
A
B
WBL
77.7
67.9
33.1
66.4
24.2
55.1
63
15.7
122
227.6
12.8
Seconds of Delay by Movement
WBT
WBR
NBL
NBT
158.8
0.2
89.6
41.7
134.5
23.2
60
34.3
54.6
30.8
152.4
35.6
154.1
46.2
10.4
117.1
83.3
31.8
35.9
367.4
256.9
106.4
132.4
212.3
1400.6
42.4
23.7
122
5.4
221.2
303
102.8
59.1
10.2
57.7
583.4
95.7
56.3
67.8
14.9
106.7
35.6
113.4
114.6
6.3
81.7
17.6
194.5
25.1
57.6
192.3
23.9
59.8
56.8
39.3
17.7
45
140.4
43.4
39.9
128.3
35.8
60.6
20.9
31.9
16
86.1
3
NBR
0
1.5
30.7
8.8
SBL
42.9
72.9
78.7
91.5
60.2
19.4
6.3
327.5
63.1
9.8
0
206.6
308.6
0.6
5.9
151.1
97.7
121.6
51.7
30.6
1.4
112.1
8.8
216.3
83.2
81.8
SBT
45.6
23.3
21.6
26.3
52
44.4
39.4
11.5
70.6
87.2
15.7
24.7
29.8
32.7
36.8
51.1
10.5
9
53.4
119.5
10.5
20.8
114.3
SBR
1
4.3
2.6
139.6
7.4
124.3
0.6
11.6
10.7
3.4
12
9.3
5
22.5
1.4
3.1
2.1
13.6
Appendix ‐ Table 1.16
COG Round 8 (2030) PM
Level of Service and Seconds of Delay by Movement
Inter. ID #
Major Street
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Sunrise Valley Drive
Centreville Road
Fairfax County Pkwy
Reston Pkwy
Wiehle Avenue
Hunter Mill Road
Cross Street
Frying Pan Rd
Frying Pan Rd
Coppermine Rd
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Spring St
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Bluemont Way
New Dominion Pkwy
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
Sunrise Valley
DTR EB On/Off ramps
DTR WB On/Off ramps
Sunset Hills
EBL
D
F
F
F
F
EBT
F
F
D
E
F
F
F
EBR
D
C
WBL
E
F
C
F
WBT
F
F
E
E
A
F
D
E
F
E
F
D
F
F
F
F
F
F
F
E
E
E
F
F
B
E
F
E
D
F
F
F
F
F
C
D
F
A
F
F
F
A
E
E
F
F
D
E
F
E
E
E
E
E
F
E
E
F
E
F
C
F
F
D
D
F
F
F
F
E
F
E
E
F
F
E
F
F
LOS by Movement
WBR
NBL
A
B
E
C
E
F
E
B
A
F
C
B
D
SBL
E
D
E
F
E
C
A
F
B
B
A
F
A
A
A
F
F
F
E
D
A
A
8
E
E
C
SBT
D
D
C
D
A
F
F
B
F
C
F
B
F
F
F
D
B
B
D
D
D
D
F
SBR
F
B
A
B
B
B
A
A
A
A
C
B
A
B
B
EBL
53.4
93.8
82.2
198
132.1
EBT
243.8
277.1
40.4
67.2
617.1
737
204
EBR
46.6
22.8
0.2
177.1
54.8
76.6
179.3
48.1
88.4
159.7
87.4
0.5
135.3
100.1
294.8
173.2
72.4
72.1
71.1
85
264.4
17.5
77.6
176.3
0.2
766.3
270.7
48.8
173.2
74.7
45.3
60.1
64.7
78.9
144
69.9
78.9
75.4
A
A
A
WBL
59.9
142.8
31.9
184.5
469.4
66.5
325.6
69.2
180.8
122.7
13.1
Seconds of Delay by Movement
WBT
WBR
NBL
NBT
491.5
0
44.7
96.5
14.6
56.8
10.9
57
26.4
64.9
26
61.9
357.4
73.3
97.6
18.7
76.3
148.4
238.4
22.9
166.2
247.4
143
170.7
306.8
409.6
24.8
182.4
41.2
13.6
163.6
445.4
95
82.2
7.8
78.9
279.3
100.1
9.1
62.7
84.1
132.7
69
65.3
103.7
5.1
91.5
48.7
123.3
29.8
78.9
38.6
17
71.8
68.6
55.5
3
228.9
97.6
86.8
33.5
93.1
37.6
45.5
7.4
110.9
13.3
26.2
4.8
NBR
0.1
3
17.8
37.2
SBL
69.9
53.7
68.4
249
74.7
20.2
5.1
193.8
19.6
10.1
0
121.5
7.6
0.1
9.9
114
105.8
118.3
75.5
41.7
1.9
6
3.9
57
72.6
31.4
SBT
45.6
54.5
24.7
54.1
3.6
81.8
119.2
13.1
91.1
26.5
99.8
12.9
105.7
266.8
82.3
41.2
18.7
15.3
53.9
44.1
41.5
40.8
140.2
SBR
370.7
14.5
1.9
18.6
15.6
15.7
3.9
3.1
0.6
4.4
28.6
11.8
6.8
13.8
18.7
3.1
1.5
3.2
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.17
3
Sceanrio G AM (2030) ‐ Optimized Storage and 50th Percentile Queuing by Movement
Inter. ID #
Major Street
Cross Street
LOS
Storage1
EBL
EBT
EBR
WBL
WBT
WBR
Queue Length (ft) ‐ 50th Percentile2
NBL
1
C
Sunrise Valley Drive Frying Pan Rd
2
Frying Pan Rd
D
225
155
310
400
3
Coppermine Rd
C
100
200
355
370
Centreville Road
D
456
271
328
4
Sunrise Valley
5
DTR EB On/Off ramps
F
365
6
DTR WB On/Off ramps
90
B
7
Sunrise Valley
D
240
275
245
215
D
160
220
8
DTR EB On/Off ramps
Fairfax County Pkwy
9
DTR WB On/Off ramps
A
185
10
Spring St
E
215
11
Sunrise Valley
E
260
155
220
12
DTR EB On/Off ramps
C
400
D
50
13
DTR WB On/Off ramps
Reston Pkwy
14
Sunset Hills
F
290
275
550
15
Bluemont Way
C
290
16
New Dominion Pkwy
E
270
275
95
165
17
Sunrise Valley
F
210
18
DTR EB On/Off ramps
C
450
450
Wiehle Avenue
19
DTR WB On/Off ramps
B
20
Sunset Hills
F
442
385
477
21
Sunrise Valley
F
430
670
22
DTR EB On/Off ramps
C
65
Hunter Mill Road
23
DTR WB On/Off ramps
F
24
Sunset Hills
E
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 50th percentile queue is the maximum back of queue on a typical cycle.
3
Splits and offsets were optimized.
~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.
NBT
205
465
418
NBR
390
435
135
400
185
650
435
SBL
380
375
375
258
270
400
640
340
325
SBT
SBR
425
395
415
625
720
670
550
430
645
480
380
500
470
550
445
300
390
205
445
285
65
235
435
250
250
320
120
220
206
120
230
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
497
164
296
157
~1298
0
136
260
0
~144
246
405
0
74
32
67
~792
179
0
231
~451
~102
0
~445
298
114
33
298
0
0
~271
0
0
0
~765
0
0
~1222
52
321
465
187
0
~956
15
0
0
0
0
0
0
0
0
0
0
171
0
0
0
~600
0
156
51
200
0
158
0
522
0
0
0
0
83
117
35
178
0
145
82
0
48
0
~180
0
324
~445
24
267
0
0
170
~141
0
0
~389
0
267
154
33
428
0
145
~201
0
79
0
271
0
492
418
26
348
270
0
171
153
21
0
0
0
46
0
0
352
0
0
0
0
69
0
655
0
466
176
0
80
~1427
0
153
0
0
0
154
0
20
202
39
156
0
10
165
0
48
~344
61
0
187
510
544
563
0
0
70
~511
284
0
39
209
10
478
368
294
30
67
0
418
218
44
~969
156
296
365
270
312
0
159
234
391
253
116
634
25
0
0
0
138
18
0
33
0
0
0
342
0
0
~2336
0
50
0
0
0
~712
0
70
0
0
23
0
61
~285
84
0
~223
204
0
0
~460
0
0
~275
32
268
~596
158
0
~469
41
215
0
0
12
245
137
216
444
308
0
202
28
~826
210
391
72
526
246
594
0
62
32
287
~283
27
32
164
56
31
159
77
0
10
101
0
0
158
212
72
1
23
3
12
6
0
0
0
0
0
0
0
Appendix ‐ Table 1.18
3
Sceanrio G PM (2030) ‐ Optimized Storage and 50th Percentile Queuing by Movement
Inter. ID #
Major Street
Cross Street
LOS
Storage1
EBL
EBT
EBR
WBL
WBT
WBR
1
F
Sunrise Valley Drive Frying Pan Rd
2
Frying Pan Rd
D
225
155
310
400
3
Coppermine Rd
C
100
200
355
370
4
Sunrise Valley
F
456
271
328
Centreville Road
5
DTR EB On/Off ramps
D
365
6
DTR WB On/Off ramps
90
C
7
Sunrise Valley
D
240
275
245
215
8
DTR EB On/Off ramps
D
160
220
Fairfax County Pkwy
9
DTR WB On/Off ramps
C
185
10
Spring St
C
215
11
Sunrise Valley
E
260
155
220
12
DTR EB On/Off ramps
C
400
13
DTR WB On/Off ramps
E
50
Reston Pkwy
14
Sunset Hills
F
290
275
550
D
290
15
Bluemont Way
16
New Dominion Pkwy
F
270
275
95
165
17
Sunrise Valley
D
210
18
DTR EB On/Off ramps
C
450
450
Wiehle Avenue
19
DTR WB On/Off ramps
D
20
Sunset Hills
F
442
385
477
21
Sunrise Valley
E
430
670
22
DTR EB On/Off ramps
B
65
Hunter Mill Road
23
DTR WB On/Off ramps
F
24
Sunset Hills
D
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 50th percentile queue is the maximum back of queue on a typical cycle.
3
Splits and offsets were optimized.
~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles.
Queue Length (ft) ‐ 50th Percentile2
NBL
205
465
418
135
400
185
650
435
NBT
NBR
390
435
SBL
380
375
375
258
270
400
640
340
325
SBT
SBR
425
395
415
625
720
670
550
430
645
480
380
500
470
550
445
300
390
205
445
285
65
235
435
320
250
250
120
220
206
120
230
9
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
250
156
460
534
345
0
306
~263
0
184
229
~469
0
157
~263
~418
~495
101
0
~990
267
77
0
~361
631
208
88
~556
0
0
245
0
0
0
186
0
0
232
77
277
245
295
0
275
~697
0
0
0
0
190
154
0
0
0
0
74
0
0
0
142
0
~1903
315
~1303
0
255
0
~2420
0
96
0
0
80
216
37
~345
0
275
313
0
276
0
428
0
~551
~751
5
152
0
0
389
~225
0
0
~674
0
~474
195
36
140
0
275
326
0
~322
0
475
0
467
441
12
262
~423
0
392
253
21
0
0
0
0
0
0
~695
0
0
79
0
246
0
~1562
0
409
550
0
150
630
0
352
215
0
0
40
0
27
134
17
38
0
39
90
0
150
167
37
0
282
~429
320
388
0
0
205
~485
191
0
91
87
13
426
169
342
300
89
0
~682
205
622
~684
151
164
~980
476
~743
0
195
313
~1030
230
270
~396
70
0
8
0
99
618
0
0
0
0
0
16
0
0
15
0
106
0
0
0
39
0
0
0
0
328
24
74
~274
73
0
95
~176
0
0
270
0
0
~279
62
~385
400
163
0
~78
144
106
0
0
28
261
261
239
867
0
0
312
145
485
611
290
~872
~1215
742
570
0
471
421
295
275
123
52
120
~3119
94
7
0
0
0
0
0
0
0
24
0
72
10
18
36
892
0
157
0
0
0
0
0
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.19
Sceanrio G AM (2030) ‐ Optimized 3
Storage and 95th Percentile Queuing by Movement
Inter. ID #
Major Street
Cross Street
Int. Delay (sec/veh) LOS
Storage1
EBL
EBT
EBR
WBL
WBT
1
27.9
C
Sunrise Valley Drive Frying Pan Rd
D
225
155
310
2
Frying Pan Rd
36.1
3
Coppermine Rd
22.6
C
100
200
355
4
Sunrise Valley
Centreville Road
54.7
D
456
271
5
DTR EB On/Off ramps
86.5
F
365
6
DTR WB On/Off ramps
11.2
B
54.7
D
240
275
245
7
Sunrise Valley
8
DTR EB On/Off ramps
35.6
D
160
220
Fairfax County Pkwy
9
DTR WB On/Off ramps
9.8
A
185
10
Spring St
66.5
E
215
70.6
E
260
155
11
Sunrise Valley
12
DTR EB On/Off ramps
34.5
C
400
13
DTR WB On/Off ramps
48.6
D
Reston Pkwy
14
Sunset Hills
153.1
F
290
275
550
15
Bluemont Way
28.2
C
290
67.4
E
270
275
95
16
New Dominion Pkwy
139.7
F
210
17
Sunrise Valley
18
DTR EB On/Off ramps
24
C
450
450
Wiehle Avenue
19
DTR WB On/Off ramps
15.5
B
20
Sunset Hills
145.2
F
442
385
477
94.2
F
430
21
Sunrise Valley
22
DTR EB On/Off ramps
21.4
C
65
Hunter Mill Road
23
DTR WB On/Off ramps
102.1
F
24
Sunset Hills
70.1
E
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 95th percentile queue is the maximum back of queue with 95th percentile traffic volumes.
WBR
Synchro Queue Length (ft) ‐ 95th Percentile2
NBL
400
370
328
205
465
418
90
215
135
400
220
185
650
435
50
165
NBT
NBR
SBL
390
435
380
375
375
258
270
400
640
340
325
SBT
SBR
425
395
415
625
720
670
550
430
645
480
380
500
470
550
445
300
390
205
445
285
65
235
435
250
250
320
120
220
670
206
120
230
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
537
207
319
178
#1567
0
176
#382
0
#235
334
#527
0
112
66
113
#928
217
0
#376
#706
#216
0
#647
327
163
46
337
0
#387
0
0
0
#923
0
0
#1304
133
#415
633
265
0
#1095
81
0
0
0
0
7
31
0
0
0
0
#334
0
0
0
#836
0
260
98
287
0
226
0
#817
0
#117
0
97
130
187
54
269
0
214
148
0
80
0
#389
0
429
#570
54
#428
0
0
238
#305
0
0
#584
0
302
208
43
#731
0
214
#312
0
#206
0
#332
0
#682
497
58
463
379
0
243
198
50
0
0
0
134
51
10
#711
0
0
105
0
#165
0
#978
0
621
286
0
135
#1695
0
220
49
0
0
#378
0
52
290
m68
#257
0
m5
#322
0
m47
#465
85
0
186
#651
615
560
0
0
70
#631
354
0
45
m177
26
535
566
240
13
m28
0
#534
m200
135
#1054
m180
m226
395
332
360
0
m133
0
#497
278
m124
396
m30
0
17
0
85
3
0
133
56
0
0
472
m0
0
#2605
0
37
0
m0
0
#945
0
m43
0
0
57
38
#133
#401
125
0
#307
m#220
0
0
m#531
0
0
m#379
69
360
#694
201
0
#673
85
285
0
0
28
287
191
143
738
451
0
m231
m24
#916
m250
m415
m213
m583
264
663
0
241
98
342
#376
m25
30
199
93
251
150
483
0
42
#248
0
m0
293
m231
m94
m1
m38
12
67
129
0
11
0
0
0
m0
0
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
287
198
422
#646
#521
0
#408
#379
0
#265
315
#597
0
#223
#297
#586
#628
127
0
#1233
#464
#139
0
#546
686
274
92
#715
0
316
174
0
0
0
80
159
0
0
0
#231
0
#2175
394
#1573
0
333
0
#2686
0
#260
0
113
#173
317
49
#470
0
356
#532
0
#401
0
#652
0
#808
#885
18
#273
0
0
516
#432
0
0
#898
0
#576
254
46
190
0
356
#467
0
#555
0
560
0
#718
516
40
365
#637
0
529
#383
48
0
0
0
0
17
0
#937
0
0
244
0
#455
0
#1914
0
#623
#790
0
236
#982
0
480
332
0
0
118
0
#79
m133
m27
81
0
m86
#210
0
m140
m174
63
0
272
m#534
m277
#501
0
0
276
#610
268
0
m93
m73
30
m383
347
289
89
269
0
#806
m188
m702
#780
m143
m127
#1073
m357
#836
0
m235
373
#1173
277
388
m341
m53
0
m8
0
75
310
0
10
36
0
0
53
m0
0
m42
0
199
0
m0
0
81
0
34
0
0
#556
m59
#147
#388
117
0
129
m#199
0
0
313
0
0
m#387
107
#590
#702
260
0
#197
233
m122
0
0
52
633
348
400
971
0
0
m157
#307
560
616
m264
m214
#1272
m1020
#640
0
556
485
350
#369
m72
56
154
#3197
297
40
0
0
0
46
0
m0
49
m26
m0
m1
m30
94
79
715
0
256
0
0
0
m0
0
3
Splits and offsets were optimized.
# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles
m Volume for 95th percentile queue is metered by upstream signal.
Appendix ‐ Table 1.20
Sceanrio G PM (2030) ‐ Optimized 3
Storage and 95th Percentile Queuing by Movement
Inter. ID #
Major Street
Cross Street
Int. Delay (sec/veh) LOS
Storage1
EBL
EBT
EBR
WBL
1
174.4
F
Sunrise Valley Drive Frying Pan Rd
D
225
155
310
2
Frying Pan Rd
36
3
Coppermine Rd
28.6
C
100
200
355
4
Sunrise Valley
85.0
F
456
271
Centreville Road
5
DTR EB On/Off ramps
37.2
D
365
6
DTR WB On/Off ramps
24.6
C
49.7
D
240
275
245
7
Sunrise Valley
8
DTR EB On/Off ramps
43.4
D
160
220
Fairfax County Pkwy
9
DTR WB On/Off ramps
29.8
C
185
10
Spring St
26
C
215
78.8
E
260
155
11
Sunrise Valley
12
DTR EB On/Off ramps
33.8
C
400
13
DTR WB On/Off ramps
56.7
E
Reston Pkwy
14
Sunset Hills
217.1
F
290
275
550
15
Bluemont Way
40.1
D
290
82.7
F
270
275
95
16
New Dominion Pkwy
53.4
D
210
17
Sunrise Valley
18
DTR EB On/Off ramps
23.8
C
450
450
Wiehle Avenue
19
DTR WB On/Off ramps
36.6
D
20
Sunset Hills
253.1
F
442
385
477
65.3
E
430
21
Sunrise Valley
22
DTR EB On/Off ramps
18.4
B
65
Hunter Mill Road
23
DTR WB On/Off ramps
140.8
F
24
Sunset Hills
54.4
D
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
The 95th percentile queue is the maximum back of queue with 95th percentile traffic volumes.
WBT
WBR
Synchro Queue Length (ft) ‐ 95th Percentile2
NBL
400
370
328
205
465
418
90
215
135
400
220
185
650
435
50
165
NBT
NBR
SBL
390
435
380
375
375
258
270
400
640
340
325
SBT
SBR
425
395
415
625
720
670
550
430
645
480
380
500
470
550
445
300
390
205
445
285
65
235
435
250
250
320
670
120
220
206
120
230
0
316
0
0
0
#289
0
0
272
209
337
334
387
0
336
#960
0
0
0
3
Splits and offsets were optimized.
# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles
m Volume for 95th percentile queue is metered by upstream signal.
10
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.21
Sceanrio G AM (2030) ‐ Optimized 2
Storage and Volume by Movement
1
Inter. ID #
Major Street
Cross Street
LOS
EBL
EBT
EBR
WBL
WBT
Storage
WBR
NBL
1
C
Sunrise Valley Drive Frying Pan Rd
D
225
155
310
2
Frying Pan Rd
C
100
200
355
3
Coppermine Rd
Centreville Road
D
456
271
4
Sunrise Valley
5
DTR EB On/Off ramps
F
365
6
DTR WB On/Off ramps
B
D
240
275
245
7
Sunrise Valley
D
160
220
8
DTR EB On/Off ramps
Fairfax County Pkwy
A
185
9
DTR WB On/Off ramps
10
Spring St
E
215
E
260
155
11
Sunrise Valley
C
400
12
DTR EB On/Off ramps
D
13
DTR WB On/Off ramps
Reston Pkwy
14
Sunset Hills
F
290
275
550
C
290
15
Bluemont Way
16
New Dominion Pkwy
E
270
275
95
F
210
17
Sunrise Valley
C
450
450
18
DTR EB On/Off ramps
Wiehle Avenue
B
19
DTR WB On/Off ramps
20
Sunset Hills
F
442
385
477
F
430
21
Sunrise Valley
C
65
22
DTR EB On/Off ramps
Hunter Mill Road
23
DTR WB On/Off ramps
F
24
Sunset Hills
E
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
Splits and offsets were optimized.
400
370
328
205
465
418
90
215
135
400
220
185
650
435
50
165
NBT
NBR
SBL
390
435
380
375
375
258
270
400
640
340
325
SBT
SBR
425
395
415
625
720
670
550
430
645
480
380
500
470
550
445
300
390
205
445
285
65
235
435
250
250
320
670
EBL
2,078
536
352
588
838
EBT
1,558
255
81
588
40
EBR
25
51
81
106
1,078
639
798
719
53
399
WBT
718
398
83
918
323
140
0
515
169
348
260
595
1,061
110
26
72
1,300
467
1,953
26
465
858
0
120
220
413
982
100
230
431
206
WBL
163
159
62
459
1,705
34
348
22
416
275
207
322
Volume by Movement
WBR
NBL
261
25
159
246
62
102
539
337
162
515
201
898
450
167
848
190
167
500
619
303
455
20
248
0
696
20
297
381
776
303
0
198
1,324
192
757
795
820
286
228
0
0
480
58
286
152
58
196
759
400
519
143
647
334
798
271
225
120
389
431
NBT
25
2,002
2,151
973
843
1,753
1,073
1,865
2,955
2,326
1,868
1,475
2,015
1,302
2,068
1,094
1,666
1,850
910
701
591
1,171
431
NBR
25
105
0
486
498
SBL
28
27
75
459
191
1,098
348
259
572
475
231
660
1,302
80
224
340
287
24
206
1,103
558
759
0
591
389
52
270
SBT
28
507
703
702
1,811
1,366
1,624
2,404
2,853
2,985
856
1,608
1,675
1,252
1,653
1,313
1,302
1,312
881
388
674
583
698
SBR
414
267
502
833
178
400
384
663
391
536
228
130
72
150
627
193
130
543
179
320
Appendix ‐ Table 1.22
Sceanrio G PM (2030) ‐ Optimized 2
Storage and Volume by Movement
1
Inter. ID #
Major Street
Cross Street
LOS
EBL
EBT
EBR
WBL
WBT
Storage
WBR
NBL
1
F
Sunrise Valley Drive Frying Pan Rd
D
225
155
310
2
Frying Pan Rd
C
100
200
355
3
Coppermine Rd
F
456
271
Centreville Road
4
Sunrise Valley
5
DTR EB On/Off ramps
D
365
6
DTR WB On/Off ramps
C
D
240
275
245
7
Sunrise Valley
D
160
220
8
DTR EB On/Off ramps
Fairfax County Pkwy
C
185
9
DTR WB On/Off ramps
10
Spring St
C
215
E
260
155
11
Sunrise Valley
C
400
12
DTR EB On/Off ramps
13
DTR WB On/Off ramps
E
Reston Pkwy
14
Sunset Hills
F
290
275
550
D
290
15
Bluemont Way
16
New Dominion Pkwy
F
270
275
95
D
210
17
Sunrise Valley
C
450
450
18
DTR EB On/Off ramps
Wiehle Avenue
D
19
DTR WB On/Off ramps
20
Sunset Hills
F
442
385
477
E
430
21
Sunrise Valley
B
65
22
DTR EB On/Off ramps
Hunter Mill Road
23
DTR WB On/Off ramps
F
24
Sunset Hills
D
370
Notes
1
Storage lengths are taken from Synchro models. These lengtht are not considered in Synchro's queuing and level of service calculations
2
Splits and offsets were optimized.
400
370
328
205
465
418
90
215
135
400
220
185
650
435
50
165
NBT
NBR
SBL
390
435
380
375
375
258
270
400
640
340
325
SBT
SBR
425
395
415
625
720
670
550
430
645
480
380
500
470
550
445
300
390
205
445
285
65
235
435
250
250
320
670
EBL
1,078
513
524
1,644
340
EBT
2,240
440
221
864
40
EBR
50
367
331
295
340
1,215
655
698
405
229
WBT
923
474
80
325
626
578
0
671
802
521
250
577
250
259
173
444
970
279
744
10
578
462
0
120
220
713
632
125
230
411
206
WBL
75
263
60
687
812
223
467
100
144
1,165
690
1,022
417
615
649
127
802
416
468
138
698
524
1,106
589
776
5
196
0
879
10
245
438
665
621
10
294
893
311
467
524
618
713
584
0
0
554
55
570
431
55
440
625
252
294
279
342
558
1,746
558
300
120
735
11
Volume by Movement
WBR
NBL
50
25
105
162
60
35
633
98
581
NBT
25
1,651
1,657
1,212
1,708
1,976
1,722
2,627
3,100
3,248
1,450
1,362
1,474
1,870
2,173
1,624
NBR
75
130
35
328
929
SBL
331
27
86
453
203
101
204
391
429
1,551
1,100
1,519
567
662
977
778
138
154
685
156
50
320
447
314
51
300
1,208
523
179
0
265
119
214
164
SBT
62
1,131
1,183
1,019
2,112
1,664
1,710
2,330
2,119
2,101
1,844
2,368
2,353
2,070
2,100
1,342
1,947
2,154
808
641
1,149
651
548
SBR
3,517
538
237
255
459
440
618
343
158
870
774
94
101
124
1,290
538
166
480
140
286
Appendix ‐ Attachment #1
Dulles Corridor Study
June 14, 2013
Appendix ‐ Table 1.23
Sceanrio G AM (2030) ‐ Optimized 1
Level of Service and Seconds of Delay by Movement
Inter. ID #
Major Street
Cross Street
1
Sunrise Valley Drive Frying Pan Rd
2
Frying Pan Rd
3
Coppermine Rd
4
Sunrise Valley
Centreville Road
5
DTR EB On/Off ramps
6
DTR WB On/Off ramps
7
Sunrise Valley
8
DTR EB On/Off ramps
Fairfax County Pkwy
9
DTR WB On/Off ramps
10
Spring St
11
Sunrise Valley
12
DTR EB On/Off ramps
13
DTR WB On/Off ramps
Reston Pkwy
14
Sunset Hills
15
Bluemont Way
16
New Dominion Pkwy
17
Sunrise Valley
18
DTR EB On/Off ramps
Wiehle Avenue
19
DTR WB On/Off ramps
20
Sunset Hills
21
Sunrise Valley
22
DTR EB On/Off ramps
Hunter Mill Road
23
DTR WB On/Off ramps
24
Sunset Hills
Notes
1
Splits and offsets were optimized.
Int. Delay (sec/veh) 27.9
36.1
22.6
54.7
86.5
11.2
54.7
35.6
9.8
66.5
70.6
34.5
48.6
153.1
28.2
67.4
139.7
24
15.5
145.2
94.2
21.4
102.1
70.1
LOS
C
D
C
D
F
B
D
D
A
E
E
C
D
F
C
E
F
C
B
F
F
C
F
E
EBL
C
E
D
D
F
EBT
B
D
D
D
D
E
F
A
A
WBL
E
E
C
D
WBT
E
E
D
E
LOS by Movement
WBR
NBL
B
D
A
E
A
E
E
F
A
F
D
F
F
F
F
E
F
D
F
E
F
C
E
D
F
F
EBR
A
D
E
D
E
F
A
B
A
F
D
C
C
E
F
C
A
F
E
E
F
F
A
C
C
C
E
F
F
F
F
E
F
E
D
F
C
E
F
E
D
C
E
A
E
F
D
F
B
F
B
F
F
F
F
F
E
D
C
F
F
B
NBT
D
C
B
D
A
A
NBR
A
A
D
A
A
F
A
E
D
A
C
B
A
SBL
D
E
E
F
E
B
A
F
E
C
A
F
F
F
F
F
F
D
A
B
A
D
D
A
F
B
A
F
A
F
D
D
SBT
D
D
B
D
B
B
B
A
F
B
B
A
D
C
E
B
A
D
F
A
A
C
SBR
A
B
A
A
A
B
A
B
A
A
A
A
A
A
A
EBL
27.1
60.6
50.2
42.4
470.3
EBT
17.1
54.3
40.4
49.6
41.8
63.1
96
EBR
1.3
5.6
WBL
58.4
67.8
32.2
44.3
2.4
0.5
42.1
63.9
47.8
41.2
185.9
49.6
105.1
0.3
96.2
107.6
85.8
60
283.1
53.2
211.2
58
107.7
21.1
64.7
147.3
177
33
20.5
28
58.6
A
43.6
109.4
274.5
166.5
5.6
68.3
360.7
85.8
92.7
36.2
62.5
204.9
28.5
A
205.1
233.9
10.2
Seconds of Delay by Movement
WBT
WBR
NBL
NBT
58.1
16.9
54.7
53
62.6
8.1
63.5
22.6
51.1
2
65.9
18.6
59.1
56.1
101.2
38.9
2.1
63.9
0.1
2.3
3.1
93.5
12
92
46.1
33.7
30.3
72.5
7.6
147.5
3.1
61.1
58.7
29.2
94.5
5.2
96.1
89.1
116.9
60.6
62.1
32.5
106.7
35.7
97
92.5
7.5
74.2
17.9
131.3
31.3
41.9
163.1
16.7
66.6
64.2
61.2
4.8
38.7
5.8
454.1
47.4
25.8
50.3
41.1
4.2
90.4
14.7
147
99.9
16.9
NBR
0.4
1.3
11.6
1.9
SBL
54.9
56.7
67.8
216.2
59.3
13.4
4.2
88.1
75.4
32.3
0.1
115.2
320.1
321.5
97.7
109.1
146.8
43.5
2.9
0.4
108.5
4.1
507
49.7
46.9
SBT
53
43.2
16.5
53.5
18.6
13.1
12.3
4.4
98.6
17.9
13.6
8.8
51
20.2
65.7
10.6
4.6
49.6
176.7
1.5
5.4
29.5
SBR
6.5
11.5
8.1
4.4
2.8
18.6
0.1
13.5
9.2
3.7
0.2
5
2.2
8.3
2.2
1
1
Appendix ‐ Table 1.24
Sceanrio G PM (2030) ‐ Optimized 1
Level of Service and Seconds of Delay by Movement
Inter. ID #
Major Street
Cross Street
1
Sunrise Valley Drive Frying Pan Rd
2
Frying Pan Rd
3
Coppermine Rd
Centreville Road
4
Sunrise Valley
5
DTR EB On/Off ramps
6
DTR WB On/Off ramps
7
Sunrise Valley
8
DTR EB On/Off ramps
Fairfax County Pkwy
9
DTR WB On/Off ramps
10
Spring St
11
Sunrise Valley
12
DTR EB On/Off ramps
13
DTR WB On/Off ramps
Reston Pkwy
14
Sunset Hills
15
Bluemont Way
16
New Dominion Pkwy
17
Sunrise Valley
18
DTR EB On/Off ramps
Wiehle Avenue
19
DTR WB On/Off ramps
20
Sunset Hills
21
Sunrise Valley
22
DTR EB On/Off ramps
Hunter Mill Road
23
DTR WB On/Off ramps
24
Sunset Hills
Notes
1
Splits and offsets were optimized.
Int. Delay (sec/veh) LOS
174.4
36
28.6
85.0
37.2
24.6
49.7
43.4
29.8
26
78.8
33.8
56.7
217.1
40.1
82.7
53.4
23.8
36.6
253.1
65.3
18.4
140.8
54.4
F
D
C
F
D
C
D
D
C
C
E
C
E
F
D
F
D
C
D
F
E
B
F
D
EBL
C
E
E
F
E
EBT
C
E
D
E
E
F
D
EBR
C
C
WBL
F
E
C
F
A
C
F
F
E
F
F
F
F
F
D
D
D
D
C
E
F
E
F
A
B
E
A
F
E
F
A
F
F
D
D
F
C
F
F
D
F
F
F
E
F
F
D
D
E
F
E
D
E
F
E
E
C
E
C
D
F
E
B
D
C
C
C
F
F
E
F
E
F
E
F
F
LOS by Movement
WBR
NBL
A
F
A
E
A
E
F
F
A
E
E
F
F
E
E
WBT
F
D
D
D
B
NBT
E
B
C
D
A
A
NBR
A
A
D
B
C
F
A
B
F
C
F
A
B
SBL
F
E
E
F
E
A
A
D
F
A
A
C
A
F
F
F
E
C
B
C
C
F
D
B
F
B
A
A
A
12
F
D
C
SBT
D
C
C
D
E
SBR
F
B
A
A
A
B
B
C
C
A
E
F
C
E
B
C
D
D
A
B
C
A
A
A
A
B
B
B
B
B
EBL
25.9
63.9
60.5
80.5
72.8
EBT
25.3
67.1
37.1
64.2
66.8
95.9
47.4
EBR
30.6
23.1
WBL
119.6
70.4
29.1
98.9
0.3
7.2
28.1
119.5
83.4
64
59.1
73.7
249.7
0.5
105.3
103.2
266.5
90.7
96.1
40.8
40.8
37.9
46.9
21.2
66.9
86.9
82.9
342.8
51.8
89.8
58.3
B
417.5
78
55.1
28.9
108.9
109
557.4
63.4
85.9
418.8
58.5
154.6
60.4
A
307.6
256.5
12
Seconds of Delay by Movement
WBT
WBR
NBL
NBT
178.5
0.8
123.4
66.9
54.3
2.6
64.3
19.8
51.4
0.5
73.1
20.8
52.9
273.9
85.5
39
7.7
119.5
0.4
4.6
6.5
69.3
17.7
125.7
53.1
82.6
59
91.5
16.7
43.3
20.6
61.2
179.1
39.8
102.7
3.7
86.9
77.5
139.1
11.1
45.8
51.2
452.1
142.2
50.4
60.7
23.2
69.4
23.8
116.3
102.9
103.3
33.2
25.7
62.9
60.2
41.7
22.6
58.7
26.5
737.2
263
26.9
56.2
54.9
17.3
12.9
43
188.8
32.4
12.2
NBR
3.9
1.5
8.1
14.4
SBL
97.5
65.6
68
226.5
58.4
3.2
2.7
55
89.8
5.7
33.1
5.8
355.3
109
137
69.3
24.3
18.3
1.1
9.1
2
133.9
42.3
34.7
SBT
54.1
34.7
26.2
37.6
69
SBR
335
13.2
2.8
0.2
5.8
11.5
16.1
31.6
34
9.6
68.2
237.9
32.2
74.8
13.3
34.6
52.1
43.2
5.5
10.4
32.6
1.7
3.1
4.2
1.5
18.8
11.7
10.2
12.7
15.2
12
1.3
Appendix ‐ Attachment #1
Appendix – Attachment #2
Roadway
Volume-to-Capacity Ratios
!
!
!
!
!
!
!
!
!
r kw
Pa
!
!
!
!
!
!
!
!
!
!!
!!
!
!
!
!!
!
!!!!
!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Re
s
!
!
!
!
Fa
ir
fax
!
!
!
!
!
!
Pa
rk
Co
un
ton
¯
!
!
2 Miles
!
1
Link Volume Location ID
!
0.5
Metrorail Stations
M
"
!
!
!
!
y
!
!
!
d
!
!
!
ay
!
!
!
!
!
!
!
!
!
Hunter Mill Roa
!
!
!
!
!
!
!
!
W ie h le A
v en u e
!
!
!
!
!
!
!
!
wa
!
!
!
!
!
!
!
!
ty
!
!
tr e v ille Road
9
!
!
Fairfax County
!
0
ad
!
Ce n
!
!
!
!
!
!
!
!
!
!
!
!
Ro
10
!
M
"
!
!
!
!
!
!
Tol
l
!
WIEHLE-RESTON EAST
Roa
d
!
!
Ro
ad
8
a nd
!
!
!
!
!
R o ad
cl
ea
re
n
e ss
"
!
!
RESTON TOWN CENTER
!
Route 28
7
!
!
!
iv e
!
!
!
!
Dr
!
!
!
!
!
pa
n
s e Va l l e y
"
!
!
HERNDON
M
!
nr i
!
!
!
M
Su
!
!
!
yin
g
!
!
!
!
!
!!
!
!
!
!
!
!
!
!!
!
Fr
4
!
!
3
!
!
!
!
!
!
!
Sun
set
Dulles Airport A
Hill
cc
s
M
!
!
!!
!
!
!
!
!
!
!
!
!
ernd on
!
!
!
of H
!
!
!
!
!
!
!
!
!
6
!
!
!
!
!
Tow
n
!
!
!
!
!
!
M
5
"
!
INNOVATION CENTER
!
!
!
!
!
!
!
!
!
Appendix - Attachment #2
Figure A-2.1
!
Co
un
ty
Lo
ud
ou
n
n A e n ue
v
!
!
o v a ti o
2
!
Inn
!
1
Freeway Link Model Results - Location Identifications
!
R ou te 6 0
6
Dulles Corridor Study Area
Dulles Corridor Study
June 14, 2013
Freeway Link Model Results
Appendix ‐ Table 2.1
2005 Base ‐ Northbound/Eastbound Freeway Link Model Results
Location ID
1
2
3
4
Freeway
NB Route 28
NB Route 28
NB Route 28
NB Route 28
1
5 EB Dulles Toll Road Between Major Roads
Route 606 and Innovation Avenue
Innovation Avenue and Dulles Toll Road
Dulles Toll Road and Frying Pan Road
Frying Pan Road and McLearen Road
1
6 EB Dulles Toll Road 1
7 EB Dulles Toll Road Volume
2,880
2,970
3,020
2,970
AM Peak Hour
Capacity per Lane
Lanes
1,500
3
1,500
3
1,500
3
900
3
V/C Ratio
0.64
0.66
0.67
1.10
Volume
3,430
4,020
2,950
2,860
PM Peak Hour
Capacity per Lane
Lanes
1,500
3
1,500
3
1,500
3
900
3
V/C Ratio
0.76
0.89
0.66
1.06
Route 28 and Centreville Road
5,800
1,800
4
0.81
4,840
1,800
4
0.67
Centreville Road and Fairfax County Parkway
6,390
2,050
4
0.78
4,860
2,050
4
0.59
Fairfax County Parkway and Reston Parkway
7,180
2,050
4
0.88
5,100
2,050
4
0.62
7,440
1,800
4
1.03
5,030
1,800
4
0.70
8,290
8,940
2,050
2,200
4
4
1.01
1.02
5,200
5,440
2,050
2,200
4
4
0.63
0.62
1
Reston Parkway and Wiehle Avenue
8 EB Dulles Toll Road 1
Wiehle Avenue and Hunter Mill Road
9 EB Dulles Toll Road 1
EB Dulles Toll Road 10
Hunter Mill Road and Trap Road
Note 1: Includes 1 HOV lane in the AM
Appendix ‐ Table 2.2
2005 Base ‐ Southbound/Westbound Freeway Link Model Results
Location ID
1
2
3
4
Freeway
SB Route 28
SB Route 28
SB Route 28
SB Route 28
1
5 WB Dulles Toll Road 1
6 WB Dulles Toll Road 1
7 WB Dulles Toll Road 1
8 WB Dulles Toll Road 1
9 WB Dulles Toll Road 1
10 WB Dulles Toll Road Between Major Roads
Route 606 and Innovation Avenue
Innovation Avenue and Dulles Toll Road
Dulles Toll Road and Frying Pan Road
Frying Pan Road and McLearen Road
Volume
2,970
3,740
2,000
2,300
AM Peak Hour
Capacity per Lane
Lanes
900
3
900
3
900
3
1,120
3
V/C Ratio
1.10
1.39
0.74
0.68
Volume
3,130
3,410
3,010
3,730
PM Peak Hour
Capacity per Lane
Lanes
900
3
900
3
900
3
1,120
3
V/C Ratio
1.16
1.26
1.11
1.11
Route 28 and Centreville Road
4,130
1,800
4
0.57
7,260
1,800
4
1.01
Centreville Road and Fairfax County Parkway
4,150
2,050
4
0.51
7,430
2,050
4
0.91
Fairfax County Parkway and Reston Parkway
4,130
1,800
4
0.57
8,070
1,800
4
1.12
Reston Parkway and Wiehle Avenue
3,970
1,800
4
0.55
8,170
1,800
4
1.13
Wiehle Avenue and Hunter Mill Road
Hunter Mill Road and Trap Road
3,780
3,460
1,800
2,200
4
4
0.53
0.39
8,770
9,260
1,800
2,200
4
4
1.22
1.05
Note 1: Includes 1 HOV lane in the PM
1
Appendix ‐ Attachment #2
Dulles Corridor Study
June 14, 2013
Freeway Link Model Results
Appendix ‐ Table 2.3
2030 Round 8 ‐ Northbound/Eastbound Freeway Link Model Results
Location ID
Freeway
Between Major Roads
1
1 NB Route 28 1
2 NB Route 28 1
3 NB Route 28 1
4 NB Route 28 2
5 EB Dulles Toll Road 2
6 EB Dulles Toll Road 2
7 EB Dulles Toll Road 2
8 EB Dulles Toll Road Volume
AM Peak Hour
Capacity per Lane
Lanes
V/C Ratio
Volume
PM Peak Hour
Capacity per Lane
Lanes
V/C Ratio
Route 606 and Innovation Avenue
6,720
1,800
5
0.75
7,370
1,800
5
0.82
Innovation Avenue and Dulles Toll Road
6,560
1,800
5
0.73
7,840
1,800
5
0.87
Dulles Toll Road and Frying Pan Road
7,000
1,800
5
0.78
6,860
1,800
5
0.76
Frying Pan Road and McLearen Road
7,700
1,800
5
0.86
6,780
1,800
5
0.75
Route 28 and Centreville Road
6,860
1,800
4
0.95
6,510
1,800
4
0.90
Centreville Road and Fairfax County Parkway
7,030
2,050
4
0.86
6,840
2,050
4
0.83
Fairfax County Parkway and Reston Parkway
7,610
2,050
4
0.93
6,380
2,050
4
0.78
Reston Parkway and Wiehle Avenue
7,700
1,800
4
1.07
6,270
1,800
4
0.87
8,060
8,780
2,050
2,200
4
4
0.98
1.00
6,220
5,900
2,050
2,200
4
4
0.76
0.67
2
Wiehle Avenue and Hunter Mill Road
9 EB Dulles Toll Road 2
10 EB Dulles Toll Road Hunter Mill Road and Trap Road
Note 1: Includes 1 HOV lane in both the AM and PM
Note 2: Includes 1 HOV lane in the AM
Appendix ‐ Table 2.4
2030 Round 8 ‐ Southbound/Westbound Freeway Link Model Results
Location ID
Freeway
Between Major Roads
1
1 SB Route 28 1
2 SB Route 28 1
3 SB Route 28 1
4 SB Route 28 2
5 WB Dulles Toll Road 2
6 WB Dulles Toll Road 2
7 WB Dulles Toll Road 2
8 WB Dulles Toll Road 2
Volume
AM Peak Hour
Capacity per Lane
Lanes
V/C Ratio
Volume
PM Peak Hour
Capacity per Lane
Lanes
V/C Ratio
Route 606 and Innovation Avenue
5,870
1,800
5
0.65
7,590
1,800
5
0.84
Innovation Avenue and Dulles Toll Road
7,020
1,800
5
0.78
7,720
1,800
5
0.86
Dulles Toll Road and Frying Pan Road
4,860
1,800
5
0.54
7,330
1,800
5
0.81
Frying Pan Road and McLearen Road
5,040
1,800
5
0.56
7,970
1,800
5
0.89
Route 28 and Centreville Road
6,250
1,800
4
0.87
8,240
1,800
4
1.14
Centreville Road and Fairfax County Parkway
5,660
2,050
4
0.69
8,110
2,050
4
0.99
Fairfax County Parkway and Reston Parkway
5,390
1,800
4
0.75
8,730
2,050
4
1.06
Reston Parkway and Wiehle Avenue
5,030
1,800
4
0.70
8,560
1,800
4
1.19
4,590
3,460
1,800
2,200
4
4
0.64
0.39
8,830
9,440
1,800
2,200
4
4
1.23
1.07
Wiehle Avenue and Hunter Mill Road
9 WB Dulles Toll Road 2
10 WB Dulles Toll Road Hunter Mill Road and Trap Road
Note 1: Includes 1 HOV lane in both the AM and PM
Note 2: Includes 1 HOV lane in the AM
2
Appendix ‐ Attachment #2
Dulles Corridor Study
June 14, 2013
Freeway Link Model Results
Appendix ‐ Table 2.5
2030 Scenario G ‐ Northbound/Eastbound Freeway Link Model Results
Location ID
Freeway
Between Major Roads
1
1 NB Route 28 1
2 NB Route 28 1
3 NB Route 28 1
4 NB Route 28 2
5 EB Dulles Toll Road 2
6 EB Dulles Toll Road 2
7 EB Dulles Toll Road 2
8 EB Dulles Toll Road Volume
AM Peak Hour
Capacity per Lane
Lanes
V/C Ratio
Volume
PM Peak Hour
Capacity per Lane
Lanes
V/C Ratio
Route 606 and Innovation Avenue
6,200
1,800
5
0.69
6,890
1,800
5
0.77
Innovation Avenue and Dulles Toll Road
6,050
1,800
5
0.67
7,660
1,800
5
0.85
Dulles Toll Road and Frying Pan Road
7,060
1,800
5
0.78
6,760
1,800
5
0.75
Frying Pan Road and McLearen Road
7,550
1,800
5
0.84
6,940
1,800
5
0.77
Route 28 and Centreville Road
5,790
1,800
4
0.80
5,570
1,800
4
0.77
Centreville Road and Fairfax County Parkway
5,070
1,800
4
0.70
4,770
1,800
4
0.66
Fairfax County Parkway and Reston Parkway
5,560
1,800
4
0.77
4,560
2,050
4
0.56
Reston Parkway and Wiehle Avenue
5,790
1,800
4
0.80
4,510
1,800
4
0.63
6,520
7,390
2,050
2,200
4
4
0.80
0.84
4,630
4,730
1,800
2,200
4
4
0.64
0.54
2
Wiehle Avenue and Hunter Mill Road
9 EB Dulles Toll Road 2
10 EB Dulles Toll Road Hunter Mill Road and Trap Road
Note 1: Includes 1 HOV lane in both the AM and PM
Note 2: Includes 1 HOV lane in the AM
Appendix ‐ Table 2.6
2030 Scenario G ‐ Southbound/Westbound Freeway Link Model Results
Location ID
Freeway
Between Major Roads
1
1 SB Route 28 1
2 SB Route 28 1
3 SB Route 28 1
4 SB Route 28 2
5 WB Dulles Toll Road 2
6 WB Dulles Toll Road 2
7 WB Dulles Toll Road 2
8 WB Dulles Toll Road 2
Volume
AM Peak Hour
Capacity per Lane
Lanes
V/C Ratio
Volume
PM Peak Hour
Capacity per Lane
Lanes
V/C Ratio
Route 606 and Innovation Avenue
5,360
1,800
5
0.60
7,390
1,800
5
0.82
Innovation Avenue and Dulles Toll Road
6,730
1,800
5
0.75
7,530
1,800
5
0.84
Dulles Toll Road and Frying Pan Road
4,550
1,800
5
0.51
7,300
1,800
5
0.81
Frying Pan Road and McLearen Road
4,680
1,800
5
0.52
8,060
1,800
5
0.90
Route 28 and Centreville Road
5,010
1,800
4
0.70
7,040
1,800
4
0.98
Centreville Road and Fairfax County Parkway
3,720
1,800
4
0.52
6,090
1,800
4
0.85
Fairfax County Parkway and Reston Parkway
3,410
1,800
4
0.47
6,740
1,800
4
0.94
Reston Parkway and Wiehle Avenue
3,040
1,800
4
0.42
6,820
1,800
4
0.95
2,800
2,930
2,050
2,200
4
4
0.34
0.33
7,210
8,090
2,050
2,200
4
4
0.88
0.92
Wiehle Avenue and Hunter Mill Road
9 WB Dulles Toll Road 2
10 WB Dulles Toll Road Hunter Mill Road and Trap Road
Note 1: Includes 1 HOV lane in both the AM and PM
Note 2: Includes 1 HOV lane in the AM
3
Appendix ‐ Attachment #2
Non-Freeway Link - Location Identifications
6
Co
un
ty
Route 60
ov
Lo
ud
ou
n
In n
Appendix - Attachment #2
Figure A-2.2
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
ou
irfa
xC
!
!
!
!
!
!
!
!
!
!
!
¯
!
!
2 Miles
Metrorail Stations
M
"
!
!
!
!
!
!
!
!
!
!
!
Fa
1
Non-Freeway Link Volume Location ID
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!!!!
!!!!
!
!
!
!
!
!
Hunter Mill Ro
ad
31
!
Re
sto
n
!
!
!
!
!
!
!
!
!
!
Wiehle A
venue
!
!
ay
!
!
!
!
Pa
rk w
30
!
!
!
!
!
!
Pa
rkw
ay
!
!
24
!
!
nty
!
!
!
!
!
!
!
!
!
trev ill e Road
!
!
Cen
!
!
!
!
!
!
!
32
33
!
27
!
Route 28
28
!
25
!
0.5
23
!
!
!
Fairfax County
d
0
o ad
!
!
!
4
16
17
29
!
10 11
15
!
Ro
a
12
!
26
M
WIEHLE-RESTON EAST "
!
!
en
!
!
!
!
!
!
e
all e y D r iv
9
!
!
!
!
!
21
Hill
sR
!
"
" 20
18
RESTON TOWN CENTER M
!
!
!
!
!
!
!
set
!
!
!
!
!
!
M
cl
ea
r
n ri
se V
!
!
!
d
HERNDON M
!
19
!
Ro
a
Ro a d
!
3
!
!
Su
!
13
!
!
!
!
8
and Toll
!
pa
n
!
!
!
!
!
!!
2
!
Fr
yi n
g
!
!!
!
1
!
!
S un
!
!
5
!!
7
!
!
!
!
ce s s
22
!
!
t Ac
14
!
6
!
por
!
!
!
!
!
!
!
ernd on
!
A ir
!
of H
!
!
!
!
!
!
!
!
"
!
Tow
n
!
Du
lles
!
!
INNOVATION CENTER M
!
!
!
!
!
!
a ti o n A
v en ue
!
!
Dulles Corridor Study Area
Dulles Corridor Study
June 14, 2013
Non‐Freeway Link Results
Appendix ‐ Table 2.7
Existing (2013) ‐ Non‐Freeway Link Results From Intersection Analysis
AM Peak Hour
PM Peak Hour
Capacity Capacity Volume per Lane
Lanes
V/C Ratio Volume per Lane
Lanes
Roadway
Between These Roads
EB Frying Pan Road
2,404
1,200
2
1.00
1,239
1,200
2
Route 28 and Sunrise Valley Drive
1
WB Frying Pan Road
1,023
750
2
0.68
2,434
750
2
NB Sunrise Valley Drive
1,667
1,100
3
0.51
431
1,100
3
Frying Pan Road and River Birch Road
2
SB Sunrise Valley Drive
394
850
3
0.15
1,613
850
3
EB Frying Pan Road
952
1,200
1
0.79
895
1,200
1
Frying Pan Road and Centreville Road
3
WB Frying Pan Road
770
1,200
1
0.64
1,007
1,200
1
NB Centreville Road
1,561
1,400
3
0.37
980
1,400
3
West Ox Road and Frying Pan Road
4
SB Centreville Road
751
1,400
3
0.18
1,675
1,400
3
NB Centreville Road
2,130
1,250
3
0.57
1,362
1,250
3
Coppermine Road and Sunrise Valley Drive
5
SB Centreville Road
1,100
1,250
3
0.29
2,099
1,250
3
EB Sunrise Valley Drive
538
750
2
0.36
1,329
750
2
Dulles Technology Drive and Centreville Road
6
WB Sunrise Valley Drive
1,740
1,100
2
0.79
590
1,100
2
NB Centreville Road
1,717
1,250
3
0.46
2,396
1,250
3
Sunrise Valley Drive and Dulles Toll Road EB ramps
7
SB Centreville Road
2,340
1,250
3
0.62
2,212
1,250
3
EB Sunrise Valley Drive
880
1,250
2
0.35
1,382
1,250
2
Centreville Road and Fox Mill Road
8
WB Sunrise Valley Drive
1,331
1,400
2
0.48
1,200
1,400
2
EB Sunrise Valley Drive
993
1,125
2
0.44
998
1,125
2
Monroe Street and Fairfax County Parkway
9
WB Sunrise Valley Drive
1,115
1,400
2
0.40
1,060
1,400
2
NB Fairfax County Pkwy
2,125
1,275
2
0.83
1,908
1,275
2
Fox Mill Road and Sunrise Valley Drive
10
SB Fairfax County Pkwy
1,203
1,275
2
0.47
2,442
1,275
2
EB Sunrise Valley Drive
1,828
1,400
2
0.65
825
1,400
2
Fairfax County Parkway and Glad Drive
11
WB Sunrise Valley Drive
823
1,125
2
0.37
1,534
1,125
2
NB Fairfax County Pkwy
2,503
1,275
3
0.65
2,659
1,275
3
Sunrise Valley Drive and Dulles Toll Road EB ramps
12
SB Fairfax County Pkwy
2,715
1,275
2
1.06
2,546
1,275
2
NB Fairfax County Pkwy
3,246
1,275
3
0.85
2,949
1,275
3
Dulles Toll Road WB ramps and Spring Street
13
SB Fairfax County Pkwy
2,401
1,275
3
0.63
2,214
1,275
3
NB Fairfax County Pkwy
2,569
1,700
3
0.50
2,997
1,700
3
New Dominion Parkway and Spring Street
14
SB Fairfax County Pkwy
2,764
1,025
3
0.90
2,075
1,025
3
EB Sunrise Valley Drive
511
850
2
0.30
2,103
850
2
Edmund Halley Drive and Reston Parkway
15
WB Sunrise Valley Drive
731
1,400
2
0.26
496
1,400
2
NB Reston Parkway
1,960
1,400
2
0.70
1,068
1,400
2
South Lakes Drive and Sunrise Valley Drive
16
SB Reston Parkway
910
1,400
2
0.33
2,549
1,400
2
EB Sunrise Valley Drive
1,082
850
2
0.64
947
850
2
Reston Parkway and Colts Neck Road
17
WB Sunrise Valley Drive
723
1,400
2
0.26
1,457
1,400
2
NB Reston Parkway
1,983
1,000
2
0.99
1,986
1,000
2
Sunrise Valley Drive and Dulles Toll Road EB ramps
18
SB Reston Parkway
1,761
1,400
2
0.63
2,350
1,400
2
EB Sunset Hills Road
1,241
1,000
3
0.41
1,656
1,000
3
Town Center Parkway and Reston Parkway
19
WB Sunset Hills Road
1,097
1,250
3
0.29
1,259
1,250
3
NB Reston Parkway
3,157
900
3
1.17
2,255
900
3
Sunset Hills Road and Dulles Toll Road WB ramps
20
SB Reston Parkway
1,773
900
3
0.66
3,094
900
3
EB Sunset Hills Road
2,598
1,250
3
0.69
885
1,250
3
Reston Parkway and Old Reston Avenue
21
WB Sunset Hills Road
686
1,000
3
0.23
2,153
1,000
3
NB Reston Parkway
1,422
1,275
3
0.37
2,533
1,275
3
Sunset Hills Road and Bluemont Way
22
SB Reston Parkway
1,806
1,275
3
0.47
1,707
1,275
3
EB Sunrise Valley Drive
1,550
1,000
2
0.78
878
1,000
2
Soapstone Drive and Wiehle Avenue
23
WB Sunrise Valley Drive
1,400
2
0.28
1,630
1,400
2
776
EB Sunrise Valley Drive
1,426
1,400
2
0.51
1,106
1,400
2
South Lakes Drive and Wiehle Avenue
24
WB Sunrise Valley Drive
1,062
775
2
0.69
1,321
775
2
NB Wiehle Avenue
1,765
1,600
3
0.37
1,546
1,600
3
Sunrise Valley Drive and Dulles Toll Road EB ramps
25
SB Wiehle Avenue
1,509
850
3
0.59
2,083
850
3
EB Sunset Hills Road
1,140
1,000
2
0.57
1,320
1,000
2
Isaac Newton Square West and Wiehle Avenue
26
WB Sunset Hills Road
1,137
1,250
2
0.45
1,071
1,250
2
NB Wiehle Avenue
1,422
1,400
3
0.34
1,691
1,400
3
Sunset Hills Road and Dulles Toll Road WB ramps
27
SB Wiehle Avenue
1,389
1,400
3
0.33
2,208
1,400
3
EB Sunset Hills Road
1,657
1,100
2
0.75
518
1,100
2
Wiehle Avenue and Michael Faraday Drive
28
WB Sunset Hills Road
643
750
2
0.43
1,443
750
2
NB Wiehle Avenue
991
1,400
2
0.35
1,845
1,400
2
Sunset Hills Road and Isaac Newton Square South
29
SB Wiehle Avenue
1,369
1,400
2
0.49
1,188
1,400
2
EB Sunrise Valley Drive
1,129
1,150
2
0.49
863
1,150
2
South Lakes Drive and Hunter Mill Road
30
WB Sunrise Valley Drive
930
1,550
2
0.30
620
1,550
2
NB Hunter Mill Road
1,507
775
2
0.97
916
775
2
Sunrise Valley Drive and Dulles Toll Road EB ramps
31
SB Hunter Mill Road
966
1,150
1
0.84
1,225
1,150
1
EB Sunset Hills Road
428
1,000
2
0.21
450
1,000
2
Hunter Mill Road and Michael Faraday Drive
32
WB Sunset Hills Road
855
1,200
1
0.71
464
1,200
1
NB Hunter Mill Road
605
775
1
0.78
814
775
1
Crowell Road and Sunset Hills Road
33
SB Hunter Mill Road
846
800
1
1.06
696
800
1
Note 1: Capacity per lane is from the TPB Versison 2.2 Model. It is the capacity of a through lane but is limited by the intersection control
Note 2: Volumes used are from the interesection analysis that has been post processed.
Note 3: In an urban environment, such as the Dulles Corridor Study area, the capacity of the road system will be determined by the intersection. These numbers
should be used and evaluated with the intersection analysis, shown in Section 4.4. of the Dulles CorridorTransportation Study and Appendix Attachment #1.
Location ID
1
V/C Ratio
0.52
1.62
0.13
0.63
0.75
0.84
0.23
0.40
0.36
0.56
0.89
0.27
0.64
0.59
0.55
0.43
0.44
0.38
0.75
0.96
0.29
0.68
0.70
1.00
0.77
0.58
0.59
0.67
1.24
0.18
0.38
0.91
0.56
0.52
0.99
0.84
0.55
0.34
0.84
1.15
0.24
0.72
0.66
0.45
0.44
0.58
0.40
0.85
0.32
0.82
0.66
0.43
0.40
0.53
0.24
0.96
0.66
0.42
0.38
0.20
0.59
1.07
0.23
0.39
1.05
0.87
Appendix ‐ Attachment #2
Dulles Corridor Study
June 14, 2013
Non‐Freeway Link Results
Appendix ‐ Table 2.8
2030 Round 8 ‐ Non‐Freeway Link Results From Intersection Analysis
AM Peak Hour
PM Peak Hour
Capacity Capacity Volume per Lane
Lanes
V/C Ratio Volume per Lane
Lanes
Roadway
Between These Roads
EB Frying Pan Road
3,400
1,125
3
1.01
2,200
1,125
3
1
Route 28 and Sunrise Valley Drive
WB Frying Pan Road
1,400
1,125
3
0.41
3,750
1,125
3
NB Sunrise Valley Drive
2,200
1,100
3
0.67
750
1,100
3
2
Frying Pan Road and River Birch Road
SB Sunrise Valley Drive
800
850
3
0.31
2,900
850
3
EB Frying Pan Road
1,550
1,200
3
0.43
1,800
1,200
3
3
Frying Pan Road and Centreville Road
WB Frying Pan Road
1,100
1,200
3
0.31
1,350
1,200
3
NB Centreville Road
1,750
1,400
3
0.42
1,150
1,400
3
4
West Ox Road and Frying Pan Road
SB Centreville Road
900
1,400
3
0.21
2,150
1,400
3
NB Centreville Road
2,450
1,250
3
0.65
1,750
1,250
3
5
Coppermine Road and Sunrise Valley Drive
SB Centreville Road
1,700
1,250
3
0.45
2,400
1,250
3
EB Sunrise Valley Drive
1,100
750
2
0.73
1,950
750
2
6
Dulles Technology Drive and Centreville Road
WB Sunrise Valley Drive
1,850
1,100
2
0.84
800
1,100
2
NB Centreville Road
2,500
1,250
3
0.67
3,150
1,250
3
7
Sunrise Valley Drive and Dulles Toll Road EB ramps
SB Centreville Road
2,550
1,250
3
0.68
2,450
1,250
3
EB Sunrise Valley Drive
1,750
1,250
2
0.70
1,600
1,250
2
Centreville Road and Fox Mill Road
8
WB Sunrise Valley Drive
1,550
1,400
2
0.55
1,800
1,400
2
EB Sunrise Valley Drive
1,200
1,125
2
0.53
2,000
1,125
2
9
Monroe Street and Fairfax County Parkway
WB Sunrise Valley Drive
2,025
1,400
2
0.72
1,300
1,400
2
NB Fairfax County Pkwy
2,525
1,275
3
0.66
2,175
1,275
3
10
Fox Mill Road and Sunrise Valley Drive
SB Fairfax County Pkwy
1,375
1,275
3
0.36
2,900
1,275
3
EB Sunrise Valley Drive
2,050
1,400
2
0.73
1,175
1,400
2
11
Fairfax County Parkway and Glad Drive
WB Sunrise Valley Drive
1,125
1,125
2
0.50
1,750
1,125
2
NB Fairfax County Pkwy
2,850
1,275
3
0.75
3,550
1,275
3
12
Sunrise Valley Drive and Dulles Toll Road EB ramps
SB Fairfax County Pkwy
3,450
1,275
3
0.90
2,950
1,275
3
NB Fairfax County Pkwy
3,350
1,275
3
0.88
3,600
1,275
3
13
Dulles Toll Road WB ramps and Spring Street
SB Fairfax County Pkwy
2,900
1,275
3
0.76
2,350
1,275
3
NB Fairfax County Pkwy
2,650
1,700
3
0.52
3,650
1,700
3
14
New Dominion Parkway and Spring Street
SB Fairfax County Pkwy
3,300
1,025
3
1.07
2,200
1,025
3
EB Sunrise Valley Drive
1,065
850
2
0.63
1,000
850
2
15
Edmund Halley Drive and Reston Parkway
WB Sunrise Valley Drive
1,000
1,400
2
0.36
700
1,400
2
NB Reston Parkway
2,150
1,400
2
0.77
1,250
1,400
2
South Lakes Drive and Sunrise Valley Drive
16
SB Reston Parkway
1,065
1,400
2
0.38
2,500
1,400
2
EB Sunrise Valley Drive
1,950
850
2
1.15
1,150
850
2
17
Reston Parkway and Colts Neck Road
WB Sunrise Valley Drive
1,150
1,400
2
0.41
2,000
1,400
2
NB Reston Parkway
2,350
1,000
3
0.78
2,450
1,000
3
18
Sunrise Valley Drive and Dulles Toll Road EB ramps
SB Reston Parkway
2,000
1,400
3
0.48
2,550
1,400
3
EB Sunset Hills Road
2,100
1,000
3
0.70
2,200
1,000
3
19
Town Center Parkway and Reston Parkway
WB Sunset Hills Road
1,500
1,250
3
0.40
1,450
1,250
3
NB Reston Parkway
3,350
900
3
1.24
2,400
900
3
20
Sunset Hills Road and Dulles Toll Road WB ramps
SB Reston Parkway
2,150
900
3
0.80
3,050
900
3
EB Sunset Hills Road
3,400
1,250
3
0.91
1,200
1,250
3
21
Reston Parkway and Old Reston Avenue
WB Sunset Hills Road
1,250
1,000
3
0.42
2,350
1,000
3
NB Reston Parkway
1,650
1,275
3
0.43
2,700
1,275
3
22
Sunset Hills Road and Bluemont Way
SB Reston Parkway
2,000
1,275
3
0.52
2,400
1,275
3
EB Sunrise Valley Drive
1,750
1,000
2
0.88
1,100
1,000
2
23
Soapstone Drive and Wiehle Avenue
WB Sunrise Valley Drive
1,400
2
0.34
1,800
1,400
2
950
EB Sunrise Valley Drive
1,750
1,400
2
0.63
1,550
1,400
2
South Lakes Drive and Wiehle Avenue
24
WB Sunrise Valley Drive
1,550
775
2
1.00
1,500
775
2
NB Wiehle Avenue
2,250
1,600
3
0.47
1,750
1,600
3
25
Sunrise Valley Drive and Dulles Toll Road EB ramps
SB Wiehle Avenue
1,650
850
3
0.65
2,500
850
3
EB Sunset Hills Road
1,450
1,000
2
0.73
1,600
1,000
2
26
Isaac Newton Square West and Wiehle Avenue
WB Sunset Hills Road
1,300
1,250
2
0.52
1,270
1,250
2
NB Wiehle Avenue
2,250
1,400
3
0.54
1,900
1,400
3
27
Sunset Hills Road and Dulles Toll Road WB ramps
SB Wiehle Avenue
1,600
1,400
3
0.38
2,650
1,400
3
EB Sunset Hills Road
2,000
1,100
2
0.91
700
1,100
2
28
Wiehle Avenue and Michael Faraday Drive
WB Sunset Hills Road
800
750
2
0.53
2,150
750
2
NB Wiehle Avenue
1,200
1,400
2
0.43
2,200
1,400
2
Sunset Hills Road and Isaac Newton Square South
29
SB Wiehle Avenue
1,600
1,400
2
0.57
1,170
1,400
2
EB Sunrise Valley Drive
1,400
1,150
2
0.61
1,000
1,150
2
30
South Lakes Drive and Hunter Mill Road
WB Sunrise Valley Drive
1,050
1,550
2
0.34
800
1,550
2
NB Hunter Mill Road
1,800
775
2
1.16
1,050
775
2
31
Sunrise Valley Drive and Dulles Toll Road EB ramps
SB Hunter Mill Road
1,100
1,150
2
0.48
1,450
1,150
2
EB Sunset Hills Road
600
1,000
2
0.30
550
1,000
2
32
Hunter Mill Road and Michael Faraday Drive
WB Sunset Hills Road
1,000
1,200
2
0.42
650
1,200
2
NB Hunter Mill Road
750
775
2
0.48
1,025
775
2
33
Crowell Road and Sunset Hills Road
SB Hunter Mill Road
950
800
2
0.59
850
800
2
Note 1: Capacity per lane is from the TPB Versison 2.2 Model. It is the capacity of a through lane but is limited by the intersection control
Note 2: Volumes used are from the interesection analysis that has been post processed.
Note 3: In an urban environment, such as the Dulles Corridor Study area, the capacity of the road system will be determined by the intersection. These numbers
should be used and evaluated with the intersection analysis, shown in Section 4.4. of the Dulles CorridorTransportation Study and Appendix Attachment #1.
Location ID
2
V/C Ratio
0.65
1.11
0.23
1.14
0.50
0.38
0.27
0.51
0.47
0.64
1.30
0.36
0.84
0.65
0.64
0.64
0.89
0.46
0.57
0.76
0.42
0.78
0.93
0.77
0.94
0.61
0.72
0.72
0.59
0.25
0.45
0.89
0.68
0.71
0.82
0.61
0.73
0.39
0.89
1.13
0.32
0.78
0.71
0.63
0.55
0.64
0.55
0.97
0.36
0.98
0.80
0.51
0.45
0.63
0.32
1.43
0.79
0.42
0.43
0.26
0.68
0.63
0.28
0.27
0.66
0.53
Appendix ‐ Attachment #2
Dulles Corridor Study
June 14, 2013
Non‐Freeway Link Results
Appendix ‐ Table 2.9
2030 Scenario G ‐ Non‐Freeway Link Results From Intersection Analysis
AM Peak Hour
Capacity per Lane
Lanes
1,125
3
1,125
3
1,100
3
850
3
1,200
3
1,200
3
1,400
3
1,400
3
1,250
3
1,250
3
750
2
1,100
2
1,250
3
1,250
3
1,250
2
1,400
2
1,125
2
1,400
2
1,275
3
1,275
3
1,400
2
1,125
2
1,275
3
1,275
3
1,275
3
1,275
3
1,700
3
1,025
3
850
2
1,400
2
1,400
2
1,400
2
850
2
1,400
2
1,000
3
1,400
3
1,000
3
1,250
3
900
3
900
3
1,250
3
1,000
3
1,275
3
1,275
3
1,000
2
1,400
2
1,400
2
775
2
1,600
3
850
3
1,000
2
1,250
2
1,400
3
1,400
3
1,100
2
750
2
1,400
2
1,400
2
1,150
2
1,550
2
775
2
1,150
2
1,000
2
1,200
2
775
2
800
2
Location ID
PM Peak Hour
Capacity per Lane
Lanes
1,125
3
1,125
3
1,100
3
850
3
1,200
3
1,200
3
1,400
3
1,400
3
1,250
3
1,250
3
750
2
1,100
2
1,250
3
1,250
3
1,250
2
1,400
2
1,125
2
1,400
2
1,275
3
1,275
3
1,400
2
1,125
2
1,275
3
1,275
3
1,275
3
1,275
3
1,700
3
1,025
3
850
2
1,400
2
1,400
2
1,400
2
850
2
1,400
2
1,000
3
1,400
3
1,000
3
1,250
3
900
3
900
3
1,250
3
1,000
3
1,275
3
1,275
3
1,000
2
1,400
2
1,400
2
775
2
1,600
3
850
3
1,000
2
1,250
2
1,400
3
1,400
3
1,100
2
750
2
1,400
2
1,400
2
1,150
2
1,550
2
775
2
1,150
2
1,000
2
1,200
2
775
2
800
2
Volume
V/C Ratio Volume
Roadway
Between These Roads
EB Frying Pan Road
3,661
1.08
3,368
1
Route 28 and Sunrise Valley Drive
WB Frying Pan Road
1,157
0.34
4,465
NB Sunrise Valley Drive
2,364
0.72
1,153
2
Frying Pan Road and River Birch Road
SB Sunrise Valley Drive
470
0.18
3,910
EB Frying Pan Road
1,611
0.45
2,596
3
Frying Pan Road and Centreville Road
WB Frying Pan Road
1,142
0.32
1,048
NB Centreville Road
2,353
0.56
1,943
4
West Ox Road and Frying Pan Road
SB Centreville Road
717
0.17
1,761
NB Centreville Road
1,796
0.48
1,638
5
Coppermine Road and Sunrise Valley Drive
SB Centreville Road
1,267
0.34
2,001
EB Sunrise Valley Drive
1,282
0.85
2,803
6
Dulles Technology Drive and Centreville Road
WB Sunrise Valley Drive
2,088
0.95
678
NB Centreville Road
2,100
0.56
3,489
7
Sunrise Valley Drive and Dulles Toll Road EB ramps
SB Centreville Road
1,994
0.53
1,727
EB Sunrise Valley Drive
1,533
0.61
1,645
8
Centreville Road and Fox Mill Road
WB Sunrise Valley Drive
1,916
0.68
1,645
EB Sunrise Valley Drive
1,409
0.63
2,318
Monroe Street and Fairfax County Parkway
9
WB Sunrise Valley Drive
1,813
0.65
1,238
NB Fairfax County Pkwy
3,069
0.80
1,950
10
Fox Mill Road and Sunrise Valley Drive
SB Fairfax County Pkwy
1,817
0.48
2,693
EB Sunrise Valley Drive
2,076
0.74
1,190
11
Fairfax County Parkway and Glad Drive
WB Sunrise Valley Drive
1,170
0.52
1,864
NB Fairfax County Pkwy
2,225
0.58
3,552
12
Sunrise Valley Drive and Dulles Toll Road EB ramps
SB Fairfax County Pkwy
2,283
0.60
2,541
NB Fairfax County Pkwy
3,174
0.83
3,716
13
Dulles Toll Road WB ramps and Spring Street
SB Fairfax County Pkwy
3,333
0.87
2,568
NB Fairfax County Pkwy
2,674
0.52
3,769
14
New Dominion Parkway and Spring Street
SB Fairfax County Pkwy
3,648
1.19
2,444
EB Sunrise Valley Drive
1,343
0.79
600
15
Edmund Halley Drive and Reston Parkway
WB Sunrise Valley Drive
1,081
0.39
820
NB Reston Parkway
2,533
0.90
1,726
16
South Lakes Drive and Sunrise Valley Drive
SB Reston Parkway
1,045
0.37
2,642
EB Sunrise Valley Drive
2,196
1.29
1,073
Reston Parkway and Colts Neck Road
17
WB Sunrise Valley Drive
1,286
0.46
2,328
NB Reston Parkway
2,747
0.92
2,806
18
Sunrise Valley Drive and Dulles Toll Road EB ramps
SB Reston Parkway
1,907
0.45
3,687
EB Sunset Hills Road
2,338
0.78
2,168
19
Town Center Parkway and Reston Parkway
WB Sunset Hills Road
1,583
0.42
1,440
NB Reston Parkway
3,361
1.24
2,493
20
Sunset Hills Road and Dulles Toll Road WB ramps
SB Reston Parkway
1,982
0.73
4,011
EB Sunset Hills Road
3,542
0.94
1,214
21
Reston Parkway and Old Reston Avenue
WB Sunset Hills Road
1,454
0.48
2,276
NB Reston Parkway
1,715
0.45
2,750
22
Sunset Hills Road and Bluemont Way
SB Reston Parkway
1,669
0.44
2,478
EB Sunrise Valley Drive
2,158
1.08
1,432
23
Soapstone Drive and Wiehle Avenue
WB Sunrise Valley Drive
0.36
1,728
1,008
EB Sunrise Valley Drive
1,961
0.70
1,670
24
South Lakes Drive and Wiehle Avenue
WB Sunrise Valley Drive
1,705
1.10
1,331
NB Wiehle Avenue
2,624
0.55
1,863
Sunrise Valley Drive and Dulles Toll Road EB ramps
25
SB Wiehle Avenue
1,730
0.68
2,498
EB Sunset Hills Road
2,916
1.46
3,271
26
Isaac Newton Square West and Wiehle Avenue
WB Sunset Hills Road
1,369
0.55
1,335
NB Wiehle Avenue
2,428
0.58
2,323
27
Sunset Hills Road and Dulles Toll Road WB ramps
SB Wiehle Avenue
1,907
0.45
3,138
EB Sunset Hills Road
2,853
1.30
1,110
28
Wiehle Avenue and Michael Faraday Drive
WB Sunset Hills Road
860
0.57
1,569
NB Wiehle Avenue
1,475
0.53
2,663
29
Sunset Hills Road and Isaac Newton Square South
SB Wiehle Avenue
1,400
0.50
1,093
EB Sunrise Valley Drive
1,287
0.56
1,413
South Lakes Drive and Hunter Mill Road
30
WB Sunrise Valley Drive
1,001
0.32
787
NB Hunter Mill Road
1,741
1.12
1,254
31
Sunrise Valley Drive and Dulles Toll Road EB ramps
SB Hunter Mill Road
983
0.43
1,362
EB Sunset Hills Road
862
0.43
992
32
Hunter Mill Road and Michael Faraday Drive
WB Sunset Hills Road
967
0.40
628
NB Hunter Mill Road
862
0.56
1,189
33
Crowell Road and Sunset Hills Road
SB Hunter Mill Road
1,018
0.64
834
Note 1: Capacity per lane is from the TPB Versison 2.2 Model. It is the capacity of a through lane.
Note 2: Volumes used are from the interesection analysis that has been post processed.
Note 3: In an urban environment, such as the Dulles Corridor Study area, the capacity of the road system will be determined by the intersection. These numbers
should be used and evaluated with the intersection analysis, shown in Section 4.4. of the Dulles CorridorTransportation Study and Appendix Attachment #1.
3
V/C Ratio
1.00
1.32
0.35
1.53
0.72
0.29
0.46
0.42
0.44
0.53
1.87
0.31
0.93
0.46
0.66
0.59
1.03
0.44
0.51
0.70
0.43
0.83
0.93
0.66
0.97
0.67
0.74
0.79
0.35
0.29
0.62
0.94
0.63
0.83
0.94
0.88
0.72
0.38
0.92
1.49
0.32
0.76
0.72
0.65
0.72
0.62
0.60
0.86
0.39
0.98
1.64
0.53
0.55
0.75
0.50
1.05
0.95
0.39
0.61
0.25
0.81
0.59
0.50
0.26
0.77
0.52
Appendix ‐ Attachment #2
Appendix – Attachment #3
Model Metro
Ridership Estimates
Dulles Corridor Study
June 14, 2013
Model Metro Riderships Estimates for Scenario G
Table 3.1 ‐ Metrorail Boarding and Alighting Estimates by Station
TPB Model Version 2.2 (Scenario G)
TPB Model Version 3.3 ‐ Conversion
Boardings
Boardings
Station Name
Innovation Center
Herndon
Reston Town Center
Wiehle‐Reston East
Total
Peak
1,318
2,576
3,619
3,888
11,401
Off‐Peak
Total
597 1,915
977 3,553
1,611 5,230
1,778 5,666
4,963 16,364
Alightings
Station
Innovation Center
Herndon
Reston Town Center
Wiehle‐Reston East
Total
Station
Innovation Center
Herndon
Reston Town Center
Wiehle‐Reston East
Total
Peak
Off‐Peak Total
3,099 861 3,960
5,835 1,707 7,542
5,765 2,172 7,937
6,660 2,068 8,728
21,359 6,808 28,167
Alightings
Peak
1,104
2,086
4,076
2,443
9,709
Off‐Peak
Total
748 1,852
1,229 3,315
2,744 6,820
1,752 4,195
6,473 16,182
Station Name
Innovation Center
Herndon
Reston Town Center
Wiehle‐Reston East
Total
1
Peak
Off‐Peak Total
1,017 482 1,499
1,277 644 1,921
1,454 737 2,191
1,937 989 2,926
5,685 2,852 8,537
Appendix ‐ Attachment #3
Appendix – Attachment #4
Synchro Files for:
Existing (2013)
2030 COG Round 8 Scenario
Scenario G
Lanes, Volumes, Timings
1: Frying Pan Rd. & Sunrise
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
WBT
WBR
SBL
SBR
1485
1900
12
919
1900
12
0%
651
1900
12
0%
182
1900
12
22
1900
12
0%
0
1
25
372
1900
12
150
1
25
1.00
100%
2%
0
1485
Prot
1
150
1
25
Yes
30
405
9.2
35
2139
41.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
919
651
6
2
0
1
25
Yes
30
382
8.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
182
Perm
22
372
Perm
4
1
6
2
2
2
4
4
4
4.0
9.0
43.0
47.8%
4.0
1.0
0.0
5.0
Lead
4.0
9.0
80.0
88.9%
4.0
1.0
0.0
5.0
4.0
9.0
37.0
41.1%
4.0
1.0
0.0
5.0
Lag
4.0
9.0
37.0
41.1%
4.0
1.0
0.0
5.0
Lag
4.0
9.0
10.0
11.1%
4.0
1.0
0.0
5.0
4.0
9.0
10.0
11.1%
4.0
1.0
0.0
5.0
None C-Max C-Max C-Max
38.0
75.0
32.0
32.0
0.42
0.83
0.36
0.36
1.02
0.59
0.98
0.28
57.3
4.3
61.7
9.0
0.0
0.0
0.0
0.0
57.3
4.3
61.7
9.0
E
A
E
A
37.0
50.2
D
D
~468
114
361
23
#598
173
#589
69
Max
5.0
0.06
0.22
46.4
0.0
46.4
D
25.1
C
12
36
Max
5.0
0.06
0.85
23.9
0.0
23.9
C
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
#137
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
1: Frying Pan Rd. & Sunrise
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
150
1449
0
0
0
1.02
6/5/2013
EBT
325
WBT
2059
1553
0
0
0
0.59
662
0
0
0
0.98
WBR
150
641
0
0
0
0.28
SBL
302
SBR
98
0
0
0
0.22
439
0
0
0
0.85
Intersection Summary
Area Type:
Other
Cycle Length: 90
Actuated Cycle Length: 90
Offset: 0 (0%), Referenced to phase 2:WBT and 6:EBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.02
Intersection Signal Delay: 38.7
Intersection LOS: D
Intersection Capacity Utilization 92.5%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
1: Frying Pan Rd. & Sunrise
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
2: Frying Pan Rd. & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
606
1900
12
284
1900
12
0%
62
1900
12
110
1900
12
243
1900
12
0%
102
1900
12
264
1900
12
1181
1900
12
0%
116
1900
12
30
1900
12
579
1900
12
0%
263
1900
12
155
1
25
Yes
310
1
25
400
1
25
Yes
205
1
25
390
1
25
Yes
375
1
25
225
2
25
35
232
4.5
1.00
100%
2%
0
1.00
100%
2%
0
35
1725
33.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
606
Prot
3
3
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
0%
284
62
pm+ov
8
1
8
8
8
110
Prot
7
7
243
102
pm+ov
4
5
4
4
4
5.0
12.0
27.0
19.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
None
28.6
0.20
0.86
67.2
0.0
67.2
E
None
27.9
0.20
0.77
67.6
0.0
67.6
E
63.4
E
244
#422
None
55.6
0.40
0.09
6.8
0.0
6.8
A
None
17.0
0.12
0.51
65.2
0.0
65.2
E
None
25.4
0.18
0.32
32.2
0.0
32.2
C
0
31
95
153
None
16.3
0.12
0.59
64.8
0.0
64.8
E
57.6
E
111
158
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
5.0
12.0
32.0
22.9%
4.0
3.0
-4.0
3.0
Lead
276
#364
1.00
100%
2%
0
49
100
264
Prot
1
1
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lead
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
1181
116
pm+ov
6
7
6
6
6
15.0
38.0
71.0
50.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
None C-Max
24.7
76.9
0.18
0.55
0.84
0.42
79.4
20.2
0.0
0.0
79.4
20.2
E
C
28.8
C
235
246
#382
298
None
97.0
0.69
0.10
1.6
0.0
1.6
A
0
20
30
Prot
5
5
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
579
263
pm+ov
2
3
2
2
2
15.0
38.0
60.0
42.9%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
32.0
22.9%
4.0
3.0
-4.0
3.0
Lead
None C-Max
11.1
58.4
0.08
0.42
0.21
0.39
75.4
18.6
0.0
0.0
75.4
18.6
E
B
16.2
B
26
130
64
142
None
90.0
0.64
0.25
4.1
0.0
4.1
A
58
1
Synchro 7 - Report
Page 3
Lanes, Volumes, Timings
2: Frying Pan Rd. & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
225
711
0
0
0
0.85
EBT
152
371
0
0
0
0.77
6/5/2013
EBR
WBL
155
666
0
0
0
0.09
310
278
0
0
0
0.40
WBT
1645
430
0
0
0
0.57
WBR
NBL
400
325
0
0
0
0.31
205
318
0
0
0
0.83
NBT
1018
2795
0
0
0
0.42
NBR
SBL
390
1132
0
0
0
0.10
375
177
0
0
0
0.17
SBT
1018
SBR
1475
0
0
0
0.39
1059
0
0
0
0.25
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 136 (97%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.86
Intersection Signal Delay: 37.9
Intersection LOS: D
Intersection Capacity Utilization 68.0%
ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
2: Frying Pan Rd. & Centreville Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 4
Lanes, Volumes, Timings
3: Coppermine Rd. & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
305
1900
12
72
1900
12
0%
71
1900
12
50
1900
12
107
1900
12
0%
43
1900
12
157
1900
12
1647
1900
12
0%
14
1900
12
38
1900
12
613
1900
12
0%
417
1900
12
200
1
25
Yes
355
1
25
370
1
25
Yes
465
2
25
435
1
25
Yes
375
1
25
100
1
25
25
254
6.9
1.00
100%
2%
0
1.00
100%
2%
1
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
305
pm+pt
3
8
3
72
7.0
14.0
30.0
21.4%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
35.0
25.0%
4.0
3.0
-4.0
3.0
Lag
None
45.9
0.33
0.63
43.1
0.0
43.1
D
None
34.0
0.24
0.08
39.8
0.0
39.8
D
36.6
D
27
43
229
264
1.00
100%
2%
0
40
991
16.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
71
pm+ov
8
1
8
8
8
50
pm+pt
7
4
7
107
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
7.0
49.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lag
None
51.5
0.37
0.11
5.3
0.0
5.3
A
None
26.8
0.19
0.17
32.3
0.0
32.3
C
0
28
32
52
None
15.0
0.11
0.28
57.9
0.0
57.9
E
41.5
D
48
72
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
1
40
689
11.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
43
pm+ov
4
5
4
4
4
425
1
25
Yes
1.00
100%
2%
1
1.00
100%
2%
0
0%
157
Prot
1
1661
0
6
38
Prot
5
1
6
5
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
15.0
39.0
68.0
48.6%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
15.0
42.0
66.0
47.1%
4.0
3.0
-4.0
3.0
Lag
7.0
14.0
30.0
21.4%
4.0
3.0
-4.0
3.0
Lead
None
27.2
0.19
0.13
11.1
0.0
11.1
B
None
14.4
0.10
0.44
60.7
0.0
60.7
E
None
11.5
0.08
0.26
69.2
0.0
69.2
E
73
m92
C-Min
70.6
0.50
0.24
15.5
0.0
15.5
B
11.9
B
73
110
None
101.5
0.72
0.33
1.3
0.0
1.3
A
0
29
C-Min
75.9
0.54
0.48
31.4
0.0
31.4
C
33.9
C
339
391
0.0
0.0%
-1.0
3.0
35
71
613
417
pm+ov
2
3
2
2
2
8
11
Synchro 7 - Report
Page 5
Lanes, Volumes, Timings
3: Coppermine Rd. & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
100
492
0
0
0
0.62
EBT
174
897
0
0
0
0.08
6/5/2013
EBR
WBL
200
624
0
0
0
0.11
355
357
0
0
0
0.14
WBT
684
577
0
0
0
0.19
WBR
NBL
370
366
0
0
0
0.12
465
393
0
0
0
0.40
NBT
911
3560
0
0
0
0.47
NBR
SBL
375
177
0
0
0
0.21
SBT
609
2634
0
0
0
0.23
SBR
425
1246
0
0
0
0.33
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 127 (91%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.63
Intersection Signal Delay: 28.0
Intersection LOS: C
Intersection Capacity Utilization 61.8%
ICU Level of Service B
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
3: Coppermine Rd. & Centreville Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 6
Lanes, Volumes, Timings
4: Sunrise Valley Dr & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
250
1900
12
250
1900
12
0%
38
1900
12
213
1900
12
408
1900
12
-6%
259
1900
12
362
1900
12
1208
1900
12
1%
560
1900
12
521
1900
12
849
1900
12
-1%
970
1900
12
0
0
25
Yes
285
2
25
305
1
25
Yes
420
2
25
0
1
25
Yes
280
2
25
520
2
25
35
836
16.3
35
852
16.6
40
951
16.2
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
250
Split
3
288
1.00
100%
2%
0
1.00
100%
2%
1
0%
0
3
213
Split
4
408
259
Perm
4
3
3
4
4
5.0
50.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lead
5.0
50.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lag
None
17.2
0.11
0.63
70.5
0.0
70.5
E
None
17.2
0.11
0.71
71.6
0.0
71.6
E
71.1
E
140
188
None
21.0
0.14
0.43
61.7
0.0
61.7
E
None
21.0
0.14
0.80
74.6
0.0
74.6
E
53.0
D
203
#271
None
21.0
0.14
0.58
11.7
0.0
11.7
B
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
4.0
97
143
1.00
100%
2%
0
40
698
11.9
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
122
165
1.00
100%
2%
0
0
86
362
Prot
1
1
5.0
12.0
24.0
16.0%
4.0
3.0
0.0
7.0
Lead
0
1
25
Yes
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
1208
560
pm+ov
6
4
6
6
6
20.0
43.0
60.0
40.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lag
None C-Max
18.3
57.7
0.12
0.38
0.87
0.62
85.3
39.9
0.0
0.0
85.3
39.9
F
D
41.6
D
181
366
#282
421
None
78.7
0.52
0.66
17.0
0.0
17.0
B
190
288
521
Prot
5
849
970
Perm
5
2
2
2
5.0
12.0
34.0
22.7%
4.0
3.0
0.0
7.0
Lead
20.0
42.0
70.0
46.7%
4.0
3.0
0.0
7.0
Lag
20.0
42.0
70.0
46.7%
4.0
3.0
0.0
7.0
Lag
2
None C-Max C-Max
26.0
65.4
65.4
0.17
0.44
0.44
0.87
0.38
1.07
79.0
21.6
62.8
0.0
0.0
39.2
79.0
21.6 102.0
E
C
F
67.7
E
241
184
~821
#313
155 #1077
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
4: Sunrise Valley Dr & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
520
481
0
0
0
0.52
EBT
756
EBR
493
0
0
0
0.58
6/5/2013
WBL
285
513
0
0
0
0.42
WBT
772
529
0
0
0
0.77
WBR
NBL
305
457
0
0
0
0.57
420
417
0
0
0
0.87
NBT
871
NBR
SBL
1947
0
0
0
0.62
849
0
0
0
0.66
280
627
0
0
0
0.83
SBT
618
SBR
2230
0
0
0
0.38
910
74
0
0
1.16
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 66 (44%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.07
Intersection Signal Delay: 56.4
Intersection LOS: E
Intersection Capacity Utilization 99.4%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
4: Sunrise Valley Dr & Centreville Rd.
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
5: Dulles Toll Rd. (S) & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
382
1900
12
8
1900
12
0%
551
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1018
1900
12
1%
551
1900
12
324
1900
12
1881
1900
12
-1%
0
1900
12
365
1
25
Yes
0
0
25
0
0
25
No
500
1
25
0
1
25
Yes
290
2
25
0
0
25
35
574
11.2
1.00
100%
2%
0
1.00
100%
2%
0
10
842
57.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
Split
4
390
1.00
100%
2%
0
40
1210
20.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
551
Free
0
0
1.00
100%
2%
0
40
521
8.9
1.00
100%
2%
0
0
4
1018
551
Perm
4
4
6
6
6
5.0
12.0
48.5
32.3%
4.0
3.0
0.0
7.0
5.0
12.0
48.5
32.3%
4.0
3.0
0.0
7.0
20.0
26.5
51.5
34.3%
4.0
2.5
0.0
6.5
Lag
20.0
26.5
51.5
34.3%
4.0
2.5
0.0
6.5
Lag
None
None
36.9
0.25
0.89
77.4
2.6
80.0
E
33.5
C
366
#492
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
6
Free
150.0
1.00
0.35
0.6
0.0
0.6
A
1.00
100%
2%
0
0%
0
0
0
25
No
C-Max C-Max
73.0
73.0
0.49
0.49
0.41
0.53
7.0
2.5
0.0
0.0
7.0
2.5
A
A
5.4
A
123
83
48
0
324
Prot
5
1881
5
2
5.0
12.0
50.0
33.3%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
101.5
67.7%
4.0
2.5
0.0
6.5
0
2
0.0
0.0%
0.0
4.0
Min C-Max
19.6
99.6
0.13
0.66
0.72
0.80
60.1
13.9
0.0
4.6
60.1
18.5
E
B
24.6
C
162
542
m173 m592
Synchro 7 - Report
Page 3
Lanes, Volumes, Timings
5: Dulles Toll Rd. (S) & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
494
491
0
38
0
0.86
EBR
6/5/2013
WBL
WBT
762
WBR
365
1583
0
0
0
0.35
NBL
NBT
1130
NBR
SBL
2461
0
0
0
0.41
1049
0
0
0
0.53
290
989
0
0
0
0.33
SBT
441
SBR
2362
410
0
0
0.96
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 94 (63%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.89
Intersection Signal Delay: 20.0
Intersection LOS: C
Intersection Capacity Utilization 123.1%
ICU Level of Service H
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
5: Dulles Toll Rd. (S) & Centreville Rd.
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 4
Lanes, Volumes, Timings
6: Dulles Toll Rd. (N) & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
887
1900
12
6
1900
12
0%
385
1900
12
116
1900
12
1340
1900
12
3%
0
1900
12
0
1900
12
1265
1900
12
-2%
93
1900
12
0
0
25
No
0
1
25
0
1
25
Yes
155
1
25
0
0
25
No
0
0
25
0
0
25
10
1144
78.0
3
1.00
100%
2%
0
30
902
20.5
40
521
8.9
40
847
14.4
4
1.00
100%
2%
0
1.00
100%
2%
0
1
1.00
100%
2%
0
0%
0
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1
25
Yes
50%
443
Split
4
450
1.00
100%
2%
0
1.00
100%
2%
0
0%
385
Perm
4
4
4
4
4
5.0
12.0
46.5
31.0%
4.0
3.0
0.0
7.0
5.0
12.0
46.5
31.0%
4.0
3.0
0.0
7.0
5.0
12.0
46.5
31.0%
4.0
3.0
0.0
7.0
None
39.5
0.26
1.00
97.3
0.0
97.3
F
None
39.5
0.26
1.01
100.0
0.0
100.0
F
86.4
F
~477
#720
None
39.5
0.26
0.82
57.9
0.0
57.9
E
~460
#706
1.00
100%
2%
0
299
#465
116
pm+pt
1
6
1
1340
5.0
12.0
26.0
17.3%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1265
93
Perm
6
2
6
2
2
2
20.0
26.5
103.5
69.0%
4.0
2.5
0.0
6.5
20.0
26.5
77.5
51.7%
4.0
2.5
0.0
6.5
Lag
20.0
26.5
77.5
51.7%
4.0
2.5
0.0
6.5
Lag
None C-Max
96.5
97.0
0.64
0.65
0.49
0.41
25.8
22.9
0.0
1.7
25.8
24.6
C
C
24.7
C
70
278
m116
445
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
C-Max C-Max
80.3
80.3
0.54
0.54
0.66
0.10
27.5
6.2
3.1
0.0
30.5
6.2
C
A
28.9
C
454
10
562
41
Synchro 7 - Report
Page 5
Lanes, Volumes, Timings
6: Dulles Toll Rd. (N) & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
1064
EBR
6/5/2013
WBL
WBT
822
WBR
NBL
443
0
0
0
1.00
444
0
0
0
1.01
468
0
0
0
0.82
155
331
0
0
0
0.35
NBT
441
3239
1655
0
0
0.85
NBR
SBL
SBT
767
SBR
1914
0
525
0
0.91
889
0
0
0
0.10
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 39 (26%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.01
Intersection Signal Delay: 45.3
Intersection LOS: D
Intersection Capacity Utilization 123.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
6: Dulles Toll Rd. (N) & Centreville Rd.
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 6
Lanes, Volumes, Timings
7: Sunrise Valley Dr & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
445
1900
12
519
1900
12
0%
29
1900
12
73
1900
12
332
1900
12
0%
418
1900
12
109
1900
12
1640
1900
12
0%
376
1900
12
933
1900
12
1101
1900
12
0%
681
1900
12
275
1
25
Yes
245
1
25
215
1
25
Yes
400
2
25
400
1
25
Yes
340
1
25
240
2
25
35
868
16.9
35
761
14.8
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
29
Perm
10%
66
Split
4
0%
445
Split
3
519
50
2361
32.2
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
3
339
1.00
100%
2%
0
50
1585
21.6
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
418
Perm
4
109
Prot
1
1640
376
Perm
6
3
3
7.0
14.0
37.5
18.8%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
37.5
18.8%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
37.5
18.8%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
25.0
12.5%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
25.0
12.5%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
25.0
12.5%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
30.0
15.0%
4.0
3.0
0.0
7.0
Lead
None
30.4
0.15
0.85
98.5
0.0
98.5
F
None
30.4
0.15
0.97
113.7
0.0
113.7
F
104.3
F
363
#487
None
30.4
0.15
0.11
24.5
0.0
24.5
C
None
18.1
0.09
0.45
96.8
0.0
96.8
F
None
18.1
0.09
1.22
150.4
0.0
150.4
F
2
38
92
160
None
18.1
0.09
1.10
159.9
0.0
159.9
F
150.0
F
~279
#400
None C-Max C-Max
10.8
87.0
87.0
0.05
0.44
0.44
0.59
1.07
0.46
105.2
95.4
15.6
0.0
0.0
0.0
105.2
95.4
15.6
F
F
B
81.8
F
73 ~1247
124
110 #1377
222
299
#380
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
4
4
4
1
6
6
6
20.0
27.5
94.5
47.3%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
94.5
47.3%
5.0
2.5
0.0
7.5
Lag
~390
#630
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
3
3
4
395
1
25
Yes
933
Prot
5
1101
681
Perm
5
2
2
2
5.0
12.0
43.0
21.5%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
107.5
53.8%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
107.5
53.8%
5.0
2.5
0.0
7.5
Lag
2
None C-Max C-Max
36.0 112.2 112.2
0.18
0.56
0.56
1.51
0.55
0.60
287.1
29.5
6.7
0.0
0.0
0.0
287.1
29.5
6.7
F
C
A
112.3
F
~875
477
70
#1013
564
196
Synchro 7 - Report
Page 7
Lanes, Volumes, Timings
7: Sunrise Valley Dr & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
240
524
0
0
0
0.85
EBT
788
540
0
0
0
0.96
EBR
WBL
275
264
0
0
0
0.11
245
146
0
0
0
0.45
6/5/2013
WBT
681
307
0
0
0
1.10
WBR
NBL
215
344
0
0
0
1.22
400
395
0
0
0
0.28
NBT
2281
1539
0
0
0
1.07
NBR
SBL
400
813
0
0
0
0.46
340
618
0
0
0
1.51
SBT
1505
1986
0
0
0
0.55
SBR
395
1127
0
0
0
0.60
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 70 (35%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.51
Intersection Signal Delay: 106.0
Intersection LOS: F
Intersection Capacity Utilization 119.7%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
7: Sunrise Valley Dr & Fairfax County Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 8
Lanes, Volumes, Timings
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
815
1900
12
1
1900
12
0%
371
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
2276
1900
12
0%
335
1900
12
590
1900
12
2157
1900
12
0%
0
1900
12
220
0
25
Yes
0
0
25
0
0
25
Yes
0
0
25
640
1
25
Yes
325
2
25
160
1
25
35
414
8.1
35
491
9.6
50
1585
21.6
0
0
25
Yes
50
713
9.7
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
815
Prot
3
372
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
4
2276
335
Perm
6
3
4
6
5.0
12.0
30.5
25.2%
4.0
3.0
0.0
7.0
Lead
5.0
21.0
21.0
17.4%
4.0
1.0
0.0
5.0
Lag
20.0
27.5
40.5
33.5%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
40.5
33.5%
5.0
2.5
0.0
7.5
Lag
None
23.5
0.19
1.22
154.6
0.0
154.6
F
None
9.8
0.08
0.87
29.1
0.0
29.1
C
115.2
F
33
142
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
6
6
~403
#528
1.00
100%
2%
0
3
C-Max C-Max
37.4
37.4
0.31
0.31
1.45
0.46
237.2
5.9
0.0
0.0
237.2
5.9
F
A
207.5
F
~910
0
#1036
71
590
Prot
5
2157
5
2
5.0
12.0
29.0
24.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
69.5
57.4%
5.0
2.5
0.0
7.5
0
2
0.0
0.0%
0.0
4.0
None C-Max
23.8
68.2
0.20
0.56
0.87
0.75
62.2
22.9
0.0
0.6
62.2
23.5
E
C
31.8
C
225
436
#347
573
Synchro 7 - Report
Page 9
Lanes, Volumes, Timings
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
160
667
0
0
0
1.22
EBT
334
EBR
WBL
WBT
411
WBR
495
0
0
0
0.75
6/5/2013
NBL
NBT
1505
1573
0
0
0
1.45
NBR
SBL
640
721
0
0
0
0.46
325
678
0
0
0
0.87
SBT
633
SBR
2867
323
0
0
0.85
Intersection Summary
Area Type:
Other
Cycle Length: 121
Actuated Cycle Length: 121
Offset: 82 (68%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.45
Intersection Signal Delay: 117.0
Intersection LOS: F
Intersection Capacity Utilization 133.7%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 10
Lanes, Volumes, Timings
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
352
1900
12
4
1900
12
0%
1077
1900
12
123
1900
12
2934
1900
12
0%
0
1900
12
0
1900
12
2406
1900
12
0%
329
1900
12
0
0
25
Yes
185
1
25
0
0
25
Yes
185
2
25
0
0
25
Yes
0
0
25
0
0
25
25
568
15.5
25
890
24.3
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
50
1458
19.9
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0.0
0.0%
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
50
713
9.7
670
1
25
Yes
352
Prot
4
1081
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
0%
2934
8
123
Prot
1
6
2
4
8
1
6
2
2
2
7.0
14.0
25.0
25.0%
4.0
3.0
0.0
7.0
5.0
21.0
21.0
21.0%
4.0
1.0
0.0
5.0
5.0
12.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
75.0
75.0%
5.0
2.0
0.0
7.0
20.0
27.0
52.0
52.0%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
52.0
52.0%
5.0
2.0
0.0
7.0
Lag
None None
18.0
20.0
0.18
0.20
0.57
3.43
41.6 1118.0
0.0
0.0
41.6 1118.0
D
F
853.6
F
106 ~1251
153 #1502
0
1.00
100%
2%
0
0.0
0.0%
0.0
4.0
None C-Max
8.0
68.0
0.08
0.68
0.45
0.85
48.7
15.3
0.0
1.2
48.7
16.5
D
B
17.8
B
39
459
66
535
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
2406
329
Perm
C-Max C-Max
53.0
53.0
0.53
0.53
0.89
0.33
8.7
0.7
0.0
0.0
8.7
0.7
A
A
7.7
A
68
0
m#108
m0
Synchro 7 - Report
Page 11
Lanes, Volumes, Timings
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
EBR
WBL
185
618
0
0
0
0.57
WBT
810
WBR
315
0
0
0
3.43
6/5/2013
NBL
185
549
0
0
0
0.22
NBT
633
3458
300
0
0
0.93
NBR
SBL
SBT
1378
2696
0
0
0
0.89
SBR
670
994
0
0
0
0.33
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 82 (82%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 3.43
Intersection Signal Delay: 179.8
Intersection LOS: F
Intersection Capacity Utilization 133.7%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 12
Lanes, Volumes, Timings
10: Spring Street & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBR
NBL
NBT
SBT
SBR
148
1900
12
0%
215
1
25
142
1900
12
825
1900
12
2421
1900
12
0%
2259
1900
12
0%
505
1900
12
0
1
25
Yes
650
2
25
25
754
20.6
550
1
25
Yes
50
427
5.8
50
557
7.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
825
Prot
5
2421
2259
2
6
8
5
2
6
6
6
7.0
14.0
17.0
17.0%
4.0
3.0
0.0
7.0
5.0
12.0
29.0
29.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
83.0
83.0%
5.0
2.0
0.0
7.0
20.0
27.0
54.0
54.0%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
54.0
54.0%
5.0
2.0
0.0
7.0
Lag
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
148
142
Free
8
Free
None
9.1
0.09
0.47
48.2
0.0
48.2
D
24.6
C
46
77
0.0
0.0%
0.0
4.0
1.00
100%
2%
0
505
Perm
None C-Max C-Max C-Max
22.0
76.9
47.9
47.9
0.22
0.77
0.48
0.48
1.09
0.62
0.93
0.54
81.1
6.6
32.8
7.8
0.0
0.0
0.0
0.0
81.1
6.6
32.8
7.8
F
A
C
A
25.6
28.3
C
C
0
~311
241
483
58
0 m#277 m198
#615
148
100.0
1.00
0.09
0.1
0.0
0.1
A
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 13
Lanes, Volumes, Timings
10: Spring Street & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
674
215
343
0
0
0
0.43
EBR
NBL
1583
0
0
0
0.09
650
755
0
0
0
1.09
6/5/2013
NBT
347
SBT
477
3911
0
0
0
0.62
2436
0
0
0
0.93
SBR
550
938
0
0
0
0.54
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 60 (60%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.09
Intersection Signal Delay: 26.7
Intersection LOS: C
Intersection Capacity Utilization 90.5%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
10: Spring Street & Fairfax County Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 14
Lanes, Volumes, Timings
11: Sunrise Valley Dr & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
102
1900
12
401
1900
12
0%
8
1900
12
84
1900
12
287
1900
12
0%
352
1900
12
112
1900
12
1529
1900
12
0%
319
1900
12
611
1900
12
818
1900
12
0%
332
1900
12
0
0
25
Yes
155
1
25
220
1
25
Yes
435
2
25
415
1
25
Yes
720
2
25
260
1
25
35
675
13.1
2
1.00
100%
2%
0
1.00
100%
2%
0
35
419
8.2
1
5
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
92
Split
3
419
1.00
100%
2%
0
45
2270
34.4
6
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
3
10%
76
Split
4
295
4
3
3
4
4
4
4
8.0
42.0
30.5
15.3%
4.0
3.0
0.0
7.0
Lead
8.0
42.0
30.5
15.3%
4.0
3.0
0.0
7.0
Lead
8.0
15.0
28.0
14.0%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
28.0
14.0%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
28.0
14.0%
4.0
3.0
0.0
7.0
Lag
None
23.5
0.12
0.49
92.1
0.0
92.1
F
None
23.5
0.12
1.05
140.0
0.0
140.0
F
131.4
F
~329
#460
None
20.0
0.10
0.47
94.9
0.0
94.9
F
None
20.0
0.10
0.87
113.2
0.0
113.2
F
83.7
F
213
#293
None
20.0
0.10
0.93
56.6
0.0
56.6
E
127
204
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
4.0
105
175
45
1208
18.3
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
352
Perm
147
#353
430
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
112
Prot
1
1529
319
Perm
1
6
6
6
5
5.0
12.0
23.0
11.5%
4.0
3.0
0.0
7.0
Lead
20.0
35.5
103.5
51.8%
4.5
2.0
0.0
6.5
Lag
20.0
35.5
103.5
51.8%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
38.0
19.0%
4.0
3.0
0.0
7.0
Lead
6
None C-Max C-Max
12.0
97.0
97.0
0.06
0.48
0.48
0.54
0.89
0.36
100.8
54.6
8.5
0.0
0.0
0.0
100.8
54.6
8.5
F
D
A
49.7
D
75
954
53
112
1062
128
611
Prot
5
818
332
pm+ov
2
3
2
2
3
20.0
35.5
118.5
59.3%
4.5
2.0
0.0
6.5
Lag
8.0
42.0
30.5
15.3%
4.0
3.0
0.0
7.0
Lead
None C-Max
32.0 117.0
0.16
0.58
1.11
0.39
123.0
21.2
0.0
0.0
123.0
21.2
F
C
53.4
D
~482
305
m231 m165
None
147.0
0.74
0.28
4.7
0.0
4.7
A
87
m37
Synchro 7 - Report
Page 15
Lanes, Volumes, Timings
11: Sunrise Valley Dr & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
260
189
0
0
0
0.49
EBT
595
398
0
0
0
1.05
EBR
6/5/2013
WBL
155
169
0
0
0
0.45
WBT
339
356
0
0
0
0.83
WBR
NBL
220
384
0
0
0
0.92
435
275
0
0
0
0.41
NBT
2190
1716
0
0
0
0.89
NBR
SBL
415
883
0
0
0
0.36
720
550
0
0
0
1.11
SBT
1128
2071
0
0
0
0.39
SBR
430
1187
0
0
0
0.28
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 167 (84%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.11
Intersection Signal Delay: 64.4
Intersection LOS: E
Intersection Capacity Utilization 103.2%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
11: Sunrise Valley Dr & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 16
Lanes, Volumes, Timings
12: EB Toll Rd Off-Ramp & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
559
1900
12
0
1900
12
0%
354
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1508
1900
12
0%
214
1900
12
489
1900
12
1749
1900
12
0%
0
1900
12
400
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
625
1
25
Yes
0
0
25
0
2
25
25
573
15.6
3
1.00
100%
2%
0
40
339
5.8
45
662
10.0
2
1.00
100%
2%
0
1.00
100%
2%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
354
custom
45
160
2.4
1
0%
559
Prot
4
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1508
214
Free
0
Perm
Free
2
20.0
26.5
69.0
69.0%
4.5
2.0
0.0
6.5
6
4
6
7.0
13.5
31.0
31.0%
4.0
2.5
0.0
6.5
7.0
13.5
31.0
31.0%
4.0
2.5
0.0
6.5
20.0
26.5
69.0
69.0%
4.5
2.0
0.0
6.5
20.0
26.5
69.0
69.0%
4.5
2.0
0.0
6.5
0.0
4.0
None
23.5
0.24
0.69
39.8
4.2
44.0
D
None
23.5
0.24
0.92
64.6
0.0
64.6
E
165
223
205
#371
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
C-Max
63.5
0.64
0.67
10.5
0.2
10.6
B
9.3
A
354
446
1.00
100%
2%
0
2238
0
2
2
2
0.0
0.0%
1.00
100%
2%
0
0%
4
4
0.0
0.0%
0
0
25
Yes
0.0
0.0%
0.0
4.0
0.0
0.0%
0.0
4.0
C-Max C-Max
63.5
0.64
3.68dl
484.4
0.0
484.4
F
484.4
F
0
~2320
m0
#2295
100.0
1.00
0.14
0.1
0.0
0.1
A
Synchro 7 - Report
Page 17
Lanes, Volumes, Timings
12: EB Toll Rd Off-Ramp & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
841
0
203
0
0.88
EBT
493
EBR
WBL
6/5/2013
WBT
259
WBR
400
401
0
0
0
0.88
NBL
NBT
582
2246
0
155
0
0.72
NBR
625
1564
0
0
0
0.14
SBL
SBT
80
SBR
1112
0
0
0
2.01
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 58 (58%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.01
Intersection Signal Delay: 235.5
Intersection LOS: F
Intersection Capacity Utilization 134.3%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
dl Defacto Left Lane. Recode with 1 though lane as a left lane.
Splits and Phases:
12: EB Toll Rd Off-Ramp & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 18
Lanes, Volumes, Timings
13: WB Toll Rd On-Ramp & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
390
1900
12
2
1900
12
0%
1044
1900
12
157
1900
12
2002
1900
12
0%
0
1900
12
0
1900
12
1770
1900
12
0%
192
1900
12
0
0
25
Yes
0
1
25
50
1
25
Yes
645
1
25
0
0
25
Yes
0
0
25
0
0
25
35
427
8.3
1.00
100%
2%
0
1.00
100%
2%
0
25
1052
28.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
45
649
9.8
50%
195
Split
4
197
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
4
1.00
100%
2%
0
0%
2002
6
2
1
6
2
2
2
20.0
26.5
131.0
65.5%
4.5
2.0
0.0
6.5
20.0
26.5
80.5
40.3%
4.5
2.0
0.0
6.5
Lag
20.0
26.5
80.5
40.3%
4.5
2.0
0.0
6.5
Lag
4
4
7.0
13.5
69.0
34.5%
4.0
2.5
0.0
6.5
7.0
13.5
69.0
34.5%
4.0
2.5
0.0
6.5
7.0
13.5
69.0
34.5%
4.0
2.5
0.0
6.5
5.0
12.0
50.5
25.3%
4.0
3.0
0.0
7.0
Lead
None
62.5
0.31
0.37
56.0
0.0
56.0
E
None
62.5
0.31
0.37
56.1
0.0
56.1
E
393.0
F
214
303
None
62.5
0.31
2.07
519.5
0.0
519.5
F
None C-Max
22.3 124.5
0.11
0.62
0.80
0.91
101.1
32.0
0.0
11.9
101.1
43.9
F
D
48.1
D
180
1035
236
980
~2159
#2432
1.00
100%
2%
0
157
Prot
1
4
4
211
300
45
847
12.8
0%
1044
Perm
0
1
25
Yes
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
1770
192
Perm
C-Max C-Max
95.2
95.2
0.48
0.48
0.73
0.24
20.1
5.5
0.1
0.0
20.1
5.5
C
A
18.7
B
205
14
244
m27
Synchro 7 - Report
Page 19
Lanes, Volumes, Timings
13: WB Toll Rd On-Ramp & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
347
EBR
6/5/2013
WBL
WBT
972
525
0
0
0
0.37
527
0
0
0
0.37
WBR
NBL
50
504
0
0
0
2.07
645
385
0
0
0
0.41
NBT
569
2203
225
69
0
1.01
NBR
SBL
SBT
767
SBR
2420
40
0
0
0.74
802
0
0
0
0.24
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 54 (27%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.07
Intersection Signal Delay: 126.8
Intersection LOS: F
Intersection Capacity Utilization 130.8%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
13: WB Toll Rd On-Ramp & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 20
Lanes, Volumes, Timings
14: Sunset Hills Rd & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
43
1900
12
1053
1900
12
0%
145
1900
12
211
1900
12
327
1900
12
0%
148
1900
12
682
1900
12
1231
1900
12
0%
1244
1900
12
301
1900
12
1417
1900
12
0%
88
1900
12
275
1
25
Yes
550
2
25
0
1
25
Yes
480
2
25
470
1
25
Yes
300
2
25
290
2
25
35
506
9.9
3
1.00
100%
2%
0
1.00
100%
2%
0
35
569
11.1
4
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
43
Prot
3
1053
1.00
100%
2%
0
45
847
12.8
1
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
145
Perm
8
211
Prot
7
327
148
Perm
4
3
8
6.0
13.0
24.5
12.3%
4.0
3.0
0.0
7.0
Lead
6.0
49.0
51.0
25.5%
4.0
3.0
0.0
7.0
Lag
6.0
49.0
51.0
25.5%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
27.5
13.8%
4.0
3.0
0.0
7.0
Lead
6.0
54.0
54.0
27.0%
4.0
3.0
0.0
7.0
Lag
6.0
54.0
54.0
27.0%
4.0
3.0
0.0
7.0
Lag
None
7.2
0.04
0.35
101.3
0.0
101.3
F
None
44.6
0.22
0.93
89.6
0.0
89.6
F
82.1
F
495
#590
None
44.6
0.22
0.34
22.1
0.0
22.1
C
None
16.6
0.08
0.74
105.2
0.0
105.2
F
None
56.6
0.28
0.27
8.0
0.0
8.0
A
43
117
142
190
None
56.6
0.28
0.33
58.0
0.0
58.0
E
61.7
E
180
233
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
45
794
12.0
2
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
8
8
29
54
1.00
100%
2%
0
7
4
4
4
0
62
445
1
25
Yes
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
682
Prot
1
1231
1244
Perm
1
6
6
6
5
5.0
12.0
48.0
24.0%
4.0
3.0
0.0
7.0
Lead
20.0
44.5
94.5
47.3%
4.5
2.0
0.0
6.5
Lag
20.0
44.5
94.5
47.3%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
27.0
13.5%
4.0
3.0
0.0
7.0
Lead
6
None C-Max C-Max
41.4
91.6
91.6
0.21
0.46
0.46
0.96
0.53
1.47
84.1
30.7 240.7
0.0
0.0
17.7
84.1
30.7 258.4
F
C
F
132.0
F
458
389 ~2276
m405 m352 m#1436
301
Prot
5
1417
88
pm+ov
2
3
2
2
2
20.0
44.5
73.5
36.8%
4.5
2.0
0.0
6.5
Lag
6.0
13.0
24.5
12.3%
4.0
3.0
0.0
7.0
Lead
None C-Max
19.7
69.9
0.10
0.35
0.89
0.80
145.6
26.4
0.0
0.2
145.6
26.7
F
C
45.3
D
214
467
#297
406
None
75.4
0.38
0.14
1.7
0.0
1.7
A
16
m2
Synchro 7 - Report
Page 21
Lanes, Volumes, Timings
14: Sunset Hills Rd & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
300
0
0
0
0.14
EBT
426
1150
0
0
0
0.92
6/5/2013
EBR
WBL
275
432
0
0
0
0.34
550
352
0
0
0
0.60
WBT
489
WBR
NBL
1001
0
0
0
0.33
548
0
0
0
0.27
480
716
0
0
0
0.95
NBT
767
2330
0
0
0
0.53
NBR
SBL
470
844
22
0
0
1.51
300
346
0
0
0
0.87
SBT
714
1776
49
0
0
0.82
SBR
445
643
0
0
0
0.14
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 46 (23%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.47
Intersection Signal Delay: 93.3
Intersection LOS: F
Intersection Capacity Utilization 125.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
14: Sunset Hills Rd & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 22
Lanes, Volumes, Timings
15: Bluemont Way & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
14
1900
12
1
1900
12
0%
215
1900
8
18
1900
12
22
1900
12
0%
0
1900
12
438
1900
12
1176
1900
12
0%
16
1900
12
3
1900
12
1727
1900
12
0%
64
1900
12
0
1
25
Yes
0
1
25
0
0
25
Yes
380
1
25
550
1
25
Yes
390
1
25
290
1
25
25
1182
32.2
3
1.00
100%
2%
0
1.00
100%
2%
0
25
258
7.0
2
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
14
pm+pt
7
4
7
1
7.0
14.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
4.0
49.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lag
None
9.0
0.04
0.17
91.6
0.0
91.6
F
None
5.6
0.03
0.02
94.0
0.0
94.0
F
34.4
C
1
9
18
43
1
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
215
pm+ov
4
1
4
4
1
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
45
794
12.0
18
pm+pt
3
8
3
22
10.0
17.0
58.0
29.0%
4.0
3.0
0.0
7.0
Lead
45
523
7.9
5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
8
438
Prot
1
8
1
5.0
12.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
58.0
29.0%
4.0
3.0
0.0
7.0
Lead
None
60.4
0.30
0.45
30.4
0.0
30.4
C
None
14.7
0.07
0.15
83.4
0.0
83.4
F
124
174
22
52
None
7.0
0.04
0.34
107.1
0.0
107.1
F
96.5
F
29
66
0.0
0.0%
0.0
4.0
285
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
1176
16
pm+ov
6
3
6
6
3
3
Prot
5
5
1727
64
pm+ov
2
7
2
2
7
20.0
39.0
134.0
67.0%
5.0
2.0
0.0
7.0
Lag
5.0
12.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
20.0
42.0
93.0
46.5%
5.0
2.0
0.0
7.0
Lag
7.0
14.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
None C-Max
58.5 167.1
0.29
0.84
0.85
0.28
108.3
2.9
0.0
0.0
108.3
2.9
F
A
31.2
C
598
67
720
96
None
179.8
0.90
0.01
0.2
0.0
0.2
A
None C-Max
5.1 104.1
0.03
0.52
0.07
0.65
80.3
23.0
0.0
0.4
80.3
23.3
F
C
22.7
C
0
276
m10
342
None
118.3
0.59
0.07
3.1
0.0
3.1
A
0
m1
2
7
Synchro 7 - Report
Page 23
Lanes, Volumes, Timings
15: Bluemont Way & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
106
0
0
0
0.13
6/5/2013
EBT
1102
EBR
WBL
WBT
178
233
0
0
0
0.00
486
0
0
0
0.44
141
0
0
0
0.13
233
0
0
0
0.09
WBR
NBL
380
522
0
0
0
0.84
NBT
714
4248
0
0
0
0.28
NBR
SBL
550
1393
0
0
0
0.01
390
89
0
0
0
0.03
SBT
443
2647
372
0
0
0.76
SBR
285
977
0
0
0
0.07
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 46 (23%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.85
Intersection Signal Delay: 28.0
Intersection LOS: C
Intersection Capacity Utilization 84.4%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
15: Bluemont Way & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 24
Lanes, Volumes, Timings
16: New Dominion Pkwy & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
36
1900
12
255
1900
12
0%
191
1900
12
197
1900
12
248
1900
12
0%
135
1900
12
570
1900
12
736
1900
12
0%
140
1900
12
137
1900
12
1149
1900
12
0%
95
1900
12
275
1
25
Yes
95
1
25
165
1
25
Yes
500
2
25
445
1
25
Yes
205
1
25
270
1
25
25
722
19.7
1
1.00
100%
2%
0
1.00
100%
2%
0
25
408
11.1
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
36
pm+pt
3
8
3
255
5.0
12.0
20.0
10.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
38.0
19.0%
4.0
3.0
0.0
7.0
Lag
None
37.0
0.18
0.16
51.9
0.0
51.9
D
None
29.4
0.15
0.93
121.5
0.0
121.5
F
76.4
E
335
#503
34
66
45
423
6.4
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
191
pm+ov
8
1
8
8
8
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
45
521
7.9
65
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
197
pm+pt
7
4
7
248
135
pm+ov
4
5
4
4
4
5.0
12.0
45.0
22.5%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lead
5.0
47.0
50.0
25.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
34.0
17.0%
4.0
3.0
0.0
7.0
Lead
None
65.4
0.33
0.20
20.7
0.0
20.7
C
None
59.1
0.30
0.78
75.8
0.0
75.8
E
None
74.6
0.37
0.20
8.1
0.0
8.1
A
45
80
203
285
None
47.0
0.24
0.57
73.6
0.0
73.6
E
59.1
E
291
400
12
61
570
Prot
1
1
5.0
12.0
45.0
22.5%
4.0
3.0
0.0
7.0
Lead
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
736
140
pm+ov
6
7
6
6
6
137
Prot
5
5
1149
95
pm+ov
2
3
2
2
2
20.0
39.0
96.0
48.0%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
34.0
17.0%
4.0
3.0
0.0
7.0
Lead
20.0
47.0
85.0
42.5%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
20.0
10.0%
4.0
3.0
0.0
7.0
Lead
None C-Max
36.0
99.3
0.18
0.50
0.92
0.29
127.0
18.5
3.8
0.2
130.8
18.7
F
B
61.2
E
408
112
#482
131
None
128.9
0.64
0.13
1.7
0.0
1.7
A
None C-Max
20.6
83.9
0.10
0.42
0.75
0.54
110.9
45.6
0.0
0.0
110.9
45.6
F
D
50.4
D
179
435
257
487
None
90.4
0.45
0.13
21.4
0.0
21.4
C
0
13
50
90
Synchro 7 - Report
Page 25
Lanes, Volumes, Timings
16: New Dominion Pkwy & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
270
274
0
0
0
0.13
EBT
642
289
0
0
0
0.88
EBR
WBL
275
992
0
0
0
0.19
95
271
0
0
0
0.73
6/5/2013
WBT
328
437
0
0
0
0.57
WBR
NBL
165
666
0
0
0
0.20
500
652
39
0
0
0.93
NBT
441
2525
984
0
0
0.48
NBR
SBL
445
1070
0
0
0
0.13
205
239
0
0
0
0.57
SBT
343
2133
0
0
0
0.54
SBR
65
721
0
0
0
0.13
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 46 (23%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.93
Intersection Signal Delay: 59.0
Intersection LOS: E
Intersection Capacity Utilization 97.3%
ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
16: New Dominion Pkwy & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 26
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
WBT
WBR
SBL
SBR
957
1900
12
593
1900
12
0%
254
1900
12
0%
808
1900
12
987
1900
12
0%
0
2
25
522
1900
12
210
1
25
0
1
25
Yes
35
2307
44.9
35
621
12.1
0
1
25
Yes
35
623
12.1
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
0%
957
Prot
1
593
254
987
1
12
10.0
17.0
43.0
33.1%
4.0
3.0
0.0
7.0
Lead
12
82.0
63.1%
None
36.0
0.28
1.01
77.5
0.0
77.5
E
~422
#566
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
7.0
75.0
0.58
0.55
19.5
0.0
19.5
B
55.3
E
296
403
1.00
100%
2%
0
808
pm+ov
2
3
2
2
2
15.0
39.0
39.0
30.0%
4.0
3.0
0.0
7.0
Lag
5.0
29.0
48.0
36.9%
4.0
3.0
0.0
7.0
1.00
100%
2%
0
1.00
100%
2%
0
522
Free
3
Free
3
5.0
29.0
48.0
36.9%
4.0
3.0
0.0
7.0
None C-Max C-Max
32.0
73.0
41.0
0.25
0.56
0.32
0.55
0.91
0.91
48.2
38.0
42.7
0.0
0.0
0.0
48.2
38.0
42.7
D
D
D
40.5
28.4
D
C
188
498
228
278
#883
#505
0.0
0.0%
0.0
4.0
130.0
1.00
0.33
1.2
0.0
1.2
A
17
38
Synchro 7 - Report
Page 27
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
951
0
0
0
1.01
6/5/2013
EBT
2227
WBT
541
WBR
SBL
543
SBR
1075
0
0
0
0.55
459
0
0
0
0.55
888
0
0
0
0.91
1083
0
0
0
0.91
1583
0
0
0
0.33
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 81 (62%), Referenced to phase 3:SBL, Start of Yellow
Natural Cycle: 115
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.01
Intersection Signal Delay: 41.6
Intersection LOS: D
Intersection Capacity Utilization 89.1%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
17: Sunrise Valley Dr & Wiehle Ave
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 28
Lanes, Volumes, Timings
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
442
1900
12
2
1900
12
0%
323
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1178
1900
12
0%
244
1900
12
393
1900
12
1122
1900
12
0%
0
1900
12
450
1
25
No
0
0
25
0
0
25
Yes
235
2
25
435
1
25
Yes
0
0
25
450
1
25
25
764
20.8
4
1.00
100%
2%
0
25
553
15.1
35
572
11.1
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
40%
265
Split
4
260
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
25%
242
Perm
0
0
1.00
100%
2%
0
4
7.0
14.0
44.0
33.8%
4.0
3.0
0.0
7.0
7.0
14.0
44.0
33.8%
4.0
3.0
0.0
7.0
7.0
14.0
44.0
33.8%
4.0
3.0
0.0
7.0
None
28.0
0.22
0.73
58.9
0.0
58.9
E
None
28.0
0.22
0.78
63.4
0.0
63.4
E
61.6
E
228
310
None
28.0
0.22
0.76
62.5
0.0
62.5
E
203
280
1.00
100%
2%
0
0
0
1178
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
244
Perm
393
Prot
5
1122
6
6
6
5
2
15.0
22.0
47.0
36.2%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
47.0
36.2%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
39.0
30.0%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
86.0
66.2%
4.0
3.0
0.0
7.0
6
4
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
0%
4
4
4
221
296
35
623
12.1
0
0
25
Yes
C-Max C-Max
60.8
60.8
0.47
0.47
0.33
0.28
18.0
1.1
0.0
0.0
18.0
1.1
B
A
15.1
B
118
0
m141
m0
0
2
0.0
0.0%
0.0
4.0
None C-Max
20.3
88.0
0.16
0.68
0.73
0.33
36.3
11.0
0.0
0.0
36.3
11.0
D
B
17.6
B
119
160
196
259
Synchro 7 - Report
Page 29
Lanes, Volumes, Timings
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
450
478
0
0
0
0.55
EBT
684
442
0
0
0
0.59
EBR
WBL
6/5/2013
WBT
473
WBR
450
421
0
0
0
0.57
NBL
NBT
543
3527
0
0
0
0.33
NBR
SBL
SBT
492
435
870
0
0
0
0.28
845
0
0
0
0.47
3444
0
0
0
0.33
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 25.7
Intersection LOS: C
Intersection Capacity Utilization 59.5%
ICU Level of Service B
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 30
Lanes, Volumes, Timings
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
344
1900
12
1
1900
12
0%
344
1900
12
158
1900
12
1471
1900
12
0%
0
1900
12
0
1900
12
1173
1900
12
0%
139
1900
12
0
0
25
Yes
0
1
25
0
1
25
No
0
2
25
0
0
25
Yes
250
2
25
0
0
25
35
627
12.2
1.00
100%
2%
0
1.00
100%
2%
0
25
432
11.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
35
572
11.1
30%
241
Split
4
231
35
387
7.5
1.00
100%
2%
0
1.00
100%
2%
0
0%
37%
217
Perm
4
4
4
4
4
5.0
11.5
49.5
38.1%
4.0
2.5
0.0
6.5
5.0
11.5
49.5
38.1%
4.0
2.5
0.0
6.5
5.0
11.5
49.5
38.1%
4.0
2.5
0.0
6.5
None
26.0
0.20
0.72
59.9
0.0
59.9
E
None
26.0
0.20
0.76
64.3
0.0
64.3
E
61.9
E
203
281
None
26.0
0.20
0.72
61.5
0.0
61.5
E
201
273
1.00
100%
2%
0
181
253
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
158
Prot
1
1471
6
2
1
6
2
2
2
5.0
12.0
25.5
19.6%
4.0
3.0
0.0
7.0
Lead
15.0
21.0
80.5
61.9%
4.0
2.0
0.0
6.0
15.0
21.0
55.0
42.3%
4.0
2.0
0.0
6.0
Lag
15.0
21.0
55.0
42.3%
4.0
2.0
0.0
6.0
Lag
None C-Max
10.5
91.5
0.08
0.70
0.57
0.41
54.9
11.1
0.0
0.3
54.9
11.4
D
B
15.6
B
66
217
90
349
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
1173
139
Perm
C-Max C-Max
74.1
74.1
0.57
0.57
0.27
0.14
5.3
1.0
0.0
0.0
5.3
1.0
A
A
4.8
A
60
5
80
12
Synchro 7 - Report
Page 31
Lanes, Volumes, Timings
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
547
EBR
6/5/2013
WBL
WBT
352
WBR
NBL
NBT
492
556
0
0
0
0.43
503
0
0
0
0.46
497
0
0
0
0.44
489
0
0
0
0.32
3581
1311
0
0
0.65
NBR
SBL
SBT
307
SBR
4299
0
0
0
0.27
962
0
0
0
0.14
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 68 (52%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.76
Intersection Signal Delay: 20.5
Intersection LOS: C
Intersection Capacity Utilization 59.5%
ICU Level of Service B
Analysis Period (min) 15
Splits and Phases:
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 32
Lanes, Volumes, Timings
20: Sunset Hills Rd & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
127
1900
12
685
1900
12
0%
328
1900
12
142
1900
12
392
1900
12
0%
109
1900
12
633
1900
12
755
1900
12
0%
634
1900
12
338
1900
12
919
1900
12
0%
112
1900
12
385
1
25
Yes
477
1
25
0
0
25
Yes
320
2
25
0
1
25
Yes
250
1
25
442
1
25
35
1259
24.5
10
1.00
100%
2%
0
1.00
100%
2%
0
35
976
19.0
10
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
127
pm+pt
7
4
7
685
5.0
12.0
20.0
15.4%
4.0
3.0
0.0
7.0
Lead
8.0
51.0
40.0
30.8%
4.0
3.0
0.0
7.0
Lag
None
41.5
0.32
0.43
31.0
0.0
31.0
C
None
30.3
0.23
0.83
56.9
0.0
56.9
E
42.7
D
286
355
69
113
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
328
pm+ov
4
1
4
4
4
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
35
540
10.5
142
pm+pt
3
8
3
501
5.0
12.0
30.0
23.1%
4.0
3.0
0.0
7.0
Lead
35
619
12.1
3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
8
633
Prot
1
8
1
5.0
12.0
20.0
15.4%
4.0
3.0
0.0
7.0
Lead
8.0
40.0
40.0
30.8%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
30.0
23.1%
4.0
3.0
0.0
7.0
Lead
None
56.4
0.43
0.45
17.6
0.0
17.6
B
None
43.4
0.33
0.60
38.0
0.0
38.0
D
124
199
77
125
None
31.2
0.24
0.60
44.4
0.0
44.4
D
43.0
D
184
243
0.0
0.0%
0.0
4.0
120
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
755
634
pm+ov
6
3
6
6
6
15.0
38.0
43.0
33.1%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
20.0
15.4%
4.0
3.0
0.0
7.0
Lead
None C-Max
26.1
40.1
0.20
0.31
0.92
0.69
75.8
33.0
0.0
0.0
75.8
33.0
E
C
50.9
D
254
314
#427
347
None
51.3
0.39
0.96
47.2
0.0
47.2
D
~433
#613
338
pm+pt
5
2
5
1031
5.0
12.0
27.0
20.8%
4.0
3.0
0.0
7.0
Lead
15.0
33.0
40.0
30.8%
4.0
2.0
0.0
6.0
Lag
0
2
2
0.0
0.0%
0.0
4.0
None C-Max
53.9
34.5
0.41
0.27
0.88
0.77
51.0
48.1
0.0
0.0
51.0
48.1
D
D
48.8
D
182
292
#362
347
Synchro 7 - Report
Page 33
Lanes, Volumes, Timings
20: Sunset Hills Rd & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
442
319
0
0
0
0.40
EBT
1179
898
0
0
0
0.76
6/5/2013
EBR
WBL
385
757
0
0
0
0.43
477
246
0
0
0
0.58
WBT
896
WBR
889
0
0
0
0.56
NBL
320
689
0
0
0
0.92
NBT
460
NBR
SBL
1092
0
0
0
0.69
657
0
0
0
0.96
250
390
0
0
0
0.87
SBT
539
SBR
1339
0
0
0
0.77
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 43 (33%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 135
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.96
Intersection Signal Delay: 47.6
Intersection LOS: D
Intersection Capacity Utilization 99.8%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
20: Sunset Hills Rd & Wiehle Ave
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 34
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
WBT
WBR
SBL
SBR
852
1900
12
277
1900
12
0%
366
1900
12
0%
655
1900
12
402
1900
12
0%
0
1
25
564
1900
12
430
1
25
670
1
25
Yes
35
3015
58.7
35
879
17.1
220
1
25
Yes
35
1671
32.6
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
277
366
2
6
852
Prot
5
1.00
100%
2%
0
1.00
100%
2%
0
0%
655
Perm
402
564
Free
4
5
2
6
6
6
5.0
12.0
40.0
33.3%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
75.0
62.5%
4.0
3.0
0.0
7.0
15.0
22.0
35.0
29.2%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
35.0
29.2%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
45.0
37.5%
4.0
3.0
0.0
7.0
None C-Max C-Max C-Max
32.3
72.4
33.1
33.1
0.27
0.60
0.28
0.28
0.92
0.25
0.71
0.76
58.8
12.6
49.7
12.3
0.0
0.0
0.0
0.0
58.8
12.6
49.7
12.3
E
B
D
B
47.5
25.7
D
C
321
98
270
40
#441
155
#430
202
None
33.6
0.28
0.81
48.8
0.0
48.8
D
20.7
C
314
424
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
Free
4
0.0
0.0%
0.0
4.0
120.0
1.00
0.36
0.6
0.0
0.6
A
0
0
Synchro 7 - Report
Page 35
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
430
954
0
0
0
0.89
EBT
2935
WBT
799
1124
0
0
0
0.25
514
0
0
0
0.71
6/5/2013
WBR
670
858
0
0
0
0.76
SBL
1591
561
0
0
0
0.72
SBR
220
1583
0
0
0
0.36
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 96 (80%), Referenced to phase 2:EBT and 6:WBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.92
Intersection Signal Delay: 32.0
Intersection LOS: C
Intersection Capacity Utilization 83.3%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
21: Sunrise Valley Dr & Hunter Mill Rd
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 36
Lanes, Volumes, Timings
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
74
1900
12
0
1900
12
0%
183
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
714
1900
12
0%
682
1900
12
227
1900
12
545
1900
12
0%
0
1900
12
65
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
0
1
25
Yes
206
1
25
0
1
25
35
693
13.5
1.00
100%
2%
0
1.00
100%
2%
0
25
406
11.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
74
Prot
4
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
183
custom
0
0
1.00
100%
2%
0
35
447
8.7
1.00
100%
2%
0
4
5.0
10.5
30.5
25.4%
4.0
1.5
0.0
5.5
5.0
10.5
30.5
25.4%
4.0
1.5
0.0
5.5
0.0
0.0%
0.0
4.0
None
10.5
0.09
0.48
61.6
0.0
61.6
E
None
10.5
0.09
0.60
15.7
0.0
15.7
B
55
103
0
68
1.00
100%
2%
0
0%
0
0
782
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
614
Perm
227
Prot
1
545
2
2
2
1
6
20.0
26.0
63.5
52.9%
4.0
2.0
0.0
6.0
Lag
20.0
26.0
63.5
52.9%
4.0
2.0
0.0
6.0
Lag
5.0
11.5
26.0
21.7%
4.0
2.5
0.0
6.5
Lead
20.0
26.0
89.5
74.6%
4.0
2.0
0.0
6.0
2
4
4
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
35
1671
32.6
0
0
25
Yes
C-Max C-Max
73.6
73.6
0.61
0.61
0.73
0.54
10.2
2.2
2.4
0.0
12.6
2.2
B
A
8.0
A
114
24
m678
m44
0
6
0.0
0.0%
0.0
4.0
None C-Max
17.9
98.0
0.15
0.82
0.86
0.36
52.6
4.9
0.0
0.9
52.6
5.8
D
A
19.6
B
128
132
#284 m192
Synchro 7 - Report
Page 37
Lanes, Volumes, Timings
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
369
0
0
0
0.20
EBT
613
EBR
WBL
WBT
326
6/5/2013
WBR
65
475
0
0
0
0.39
NBL
NBT
1591
NBR
SBL
1074
0
173
0
0.87
1133
0
0
0
0.54
206
288
0
0
0
0.79
SBT
367
SBR
1522
660
0
0
0.63
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.86
Intersection Signal Delay: 13.9
Intersection LOS: B
Intersection Capacity Utilization 83.1%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 38
Lanes, Volumes, Timings
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
231
1900
12
1
1900
12
0%
314
1900
12
239
1900
12
555
1900
12
0%
0
1900
12
0
1900
12
548
1900
12
0%
144
1900
12
0
0
25
Yes
0
1
25
0
0
25
Yes
120
1
25
0
0
25
Yes
0
0
25
0
0
25
35
452
8.8
25
854
23.3
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
231
Prot
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
4
5.0
11.0
25.0
20.8%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
28.0
23.3%
4.0
2.0
0.0
6.0
Lead
10.0
16.0
73.0
60.8%
4.0
2.0
0.0
6.0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
0.00
1.00
58.4
98.1
156.5
F
121.6
F
~2
#184
1.00
100%
2%
0
1.00
100%
2%
0
0%
555
175
#308
315
1.00
100%
2%
0
239
pm+pt
1
6
1
None
18.8
0.16
0.83
74.1
0.0
74.1
E
35
218
4.2
1
0%
0.0
0.0%
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
35
447
8.7
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
548
144
Perm
6
23
6
23
23
23
None C-Max
67.2
67.2
0.56
0.56
0.54
0.53
17.7
19.5
0.0
3.5
17.7
23.0
B
C
21.4
C
143
369
m140
394
0.0
0.0%
0.0
0.0%
67.0
55.8%
67.0
55.8%
0.0
4.0
0.0
4.0
0.0
6.0
0.0
6.0
64.3
0.54
0.55
4.7
2.0
6.7
A
5.6
A
59
m48
64.3
0.54
0.16
0.2
1.0
1.2
A
0
m0
Synchro 7 - Report
Page 39
Lanes, Volumes, Timings
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
372
EBR
WBL
WBT
774
280
0
0
0
0.82
314
0
64
0
1.26
6/5/2013
WBR
NBL
120
481
0
0
0
0.50
NBT
367
1043
382
69
0
0.84
NBR
SBL
SBT
138
SBR
998
295
0
0
0.78
914
573
0
0
0.42
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 37 (31%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.00
Intersection Signal Delay: 42.9
Intersection LOS: D
Intersection Capacity Utilization 75.0%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 41
Lanes, Volumes, Timings
24: Sunset Hills Rd & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBR
NBL
NBT
SBT
SBR
208
1900
12
0%
0
1
25
220
1900
12
595
1900
12
397
1900
12
0%
586
1900
12
0%
260
1900
12
370
1
25
Yes
0
2
25
35
385
7.5
1
1.00
100%
2%
0
?
?
1
4
6
5.0
11.0
28.0
23%
4.0
2.0
5.0
11.0
25.0
21%
4.0
2.0
10.0
16.0
73.0
61%
4.0
2.0
Lead
Lag
230
1
25
Yes
35
218
4.2
35
772
15.0
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
208
?
220
Perm
3
1.00
100%
2%
0
0%
0%
397
586
595
Prot
14
124
14
124
3
3
3
5.0
12.0
22.0
18.3%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
22.0
18.3%
4.0
3.0
0.0
7.0
Lead
None
15.0
0.12
0.94
99.5
0.0
99.5
F
54.7
D
162
#312
None
15.0
0.12
0.56
12.4
0.0
12.4
B
43.7
0.36
0.48
35.9
65.6
101.5
F
0
74
151
m191
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
53.0
44.2%
98.0
81.7%
0.0
6.0
0.0
6.0
92.0
0.77
0.28
2.0
1.3
3.2
A
62.2
E
30
m37
1.00
100%
2%
0
260
pm+ov
2
3
2
2
2
10.0
16.0
45.0
37.5%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
22.0
18.3%
4.0
3.0
0.0
7.0
Lead
C-Max
42.3
0.35
0.89
55.3
0.0
55.3
E
40.8
D
439
#679
None
56.3
0.47
0.32
8.3
0.0
8.3
A
None
None C-Max
44
98
Synchro 7 - Report
Page 43
Lanes, Volumes, Timings
24: Sunset Hills Rd & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
305
221
0
0
0
0.94
6/5/2013
EBR
NBL
NBT
138
SBT
692
370
390
0
0
0
0.56
1311
784
0
0
1.13
1394
759
0
0
0.63
656
0
0
0
0.89
SBR
?
?
?
230
813
0
0
0
0.32
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 37 (31%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.00
Intersection Signal Delay: 52.8
Intersection LOS: D
Intersection Capacity Utilization 75.2%
ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
24: Sunset Hills Rd & Hunter Mill Rd
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 44
Lanes, Volumes, Timings
1: Frying Pan Rd. & Sunrise
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
WBT
WBR
SBL
SBR
392
1900
12
847
1900
12
0%
962
1900
12
0%
39
1900
12
141
1900
12
0%
0
1
25
1472
1900
12
150
1
25
150
1
25
Yes
0
1
25
Yes
30
307
7.0
35
1595
31.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
392
Prot
1
847
962
6
2
1
6
2
2
2
4.0
9.0
31.0
20.7%
4.0
1.0
0.0
5.0
Lead
4.0
9.0
90.0
60.0%
4.0
1.0
0.0
5.0
4.0
9.0
59.0
39.3%
4.0
1.0
0.0
5.0
Lag
4.0
9.0
59.0
39.3%
4.0
1.0
0.0
5.0
Lag
4.0
9.0
60.0
40.0%
4.0
1.0
0.0
5.0
4.0
9.0
31.0
20.7%
4.0
1.0
0.0
5.0
Lead
None C-Max C-Max C-Max
26.0
85.0
54.0
54.0
0.17
0.57
0.36
0.36
0.66
0.80
1.43
0.07
63.9
33.1 239.7
24.8
0.0
0.0
0.0
0.0
63.9
33.1 239.7
24.8
E
C
F
C
42.9 231.3
D
F
186
637 ~1271
18
245
837 #1533
45
Max
55.0
0.37
0.22
33.9
0.0
33.9
C
277.9
F
95
150
None
86.0
0.57
1.60
301.3
0.0
301.3
F
1.00
100%
2%
0
30
275
6.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
39
Perm
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
141
1472
pm+ov
4
1
4
4
1
~2055
#2324
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
1: Frying Pan Rd. & Sunrise
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
150
595
0
0
0
0.66
6/5/2013
EBT
227
WBT
1515
1056
0
0
0
0.80
671
0
0
0
1.43
WBR
150
577
0
0
0
0.07
SBL
195
SBR
649
0
0
0
0.22
920
0
0
0
1.60
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 0 (0%), Referenced to phase 2:WBT and 6:EBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.60
Intersection Signal Delay: 190.2
Intersection LOS: F
Intersection Capacity Utilization 150.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
1: Frying Pan Rd. & Sunrise
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
2: Frying Pan Rd. & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
330
1900
12
299
1900
12
0%
226
1900
12
141
1900
12
281
1900
12
0%
52
1900
12
140
1900
12
727
1900
12
0%
113
1900
12
10
1900
12
1268
1900
12
0%
586
1900
12
155
1
25
Yes
310
1
25
400
1
25
Yes
205
1
25
390
1
25
Yes
375
1
25
225
2
25
35
232
4.5
1.00
100%
2%
0
1.00
100%
2%
0
35
1725
33.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
330
Prot
3
3
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
0%
299
226
pm+ov
8
1
8
8
8
141
Prot
7
7
281
52
pm+ov
4
5
4
4
4
5.0
12.0
33.0
23.6%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
21.0
15.0%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
23.0
16.4%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
21.0
15.0%
4.0
3.0
-4.0
3.0
Lead
None
21.9
0.16
0.62
60.0
0.0
60.0
E
None
28.1
0.20
0.80
69.8
0.0
69.8
E
53.8
D
257
367
None
50.4
0.36
0.37
23.6
0.0
23.6
C
None
16.9
0.12
0.66
73.8
0.0
73.8
E
None
25.9
0.18
0.16
11.8
0.0
11.8
B
101
167
123
198
None
23.1
0.16
0.48
56.0
0.0
56.0
E
56.5
E
120
174
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
5.0
12.0
31.0
22.1%
4.0
3.0
-4.0
3.0
Lead
146
191
1.00
100%
2%
0
0
35
140
Prot
1
1
5.0
12.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
727
113
pm+ov
6
7
6
6
6
15.0
38.0
65.0
46.4%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
21.0
15.0%
4.0
3.0
-4.0
3.0
Lead
None C-Max
19.4
83.2
0.14
0.59
0.57
0.24
56.6
6.1
0.0
0.0
56.6
6.1
E
A
12.8
B
102
61
m103 m112
None
103.1
0.74
0.09
1.7
0.0
1.7
A
6
m17
10
Prot
5
5
5.0
12.0
21.0
15.0%
4.0
3.0
-4.0
3.0
Lead
1268
586
pm+ov
2
3
2
2
2
15.0
38.0
61.0
43.6%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
31.0
22.1%
4.0
3.0
-4.0
3.0
Lead
None C-Max
9.7
63.7
0.07
0.46
0.08
0.79
52.9
37.9
0.0
0.0
52.9
37.9
D
D
29.6
C
9
283
m19
693
None
88.5
0.63
0.54
11.1
0.0
11.1
B
91
224
Synchro 7 - Report
Page 3
Lanes, Volumes, Timings
2: Frying Pan Rd. & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
225
687
0
0
0
0.48
EBT
152
399
0
0
0
0.75
6/5/2013
EBR
WBL
155
612
0
0
0
0.37
310
228
0
0
0
0.62
WBT
1645
589
0
0
0
0.48
WBR
NBL
400
337
0
0
0
0.15
205
278
0
0
0
0.50
NBT
1018
3023
0
0
0
0.24
NBR
SBL
390
1196
0
0
0
0.09
375
228
0
0
0
0.04
SBT
1018
SBR
1610
0
0
0
0.79
1076
0
0
0
0.54
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 112 (80%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 33.7
Intersection LOS: C
Intersection Capacity Utilization 79.7%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
2: Frying Pan Rd. & Centreville Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 4
Lanes, Volumes, Timings
3: Coppermine Rd. & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
370
1900
12
155
1900
12
0%
260
1900
12
76
1900
12
90
1900
12
0%
56
1900
12
59
1900
12
828
1900
12
0%
28
1900
12
76
1900
12
1377
1900
12
0%
242
1900
12
200
1
25
Yes
355
1
25
370
1
25
Yes
465
2
25
435
1
25
Yes
375
1
25
100
1
25
25
254
6.9
1.00
100%
2%
0
1.00
100%
2%
1
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
370
pm+pt
3
8
3
155
7.0
14.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
37.0
26.4%
4.0
3.0
-4.0
3.0
Lag
None
48.4
0.35
0.72
45.3
0.0
45.3
D
None
32.6
0.23
0.19
42.2
0.0
42.2
D
33.7
C
60
83
280
333
1.00
100%
2%
0
40
991
16.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
260
pm+ov
8
1
8
8
8
76
pm+pt
7
4
7
90
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
22.0
15.7%
4.0
3.0
-4.0
3.0
Lead
7.0
49.0
34.0
24.3%
4.0
3.0
-4.0
3.0
Lag
None
44.1
0.32
0.42
12.1
0.0
12.1
B
None
28.5
0.20
0.26
32.8
0.0
32.8
C
52
110
48
74
None
15.7
0.11
0.23
55.9
0.0
55.9
E
36.1
D
41
60
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
1
40
689
11.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
56
pm+ov
4
5
4
4
4
425
1
25
Yes
1.00
100%
2%
1
1.00
100%
2%
0
0%
59
Prot
1
856
0
6
76
Prot
5
1
6
5
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
15.0
39.0
61.0
43.6%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
15.0
42.0
62.0
44.3%
4.0
3.0
-4.0
3.0
Lag
7.0
14.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
None
32.8
0.23
0.14
8.8
0.0
8.8
A
None
10.9
0.08
0.22
72.4
0.0
72.4
E
None
14.1
0.10
0.43
65.2
0.0
65.2
E
28
55
C-Min
74.1
0.53
0.51
23.9
0.0
23.9
C
22.6
C
276
280
None
106.8
0.76
0.19
1.5
0.0
1.5
A
0
30
C-Min
68.5
0.49
0.27
16.1
0.0
16.1
B
19.7
B
88
152
0.0
0.0%
-1.0
3.0
67
120
1377
242
pm+ov
2
3
2
2
2
0
43
Synchro 7 - Report
Page 5
Lanes, Volumes, Timings
3: Coppermine Rd. & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
100
517
0
0
0
0.72
EBT
174
907
0
0
0
0.17
6/5/2013
EBR
WBL
200
639
0
0
0
0.41
355
376
0
0
0
0.20
WBT
684
784
0
0
0
0.11
WBR
NBL
370
441
0
0
0
0.13
465
392
0
0
0
0.15
NBT
911
3162
0
0
0
0.27
NBR
SBL
375
215
0
0
0
0.35
SBT
609
2699
0
0
0
0.51
SBR
425
1262
0
0
0
0.19
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 137 (98%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.72
Intersection Signal Delay: 25.1
Intersection LOS: C
Intersection Capacity Utilization 70.4%
ICU Level of Service C
Analysis Period (min) 15
Splits and Phases:
3: Coppermine Rd. & Centreville Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 6
Lanes, Volumes, Timings
4: Sunrise Valley Dr & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
794
1900
12
416
1900
12
0%
119
1900
12
578
1900
12
275
1900
12
-6%
529
1900
12
55
1900
12
1073
1900
12
1%
234
1900
12
550
1900
12
1402
1900
12
-1%
260
1900
12
0
0
25
Yes
285
2
25
305
1
25
Yes
420
2
25
0
1
25
Yes
280
2
25
520
2
25
35
836
16.3
2
1.00
100%
2%
0
1.00
100%
2%
0
35
852
16.6
1
5
1.00
100%
2%
0
1.00
100%
2%
0
0%
794
Split
3
535
1.00
100%
2%
0
40
951
16.2
4
7
1.00
100%
2%
1
1.00
100%
2%
0
0%
0
3
578
Split
4
275
4
3
3
4
4
4
4
5.0
50.0
45.0
30.0%
4.0
3.0
0.0
7.0
Lead
5.0
50.0
45.0
30.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
32.0
21.3%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
32.0
21.3%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
32.0
21.3%
4.0
3.0
0.0
7.0
Lag
None
37.4
0.25
0.93
72.2
0.0
72.2
E
None
37.4
0.25
0.62
51.1
0.0
51.1
D
63.7
E
234
298
None
25.6
0.17
0.96
88.9
0.0
88.9
F
None
25.6
0.17
0.44
58.6
0.0
58.6
E
113.1
F
129
177
None
25.6
0.17
1.24
160.0
7.8
167.8
F
391
#506
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
4.0
294
#418
40
698
11.9
8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
529
Perm
~490
#724
55
Prot
1
1
5.0
12.0
22.0
14.7%
4.0
3.0
0.0
7.0
Lead
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
1073
234
pm+ov
6
4
6
6
6
20.0
43.0
46.0
30.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
32.0
21.3%
4.0
3.0
0.0
7.0
Lag
None C-Max
7.9
39.0
0.05
0.26
0.31
0.82
72.4
58.1
0.0
2.8
72.4
60.8
E
E
52.6
D
27
363
51
421
None
64.6
0.43
0.32
10.1
0.0
10.1
B
51
88
550
Prot
5
1402
260
Perm
5
2
2
2
5.0
12.0
27.0
18.0%
4.0
3.0
0.0
7.0
Lead
20.0
42.0
51.0
34.0%
4.0
3.0
0.0
7.0
Lag
20.0
42.0
51.0
34.0%
4.0
3.0
0.0
7.0
Lag
2
None C-Max C-Max
20.0
53.7
53.7
0.13
0.36
0.36
1.20
0.77
0.38
168.6
48.8
18.0
0.0
0.0
0.0
168.6
48.8
18.0
F
D
B
75.0
E
~343
307
54
#465
393
135
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
4: Sunrise Valley Dr & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
520
870
0
0
0
0.91
EBT
756
EBR
882
0
0
0
0.61
6/5/2013
WBL
285
603
0
0
0
0.96
WBT
772
622
0
0
0
0.44
WBR
NBL
305
425
0
6
0
1.26
420
342
0
0
0
0.16
NBT
871
NBR
SBL
1316
0
146
0
0.92
721
0
0
0
0.32
280
460
0
0
0
1.20
SBT
618
SBR
1829
0
0
0
0.77
691
0
0
0
0.38
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 40 (27%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.24
Intersection Signal Delay: 76.1
Intersection LOS: E
Intersection Capacity Utilization 103.3%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
4: Sunrise Valley Dr & Centreville Rd.
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
5: Dulles Toll Rd. (S) & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
150
1900
12
1
1900
12
0%
124
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1735
1900
12
1%
891
1900
12
402
1900
12
1850
1900
12
-1%
0
1900
12
365
1
25
Yes
0
0
25
0
0
25
No
500
1
25
0
1
25
Yes
290
2
25
0
0
25
35
574
11.2
7
1.00
100%
2%
0
10
842
57.4
40
1210
20.6
7
1.00
100%
2%
0
1.00
100%
2%
0
2
1.00
100%
2%
0
0%
0
Split
4
151
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
124
Free
0
0
40
521
8.9
3
1.00
100%
2%
0
1.00
100%
2%
0
0
4
1735
891
Perm
4
4
6
6
6
5.0
12.0
32.5
21.7%
4.0
3.0
0.0
7.0
5.0
12.0
32.5
21.7%
4.0
3.0
0.0
7.0
20.0
26.5
78.5
52.3%
4.0
2.5
0.0
6.5
Lag
20.0
26.5
78.5
52.3%
4.0
2.5
0.0
6.5
Lag
None
None
18.1
0.12
0.71
80.4
0.0
80.4
F
44.2
D
144
214
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
6
Free
150.0
1.00
0.08
0.1
0.0
0.1
A
1.00
100%
2%
0
0%
0
0
0
25
No
C-Max C-Max
88.6
88.6
0.59
0.59
0.58
0.80
13.4
11.2
0.0
0.0
13.4
11.2
B
B
12.7
B
176
87
230
231
402
Prot
5
1850
5
2
5.0
12.0
39.0
26.0%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
117.5
78.3%
4.0
2.5
0.0
6.5
0
2
0.0
0.0%
0.0
4.0
Min C-Max
22.8 118.4
0.15
0.79
0.77
0.66
84.9
1.3
0.0
0.7
84.9
1.9
F
A
16.7
B
200
14
m181
m58
Synchro 7 - Report
Page 3
Lanes, Volumes, Timings
5: Dulles Toll Rd. (S) & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
494
302
0
0
0
0.50
EBR
6/5/2013
WBL
WBT
762
WBR
365
1561
0
0
0
0.08
NBL
NBT
1130
NBR
SBL
2988
0
0
0
0.58
1115
0
0
0
0.80
290
736
0
0
0
0.55
SBT
441
SBR
2808
538
0
0
0.81
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 88 (59%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 16.1
Intersection LOS: B
Intersection Capacity Utilization 102.3%
ICU Level of Service G
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
5: Dulles Toll Rd. (S) & Centreville Rd.
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 4
Lanes, Volumes, Timings
6: Dulles Toll Rd. (N) & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
609
1900
12
12
1900
12
0%
421
1900
12
408
1900
12
1477
1900
12
3%
0
1900
12
0
1900
12
1645
1900
12
-2%
379
1900
12
0
0
25
No
0
1
25
0
1
25
Yes
155
1
25
0
0
25
No
0
0
25
0
0
25
10
1144
78.0
7
1.00
100%
2%
0
30
902
20.5
40
521
8.9
0
1
25
Yes
40
847
14.4
6
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
49%
311
Split
4
310
1.00
100%
2%
0
1.00
100%
2%
0
0%
421
Perm
4
4
4
4
4
5.0
12.0
43.5
29.0%
4.0
3.0
0.0
7.0
5.0
12.0
43.5
29.0%
4.0
3.0
0.0
7.0
5.0
12.0
43.5
29.0%
4.0
3.0
0.0
7.0
None
36.5
0.24
0.76
65.9
0.0
65.9
E
None
36.5
0.24
0.75
65.5
0.0
65.5
E
74.7
E
298
421
None
36.5
0.24
0.98
87.9
0.0
87.9
F
300
423
1.00
100%
2%
0
368
#594
408
pm+pt
1
6
1
1477
5.0
12.0
33.0
22.0%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1645
379
Perm
6
2
6
2
2
2
20.0
26.5
106.5
71.0%
4.0
2.5
0.0
6.5
20.0
26.5
73.5
49.0%
4.0
2.5
0.0
6.5
Lag
20.0
26.5
73.5
49.0%
4.0
2.5
0.0
6.5
Lag
None C-Max
99.5 100.0
0.66
0.67
1.16
0.44
141.1
20.0
0.0
0.5
141.1
20.5
F
C
46.6
D
~433
328
#647
374
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
C-Max C-Max
67.0
67.0
0.45
0.45
1.03
0.46
71.1
14.0
0.0
0.0
71.1
14.0
E
B
60.4
E
~903
108
#1042
196
Synchro 7 - Report
Page 5
Lanes, Volumes, Timings
6: Dulles Toll Rd. (N) & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
1064
EBR
6/5/2013
WBL
WBT
822
WBR
NBL
409
0
0
0
0.76
411
0
0
0
0.75
428
0
0
0
0.98
155
351
0
0
0
1.16
NBT
441
3339
1271
0
0
0.71
NBR
SBL
SBT
767
SBR
1597
0
0
0
1.03
830
0
0
0
0.46
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 44 (29%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.16
Intersection Signal Delay: 58.2
Intersection LOS: E
Intersection Capacity Utilization 102.3%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
6: Dulles Toll Rd. (N) & Centreville Rd.
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 6
Lanes, Volumes, Timings
7: Sunrise Valley Dr & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
419
1900
12
381
1900
12
0%
198
1900
12
456
1900
12
550
1900
12
0%
528
1900
12
102
1900
12
1712
1900
12
0%
94
1900
12
350
1900
12
1788
1900
12
0%
408
1900
12
275
1
25
Yes
245
1
25
215
1
25
Yes
400
2
25
400
1
25
Yes
340
1
25
240
2
25
35
942
18.4
1.00
100%
2%
0
1.00
100%
2%
0
35
761
14.8
1.00
100%
2%
0
1.00
100%
2%
0
198
Perm
28%
328
Split
4
0%
419
Split
3
381
1.00
100%
2%
0
50
3688
50.3
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
3
678
1.00
100%
2%
0
50
1585
21.6
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
528
Perm
4
102
Prot
1
1712
94
Perm
6
3
3
7.0
14.0
36.5
16.6%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
36.5
16.6%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
36.5
16.6%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
52.0
23.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
52.0
23.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
52.0
23.6%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
18.0
8.2%
4.0
3.0
0.0
7.0
Lead
None
28.8
0.13
0.93
121.9
0.0
121.9
F
None
28.8
0.13
0.82
108.2
0.0
108.2
F
104.1
F
287
356
None
28.8
0.13
0.68
58.2
0.0
58.2
E
None
45.7
0.21
0.98
128.1
0.0
128.1
F
None
45.7
0.21
1.23
171.7
0.0
171.7
F
143
250
530
#789
None
45.7
0.21
0.97
112.1
0.0
112.1
F
136.1
F
547
#696
None C-Max C-Max
10.0
94.0
94.0
0.05
0.43
0.43
0.65
1.13
0.13
122.4 123.6
18.2
0.0
0.0
0.0
122.4 123.6
18.2
F
F
B
118.4
F
76 ~1509
37
115 #1630
82
315
#417
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
4
4
4
1
6
6
6
20.0
27.5
101.5
46.1%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
101.5
46.1%
5.0
2.5
0.0
7.5
Lag
~792
#1050
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
3
3
4
395
1
25
Yes
350
Prot
5
1788
408
Perm
5
2
2
2
5.0
12.0
30.0
13.6%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
113.5
51.6%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
113.5
51.6%
5.0
2.5
0.0
7.5
Lag
2
None C-Max C-Max
23.0 107.0 107.0
0.10
0.49
0.49
0.97
1.04
0.46
117.6
66.0
14.7
0.0
0.0
0.0
117.6
66.0
14.7
F
E
B
64.9
E
273 ~1477
206
#387 #1575
255
Synchro 7 - Report
Page 7
Lanes, Volumes, Timings
7: Sunrise Valley Dr & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
240
460
0
0
0
0.91
EBT
862
475
0
0
0
0.80
EBR
WBL
275
296
0
0
0
0.67
245
334
0
0
0
0.98
6/5/2013
WBT
681
698
0
0
0
0.97
WBR
NBL
215
429
0
0
0
1.23
400
172
0
0
0
0.59
NBT
3608
1512
0
0
0
1.13
NBR
SBL
400
697
0
0
0
0.13
340
359
0
0
0
0.97
SBT
1505
1721
0
0
0
1.04
SBR
395
878
0
0
0
0.46
Intersection Summary
Area Type:
Other
Cycle Length: 220
Actuated Cycle Length: 220
Offset: 183 (83%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.23
Intersection Signal Delay: 100.7
Intersection LOS: F
Intersection Capacity Utilization 112.0%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
7: Sunrise Valley Dr & Fairfax County Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 8
Lanes, Volumes, Timings
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
511
1900
12
0
1900
12
0%
162
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
2463
1900
12
0%
180
1900
12
364
1900
12
2308
1900
12
0%
0
1900
12
220
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
640
1
25
Yes
325
2
25
160
1
25
35
414
8.1
35
491
9.6
50
1585
21.6
0
0
25
Yes
50
713
9.7
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
511
Prot
3
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
162
custom
0
0
1.00
100%
2%
0
1.00
100%
2%
0
3
5.0
12.0
26.5
24.1%
4.0
3.0
0.0
7.0
5.0
12.0
26.5
24.1%
4.0
3.0
0.0
7.0
0.0
0.0%
0.0
4.0
None
18.7
0.17
0.88
61.5
280.0
341.5
F
None
18.7
0.17
0.58
48.0
0.0
48.0
D
181
#263
98
169
1.00
100%
2%
0
0%
0
0
2463
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
180
Perm
364
Prot
5
2308
6
6
6
5
2
20.0
27.5
53.5
48.6%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
53.5
48.6%
5.0
2.5
0.0
7.5
Lag
5.0
12.0
30.0
27.3%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
83.5
75.9%
5.0
2.5
0.0
7.5
6
3
3
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
4
C-Max C-Max
53.8
53.8
0.49
0.49
0.99
0.21
29.6
3.5
0.0
0.0
29.6
3.5
C
A
27.9
C
~680
14
m551
m10
0
2
0.0
0.0%
0.0
4.0
None C-Max
16.0
76.8
0.15
0.70
0.73
0.65
24.3
11.3
0.0
0.7
24.3
12.0
C
B
13.7
B
96
460
m68 m473
Synchro 7 - Report
Page 9
Lanes, Volumes, Timings
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
160
609
0
294
0
1.62
EBT
334
EBR
WBL
WBT
411
WBR
220
290
0
0
0
0.56
6/5/2013
NBL
NBT
1505
2487
0
0
0
0.99
NBR
SBL
640
866
0
0
0
0.21
325
718
0
0
0
0.51
SBT
633
SBR
3550
799
0
0
0.84
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 74 (67%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.99
Intersection Signal Delay: 48.8
Intersection LOS: D
Intersection Capacity Utilization 104.4%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 10
Lanes, Volumes, Timings
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
660
1900
12
0
1900
12
0%
676
1900
12
365
1900
12
2603
1900
12
0%
0
1900
12
0
1900
12
2007
1900
12
0%
572
1900
12
0
0
25
Yes
185
1
25
0
1
25
Yes
185
2
25
0
0
25
Yes
0
0
25
0
0
25
25
568
15.5
25
890
24.3
5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
660
Prot
4
50
1458
19.9
5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0.0
0.0%
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
50
713
9.7
670
1
25
Yes
0
676
custom
4
7.0
14.0
36.0
32.7%
4.0
3.0
0.0
7.0
7.0
14.0
36.0
32.7%
4.0
3.0
0.0
7.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
0.0
0.0%
1.00
100%
2%
0
None
29.0
0.26
0.73
42.5
0.0
42.5
D
None
29.0
0.26
1.64
328.3
0.0
328.3
F
219
285
~698
#927
1.00
100%
2%
0
1.00
100%
2%
0
0%
365
Prot
1
2603
6
2
1
6
2
2
2
5.0
12.0
28.0
25.5%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
74.0
67.3%
5.0
2.0
0.0
7.0
20.0
27.0
46.0
41.8%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
46.0
41.8%
5.0
2.0
0.0
7.0
Lag
None C-Max
16.0
67.0
0.15
0.61
0.73
0.84
27.1
22.2
0.0
26.5
27.1
48.7
C
D
46.1
D
107
723
m87 m689
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
2007
572
Perm
C-Max C-Max
44.0
44.0
0.40
0.40
0.99
0.59
36.3
2.8
0.0
0.0
36.3
2.8
D
A
28.9
C
402
0
#667
53
Synchro 7 - Report
Page 11
Lanes, Volumes, Timings
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
EBR
WBL
185
905
0
5
0
0.73
WBT
810
6/5/2013
WBR
NBL
412
0
0
0
1.64
185
655
0
0
0
0.56
NBT
633
3097
624
0
0
1.05
NBR
SBL
SBT
1378
2034
0
0
0
0.99
SBR
670
976
0
0
0
0.59
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 14 (13%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.64
Intersection Signal Delay: 67.0
Intersection LOS: E
Intersection Capacity Utilization 104.4%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 12
Lanes, Volumes, Timings
10: Spring Street & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBR
NBL
NBT
SBT
SBR
415
1900
12
0%
215
1
25
365
1900
12
377
1900
12
2582
1900
12
0%
1849
1900
12
0%
226
1900
12
0
1
25
Yes
650
2
25
25
754
20.6
550
1
25
Yes
50
427
5.8
50
557
7.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
377
Prot
5
2582
1849
2
6
8
5
2
6
6
6
7.0
14.0
23.0
20.9%
4.0
3.0
0.0
7.0
5.0
12.0
33.0
30.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
87.0
79.1%
5.0
2.0
0.0
7.0
20.0
27.0
54.0
49.1%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
54.0
49.1%
5.0
2.0
0.0
7.0
Lag
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
415
365
Free
8
Free
None
15.7
0.14
0.85
63.0
0.0
63.0
E
33.7
C
148
#224
0.0
0.0%
0.0
4.0
110.0
1.00
0.23
0.3
0.0
0.3
A
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0
0
1.00
100%
2%
0
226
Perm
None C-Max C-Max C-Max
17.3
80.3
56.0
56.0
0.16
0.73
0.51
0.51
0.70
0.70
0.71
0.25
45.7
10.0
23.4
2.9
0.0
0.0
0.0
0.0
45.7
10.0
23.4
2.9
D
A
C
A
14.5
21.1
B
C
143
264
357
0
m148 m295
453
41
Synchro 7 - Report
Page 13
Lanes, Volumes, Timings
10: Spring Street & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
674
215
499
0
0
0
0.83
EBR
NBL
1583
0
0
0
0.23
650
811
0
0
0
0.46
6/5/2013
NBT
347
SBT
477
3713
0
0
0
0.70
2589
0
0
0
0.71
SBR
550
917
0
0
0
0.25
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 4 (4%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.85
Intersection Signal Delay: 19.5
Intersection LOS: B
Intersection Capacity Utilization 75.8%
ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
10: Spring Street & Fairfax County Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 14
Lanes, Volumes, Timings
11: Sunrise Valley Dr & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
350
1900
12
318
1900
12
0%
109
1900
12
435
1900
12
339
1900
12
0%
683
1900
12
45
1900
12
953
1900
12
0%
70
1900
12
559
1900
12
1679
1900
12
0%
112
1900
12
0
0
25
Yes
155
1
25
220
1
25
Yes
435
2
25
415
1
25
Yes
720
2
25
260
1
25
35
683
13.3
1
1.00
100%
2%
0
1.00
100%
2%
0
35
419
8.2
1
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
26%
259
Split
3
518
1.00
100%
2%
0
45
1245
18.9
2
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
3
42%
252
Split
4
522
1.00
100%
2%
0
45
1208
18.3
1
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
683
Perm
4
45
Prot
1
953
70
Perm
1
6
6
6
5
20.0
35.5
61.5
34.2%
4.5
2.0
0.0
6.5
Lag
20.0
35.5
61.5
34.2%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
40.0
22.2%
4.0
3.0
0.0
7.0
Lead
6
3
3
4
4
8.0
42.0
39.5
21.9%
4.0
3.0
0.0
7.0
Lead
8.0
42.0
39.5
21.9%
4.0
3.0
0.0
7.0
Lead
8.0
15.0
39.0
21.7%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
39.0
21.7%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
39.0
21.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
None
31.0
0.17
0.94
111.6
0.0
111.6
F
None
31.0
0.17
0.91
91.1
0.0
91.1
F
98.0
F
323
#419
None
33.5
0.19
0.84
94.4
0.0
94.4
F
None
33.5
0.19
0.84
83.7
0.0
83.7
F
133.4
F
335
#436
None
33.5
0.19
1.32
185.8
0.0
185.8
F
None C-Max C-Max
7.9
56.4
56.4
0.04
0.31
0.31
0.30
0.86
0.13
88.0
67.3
9.2
0.0
0.0
0.0
88.0
67.3
9.2
F
E
A
64.3
E
27
567
0
51
660
42
332
#520
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
4.0
324
#507
~765
#1024
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
0.0
0.0%
430
1
25
Yes
559
Prot
5
1679
112
pm+ov
2
3
2
2
3
20.0
35.5
84.5
46.9%
4.5
2.0
0.0
6.5
Lag
8.0
42.0
39.5
21.9%
4.0
3.0
0.0
7.0
Lead
None C-Max
31.6
82.7
0.18
0.46
0.93
1.03
84.5
59.7
0.0
0.0
84.5
59.7
F
E
62.8
E
330 ~1143
m151 m331
None
113.2
0.63
0.11
0.4
0.0
0.4
A
1
m0
Synchro 7 - Report
Page 15
Lanes, Volumes, Timings
11: Sunrise Valley Dr & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
260
291
0
0
0
0.89
EBT
603
598
0
0
0
0.87
EBR
6/5/2013
WBL
155
300
0
0
0
0.84
WBT
339
621
0
0
0
0.84
WBR
NBL
220
519
0
0
0
1.32
435
191
0
0
0
0.24
NBT
1165
1108
0
0
0
0.86
NBR
SBL
415
537
0
0
0
0.13
720
629
0
0
0
0.89
SBT
1128
1626
0
0
0
1.03
SBR
430
1039
0
0
0
0.11
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 10 (6%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.32
Intersection Signal Delay: 86.1
Intersection LOS: F
Intersection Capacity Utilization 103.6%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
11: Sunrise Valley Dr & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 16
Lanes, Volumes, Timings
12: EB Toll Rd Off-Ramp & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
310
1900
12
0
1900
12
0%
192
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1586
1900
12
0%
209
1900
12
753
1900
12
2272
1900
12
0%
0
1900
12
400
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
625
1
25
Yes
0
0
25
0
2
25
25
573
15.6
4
1.00
100%
2%
0
40
339
5.8
45
662
10.0
3
1.00
100%
2%
0
1.00
100%
2%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
192
Free
45
160
2.4
1
0%
310
Prot
4
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1586
209
Free
0
Perm
Free
2
20.0
26.5
141.0
78.3%
4.5
2.0
0.0
6.5
4
6
7.0
13.5
39.0
21.7%
4.0
2.5
0.0
6.5
20.0
26.5
141.0
78.3%
4.5
2.0
0.0
6.5
20.0
26.5
141.0
78.3%
4.5
2.0
0.0
6.5
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
180.0
1.00
0.12
0.2
0.0
0.2
A
186
235
0
0
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
C-Max
145.4
0.81
0.55
6.0
0.0
6.0
A
5.3
A
253
m325
1.00
100%
2%
0
3025
0
2
2
2
0.0
0.0%
1.00
100%
2%
0
0%
6
Free
None
21.6
0.12
0.75
88.1
0.0
88.1
F
0
0
25
Yes
0.0
0.0%
0.0
4.0
0.0
0.0%
0.0
4.0
C-Max C-Max
145.4
0.81
3.77dl
546.3
40.1
586.3
F
586.3
F
0
~3027
m0
m#2934
180.0
1.00
0.13
0.0
0.0
0.0
A
Synchro 7 - Report
Page 17
Lanes, Volumes, Timings
12: EB Toll Rd Off-Ramp & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
620
0
0
0
0.50
EBT
493
EBR
WBL
6/5/2013
WBT
259
WBR
400
1563
0
0
0
0.12
NBL
NBT
582
2858
0
0
0
0.55
NBR
625
1564
0
0
0
0.13
SBL
SBT
80
SBR
1395
55
0
0
2.26
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 32 (18%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.17
Intersection Signal Delay: 340.2
Intersection LOS: F
Intersection Capacity Utilization 152.0%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
dl Defacto Left Lane. Recode with 1 though lane as a left lane.
Splits and Phases:
12: EB Toll Rd Off-Ramp & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 18
Lanes, Volumes, Timings
13: WB Toll Rd On-Ramp & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
454
1900
12
0
1900
12
0%
406
1900
12
321
1900
12
1571
1900
12
0%
0
1900
12
0
1900
12
2546
1900
12
0%
771
1900
12
0
0
25
Yes
0
1
25
50
1
25
Yes
645
1
25
0
0
25
Yes
0
0
25
0
0
25
35
427
8.3
25
1052
28.7
45
649
9.8
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
50%
227
Split
4
227
4
4
4
4
4
7.0
13.5
44.0
24.4%
4.0
2.5
0.0
6.5
7.0
13.5
44.0
24.4%
4.0
2.5
0.0
6.5
7.0
13.5
44.0
24.4%
4.0
2.5
0.0
6.5
None
37.5
0.21
0.65
75.0
0.7
75.7
E
None
37.5
0.21
0.65
75.0
0.7
75.7
E
99.0
F
262
370
None
37.5
0.21
1.08
123.1
2.1
125.2
F
262
370
45
847
12.8
1
1.00
100%
2%
0
1.00
100%
2%
0
1
1.00
100%
2%
0
0%
406
Perm
~475
#705
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
321
Prot
1
1571
6
2
1
6
2
2
2
5.0
12.0
45.5
25.3%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
136.0
75.6%
4.5
2.0
0.0
6.5
20.0
26.5
90.5
50.3%
4.5
2.0
0.0
6.5
Lag
20.0
26.5
90.5
50.3%
4.5
2.0
0.0
6.5
Lag
None C-Max
35.3 129.5
0.20
0.72
0.92
0.62
93.6
11.1
0.0
0.2
93.6
11.3
F
B
25.2
C
401
450
#546
447
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
2546
771
Perm
C-Max C-Max
87.2
87.2
0.48
0.48
1.03
0.83
56.0
19.7
239.5
1.1
295.5
20.8
F
C
231.7
F
~1201
304
m710 m263
Synchro 7 - Report
Page 19
Lanes, Volumes, Timings
13: WB Toll Rd On-Ramp & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
347
EBR
6/5/2013
WBL
WBT
972
350
0
19
0
0.69
350
0
19
0
0.69
WBR
NBL
50
377
0
2
0
1.08
645
379
0
0
0
0.85
NBT
569
2546
304
129
0
0.70
NBR
SBL
SBT
767
SBR
2462
105
846
0
1.58
926
41
0
0
0.87
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 150 (83%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.08
Intersection Signal Delay: 148.5
Intersection LOS: F
Intersection Capacity Utilization 96.2%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
13: WB Toll Rd On-Ramp & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 20
Lanes, Volumes, Timings
14: Sunset Hills Rd & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
185
1900
12
564
1900
12
0%
907
1900
12
726
1900
12
844
1900
12
0%
583
1900
12
363
1900
12
1765
1900
12
0%
127
1900
12
194
1900
12
1461
1900
12
0%
52
1900
12
275
1
25
Yes
550
2
25
0
1
25
Yes
480
2
25
470
1
25
Yes
300
2
25
290
2
25
35
506
9.9
7
1.00
100%
2%
0
1.00
100%
2%
0
35
569
11.1
7
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
185
Prot
3
564
1.00
100%
2%
0
45
847
12.8
3
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
907
Perm
8
726
Prot
7
844
583
Perm
4
3
8
6.0
13.0
24.5
13.6%
4.0
3.0
0.0
7.0
Lead
6.0
49.0
44.0
24.4%
4.0
3.0
0.0
7.0
Lag
6.0
49.0
44.0
24.4%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
43.5
24.2%
4.0
3.0
0.0
7.0
Lead
6.0
54.0
63.0
35.0%
4.0
3.0
0.0
7.0
Lag
6.0
54.0
63.0
35.0%
4.0
3.0
0.0
7.0
Lag
None
14.0
0.08
0.69
94.3
0.0
94.3
F
None
37.0
0.21
0.54
66.1
0.0
66.1
E
309.8
F
221
266
None
37.0
0.21
1.99
481.0
24.3
505.3
F
None
36.5
0.20
1.04
113.0
0.0
113.0
F
None
59.5
0.33
0.89
53.2
0.0
53.2
D
~1503
#1772
~476
#609
None
59.5
0.33
0.72
57.7
0.0
57.7
E
75.1
E
464
561
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
45
794
12.0
2
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
8
8
111
155
1.00
100%
2%
0
7
4
4
4
445
1
25
Yes
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
363
Prot
1
1765
127
Perm
1
6
6
6
5
5.0
12.0
28.0
15.6%
4.0
3.0
0.0
7.0
Lead
20.0
44.5
69.5
38.6%
4.5
2.0
0.0
6.5
Lag
20.0
44.5
69.5
38.6%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
23.0
12.8%
4.0
3.0
0.0
7.0
Lead
6
None C-Max C-Max
20.6
65.0
65.0
0.11
0.36
0.36
0.92
0.96
0.20
91.8
58.6
6.6
0.0
0.3
0.0
91.8
58.9
6.6
F
E
A
61.2
E
463
211
781
30
#729 m#288 m#849
m53
194
Prot
5
1461
52
pm+ov
2
3
2
2
2
20.0
44.5
64.5
35.8%
4.5
2.0
0.0
6.5
Lag
6.0
13.0
24.5
13.6%
4.0
3.0
0.0
7.0
Lead
None C-Max
14.0
58.4
0.08
0.32
0.73
0.89
111.1
38.4
0.0
56.5
111.1
94.9
F
F
94.0
F
119
262
m163
395
None
71.9
0.40
0.08
3.7
0.0
3.7
A
3
m8
Synchro 7 - Report
Page 21
Lanes, Volumes, Timings
14: Sunset Hills Rd & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
334
0
0
0
0.55
EBT
426
1045
0
0
0
0.54
6/5/2013
EBR
WBL
275
455
0
12
0
2.05
550
696
0
0
0
1.04
WBT
489
WBR
NBL
1169
0
0
0
0.72
654
0
0
0
0.89
480
401
0
0
0
0.91
NBT
767
1836
5
0
0
0.96
NBR
SBL
470
640
0
0
0
0.20
300
305
0
0
0
0.64
SBT
714
1650
0
349
0
1.12
SBR
445
639
0
0
0
0.08
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 144 (80%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.99
Intersection Signal Delay: 125.2
Intersection LOS: F
Intersection Capacity Utilization 126.4%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
14: Sunset Hills Rd & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 22
Lanes, Volumes, Timings
15: Bluemont Way & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
111
1900
12
12
1900
12
0%
430
1900
8
1
1900
12
10
1900
12
0%
8
1900
12
435
1900
12
2014
1900
12
0%
30
1900
12
19
1900
12
1437
1900
12
0%
57
1900
12
0
1
25
Yes
0
1
25
0
0
25
Yes
380
1
25
550
1
25
Yes
390
1
25
290
1
25
25
1182
32.2
9
1.00
100%
2%
0
1.00
100%
2%
0
25
258
7.0
8
7
1.00
100%
2%
0
1.00
100%
2%
0
0%
111
pm+pt
7
4
7
12
7.0
14.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
4.0
49.0
25.0
13.9%
4.0
3.0
0.0
7.0
Lag
None
14.8
0.08
0.82
119.7
0.0
119.7
F
None
7.9
0.04
0.15
84.2
0.0
84.2
F
64.4
E
14
38
~151
195
8
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
430
pm+ov
4
1
4
4
1
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
45
794
12.0
1
pm+pt
3
8
3
18
10.0
17.0
45.0
25.0%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
45
523
7.9
6
5
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
8
435
Prot
1
8
1
5.0
12.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
25.0
13.9%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
45.0
25.0%
4.0
3.0
0.0
7.0
Lead
None
59.7
0.33
0.80
49.6
0.0
49.6
D
None
12.5
0.07
0.01
68.0
0.0
68.0
E
369
464
1
7
None
5.9
0.03
0.28
66.8
0.0
66.8
E
66.8
E
12
42
0.0
0.0%
0.0
4.0
285
1
25
Yes
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
2014
30
pm+ov
6
3
6
6
3
19
Prot
5
5
1437
57
pm+ov
2
7
2
2
7
20.0
39.0
121.0
67.2%
5.0
2.0
0.0
7.0
Lag
5.0
12.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
20.0
42.0
93.0
51.7%
5.0
2.0
0.0
7.0
Lag
7.0
14.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
None C-Max
54.8 139.0
0.30
0.77
0.81
0.51
95.4
3.7
0.0
0.1
95.4
3.8
F
A
19.8
B
541
153
m581 m169
None
148.6
0.83
0.02
0.2
0.0
0.2
A
None C-Max
6.6
86.0
0.04
0.48
0.29
0.59
90.3
26.9
0.0
0.6
90.3
27.5
F
C
27.5
C
21
497
52
378
None
96.0
0.53
0.07
5.5
0.0
5.5
A
0
m0
6
13
Synchro 7 - Report
Page 23
Lanes, Volumes, Timings
15: Bluemont Way & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
135
0
0
0
0.82
6/5/2013
EBT
1102
EBR
WBL
WBT
178
186
0
0
0
0.06
540
0
0
0
0.80
152
0
0
0
0.01
178
0
0
0
0.10
WBR
NBL
380
539
0
0
0
0.81
NBT
714
3927
646
0
0
0.61
NBR
SBL
550
1293
0
0
0
0.02
390
98
0
0
0
0.19
SBT
443
2431
542
0
0
0.76
SBR
285
848
0
0
0
0.07
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 179 (99%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.82
Intersection Signal Delay: 27.9
Intersection LOS: C
Intersection Capacity Utilization 88.8%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
15: Bluemont Way & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 24
Lanes, Volumes, Timings
16: New Dominion Pkwy & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
155
1900
12
216
1900
12
0%
374
1900
12
149
1900
12
210
1900
12
0%
221
1900
12
521
1900
12
1502
1900
12
0%
242
1900
12
160
1900
12
820
1900
12
0%
73
1900
12
275
1
25
Yes
95
1
25
165
1
25
Yes
500
2
25
445
1
25
Yes
205
1
25
270
1
25
25
722
19.7
2
1.00
100%
2%
0
1.00
100%
2%
0
25
408
11.1
3
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
155
pm+pt
3
8
3
216
5.0
12.0
24.0
13.3%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lag
None
39.6
0.22
0.68
67.5
0.0
67.5
E
None
24.1
0.13
0.87
106.9
0.0
106.9
F
54.3
D
252
#366
147
207
2
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
374
pm+ov
8
1
8
8
8
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
45
521
7.9
1.00
100%
2%
0
45
423
6.4
1
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
149
pm+pt
7
4
7
210
221
pm+ov
4
5
4
4
4
5.0
12.0
37.0
20.6%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
30.0
16.7%
4.0
3.0
0.0
7.0
Lead
5.0
47.0
40.0
22.2%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lead
None
53.3
0.30
0.38
18.5
0.0
18.5
B
None
41.8
0.23
0.66
65.8
0.0
65.8
E
None
46.4
0.26
0.49
39.7
0.0
39.7
D
73
121
141
200
None
25.1
0.14
0.81
97.3
0.0
97.3
F
67.2
E
245
331
156
218
521
Prot
1
1
5.0
12.0
37.0
20.6%
4.0
3.0
0.0
7.0
Lead
65
1
25
Yes
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
1502
242
pm+ov
6
7
6
6
6
20.0
39.0
82.0
45.6%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
30.0
16.7%
4.0
3.0
0.0
7.0
Lead
None C-Max
29.3
90.1
0.16
0.50
0.93
0.59
99.9
20.1
0.0
0.3
99.9
20.4
F
C
36.8
D
283
264
#412
307
None
106.7
0.59
0.24
2.2
0.2
2.3
A
15
37
160
Prot
5
5
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lead
820
73
pm+ov
2
3
2
2
2
20.0
47.0
79.0
43.9%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
24.0
13.3%
4.0
3.0
0.0
7.0
Lead
None C-Max
21.2
82.0
0.12
0.46
0.77
0.35
99.5
33.4
0.0
0.0
99.5
33.4
F
C
41.9
D
186
234
267
293
None
97.6
0.54
0.08
10.5
0.0
10.5
B
19
50
Synchro 7 - Report
Page 25
Lanes, Volumes, Timings
16: New Dominion Pkwy & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
270
243
0
0
0
0.64
EBT
642
280
0
0
0
0.77
EBR
WBL
275
1009
0
0
0
0.37
95
287
0
0
0
0.52
6/5/2013
WBT
328
342
0
0
0
0.61
WBR
NBL
165
489
0
0
0
0.45
500
572
0
0
0
0.91
NBT
441
2544
447
0
0
0.72
NBR
SBL
445
1008
238
0
0
0.31
205
266
0
0
0
0.60
SBT
343
2317
0
0
0
0.35
SBR
65
860
0
0
0
0.08
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 164 (91%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.93
Intersection Signal Delay: 44.6
Intersection LOS: D
Intersection Capacity Utilization 92.6%
ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
16: New Dominion Pkwy & Reston Parkway
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 26
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
WBT
WBR
SBL
SBR
605
1900
12
273
1900
12
0%
408
1900
12
0%
941
1900
12
833
1900
12
0%
0
2
25
1250
1900
12
210
1
25
0
1
25
Yes
35
2307
44.9
35
621
12.1
1
1.00
100%
2%
0
35
623
12.1
2
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
0%
605
Prot
1
273
408
833
1
12
10.0
17.0
40.0
28.6%
4.0
3.0
0.0
7.0
Lead
12
86.0
61.4%
None
29.6
0.21
0.83
63.4
0.0
63.4
E
272
334
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
7.0
78.0
0.56
0.26
16.7
0.0
16.7
B
48.9
D
122
176
1.00
100%
2%
0
941
pm+ov
2
3
2
2
2
15.0
39.0
46.0
32.9%
4.0
3.0
0.0
7.0
Lag
5.0
29.0
54.0
38.6%
4.0
3.0
0.0
7.0
0
1
25
Yes
1250
Free
3
Free
3
5.0
29.0
54.0
38.6%
4.0
3.0
0.0
7.0
None C-Max C-Max
41.3
96.4
48.0
0.30
0.69
0.34
0.74
0.86
0.71
54.4
26.3
30.6
0.0
0.0
0.0
54.4
26.3
30.6
D
C
C
34.8
21.7
C
C
336
597
348
473
#969
269
0.0
0.0%
0.0
4.0
140.0
1.00
0.80
15.7
0.0
15.7
B
482
552
Synchro 7 - Report
Page 27
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
809
0
0
0
0.75
6/5/2013
EBT
2227
WBT
541
WBR
SBL
543
SBR
1019
0
0
0
0.27
550
0
0
0
0.74
1100
0
0
0
0.86
1178
0
0
0
0.71
1563
0
0
0
0.80
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 74 (53%), Referenced to phase 3:SBL, Start of Yellow
Natural Cycle: 85
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.86
Intersection Signal Delay: 31.3
Intersection LOS: C
Intersection Capacity Utilization 87.2%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
17: Sunrise Valley Dr & Wiehle Ave
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 28
Lanes, Volumes, Timings
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
113
1900
12
3
1900
12
0%
161
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1303
1900
12
0%
284
1900
12
476
1900
12
1776
1900
12
0%
0
1900
12
450
1
25
No
0
0
25
0
0
25
Yes
235
2
25
435
1
25
Yes
0
0
25
450
1
25
25
764
20.8
3
1.00
100%
2%
0
25
553
15.1
35
572
11.1
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
14%
97
Split
4
91
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
45%
89
Perm
0
0
1.00
100%
2%
0
4
7.0
14.0
30.0
21.4%
4.0
3.0
0.0
7.0
7.0
14.0
30.0
21.4%
4.0
3.0
0.0
7.0
7.0
14.0
30.0
21.4%
4.0
3.0
0.0
7.0
None
14.1
0.10
0.57
72.4
0.0
72.4
E
None
14.1
0.10
0.62
77.3
0.0
77.3
E
75.0
E
89
149
None
14.1
0.10
0.59
75.5
0.0
75.5
E
83
140
1.00
100%
2%
0
0
0
1303
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
284
Perm
476
Prot
5
1776
6
6
6
5
2
15.0
22.0
60.0
42.9%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
60.0
42.9%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
50.0
35.7%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
110.0
78.6%
4.0
3.0
0.0
7.0
6
4
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
0%
4
4
4
90
148
35
623
12.1
0
0
25
Yes
C-Max C-Max
79.9
79.9
0.57
0.57
0.30
0.28
13.3
1.4
0.0
0.0
13.3
1.4
B
A
11.1
B
122
2
171
m13
0
2
0.0
0.0%
0.0
4.0
None C-Max
25.0 111.9
0.18
0.80
0.78
0.44
40.9
9.2
0.0
0.5
40.9
9.7
D
A
16.3
B
195
163
294
478
Synchro 7 - Report
Page 29
Lanes, Volumes, Timings
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
450
276
0
0
0
0.35
EBT
684
240
0
0
0
0.38
EBR
WBL
6/5/2013
WBT
473
WBR
450
243
0
0
0
0.37
NBL
NBT
543
4304
0
0
0
0.30
NBR
SBL
SBT
492
435
1025
0
0
0
0.28
1054
0
0
0
0.45
4064
1608
0
0
0.72
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 118 (84%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 18.3
Intersection LOS: B
Intersection Capacity Utilization 67.7%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 30
Lanes, Volumes, Timings
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
340
1900
12
16
1900
12
0%
322
1900
12
361
1900
12
1064
1900
12
0%
0
1900
12
0
1900
12
1920
1900
12
0%
453
1900
12
0
0
25
Yes
0
1
25
0
1
25
No
0
2
25
0
0
25
Yes
250
2
25
0
0
25
35
627
12.2
4
1.00
100%
2%
0
25
432
11.8
35
572
11.1
3
1.00
100%
2%
0
1.00
100%
2%
0
0
1.00
100%
2%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
35
387
7.5
1
0%
0
0
1
25
Yes
31%
235
Split
4
227
1.00
100%
2%
0
1.00
100%
2%
0
0%
33%
216
Perm
4
4
4
4
4
5.0
11.5
43.5
31.1%
4.0
2.5
0.0
6.5
5.0
11.5
43.5
31.1%
4.0
2.5
0.0
6.5
5.0
11.5
43.5
31.1%
4.0
2.5
0.0
6.5
None
26.6
0.19
0.73
66.3
0.2
66.5
E
None
26.6
0.19
0.77
70.8
0.3
71.1
E
69.0
E
217
298
None
26.6
0.19
0.76
69.3
0.0
69.3
E
213
290
1.00
100%
2%
0
197
273
1.00
100%
2%
0
1.00
100%
2%
0
0%
361
Prot
1
1064
6
2
1
6
2
2
2
5.0
12.0
34.5
24.6%
4.0
3.0
0.0
7.0
Lead
15.0
21.0
96.5
68.9%
4.0
2.0
0.0
6.0
15.0
21.0
62.0
44.3%
4.0
2.0
0.0
6.0
Lag
15.0
21.0
62.0
44.3%
4.0
2.0
0.0
6.0
Lag
None C-Max
19.1 100.9
0.14
0.72
0.77
0.29
58.3
4.2
0.0
0.0
58.3
4.2
E
A
17.9
B
171
161
212
211
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
1920
453
Perm
C-Max C-Max
74.7
74.7
0.53
0.53
0.48
0.43
8.6
1.1
0.2
0.6
8.8
1.7
A
A
7.4
A
73
0
185
9
Synchro 7 - Report
Page 31
Lanes, Volumes, Timings
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
547
EBR
6/5/2013
WBL
WBT
352
WBR
NBL
NBT
492
444
0
20
0
0.55
407
0
19
0
0.59
397
0
0
0
0.54
674
0
0
0
0.54
3664
0
199
0
0.31
NBR
SBL
SBT
307
SBR
4027
1016
0
0
0.64
1055
286
0
0
0.59
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 19 (14%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.77
Intersection Signal Delay: 20.1
Intersection LOS: C
Intersection Capacity Utilization 67.7%
ICU Level of Service C
Analysis Period (min) 15
Splits and Phases:
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 32
Lanes, Volumes, Timings
20: Sunset Hills Rd & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
261
1900
12
324
1900
12
0%
735
1900
12
523
1900
12
511
1900
12
0%
409
1900
12
423
1900
12
1175
1900
12
0%
93
1900
12
101
1900
12
950
1900
12
0%
137
1900
12
385
1
25
Yes
477
1
25
0
0
25
Yes
320
2
25
0
1
25
Yes
250
1
25
442
1
25
35
1259
24.5
2
1.00
100%
2%
0
35
976
19.0
1
1.00
100%
2%
0
1.00
100%
2%
0
7
1.00
100%
2%
0
0%
261
pm+pt
7
4
7
324
5.0
12.0
25.0
17.9%
4.0
3.0
0.0
7.0
Lead
8.0
51.0
31.0
22.1%
4.0
3.0
0.0
7.0
Lag
None
41.8
0.30
0.94
80.1
0.0
80.1
F
None
24.0
0.17
0.53
56.6
0.0
56.6
E
191.0
F
143
195
184
#358
35
540
10.5
1.00
100%
2%
0
1.00
100%
2%
0
0%
735
pm+ov
4
1
4
4
4
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
523
pm+pt
3
8
3
920
5.0
12.0
27.0
19.3%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
35
619
12.1
8
5
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
8
423
Prot
1
8
1
5.0
12.0
37.0
26.4%
4.0
3.0
0.0
7.0
Lead
8.0
40.0
43.0
30.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
27.0
19.3%
4.0
3.0
0.0
7.0
Lead
None
43.4
0.31
1.42
233.3
56.3
289.5
F
None
61.0
0.44
1.01
74.8
0.0
74.8
E
~650
#899
~382
#593
None
36.2
0.26
0.96
64.5
0.0
64.5
E
68.2
E
383
#525
0.0
0.0%
0.0
4.0
120
1
25
Yes
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
1175
93
pm+ov
6
3
6
6
6
15.0
38.0
52.0
37.1%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
37.0
26.4%
4.0
3.0
0.0
7.0
Lead
None C-Max
19.4
49.7
0.14
0.36
0.89
0.93
72.9
50.9
0.0
2.3
72.9
53.2
E
D
55.4
E
206
587
#272
#743
None
78.7
0.56
0.10
4.1
0.0
4.1
A
26
m32
101
pm+pt
5
2
5
1087
5.0
12.0
20.0
14.3%
4.0
3.0
0.0
7.0
Lead
15.0
33.0
45.0
32.1%
4.0
2.0
0.0
6.0
Lag
0
2
2
0.0
0.0%
0.0
4.0
None C-Max
47.9
39.6
0.34
0.28
0.60
0.76
40.8
49.5
0.0
0.0
40.8
49.5
D
D
48.7
D
51
329
99
386
Synchro 7 - Report
Page 33
Lanes, Volumes, Timings
20: Sunset Hills Rd & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
442
281
0
0
0
0.93
EBT
1179
607
0
0
0
0.53
6/5/2013
EBR
WBL
385
517
0
42
0
1.55
477
519
0
0
0
1.01
WBT
896
WBR
957
0
0
0
0.96
NBL
320
490
0
0
0
0.86
NBT
460
NBR
SBL
1257
34
0
0
0.96
918
0
0
0
0.10
250
216
0
0
0
0.47
SBT
539
SBR
1422
0
0
0
0.76
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 16 (11%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.42
Intersection Signal Delay: 89.0
Intersection LOS: F
Intersection Capacity Utilization 113.8%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
20: Sunset Hills Rd & Wiehle Ave
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 34
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
WBT
WBR
SBL
SBR
383
1900
12
480
1900
12
0%
200
1900
12
0%
533
1900
12
805
1900
12
0%
0
1
25
420
1900
12
430
1
25
1.00
100%
2%
0
670
1
25
Yes
35
3015
58.7
35
879
17.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
480
200
2
6
383
Prot
5
35
1671
32.6
1
1.00
100%
2%
0
533
Perm
1.00
100%
2%
0
805
420
Free
4
5
2
6
5.0
12.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
50.0
50.0%
4.0
3.0
0.0
7.0
15.0
22.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lag
None
15.2
0.15
0.74
49.2
0.0
49.2
D
None
38.9
0.39
0.66
29.7
0.0
29.7
C
38.3
D
242
334
None
16.7
0.17
0.64
48.8
0.0
48.8
D
21.3
C
119
193
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
0%
6
6
121
165
220
1
25
Yes
Free
4
7.0
14.0
50.0
50.0%
4.0
3.0
0.0
7.0
None C-Max
16.7
47.1
0.17
0.47
0.75
0.97
10.9
41.1
0.0
0.0
10.9
41.1
B
D
27.1
C
0
343
103
#791
0.0
0.0%
0.0
4.0
100.0
1.00
0.27
0.3
0.0
0.3
A
0
0
Synchro 7 - Report
Page 35
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
430
618
0
0
0
0.62
EBT
2935
WBT
799
801
0
0
0
0.60
335
0
0
0
0.60
6/5/2013
WBR
670
722
0
0
0
0.74
SBL
1591
834
0
0
0
0.97
SBR
220
1583
0
0
0
0.27
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 24 (24%), Referenced to phase 4:SBL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.97
Intersection Signal Delay: 29.0
Intersection LOS: C
Intersection Capacity Utilization 85.5%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
21: Sunrise Valley Dr & Hunter Mill Rd
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 36
Lanes, Volumes, Timings
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
111
1900
12
2
1900
12
0%
255
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
706
1900
12
0%
256
1900
12
112
1900
12
895
1900
12
0%
0
1900
12
65
0
25
Yes
0
0
25
0
0
25
Yes
0
0
25
0
1
25
Yes
206
1
25
0
1
25
35
693
13.5
1.00
100%
2%
0
1.00
100%
2%
0
25
406
11.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
111
Split
4
257
1.00
100%
2%
0
35
1671
32.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
1.00
100%
2%
0
35
447
8.7
1.00
100%
2%
0
0
4
732
2
4
4
2
5.0
10.5
24.5
24.5%
4.0
1.5
0.0
5.5
5.0
10.5
24.5
24.5%
4.0
1.5
0.0
5.5
20.0
26.0
51.5
51.5%
4.0
2.0
0.0
6.0
Lag
20.0
26.0
51.5
51.5%
4.0
2.0
0.0
6.0
Lag
None
12.0
0.12
0.52
49.1
0.0
49.1
D
None
12.0
0.12
0.70
21.0
0.0
21.0
C
29.5
C
33
108
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
230
Perm
2
2
68
115
1.00
100%
2%
0
0%
0
0
0
25
Yes
C-Max C-Max
59.2
59.2
0.59
0.59
0.70
0.23
13.3
0.4
0.1
0.0
13.5
0.4
B
A
10.4
B
147
0
#651
m0
112
Prot
1
895
1
6
5.0
11.5
24.0
24.0%
4.0
2.5
0.0
6.5
Lead
20.0
26.0
75.5
75.5%
4.0
2.0
0.0
6.0
0
6
0.0
0.0%
0.0
4.0
None C-Max
10.8
76.5
0.11
0.76
0.59
0.63
41.8
4.8
0.0
2.8
41.8
7.6
D
A
11.4
B
45
143
m67 m227
Synchro 7 - Report
Page 37
Lanes, Volumes, Timings
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
613
336
0
0
0
0.33
465
0
0
0
0.55
EBR
WBL
WBT
326
6/5/2013
WBR
NBL
NBT
1591
NBR
SBL
1043
0
26
0
0.72
984
0
0
0
0.23
206
310
0
0
0
0.36
SBT
367
SBR
1424
399
0
0
0.87
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 4 (4%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 13.8
Intersection LOS: B
Intersection Capacity Utilization 117.2%
ICU Level of Service H
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 38
Lanes, Volumes, Timings
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
412
1900
12
3
1900
12
0%
157
1900
12
285
1900
12
523
1900
12
0%
0
1900
12
0
1900
12
591
1900
12
0%
125
1900
12
0
0
25
Yes
0
1
25
0
0
25
Yes
120
1
25
0
0
25
Yes
0
0
25
0
0
25
35
452
8.8
25
854
23.3
35
447
8.7
0
1
25
Yes
35
218
4.2
3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
1.00
100%
2%
0
412
Prot
4
523
4
5.0
11.0
28.0
28.0%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
21.0
21.0%
4.0
2.0
0.0
6.0
Lead
10.0
16.0
53.0
53.0%
4.0
2.0
0.0
6.0
~290
#475
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
0.00
1.02
87.7
0.0
87.7
F
97.3
F
~4
#133
1.00
100%
2%
0
1.00
100%
2%
0
0%
285
pm+pt
1
6
1
None
22.0
0.22
1.06
101.1
0.0
101.1
F
160
1.00
100%
2%
0
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
591
125
Perm
6
23
6
23
23
23
None C-Max
47.0
47.0
0.47
0.47
0.84
0.60
36.5
18.7
0.0
1.4
36.5
20.1
D
C
25.9
C
179
273
m#245
355
0.0
0.0%
0.0
0.0%
51.0
51.0%
51.0
51.0%
0.0
4.0
0.0
4.0
0.0
6.0
0.0
6.0
45.0
0.45
0.71
9.0
7.1
16.1
B
13.5
B
79
m62
45.0
0.45
0.16
0.2
1.1
1.3
A
0
m0
Synchro 7 - Report
Page 39
Lanes, Volumes, Timings
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
372
EBR
WBL
WBT
774
389
0
0
0
1.06
157
0
0
0
1.02
6/5/2013
WBR
NBL
120
340
0
0
0
0.84
NBT
367
876
181
0
0
0.75
NBR
SBL
SBT
138
SBR
838
201
43
0
0.93
764
457
0
0
0.41
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 36 (36%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.06
Intersection Signal Delay: 41.2
Intersection LOS: D
Intersection Capacity Utilization 83.1%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 41
Lanes, Volumes, Timings
24: Sunset Hills Rd & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBR
NBL
NBT
SBT
SBR
188
1900
12
0%
0
1
25
262
1900
12
253
1900
12
626
1900
12
0%
485
1900
12
0%
211
1900
12
370
1
25
Yes
0
2
25
35
385
7.5
2
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
188
262
Perm
3
35
772
15.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
626
485
14
124
5.0
12.0
19.0
19.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
19.0
19.0%
4.0
3.0
0.0
7.0
Lead
None
12.0
0.12
0.89
83.0
0.0
83.0
F
42.1
D
120
#247
None
12.0
0.12
0.63
12.7
0.1
12.7
B
43.0
0.43
0.17
25.0
1.4
26.4
C
0
75
53
m81
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
35
218
4.2
124
3
?
?
1
4
6
5.0
11.0
21.0
21%
4.0
2.0
5.0
11.0
28.0
28%
4.0
2.0
10.0
16.0
53.0
53%
4.0
2.0
Lead
Lag
230
1
25
Yes
253
Prot
14
3
3
?
49.0
49.0%
81.0
81.0%
0.0
6.0
0.0
6.0
75.0
0.75
0.45
2.4
1.0
3.4
A
10.0
A
39
m52
1.00
100%
2%
0
211
pm+ov
2
3
2
2
2
10.0
16.0
32.0
32.0%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
19.0
19.0%
4.0
3.0
0.0
7.0
Lead
C-Max
26.0
0.26
1.00
79.8
13.6
93.3
F
66.0
E
~310
#520
None
44.0
0.44
0.26
3.3
0.0
3.3
A
None
None C-Max
0
40
Synchro 7 - Report
Page 43
Lanes, Volumes, Timings
24: Sunset Hills Rd & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
305
212
0
0
0
0.89
6/5/2013
EBR
NBL
NBT
138
SBT
692
370
417
0
3
0
0.63
1476
1020
0
0
0.55
1397
483
0
0
0.68
484
0
21
0
1.05
SBR
?
?
?
230
815
0
0
0
0.26
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 36 (36%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.06
Intersection Signal Delay: 36.4
Intersection LOS: D
Intersection Capacity Utilization 59.2%
ICU Level of Service B
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
24: Sunset Hills Rd & Hunter Mill Rd
RANAMNRT5 5:00 pm 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 44
Lanes, Volumes, Timings
1: Frying Pan & Sunrise
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Baseline
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1950
1900
12
1450
1900
12
0%
0
1900
12
150
1900
12
700
1900
12
0%
250
1900
12
0
1900
12
0
1900
12
0%
50
1900
12
50
1900
12
50
1900
12
0%
700
1900
12
0
0
25
Yes
0
1
25
0
1
25
Yes
0
1
25
0
1
25
Yes
0
1
25
0
2
25
30
294
6.7
0.92
100%
2%
0
0.92
100%
2%
0
30
318
7.2
0.92
100%
2%
0
0.92
100%
2%
0
0%
2120
Prot
7
1576
0.92
100%
2%
0
30
342
7.8
0.92
100%
2%
0
0.92
100%
2%
0
0%
0
4
163
Prot
3
761
0.92
100%
2%
0
30
339
7.7
0.92
100%
2%
0
0.92
100%
2%
0
0%
272
Free
8
0
Prot
5
0
0.92
100%
2%
0
54
Free
54
Prot
1
54
Free
4
3
8
5
2
1
6
4.0
11.0
38.0
31.7%
4.0
3.0
0.0
7.0
Lead
Yes
Max
31.0
0.26
2.39
651.4
0.0
651.4
F
4.0
23.0
45.0
37.5%
4.0
3.0
0.0
7.0
Lag
Yes
Max
38.0
0.32
1.41
221.1
0.0
221.1
F
467.9
F
~861
#1001
4.0
11.0
21.0
17.5%
4.0
3.0
0.0
7.0
Lead
Yes
Max
14.0
0.12
0.79
77.7
0.0
77.7
E
4.0
23.0
28.0
23.3%
4.0
3.0
0.0
7.0
Lag
Yes
Max
21.0
0.18
1.23
158.8
0.0
158.8
F
111.7
F
~383
#508
4.0
11.0
30.0
25.0%
4.0
3.0
0.0
7.0
Lead
Yes
Max
4.0
23.0
25.0
20.8%
4.0
3.0
0.0
7.0
Lag
Yes
Max
4.0
23.0
24.0
20.0%
4.0
3.0
0.0
7.0
Lag
Yes
Max
17.0
0.14
0.11
45.6
0.0
45.6
D
6.4
A
19
39
~1392
#1527
0.0
4.0
125
#237
120.0
1.00
0.17
0.2
0.0
0.2
A
120.0
1.00
0.03
0.0
0.0
0.0
A
4.0
11.0
29.0
24.2%
4.0
3.0
0.0
7.0
Lead
Yes
Max
22.0
0.18
0.17
42.9
0.0
42.9
D
0
0
0
0
36
74
0.0
0.0%
0.0
4.0
0.0
0.0%
0.0
4.0
761
Free
6
Free
7
0.0
0.0%
0.92
100%
2%
0
0%
2
Free
0
1
25
Yes
0.0
0.0%
0.0
4.0
120.0
1.00
0.48
1.0
0.0
1.0
A
0
0
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
1: Frying Pan & Sunrise
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
6/5/2013
EBL
EBT
214
887
0
0
0
2.39
1121
0
0
0
1.41
EBR
WBL
WBT
238
WBR
207
0
0
0
0.79
619
0
0
0
1.23
1583
0
0
0
0.17
NBL
NBT
262
NBR
SBL
SBT
259
SBR
1583
0
0
0
0.03
325
0
0
0
0.17
501
0
0
0
0.11
1583
0
0
0
0.48
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 150
Control Type: Pretimed
Maximum v/c Ratio: 2.39
Intersection Signal Delay: 321.3
Intersection LOS: F
Intersection Capacity Utilization 95.8%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
Baseline
1: Frying Pan & Sunrise
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
2: Frying Pan Rd. & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1000
1900
12
450
1900
12
0%
100
1900
12
150
1900
12
400
1900
12
0%
150
1900
12
350
1900
12
1250
1900
12
0%
150
1900
12
50
1900
12
650
1900
12
0%
350
1900
12
155
1
25
Yes
310
1
25
400
1
25
Yes
205
1
25
390
1
25
Yes
375
1
25
225
2
25
35
232
4.5
1.00
100%
2%
0
1.00
100%
2%
0
35
1725
33.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
1000
Prot
3
3
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
0%
450
100
pm+ov
8
1
8
8
8
150
Prot
7
7
400
150
pm+ov
4
5
4
4
4
5.0
12.0
27.0
19.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
None
29.0
0.21
1.41
231.7
0.0
231.7
F
None
26.8
0.19
1.26
183.7
0.0
183.7
F
203.6
F
~527
#764
None
54.8
0.39
0.15
12.3
0.0
12.3
B
None
19.2
0.14
0.62
67.9
0.0
67.9
E
None
29.7
0.21
0.42
41.7
0.0
41.7
D
20
61
129
203
None
17.0
0.12
0.93
89.6
0.0
89.6
F
74.7
E
192
#293
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
5.0
12.0
32.0
22.9%
4.0
3.0
-4.0
3.0
Lead
~627
#761
1.00
100%
2%
0
96
162
350
Prot
1
1
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lead
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
1250
150
pm+ov
6
7
6
6
6
15.0
38.0
71.0
50.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
None C-Max
25.0
72.3
0.18
0.52
1.11
0.48
134.5
23.2
0.0
0.0
134.5
23.2
F
C
43.6
D
~363
271
#561
321
None
94.5
0.68
0.13
1.5
0.0
1.5
A
0
23
50
Prot
5
5
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
650
350
pm+ov
2
3
2
2
2
15.0
38.0
60.0
42.9%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
32.0
22.9%
4.0
3.0
-4.0
3.0
Lead
None C-Max
12.1
57.0
0.09
0.41
0.33
0.45
72.9
23.3
0.0
0.0
72.9
23.3
E
C
19.4
B
46
124
91
169
None
89.0
0.64
0.34
4.3
0.0
4.3
A
22
61
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
2: Frying Pan Rd. & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
225
711
0
0
0
1.41
EBT
152
357
0
0
0
1.26
6/5/2013
EBR
WBL
155
659
0
0
0
0.15
310
278
0
0
0
0.54
WBT
1645
430
0
0
0
0.93
WBR
NBL
400
356
0
0
0
0.42
205
316
0
0
0
1.11
NBT
1018
2627
0
0
0
0.48
NBR
SBL
390
1118
0
0
0
0.13
375
177
0
0
0
0.28
SBT
1018
SBR
1441
0
0
0
0.45
1023
0
0
0
0.34
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 136 (97%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 110
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.41
Intersection Signal Delay: 92.0
Intersection LOS: F
Intersection Capacity Utilization 90.3%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
2: Frying Pan Rd. & Centreville Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
3: Coppermine Rd. & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
500
1900
12
100
1900
12
0%
100
1900
12
100
1900
12
150
1900
12
0%
100
1900
12
200
1900
12
2050
1900
12
0%
25
1900
12
75
1900
12
700
1900
12
0%
500
1900
12
200
1
25
Yes
355
1
25
370
1
25
Yes
465
2
25
435
1
25
Yes
375
1
25
100
1
25
25
254
6.9
1.00
100%
2%
0
1.00
100%
2%
1
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
500
pm+pt
3
8
3
100
7.0
14.0
30.0
21.4%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
35.0
25.0%
4.0
3.0
-4.0
3.0
Lag
None
54.3
0.39
0.89
56.3
0.0
56.3
E
None
37.4
0.27
0.11
40.3
0.0
40.3
D
46.7
D
35
64
383
#545
1.00
100%
2%
0
40
991
16.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
100
pm+ov
8
1
8
8
8
100
pm+pt
7
4
7
150
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
7.0
49.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lag
None
56.1
0.40
0.14
5.7
0.0
5.7
A
None
29.3
0.21
0.32
33.1
0.0
33.1
C
0
39
58
102
None
15.4
0.11
0.39
60.0
0.0
60.0
E
45.0
D
68
99
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
1
40
689
11.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
100
pm+ov
4
5
4
4
4
425
1
25
Yes
1.00
100%
2%
1
1.00
100%
2%
0
0%
200
Prot
1
2075
0
6
75
Prot
5
1
6
5
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
15.0
39.0
68.0
48.6%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
15.0
42.0
66.0
47.1%
4.0
3.0
-4.0
3.0
Lag
7.0
14.0
30.0
21.4%
4.0
3.0
-4.0
3.0
Lead
None
31.8
0.23
0.27
34.3
0.0
34.3
C
None
15.7
0.11
0.52
54.6
0.0
54.6
D
None
13.4
0.10
0.44
78.7
0.0
78.7
E
76
m89
C-Min
61.0
0.44
0.32
21.6
0.0
21.6
C
17.5
B
146
111
None
99.9
0.71
0.42
2.6
0.0
2.6
A
58
104
C-Min
63.3
0.45
0.72
30.8
0.0
30.8
C
32.9
C
452
m379
0.0
0.0%
-1.0
3.0
71
123
700
500
pm+ov
2
3
2
2
2
2
25
Synchro 7 - Report
Page 3
Lanes, Volumes, Timings
3: Coppermine Rd. & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
100
564
0
0
0
0.89
EBT
174
942
0
0
0
0.11
6/5/2013
EBR
WBL
200
694
0
0
0
0.14
355
357
0
0
0
0.28
WBT
684
556
0
0
0
0.27
WBR
NBL
370
377
0
0
0
0.27
465
405
0
0
0
0.49
NBT
911
2994
0
0
0
0.69
NBR
SBL
375
184
0
0
0
0.41
SBT
609
2301
0
0
0
0.30
SBR
425
1194
0
0
0
0.42
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 127 (91%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.89
Intersection Signal Delay: 31.7
Intersection LOS: C
Intersection Capacity Utilization 81.2%
ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
3: Coppermine Rd. & Centreville Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 4
Lanes, Volumes, Timings
4: Sunrise Valley Dr & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
500
1900
12
500
1900
12
0%
100
1900
12
300
1900
12
600
1900
12
-6%
350
1900
12
450
1900
12
1350
1900
12
1%
650
1900
12
600
1900
12
900
1900
12
-1%
1050
1900
12
0
0
25
Yes
285
2
25
305
1
25
Yes
420
2
25
0
1
25
Yes
280
2
25
520
2
25
35
836
16.3
35
852
16.6
40
951
16.2
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
500
Split
3
600
1.00
100%
2%
0
1.00
100%
2%
1
0%
0
3
300
Split
4
600
350
Perm
4
3
3
4
4
5.0
50.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lead
5.0
50.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lag
None
21.0
0.14
1.04
112.8
0.0
112.8
F
None
21.0
0.14
1.21
165.1
0.0
165.1
F
141.3
F
~372
#498
None
21.0
0.14
0.61
66.4
0.0
66.4
E
None
21.0
0.14
1.18
152.4
0.0
152.4
F
99.1
F
~368
#493
None
21.0
0.14
0.81
35.5
0.1
35.6
D
RANAMNRT5 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
4.0
144
196
1.00
100%
2%
0
40
698
11.9
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
~271
#388
1.00
100%
2%
0
111
#266
450
Prot
1
1
5.0
12.0
24.0
16.0%
4.0
3.0
0.0
7.0
Lead
0
1
25
Yes
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
1350
650
pm+ov
6
4
6
6
6
20.0
43.0
60.0
40.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
28.0
18.7%
4.0
3.0
0.0
7.0
Lag
None C-Max
17.0
53.0
0.11
0.35
1.16
0.76
154.1
46.1
0.0
0.1
154.1
46.2
F
D
61.9
E
~268
426
#381
484
None
74.0
0.49
0.84
30.7
0.0
30.7
C
299
493
600
Prot
5
900
1050
Perm
5
2
2
2
5.0
12.0
34.0
22.7%
4.0
3.0
0.0
7.0
Lead
20.0
42.0
70.0
46.7%
4.0
3.0
0.0
7.0
Lag
20.0
42.0
70.0
46.7%
4.0
3.0
0.0
7.0
Lag
2
None C-Max C-Max
27.0
63.0
63.0
0.18
0.42
0.42
0.97
0.42
1.19
91.5
26.3 114.2
0.0
0.0
25.4
91.5
26.3 139.6
F
C
F
88.3
F
315
209
~986
#416
193 #1257
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
4: Sunrise Valley Dr & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
520
481
0
0
0
1.04
EBT
756
EBR
494
0
0
0
1.21
6/5/2013
WBL
285
495
0
0
0
0.61
WBT
772
510
0
0
0
1.18
WBR
NBL
305
431
0
2
0
0.82
420
387
0
0
0
1.16
NBT
871
NBR
SBL
1788
0
50
0
0.78
775
0
0
0
0.84
280
621
0
0
0
0.97
SBT
618
SBR
2147
0
0
0
0.42
885
41
0
0
1.24
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 66 (44%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.21
Intersection Signal Delay: 89.3
Intersection LOS: F
Intersection Capacity Utilization 112.2%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
4: Sunrise Valley Dr & Centreville Rd.
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
5: Dulles Toll Rd. (S) & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
500
1900
12
25
1900
12
0%
650
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1100
1900
12
1%
650
1900
12
450
1900
12
1950
1900
12
-1%
0
1900
12
365
1
25
Yes
0
0
25
0
0
25
No
500
1
25
0
1
25
Yes
290
2
25
0
0
25
35
574
11.2
1.00
100%
2%
0
1.00
100%
2%
0
10
842
57.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
Split
4
525
1.00
100%
2%
0
40
1210
20.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
650
Free
0
0
1.00
100%
2%
0
40
521
8.9
1.00
100%
2%
0
0
4
1100
650
Perm
4
4
6
6
6
5.0
12.0
48.5
32.3%
4.0
3.0
0.0
7.0
5.0
12.0
48.5
32.3%
4.0
3.0
0.0
7.0
20.0
26.5
51.5
34.3%
4.0
2.5
0.0
6.5
Lag
20.0
26.5
51.5
34.3%
4.0
2.5
0.0
6.5
Lag
None
None
41.5
0.28
1.07
110.3
42.3
152.6
F
68.6
E
~566
#797
RANAMNRT5 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
6
Free
150.0
1.00
0.41
0.8
0.0
0.8
A
1.00
100%
2%
0
0%
0
0
0
25
No
C-Max C-Max
62.9
62.9
0.42
0.42
0.52
0.66
10.4
8.8
0.0
0.0
10.4
8.8
B
A
9.8
A
160
144
113
725
450
Prot
5
1950
5
2
5.0
12.0
50.0
33.3%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
101.5
67.7%
4.0
2.5
0.0
6.5
0
2
0.0
0.0%
0.0
4.0
Min C-Max
25.1
95.0
0.17
0.63
0.78
0.87
60.2
15.4
0.0
36.6
60.2
52.0
E
D
53.5
D
225
592
m224 m589
Synchro 7 - Report
Page 3
Lanes, Volumes, Timings
5: Dulles Toll Rd. (S) & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
494
492
0
44
0
1.17
EBR
6/5/2013
WBL
WBT
762
WBR
365
1583
0
0
0
0.41
NBL
NBT
1130
NBR
SBL
2122
0
0
0
0.52
979
0
0
0
0.66
290
989
0
0
0
0.46
SBT
441
SBR
2253
441
0
0
1.08
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 94 (63%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.07
Intersection Signal Delay: 42.5
Intersection LOS: D
Intersection Capacity Utilization 142.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
5: Dulles Toll Rd. (S) & Centreville Rd.
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 4
Lanes, Volumes, Timings
6: Dulles Toll Rd. (N) & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
950
1900
12
15
1900
12
0%
450
1900
12
150
1900
12
1400
1900
12
3%
0
1900
12
0
1900
12
1350
1900
12
-2%
150
1900
12
0
0
25
No
0
1
25
0
1
25
Yes
155
1
25
0
0
25
No
0
0
25
0
0
25
10
1144
78.0
3
1.00
100%
2%
0
30
902
20.5
1.00
100%
2%
0
1.00
100%
2%
0
1
1.00
100%
2%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 6/1/2000 Retimed
DLM
40
847
14.4
4
0%
0
40
521
8.9
0
1
25
Yes
49%
484
Split
4
481
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
Perm
4
4
4
4
4
5.0
12.0
46.5
31.0%
4.0
3.0
0.0
7.0
5.0
12.0
46.5
31.0%
4.0
3.0
0.0
7.0
5.0
12.0
46.5
31.0%
4.0
3.0
0.0
7.0
None
39.5
0.26
1.09
120.6
0.0
120.6
F
None
39.5
0.26
1.08
117.1
0.0
117.1
F
107.6
F
~552
#789
None
39.5
0.26
0.98
83.3
0.0
83.3
F
~561
#797
1.00
100%
2%
0
392
#623
150
pm+pt
1
6
1
1400
5.0
12.0
26.0
17.3%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1350
150
Perm
6
2
6
2
2
2
20.0
26.5
103.5
69.0%
4.0
2.5
0.0
6.5
20.0
26.5
77.5
51.7%
4.0
2.5
0.0
6.5
Lag
20.0
26.5
77.5
51.7%
4.0
2.5
0.0
6.5
Lag
None C-Max
96.5
97.0
0.64
0.65
0.63
0.43
31.8
27.9
0.0
8.1
31.8
35.9
C
D
35.5
D
103
399
m130 m426
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
C-Max C-Max
77.3
77.3
0.52
0.52
0.73
0.17
31.9
7.4
12.4
0.0
44.4
7.4
D
A
40.7
D
524
21
674
65
Synchro 7 - Report
Page 5
Lanes, Volumes, Timings
6: Dulles Toll Rd. (N) & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
1064
EBR
6/5/2013
WBL
WBT
822
WBR
NBL
443
0
0
0
1.09
445
0
0
0
1.08
461
0
0
0
0.98
155
303
0
0
0
0.50
NBT
441
3239
1801
0
0
0.97
NBR
SBL
SBT
767
SBR
1843
0
492
0
1.00
875
0
0
0
0.17
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 39 (26%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.09
Intersection Signal Delay: 60.1
Intersection LOS: E
Intersection Capacity Utilization 142.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
6: Dulles Toll Rd. (N) & Centreville Rd.
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 6
Lanes, Volumes, Timings
7: Sunrise Valley Dr & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
550
1900
12
600
1900
12
0%
50
1900
12
125
1900
12
500
1900
12
0%
500
1900
12
275
1900
12
1800
1900
12
0%
450
1900
12
1000
1900
12
1200
1900
12
0%
1250
1900
12
275
1
25
Yes
245
1
25
215
1
25
Yes
400
2
25
400
1
25
Yes
340
1
25
240
2
25
35
868
16.9
35
761
14.8
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
50
Perm
10%
112
Split
4
0%
550
Split
3
600
50
2361
32.2
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
3
513
1.00
100%
2%
0
50
1585
21.6
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
500
Perm
4
275
Prot
1
1800
395
1
25
Yes
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
Perm
6
6
20.0
27.5
94.5
47.3%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
94.5
47.3%
5.0
2.5
0.0
7.5
Lag
5
2
2
2
5.0
12.0
43.0
21.5%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
107.5
53.8%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
107.5
53.8%
5.0
2.5
0.0
7.5
Lag
2
3
7.0
14.0
37.5
18.8%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
37.5
18.8%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
37.5
18.8%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
25.0
12.5%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
25.0
12.5%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
25.0
12.5%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
30.0
15.0%
4.0
3.0
0.0
7.0
Lead
None
30.5
0.15
1.05
130.9
0.0
130.9
F
None
30.5
0.15
1.11
146.1
0.0
146.1
F
134.2
F
~473
#607
None
30.5
0.15
0.18
26.2
0.0
26.2
C
None
18.0
0.09
0.77
120.1
0.0
120.1
F
None
18.0
0.09
1.47
256.9
0.0
256.9
F
11
57
161
#283
None
18.0
0.09
1.68
367.4
0.0
367.4
F
293.7
F
~539
#675
None C-Max C-Max None C-Max C-Max
19.8
87.0
87.0
36.0 103.2 103.2
0.10
0.44
0.44
0.18
0.52
0.52
0.81
1.17
0.55
1.62
0.66
1.20
106.4 132.4
19.4 327.5
39.4 124.3
0.0
0.0
0.0
0.0
0.0
0.0
106.4 132.4
19.4 327.5
39.4 124.3
F
F
B
F
D
F
109.4
153.7
F
F
186 ~1476
189
~970
641 ~1875
240 #1600
305 m#1060 m695 m#2048
RANAMNRT5 6/1/2000 Retimed
DLM
1
1250
Perm
3
~404
#535
4
6
6
1200
3
3
4
4
4
1000
Prot
5
~626
#874
Synchro 7 - Report
Page 7
Lanes, Volumes, Timings
7: Sunrise Valley Dr & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
240
524
0
0
0
1.05
EBT
788
540
0
0
0
1.11
EBR
WBL
275
275
0
0
0
0.18
245
145
0
0
0
0.77
6/5/2013
WBT
681
305
0
0
0
1.68
WBR
NBL
215
339
0
0
0
1.47
400
395
0
0
0
0.70
NBT
2281
1539
0
0
0
1.17
NBR
SBL
400
824
0
0
0
0.55
340
618
0
0
0
1.62
SBT
1505
1826
0
0
0
0.66
SBR
395
1039
0
0
0
1.20
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 70 (35%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.68
Intersection Signal Delay: 156.4
Intersection LOS: F
Intersection Capacity Utilization 132.4%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
7: Sunrise Valley Dr & Fairfax County Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 8
Lanes, Volumes, Timings
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
900
1900
12
0
1900
12
0%
450
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
2400
1900
12
0%
450
1900
12
650
1900
12
2700
1900
12
0%
0
1900
12
220
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
640
1
25
Yes
325
2
25
160
1
25
35
414
8.1
35
491
9.6
50
1585
21.6
0
0
25
Yes
50
713
9.7
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
900
Prot
3
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
custom
0
0
1.00
100%
2%
0
1.00
100%
2%
0
3
5.0
12.0
30.5
30.5%
4.0
3.0
0.0
7.0
5.0
12.0
30.5
30.5%
4.0
3.0
0.0
7.0
0.0
0.0%
0.0
4.0
None
23.5
0.24
1.12
104.9
0.0
104.9
F
None
23.5
0.24
1.20
149.4
0.0
149.4
F
~341
#462
~352
#547
1.00
100%
2%
0
0%
0
0
2400
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
Perm
650
Prot
5
2700
6
6
6
5
2
20.0
27.5
40.5
40.5%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
40.5
40.5%
5.0
2.5
0.0
7.5
Lag
5.0
12.0
29.0
29.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
69.5
69.5%
5.0
2.5
0.0
7.5
6
3
3
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
3
C-Max C-Max
33.9
33.9
0.34
0.34
1.39
0.54
212.3
6.3
0.0
0.0
212.3
6.3
F
A
179.8
F
~1123
89
m#745
m42
0
2
0.0
0.0%
0.0
4.0
None C-Max
21.1
62.0
0.21
0.62
0.90
0.86
63.1
11.2
0.0
0.3
63.1
11.5
E
B
21.5
C
224
220
m206 m208
Synchro 7 - Report
Page 9
Lanes, Volumes, Timings
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
160
807
0
0
0
1.12
EBT
334
EBR
WBL
WBT
411
WBR
220
374
0
0
0
1.20
6/5/2013
NBL
NBT
1505
1723
0
0
0
1.39
NBR
SBL
640
834
0
0
0
0.54
325
755
0
0
0
0.86
SBT
633
SBR
3153
105
0
0
0.89
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 82 (82%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.39
Intersection Signal Delay: 98.8
Intersection LOS: F
Intersection Capacity Utilization 143.8%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 10
Lanes, Volumes, Timings
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
450
1900
12
0
1900
12
0%
1150
1900
12
175
1900
12
3150
1900
12
0%
0
1900
12
0
1900
12
2950
1900
12
0%
400
1900
12
0
0
25
Yes
185
1
25
0
1
25
Yes
185
2
25
0
0
25
Yes
0
0
25
0
0
25
25
568
15.5
25
890
24.3
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
450
Prot
4
50
1458
19.9
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0.0
0.0%
RANAMNRT5 6/1/2000 Retimed
DLM
50
713
9.7
670
1
25
Yes
0
1150
custom
4
7.0
14.0
25.0
25.0%
4.0
3.0
0.0
7.0
7.0
14.0
25.0
25.0%
4.0
3.0
0.0
7.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
0.0
0.0%
1.00
100%
2%
0
None
18.0
0.18
0.73
46.4
0.0
46.4
D
None
18.0
0.18
4.06
1400.6
0.0
1400.6
F
140
195
~1368
#1623
1.00
100%
2%
0
1.00
100%
2%
0
0%
175
Prot
1
3150
6
2
1
6
2
2
2
5.0
12.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
75.0
75.0%
5.0
2.0
0.0
7.0
20.0
27.0
52.0
52.0%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
52.0
52.0%
5.0
2.0
0.0
7.0
Lag
None C-Max
9.5
68.0
0.10
0.68
0.54
0.91
42.4
23.4
0.0
0.4
42.4
23.7
D
C
24.7
C
62
493
m44 m306
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
2950
400
Perm
C-Max C-Max
51.5
51.5
0.52
0.52
1.13
0.40
70.6
0.6
0.0
0.0
70.6
0.6
E
A
62.2
E
~778
0
m#708
m0
Synchro 7 - Report
Page 11
Lanes, Volumes, Timings
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
EBR
WBL
185
618
0
0
0
0.73
WBT
810
6/5/2013
WBR
NBL
283
0
0
0
4.06
185
549
0
0
0
0.32
NBT
633
3458
59
0
0
0.93
NBR
SBL
SBT
1378
2620
0
0
0
1.13
SBR
670
1009
0
0
0
0.40
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 82 (82%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 4.06
Intersection Signal Delay: 232.3
Intersection LOS: F
Intersection Capacity Utilization 143.8%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 12
Lanes, Volumes, Timings
10: Spring Street & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBR
NBL
NBT
SBT
SBR
200
1900
12
0%
215
1
25
200
1900
12
900
1900
12
2450
1900
12
0%
2700
1900
12
0%
600
1900
12
0
1
25
Yes
650
2
25
25
754
20.6
550
1
25
Yes
50
427
5.8
50
557
7.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
900
Prot
5
2450
2700
2
6
8
5
2
6
6
6
7.0
14.0
17.0
17.0%
4.0
3.0
0.0
7.0
5.0
12.0
29.0
29.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
83.0
83.0%
5.0
2.0
0.0
7.0
20.0
27.0
54.0
54.0%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
54.0
54.0%
5.0
2.0
0.0
7.0
Lag
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
200
200
Free
8
Free
None
9.6
0.10
0.61
51.6
0.0
51.6
D
25.9
C
63
101
RANAMNRT5 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
4.0
1.00
100%
2%
0
600
Perm
None C-Max C-Max C-Max
22.0
76.4
47.4
47.4
0.22
0.76
0.47
0.47
1.19
0.63
1.12
0.64
122.0
5.4
87.2
11.6
0.0
0.0
0.0
0.0
122.0
5.4
87.2
11.6
F
A
F
B
36.7
73.4
D
E
0
~462
201
~735
112
0 m#297 m172
#829
233
100.0
1.00
0.13
0.2
0.0
0.2
A
Synchro 7 - Report
Page 13
Lanes, Volumes, Timings
10: Spring Street & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
674
215
343
0
0
0
0.58
EBR
NBL
1583
0
0
0
0.13
650
755
0
0
0
1.19
6/5/2013
NBT
347
SBT
477
3885
0
0
0
0.63
2410
0
0
0
1.12
SBR
550
931
0
0
0
0.64
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 60 (60%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.19
Intersection Signal Delay: 53.3
Intersection LOS: D
Intersection Capacity Utilization 101.2%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
10: Spring Street & Fairfax County Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 14
Lanes, Volumes, Timings
11: Sunrise Valley Dr & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
200
1900
12
850
1900
12
0%
15
1900
12
150
1900
12
450
1900
12
0%
550
1900
12
150
1900
12
1600
1900
12
0%
400
1900
12
700
1900
12
900
1900
12
0%
400
1900
12
0
0
25
Yes
155
1
25
220
1
25
Yes
435
2
25
415
1
25
Yes
720
2
25
260
1
25
35
675
13.1
2
1.00
100%
2%
0
1.00
100%
2%
0
35
419
8.2
1
5
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
180
Split
3
885
1.00
100%
2%
0
45
2270
34.4
6
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
3
10%
135
Split
4
465
45
1208
18.3
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
550
Perm
4
430
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
150
Prot
1
1600
400
Perm
1
6
6
6
5
20.0
35.5
103.5
51.8%
4.5
2.0
0.0
6.5
Lag
20.0
35.5
103.5
51.8%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
38.0
19.0%
4.0
3.0
0.0
7.0
Lead
6
700
Prot
5
900
400
pm+ov
2
3
2
2
3
3
3
4
4
4
4
8.0
42.0
30.5
15.3%
4.0
3.0
0.0
7.0
Lead
8.0
42.0
30.5
15.3%
4.0
3.0
0.0
7.0
Lead
8.0
15.0
28.0
14.0%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
28.0
14.0%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
28.0
14.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
23.0
11.5%
4.0
3.0
0.0
7.0
Lead
20.0
35.5
118.5
59.3%
4.5
2.0
0.0
6.5
Lag
8.0
42.0
30.5
15.3%
4.0
3.0
0.0
7.0
Lead
None
23.5
0.12
0.95
138.5
0.0
138.5
F
None
23.5
0.12
2.22
591.4
0.0
591.4
F
514.8
F
~1033
#1182
None
21.0
0.10
0.80
117.9
0.0
117.9
F
None
21.0
0.10
1.31
221.2
0.0
221.2
F
248.2
F
~430
#563
None
21.0
0.10
1.58
303.0
0.0
303.0
F
None C-Max C-Max None C-Max
13.8
97.0
97.0
31.0 114.2
0.07
0.48
0.48
0.16
0.57
0.64
0.93
0.44
1.32
0.45
102.8
59.1
9.8 206.6
15.7
0.0
0.0
0.0
0.0
0.0
102.8
59.1
9.8 206.6
15.7
F
E
A
F
B
53.0
81.5
D
F
101
1035
82
~604
344
143
1148
172 m#694 m375
None
144.2
0.72
0.35
10.7
0.0
10.7
B
263
#456
RANAMNRT5 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
4.0
194
#327
~771
#1027
240
m255
Synchro 7 - Report
Page 15
Lanes, Volumes, Timings
11: Sunrise Valley Dr & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
260
189
0
0
0
0.95
EBT
595
398
0
0
0
2.22
EBR
6/5/2013
WBL
155
169
0
0
0
0.80
WBT
339
355
0
0
0
1.31
WBR
NBL
220
348
0
0
0
1.58
435
275
0
0
0
0.55
NBT
2190
1716
0
0
0
0.93
NBR
SBL
415
907
0
0
0
0.44
720
532
0
0
0
1.32
SBT
1128
2022
0
0
0
0.45
SBR
430
1153
0
0
0
0.35
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 167 (84%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.22
Intersection Signal Delay: 174.5
Intersection LOS: F
Intersection Capacity Utilization 123.5%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
11: Sunrise Valley Dr & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 16
Lanes, Volumes, Timings
12: EB Toll Rd Off-Ramp & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
650
1900
12
0
1900
12
0%
450
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1550
1900
12
0%
250
1900
12
0
1900
12
1800
1900
12
0%
600
1900
12
400
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
625
1
25
Yes
0
0
25
0
2
25
25
573
15.6
3
1.00
100%
2%
0
40
339
5.8
2
1.00
100%
2%
0
1.00
100%
2%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
custom
45
160
2.4
1
0%
650
Prot
4
45
662
10.0
0
1
25
Yes
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1550
1.00
100%
2%
0
1.00
100%
2%
0
0%
250
Free
0
6
1800
600
Perm
2
4
4
4
6
2
2
2
7.0
13.5
31.0
31.0%
4.0
2.5
0.0
6.5
7.0
13.5
31.0
31.0%
4.0
2.5
0.0
6.5
20.0
26.5
69.0
69.0%
4.5
2.0
0.0
6.5
20.0
26.5
69.0
69.0%
4.5
2.0
0.0
6.5
20.0
26.5
69.0
69.0%
4.5
2.0
0.0
6.5
0.0
0.0%
0.0
4.0
None
24.5
0.24
0.77
42.4
22.2
64.7
E
None
24.5
0.24
1.13
119.3
0.0
119.3
F
199
264
~324
#519
RANAMNRT5 6/1/2000 Retimed
DLM
Free
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
C-Max
62.5
0.62
0.70
10.0
0.3
10.2
B
8.8
A
378
m401
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
100.0
1.00
0.16
0.0
0.0
0.0
A
0
m0
C-Max C-Max
62.5
62.5
0.62
0.62
0.81
0.49
24.5
3.4
0.2
0.0
24.7
3.4
C
A
19.3
B
961
99
830
33
Synchro 7 - Report
Page 17
Lanes, Volumes, Timings
12: EB Toll Rd Off-Ramp & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
841
0
203
0
1.02
EBT
493
EBR
WBL
6/5/2013
WBT
259
WBR
400
399
0
0
0
1.13
NBL
NBT
582
2212
0
167
0
0.76
NBR
625
1564
0
0
0
0.16
SBL
SBT
80
SBR
2212
60
0
0
0.84
1214
0
0
0
0.49
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 58 (58%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.13
Intersection Signal Delay: 29.8
Intersection LOS: C
Intersection Capacity Utilization 88.7%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
12: EB Toll Rd Off-Ramp & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 18
Lanes, Volumes, Timings
13: WB Toll Rd On-Ramp & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
450
1900
12
0
1900
12
0%
1100
1900
12
200
1900
12
2050
1900
12
0%
0
1900
12
0
1900
12
1800
1900
12
0%
250
1900
12
0
0
25
Yes
0
1
25
50
1
25
Yes
645
1
25
0
0
25
Yes
0
0
25
0
0
25
35
427
8.3
1.00
100%
2%
0
1.00
100%
2%
0
25
1052
28.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
45
649
9.8
50%
225
Split
4
225
45
847
12.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
1100
Perm
4
4
4
4
4
7.0
13.5
69.0
34.5%
4.0
2.5
0.0
6.5
7.0
13.5
69.0
34.5%
4.0
2.5
0.0
6.5
7.0
13.5
69.0
34.5%
4.0
2.5
0.0
6.5
None
62.5
0.31
0.43
57.7
0.0
57.7
E
None
62.5
0.31
0.43
57.7
0.0
57.7
E
430.8
F
249
347
None
62.5
0.31
2.19
569.5
13.9
583.4
F
249
347
1.00
100%
2%
0
~2315
#2585
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
200
Prot
1
2050
6
2
1
6
2
2
2
5.0
12.0
50.5
25.3%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
131.0
65.5%
4.5
2.0
0.0
6.5
20.0
26.5
80.5
40.3%
4.5
2.0
0.0
6.5
Lag
20.0
26.5
80.5
40.3%
4.5
2.0
0.0
6.5
Lag
None C-Max
27.2 124.5
0.14
0.62
0.83
0.93
95.7
34.4
0.0
21.9
95.7
56.3
F
E
59.8
E
239
1058
306
1045
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
1800
250
Perm
C-Max C-Max
90.3
90.3
0.45
0.45
0.78
0.32
29.1
12.0
0.7
0.0
29.8
12.0
C
B
27.7
C
268
46
m316
m67
Synchro 7 - Report
Page 19
Lanes, Volumes, Timings
13: WB Toll Rd On-Ramp & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
347
EBR
6/5/2013
WBL
WBT
972
525
0
0
0
0.43
525
0
0
0
0.43
WBR
NBL
50
503
0
7
0
2.22
645
385
0
0
0
0.52
NBT
569
2203
239
67
0
1.04
NBR
SBL
SBT
767
SBR
2297
89
198
0
0.86
780
0
0
0
0.32
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 54 (27%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.19
Intersection Signal Delay: 146.8
Intersection LOS: F
Intersection Capacity Utilization 135.6%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
13: WB Toll Rd On-Ramp & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 20
Lanes, Volumes, Timings
14: Sunset Hills Rd & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
100
1900
12
1750
1900
12
0%
250
1900
12
400
1900
12
600
1900
12
0%
250
1900
12
750
1900
12
1300
1900
12
0%
1300
1900
12
350
1900
12
1500
1900
12
0%
150
1900
12
275
1
25
Yes
550
2
25
0
1
25
Yes
480
2
25
470
1
25
Yes
300
2
25
290
2
25
35
506
9.9
3
1.00
100%
2%
0
1.00
100%
2%
0
35
569
11.1
4
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
100
Prot
3
1750
1.00
100%
2%
0
45
847
12.8
1
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
250
Perm
8
400
Prot
7
600
250
Perm
4
3
8
6.0
13.0
24.5
12.3%
4.0
3.0
0.0
7.0
Lead
6.0
49.0
51.0
25.5%
4.0
3.0
0.0
7.0
Lag
6.0
49.0
51.0
25.5%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
27.5
13.8%
4.0
3.0
0.0
7.0
Lead
6.0
54.0
54.0
27.0%
4.0
3.0
0.0
7.0
Lag
6.0
54.0
54.0
27.0%
4.0
3.0
0.0
7.0
Lag
None
10.3
0.05
0.56
104.6
0.0
104.6
F
None
44.0
0.22
1.56
303.9
0.0
303.9
F
263.6
F
~1187
#1275
None
44.0
0.22
0.59
44.9
0.0
44.9
D
None
20.5
0.10
1.14
165.1
0.0
165.1
F
None
54.2
0.27
0.44
14.9
0.0
14.9
B
171
278
~314
#435
None
54.2
0.27
0.63
67.8
0.0
67.8
E
88.4
F
368
451
RANAMNRT5 6/1/2000 Retimed
DLM
45
794
12.0
2
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
8
8
67
103
1.00
100%
2%
0
7
4
4
4
45
138
445
1
25
Yes
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
750
Prot
1
1300
1300
Perm
1
6
6
6
5
5.0
12.0
48.0
24.0%
4.0
3.0
0.0
7.0
Lead
20.0
44.5
94.5
47.3%
4.5
2.0
0.0
6.5
Lag
20.0
44.5
94.5
47.3%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
27.0
13.5%
4.0
3.0
0.0
7.0
Lead
6
350
Prot
5
1500
150
pm+ov
2
3
2
2
2
20.0
44.5
73.5
36.8%
4.5
2.0
0.0
6.5
Lag
6.0
13.0
24.5
12.3%
4.0
3.0
0.0
7.0
Lead
None C-Max C-Max None C-Max
41.0
88.0
88.0
20.0
67.0
0.20
0.44
0.44
0.10
0.34
1.07
0.58
1.59
1.02
0.88
106.7
35.6 292.6 151.1
31.8
0.0
0.0
16.1
0.0
1.0
106.7
35.6 308.6 151.1
32.7
F
D
F
F
C
157.5
51.7
F
D
~558
431 ~2425
~254
554
m443 m381 m#1946 m#365
576
None
76.8
0.38
0.24
9.3
0.0
9.3
A
23
m33
Synchro 7 - Report
Page 21
Lanes, Volumes, Timings
14: Sunset Hills Rd & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
300
0
0
0
0.33
EBT
426
1119
0
0
0
1.56
6/5/2013
EBR
WBL
275
426
0
0
0
0.59
550
352
0
0
0
1.14
WBT
489
WBR
NBL
959
0
0
0
0.63
573
0
0
0
0.44
480
704
0
0
0
1.07
NBT
767
2237
0
0
0
0.58
NBR
SBL
470
818
18
0
0
1.63
300
343
0
0
0
1.02
SBT
714
1703
61
7
0
0.91
SBR
445
614
0
0
0
0.24
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 46 (23%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.59
Intersection Signal Delay: 148.8
Intersection LOS: F
Intersection Capacity Utilization 141.7%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
14: Sunset Hills Rd & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 22
Lanes, Volumes, Timings
15: Bluemont Way & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
25
1900
12
25
1900
12
0%
400
1900
8
50
1900
12
50
1900
12
0%
0
1900
12
600
1900
12
1550
1900
12
0%
50
1900
12
15
1900
12
1800
1900
12
0%
75
1900
12
0
1
25
Yes
0
1
25
0
0
25
Yes
380
1
25
550
1
25
Yes
390
1
25
290
1
25
25
1182
32.2
3
1.00
100%
2%
0
1.00
100%
2%
0
25
258
7.0
2
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
25
pm+pt
7
4
7
25
7.0
14.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
4.0
49.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lag
None
15.4
0.08
0.21
80.2
0.0
80.2
F
None
8.5
0.04
0.32
101.6
0.0
101.6
F
52.5
D
33
70
RANAMNRT5 6/1/2000 Retimed
DLM
30
63
1.00
100%
2%
0
45
794
12.0
1
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
400
pm+ov
4
1
4
4
1
50
pm+pt
3
8
3
50
10.0
17.0
58.0
29.0%
4.0
3.0
0.0
7.0
Lead
45
523
7.9
5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
8
600
Prot
1
8
1
5.0
12.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
58.0
29.0%
4.0
3.0
0.0
7.0
Lead
None
78.1
0.39
0.69
47.7
0.0
47.7
D
None
17.7
0.09
0.38
86.8
0.0
86.8
F
350
488
61
106
None
9.9
0.05
0.54
113.4
0.0
113.4
F
100.1
F
66
117
0.0
0.0%
0.0
4.0
285
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
1550
50
pm+ov
6
3
6
6
3
15
Prot
5
5
1800
75
pm+ov
2
7
2
2
7
20.0
39.0
134.0
67.0%
5.0
2.0
0.0
7.0
Lag
5.0
12.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
20.0
42.0
93.0
46.5%
5.0
2.0
0.0
7.0
Lag
7.0
14.0
17.0
8.5%
4.0
3.0
0.0
7.0
Lead
None C-Max
70.5 155.3
0.35
0.78
0.96
0.39
114.6
6.3
0.0
0.1
114.6
6.3
F
A
35.7
D
822
159
#1159
194
None
164.2
0.82
0.04
0.6
0.0
0.6
A
None C-Max
6.4
86.4
0.03
0.43
0.27
0.82
97.7
33.7
0.0
3.1
97.7
36.8
F
D
36.0
D
20
356
49
375
None
101.2
0.51
0.09
5.0
0.0
5.0
A
0
m3
5
19
Synchro 7 - Report
Page 23
Lanes, Volumes, Timings
15: Bluemont Way & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
140
0
0
0
0.18
6/5/2013
EBT
1102
EBR
WBL
WBT
178
233
0
0
0
0.11
580
0
0
0
0.69
141
0
0
0
0.35
233
0
0
0
0.21
WBR
NBL
380
624
0
0
0
0.96
NBT
714
3948
609
0
0
0.46
NBR
SBL
550
1273
0
0
0
0.04
390
89
0
0
0
0.17
SBT
443
2197
294
34
0
0.95
SBR
285
843
0
0
0
0.09
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 46 (23%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.96
Intersection Signal Delay: 38.8
Intersection LOS: D
Intersection Capacity Utilization 95.3%
ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
15: Bluemont Way & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 24
Lanes, Volumes, Timings
16: New Dominion Pkwy & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
75
1900
12
500
1900
12
0%
350
1900
12
250
1900
12
300
1900
12
0%
200
1900
12
750
1900
12
1000
1900
12
0%
200
1900
12
200
1900
12
1250
1900
12
0%
150
1900
12
275
1
25
Yes
95
1
25
165
1
25
Yes
500
2
25
445
1
25
Yes
205
1
25
270
1
25
25
722
19.7
1
1.00
100%
2%
0
1.00
100%
2%
0
25
408
11.1
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
75
pm+pt
3
8
3
500
5.0
12.0
20.0
10.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
38.0
19.0%
4.0
3.0
0.0
7.0
Lag
None
41.3
0.21
0.36
55.4
0.0
55.4
E
None
31.0
0.16
1.73
385.6
0.0
385.6
F
227.1
F
~968
#1213
RANAMNRT5 6/1/2000 Retimed
DLM
71
119
45
521
7.9
45
423
6.4
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
350
pm+ov
8
1
8
8
8
65
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
250
pm+pt
7
4
7
300
200
pm+ov
4
5
4
4
4
5.0
12.0
45.0
22.5%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lead
5.0
47.0
50.0
25.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
34.0
17.0%
4.0
3.0
0.0
7.0
Lead
None
69.0
0.34
0.35
37.6
0.0
37.6
D
None
63.0
0.32
0.97
108.6
0.0
108.6
F
None
78.1
0.39
0.29
17.6
0.0
17.6
B
155
206
281
#480
None
45.7
0.23
0.70
81.7
0.0
81.7
F
73.6
E
369
499
69
142
750
Prot
1
1
5.0
12.0
45.0
22.5%
4.0
3.0
0.0
7.0
Lead
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
1000
200
pm+ov
6
7
6
6
6
200
Prot
5
5
1250
150
pm+ov
2
3
2
2
2
20.0
39.0
96.0
48.0%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
34.0
17.0%
4.0
3.0
0.0
7.0
Lead
20.0
47.0
85.0
42.5%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
20.0
10.0%
4.0
3.0
0.0
7.0
Lead
None C-Max
38.0
90.6
0.19
0.45
1.15
0.43
165.4
24.5
29.1
0.6
194.5
25.1
F
C
88.3
F
~603
221
#742
247
None
122.6
0.61
0.20
5.9
0.0
5.9
A
None C-Max
25.4
78.0
0.13
0.39
0.89
0.63
121.6
51.1
0.0
0.0
121.6
51.1
F
D
57.2
E
261
489
#407
541
None
88.3
0.44
0.21
22.5
0.0
22.5
C
44
69
82
131
Synchro 7 - Report
Page 25
Lanes, Volumes, Timings
16: New Dominion Pkwy & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
270
233
0
0
0
0.32
EBT
642
289
0
0
0
1.73
EBR
WBL
275
993
0
0
0
0.35
95
258
0
0
0
0.97
6/5/2013
WBT
328
426
0
0
0
0.70
WBR
NBL
165
690
0
0
0
0.29
500
652
36
0
0
1.22
NBT
441
2304
828
0
0
0.68
NBR
SBL
445
1001
0
0
0
0.20
205
239
0
0
0
0.84
SBT
343
1983
0
0
0
0.63
SBR
65
712
0
0
0
0.21
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 46 (23%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.73
Intersection Signal Delay: 101.2
Intersection LOS: F
Intersection Capacity Utilization 118.2%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
16: New Dominion Pkwy & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 26
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
WBT
WBR
SBL
SBR
1050
1900
12
700
1900
12
0%
350
1900
12
0%
1200
1900
12
1050
1900
12
0%
0
2
25
600
1900
12
210
1
25
0
1
25
Yes
35
2307
44.9
35
621
12.1
0
1
25
Yes
35
623
12.1
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
0%
1050
Prot
1
700
350
1050
1
12
10.0
17.0
43.0
33.1%
4.0
3.0
0.0
7.0
Lead
None
36.0
0.28
1.10
105.7
0.0
105.7
F
~518
#652
RANAMNRT5 6/1/2000 Retimed
DLM
12
82.0
63.1%
0.0
7.0
75.0
0.58
0.65
22.3
0.0
22.3
C
72.3
E
382
516
1.00
100%
2%
0
1200
pm+ov
2
3
2
2
2
15.0
39.0
39.0
30.0%
4.0
3.0
0.0
7.0
Lag
5.0
29.0
48.0
36.9%
4.0
3.0
0.0
7.0
1.00
100%
2%
0
1.00
100%
2%
0
600
Free
3
Free
3
5.0
29.0
48.0
36.9%
4.0
3.0
0.0
7.0
None C-Max C-Max
32.0
73.0
41.0
0.25
0.56
0.32
0.76
1.35
0.97
57.6 192.3
51.7
0.0
0.0
0.0
57.6 192.3
51.7
E
F
D
161.9
33.4
F
C
275 ~1331
271
#394 #1598
#567
0.0
0.0%
0.0
4.0
130.0
1.00
0.38
1.4
0.0
1.4
A
30
48
Synchro 7 - Report
Page 27
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
951
0
0
0
1.10
6/5/2013
EBT
2227
WBT
541
WBR
SBL
543
SBR
1075
0
0
0
0.65
459
0
0
0
0.76
886
0
0
0
1.35
1083
0
0
0
0.97
1583
0
0
0
0.38
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 81 (62%), Referenced to phase 3:SBL, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.35
Intersection Signal Delay: 87.4
Intersection LOS: F
Intersection Capacity Utilization 116.0%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
17: Sunrise Valley Dr & Wiehle Ave
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 28
Lanes, Volumes, Timings
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
550
1900
12
15
1900
12
0%
400
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1550
1900
12
0%
300
1900
12
500
1900
12
1200
1900
12
0%
0
1900
12
450
1
25
No
0
0
25
0
0
25
Yes
235
2
25
435
1
25
Yes
0
0
25
450
1
25
25
764
20.8
4
1.00
100%
2%
0
25
553
15.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
326
1.00
100%
2%
0
1.00
100%
2%
0
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0
0
1550
7.0
14.0
44.0
33.8%
4.0
3.0
0.0
7.0
7.0
14.0
44.0
33.8%
4.0
3.0
0.0
7.0
7.0
14.0
44.0
33.8%
4.0
3.0
0.0
7.0
None
32.0
0.25
0.81
61.5
0.9
62.4
E
None
32.0
0.25
0.85
66.7
1.3
68.0
E
65.4
E
283
398
None
32.0
0.25
0.84
65.9
0.0
65.9
E
252
361
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
300
Perm
500
Prot
5
1200
6
6
6
5
2
15.0
22.0
47.0
36.2%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
47.0
36.2%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
39.0
30.0%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
86.0
66.2%
4.0
3.0
0.0
7.0
6
4
1.00
100%
2%
0
0%
4
4
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
0%
24%
304
Perm
4
4
275
384
35
572
11.1
4
0%
39%
335
Split
4
35
623
12.1
0
0
25
Yes
C-Max C-Max
52.8
52.8
0.41
0.41
0.51
0.37
23.9
1.4
0.0
0.0
23.9
1.4
C
A
20.3
C
200
0
m172
m0
0
2
0.0
0.0%
0.0
4.0
None C-Max
24.2
84.0
0.19
0.65
0.78
0.37
30.6
10.5
0.0
0.0
30.6
10.5
C
B
16.4
B
180
189
256
233
Synchro 7 - Report
Page 29
Lanes, Volumes, Timings
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
450
478
0
32
0
0.75
EBT
684
444
0
29
0
0.79
EBR
WBL
6/5/2013
WBT
473
WBR
450
421
0
0
0
0.72
NBL
NBT
543
3064
0
0
0
0.51
NBR
SBL
SBT
492
435
821
0
0
0
0.37
845
0
0
0
0.59
3287
0
0
0
0.37
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.85
Intersection Signal Delay: 28.5
Intersection LOS: C
Intersection Capacity Utilization 70.1%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 30
Lanes, Volumes, Timings
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
450
1900
12
15
1900
12
0%
450
1900
12
200
1900
12
1850
1900
12
0%
0
1900
12
0
1900
12
1250
1900
12
0%
200
1900
12
0
0
25
Yes
0
1
25
0
1
25
No
0
2
25
0
0
25
Yes
250
2
25
0
0
25
35
627
12.2
1.00
100%
2%
0
1.00
100%
2%
0
25
432
11.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
35
572
11.1
29%
319
Split
4
308
35
387
7.5
1.00
100%
2%
0
1.00
100%
2%
0
0%
36%
288
Perm
4
4
4
4
4
5.0
11.5
49.5
38.1%
4.0
2.5
0.0
6.5
5.0
11.5
49.5
38.1%
4.0
2.5
0.0
6.5
5.0
11.5
49.5
38.1%
4.0
2.5
0.0
6.5
None
33.0
0.25
0.75
55.1
0.0
55.1
E
None
33.0
0.25
0.80
59.8
0.0
59.8
E
57.2
E
267
351
None
33.0
0.25
0.76
56.8
0.0
56.8
E
261
338
1.00
100%
2%
0
235
313
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
200
Prot
1
1850
6
2
1
6
2
2
2
5.0
12.0
25.5
19.6%
4.0
3.0
0.0
7.0
Lead
15.0
21.0
80.5
61.9%
4.0
2.0
0.0
6.0
15.0
21.0
55.0
42.3%
4.0
2.0
0.0
6.0
Lag
15.0
21.0
55.0
42.3%
4.0
2.0
0.0
6.0
Lag
None C-Max
12.0
84.5
0.09
0.65
0.63
0.56
39.3
16.7
0.0
1.0
39.3
17.7
D
B
19.8
B
78
435
113
523
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
1250
200
Perm
C-Max C-Max
65.5
65.5
0.50
0.50
0.33
0.22
9.0
3.1
0.0
0.0
9.0
3.1
A
A
8.2
A
99
19
127
56
Synchro 7 - Report
Page 31
Lanes, Volumes, Timings
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
547
EBR
6/5/2013
WBL
WBT
352
WBR
NBL
NBT
492
556
0
0
0
0.57
505
0
0
0
0.61
497
0
0
0
0.58
489
0
0
0
0.41
3307
1089
0
0
0.83
NBR
SBL
SBT
307
SBR
3801
0
0
0
0.33
897
0
0
0
0.22
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 68 (52%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 23.7
Intersection LOS: C
Intersection Capacity Utilization 70.1%
ICU Level of Service C
Analysis Period (min) 15
Splits and Phases:
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 32
Lanes, Volumes, Timings
20: Sunset Hills Rd & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
200
1900
12
850
1900
12
0%
400
1900
12
200
1900
12
450
1900
12
0%
150
1900
12
700
1900
12
850
1900
12
0%
700
1900
12
450
1900
12
1000
1900
12
0%
150
1900
12
385
1
25
Yes
477
1
25
0
0
25
Yes
320
2
25
0
1
25
Yes
250
1
25
442
1
25
35
1259
24.5
10
1.00
100%
2%
0
1.00
100%
2%
0
35
976
19.0
10
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
200
pm+pt
7
4
7
850
5.0
12.0
20.0
15.4%
4.0
3.0
0.0
7.0
Lead
8.0
51.0
40.0
30.8%
4.0
3.0
0.0
7.0
Lag
None
45.5
0.35
0.69
39.7
0.0
39.7
D
None
33.0
0.25
0.95
67.3
0.0
67.3
E
51.6
D
372
#500
RANAMNRT5 6/1/2000 Retimed
DLM
111
171
35
540
10.5
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
400
pm+ov
4
1
4
4
4
200
pm+pt
3
8
3
600
5.0
12.0
30.0
23.1%
4.0
3.0
0.0
7.0
Lead
35
619
12.1
3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
8
700
Prot
1
8
1
5.0
12.0
20.0
15.4%
4.0
3.0
0.0
7.0
Lead
8.0
40.0
40.0
30.8%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
30.0
23.1%
4.0
3.0
0.0
7.0
Lead
None
56.0
0.43
0.57
24.2
0.0
24.2
C
None
46.5
0.36
0.85
63.4
0.0
63.4
E
199
293
116
#254
None
33.5
0.26
0.66
45.0
0.0
45.0
D
49.6
D
227
294
0.0
0.0%
0.0
4.0
120
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
850
700
pm+ov
6
3
6
6
6
450
pm+pt
5
2
5
1150
15.0
33.0
40.0
30.8%
4.0
2.0
0.0
6.0
Lag
2
2
15.0
38.0
43.0
33.1%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
20.0
15.4%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
27.0
20.8%
4.0
3.0
0.0
7.0
Lead
None C-Max
23.0
37.0
0.18
0.28
1.15
0.84
140.4
43.3
0.0
0.1
140.4
43.4
F
D
95.0
F
~366
319
#490
401
None
49.0
0.38
1.16
112.1
0.0
112.1
F
None C-Max
53.0
34.0
0.41
0.26
1.37
0.87
216.3
53.4
0.0
0.0
216.3
53.4
F
D
99.2
F
~452
335
#667
395
~544
#772
0
0.0
0.0%
0.0
4.0
Synchro 7 - Report
Page 33
Lanes, Volumes, Timings
20: Sunset Hills Rd & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
442
298
0
0
0
0.67
EBT
1179
898
0
0
0
0.95
6/5/2013
EBR
WBL
385
699
0
0
0
0.57
477
234
0
0
0
0.85
WBT
896
WBR
903
0
0
0
0.66
NBL
320
607
0
0
0
1.15
NBT
460
NBR
SBL
1007
4
0
0
0.85
604
0
0
0
1.16
250
329
0
0
0
1.37
SBT
539
SBR
1319
0
0
0
0.87
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 43 (33%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.37
Intersection Signal Delay: 79.8
Intersection LOS: E
Intersection Capacity Utilization 112.5%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
20: Sunset Hills Rd & Wiehle Ave
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 34
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1050
1900
12
50
1900
12
0%
300
1900
12
0
1900
12
50
1900
12
0%
50
1900
12
400
1900
12
700
1900
12
0%
0
1900
12
50
1900
12
450
1900
12
0%
600
1900
12
0
0
25
Yes
0
1
25
670
0
25
Yes
0
1
25
0
0
25
Yes
0
1
25
430
1
25
35
3015
58.7
35
879
17.1
30
256
5.8
220
0
25
Yes
35
1671
32.6
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1050
Prot
5
350
2
5.0
12.0
56.0
37.3%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
72.0
48.0%
4.0
3.0
0.0
7.0
None C-Max
47.9
65.0
0.32
0.43
0.96
0.41
68.4
9.3
0.0
0.0
68.4
9.3
E
A
53.7
D
514
56
#647
135
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Perm
0.0
0.0%
0.0
4.0
100
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
6
6
3
8
7
4
15.0
22.0
16.0
10.7%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
16.0
10.7%
4.0
3.0
0.0
7.0
Lag
5.0
10.0
36.0
24.0%
4.0
1.0
0.0
5.0
Lead
5.0
21.0
62.0
41.3%
4.0
1.0
0.0
5.0
Lag
7.0
14.0
16.0
10.7%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
42.0
28.0%
4.0
3.0
0.0
7.0
Lag
None
31.0
0.21
1.09
128.3
0.0
128.3
F
None
60.2
0.40
0.49
35.8
0.0
35.8
D
69.4
E
277
340
None
9.0
0.06
0.47
83.2
0.0
83.2
F
None
35.0
0.23
1.15
119.5
0.0
119.5
F
117.8
F
~546
#687
0.0
0.0%
0.0
4.0
~440
#653
700
1.00
100%
2%
0
0%
6
6
C-Max C-Max
10.1
0.07
0.38
39.9
0.0
39.9
D
39.9
D
25
57
0
1.00
100%
2%
0
400
Prot
3
2
5
1.00
100%
2%
0
0
1050
8
50
Prot
7
0.0
0.0%
0.0
4.0
48
95
0
4
0.0
0.0%
0.0
4.0
Synchro 7 - Report
Page 35
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
430
1121
0
0
0
0.94
EBT
2935
EBR
847
0
0
0
0.41
6/5/2013
WBL
WBT
799
WBR
264
0
0
0
0.38
NBL
NBT
176
366
0
0
0
1.09
1420
0
0
0
0.49
NBR
SBL
SBT
1591
106
0
0
0
0.47
915
0
0
0
1.15
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBTL, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.15
Intersection Signal Delay: 77.0
Intersection LOS: E
Intersection Capacity Utilization 106.4%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
21: Sunrise Valley Dr & Hunter Mill Rd
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 36
Lanes, Volumes, Timings
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
150
1900
12
0
1900
12
0%
300
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
850
1900
12
0%
850
1900
12
300
1900
12
700
1900
12
0%
0
1900
12
65
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
0
1
25
Yes
206
1
25
0
1
25
35
693
13.5
1.00
100%
2%
0
1.00
100%
2%
0
25
406
11.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
150
Prot
4
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
300
custom
0
0
1.00
100%
2%
0
35
447
8.7
1.00
100%
2%
0
4
5.0
10.5
30.5
25.4%
4.0
1.5
0.0
5.5
5.0
10.5
30.5
25.4%
4.0
1.5
0.0
5.5
0.0
0.0%
0.0
4.0
None
15.7
0.13
0.65
61.8
0.0
61.8
E
None
15.7
0.13
0.68
15.7
0.0
15.7
B
112
172
19
103
1.00
100%
2%
0
0%
0
0
935
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
765
Perm
300
Prot
1
700
2
2
2
1
6
20.0
26.0
63.5
52.9%
4.0
2.0
0.0
6.0
Lag
20.0
26.0
63.5
52.9%
4.0
2.0
0.0
6.0
Lag
5.0
11.5
26.0
21.7%
4.0
2.5
0.0
6.5
Lead
20.0
26.0
89.5
74.6%
4.0
2.0
0.0
6.0
2
4
4
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
35
1671
32.6
0
0
25
Yes
0
6
0.0
0.0%
0.0
4.0
C-Max C-Max None C-Max
66.8
66.8
19.5
92.8
0.56
0.56
0.16
0.77
0.96
0.70
1.04
0.49
47.4
8.8
81.8
7.3
13.2
0.0
0.0
3.2
60.6
8.8
81.8
10.5
E
A
F
B
37.3
31.9
D
C
687
86
~214
248
#1105
278 m#409 m264
Synchro 7 - Report
Page 37
Lanes, Volumes, Timings
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
369
0
0
0
0.41
EBT
613
EBR
WBL
WBT
326
6/5/2013
WBR
65
546
0
0
0
0.55
NBL
NBT
1591
NBR
SBL
974
0
59
0
1.02
1090
0
0
0
0.70
206
288
0
0
0
1.04
SBT
367
SBR
1441
617
0
0
0.85
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.04
Intersection Signal Delay: 34.7
Intersection LOS: C
Intersection Capacity Utilization 101.9%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 38
Lanes, Volumes, Timings
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
300
1900
12
0
1900
12
0%
400
1900
12
350
1900
12
650
1900
12
0%
0
1900
12
0
1900
12
700
1900
12
0%
200
1900
12
0
0
25
Yes
0
1
25
0
1
25
Yes
120
1
25
0
0
25
Yes
0
0
25
0
0
25
35
452
8.8
25
854
23.3
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
300
Prot
4
35
218
4.2
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0.0
0.0%
RANAMNRT5 6/1/2000 Retimed
DLM
35
447
8.7
0
1
25
Yes
0
1.00
100%
2%
0
650
4
4
4
5.0
11.0
25.0
20.8%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
25.0
20.8%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
28.0
23.3%
4.0
2.0
0.0
6.0
Lead
10.0
16.0
73.0
60.8%
4.0
2.0
0.0
6.0
0.0
4.0
1.00
100%
2%
0
0%
350
pm+pt
1
6
1
0.0
0.0%
1.00
100%
2%
0
400
custom
None
19.0
0.16
1.07
122.0
0.0
122.0
F
None
19.0
0.16
0.68
11.1
9.9
20.9
C
~258
#435
0
96
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
700
200
Perm
6
23
6
23
23
23
None C-Max
67.0
67.0
0.56
0.56
0.90
0.62
31.9
12.1
0.0
3.6
31.9
15.7
C
B
21.4
C
177
294
m183 m283
0.0
0.0%
0.0
0.0%
67.0
55.8%
67.0
55.8%
0.0
4.0
0.0
4.0
0.0
6.0
0.0
6.0
61.0
0.51
0.74
8.2
12.5
20.8
C
16.6
B
92
m66
61.0
0.51
0.22
0.2
1.9
2.1
A
0
m0
Synchro 7 - Report
Page 39
Lanes, Volumes, Timings
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
372
EBR
WBL
WBT
774
280
0
0
0
1.07
6/5/2013
WBR
NBL
584
0
153
0
0.93
120
387
0
0
0
0.90
NBT
367
1040
293
168
0
0.87
NBR
SBL
SBT
138
SBR
947
232
34
0
0.98
899
550
0
0
0.57
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 37 (31%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.36
Intersection Signal Delay: 31.3
Intersection LOS: C
Intersection Capacity Utilization 86.2%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 41
Lanes, Volumes, Timings
24: Sunset Hills Rd & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBR
NBL
NBT
SBT
SBR
300
1900
12
0%
0
1
25
300
1900
12
700
1900
12
450
1900
12
0%
650
1900
12
0%
300
1900
12
370
1
25
Yes
0
2
25
35
385
7.5
1
1.00
100%
2%
0
?
1
4
6
5.0
11.0
28.0
23%
4.0
2.0
5.0
11.0
25.0
21%
4.0
2.0
10.0
16.0
73.0
61%
4.0
2.0
Lead
Lag
35
772
15.0
4
1.00
100%
2%
0
300
Perm
3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
450
650
700
Prot
14
124
14
124
3
3
3
5.0
12.0
22.0
18.3%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
22.0
18.3%
4.0
3.0
0.0
7.0
Lead
None
15.0
0.12
1.36
227.6
0.0
227.6
F
120.2
F
~305
#483
None
15.0
0.12
0.65
12.7
0.1
12.8
B
47.0
0.39
0.52
32.6
53.5
86.1
F
0
85
187
250
RANAMNRT5 6/1/2000 Retimed
DLM
?
230
1
25
Yes
35
218
4.2
0%
300
?
53.0
44.2%
98.0
81.7%
0.0
6.0
0.0
6.0
92.0
0.77
0.32
2.0
1.0
3.0
A
53.6
D
33
36
1.00
100%
2%
0
300
pm+ov
2
3
2
2
2
10.0
16.0
45.0
37.5%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
22.0
18.3%
4.0
3.0
0.0
7.0
Lead
C-Max
39.0
0.32
1.07
97.4
16.9
114.3
F
82.5
F
~560
#789
None
53.0
0.44
0.40
13.6
0.0
13.6
B
None
None C-Max
86
150
Synchro 7 - Report
Page 43
Lanes, Volumes, Timings
24: Sunset Hills Rd & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
305
221
0
0
0
1.36
6/5/2013
EBR
NBL
NBT
138
SBT
692
370
460
0
4
0
0.66
1345
710
0
0
1.10
1428
703
0
0
0.62
605
0
23
0
1.12
SBR
?
?
?
230
749
0
0
0
0.40
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 37 (31%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.36
Intersection Signal Delay: 78.5
Intersection LOS: E
Intersection Capacity Utilization 86.6%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
24: Sunset Hills Rd & Hunter Mill Rd
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 44
Lanes, Volumes, Timings
1: Frying Pan & Sunrise
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Baseline
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
700
1900
12
1450
1900
12
0%
50
1900
12
100
1900
12
1150
1900
12
0%
50
1900
12
0
1900
12
50
1900
12
0%
150
1900
12
250
1900
12
50
1900
12
0%
2600
1900
12
0
0
25
Yes
0
1
25
0
1
25
Yes
0
1
25
0
1
25
Yes
0
1
25
0
2
25
30
294
6.7
0.92
100%
2%
0
0.92
100%
2%
0
30
318
7.2
0.92
100%
2%
0
0.92
100%
2%
0
0%
761
Prot
7
1630
0.92
100%
2%
0
30
342
7.8
0.92
100%
2%
0
0.92
100%
2%
0
0%
0
4
109
Prot
3
1250
0.92
100%
2%
0
30
339
7.7
0.92
100%
2%
0
0.92
100%
2%
0
0%
54
Free
8
0
Prot
5
54
0.92
100%
2%
0
163
Free
272
Prot
1
54
Free
4
3
8
5
2
1
6
4.0
11.0
38.0
31.7%
4.0
3.0
0.0
7.0
Lead
Yes
Max
31.0
0.26
0.86
53.4
0.0
53.4
D
4.0
23.0
45.0
37.5%
4.0
3.0
0.0
7.0
Lag
Yes
Max
38.0
0.32
1.46
243.8
0.0
243.8
F
183.2
F
~915
#1057
4.0
11.0
21.0
17.5%
4.0
3.0
0.0
7.0
Lead
Yes
Max
14.0
0.12
0.53
59.9
0.0
59.9
E
4.0
23.0
28.0
23.3%
4.0
3.0
0.0
7.0
Lag
Yes
Max
21.0
0.18
2.02
491.5
0.0
491.5
F
439.5
F
~797
#935
4.0
11.0
30.0
25.0%
4.0
3.0
0.0
7.0
Lead
Yes
Max
4.0
23.0
25.0
20.8%
4.0
3.0
0.0
7.0
Lag
Yes
Max
18.0
0.15
0.10
44.7
0.0
44.7
D
11.2
B
19
38
120.0
1.00
0.10
0.1
0.0
0.1
A
4.0
11.0
29.0
24.2%
4.0
3.0
0.0
7.0
Lead
Yes
Max
22.0
0.18
0.84
69.9
0.0
69.9
E
0
0
205
#349
4.0
23.0
24.0
20.0%
4.0
3.0
0.0
7.0
Lag
Yes
Max
17.0
0.14
0.11
45.6
0.0
45.6
D
339.2
F
19
39
290
#386
0.0
4.0
81
142
0.0
0.0%
0.0
4.0
120.0
1.00
0.03
0.0
0.0
0.0
A
0
0
0.0
0.0%
0.0
4.0
2826
Free
6
Free
7
0.0
0.0%
0.92
100%
2%
0
0%
2
Free
0
1
25
Yes
0.0
0.0%
0.0
4.0
120.0
1.00
1.79
370.7
0.0
370.7
F
~2004
#2244
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
1: Frying Pan & Sunrise
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
6/5/2013
EBL
EBT
214
887
0
0
0
0.86
1117
0
0
0
1.46
EBR
WBL
WBT
238
WBR
207
0
0
0
0.53
619
0
0
0
2.02
1583
0
0
0
0.03
NBL
NBT
262
NBR
SBL
SBT
259
SBR
531
0
0
0
0.10
1583
0
0
0
0.10
325
0
0
0
0.84
501
0
0
0
0.11
1583
0
0
0
1.79
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 150
Control Type: Pretimed
Maximum v/c Ratio: 2.02
Intersection Signal Delay: 297.0
Intersection LOS: F
Intersection Capacity Utilization 89.8%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
Baseline
1: Frying Pan & Sunrise
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
2: Frying Pan Rd. & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
700
1900
12
600
1900
12
0%
500
1900
12
250
1900
12
500
1900
12
0%
100
1900
12
200
1900
12
800
1900
12
0%
150
1900
12
25
1900
12
1400
1900
12
0%
650
1900
12
155
1
25
Yes
310
1
25
400
1
25
Yes
205
1
25
390
1
25
Yes
375
1
25
225
2
25
35
232
4.5
1.00
100%
2%
0
1.00
100%
2%
0
35
1725
33.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
700
Prot
3
3
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
0%
600
500
pm+ov
8
1
8
8
8
250
Prot
7
7
500
100
pm+ov
4
5
4
4
4
5.0
12.0
33.0
23.6%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
21.0
15.0%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
23.0
16.4%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
21.0
15.0%
4.0
3.0
-4.0
3.0
Lead
None
28.0
0.20
1.02
93.8
0.0
93.8
F
None
30.0
0.21
1.50
277.1
0.0
277.1
F
141.8
F
~757
#991
None
54.2
0.39
0.79
46.6
0.0
46.6
D
None
18.0
0.13
1.10
142.8
0.0
142.8
F
None
28.8
0.21
0.26
14.6
0.0
14.6
B
380
532
~257
#435
None
20.0
0.14
0.99
96.5
0.0
96.5
F
100.5
F
242
#363
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
5.0
12.0
31.0
22.1%
4.0
3.0
-4.0
3.0
Lead
~347
#473
1.00
100%
2%
0
16
63
200
Prot
1
1
5.0
12.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
800
150
pm+ov
6
7
6
6
6
15.0
38.0
65.0
46.4%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
21.0
15.0%
4.0
3.0
-4.0
3.0
Lead
None C-Max
21.2
74.2
0.15
0.53
0.75
0.30
56.8
10.9
0.0
0.0
56.8
10.9
E
B
17.8
B
152
146
m157 m137
None
95.2
0.68
0.13
3.0
0.0
3.0
A
23
m25
25
Prot
5
5
5.0
12.0
21.0
15.0%
4.0
3.0
-4.0
3.0
Lead
1400
650
pm+ov
2
3
2
2
2
15.0
38.0
61.0
43.6%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
31.0
22.1%
4.0
3.0
-4.0
3.0
Lead
None C-Max
10.7
58.8
0.08
0.42
0.18
0.94
53.7
54.5
0.0
0.0
53.7
54.5
D
D
42.0
D
24
467
m38
#823
None
89.8
0.64
0.62
14.5
0.0
14.5
B
184
249
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
2: Frying Pan Rd. & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
225
687
0
0
0
1.02
EBT
152
399
0
0
0
1.50
6/5/2013
EBR
WBL
155
629
0
0
0
0.79
310
228
0
0
0
1.10
WBT
1645
506
0
0
0
0.99
WBR
NBL
400
388
0
0
0
0.26
205
278
0
0
0
0.72
NBT
1018
2694
0
0
0
0.30
NBR
SBL
390
1124
0
0
0
0.13
375
228
0
0
0
0.11
SBT
1018
SBR
1485
0
0
0
0.94
1051
0
0
0
0.62
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 112 (80%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 100
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.50
Intersection Signal Delay: 76.3
Intersection LOS: E
Intersection Capacity Utilization 108.5%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
2: Frying Pan Rd. & Centreville Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
3: Coppermine Rd. & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
600
1900
12
250
1900
12
0%
400
1900
12
100
1900
12
150
1900
12
0%
100
1900
12
100
1900
12
1150
1900
12
0%
50
1900
12
100
1900
12
1450
1900
12
0%
300
1900
12
200
1
25
Yes
355
1
25
370
1
25
Yes
465
2
25
435
1
25
Yes
375
1
25
100
1
25
25
254
6.9
1.00
100%
2%
0
1.00
100%
2%
1
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
600
pm+pt
3
8
3
250
7.0
14.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
37.0
26.4%
4.0
3.0
-4.0
3.0
Lag
None
56.4
0.40
1.03
82.2
0.0
82.2
F
None
39.6
0.28
0.25
40.4
0.0
40.4
D
54.8
D
93
135
~514
#889
1.00
100%
2%
0
40
991
16.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
400
pm+ov
8
1
8
8
8
100
pm+pt
7
4
7
150
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
22.0
15.7%
4.0
3.0
-4.0
3.0
Lead
7.0
49.0
34.0
24.3%
4.0
3.0
-4.0
3.0
Lag
None
55.2
0.39
0.56
22.8
0.0
22.8
C
None
30.9
0.22
0.32
31.9
0.0
31.9
C
172
275
58
97
None
17.1
0.12
0.35
57.0
0.0
57.0
E
41.1
D
68
91
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
1
40
689
11.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
100
pm+ov
4
5
4
4
4
425
1
25
Yes
1.00
100%
2%
1
1.00
100%
2%
0
0%
100
Prot
1
1200
0
6
100
Prot
5
1
6
5
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
15.0
39.0
61.0
43.6%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
15.0
42.0
62.0
44.3%
4.0
3.0
-4.0
3.0
Lag
7.0
14.0
25.0
17.9%
4.0
3.0
-4.0
3.0
Lead
None
35.5
0.25
0.23
26.4
0.0
26.4
C
None
12.6
0.09
0.32
64.9
0.0
64.9
E
None
15.4
0.11
0.51
68.4
0.0
68.4
E
49
m67
C-Min
62.0
0.44
0.64
24.7
0.0
24.7
C
23.3
C
293
269
None
101.3
0.72
0.24
1.9
0.0
1.9
A
49
83
C-Min
59.2
0.42
0.45
26.0
0.0
26.0
C
29.0
C
168
m277
0.0
0.0%
-1.0
3.0
86
151
1450
300
pm+ov
2
3
2
2
2
7
51
Synchro 7 - Report
Page 3
Lanes, Volumes, Timings
3: Coppermine Rd. & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
100
585
0
0
0
1.03
EBT
174
999
0
0
0
0.25
6/5/2013
EBR
WBL
200
719
0
0
0
0.56
355
376
0
0
0
0.27
WBT
684
784
0
0
0
0.19
WBR
NBL
370
440
0
0
0
0.23
465
392
0
0
0
0.26
NBT
911
2704
0
0
0
0.44
NBR
SBL
375
219
0
0
0
0.46
SBT
609
2252
0
0
0
0.64
SBR
425
1223
0
0
0
0.25
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 137 (98%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.03
Intersection Signal Delay: 34.5
Intersection LOS: C
Intersection Capacity Utilization 84.6%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
3: Coppermine Rd. & Centreville Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 7 - Report
Page 4
Lanes, Volumes, Timings
4: Sunrise Valley Dr & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1150
1900
12
600
1900
12
0%
200
1900
12
750
1900
12
350
1900
12
-6%
700
1900
12
100
1900
12
1300
1900
12
1%
350
1900
12
650
1900
12
1450
1900
12
-1%
350
1900
12
0
0
25
Yes
285
2
25
305
1
25
Yes
420
2
25
0
1
25
Yes
280
2
25
520
2
25
35
836
16.3
2
1.00
100%
2%
0
1.00
100%
2%
0
35
852
16.6
1
5
1.00
100%
2%
0
1.00
100%
2%
0
0%
1150
Split
3
800
1.00
100%
2%
0
40
951
16.2
4
7
1.00
100%
2%
1
1.00
100%
2%
0
0%
0
3
750
Split
4
350
4
3
3
4
4
4
4
5.0
50.0
45.0
30.0%
4.0
3.0
0.0
7.0
Lead
5.0
50.0
45.0
30.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
32.0
21.3%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
32.0
21.3%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
32.0
21.3%
4.0
3.0
0.0
7.0
Lag
None
38.0
0.25
1.32
196.0
2.0
198.0
F
None
38.0
0.25
0.91
67.2
0.0
67.2
E
144.3
F
390
#505
None
25.0
0.17
1.27
184.5
0.0
184.5
F
None
25.0
0.17
0.58
61.9
0.0
61.9
E
227.9
F
168
224
None
25.0
0.17
1.69
346.3
11.1
357.4
F
~747
#884
RANAMNRT5 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
4.0
~476
#605
40
698
11.9
8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
700
Perm
~852
#1103
100
Prot
1
1
5.0
12.0
22.0
14.7%
4.0
3.0
0.0
7.0
Lead
0
1
25
Yes
1.00
100%
2%
0
1.00
100%
2%
0
0%
1300
350
pm+ov
6
4
6
6
6
20.0
43.0
46.0
30.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
32.0
21.3%
4.0
3.0
0.0
7.0
Lag
None C-Max
9.9
39.0
0.07
0.26
0.44
0.99
73.3
76.9
0.0
20.7
73.3
97.6
E
F
80.3
F
49
467
80
#575
None
64.0
0.43
0.51
17.8
0.0
17.8
B
129
186
650
Prot
5
1450
350
Perm
5
2
2
2
5.0
12.0
27.0
18.0%
4.0
3.0
0.0
7.0
Lead
20.0
42.0
51.0
34.0%
4.0
3.0
0.0
7.0
Lag
20.0
42.0
51.0
34.0%
4.0
3.0
0.0
7.0
Lag
2
None C-Max C-Max
20.0
49.1
49.1
0.13
0.33
0.33
1.41
0.87
0.51
249.0
54.1
18.6
0.0
0.0
0.0
249.0
54.1
18.6
F
D
B
100.7
F
~449
327
68
#579
482
166
Synchro 7 - Report
Page 1
Lanes, Volumes, Timings
4: Sunrise Valley Dr & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
520
870
0
3
0
1.33
EBT
756
EBR
881
0
0
0
0.91
6/5/2013
WBL
285
589
0
0
0
1.27
WBT
772
608
0
0
0
0.58
WBR
NBL
305
415
0
6
0
1.71
420
342
0
0
0
0.29
NBT
871
NBR
SBL
1316
0
85
0
1.06
682
0
0
0
0.51
280
460
0
0
0
1.41
SBT
618
SBR
1674
0
0
0
0.87
686
0
0
0
0.51
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 40 (27%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.69
Intersection Signal Delay: 135.7
Intersection LOS: F
Intersection Capacity Utilization 124.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
4: Sunrise Valley Dr & Centreville Rd.
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 2
Lanes, Volumes, Timings
5: Dulles Toll Rd. (S) & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
250
1900
12
25
1900
12
0%
250
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1850
1900
12
1%
1000
1900
12
500
1900
12
1900
1900
12
-1%
0
1900
12
365
1
25
Yes
0
0
25
0
0
25
No
500
1
25
0
1
25
Yes
290
2
25
0
0
25
35
574
11.2
7
1.00
100%
2%
0
10
842
57.4
7
1.00
100%
2%
0
1.00
100%
2%
0
2
1.00
100%
2%
0
0%
0
Split
4
40
1210
20.6
275
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
250
Free
0
0
40
521
8.9
3
1.00
100%
2%
0
1.00
100%
2%
0
0
4
1850
1000
Perm
4
4
6
6
6
5.0
12.0
32.5
21.7%
4.0
3.0
0.0
7.0
5.0
12.0
32.5
21.7%
4.0
3.0
0.0
7.0
20.0
26.5
78.5
52.3%
4.0
2.5
0.0
6.5
Lag
20.0
26.5
78.5
52.3%
4.0
2.5
0.0
6.5
Lag
None
None
24.9
0.17
0.93
98.4
33.7
132.1
F
69.3
E
268
#439
RANAMNRT5 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
6
Free
150.0
1.00
0.16
0.2
0.0
0.2
A
1.00
100%
2%
0
0%
0
0
0
25
No
C-Max C-Max
77.9
77.9
0.52
0.52
0.70
1.01
18.7
37.2
0.0
0.0
18.7
37.2
B
D
25.2
C
204
~136
289 #1105
500
Prot
5
1900
5
2
5.0
12.0
39.0
26.0%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
117.5
78.3%
4.0
2.5
0.0
6.5
0
2
0.0
0.0%
0.0
4.0
Min C-Max
26.8 111.6
0.18
0.74
0.81
0.72
74.7
1.6
0.0
2.0
74.7
3.6
E
A
18.4
B
226
30
m208
m64
Synchro 7 - Report
Page 3
Lanes, Volumes, Timings
5: Dulles Toll Rd. (S) & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
494
303
0
43
0
1.06
EBR
6/5/2013
WBL
WBT
762
WBR
365
1561
0
0
0
0.16
NBL
NBT
1130
NBR
SBL
2627
0
0
0
0.70
993
0
0
0
1.01
290
736
0
0
0
0.68
SBT
441
SBR
2647
560
0
0
0.91
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 88 (59%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.01
Intersection Signal Delay: 26.4
Intersection LOS: C
Intersection Capacity Utilization 111.6%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
5: Dulles Toll Rd. (S) & Centreville Rd.
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 4
Lanes, Volumes, Timings
6: Dulles Toll Rd. (N) & Centreville Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
700
1900
12
15
1900
12
0%
500
1900
12
500
1900
12
1550
1900
12
3%
0
1900
12
0
1900
12
1700
1900
12
-2%
450
1900
12
0
0
25
No
0
1
25
0
1
25
Yes
155
1
25
0
0
25
No
0
0
25
0
0
25
10
1144
78.0
7
1.00
100%
2%
0
30
902
20.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 6/1/2000 Retimed
DLM
40
847
14.4
6
0%
0
40
521
8.9
0
1
25
Yes
49%
357
Split
4
358
1.00
100%
2%
0
1.00
100%
2%
0
0%
500
Perm
4
4
4
4
4
5.0
12.0
43.5
29.0%
4.0
3.0
0.0
7.0
5.0
12.0
43.5
29.0%
4.0
3.0
0.0
7.0
5.0
12.0
43.5
29.0%
4.0
3.0
0.0
7.0
None
36.5
0.24
0.87
76.6
0.0
76.6
E
None
36.5
0.24
0.87
76.3
0.0
76.3
E
106.1
F
356
#541
None
36.5
0.24
1.18
148.4
0.0
148.4
F
356
#541
1.00
100%
2%
0
500
pm+pt
1
6
1
1550
5.0
12.0
33.0
22.0%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1700
450
Perm
6
2
6
2
2
2
20.0
26.5
106.5
71.0%
4.0
2.5
0.0
6.5
20.0
26.5
73.5
49.0%
4.0
2.5
0.0
6.5
Lag
20.0
26.5
73.5
49.0%
4.0
2.5
0.0
6.5
Lag
None C-Max
99.5 100.0
0.66
0.67
1.42
0.46
238.4
21.1
0.0
1.8
238.4
22.9
F
C
75.5
E
~551
~615
321
#781 m#831
453
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
C-Max C-Max
67.0
67.0
0.45
0.45
1.06
0.53
81.8
15.6
0.0
0.0
81.8
15.6
F
B
67.9
E
~962
142
#1100
247
Synchro 7 - Report
Page 5
Lanes, Volumes, Timings
6: Dulles Toll Rd. (N) & Centreville Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
1064
EBR
6/5/2013
WBL
WBT
822
WBR
NBL
409
0
0
0
0.87
411
0
0
0
0.87
422
0
0
0
1.18
155
351
0
0
0
1.42
NBT
441
3339
1553
0
0
0.87
NBR
SBL
SBT
767
SBR
1597
0
0
0
1.06
847
0
0
0
0.53
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 44 (29%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.42
Intersection Signal Delay: 79.3
Intersection LOS: E
Intersection Capacity Utilization 111.6%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
6: Dulles Toll Rd. (N) & Centreville Rd.
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 6
Lanes, Volumes, Timings
7: Sunrise Valley Dr & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1050
1900
12
600
1900
12
0%
350
1900
12
550
1900
12
650
1900
12
0%
600
1900
12
150
1900
12
1900
1900
12
0%
125
1900
12
450
1900
12
2000
1900
12
0%
500
1900
12
275
1
25
Yes
245
1
25
215
1
25
Yes
400
2
25
400
1
25
Yes
340
1
25
240
2
25
35
942
18.4
1.00
100%
2%
0
1.00
100%
2%
0
35
761
14.8
1.00
100%
2%
0
1.00
100%
2%
0
350
Perm
29%
390
Split
4
0%
1050
Split
3
600
1.00
100%
2%
0
50
3688
50.3
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
3
810
1.00
100%
2%
0
50
1585
21.6
1
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
600
Perm
4
150
Prot
1
1900
125
Perm
6
3
3
7.0
14.0
36.5
16.6%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
36.5
16.6%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
36.5
16.6%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
52.0
23.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
52.0
23.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
52.0
23.6%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
18.0
8.2%
4.0
3.0
0.0
7.0
Lead
None
29.5
0.13
2.28
617.1
0.0
617.1
F
None
29.5
0.13
1.26
204.0
0.0
204.0
F
416.2
F
~572
#710
None
29.5
0.13
1.22
177.1
0.0
177.1
F
None
45.0
0.20
1.19
179.3
0.0
179.3
F
None
45.0
0.20
1.43
247.4
0.0
247.4
F
~503
#736
~742
#1003
None
45.0
0.20
1.18
166.2
0.0
166.2
F
196.1
F
~769
#916
None C-Max C-Max
11.0
94.0
94.0
0.05
0.43
0.43
0.87
1.26
0.18
143.0 170.7
20.2
0.0
0.0
0.0
143.0 170.7
20.2
F
F
C
160.1
F
113 ~1806
56
#189 #1918
108
~1268
#1405
RANAMNRT5 6/1/2000 Retimed
DLM
4
4
4
1
6
6
6
20.0
27.5
101.5
46.1%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
101.5
46.1%
5.0
2.5
0.0
7.5
Lag
~1020
#1284
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
3
3
4
395
1
25
Yes
450
Prot
5
2000
500
Perm
5
2
2
2
5.0
12.0
30.0
13.6%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
113.5
51.6%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
113.5
51.6%
5.0
2.5
0.0
7.5
Lag
2
None C-Max C-Max
23.0 106.0 106.0
0.10
0.48
0.48
1.25
1.17
0.57
193.8 119.2
15.7
0.0
0.0
0.0
193.8 119.2
15.7
F
F
B
113.1
F
~424 ~1808
247
#547 #1905
303
Synchro 7 - Report
Page 7
Lanes, Volumes, Timings
7: Sunrise Valley Dr & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
240
460
0
0
0
2.28
EBT
862
475
0
0
0
1.26
EBR
WBL
275
288
0
0
0
1.22
245
329
0
0
0
1.19
6/5/2013
WBT
681
686
0
0
0
1.18
WBR
NBL
215
421
0
0
0
1.43
400
172
0
0
0
0.87
NBT
3608
1512
0
0
0
1.26
NBR
SBL
400
703
0
0
0
0.18
340
359
0
0
0
1.25
SBT
1505
1705
0
0
0
1.17
SBR
395
884
0
0
0
0.57
Intersection Summary
Area Type:
Other
Cycle Length: 220
Actuated Cycle Length: 220
Offset: 183 (83%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.28
Intersection Signal Delay: 209.2
Intersection LOS: F
Intersection Capacity Utilization 141.7%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
7: Sunrise Valley Dr & Fairfax County Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 8
Lanes, Volumes, Timings
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
600
1900
12
0
1900
12
0%
200
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
3150
1900
12
0%
250
1900
12
450
1900
12
2450
1900
12
0%
0
1900
12
220
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
640
1
25
Yes
325
2
25
160
1
25
35
414
8.1
35
491
9.6
50
1585
21.6
0
0
25
Yes
50
713
9.7
4
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
600
Prot
3
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
200
custom
0
0
1.00
100%
2%
0
1.00
100%
2%
0
3
5.0
12.0
26.5
24.1%
4.0
3.0
0.0
7.0
5.0
12.0
26.5
24.1%
4.0
3.0
0.0
7.0
0.0
0.0%
0.0
4.0
None
19.5
0.18
0.99
78.8
658.2
737.0
F
None
19.5
0.18
0.70
54.8
0.0
54.8
D
220
#337
129
#226
1.00
100%
2%
0
0%
0
0
3150
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
250
Perm
450
Prot
5
2450
6
6
6
5
2
20.0
27.5
53.5
48.6%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
53.5
48.6%
5.0
2.5
0.0
7.5
Lag
5.0
12.0
30.0
27.3%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
83.5
75.9%
5.0
2.5
0.0
7.5
6
3
3
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
4
C-Max C-Max
50.4
50.4
0.46
0.46
1.35
0.29
188.2
5.1
118.7
0.0
306.8
5.1
F
A
284.7
F
~2206
64
m657
m23
0
2
0.0
0.0%
0.0
4.0
None C-Max
18.6
76.0
0.17
0.69
0.78
0.70
19.1
10.7
0.0
1.5
19.1
12.2
B
B
13.2
B
109
480
m59 m450
Synchro 7 - Report
Page 9
Lanes, Volumes, Timings
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
160
609
0
590
0
31.58
EBT
334
EBR
WBL
WBT
411
WBR
220
287
0
0
0
0.70
6/5/2013
NBL
NBT
1505
2331
0
381
0
1.62
NBR
SBL
640
861
0
0
0
0.29
325
718
0
0
0
0.63
SBT
633
SBR
3513
804
0
0
0.90
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 74 (67%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.35
Intersection Signal Delay: 205.5
Intersection LOS: F
Intersection Capacity Utilization 123.4%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
8: Dulles Toll Rd EB Off-Ramp & Fairfax County Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 10
Lanes, Volumes, Timings
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
750
1900
12
0
1900
12
0%
750
1900
12
450
1900
12
3350
1900
12
0%
0
1900
12
0
1900
12
2200
1900
12
0%
650
1900
12
0
0
25
Yes
185
1
25
0
1
25
Yes
185
2
25
0
0
25
Yes
0
0
25
0
0
25
25
568
15.5
25
890
24.3
5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
750
Prot
4
50
1458
19.9
5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0.0
0.0%
RANAMNRT5 6/1/2000 Retimed
DLM
50
713
9.7
670
1
25
Yes
0
750
custom
4
7.0
14.0
36.0
32.7%
4.0
3.0
0.0
7.0
7.0
14.0
36.0
32.7%
4.0
3.0
0.0
7.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
0.0
0.0%
1.00
100%
2%
0
None
29.0
0.26
0.83
47.3
1.0
48.3
D
None
29.0
0.26
1.83
409.6
0.0
409.6
F
257
#331
~803
#1034
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
Prot
1
3350
6
2
1
6
2
2
2
5.0
12.0
28.0
25.5%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
74.0
67.3%
5.0
2.0
0.0
7.0
20.0
27.0
46.0
41.8%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
46.0
41.8%
5.0
2.0
0.0
7.0
Lag
None C-Max
18.2
67.0
0.17
0.61
0.79
1.08
24.8
62.1
0.0 120.2
24.8 182.4
C
F
163.7
F
124 ~1101
m69 m666
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
2200
650
Perm
C-Max C-Max
41.8
41.8
0.38
0.38
1.14
0.65
91.1
3.9
0.0
0.0
91.1
3.9
F
A
71.2
E
~674
0
#780
90
Synchro 7 - Report
Page 11
Lanes, Volumes, Timings
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
EBR
WBL
185
905
0
39
0
0.87
WBT
810
6/5/2013
WBR
NBL
410
0
0
0
1.83
185
655
0
0
0
0.69
NBT
633
3097
619
0
0
1.35
NBR
SBL
SBT
1378
1934
0
0
0
1.14
SBR
670
1005
0
0
0
0.65
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 14 (13%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.83
Intersection Signal Delay: 143.4
Intersection LOS: F
Intersection Capacity Utilization 123.4%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
9: Dulles Toll Rd WB Off-Ramp & Fairfax County Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 12
Lanes, Volumes, Timings
10: Spring Street & Fairfax County Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBR
NBL
NBT
SBT
SBR
500
1900
12
0%
215
1
25
450
1900
12
450
1900
12
3150
1900
12
0%
1900
1900
12
0%
300
1900
12
0
1
25
Yes
650
2
25
25
754
20.6
550
1
25
Yes
50
427
5.8
50
557
7.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
450
Prot
5
3150
1900
2
6
8
5
2
6
6
6
7.0
14.0
23.0
20.9%
4.0
3.0
0.0
7.0
5.0
12.0
33.0
30.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
87.0
79.1%
5.0
2.0
0.0
7.0
20.0
27.0
54.0
49.1%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
54.0
49.1%
5.0
2.0
0.0
7.0
Lag
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
500
450
Free
8
Free
None
16.0
0.15
1.00
88.4
0.0
88.4
F
46.7
D
~184
#295
RANAMNRT5 6/1/2000 Retimed
DLM
0.0
0.0%
0.0
4.0
110.0
1.00
0.28
0.5
0.0
0.5
A
0
0
1.00
100%
2%
0
300
Perm
None C-Max C-Max C-Max
19.6
80.0
53.4
53.4
0.18
0.73
0.49
0.49
0.74
0.85
0.77
0.33
41.2
13.6
26.5
3.1
0.0
0.0
0.0
0.0
41.2
13.6
26.5
3.1
D
B
C
A
17.0
23.3
B
C
169
491
390
0
m140 m378
495
49
Synchro 7 - Report
Page 13
Lanes, Volumes, Timings
10: Spring Street & Fairfax County Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
674
215
499
0
0
0
1.00
EBR
NBL
1583
0
0
0
0.28
650
811
0
0
0
0.55
6/5/2013
NBT
347
SBT
477
3698
0
0
0
0.85
2470
0
0
0
0.77
SBR
550
923
0
0
0
0.33
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 4 (4%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.00
Intersection Signal Delay: 23.3
Intersection LOS: C
Intersection Capacity Utilization 86.8%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
10: Spring Street & Fairfax County Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 14
Lanes, Volumes, Timings
11: Sunrise Valley Dr & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
450
1900
12
400
1900
12
0%
150
1900
12
600
1900
12
450
1900
12
0%
950
1900
12
100
1900
12
1050
1900
12
0%
100
1900
12
650
1900
12
1750
1900
12
0%
150
1900
12
0
0
25
Yes
155
1
25
220
1
25
Yes
435
2
25
415
1
25
Yes
720
2
25
260
1
25
35
683
13.3
1
1.00
100%
2%
0
1.00
100%
2%
0
35
419
8.2
1
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
26%
333
Split
3
667
1.00
100%
2%
0
45
1245
18.9
2
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
3
43%
342
Split
4
708
1.00
100%
2%
0
45
1208
18.3
1
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
950
Perm
4
100
Prot
1
1050
100
Perm
1
6
6
6
5
20.0
35.5
61.5
34.2%
4.5
2.0
0.0
6.5
Lag
20.0
35.5
61.5
34.2%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
40.0
22.2%
4.0
3.0
0.0
7.0
Lead
6
3
3
4
4
8.0
42.0
39.5
21.9%
4.0
3.0
0.0
7.0
Lead
8.0
42.0
39.5
21.9%
4.0
3.0
0.0
7.0
Lead
8.0
15.0
39.0
21.7%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
39.0
21.7%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
39.0
21.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
None
32.5
0.18
1.14
159.7
0.0
159.7
F
None
32.5
0.18
1.12
135.3
0.0
135.3
F
143.4
F
~485
#626
None
32.0
0.18
1.20
176.3
0.0
176.3
F
None
32.0
0.18
1.20
163.6
0.0
163.6
F
299.6
F
~553
#696
None
32.0
0.18
1.92
445.4
0.0
445.4
F
None C-Max C-Max
9.5
55.0
55.0
0.05
0.31
0.31
0.55
0.97
0.18
95.0
82.2
10.1
0.0
0.0
0.0
95.0
82.2
10.1
F
F
B
77.4
E
60
649
7
96
#795
56
~504
#738
RANAMNRT5 6/1/2000 Retimed
DLM
0.0
4.0
~534
#771
~1458
#1727
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
0.0
0.0%
430
1
25
Yes
650
Prot
5
1750
150
pm+ov
2
3
2
2
3
20.0
35.5
84.5
46.9%
4.5
2.0
0.0
6.5
Lag
8.0
42.0
39.5
21.9%
4.0
3.0
0.0
7.0
Lead
None C-Max
33.0
78.5
0.18
0.44
1.03
1.13
121.5
99.8
0.0
0.0
121.5
99.8
F
F
99.5
F
~417 ~1254
#551 #1391
None
110.5
0.61
0.15
0.6
0.0
0.6
A
1
m2
Synchro 7 - Report
Page 15
Lanes, Volumes, Timings
11: Sunrise Valley Dr & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
260
291
0
0
0
1.14
EBT
603
598
0
0
0
1.12
EBR
6/5/2013
WBL
155
286
0
0
0
1.20
WBT
339
592
0
0
0
1.20
WBR
NBL
220
495
0
0
0
1.92
435
191
0
0
0
0.52
NBT
1165
1081
0
0
0
0.97
NBR
SBL
415
541
0
0
0
0.18
720
629
0
0
0
1.03
SBT
1128
1544
0
0
0
1.13
SBR
430
982
0
0
0
0.15
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 10 (6%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.92
Intersection Signal Delay: 160.8
Intersection LOS: F
Intersection Capacity Utilization 124.8%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
11: Sunrise Valley Dr & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 16
Lanes, Volumes, Timings
12: EB Toll Rd Off-Ramp & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
350
1900
12
0
1900
12
0%
250
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1650
1900
12
0%
250
1900
12
0
1900
12
2300
1900
12
0%
850
1900
12
400
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
625
1
25
Yes
0
0
25
0
2
25
25
573
15.6
4
1.00
100%
2%
0
40
339
5.8
3
1.00
100%
2%
0
1.00
100%
2%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
250
Free
45
160
2.4
1
0%
350
Prot
4
45
662
10.0
0
1
25
Yes
0
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1650
1.00
100%
2%
0
0%
250
Free
0
6
Free
1.00
100%
2%
0
2300
850
Perm
2
4
6
2
2
2
7.0
13.5
39.0
21.7%
4.0
2.5
0.0
6.5
20.0
26.5
141.0
78.3%
4.5
2.0
0.0
6.5
20.0
26.5
141.0
78.3%
4.5
2.0
0.0
6.5
20.0
26.5
141.0
78.3%
4.5
2.0
0.0
6.5
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
None
23.7
0.13
0.77
87.4
0.0
87.4
F
180.0
1.00
0.16
0.2
0.0
0.2
A
209
260
0
0
RANAMNRT5 6/1/2000 Retimed
DLM
Free
C-Max
143.3
0.80
0.59
7.8
0.0
7.8
A
6.8
A
338
m294
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
180.0
1.00
0.16
0.0
0.0
0.0
A
0
m0
C-Max C-Max
143.3 143.3
0.80
0.80
0.82
0.61
5.8
1.5
7.1
2.8
12.9
4.4
B
A
10.6
B
124
0
m39
m0
Synchro 7 - Report
Page 17
Lanes, Volumes, Timings
12: EB Toll Rd Off-Ramp & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
620
0
0
0
0.56
EBT
493
EBR
WBL
6/5/2013
WBT
259
WBR
400
1563
0
0
0
0.16
NBL
NBT
582
2817
0
0
0
0.59
NBR
625
1564
0
0
0
0.16
SBL
SBT
80
SBR
2817
491
0
0
0.99
1385
407
0
0
0.87
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 32 (18%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.82
Intersection Signal Delay: 13.6
Intersection LOS: B
Intersection Capacity Utilization 82.6%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
12: EB Toll Rd Off-Ramp & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 18
Lanes, Volumes, Timings
13: WB Toll Rd On-Ramp & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
500
1900
12
0
1900
12
0%
550
1900
12
350
1900
12
1650
1900
12
0%
0
1900
12
0
1900
12
2550
1900
12
0%
850
1900
12
0
0
25
Yes
0
1
25
50
1
25
Yes
645
1
25
0
0
25
Yes
0
0
25
0
0
25
35
427
8.3
25
1052
28.7
45
649
9.8
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
50%
250
Split
4
250
1
1.00
100%
2%
0
1.00
100%
2%
0
1
1.00
100%
2%
0
4
1.00
100%
2%
0
0%
1650
6
2
1
6
2
2
2
20.0
26.5
136.0
75.6%
4.5
2.0
0.0
6.5
20.0
26.5
90.5
50.3%
4.5
2.0
0.0
6.5
Lag
20.0
26.5
90.5
50.3%
4.5
2.0
0.0
6.5
Lag
4
4
7.0
13.5
44.0
24.4%
4.0
2.5
0.0
6.5
7.0
13.5
44.0
24.4%
4.0
2.5
0.0
6.5
7.0
13.5
44.0
24.4%
4.0
2.5
0.0
6.5
5.0
12.0
45.5
25.3%
4.0
3.0
0.0
7.0
Lead
None
37.5
0.21
0.71
78.9
0.0
78.9
E
None
37.5
0.21
0.71
78.9
0.0
78.9
E
183.8
F
292
408
None
37.5
0.21
1.49
275.6
3.6
279.3
F
None C-Max
37.3 129.5
0.21
0.72
0.95
0.65
100.1
8.8
0.0
0.3
100.1
9.1
F
A
25.0
C
436
408
#619
424
~849
#1098
1.00
100%
2%
0
350
Prot
1
4
4
292
408
45
847
12.8
0%
550
Perm
0
1
25
Yes
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
2550
850
Perm
C-Max C-Max
85.2
85.2
0.47
0.47
1.06
0.91
65.2
19.9
40.5
8.7
105.7
28.6
F
C
86.5
F
~1204
307
m425 m133
Synchro 7 - Report
Page 19
Lanes, Volumes, Timings
13: WB Toll Rd On-Ramp & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
347
EBR
6/5/2013
WBL
WBT
972
350
0
0
0
0.71
350
0
0
0
0.71
WBR
NBL
50
369
0
2
0
1.50
645
379
0
0
0
0.92
NBT
569
2546
341
136
0
0.75
NBR
SBL
SBT
767
SBR
2407
196
0
0
1.15
931
70
0
0
0.99
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 150 (83%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.49
Intersection Signal Delay: 83.3
Intersection LOS: F
Intersection Capacity Utilization 102.6%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
13: WB Toll Rd On-Ramp & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 20
Lanes, Volumes, Timings
14: Sunset Hills Rd & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
250
1900
12
750
1900
12
0%
1200
1900
12
800
1900
12
900
1900
12
0%
650
1900
12
450
1900
12
1800
1900
12
0%
150
1900
12
300
1900
12
2000
1900
12
0%
100
1900
12
275
1
25
Yes
550
2
25
0
1
25
Yes
480
2
25
470
1
25
Yes
300
2
25
290
2
25
35
506
9.9
7
1.00
100%
2%
0
1.00
100%
2%
0
35
569
11.1
7
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
250
Prot
3
750
1.00
100%
2%
0
45
847
12.8
3
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
1200
Perm
8
800
Prot
7
900
650
Perm
4
3
8
6.0
13.0
24.5
13.6%
4.0
3.0
0.0
7.0
Lead
6.0
49.0
44.0
24.4%
4.0
3.0
0.0
7.0
Lag
6.0
49.0
44.0
24.4%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
43.5
24.2%
4.0
3.0
0.0
7.0
Lead
6.0
54.0
63.0
35.0%
4.0
3.0
0.0
7.0
Lag
6.0
54.0
63.0
35.0%
4.0
3.0
0.0
7.0
Lag
None
16.2
0.09
0.81
100.1
0.0
100.1
F
None
37.0
0.21
0.72
71.1
0.0
71.1
E
453.6
F
306
358
None
37.0
0.21
2.64
766.3
0.0
766.3
F
None
36.5
0.20
1.15
144.0
0.0
144.0
F
None
57.3
0.32
1.03
84.1
0.0
84.1
F
~2231
#2503
~569
#704
None
57.3
0.32
0.80
62.7
0.0
62.7
E
96.3
F
520
608
RANAMNRT5 6/1/2000 Retimed
DLM
45
794
12.0
2
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
8
8
151
204
1.00
100%
2%
0
7
4
4
4
445
1
25
Yes
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
Prot
1
1800
150
Perm
1
6
6
6
5
5.0
12.0
28.0
15.6%
4.0
3.0
0.0
7.0
Lead
20.0
44.5
69.5
38.6%
4.5
2.0
0.0
6.5
Lag
20.0
44.5
69.5
38.6%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
23.0
12.8%
4.0
3.0
0.0
7.0
Lead
6
300
Prot
5
2000
100
pm+ov
2
3
2
2
2
20.0
44.5
64.5
35.8%
4.5
2.0
0.0
6.5
Lag
6.0
13.0
24.5
13.6%
4.0
3.0
0.0
7.0
Lead
None C-Max C-Max None C-Max
21.0
63.0
63.0
16.0
58.0
0.12
0.35
0.35
0.09
0.32
1.12
1.01
0.24
0.98
1.22
132.7
69.0
7.6 114.0 144.9
0.0
0.0
0.0
0.0 121.9
132.7
69.0
7.6 114.0 266.8
F
E
A
F
F
77.1
237.1
E
F
~660
~310
~826
31
188 ~1043
#917 m#362 m736
m52 m#214 m#954
None
73.7
0.41
0.15
11.8
0.0
11.8
B
22
m34
Synchro 7 - Report
Page 21
Lanes, Volumes, Timings
14: Sunset Hills Rd & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
334
0
0
0
0.75
EBT
426
1045
0
0
0
0.72
6/5/2013
EBR
WBL
275
454
0
10
0
2.70
550
696
0
0
0
1.15
WBT
489
WBR
NBL
1126
0
0
0
0.80
631
0
0
0
1.03
480
401
0
0
0
1.12
NBT
767
1780
0
0
0
1.01
NBR
SBL
470
636
0
0
0
0.24
300
305
0
0
0
0.98
SBT
714
1639
0
299
0
1.49
SBR
445
651
0
0
0
0.15
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 144 (80%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.64
Intersection Signal Delay: 211.6
Intersection LOS: F
Intersection Capacity Utilization 153.6%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
14: Sunset Hills Rd & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 22
Lanes, Volumes, Timings
15: Bluemont Way & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
200
1900
12
15
1900
12
0%
750
1900
8
15
1900
12
15
1900
12
0%
15
1900
12
500
1900
12
2050
1900
12
0%
50
1900
12
50
1900
12
2000
1900
12
0%
100
1900
12
0
1
25
Yes
0
1
25
0
0
25
Yes
380
1
25
550
1
25
Yes
390
1
25
290
1
25
25
1182
32.2
9
1.00
100%
2%
0
1.00
100%
2%
0
25
258
7.0
8
7
1.00
100%
2%
0
1.00
100%
2%
0
0%
200
pm+pt
7
4
7
15
7.0
14.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
4.0
49.0
25.0
13.9%
4.0
3.0
0.0
7.0
Lag
None
16.5
0.09
1.47
294.8
0.0
294.8
F
None
8.5
0.05
0.17
85.0
0.0
85.0
F
272.8
F
17
45
~296
#382
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
45
794
12.0
8
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
750
pm+ov
4
1
4
4
1
15
pm+pt
3
8
3
30
10.0
17.0
45.0
25.0%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
45
523
7.9
6
5
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
8
500
Prot
1
8
1
5.0
12.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
25.0
13.9%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
45.0
25.0%
4.0
3.0
0.0
7.0
Lead
None
58.4
0.32
1.46
254.9
15.7
270.7
F
None
14.0
0.08
0.12
69.9
0.0
69.9
E
~1121
#1398
16
41
None
6.5
0.04
0.39
65.3
0.0
65.3
E
66.8
E
18
56
0.0
0.0%
0.0
4.0
285
1
25
Yes
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
2050
50
pm+ov
6
3
6
6
3
50
Prot
5
5
2000
100
pm+ov
2
7
2
2
7
20.0
39.0
121.0
67.2%
5.0
2.0
0.0
7.0
Lag
5.0
12.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
20.0
42.0
93.0
51.7%
5.0
2.0
0.0
7.0
Lag
7.0
14.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
None C-Max
51.8 130.7
0.29
0.73
0.98
0.56
103.7
4.9
0.0
0.2
103.7
5.1
F
A
24.0
C
~634
170
m#681 m184
None
140.2
0.78
0.04
0.1
0.0
0.1
A
None C-Max
9.6
86.0
0.05
0.48
0.53
0.82
105.8
38.6
0.0
43.8
105.8
82.3
F
F
79.3
E
58
801
107
858
None
96.0
0.53
0.12
6.8
0.0
6.8
A
0
m0
12
40
Synchro 7 - Report
Page 23
Lanes, Volumes, Timings
15: Bluemont Way & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
136
0
0
0
1.47
6/5/2013
EBT
1102
EBR
WBL
WBT
178
186
0
0
0
0.08
512
0
12
0
1.50
157
0
0
0
0.10
183
0
0
0
0.16
WBR
NBL
380
510
0
0
0
0.98
NBT
714
3693
655
0
0
0.67
NBR
SBL
550
1227
0
0
0
0.04
390
108
0
0
0
0.46
SBT
443
2430
373
599
0
1.09
SBR
285
856
0
0
0
0.12
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 179 (99%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.47
Intersection Signal Delay: 86.7
Intersection LOS: F
Intersection Capacity Utilization 107.6%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
15: Bluemont Way & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 24
Lanes, Volumes, Timings
16: New Dominion Pkwy & Reston Parkway
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
300
1900
12
400
1900
12
0%
700
1900
12
200
1900
12
250
1900
12
0%
300
1900
12
600
1900
12
1550
1900
12
0%
300
1900
12
250
1900
12
1150
1900
12
0%
100
1900
12
275
1
25
Yes
95
1
25
165
1
25
Yes
500
2
25
445
1
25
Yes
205
1
25
270
1
25
25
722
19.7
2
1.00
100%
2%
0
1.00
100%
2%
0
25
408
11.1
3
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
300
pm+pt
3
8
3
400
5.0
12.0
24.0
13.3%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lag
None
44.0
0.24
1.21
173.2
0.0
173.2
F
None
27.0
0.15
1.43
264.4
0.0
264.4
F
137.0
F
~636
#861
~332
#536
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
45
521
7.9
2
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
700
pm+ov
8
1
8
8
8
1.00
100%
2%
0
45
423
6.4
1
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
200
pm+pt
7
4
7
250
300
pm+ov
4
5
4
4
4
5.0
12.0
37.0
20.6%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
30.0
16.7%
4.0
3.0
0.0
7.0
Lead
5.0
47.0
40.0
22.2%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lead
None
57.0
0.32
0.74
48.8
0.0
48.8
D
None
50.1
0.28
0.84
78.9
0.0
78.9
E
None
56.7
0.32
0.59
48.7
0.0
48.7
D
346
430
186
#276
None
30.0
0.17
0.80
91.5
0.0
91.5
F
71.0
E
286
391
263
359
600
Prot
1
1
5.0
12.0
37.0
20.6%
4.0
3.0
0.0
7.0
Lead
65
1
25
Yes
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
1550
300
pm+ov
6
7
6
6
6
20.0
39.0
82.0
45.6%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
30.0
16.7%
4.0
3.0
0.0
7.0
Lead
None C-Max
30.0
78.3
0.17
0.44
1.05
0.70
123.3
28.7
0.0
1.1
123.3
29.8
F
C
50.3
D
~389
335
#517
390
None
98.3
0.55
0.34
9.7
0.2
9.9
A
90
129
250
Prot
5
5
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lead
1150
100
pm+ov
2
3
2
2
2
20.0
47.0
79.0
43.9%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
24.0
13.3%
4.0
3.0
0.0
7.0
Lead
None C-Max
26.7
75.0
0.15
0.42
0.95
0.54
118.3
41.2
0.0
0.0
118.3
41.2
F
D
52.2
D
297
379
#480
434
None
92.0
0.51
0.12
13.8
0.0
13.8
B
36
73
Synchro 7 - Report
Page 25
Lanes, Volumes, Timings
16: New Dominion Pkwy & Reston Parkway
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
270
247
0
0
0
1.21
EBT
642
279
0
0
0
1.43
EBR
WBL
275
943
0
0
0
0.74
95
268
0
0
0
0.75
6/5/2013
WBT
328
342
0
0
0
0.73
WBR
NBL
165
530
0
0
0
0.57
500
572
0
0
0
1.05
NBT
441
2211
391
0
0
0.85
NBR
SBL
445
883
176
0
0
0.42
205
266
0
0
0
0.94
SBT
343
2118
0
0
0
0.54
SBR
65
812
0
0
0
0.12
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 164 (91%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.43
Intersection Signal Delay: 73.2
Intersection LOS: E
Intersection Capacity Utilization 105.9%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
16: New Dominion Pkwy & Reston Parkway
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 26
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
WBT
WBR
SBL
SBR
750
1900
12
350
1900
12
0%
500
1900
12
0%
1000
1900
12
1200
1900
12
0%
0
2
25
1300
1900
12
210
1
25
0
1
25
Yes
35
2307
44.9
35
621
12.1
1
1.00
100%
2%
0
35
623
12.1
2
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
0%
750
Prot
1
350
500
1200
1
12
10.0
17.0
40.0
28.6%
4.0
3.0
0.0
7.0
Lead
None
32.6
0.23
0.94
72.4
0.0
72.4
E
346
#462
RANAMNRT5 6/1/2000 Retimed
DLM
12
86.0
61.4%
0.0
7.0
79.0
0.56
0.33
17.5
0.0
17.5
B
54.9
D
165
230
1.00
100%
2%
0
1000
pm+ov
2
3
2
2
2
15.0
39.0
46.0
32.9%
4.0
3.0
0.0
7.0
Lag
5.0
29.0
54.0
38.6%
4.0
3.0
0.0
7.0
0
1
25
Yes
1300
Free
3
Free
3
5.0
29.0
54.0
38.6%
4.0
3.0
0.0
7.0
None C-Max C-Max
39.4
93.4
47.0
0.28
0.67
0.34
0.95
0.94
1.04
78.9
38.6
68.4
0.0
0.0
6.5
78.9
38.6
74.9
E
D
E
52.1
45.5
D
D
451
761
~621
#677 #1150
#730
0.0
0.0%
0.0
4.0
140.0
1.00
0.83
18.5
0.0
18.5
B
448
599
Synchro 7 - Report
Page 27
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
809
0
0
0
0.93
6/5/2013
EBT
2227
WBT
541
WBR
SBL
543
SBR
1037
0
0
0
0.34
524
0
0
0
0.95
1060
0
0
0
0.94
1153
19
0
0
1.06
1563
0
0
0
0.83
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 74 (53%), Referenced to phase 3:SBL, Start of Yellow
Natural Cycle: 115
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.04
Intersection Signal Delay: 49.5
Intersection LOS: D
Intersection Capacity Utilization 99.4%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
17: Sunrise Valley Dr & Wiehle Ave
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 28
Lanes, Volumes, Timings
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
150
1900
12
15
1900
12
0%
200
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1350
1900
12
0%
400
1900
12
550
1900
12
2100
1900
12
0%
0
1900
12
450
1
25
No
0
0
25
0
0
25
Yes
235
2
25
435
1
25
Yes
0
0
25
450
1
25
25
764
20.8
3
1.00
100%
2%
0
25
553
15.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
122
1.00
100%
2%
0
1.00
100%
2%
0
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0
0
1350
7.0
14.0
30.0
21.4%
4.0
3.0
0.0
7.0
7.0
14.0
30.0
21.4%
4.0
3.0
0.0
7.0
7.0
14.0
30.0
21.4%
4.0
3.0
0.0
7.0
None
16.7
0.12
0.63
72.1
0.0
72.1
E
None
16.7
0.12
0.69
77.6
0.0
77.6
E
75.0
E
118
187
None
16.7
0.12
0.66
75.4
0.0
75.4
E
107
171
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
400
Perm
550
Prot
5
2100
6
6
6
5
2
15.0
22.0
60.0
42.9%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
60.0
42.9%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
50.0
35.7%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
110.0
78.6%
4.0
3.0
0.0
7.0
6
4
1.00
100%
2%
0
0%
4
4
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
0%
42%
116
Perm
4
4
117
183
35
572
11.1
2
0%
15%
127
Split
4
35
623
12.1
0
0
25
Yes
C-Max C-Max
74.1
74.1
0.53
0.53
0.34
0.39
17.0
1.7
0.0
0.2
17.0
1.9
B
A
13.5
B
143
0
m189
m7
0
2
0.0
0.0%
0.0
4.0
None C-Max
28.2 109.3
0.20
0.78
0.80
0.53
40.5
17.8
0.0
2.8
40.5
20.6
D
C
24.7
C
258
400
335
736
Synchro 7 - Report
Page 29
Lanes, Volumes, Timings
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
450
276
0
0
0
0.46
EBT
684
245
0
0
0
0.50
EBR
WBL
6/5/2013
WBT
473
WBR
450
243
0
0
0
0.48
NBL
NBT
543
3993
0
0
0
0.34
NBR
SBL
SBT
492
435
1024
155
0
0
0.46
1054
0
0
0
0.52
3969
1711
342
0
0.93
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 118 (84%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 24.4
Intersection LOS: C
Intersection Capacity Utilization 78.4%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
18: Dulles Toll Rd (E) Off-Ramp & Wiehle Ave
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 30
Lanes, Volumes, Timings
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
400
1900
12
25
1900
12
0%
350
1900
12
450
1900
12
1150
1900
12
0%
0
1900
12
0
1900
12
2250
1900
12
0%
550
1900
12
0
0
25
Yes
0
1
25
0
1
25
No
0
2
25
0
0
25
Yes
250
2
25
0
0
25
35
627
12.2
4
1.00
100%
2%
0
25
432
11.8
3
1.00
100%
2%
0
1.00
100%
2%
0
0
1.00
100%
2%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
35
387
7.5
1
0%
0
35
572
11.1
0
1
25
Yes
33%
268
Split
4
262
1.00
100%
2%
0
1.00
100%
2%
0
0%
30%
245
Perm
4
4
4
4
4
5.0
11.5
43.5
31.1%
4.0
2.5
0.0
6.5
5.0
11.5
43.5
31.1%
4.0
2.5
0.0
6.5
5.0
11.5
43.5
31.1%
4.0
2.5
0.0
6.5
None
29.3
0.21
0.76
65.6
0.9
66.5
E
None
29.3
0.21
0.80
70.5
1.2
71.8
E
68.9
E
250
342
None
29.3
0.21
0.78
68.6
0.0
68.6
E
243
330
1.00
100%
2%
0
223
309
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
Prot
1
1150
6
2
1
6
2
2
2
5.0
12.0
34.5
24.6%
4.0
3.0
0.0
7.0
Lead
15.0
21.0
96.5
68.9%
4.0
2.0
0.0
6.0
15.0
21.0
62.0
44.3%
4.0
2.0
0.0
6.0
Lag
15.0
21.0
62.0
44.3%
4.0
2.0
0.0
6.0
Lag
None C-Max
22.6
98.2
0.16
0.70
0.81
0.32
55.5
3.0
0.0
0.0
55.5
3.0
E
A
17.8
B
193
161
133
8
0
0
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
2250
550
Perm
C-Max C-Max
68.6
68.6
0.49
0.49
0.61
0.54
15.0
2.4
0.4
0.7
15.3
3.1
B
A
12.9
B
260
0
367
52
Synchro 7 - Report
Page 31
Lanes, Volumes, Timings
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
547
EBR
6/5/2013
WBL
WBT
352
WBR
NBL
NBT
492
444
0
46
0
0.67
411
0
42
0
0.71
397
0
0
0
0.62
674
0
0
0
0.67
3566
0
57
0
0.33
NBR
SBL
SBT
307
SBR
3697
763
180
0
0.77
1013
190
0
0
0.67
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 19 (14%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 65
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.81
Intersection Signal Delay: 22.8
Intersection LOS: C
Intersection Capacity Utilization 78.4%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:
19: Dulles Toll Rd (W) On-Ramp & Wiehle Ave
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 32
Lanes, Volumes, Timings
20: Sunset Hills Rd & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
350
1900
12
400
1900
12
0%
850
1900
12
800
1900
12
750
1900
12
0%
600
1900
12
500
1900
12
1250
1900
12
0%
150
1900
12
150
1900
12
1000
1900
12
0%
200
1900
12
385
1
25
Yes
477
1
25
0
0
25
Yes
320
2
25
0
1
25
Yes
250
1
25
442
1
25
35
1259
24.5
2
1.00
100%
2%
0
35
976
19.0
1
1.00
100%
2%
0
1.00
100%
2%
0
7
1.00
100%
2%
0
0%
350
pm+pt
7
4
7
400
5.0
12.0
25.0
17.9%
4.0
3.0
0.0
7.0
Lead
8.0
51.0
31.0
22.1%
4.0
3.0
0.0
7.0
Lag
None
42.0
0.30
1.25
173.2
0.0
173.2
F
None
24.0
0.17
0.66
60.1
0.0
60.1
E
302.2
F
181
239
~346
#547
RANAMNRT5 6/1/2000 Retimed
DLM
35
540
10.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
850
pm+ov
4
1
4
4
4
800
pm+pt
3
8
3
1350
5.0
12.0
27.0
19.3%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
35
619
12.1
8
5
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
8
500
Prot
1
8
1
5.0
12.0
37.0
26.4%
4.0
3.0
0.0
7.0
Lead
8.0
40.0
43.0
30.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
27.0
19.3%
4.0
3.0
0.0
7.0
Lead
None
44.0
0.31
1.69
350.0
119.3
469.4
F
None
61.0
0.44
1.65
325.6
0.0
325.6
F
~913
#1255
~956
#1210
None
36.0
0.26
1.42
228.9
0.0
228.9
F
264.9
F
~822
#964
0.0
0.0%
0.0
4.0
120
1
25
Yes
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
1250
150
pm+ov
6
3
6
6
6
15.0
38.0
52.0
37.1%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
37.0
26.4%
4.0
3.0
0.0
7.0
Lead
None C-Max
20.0
47.7
0.14
0.34
1.02
1.04
97.6
77.0
0.0
9.8
97.6
86.8
F
F
83.2
F
~252
~665
#353
#820
None
76.7
0.55
0.17
6.0
0.0
6.0
A
46
m52
150
pm+pt
5
2
5
1200
5.0
12.0
20.0
14.3%
4.0
3.0
0.0
7.0
Lead
15.0
33.0
45.0
32.1%
4.0
2.0
0.0
6.0
Lag
0
2
2
0.0
0.0%
0.0
4.0
None C-Max
49.3
39.0
0.35
0.28
0.77
0.86
57.0
53.9
0.0
0.0
57.0
53.9
E
D
54.3
D
83
372
#174
433
Synchro 7 - Report
Page 33
Lanes, Volumes, Timings
20: Sunset Hills Rd & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
442
281
0
0
0
1.25
EBT
1179
607
0
0
0
0.66
6/5/2013
EBR
WBL
385
502
0
68
0
1.96
477
486
0
0
0
1.65
WBT
896
WBR
952
0
0
0
1.42
NBL
320
490
0
0
0
1.02
NBT
460
NBR
SBL
1206
30
0
0
1.06
904
0
0
0
0.17
250
216
0
0
0
0.69
SBT
539
SBR
1399
0
1
0
0.86
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 16 (11%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.69
Intersection Signal Delay: 183.5
Intersection LOS: F
Intersection Capacity Utilization 137.6%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
20: Sunset Hills Rd & Wiehle Ave
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 34
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
450
1900
12
150
1900
12
0%
400
1900
12
0
1900
12
50
1900
12
0%
50
1900
12
250
1900
12
550
1900
12
0%
0
1900
12
250
1900
12
700
1900
12
0%
500
1900
12
0
0
25
Yes
0
1
25
670
0
25
Yes
0
1
25
0
0
25
Yes
0
1
25
430
1
25
35
3015
58.7
35
879
17.1
30
257
5.8
220
0
25
Yes
35
1671
32.6
1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
Prot
5
550
2
5.0
12.0
35.0
23.3%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
57.0
38.0%
4.0
3.0
0.0
7.0
None
23.7
0.16
0.83
74.7
0.0
74.7
E
None
47.3
0.32
0.93
64.7
0.0
64.7
E
69.2
E
437
#658
RANAMNRT5 6/1/2000 Retimed
DLM
222
277
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Perm
0.0
0.0%
0.0
4.0
100
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
6
6
3
8
7
4
15.0
22.0
22.0
14.7%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
22.0
14.7%
4.0
3.0
0.0
7.0
Lag
5.0
10.0
31.0
20.7%
4.0
1.0
0.0
5.0
Lead
5.0
21.0
54.0
36.0%
4.0
1.0
0.0
5.0
Lag
7.0
14.0
39.0
26.0%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
62.0
41.3%
4.0
3.0
0.0
7.0
Lag
None
None
16.6
0.11
0.25
33.5
0.0
33.5
C
33.5
C
23
55
None
23.8
0.16
0.89
93.1
0.0
93.1
F
None
55.8
0.37
0.42
37.6
0.0
37.6
D
55.0
D
218
284
0.0
4.0
239
#377
1.00
100%
2%
0
0%
6
6
0.0
0.0%
550
1.00
100%
2%
0
250
Prot
3
2
5
1.00
100%
2%
0
0
1200
8
250
Prot
7
0.0
0.0%
0.0
4.0
0
4
0.0
0.0%
0.0
4.0
None C-Max
27.9
59.9
0.19
0.40
0.76
0.85
72.6
44.1
0.0
0.0
72.6
44.1
E
D
49.0
D
233
538
326
#680
Synchro 7 - Report
Page 35
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
430
641
0
0
0
0.70
EBT
2935
EBR
617
0
0
0
0.89
6/5/2013
WBL
WBT
799
WBR
407
0
0
0
0.25
NBL
NBT
177
307
0
0
0
0.81
1317
0
0
0
0.42
NBR
SBL
SBT
1591
378
0
0
0
0.66
1406
0
0
0
0.85
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 0 (0%), Referenced to phase 4:SBT, Start of Yellow
Natural Cycle: 100
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.93
Intersection Signal Delay: 56.0
Intersection LOS: E
Intersection Capacity Utilization 97.6%
ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
21: Sunrise Valley Dr & Hunter Mill Rd
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 36
Lanes, Volumes, Timings
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
200
1900
12
0
1900
12
0%
450
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
800
1900
12
0%
300
1900
12
150
1900
12
950
1900
12
0%
0
1900
12
65
1
25
Yes
0
0
25
0
0
25
Yes
0
0
25
0
1
25
Yes
206
1
25
0
1
25
35
693
13.5
1.00
100%
2%
0
1.00
100%
2%
0
25
406
11.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
200
Prot
4
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
450
custom
0
0
1.00
100%
2%
0
35
447
8.7
1.00
100%
2%
0
4
5.0
10.5
24.5
24.5%
4.0
1.5
0.0
5.5
5.0
10.5
24.5
24.5%
4.0
1.5
0.0
5.5
0.0
0.0%
0.0
4.0
None
19.0
0.19
0.60
45.3
0.0
45.3
D
None
19.0
0.19
1.00
69.2
0.0
69.2
E
117
193
~187
#394
1.00
100%
2%
0
0%
0
0
830
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
270
Perm
150
Prot
1
950
2
2
2
1
6
20.0
26.0
51.5
51.5%
4.0
2.0
0.0
6.0
Lag
20.0
26.0
51.5
51.5%
4.0
2.0
0.0
6.0
Lag
5.0
11.5
24.0
24.0%
4.0
2.5
0.0
6.5
Lead
20.0
26.0
75.5
75.5%
4.0
2.0
0.0
6.0
2
4
4
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
35
1671
32.6
0
0
25
Yes
C-Max C-Max
50.2
50.2
0.50
0.50
0.94
0.31
44.0
3.9
1.5
0.0
45.5
3.9
D
A
35.3
D
502
8
#850
56
0
6
0.0
0.0%
0.0
4.0
None C-Max
12.8
69.5
0.13
0.70
0.66
0.73
31.4
6.9
0.0
34.6
31.4
41.5
C
D
40.1
D
62
318
m83 m163
Synchro 7 - Report
Page 37
Lanes, Volumes, Timings
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
336
0
0
0
0.60
EBT
613
EBR
WBL
WBT
326
6/5/2013
WBR
65
448
0
0
0
1.00
NBL
NBT
1591
NBR
SBL
886
0
14
0
0.95
877
0
0
0
0.31
206
310
0
0
0
0.48
SBT
367
SBR
1295
400
0
0
1.06
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 4 (4%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.00
Intersection Signal Delay: 43.2
Intersection LOS: D
Intersection Capacity Utilization 143.0%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
22: Dulles Toll Rd EB Off-Ramp & Hunter Mill Rd
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 38
Lanes, Volumes, Timings
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
500
1900
12
0
1900
12
0%
200
1900
12
400
1900
12
600
1900
12
0%
0
1900
12
0
1900
12
650
1900
12
0%
150
1900
12
0
0
25
Yes
0
1
25
0
1
25
Yes
120
1
25
0
0
25
Yes
0
0
25
0
0
25
35
452
8.8
25
854
23.3
35
447
8.7
0
1
25
Yes
35
218
4.2
3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0.0
0.0%
0.0
0.0%
0.0
0.0%
0.0
4.0
0.0
4.0
0.0
4.0
RANAMNRT5 6/1/2000 Retimed
DLM
1.00
100%
2%
0
500
Prot
4
600
4
4
4
5.0
11.0
28.0
28.0%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
28.0
28.0%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
21.0
21.0%
4.0
2.0
0.0
6.0
Lead
10.0
16.0
53.0
53.0%
4.0
2.0
0.0
6.0
~407
#606
0.0
0.0%
0.0
4.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
400
pm+pt
1
6
1
None
22.0
0.22
1.29
180.8
0.0
180.8
F
0
1.00
100%
2%
0
200
custom
None
22.0
0.22
0.40
7.3
0.0
7.4
A
4
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
650
150
Perm
6
23
6
23
23
23
None C-Max
47.0
47.0
0.47
0.47
1.18
0.68
110.9
12.5
0.0
0.8
110.9
13.3
F
B
52.3
D
0
~245
229
57 m#280 m244
0.0
0.0%
0.0
0.0%
51.0
51.0%
51.0
51.0%
0.0
4.0
0.0
4.0
0.0
6.0
0.0
6.0
45.0
0.45
0.78
10.8
30.0
40.8
D
33.4
C
94
m77
45.0
0.45
0.19
0.2
1.3
1.5
A
0
m1
Synchro 7 - Report
Page 39
Lanes, Volumes, Timings
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
372
EBR
WBL
WBT
774
389
0
0
0
1.29
6/5/2013
WBR
NBL
504
0
7
0
0.40
120
340
0
0
0
1.18
NBT
367
876
83
0
0
0.76
NBR
SBL
SBT
138
SBR
838
215
29
0
1.04
778
459
0
0
0.47
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 36 (36%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.29
Intersection Signal Delay: 68.4
Intersection LOS: E
Intersection Capacity Utilization 97.4%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
23: Dulles Toll Rd WB On-Ramp & Hunter Mill Rd
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 41
Lanes, Volumes, Timings
24: Sunset Hills Rd & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/5/2013
EBL
EBR
NBL
NBT
SBT
SBR
225
1900
12
0%
0
1
25
325
1900
12
350
1900
12
800
1900
12
0%
550
1900
12
0%
300
1900
12
370
1
25
Yes
0
2
25
35
385
7.5
2
2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
225
325
Perm
3
35
772
15.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
800
550
14
124
5.0
12.0
19.0
19.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
19.0
19.0%
4.0
3.0
0.0
7.0
Lead
None
12.0
0.12
1.06
122.7
0.0
122.7
F
57.9
E
~159
#307
None
12.0
0.12
0.69
13.1
0.1
13.1
B
43.0
0.43
0.24
24.3
1.9
26.2
C
0
84
77
110
RANAMNRT5 6/1/2000 Retimed
DLM
35
218
4.2
124
3
?
?
1
4
6
5.0
11.0
21.0
21%
4.0
2.0
5.0
11.0
28.0
28%
4.0
2.0
10.0
16.0
53.0
53%
4.0
2.0
Lead
Lag
230
1
25
Yes
350
Prot
14
3
3
?
49.0
49.0%
81.0
81.0%
0.0
6.0
0.0
6.0
75.0
0.75
0.57
3.9
0.8
4.8
A
11.3
B
69
103
1.00
100%
2%
0
300
pm+ov
2
3
2
2
2
10.0
16.0
32.0
32.0%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
19.0
19.0%
4.0
3.0
0.0
7.0
Lead
C-Max
26.0
0.26
1.14
119.5
20.7
140.2
F
91.9
F
~411
#615
None
44.0
0.44
0.35
3.2
0.0
3.2
A
None
None C-Max
0
47
Synchro 7 - Report
Page 43
Lanes, Volumes, Timings
24: Sunset Hills Rd & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
305
212
0
0
0
1.06
6/5/2013
EBR
NBL
NBT
138
SBT
692
370
473
0
3
0
0.69
1476
947
0
0
0.66
1397
308
0
0
0.73
484
0
20
0
1.19
SBR
?
?
?
230
865
0
0
0
0.35
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 36 (36%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.29
Intersection Signal Delay: 48.2
Intersection LOS: D
Intersection Capacity Utilization 67.3%
ICU Level of Service C
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
24: Sunset Hills Rd & Hunter Mill Rd
RANAMNRT5 6/1/2000 Retimed
DLM
Synchro 7 - Report
Page 44
Lanes, Volumes, Timings
1: Sunrise Valley Dr. & Frying Pan Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
2078
1900
12
1558
1900
12
0%
25
1900
12
163
1900
12
718
1900
12
0%
261
1900
12
25
1900
12
25
1900
12
0%
25
1900
12
28
1900
12
28
1900
12
0%
414
1900
12
0
0
0
1
25
0
1
0
1
25
0
1
0
1
25
0
3
25
Yes
Yes
30
309
7.0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
2078
pm+pt
7
4
7
1583
NA
4
Yes
35
1575
30.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
30
355
8.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
17%
217
25
Perm custom
762
NA
8
4
8
8
8
2
2
2
2
2
2
6
6
5.0
10.0
79.0
53.0%
4.0
1.0
0.0
5.0
Lead
20.0
25.0
98.0
65.8%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
29.0
19.5%
4.0
1.0
0.0
5.0
Lead
20.0
25.0
48.0
32.2%
4.0
1.0
0.0
5.0
Lag
20.0
25.0
48.0
32.2%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
None
110.3
0.74
0.80
27.1
0.0
27.1
C
None
90.7
0.61
0.51
17.1
0.0
17.1
B
22.8
C
298
327
None
46.9
0.31
0.70
58.4
0.0
58.4
E
None
32.3
0.22
0.73
58.1
0.0
58.1
E
50.3
D
267
302
83
130
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
1.00
100%
2%
0
0%
163
pm+pt
3
8
3
497
537
0
Yes
30
288
6.5
1.00
100%
2%
0
0
2
25
25
NA custom
28
Perm
28
414
NA pm+ov
6
7
6
6
7
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
5.0
10.0
79.0
53.0%
4.0
1.0
0.0
5.0
Lead
None C-Max C-Max C-Max C-Max C-Max
32.3
28.7
28.7
28.7
28.7
28.7
0.22
0.19
0.19
0.19
0.19
0.19
0.51
0.09
0.04
0.07
0.11
0.04
16.9
54.7
53.0
0.4
54.9
53.0
0.0
0.0
0.0
0.0
0.0
0.0
16.9
54.7
53.0
0.4
54.9
53.0
B
D
D
A
D
D
36.0
12.2
D
B
46
20
10
0
23
12
134
52
26
0
57
28
None
106.7
0.72
0.21
6.5
0.0
6.5
A
56
93
Synchro 8 Report
Page 1
Lanes, Volumes, Timings
1: Sunrise Valley Dr. & Frying Pan Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
229
2644
0
0
0
0.79
3169
0
0
0
0.50
EBR
6/6/2013
WBL
WBT
1495
WBR
NBL
NBT
208
NBR
SBL
SBT
275
SBR
345
0
0
0
0.47
1378
0
0
0
0.55
511
0
0
0
0.42
265
0
0
0
0.09
682
0
0
0
0.04
376
0
0
0
0.07
265
0
0
0
0.11
682
0
0
0
0.04
2033
0
0
0
0.20
Intersection Summary
Area Type:
Other
Cycle Length: 149
Actuated Cycle Length: 149
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 27.9
Intersection LOS: C
Intersection Capacity Utilization 76.9%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:
1: Sunrise Valley Dr. & Frying Pan Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 2
Lanes, Volumes, Timings
2: Centreville Rd. & Frying Pan Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
538
1900
12
256
1900
12
0%
51
1900
12
136
1900
12
340
1900
12
0%
136
1900
12
238
1900
12
1940
1900
12
0%
102
1900
12
27
1900
12
504
1900
12
0%
265
1900
12
155
1
310
1
25
400
1
205
1
25
390
1
375
1
25
225
3
25
Yes
Yes
35
232
4.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
256
NA
8
3
8
5.0
12.0
27.0
19.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
34.0
24.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
22.0
15.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
24.0
17.1%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
None
22.5
0.16
0.67
59.7
0.0
59.7
E
None
25.2
0.18
0.42
53.1
0.0
53.1
D
54.2
D
114
160
None
55.3
0.40
0.08
1.3
0.0
1.3
A
None
17.4
0.12
0.62
70.6
0.0
70.6
E
None
27.3
0.20
0.32
8.2
0.0
8.2
A
0
7
118
190
None
20.1
0.14
0.67
63.7
0.0
63.7
E
52.9
D
154
210
7
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
538
Prot
3
136
Prot
7
Yes
40
549
9.4
0%
51
pm+ov
1
8
8
164
205
Yes
35
1725
33.6
1.00
100%
2%
0
340
136
NA pm+ov
4
5
4
4
4
0
51
0
1
238
Prot
1
1
5.0
12.0
34.0
24.3%
4.0
3.0
-4.0
3.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
1940
102
NA pm+ov
6
7
6
6
6
27
Prot
5
5
504
265
NA pm+ov
2
3
2
2
2
15.0
38.0
77.0
55.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
22.0
15.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
15.0
38.0
55.0
39.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
27.0
19.3%
4.0
3.0
-4.0
3.0
Lead
None C-Max
27.0
81.2
0.19
0.58
0.70
0.66
63.5
22.6
0.0
0.0
63.5
22.6
E
C
25.9
C
202
478
290
535
None
101.6
0.73
0.09
1.5
0.0
1.5
A
None C-Max
9.1
58.4
0.06
0.42
0.23
0.34
59.6
42.0
0.0
0.0
59.6
42.0
E
D
31.9
C
26
245
46
287
None
83.8
0.60
0.26
10.0
0.0
10.0
A
0
18
3
250
Synchro 8 Report
Page 3
Lanes, Volumes, Timings
2: Centreville Rd. & Frying Pan Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
225
855
0
0
0
0.63
EBT
152
629
0
0
0
0.41
6/6/2013
EBR
WBL
155
616
0
0
0
0.08
310
240
0
0
0
0.57
WBT
1645
533
0
0
0
0.64
WBR
NBL
400
432
0
0
0
0.31
205
391
0
0
0
0.61
NBT
469
2949
0
0
0
0.66
NBR
SBL
390
1176
0
0
0
0.09
375
115
0
0
0
0.23
SBT
1018
SBR
1475
0
0
0
0.34
1015
0
0
0
0.26
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 72 (51%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 35.9
Intersection LOS: D
Intersection Capacity Utilization 74.6%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:
2: Centreville Rd. & Frying Pan Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 4
Lanes, Volumes, Timings
3: Centreville Rd. & Coppermine Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
375
1900
12
86
1900
12
0%
86
1900
12
55
1900
12
73
1900
12
0%
55
1900
12
100
1900
12
2109
1900
12
0%
0
1900
12
75
1900
12
696
1900
12
0%
497
1900
12
200
1
355
1
25
370
1
465
2
25
435
1
375
1
25
100
1
25
Yes
Yes
25
254
6.9
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
375
pm+pt
3
8
3
Yes
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
86
86
NA pm+ov
8
1
8
8
8
55
pm+pt
7
4
7
Yes
40
991
16.9
1.00
100%
2%
0
1.00
100%
2%
1
40
689
11.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
73
55
NA pm+ov
4
5
4
4
4
425
1
1.00
100%
2%
1
1.00
100%
2%
0
0%
100
Prot
1
2109
NA
6
0
75
Prot
5
1
6
5
696
497
NA pm+ov
2
3
2
2
2
7.0
14.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
52.0
37.1%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
14.0
10.0%
4.0
3.0
-4.0
3.0
Lead
7.0
49.0
49.0
35.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
14.0
10.0%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
15.0
39.0
60.0
42.9%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
14.0
10.0%
4.0
3.0
-4.0
3.0
Lead
15.0
42.0
62.0
44.3%
4.0
3.0
-4.0
3.0
Lag
7.0
14.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
None
46.1
0.33
0.77
51.3
0.0
51.3
D
None
34.4
0.25
0.10
40.8
0.0
40.8
D
42.5
D
33
47
None
48.7
0.35
0.14
5.8
0.0
5.8
A
None
29.9
0.21
0.17
32.6
0.0
32.6
C
None
34.2
0.24
0.12
2.0
0.0
2.0
A
None
11.3
0.08
0.36
66.6
0.0
66.6
E
0
10
40
m68
C-Min
73.5
0.52
0.26
18.8
0.0
18.8
B
15.6
B
97
151
None
101.3
0.72
0.39
1.8
0.0
1.8
A
35
55
C-Min
72.0
0.51
0.64
18.6
0.0
18.6
B
20.7
C
366
566
None
12.8
0.09
0.46
77.2
0.0
77.2
E
0
32
None
18.3
0.13
0.16
51.1
0.0
51.1
D
30.8
C
33
43
297
328
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
71
111
2
130
Synchro 8 Report
Page 5
Lanes, Volumes, Timings
3: Centreville Rd. & Coppermine Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
100
487
0
0
0
0.77
EBT
174
1236
0
0
0
0.07
6/6/2013
EBR
WBL
200
642
0
0
0
0.13
355
316
0
0
0
0.17
WBT
684
1162
0
0
0
0.06
WBR
NBL
370
607
0
0
0
0.09
465
277
0
0
0
0.36
NBT
911
3293
0
0
0
0.64
NBR
SBL
375
165
0
0
0
0.45
SBT
609
2667
0
0
0
0.26
SBR
425
1283
0
0
0
0.39
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.77
Intersection Signal Delay: 22.4
Intersection LOS: C
Intersection Capacity Utilization 72.2%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
3: Centreville Rd. & Coppermine Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 6
Lanes, Volumes, Timings
4: Centreville Rd. & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
589
1900
12
589
1900
12
0%
107
1900
12
466
1900
12
932
1900
12
0%
547
1900
12
336
1900
12
972
1900
12
0%
486
1900
12
459
1900
12
700
1900
12
0%
831
1900
12
0
0
271
2
25
328
1
418
2
25
0
1
258
2
25
456
3
25
Yes
Yes
35
836
16.3
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
589
Split
3
696
NA
3
3
Yes
35
852
16.6
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
1.00
100%
2%
0
932
NA
4
3
4
4
4
4
1
5.0
50.0
50.0
35.7%
4.0
3.0
-4.0
3.0
Lead
5.0
50.0
50.0
35.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
20.0
43.0
44.0
31.4%
4.0
3.0
-4.0
3.0
Lag
None
38.1
0.27
0.43
42.4
0.0
42.4
D
None
38.1
0.27
0.73
49.6
0.0
49.6
D
46.3
D
298
337
None
40.3
0.29
0.47
45.3
0.0
45.3
D
None
40.3
0.29
0.92
62.2
0.0
62.2
E
56.4
E
433
#743
None
40.3
0.29
0.93
54.8
1.0
55.8
E
None
16.0
0.11
0.86
93.1
0.0
93.1
F
344
#701
165
#243
C-Min
34.5
0.25
0.78
48.3
0.4
48.8
D
48.8
D
212
332
180
272
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
40
701
11.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
466
Split
4
157
178
0
Yes
40
949
16.2
1.00
100%
2%
0
547
Perm
0
1
336
Prot
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
972
486
NA pm+ov
6
4
6
6
6
459
Prot
5
700
NA
2
5
2
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
18.0
12.9%
4.0
3.0
-4.0
3.0
Lead
20.0
42.0
43.0
30.7%
4.0
3.0
-4.0
3.0
Lag
None
74.9
0.54
0.55
18.2
0.0
18.2
B
None
15.0
0.11
1.25
187.5
0.0
187.5
F
122
445
~265
#379
C-Min
33.5
0.24
0.57
43.2
0.0
43.2
D
59.2
E
196
209
831
Free
Free
140.0
1.00
0.52
1.9
0.0
1.9
A
7
66
Synchro 8 Report
Page 7
Lanes, Volumes, Timings
4: Centreville Rd. & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
456
1675
0
0
0
0.35
EBT
756
EBR
1169
0
0
0
0.60
6/6/2013
WBL
271
989
0
0
0
0.47
WBT
772
1017
0
0
0
0.92
WBR
NBL
328
590
0
6
0
0.94
418
392
0
0
0
0.86
NBT
869
NBR
SBL
1489
0
165
0
0.73
955
0
0
0
0.51
258
367
0
0
0
1.25
SBT
621
SBR
1452
0
0
0
0.48
1583
0
0
0
0.52
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 120 (86%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.25
Intersection Signal Delay: 53.4
Intersection LOS: D
Intersection Capacity Utilization 82.2%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
4: Centreville Rd. & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 8
Lanes, Volumes, Timings
5: Centreville Rd. & Dulles Toll Rd. (S)
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
836
1900
12
40
1900
12
0%
1075
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
877
1900
12
0%
518
1900
12
190
1900
12
1807
1900
12
0%
0
1900
12
365
1
0
0
25
0
0
0
0
25
380
1
270
2
25
0
1
25
Yes
Yes
30
568
12.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
100%
0
Perm
876
NA
4
Yes
30
833
18.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1075
Free
0
0
Yes
40
380
6.5
1.00
100%
2%
0
1.00
100%
2%
0
40
504
8.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
877
NA
6
Free
1.00
100%
2%
0
0%
518
Perm
190
Prot
5
1807
NA
2
4
4
4
6
6
6
5
2
5.0
11.5
40.0
28.6%
4.0
2.5
-3.5
3.0
5.0
11.5
40.0
28.6%
4.0
2.5
-3.5
3.0
20.0
26.5
53.5
38.2%
4.0
2.5
-3.5
3.0
Lag
20.0
26.5
53.5
38.2%
4.0
2.5
-3.5
3.0
Lag
5.0
12.0
46.5
33.2%
4.0
3.0
-4.0
3.0
Lead
20.0
26.5
100.0
71.4%
4.0
2.5
-3.5
3.0
None
None
37.0
0.26
1.96
470.3
0.0
470.3
F
212.5
F
~1298
#1567
140.0
1.00
0.68
2.4
0.0
2.4
A
0
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
C-Max C-Max
77.7
77.7
0.56
0.56
0.31
0.47
16.1
4.4
0.0
0.0
16.1
4.4
B
A
11.7
B
90
44
143
148
0
Min C-Max
16.3
97.0
0.12
0.69
0.48
0.74
59.3
15.5
0.0
3.1
59.3
18.6
E
B
22.5
C
84
444
125
738
Synchro 8 Report
Page 9
Lanes, Volumes, Timings
5: Centreville Rd. & Dulles Toll Rd. (S)
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
446
0
0
0
1.96
EBR
6/6/2013
WBL
WBT
753
WBR
365
1583
0
0
0
0.68
NBL
NBT
300
2822
0
0
0
0.31
NBR
SBL
380
1109
0
0
0
0.47
270
1066
0
0
0
0.18
SBT
424
SBR
2452
524
0
0
0.94
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 136 (97%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.96
Intersection Signal Delay: 89.0
Intersection LOS: F
Intersection Capacity Utilization 80.8%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
5: Centreville Rd. & Dulles Toll Rd. (S)
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 10
Lanes, Volumes, Timings
6: Centreville Rd. & Dulles Toll Rd. (N)
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
322
1900
12
0
1900
12
0%
161
1900
12
205
1900
12
1789
1900
12
0%
0
1900
12
0
1900
12
1372
1900
12
0%
179
1900
12
0
0
0
1
25
90
1
135
2
25
0
0
0
0
25
0
0
25
Yes
Yes
30
734
16.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0
50%
161
Perm
0%
0
0
Yes
25
815
22.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
161
NA
4
4
4
4
5.0
11.5
43.5
31.1%
4.0
2.5
-3.5
3.0
5.0
11.5
43.5
31.1%
4.0
2.5
-3.5
3.0
None
22.4
0.16
0.60
63.4
0.5
63.9
E
None
22.4
0.16
0.60
63.4
0.5
63.9
E
42.6
D
145
214
145
214
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
40
504
8.6
1.00
100%
2%
0
1.00
100%
2%
0
40
798
13.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
161
Free
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
205
pm+pt
1
6
1
1789
NA
6
6
2
2
2
5.0
12.0
22.5
16.1%
4.0
3.0
-4.0
3.0
Lead
20.0
26.0
96.5
68.9%
4.0
2.0
-3.0
3.0
20.0
26.0
74.0
52.9%
4.0
2.0
-3.0
3.0
Lag
20.0
26.0
74.0
52.9%
4.0
2.0
-3.0
3.0
Lag
140.0
1.00
0.10
0.1
0.0
0.1
A
None
111.6
0.80
0.31
3.0
0.0
3.0
A
10
m22
C-Min
96.6
0.69
0.56
13.0
0.1
13.1
B
11.9
B
308
451
C-Min
96.6
0.69
0.16
2.8
0.0
2.8
A
0
0
C-Min
111.6
0.80
0.44
3.5
0.4
3.9
A
3.8
A
67
m116
Free
0
0
1372
NA
2
179
Perm
10
42
Synchro 8 Report
Page 11
Lanes, Volumes, Timings
6: Centreville Rd. & Dulles Toll Rd. (N)
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
654
EBR
6/6/2013
WBL
WBT
735
486
0
102
0
0.42
486
0
102
0
0.42
WBR
NBL
90
1583
0
0
0
0.10
135
811
0
0
0
0.25
NBT
424
4054
1535
0
0
0.71
NBR
SBL
SBT
718
SBR
2440
0
231
0
0.62
1136
0
0
0
0.16
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 73 (52%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.60
Intersection Signal Delay: 11.6
Intersection LOS: B
Intersection Capacity Utilization 80.8%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
6: Centreville Rd. & Dulles Toll Rd. (N)
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 12
Lanes, Volumes, Timings
7: Fairfax County Parkway & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
642
1900
12
722
1900
12
0%
54
1900
12
140
1900
12
515
1900
12
0%
515
1900
12
257
1900
12
0
1900
12
0%
398
1900
12
897
1900
12
0
1900
12
0%
1096
1900
12
275
1
245
1
25
215
1
400
1
25
400
0
340
1
25
240
3
25
Yes
Yes
35
936
18.2
1.00
100%
2%
0
1.00
100%
2%
0
Yes
35
761
14.8
1.00
100%
2%
0
1.00
100%
2%
0
54
Perm
10%
126
Split
4
529
NA
4
0%
1.00
100%
2%
0
Yes
50
732
10.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
50
673
9.2
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
1.00
100%
2%
0
0%
722
NA
3
3
3
3
3
4
4
4
4
1
6
6
5
2
2
7.0
14.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
28.0
28.0%
5.0
2.5
0.0
7.5
Lag
5.0
12.0
24.0
24.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
29.0
29.0%
5.0
2.5
0.0
7.5
Lag
None
18.0
0.18
0.71
43.7
0.0
43.7
D
None
18.0
0.18
1.13
116.9
0.0
116.9
F
79.3
E
~283
#400
None
18.0
0.18
0.12
0.5
0.0
0.5
A
None
16.0
0.16
0.49
45.6
0.0
45.6
D
None
16.0
0.16
0.75
11.4
0.0
11.4
B
None
15.7
0.16
0.92
80.5
0.0
80.5
F
C-Max
20.5
0.20
0.66
12.1
0.0
12.1
B
None
17.0
0.17
1.06
88.1
0.0
88.1
F
C-Max
21.8
0.22
0.91
22.9
0.0
22.9
C
0
0
81
146
None
16.0
0.16
0.98
76.5
0.0
76.5
E
44.5
D
186
#300
0
103
163
#310
25
121
~223
#307
123
#276
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
257
Prot
1
1.00
100%
2%
0
642
Split
3
137
179
515
Perm
395
2
398
custom
897
Prot
5
0
1096
custom
Synchro 8 Report
Page 13
Lanes, Volumes, Timings
7: Fairfax County Parkway & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
240
898
0
0
0
0.71
EBT
856
637
0
0
0
1.13
EBR
WBL
275
450
0
0
0
0.12
245
257
0
0
0
0.49
6/6/2013
WBT
681
541
0
0
0
0.98
WBR
NBL
215
685
0
0
0
0.75
400
283
0
0
0
0.91
NBT
652
NBR
SBL
400
603
0
0
0
0.66
340
848
0
0
0
1.06
SBT
593
SBR
395
1211
0
0
0
0.91
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:SBR and 6:NBR, Start of Yellow
Natural Cycle: 100
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.13
Intersection Signal Delay: 56.2
Intersection LOS: E
Intersection Capacity Utilization 82.2%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
7: Fairfax County Parkway & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 14
Lanes, Volumes, Timings
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
797
1900
12
0
1900
12
0%
399
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1850
1900
12
0%
345
1900
12
572
1900
12
2402
1900
12
0%
0
1900
12
220
1
0
0
25
0
0
0
0
25
640
1
325
2
25
160
1
25
Yes
Yes
35
414
8.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
797
Prot
3
0
Yes
35
491
9.6
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
399
custom
3
3
3
5.0
12.0
30.0
30.0%
4.0
3.0
0.0
7.0
5.0
12.0
30.0
30.0%
4.0
3.0
0.0
7.0
None
23.0
0.23
1.01
73.8
0.0
73.8
E
None
23.0
0.23
0.87
45.7
0.0
45.7
D
~267
#394
174
#343
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
50
891
12.2
1.00
100%
2%
0
1.00
100%
2%
0
50
713
9.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
1850
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
345
Perm
572
Prot
5
2402
NA
2
6
6
6
5
2
20.0
27.5
47.0
47.0%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
47.0
47.0%
5.0
2.5
0.0
7.5
Lag
5.0
12.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
70.0
70.0%
5.0
2.5
0.0
7.5
0
C-Max C-Max None C-Max
39.5
39.5
16.0
62.5
0.40
0.40
0.16
0.62
0.92
0.41
1.04
0.76
37.7
3.9
90.3
8.1
0.0
0.0
0.0
0.1
37.7
3.9
90.3
8.2
D
A
F
A
32.4
23.9
C
C
402
0
~202
137
#491
54 m#222 m139
Synchro 8 Report
Page 15
Lanes, Volumes, Timings
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
160
789
0
0
0
1.01
EBT
334
EBR
WBL
WBT
411
WBR
220
460
0
0
0
0.87
6/6/2013
NBL
NBT
811
2008
0
0
0
0.92
NBR
SBL
640
834
0
0
0
0.41
325
549
0
0
0
1.04
SBT
633
SBR
3178
100
0
0
0.78
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 80 (80%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.04
Intersection Signal Delay: 34.5
Intersection LOS: C
Intersection Capacity Utilization 92.7%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 16
Lanes, Volumes, Timings
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
168
1900
12
0
1900
12
0%
449
1900
12
167
1900
12
2955
1900
12
0%
0
1900
12
0
1900
12
2859
1900
12
0%
385
1900
12
0
0
185
1
25
0
1
185
2
25
0
0
0
0
0
0
0
0
Yes
Yes
25
568
15.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
890
24.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
233
NA
8
4
8
8
8
7.0
14.0
21.0
21.0%
4.0
3.0
0.0
7.0
5.0
21.0
21.0
21.0%
4.0
1.0
0.0
5.0
5.0
21.0
21.0
21.0%
4.0
1.0
0.0
5.0
None
14.0
0.14
0.34
41.2
0.0
41.2
D
None
16.0
0.16
0.73
33.7
0.0
33.7
C
34.3
C
79
#206
None
16.0
0.16
0.68
30.3
0.0
30.3
C
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
50
1458
19.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
151
Prot
4
48
80
Yes
50
713
9.7
1.00
100%
2%
0
48%
233
Perm
69
#165
670
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
167
Prot
1
2955
NA
6
1
6
2
2
2
5.0
12.0
13.0
13.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
79.0
79.0%
5.0
2.0
0.0
7.0
20.0
27.0
66.0
66.0%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
66.0
66.0%
5.0
2.0
0.0
7.0
Lag
None C-Max
6.0
72.0
0.06
0.72
0.81
0.81
67.6
9.4
0.0
0.2
67.6
9.6
E
A
12.7
B
48
289
m49 m285
0
0
2859
NA
2
385
Perm
C-Max C-Max
59.0
59.0
0.59
0.59
0.95
0.35
6.0
0.1
0.0
0.0
6.0
0.1
A
A
5.3
A
56
0
m45
m0
Synchro 8 Report
Page 17
Lanes, Volumes, Timings
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
EBR
WBL
185
450
0
0
0
0.34
6/6/2013
WBT
810
WBR
NBL
320
0
0
0
0.73
341
0
0
0
0.68
185
205
0
0
0
0.81
NBT
633
3661
124
0
0
0.84
NBR
SBL
SBT
1378
3000
0
0
0
0.95
SBR
670
1091
0
0
0
0.35
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 80 (80%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.95
Intersection Signal Delay: 11.2
Intersection LOS: B
Intersection Capacity Utilization 92.7%
ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 18
Lanes, Volumes, Timings
10: Fairfax County Parkway & Spring Street
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBR
NBL
NBT
SBT
SBR
348
1900
12
0%
215
1
25
348
1900
12
850
1900
12
2332
1900
12
0%
2987
1900
12
0%
664
1900
12
0
1
650
2
25
550
1
Yes
Yes
25
754
20.6
50
427
5.8
50
557
7.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
850
Prot
5
2332
NA
2
2987
NA
6
8
5
2
6
6
6
7.0
14.0
14.0
14.0%
4.0
3.0
0.0
7.0
5.0
12.0
26.0
26.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
86.0
86.0%
5.0
2.0
0.0
7.0
20.0
27.0
60.0
60.0%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
60.0
60.0%
5.0
2.0
0.0
7.0
Lag
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
348
NA
8
348
Free
Free
None
7.0
0.07
1.45
259.4
0.0
259.4
F
129.9
F
~156
#246
100.0
1.00
0.22
0.3
0.0
0.3
A
0
0
1.00
100%
2%
0
664
Perm
None C-Max C-Max C-Max
19.0
79.0
53.0
53.0
0.19
0.79
0.53
0.53
1.30
0.58
1.11
0.68
175.0
2.5
79.3
13.1
0.0
0.0
0.0
0.0
175.0
2.5
79.3
13.1
F
A
E
B
48.6
67.3
D
E
~356
27
~801
160
#478
134
#891
291
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 19
Lanes, Volumes, Timings
10: Fairfax County Parkway & Spring Street
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
674
215
240
0
0
0
1.45
EBR
NBL
1583
0
0
0
0.22
650
652
0
0
0
1.30
6/6/2013
NBT
347
SBT
477
4017
0
0
0
0.58
2695
0
0
0
1.11
SBR
550
977
0
0
0
0.68
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 56 (56%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.45
Intersection Signal Delay: 65.2
Intersection LOS: E
Intersection Capacity Utilization 109.4%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
10: Fairfax County Parkway & Spring Street
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 20
Lanes, Volumes, Timings
11: Reston Parkway & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
260
1900
12
1061
1900
12
0%
22
1900
12
167
1900
12
500
1900
12
0%
619
1900
12
190
1900
12
1868
1900
12
0%
475
1900
12
660
1900
12
856
1900
12
0%
391
1900
12
0
0
155
1
25
220
1
435
2
25
415
1
720
2
25
260
1
25
Yes
Yes
35
675
13.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
0
517
NA
4
1083
NA
3
3
3
4
4
8.0
42.0
63.0
31.5%
4.0
3.0
0.0
7.0
Lead
8.0
42.0
63.0
31.5%
4.0
3.0
0.0
7.0
Lead
8.0
15.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lag
None
56.0
0.28
0.53
65.4
0.0
65.4
E
None
56.0
0.28
1.10
122.7
0.0
122.7
F
111.6
F
~844
#987
None
25.0
0.12
0.75
106.5
0.0
106.5
F
213
#332
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
2270
34.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
150
Split
4
260
Split
3
292
398
Yes
35
419
8.2
1.00
100%
2%
0
1.00
100%
2%
0
45
1208
18.3
1.00
100%
2%
0
1.00
100%
2%
0
0%
619
Perm
430
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
190
Prot
1
1868
NA
6
4
4
1
6
6
6
5
8.0
15.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
32.0
16.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
26.0
13.0%
4.0
3.0
0.0
7.0
Lead
20.0
35.5
71.0
35.5%
4.5
2.0
0.0
6.5
Lag
20.0
35.5
71.0
35.5%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
34.0
17.0%
4.0
3.0
0.0
7.0
Lead
20.0
35.5
79.0
39.5%
4.5
2.0
0.0
6.5
Lag
8.0
42.0
63.0
31.5%
4.0
3.0
0.0
7.0
Lead
None
25.0
0.12
1.23
187.7
0.0
187.7
F
190.8
F
~457
#593
None
25.0
0.12
1.38
213.8
0.0
213.8
F
None C-Max C-Max None C-Max
16.1
64.5
64.5
27.0
75.4
0.08
0.32
0.32
0.14
0.38
0.69
1.14
0.68
1.43
0.45
102.3 129.4
29.3 252.8
57.3
0.0
0.0
0.0
0.0
0.0
102.3 129.4
29.3 252.8
57.3
F
F
C
F
E
108.6
115.4
F
F
127 ~1045
243
~595
419
174 #1130
389 m#668 m421
None
137.9
0.69
0.35
10.6
0.0
10.6
B
~733
#994
475
Perm
660
Prot
5
856
391
NA pm+ov
2
3
2
2
3
198
m246
Synchro 8 Report
Page 21
Lanes, Volumes, Timings
11: Reston Parkway & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
260
495
0
0
0
0.53
EBT
595
988
0
0
0
1.10
EBR
6/6/2013
WBL
155
201
0
0
0
0.75
WBT
339
422
0
0
0
1.23
WBR
NBL
220
448
0
0
0
1.38
435
326
0
0
0
0.58
NBT
2190
1639
0
0
0
1.14
NBR
SBL
415
695
0
0
0
0.68
720
463
0
0
0
1.43
SBT
1128
1916
0
0
0
0.45
SBR
430
1110
0
0
0
0.35
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.43
Intersection Signal Delay: 125.9
Intersection LOS: F
Intersection Capacity Utilization 121.5%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
11: Reston Parkway & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 22
Lanes, Volumes, Timings
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
595
1900
12
0
1900
12
0%
416
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1475
1900
12
0%
231
1900
12
0
1900
12
1608
1900
12
0%
536
1900
12
400
1
0
0
25
0
0
0
0
25
625
1
0
0
25
0
2
25
Yes
Yes
25
573
15.6
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
595
Prot
4
0
Yes
40
339
5.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
416
custom
0
0
Yes
45
662
10.0
1.00
100%
2%
0
1.00
100%
2%
0
45
160
2.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1
0
1475
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
231
Free
0
1608
NA
2
4
4
4
6
2
2
2
7.0
13.5
43.0
21.5%
4.0
2.5
0.0
6.5
7.0
13.5
43.0
21.5%
4.0
2.5
0.0
6.5
20.0
26.5
157.0
78.5%
4.5
2.0
0.0
6.5
20.0
26.5
157.0
78.5%
4.5
2.0
0.0
6.5
20.0
26.5
157.0
78.5%
4.5
2.0
0.0
6.5
None
36.5
0.18
0.95
105.1
0.0
105.1
F
None
36.5
0.18
1.22
177.0
0.0
177.0
F
405
#527
~600
#836
C-Max
150.5
0.75
0.55
4.6
0.0
4.6
A
4.0
A
125
m111
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Free
536
Perm
200.0
1.00
0.15
0.0
0.0
0.0
A
0
m0
C-Max C-Max
150.5 150.5
0.75
0.75
0.60
0.41
13.2
3.4
0.5
0.3
13.7
3.7
B
A
11.2
B
390
72
m415
m94
Synchro 8 Report
Page 23
Lanes, Volumes, Timings
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
626
0
0
0
0.95
EBT
493
EBR
WBL
WBT
259
WBR
400
340
0
0
0
1.22
NBL
6/6/2013
NBT
582
2663
0
8
0
0.56
NBR
625
1583
0
0
0
0.15
SBL
SBT
80
SBR
2663
563
0
0
0.77
1316
309
0
0
0.53
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 40 (20%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 65
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.22
Intersection Signal Delay: 34.4
Intersection LOS: C
Intersection Capacity Utilization 81.0%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 24
Lanes, Volumes, Timings
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
303
1900
12
0
1900
12
0%
775
1900
12
191
1900
12
2007
1900
12
0%
0
1900
12
0
1900
12
1676
1900
12
0%
229
1900
12
0
0
0
1
25
50
1
645
1
25
0
0
0
0
25
0
0
25
Yes
Yes
35
427
8.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
1052
28.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
402
NA
4
4
4
4
4
7.0
13.5
55.0
27.5%
4.0
2.5
0.0
6.5
7.0
13.5
55.0
27.5%
4.0
2.5
0.0
6.5
None
48.5
0.24
0.67
77.8
0.0
77.8
E
None
48.5
0.24
1.02
111.2
28.6
139.7
F
123.5
F
~545
#805
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
45
847
12.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
273
Split
4
346
468
Yes
45
649
9.8
1.00
100%
2%
0
48%
403
Perm
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
191
Prot
1
2007
NA
6
1
6
2
2
2
7.0
13.5
55.0
27.5%
4.0
2.5
0.0
6.5
5.0
12.0
43.0
21.5%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
145.0
72.5%
4.5
2.0
0.0
6.5
20.0
26.5
102.0
51.0%
4.5
2.0
0.0
6.5
Lag
20.0
26.5
102.0
51.0%
4.5
2.0
0.0
6.5
Lag
None
48.5
0.24
0.99
104.7
33.6
138.3
F
None C-Max
26.0 138.5
0.13
0.69
0.83
0.82
133.1
21.8
0.0
3.1
133.1
25.0
F
C
34.4
C
243
508
303
512
498
#755
0
0
1676
NA
2
229
Perm
C-Max C-Max
105.5 105.5
0.53
0.53
0.63
0.25
6.4
0.3
0.8
0.0
7.1
0.3
A
A
6.3
A
73
2
m83
m0
Synchro 8 Report
Page 25
Lanes, Volumes, Timings
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
347
EBR
WBL
WBT
972
407
0
0
0
0.67
395
0
37
0
1.12
WBR
NBL
50
407
0
39
0
1.10
645
318
0
0
0
0.60
NBT
569
2450
277
338
0
0.95
6/6/2013
NBR
SBL
SBT
767
SBR
2681
609
0
0
0.81
901
0
0
0
0.25
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 72 (36%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.02
Intersection Signal Delay: 42.6
Intersection LOS: D
Intersection Capacity Utilization 98.3%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 26
Lanes, Volumes, Timings
14: Reston Parkway & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
110
1900
12
1950
1900
12
0%
275
1900
12
455
1900
12
698
1900
12
0%
303
1900
12
755
1900
12
1298
1900
12
0%
1298
1900
12
287
1900
12
1251
1900
12
0%
130
1900
12
275
1
550
2
25
0
1
480
2
25
470
1
300
2
25
290
2
25
Yes
Yes
35
506
9.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
110
Prot
3
1950
NA
8
3
8
6.0
13.0
19.0
9.5%
4.0
3.0
0.0
7.0
Lead
None
10.4
0.05
0.62
107.6
0.0
107.6
F
74
112
Yes
35
569
11.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
275
Perm
455
Prot
7
698
NA
4
8
8
7
4
6.0
49.0
63.0
31.5%
4.0
3.0
0.0
7.0
Lag
6.0
49.0
63.0
31.5%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
24.0
12.0%
4.0
3.0
0.0
7.0
Lead
None
56.0
0.28
1.37
221.4
0.0
221.4
F
193.9
F
~1234
#1316
None
56.0
0.28
0.51
33.5
0.0
33.5
C
None
17.0
0.08
1.56
321.0
0.0
321.0
F
157
262
~434
#558
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
847
12.8
1.00
100%
2%
0
1.00
100%
2%
0
45
794
12.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
303
Perm
445
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
755
Prot
1
1298
NA
6
1298
Perm
4
4
1
6
6
6
5
6.0
54.0
68.0
34.0%
4.0
3.0
0.0
7.0
Lag
6.0
54.0
68.0
34.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
51.0
25.5%
4.0
3.0
0.0
7.0
Lead
20.0
44.5
95.0
47.5%
4.5
2.0
0.0
6.5
Lag
20.0
44.5
95.0
47.5%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
18.0
9.0%
4.0
3.0
0.0
7.0
Lead
None
62.6
0.31
0.63
62.1
0.0
62.1
E
136.9
F
418
497
None
62.6
0.31
0.51
32.5
0.0
32.5
C
None C-Max C-Max
44.0
88.5
88.5
0.22
0.44
0.44
1.00
0.58
1.64
107.0
38.5 319.4
0.0
0.0
0.0
107.0
38.5 319.4
F
D
F
162.8
F
176
510
426 ~2338
286 m#633 m456 m#2544
287
Prot
5
1251
130
NA pm+ov
2
3
2
2
2
20.0
44.5
62.0
31.0%
4.5
2.0
0.0
6.5
Lag
6.0
13.0
19.0
9.5%
4.0
3.0
0.0
7.0
Lead
None C-Max
11.0
55.5
0.06
0.28
1.53
0.89
323.8
37.0
0.0
0.0
323.8
37.0
F
D
83.7
F
~276
398
#387
528
None
72.4
0.36
0.20
3.4
0.0
3.4
A
27
25
Synchro 8 Report
Page 27
Lanes, Volumes, Timings
14: Reston Parkway & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
205
0
0
0
0.54
EBT
426
1423
0
0
0
1.37
6/6/2013
EBR
WBL
275
539
0
0
0
0.51
550
291
0
0
0
1.56
WBT
489
WBR
NBL
1107
0
0
0
0.63
592
0
0
0
0.51
480
755
0
0
0
1.00
NBT
767
2250
0
0
0
0.58
NBR
SBL
470
793
0
0
0
1.64
300
188
0
0
0
1.53
SBT
714
1411
0
0
0
0.89
SBR
445
635
0
0
0
0.20
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 24 (12%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.64
Intersection Signal Delay: 151.8
Intersection LOS: F
Intersection Capacity Utilization 143.3%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
14: Reston Parkway & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 28
Lanes, Volumes, Timings
15: Reston Parkway & Bluemont Way/Stratford Park Pl
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
26
1900
12
26
1900
12
0%
207
1900
8
20
1900
12
20
1900
12
0%
0
1900
12
795
1900
12
2068
1900
12
0%
80
1900
12
24
1900
12
1653
1900
12
0%
72
1900
12
0
1
0
1
25
0
0
380
2
25
550
0
390
1
25
290
1
25
Yes
Yes
25
1182
32.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
26
pm+pt
7
4
7
119
NA
4
4
7.0
14.0
14.0
7.0%
4.0
3.0
0.0
7.0
Lead
4.0
49.0
49.0
24.5%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
55.0
27.5%
4.0
3.0
0.0
7.0
Lead
None
15.0
0.08
0.27
86.0
0.0
86.0
F
None
10.8
0.05
0.74
58.4
0.0
58.4
E
44.3
D
52
133
20
pm+pt
3
8
3
20
NA
8
Yes
45
794
12.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
45%
114
pm+ov
1
4
1
32
66
Yes
25
258
7.0
1.00
100%
2%
0
1.00
100%
2%
0
45
523
7.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
2148
NA
6
8
1
6
5
5.0
12.0
12.0
6.0%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
47.0
23.5%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
55.0
27.5%
4.0
3.0
0.0
7.0
Lead
20.0
39.0
125.0
62.5%
5.0
2.0
0.0
7.0
Lag
4.0
11.0
14.0
7.0%
4.0
3.0
0.0
7.0
Lead
None
72.1
0.36
0.22
20.2
0.0
20.2
C
None
11.8
0.06
0.25
86.0
0.0
86.0
F
50
97
24
54
None
8.9
0.04
0.24
97.0
0.0
97.0
F
91.5
F
26
58
None C-Max
54.2 156.0
0.27
0.78
0.85
0.54
93.0
7.4
0.0
0.0
93.0
7.4
F
A
30.5
C
544
268
616
331
1.00
100%
2%
0
1.00
100%
2%
0
0%
795
Prot
1
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
285
1
0
24
Prot
5
1653
72
NA pm+ov
2
7
2
2
7
20.0
42.0
84.0
42.0%
5.0
2.0
0.0
7.0
Lag
7.0
14.0
14.0
7.0%
4.0
3.0
0.0
7.0
Lead
None C-Max
7.3 106.7
0.04
0.53
0.38
0.61
96.8
19.4
0.0
0.3
96.8
19.7
F
B
20.0
B
32
235
69
257
None
120.7
0.60
0.07
0.1
0.0
0.1
A
0
0
Synchro 8 Report
Page 29
Lanes, Volumes, Timings
15: Reston Parkway & Bluemont Way/Stratford Park Pl
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
96
0
0
0
0.27
EBT
1102
EBR
WBL
WBT
178
392
0
0
0
0.30
509
0
0
0
0.22
81
0
0
0
0.25
372
0
0
0
0.05
WBR
6/6/2013
NBL
380
933
0
0
0
0.85
NBT
714
3943
223
0
0
0.58
NBR
SBL
390
70
0
0
0
0.34
SBT
443
2713
442
0
0
0.73
SBR
285
994
0
0
0
0.07
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 32 (16%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.85
Intersection Signal Delay: 28.1
Intersection LOS: C
Intersection Capacity Utilization 80.2%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:
15: Reston Parkway & Bluemont Way/Stratford Park Pl
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 30
Lanes, Volumes, Timings
16: Reston Parkway & New Dominion Pkwy
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
72
1900
12
466
1900
12
0%
323
1900
12
248
1900
12
297
1900
12
0%
198
1900
12
818
1900
12
1091
1900
12
0%
223
1900
12
206
1900
12
1310
1900
12
0%
150
1900
12
275
1
95
1
25
165
1
500
2
25
445
1
205
1
25
270
1
25
Yes
Yes
25
722
19.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
72
pm+pt
3
8
3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
466
323
NA pm+ov
8
1
8
8
8
248
pm+pt
7
4
7
1.00
100%
2%
0
45
423
6.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
297
198
NA pm+ov
4
5
4
4
4
5.0
12.0
37.0
18.5%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
53.0
26.5%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
36.0
18.0%
4.0
3.0
0.0
7.0
Lead
5.0
47.0
60.0
30.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
46.0
23.0%
4.0
3.0
0.0
7.0
Lead
None
34.7
0.17
0.36
59.4
0.0
59.4
E
None
28.7
0.14
0.92
107.7
0.0
107.7
F
74.9
E
321
#415
None
81.7
0.41
0.46
31.1
0.0
31.1
C
None
62.9
0.31
0.89
90.0
0.0
90.0
F
None
85.5
0.43
0.28
24.8
0.0
24.8
C
213
310
265
#416
None
49.9
0.25
0.64
73.4
0.0
73.4
E
66.0
E
346
460
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
521
7.9
5.0
12.0
13.0
6.5%
4.0
3.0
0.0
7.0
Lead
67
112
Yes
25
408
11.1
1.00
100%
2%
0
113
163
65
1
818
Prot
1
1
5.0
12.0
53.0
26.5%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
1091
223
NA pm+ov
6
7
6
6
6
206
Prot
5
5
1310
150
NA pm+ov
2
3
2
2
2
20.0
39.0
81.0
40.5%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
36.0
18.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
46.0
23.0%
4.0
3.0
0.0
7.0
Lead
20.0
47.0
74.0
37.0%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
13.0
6.5%
4.0
3.0
0.0
7.0
Lead
None C-Max
46.0
87.5
0.23
0.44
1.04
0.49
117.6
33.5
24.4
0.7
142.0
34.2
F
C
72.3
E
~598
320
#724
357
None
121.7
0.61
0.22
2.6
0.4
3.1
A
None C-Max
28.6
70.1
0.14
0.35
0.81
0.74
106.6
60.4
0.0
0.5
106.6
60.9
F
E
62.4
E
268
569
355
628
None
83.1
0.42
0.21
14.6
0.0
14.6
B
37
55
43
100
Synchro 8 Report
Page 31
Lanes, Volumes, Timings
16: Reston Parkway & New Dominion Pkwy
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
270
199
0
0
0
0.36
EBT
642
530
0
0
0
0.88
EBR
WBL
275
693
0
2
0
0.47
95
293
0
0
0
0.85
6/6/2013
WBT
328
493
0
0
0
0.60
WBR
NBL
165
705
0
0
0
0.28
500
789
97
0
0
1.18
NBT
441
2223
713
0
0
0.72
NBR
SBL
445
1026
451
0
0
0.39
205
345
0
0
0
0.60
SBT
343
1781
0
145
0
0.80
SBR
65
715
0
0
0
0.21
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 8 (4%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.04
Intersection Signal Delay: 68.8
Intersection LOS: E
Intersection Capacity Utilization 98.6%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
16: Reston Parkway & New Dominion Pkwy
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 32
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
WBT
WBR
SBL
SBR
1301
1900
12
859
1900
12
0%
381
1900
12
0%
1322
1900
12
1100
1900
12
0%
0
2
25
625
1900
12
210
1
25
0
1
Yes
35
2307
44.9
35
621
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
1301
Prot
1
859
NA
12
1
12
381
1322
NA pm+ov
2
3
2
2
2
1.00
100%
2%
0
10.0
17.0
36.0
27.7%
4.0
3.0
0.0
7.0
Lead
None
29.0
0.22
1.70
352.9
0.0
352.9
F
~828
#964
15.0
39.0
52.0
40.0%
4.0
3.0
0.0
7.0
Lag
81.0
0.62
0.74
22.1
0.0
22.1
C
221.3
F
476
648
0
1
Yes
35
623
12.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
5.0
29.0
42.0
32.3%
4.0
3.0
0.0
7.0
1100
NA
3
Free
3
5.0
29.0
42.0
32.3%
4.0
3.0
0.0
7.0
None C-Max C-Max
45.0
87.0
35.0
0.35
0.67
0.27
0.59
1.25
1.19
39.5 143.1 129.0
0.0
0.0
0.0
39.5 143.1 129.0
D
F
F
119.9
83.1
F
F
263 ~1387
~578
370 #1651
#681
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
625
Free
130.0
1.00
0.39
2.2
0.0
2.2
A
50
117
Synchro 8 Report
Page 33
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
765
0
0
0
1.70
6/6/2013
EBT
2227
WBT
541
WBR
SBL
543
SBR
1160
0
0
0
0.74
644
0
0
0
0.59
1059
0
0
0
1.25
924
0
0
0
1.19
1583
0
0
0
0.39
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 80 (62%), Referenced to phase 3:SBL, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.70
Intersection Signal Delay: 147.7
Intersection LOS: F
Intersection Capacity Utilization 130.6%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
17: Sunrise Valley Dr & Wiehle Ave
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 34
Lanes, Volumes, Timings
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
468
1900
12
0
1900
12
0%
335
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1668
1900
12
0%
340
1900
12
557
1900
12
1299
1900
12
0%
0
1900
12
450
1
0
0
25
0
0
235
2
25
435
1
0
0
25
450
2
25
No
Yes
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
43%
191
Perm
200
NA
4
4
4
4
4
7.0
14.0
42.0
32.3%
4.0
3.0
0.0
7.0
7.0
14.0
42.0
32.3%
4.0
3.0
0.0
7.0
7.0
14.0
42.0
32.3%
4.0
3.0
0.0
7.0
None
25.2
0.19
0.66
53.0
0.0
53.0
D
None
25.2
0.19
0.74
64.3
0.1
64.4
E
57.1
E
187
263
None
25.2
0.19
0.66
58.3
0.0
58.3
E
0
158
225
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
623
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
12%
412
Split
4
179
215
Yes
25
553
15.1
1.00
100%
2%
0
1.00
100%
2%
0
35
572
11.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
1668
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
340
Perm
557
Prot
5
1299
NA
2
6
6
6
5
2
15.0
22.0
48.0
36.9%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
48.0
36.9%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
40.0
30.8%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
88.0
67.7%
4.0
3.0
0.0
7.0
C-Max C-Max
57.3
57.3
0.44
0.44
0.50
0.38
16.2
0.3
0.0
0.0
16.2
0.3
B
A
13.5
B
153
0
m128
m0
0
None C-Max
26.5
90.8
0.20
0.70
0.80
0.37
43.2
11.7
0.0
0.3
43.2
12.0
D
B
21.4
C
156
155
175
205
Synchro 8 Report
Page 35
Lanes, Volumes, Timings
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
450
867
0
9
0
0.48
EBT
684
379
0
4
0
0.53
EBR
WBL
WBT
473
WBR
NBL
450
404
0
0
0
0.47
NBT
543
3326
0
19
0
0.50
6/6/2013
NBR
SBL
SBT
492
435
888
0
0
0
0.38
871
0
0
0
0.64
3552
1461
0
0
0.62
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 128 (98%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 24.1
Intersection LOS: C
Intersection Capacity Utilization 65.4%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 36
Lanes, Volumes, Timings
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
287
1900
12
0
1900
12
0%
287
1900
12
196
1900
12
1852
1900
12
0%
0
1900
12
0
1900
12
1310
1900
12
0%
193
1900
12
0
0
0
1
25
0
1
0
2
25
0
0
250
2
25
0
0
25
Yes
No
35
627
12.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
432
11.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
192
NA
4
4
4
4
4
5.0
11.5
44.0
33.8%
4.0
2.5
0.0
6.5
5.0
11.5
44.0
33.8%
4.0
2.5
0.0
6.5
5.0
11.5
44.0
33.8%
4.0
2.5
0.0
6.5
None
22.4
0.17
0.70
62.6
0.0
62.6
E
None
22.4
0.17
0.74
66.7
0.0
66.7
E
64.5
E
171
243
None
22.4
0.17
0.70
64.3
0.0
64.3
E
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
35
387
7.5
1.00
100%
2%
0
1.00
100%
2%
0
0%
30%
201
Split
4
170
240
Yes
35
572
11.1
1.00
100%
2%
0
37%
181
Perm
153
220
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
196
Prot
1
1852
NA
6
1
6
2
2
2
5.0
12.0
26.0
20.0%
4.0
3.0
0.0
7.0
Lead
15.0
21.0
86.0
66.2%
4.0
2.0
0.0
6.0
15.0
21.0
60.0
46.2%
4.0
2.0
0.0
6.0
Lag
15.0
21.0
60.0
46.2%
4.0
2.0
0.0
6.0
Lag
None C-Max
11.9
95.1
0.09
0.73
0.63
0.50
57.4
9.0
0.0
0.7
57.4
9.7
E
A
14.3
B
89
242
78
503
0
0
1310
NA
2
193
Perm
C-Max C-Max
76.3
76.3
0.59
0.59
0.30
0.19
2.5
0.5
0.1
0.0
2.6
0.5
A
A
2.3
A
13
0
22
0
Synchro 8 Report
Page 37
Lanes, Volumes, Timings
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
547
EBR
WBL
WBT
352
WBR
NBL
NBT
492
484
0
0
0
0.42
438
0
0
0
0.44
433
0
0
0
0.42
501
0
0
0
0.39
3721
1354
0
0
0.78
NBR
6/6/2013
SBL
SBT
307
SBR
4425
1244
0
0
0.41
1008
0
0
0
0.19
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 64 (49%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.74
Intersection Signal Delay: 16.9
Intersection LOS: B
Intersection Capacity Utilization 65.4%
ICU Level of Service C
Analysis Period (min) 15
Splits and Phases:
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 38
Lanes, Volumes, Timings
20: Wiehle Ave & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
412
1900
12
1705
1900
12
0%
797
1900
12
227
1900
12
480
1900
12
0%
152
1900
12
761
1900
12
913
1900
12
0%
761
1900
12
389
1900
12
882
1900
12
0%
130
1900
12
385
1
477
1
25
0
1
320
2
25
0
1
250
1
25
442
1
25
Yes
Yes
35
1259
24.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1705
797
NA pm+ov
4
1
4
4
4
28%
163
pm+pt
3
8
3
0%
412
pm+pt
7
4
7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
544
NA
8
1.00
100%
2%
0
35
619
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
152
Perm
761
Prot
1
8
8
8
1
5.0
12.0
22.0
16.9%
4.0
3.0
0.0
7.0
Lead
8.0
51.0
55.0
42.3%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
22.0
16.9%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
13.0
10.0%
4.0
3.0
0.0
7.0
Lead
8.0
40.0
50.0
38.5%
4.0
3.0
0.0
7.0
Lag
8.0
40.0
50.0
38.5%
4.0
3.0
0.0
7.0
Lag
None
59.0
0.45
0.91
55.0
0.0
55.0
D
None
48.0
0.37
1.31
177.9
0.0
177.9
F
122.3
F
~968
#1107
None
70.0
0.54
0.89
38.0
0.0
38.0
D
None
49.0
0.38
1.29
204.6
0.0
204.6
F
None
43.0
0.33
0.24
5.6
0.0
5.6
A
532
#827
~140
#305
None
49.0
0.38
0.76
37.8
0.0
37.8
D
63.8
E
156
201
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
35
540
10.5
5.0
12.0
18.0
13.8%
4.0
3.0
0.0
7.0
Lead
235
#421
Yes
35
976
19.0
1.00
100%
2%
0
0
48
120
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
913
761
NA pm+ov
6
3
6
6
6
389
pm+pt
5
2
5
1012
NA
2
15.0
33.0
40.0
30.8%
4.0
2.0
0.0
6.0
Lag
2
15.0
38.0
45.0
34.6%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
13.0
10.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
17.0
13.1%
4.0
3.0
0.0
7.0
Lead
None C-Max
15.0
39.0
0.12
0.30
1.92
0.86
454.3
38.4
0.0
0.7
454.3
39.1
F
D
188.0
F
~504
367
#631
450
None
51.0
0.39
1.13
100.3
0.0
100.3
F
None C-Max
43.0
34.0
0.33
0.26
2.03
0.77
502.3
48.0
0.0
0.0
502.3
48.0
F
D
174.2
F
~468
284
#672
339
~704
#950
0
Synchro 8 Report
Page 39
Lanes, Volumes, Timings
20: Wiehle Ave & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
442
451
0
0
0
0.91
EBT
1179
1306
0
0
0
1.31
6/6/2013
EBR
WBL
385
891
0
0
0
0.89
477
126
0
0
0
1.29
WBT
896
WBR
NBL
713
0
0
0
0.76
625
0
0
0
0.24
320
396
0
0
0
1.92
NBT
460
NBR
SBL
1061
27
0
0
0.88
676
0
0
0
1.13
250
192
0
0
0
2.03
SBT
539
SBR
1319
0
0
0
0.77
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 48 (37%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.03
Intersection Signal Delay: 146.3
Intersection LOS: F
Intersection Capacity Utilization 132.5%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
20: Wiehle Ave & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 40
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
980
1900
12
34
1900
12
0%
270
1900
12
0
1900
12
58
1900
12
0%
58
1900
12
399
1900
12
699
1900
12
0%
0
1900
12
52
1900
12
388
1900
12
0%
543
1900
12
0
0
0
1
25
670
0
0
1
25
0
0
300
1
25
430
1
25
Yes
Yes
35
3015
58.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
980
Prot
5
304
NA
2
5
2
5.0
12.0
26.0
21.7%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
50.0
41.7%
4.0
3.0
0.0
7.0
None C-Max
19.0
43.0
0.16
0.36
1.80
0.40
399.8
6.5
0.0
0.0
399.8
6.5
F
A
306.7
F
~588
17
#718
81
Yes
35
879
17.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Perm
116
NA
6
6
6
6
15.0
22.0
24.0
20.0%
4.0
3.0
0.0
7.0
Lag
Yes
30
206
4.7
1.00
100%
2%
0
1.00
100%
2%
0
35
1671
32.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
220
0
399
Perm
699
NA
8
1.00
100%
2%
0
0%
0
52
Split
4
931
NA
4
8
8
8
4
4
15.0
22.0
24.0
20.0%
4.0
3.0
0.0
7.0
Lag
5.0
21.0
50.0
41.7%
4.0
1.0
0.0
5.0
5.0
21.0
50.0
41.7%
4.0
1.0
0.0
5.0
7.0
14.0
20.0
16.7%
4.0
3.0
0.0
7.0
7.0
14.0
20.0
16.7%
4.0
3.0
0.0
7.0
C-Max C-Max
17.0
0.14
0.23
25.2
0.0
25.2
C
25.2
C
21
49
None
45.0
0.38
1.86
432.1
0.0
432.1
F
None
45.0
0.38
0.53
31.0
0.0
31.0
C
176.7
F
219
278
None
13.0
0.11
0.27
44.9
0.0
44.9
D
None
13.0
0.11
1.66
327.5
0.0
327.5
F
312.6
F
~474
#610
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
~470
#667
1.00
100%
2%
0
36
m73
0
Synchro 8 Report
Page 41
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
430
543
0
0
0
1.80
EBT
2935
EBR
6/6/2013
WBL
751
0
0
0
0.40
WBT
799
WBR
513
0
0
0
0.23
NBL
NBT
126
214
0
0
0
1.86
1327
0
0
0
0.53
NBR
SBL
300
191
0
0
0
0.27
SBT
1591
SBR
561
0
0
0
1.66
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 96 (80%), Referenced to phase 2:EBT and 6:WBTL, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.86
Intersection Signal Delay: 258.0
Intersection LOS: F
Intersection Capacity Utilization 100.8%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
21: Sunrise Valley Dr & Hunter Mill Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 42
Lanes, Volumes, Timings
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
100
1900
12
0
1900
12
0%
225
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
590
1900
12
0%
590
1900
12
270
1900
12
674
1900
12
0%
0
1900
12
65
1
0
0
25
0
0
0
0
25
0
1
206
1
25
0
1
25
Yes
Yes
35
693
13.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
100
Prot
4
0
Yes
25
406
11.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
225
custom
4
4
4
5.0
10.5
10.5
8.8%
4.0
1.5
0.0
5.5
0
0
Yes
35
1671
32.6
1.00
100%
2%
0
1.00
100%
2%
0
35
447
8.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
590
NA
2
1.00
100%
2%
0
0%
590
Perm
270
Prot
1
674
NA
6
2
2
2
1
6
5.0
10.5
10.5
8.8%
4.0
1.5
0.0
5.5
20.0
26.0
67.5
56.3%
4.0
2.0
0.0
6.0
Lag
20.0
26.0
67.5
56.3%
4.0
2.0
0.0
6.0
Lag
5.0
11.5
42.0
35.0%
4.0
2.5
0.0
6.5
Lead
20.0
26.0
109.5
91.3%
4.0
2.0
0.0
6.0
None
5.0
0.04
1.37
274.5
0.0
274.5
F
None
5.0
0.04
0.80
28.5
0.0
28.5
C
~102
#216
0
#117
C-Max C-Max
74.1
74.1
0.62
0.62
0.51
0.52
4.2
4.1
0.0
0.0
4.2
4.1
A
A
4.1
A
116
70
m124
m43
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
0
None C-Max
22.9 103.5
0.19
0.86
0.80
0.22
46.9
1.2
0.0
0.3
46.9
1.5
D
A
14.5
B
215
27
285
m25
Synchro 8 Report
Page 43
Lanes, Volumes, Timings
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
73
0
0
0
1.37
EBT
613
EBR
WBL
WBT
326
WBR
65
281
0
0
0
0.80
NBL
6/6/2013
NBT
1591
NBR
SBL
1150
0
0
0
0.51
1140
0
0
0
0.52
206
523
0
0
0
0.52
SBT
367
SBR
3052
1703
0
0
0.50
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.37
Intersection Signal Delay: 21.4
Intersection LOS: C
Intersection Capacity Utilization 75.1%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 44
Lanes, Volumes, Timings
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
389
1900
12
0
1900
12
0%
519
1900
12
143
1900
12
1174
1900
12
0%
0
1900
12
0
1900
12
581
1900
12
0%
179
1900
12
0
0
0
1
25
0
1
120
1
25
0
0
0
0
25
0
0
25
Yes
Yes
35
452
8.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
854
23.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
389
Prot
4
1.00
100%
2%
0
35
218
4.2
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
4
143
pm+pt
1
6
1
5.0
11.0
26.0
21.7%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
26.0
21.7%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
14.0
11.7%
4.0
2.0
0.0
6.0
Lead
None
20.0
0.17
1.32
205.1
0.0
205.1
F
None
20.0
0.17
0.90
33.7
50.0
83.7
F
~389
#584
116
#327
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
447
8.7
1.00
100%
2%
0
519
custom
0
1
1174
NA
6
10.0
16.0
63.0
52.5%
4.0
2.0
0.0
6.0
6
None C-Max
57.0
57.0
0.48
0.48
0.47
0.70
18.4
21.7
0.0
39.9
18.4
61.6
B
E
56.9
E
40
220
40 m171
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
581
NA
23
23
74.0
0.62
0.51
5.2
1.9
7.0
A
5.7
A
79
m75
179
Perm
23
23
74.0
0.62
0.17
0.2
1.2
1.4
A
0
m0
Synchro 8 Report
Page 45
Lanes, Volumes, Timings
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
372
EBR
WBL
295
0
0
0
1.32
WBT
774
WBR
NBL
577
0
195
0
1.36
120
302
0
0
0
0.47
NBT
367
1681
497
591
0
1.08
NBR
SBL
6/6/2013
SBT
138
SBR
1148
394
0
0
0.77
1044
670
0
0
0.48
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 8 (7%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 110
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.32
Intersection Signal Delay: 67.8
Intersection LOS: E
Intersection Capacity Utilization 74.6%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 47
Lanes, Volumes, Timings
24: Hunter Mill Rd & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBR
NBL
NBT
SBT
SBR
431
1900
12
0%
0
1
25
431
1900
12
646
1900
12
431
1900
12
0%
696
1900
12
0%
319
1900
12
370
1
0
2
25
1.00
100%
2%
0
431
Perm
?
1
4
6
5.0
11.0
14.0
12%
4.0
2.0
5.0
11.0
26.0
22%
4.0
2.0
10.0
16.0
63.0
53%
4.0
2.0
Lead
Lag
Yes
35
218
4.2
35
772
15.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
646
Prot
14
431
NA
124
1015
NA
2
14
124
2
1.00
100%
2%
0
0%
431
NA
3
?
230
0
Yes
35
385
7.5
1.00
100%
2%
0
?
3
3
3
5.0
12.0
31.0
25.8%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
31.0
25.8%
4.0
3.0
0.0
7.0
Lead
None
24.0
0.20
1.22
162.2
0.0
162.2
F
85.6
F
~409
#611
None
24.0
0.20
0.65
9.1
0.0
9.1
A
34.0
0.28
0.66
58.1
55.1
113.2
F
0
93
233
m283
10.0
16.0
49.0
40.8%
4.0
2.0
0.0
6.0
Lag
83.0
0.69
0.33
2.4
1.3
3.7
A
69.4
E
28
m32
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
C-Max
43.0
0.36
0.81
38.5
0.2
38.7
D
38.7
D
348
436
1.00
100%
2%
0
0
None
None C-Max
Synchro 8 Report
Page 49
Lanes, Volumes, Timings
24: Hunter Mill Rd & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
305
354
0
0
0
1.22
6/6/2013
EBR
NBL
NBT
138
SBT
692
370
661
0
2
0
0.65
972
549
0
0
1.53
1288
629
0
0
0.65
1252
0
21
0
0.82
SBR
?
?
?
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 8 (7%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 110
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.32
Intersection Signal Delay: 63.6
Intersection LOS: E
Intersection Capacity Utilization 87.6%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
24: Hunter Mill Rd & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 50
Lanes, Volumes, Timings
1: Sunrise Valley Dr. & Frying Pan Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1078
1900
12
2240
1900
12
0%
83
1900
12
75
1900
12
923
1900
12
0%
50
1900
12
25
1900
12
25
1900
12
0%
75
1900
12
331
1900
12
62
1900
12
0%
3517
1900
12
0
0
0
1
0
0
1
0
1
0
0
1
0
1
0
0
3
0
Yes
Yes
30
310
7.0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1078
Prot
7
2323
NA
4
7
Yes
35
1575
30.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
928
NA
8
4
3
8
8
8
5
5.0
10.0
95.0
58.6%
4.0
1.0
0.0
5.0
Lead
20.0
25.0
103.0
63.6%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
22.0
13.6%
4.0
1.0
0.0
5.0
Lead
20.0
25.0
30.0
18.5%
4.0
1.0
0.0
5.0
Lag
20.0
25.0
30.0
18.5%
4.0
1.0
0.0
5.0
Lag
4.0
9.0
9.0
5.6%
4.0
1.0
0.0
5.0
Lead
None
90.0
0.56
0.39
20.9
0.0
20.9
C
None
102.8
0.63
0.72
22.0
0.0
22.0
C
21.7
C
579
685
None
12.2
0.08
0.56
87.8
0.0
87.8
F
None
25.0
0.15
1.25
178.5
0.0
178.5
F
164.4
F
~474
#576
None
25.0
0.15
0.13
0.8
0.0
0.8
A
78
133
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
30
355
8.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
45
Perm
75
Prot
3
223
256
0
Yes
30
288
6.5
1.00
100%
2%
0
0
0
0
2
25
Prot
5
25
NA
1.00
100%
2%
0
1.00
100%
2%
0
0%
75
Over
3
331
Prot
1
2
2
3
1
5.0
10.0
13.0
8.0%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
22.0
13.6%
4.0
1.0
0.0
5.0
Lead
4.0
9.0
24.0
14.8%
4.0
1.0
0.0
5.0
Lead
None C-Max
4.0
8.0
0.02
0.05
0.58
0.14
123.4
75.8
0.0
0.0
123.4
75.8
F
E
41.6
D
27
13
#79
32
None
12.2
0.08
0.29
2.9
0.0
2.9
A
0
0
62
3517
NA pm+ov
6
7
6
6
7
5.0
10.0
28.0
17.3%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
95.0
58.6%
4.0
1.0
0.0
5.0
Lead
None C-Max
19.0
24.8
0.12
0.15
1.60
0.11
333.1
61.1
0.0
0.0
333.1
61.1
F
E
330.5
F
~499
30
#705
55
None
119.8
0.74
1.69
335.0
0.0
335.0
F
~3119
#3197
Synchro 8 Report
Page 1
Lanes, Volumes, Timings
1: Sunrise Valley Dr. & Frying Pan Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
230
2772
0
0
0
0.39
3213
0
0
0
0.72
EBR
6/6/2013
WBL
WBT
1495
WBR
NBL
NBT
208
NBR
SBL
SBT
275
SBR
185
0
0
0
0.41
740
0
0
0
1.25
335
0
0
0
0.13
43
0
0
0
0.58
174
0
0
0
0.14
298
0
0
0
0.25
207
0
0
0
1.60
541
0
0
0
0.11
2079
0
0
0
1.69
Intersection Summary
Area Type:
Other
Cycle Length: 162
Actuated Cycle Length: 162
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.69
Intersection Signal Delay: 181.9
Intersection LOS: F
Intersection Capacity Utilization 157.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
1: Sunrise Valley Dr. & Frying Pan Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 2
Lanes, Volumes, Timings
2: Centreville Rd. & Frying Pan Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
502
1900
12
430
1900
12
0%
359
1900
12
252
1900
12
453
1900
12
0%
101
1900
12
160
1900
12
1636
1900
12
0%
128
1900
12
27
1900
12
1137
1900
12
0%
541
1900
12
155
1
310
1
25
400
1
205
1
25
390
1
375
1
25
225
3
25
Yes
Yes
35
232
4.5
1.00
100%
2%
0
1.00
100%
2%
0
Yes
35
1725
33.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
Yes
40
1098
18.7
1.00
100%
2%
0
0
1
1.00
100%
2%
0
0%
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
1.00
100%
2%
0
0%
502
Prot
3
430
NA
8
3
8
0%
359
pm+ov
1
8
8
5.0
12.0
26.0
18.6%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
32.0
22.9%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
15.0
38.0
70.0
50.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
15.0
38.0
62.0
44.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
26.0
18.6%
4.0
3.0
-4.0
3.0
Lead
None
21.5
0.15
0.66
60.0
0.0
60.0
E
None
25.1
0.18
0.71
60.9
0.0
60.9
E
54.3
D
202
266
None
45.0
0.32
0.69
38.6
0.0
38.6
D
None
24.8
0.18
0.81
74.7
0.0
74.7
E
None
35.7
0.26
0.20
2.7
0.0
2.7
A
None C-Max
9.0
61.2
0.06
0.44
0.24
0.73
68.2
45.2
0.0
0.0
68.2
45.2
E
D
37.6
D
25
516
m47
588
None
85.7
0.61
0.53
20.1
0.0
20.1
C
220
#343
None C-Max
16.8
73.8
0.12
0.53
0.75
0.61
68.7
28.1
0.0
0.0
68.7
28.1
E
C
29.6
C
146
362
m152 m373
None
101.7
0.73
0.11
0.9
0.0
0.9
A
239
370
None
28.5
0.20
0.63
55.2
0.0
55.2
E
54.7
D
198
260
153
193
252
Prot
7
7
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
453
101
NA pm+ov
4
5
4
4
4
0
18
160
Prot
1
1
1636
128
NA pm+ov
6
7
6
6
6
1
m2
27
Prot
5
5
1137
541
NA pm+ov
2
3
2
2
2
312
484
Synchro 8 Report
Page 3
Lanes, Volumes, Timings
2: Centreville Rd. & Frying Pan Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
225
819
0
0
0
0.61
EBT
152
631
0
0
0
0.68
6/6/2013
EBR
WBL
155
521
0
0
0
0.69
310
328
0
0
0
0.77
WBT
1645
747
0
0
0
0.61
WBR
NBL
400
518
0
0
0
0.19
205
214
0
0
0
0.75
NBT
1018
2681
0
0
0
0.61
NBR
SBL
390
1184
0
0
0
0.11
375
113
0
0
0
0.24
SBT
1018
SBR
1547
0
0
0
0.73
1023
0
0
0
0.53
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 40 (29%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.81
Intersection Signal Delay: 41.1
Intersection LOS: D
Intersection Capacity Utilization 83.3%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
2: Centreville Rd. & Frying Pan Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 4
Lanes, Volumes, Timings
3: Centreville Rd. & Coppermine Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
538
1900
12
227
1900
12
0%
340
1900
12
60
1900
12
80
1900
12
0%
60
1900
12
34
1900
12
1656
1900
12
0%
34
1900
12
85
1900
12
1174
1900
12
0%
235
1900
12
200
1
355
1
25
370
1
465
2
25
435
1
375
1
25
100
1
25
Yes
Yes
25
254
6.9
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
538
pm+pt
3
8
3
Yes
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
227
340
NA pm+ov
8
1
8
8
8
60
pm+pt
7
4
7
Yes
40
991
16.9
1.00
100%
2%
0
1.00
100%
2%
1
40
689
11.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
80
60
NA pm+ov
4
5
4
4
4
425
1
1.00
100%
2%
1
1.00
100%
2%
0
0%
34
Prot
1
1690
NA
6
0
85
Prot
5
1
6
5
1174
235
NA pm+ov
2
3
2
2
2
7.0
14.0
30.0
21.4%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
65.0
46.4%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
14.0
10.0%
4.0
3.0
-4.0
3.0
Lead
7.0
49.0
49.0
35.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
13.0
9.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
15.0
39.0
48.0
34.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
13.0
9.3%
4.0
3.0
-4.0
3.0
Lead
15.0
42.0
49.0
35.0%
4.0
3.0
-4.0
3.0
Lag
7.0
14.0
30.0
21.4%
4.0
3.0
-4.0
3.0
Lead
None
54.3
0.39
0.91
58.6
0.0
58.6
E
None
42.6
0.30
0.21
36.7
0.0
36.7
D
43.2
D
88
92
None
50.3
0.36
0.52
23.2
0.0
23.2
C
None
30.0
0.21
0.20
28.9
0.0
28.9
C
None
35.0
0.25
0.12
0.5
0.0
0.5
A
None
9.6
0.07
0.15
65.2
0.0
65.2
E
0
0
13
m25
C-Min
72.0
0.51
0.45
26.0
0.0
26.0
C
24.6
C
238
351
None
107.8
0.77
0.18
1.9
0.0
1.9
A
37
49
C-Min
63.2
0.45
0.59
16.8
0.0
16.8
B
17.7
B
253
466
None
13.5
0.10
0.50
68.0
0.0
68.0
E
155
176
None
18.5
0.13
0.17
51.4
0.0
51.4
D
29.4
C
36
46
455
422
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
75
#159
0
21
Synchro 8 Report
Page 5
Lanes, Volumes, Timings
3: Centreville Rd. & Coppermine Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
100
589
0
0
0
0.91
EBT
174
1564
0
0
0
0.15
6/6/2013
EBR
WBL
200
797
0
0
0
0.43
355
295
0
0
0
0.20
WBT
684
1162
0
0
0
0.07
WBR
NBL
370
641
0
0
0
0.09
465
234
0
0
0
0.15
NBT
911
2880
0
0
0
0.59
NBR
SBL
375
170
0
0
0
0.50
SBT
609
2610
0
0
0
0.45
SBR
425
1273
0
0
0
0.18
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 104 (74%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 26.7
Intersection LOS: C
Intersection Capacity Utilization 78.2%
ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
3: Centreville Rd. & Coppermine Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 6
Lanes, Volumes, Timings
4: Centreville Rd. & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1662
1900
12
874
1900
12
0%
298
1900
12
686
1900
12
325
1900
12
0%
632
1900
12
99
1900
12
1219
1900
12
0%
330
1900
12
439
1900
12
987
1900
12
0%
247
1900
12
0
0
271
2
25
328
0
418
2
25
0
1
258
2
25
456
3
25
Yes
Yes
35
836
16.3
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
1662
Split
3
1172
NA
3
3
Yes
35
852
16.6
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
1.00
100%
2%
0
325
NA
4
3
4
4
4
4
1
5.0
50.0
50.0
35.7%
4.0
3.0
-4.0
3.0
Lead
5.0
50.0
50.0
35.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
20.0
43.0
44.0
31.4%
4.0
3.0
-4.0
3.0
Lag
None
48.6
0.35
0.96
58.7
0.0
58.7
E
None
48.6
0.35
0.97
64.2
0.0
64.2
E
61.0
E
~556
#715
None
26.0
0.19
1.08
111.0
0.0
111.0
F
None
26.0
0.19
0.50
54.1
0.0
54.1
D
168.7
F
141
192
None
26.0
0.19
1.55
289.9
0.5
290.4
F
None
9.0
0.06
0.45
74.9
0.0
74.9
E
~704
#946
37
69
C-Min
39.4
0.28
0.85
39.1
0.1
39.2
D
35.6
D
369
321
~357
#482
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
40
701
11.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
686
Split
4
534
#646
0
Yes
40
949
16.2
1.00
100%
2%
0
632
Perm
0
1
99
Prot
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
1219
330
NA pm+ov
6
4
6
6
6
439
Prot
5
987
NA
2
5
2
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
20.0
42.0
49.0
35.0%
4.0
3.0
-4.0
3.0
Lag
None
65.4
0.47
0.42
10.6
0.0
10.6
B
None
14.0
0.10
1.28
198.8
0.0
198.8
F
153
79
~258
#371
C-Min
44.4
0.32
0.61
35.8
0.0
35.8
D
73.3
E
238
282
247
Free
Free
140.0
1.00
0.16
0.2
0.0
0.2
A
0
0
Synchro 8 Report
Page 7
Lanes, Volumes, Timings
4: Centreville Rd. & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
456
1733
0
0
0
0.96
EBT
756
EBR
1203
0
0
0
0.97
6/6/2013
WBL
271
637
0
0
0
1.08
WBT
772
655
0
0
0
0.50
WBR
NBL
328
407
0
21
0
1.64
418
220
0
0
0
0.45
NBT
869
NBR
SBL
1489
0
20
0
0.83
802
0
0
0
0.41
258
343
0
0
0
1.28
SBT
621
SBR
1670
0
0
0
0.59
1583
0
0
0
0.16
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 128 (91%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.55
Intersection Signal Delay: 81.0
Intersection LOS: F
Intersection Capacity Utilization 104.3%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
4: Centreville Rd. & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 8
Lanes, Volumes, Timings
5: Centreville Rd. & Dulles Toll Rd. (S)
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
338
1900
12
40
1900
12
0%
338
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1710
1900
12
0%
930
1900
12
200
1900
12
2083
1900
12
0%
0
1900
12
365
1
0
0
0
0
0
0
0
0
380
3
270
3
25
0
1
0
Yes
Yes
30
568
12.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
100%
0
Perm
378
NA
4
Yes
30
833
18.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
338
Free
0
0
Yes
40
380
6.5
1.00
100%
2%
0
1.00
100%
2%
0
40
504
8.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
1710
NA
6
Free
1.00
100%
2%
0
0%
930
Perm
200
Prot
5
2083
NA
2
4
4
4
6
6
6
5
2
5.0
11.5
40.0
28.6%
4.0
2.5
-3.5
3.0
5.0
11.5
40.0
28.6%
4.0
2.5
-3.5
3.0
20.0
26.5
53.5
38.2%
4.0
2.5
-3.5
3.0
Lag
20.0
26.5
53.5
38.2%
4.0
2.5
-3.5
3.0
Lag
5.0
12.0
46.5
33.2%
4.0
3.0
-4.0
3.0
Lead
20.0
26.5
100.0
71.4%
4.0
2.5
-3.5
3.0
None
None
35.4
0.25
0.89
72.8
0.0
72.8
E
38.6
D
345
#521
140.0
1.00
0.21
0.3
0.0
0.3
A
0
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
C-Max C-Max
78.9
78.9
0.56
0.56
0.60
0.78
13.8
15.7
0.0
0.0
13.8
15.7
B
B
14.5
B
442
620
113
254
0
Min C-Max
16.7
98.6
0.12
0.70
0.49
0.84
58.4
21.8
0.0
47.2
58.4
69.0
E
E
68.1
E
73
867
117
971
Synchro 8 Report
Page 9
Lanes, Volumes, Timings
5: Centreville Rd. & Dulles Toll Rd. (S)
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
447
0
0
0
0.85
EBR
6/6/2013
WBL
WBT
753
WBR
365
1583
0
0
0
0.21
NBL
NBT
300
2867
0
126
0
0.62
NBR
SBL
380
1185
0
0
0
0.78
270
1066
0
0
0
0.19
SBT
424
SBR
2493
808
0
0
1.24
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 136 (97%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.89
Intersection Signal Delay: 39.2
Intersection LOS: D
Intersection Capacity Utilization 83.7%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
5: Centreville Rd. & Dulles Toll Rd. (S)
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 10
Lanes, Volumes, Timings
6: Centreville Rd. & Dulles Toll Rd. (N)
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
624
1900
12
0
1900
12
0%
416
1900
12
653
1900
12
1986
1900
12
0%
0
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
0
0
1
0
90
1
135
2
25
0
0
0
0
0
0
0
0
Yes
Yes
30
734
16.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0
50%
312
Perm
0%
0
0
Yes
25
815
22.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
312
NA
4
4
4
4
5.0
11.5
43.5
31.1%
4.0
2.5
-3.5
3.0
5.0
11.5
43.5
31.1%
4.0
2.5
-3.5
3.0
None
35.2
0.25
0.74
58.4
61.2
119.5
F
None
35.2
0.25
0.74
58.4
61.2
119.5
F
71.9
E
275
356
275
356
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
40
504
8.6
1.00
100%
2%
0
1.00
100%
2%
0
40
798
13.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
416
Free
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
653
pm+pt
1
6
1
1986
NA
6
6
2
2
2
5.0
12.0
22.5
16.1%
4.0
3.0
-4.0
3.0
Lead
20.0
26.0
96.5
68.9%
4.0
2.0
-3.0
3.0
20.0
26.0
74.0
52.9%
4.0
2.0
-3.0
3.0
Lag
20.0
26.0
74.0
52.9%
4.0
2.0
-3.0
3.0
Lag
None
98.8
0.71
0.33
4.6
0.3
4.9
A
C-Min
0
0
39
m134
C-Min
98.8
0.71
0.55
7.0
0.3
7.3
A
6.7
A
89
423
C-Min
140.0
1.00
0.26
0.4
0.0
0.4
A
Free
0
0
0
0
Perm
2
Synchro 8 Report
Page 11
Lanes, Volumes, Timings
6: Centreville Rd. & Dulles Toll Rd. (N)
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
654
EBR
6/6/2013
WBL
WBT
735
496
0
260
0
1.32
496
0
260
0
1.32
WBR
NBL
90
1583
0
0
0
0.26
135
1977
690
0
0
0.51
NBT
424
NBR
SBL
SBT
718
SBR
3620
839
0
0
0.71
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 73 (52%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.74
Intersection Signal Delay: 25.2
Intersection LOS: C
Intersection Capacity Utilization 83.7%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
6: Centreville Rd. & Dulles Toll Rd. (N)
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 12
Lanes, Volumes, Timings
7: Fairfax County Parkway & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1220
1900
12
700
1900
12
0%
407
1900
12
577
1900
12
670
1900
12
0%
614
1900
12
125
1900
12
0
1900
12
0%
100
1900
12
390
1900
12
0
1900
12
0%
439
1900
12
275
1
245
1
25
215
1
400
1
25
400
0
340
1
25
240
3
25
Yes
Yes
35
936
18.2
1.00
100%
2%
0
1.00
100%
2%
0
Yes
35
761
14.8
1.00
100%
2%
0
1.00
100%
2%
0
407
Perm
30%
404
Split
4
843
NA
4
0%
1.00
100%
2%
0
Yes
50
732
10.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
50
673
9.2
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
1.00
100%
2%
0
0%
700
NA
3
3
3
3
3
4
4
4
4
1
6
6
5
2
2
7.0
14.0
32.0
29.1%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
32.0
29.1%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
32.0
29.1%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
37.0
33.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
37.0
33.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
37.0
33.6%
4.0
3.0
0.0
7.0
Lag
5.0
10.0
13.0
11.8%
4.0
1.0
0.0
5.0
Lead
7.0
14.0
20.0
18.2%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
21.0
19.1%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
28.0
25.5%
5.0
2.5
0.0
7.5
Lag
None
25.0
0.23
1.08
90.4
0.0
90.4
F
None
25.0
0.23
0.87
53.9
0.0
53.9
D
65.0
E
252
#350
None
25.0
0.23
0.60
7.8
0.0
7.8
A
None
29.6
0.27
0.93
69.2
0.0
69.2
E
None
29.6
0.27
0.77
14.5
0.0
14.5
B
None
8.4
0.08
0.93
113.9
0.0
113.9
F
C-Max
14.9
0.14
0.24
1.4
0.0
1.4
A
None
12.5
0.11
0.69
53.5
0.0
53.5
D
C-Max
20.5
0.19
0.50
5.8
0.0
5.8
A
0
82
304
#508
None
29.6
0.27
0.93
57.1
0.0
57.1
E
45.7
D
318
#442
60
214
90
#210
0
0
95
128
0
46
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
125
Prot
1
1.00
100%
2%
0
1220
Split
3
~341
#431
614
Perm
395
2
100
custom
390
Prot
5
0
439
custom
Synchro 8 Report
Page 13
Lanes, Volumes, Timings
7: Fairfax County Parkway & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
240
1134
0
0
0
1.08
EBT
856
804
0
0
0
0.87
EBR
WBL
275
674
0
0
0
0.60
245
439
0
0
0
0.92
6/6/2013
WBT
681
915
0
0
0
0.92
WBR
NBL
215
799
0
0
0
0.77
400
134
0
0
0
0.93
NBT
652
NBR
SBL
400
411
0
0
0
0.24
340
635
0
0
0
0.61
SBT
593
SBR
395
876
0
0
0
0.50
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 0 (0%), Referenced to phase 2:SBR and 6:NBR, Start of Yellow
Natural Cycle: 100
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.08
Intersection Signal Delay: 52.3
Intersection LOS: D
Intersection Capacity Utilization 72.9%
ICU Level of Service C
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
7: Fairfax County Parkway & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 14
Lanes, Volumes, Timings
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
660
1900
12
0
1900
12
0%
231
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
2607
1900
12
0%
203
1900
12
428
1900
12
1666
1900
12
0%
460
1900
12
220
1
0
0
25
0
0
0
0
25
640
1
325
2
25
160
1
25
Yes
Yes
35
414
8.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
660
Prot
3
0
Yes
35
491
9.6
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
231
custom
3
3
3
5.0
12.0
26.0
23.6%
4.0
3.0
0.0
7.0
5.0
12.0
26.0
23.6%
4.0
3.0
0.0
7.0
None
19.0
0.17
1.11
115.1
0.0
115.1
F
None
19.0
0.17
0.63
29.5
0.0
29.5
C
~275
#391
75
161
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
50
891
12.2
1.00
100%
2%
0
1.00
100%
2%
0
50
713
9.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
2607
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
203
Perm
428
Prot
5
2126
NA
2
6
6
6
5
2
20.0
27.5
64.0
58.2%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
64.0
58.2%
5.0
2.5
0.0
7.5
Lag
5.0
12.0
20.0
18.2%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
84.0
76.4%
5.0
2.5
0.0
7.5
0
C-Max C-Max None C-Max
56.5
56.5
13.0
76.5
0.51
0.51
0.12
0.70
1.00
0.22
1.06
0.61
44.4
2.6 111.0
7.4
0.0
0.0
0.0
0.1
44.4
2.6 111.0
7.5
D
A
F
A
41.4
24.8
D
C
646
0
~176
182
#794
35 m#237 m188
Synchro 8 Report
Page 15
Lanes, Volumes, Timings
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
160
592
0
0
0
1.11
EBT
334
EBR
WBL
WBT
411
WBR
220
367
0
0
0
0.63
6/6/2013
NBL
NBT
811
2611
0
0
0
1.00
NBR
SBL
640
911
0
0
0
0.22
325
405
0
0
0
1.06
SBT
633
SBR
3468
296
0
0
0.67
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 40 (36%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.11
Intersection Signal Delay: 42.0
Intersection LOS: D
Intersection Capacity Utilization 96.8%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 16
Lanes, Volumes, Timings
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
801
1900
12
0
1900
12
0%
801
1900
12
415
1900
12
3092
1900
12
0%
0
1900
12
0
1900
12
2119
1900
12
0%
618
1900
12
0
0
185
1
25
0
1
185
2
25
0
0
0
0
0
0
0
0
Yes
Yes
25
568
15.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
890
24.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
448
NA
8
4
8
8
8
7.0
14.0
27.0
24.5%
4.0
3.0
0.0
7.0
5.0
21.0
27.0
24.5%
4.0
1.0
0.0
5.0
None
20.0
0.18
1.23
157.8
0.0
157.8
F
None
22.0
0.20
1.23
154.0
0.0
154.0
F
144.5
F
~379
#612
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
50
1458
19.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
721
Prot
4
~346
#472
Yes
50
713
9.7
1.00
100%
2%
0
46%
433
Perm
670
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
415
Prot
1
3092
NA
6
1
6
2
2
2
5.0
21.0
27.0
24.5%
4.0
1.0
0.0
5.0
5.0
12.0
22.0
20.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
83.0
75.5%
5.0
2.0
0.0
7.0
20.0
27.0
61.0
55.5%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
61.0
55.5%
5.0
2.0
0.0
7.0
Lag
None
22.0
0.20
1.12
112.4
0.0
112.4
F
None C-Max
14.8
76.0
0.13
0.69
0.90
0.88
65.3
13.5
0.0
0.8
65.3
14.3
E
B
20.3
C
149
383
m142 m353
~302
#511
0
0
2119
NA
2
618
Perm
C-Max C-Max
54.2
54.2
0.49
0.49
0.85
0.57
7.7
1.4
0.0
0.0
7.7
1.4
A
A
6.3
A
76
0
93
m0
Synchro 8 Report
Page 17
Lanes, Volumes, Timings
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
EBR
WBL
185
585
0
0
0
1.23
6/6/2013
WBT
810
WBR
NBL
365
0
0
0
1.23
388
0
0
0
1.12
185
468
0
0
0
0.89
NBT
633
3513
172
0
0
0.93
NBR
SBL
SBT
1378
2506
0
0
0
0.85
SBR
670
1093
0
0
0
0.57
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 32 (29%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.23
Intersection Signal Delay: 40.8
Intersection LOS: D
Intersection Capacity Utilization 102.8%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 18
Lanes, Volumes, Timings
10: Fairfax County Parkway & Spring Street
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBR
NBL
NBT
SBT
SBR
521
1900
12
0%
215
1
25
466
1900
12
467
1900
12
3243
1900
12
0%
2108
1900
12
0%
344
1900
12
0
1
650
2
25
550
1
Yes
Yes
25
754
20.6
50
427
5.8
50
557
7.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
467
Prot
5
3243
NA
2
2108
NA
6
8
5
2
6
6
6
7.0
14.0
31.0
28.2%
4.0
3.0
0.0
7.0
5.0
12.0
23.0
20.9%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
79.0
71.8%
5.0
2.0
0.0
7.0
20.0
27.0
56.0
50.9%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
56.0
50.9%
5.0
2.0
0.0
7.0
Lag
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
521
NA
8
466
Free
Free
None
21.2
0.19
0.79
51.2
0.0
51.2
D
27.3
C
180
235
1.00
100%
2%
0
344
Perm
None C-Max C-Max C-Max
16.0
74.8
51.8
51.8
0.15
0.68
0.47
0.47
0.94
0.94
0.88
0.37
55.0
17.9
32.3
3.2
0.0
0.0
0.0
0.0
55.0
17.9
32.3
3.2
E
B
C
A
22.6
28.2
C
C
0
171
547
483
0
0 m#200 m632
#591
51
110.0
1.00
0.29
0.5
0.0
0.5
A
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 19
Lanes, Volumes, Timings
10: Fairfax County Parkway & Spring Street
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
674
215
749
0
0
0
0.70
EBR
NBL
1583
0
0
0
0.29
650
499
0
0
0
0.94
6/6/2013
NBT
347
SBT
477
3456
0
0
0
0.94
2393
0
0
0
0.88
SBR
550
927
0
0
0
0.37
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 8 (7%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.94
Intersection Signal Delay: 25.1
Intersection LOS: C
Intersection Capacity Utilization 89.2%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
10: Fairfax County Parkway & Spring Street
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 20
Lanes, Volumes, Timings
11: Reston Parkway & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
250
1900
12
225
1900
12
0%
100
1900
12
698
1900
12
524
1900
12
0%
1106
1900
12
138
1900
12
1450
1900
12
0%
138
1900
12
685
1900
12
1844
1900
12
0%
158
1900
12
0
0
155
1
25
220
1
435
2
25
415
1
720
2
25
260
1
25
Yes
Yes
35
675
13.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
0
824
NA
4
325
NA
3
3
3
4
4
8.0
42.0
45.0
25.0%
4.0
3.0
0.0
7.0
Lead
8.0
42.0
45.0
25.0%
4.0
3.0
0.0
7.0
Lead
8.0
15.0
60.0
33.3%
4.0
3.0
0.0
7.0
Lag
None
29.7
0.16
0.86
98.8
0.0
98.8
F
None
29.7
0.16
0.55
64.0
0.0
64.0
E
79.1
E
167
212
None
61.3
0.34
0.73
61.9
0.0
61.9
E
454
#682
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
2270
34.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
43%
398
Split
4
250
Split
3
291
382
Yes
35
419
8.2
1.00
100%
2%
0
1.00
100%
2%
0
45
1208
18.3
1.00
100%
2%
0
1.00
100%
2%
0
0%
1106
Perm
1.00
100%
2%
0
1.00
100%
2%
0
0%
138
Prot
1
1450
NA
6
4
4
1
6
6
6
5
8.0
15.0
60.0
33.3%
4.0
3.0
0.0
7.0
Lag
8.0
15.0
60.0
33.3%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
12.0
6.7%
4.0
3.0
0.0
7.0
Lead
20.0
35.5
46.0
25.6%
4.5
2.0
0.0
6.5
Lag
20.0
35.5
46.0
25.6%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
29.0
16.1%
4.0
3.0
0.0
7.0
Lead
None
61.3
0.34
0.73
57.5
0.0
57.5
E
163.4
F
471
597
None
61.3
0.34
1.54
278.9
0.0
278.9
F
None C-Max C-Max
5.0
39.5
39.5
0.03
0.22
0.22
1.45
1.30
0.30
306.3 194.0
7.1
0.0
0.0
0.0
306.3 194.0
7.1
F
F
A
188.1
F
~113
~798
0
#194
#894
48
~1614
#1944
430
1
138
Perm
685
Prot
5
1844
158
NA pm+ov
2
3
2
2
3
20.0
35.5
63.0
35.0%
4.5
2.0
0.0
6.5
Lag
8.0
42.0
45.0
25.0%
4.0
3.0
0.0
7.0
Lead
None C-Max
22.0
56.5
0.12
0.31
1.63
1.16
336.1 118.0
0.0
0.0
336.1 118.0
F
F
167.1
F
~545
~854
#617
#838
None
92.7
0.52
0.18
7.1
0.0
7.1
A
27
m39
Synchro 8 Report
Page 21
Lanes, Volumes, Timings
11: Reston Parkway & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
260
373
0
0
0
0.67
EBT
595
741
0
0
0
0.44
EBR
6/6/2013
WBL
155
548
0
0
0
0.73
WBT
339
1134
0
0
0
0.73
WBR
NBL
220
718
0
0
0
1.54
435
95
0
0
0
1.45
NBT
2190
1115
0
0
0
1.30
NBR
SBL
415
466
0
0
0
0.30
720
419
0
0
0
1.63
SBT
1128
1596
0
0
0
1.16
SBR
430
929
0
0
0
0.17
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 96 (53%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.63
Intersection Signal Delay: 164.0
Intersection LOS: F
Intersection Capacity Utilization 127.4%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
11: Reston Parkway & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 22
Lanes, Volumes, Timings
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
577
1900
12
0
1900
12
0%
144
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1362
1900
12
0%
154
1900
12
0
1900
12
2368
1900
12
0%
870
1900
12
400
1
0
0
0
0
0
0
0
0
625
1
0
0
0
0
2
0
Yes
Yes
25
573
15.6
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
577
Prot
4
0
Yes
40
339
5.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
144
custom
0
0
Yes
45
662
10.0
1.00
100%
2%
0
1.00
100%
2%
0
45
160
2.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1
0
1362
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
154
Free
0
2368
NA
2
4
4
4
6
2
2
2
7.0
13.5
28.0
15.6%
4.0
2.5
0.0
6.5
7.0
13.5
28.0
15.6%
4.0
2.5
0.0
6.5
20.0
26.5
152.0
84.4%
4.5
2.0
0.0
6.5
20.0
26.5
152.0
84.4%
4.5
2.0
0.0
6.5
20.0
26.5
152.0
84.4%
4.5
2.0
0.0
6.5
None
21.5
0.12
1.41
249.7
0.0
249.7
F
None
21.5
0.12
0.70
82.9
0.0
82.9
F
~469
#597
142
#231
C-Max
145.5
0.81
0.48
8.7
0.0
8.8
A
7.9
A
520
m314
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Free
870
Perm
180.0
1.00
0.10
0.0
0.0
0.0
A
0
m0
C-Max C-Max
145.5 145.5
0.81
0.81
0.83
0.61
9.4
1.1
0.2
0.4
9.6
1.5
A
A
7.4
A
290
0
m264
m0
Synchro 8 Report
Page 23
Lanes, Volumes, Timings
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
410
0
0
0
1.41
EBT
493
EBR
WBL
WBT
259
WBR
400
207
0
0
0
0.70
NBL
6/6/2013
NBT
582
2860
0
211
0
0.51
NBR
625
1583
0
0
0
0.10
SBL
SBT
80
SBR
2860
73
0
0
0.85
1433
168
0
0
0.69
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 64 (36%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.41
Intersection Signal Delay: 35.1
Intersection LOS: D
Intersection Capacity Utilization 90.7%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 24
Lanes, Volumes, Timings
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
589
1900
12
0
1900
12
0%
654
1900
12
311
1900
12
1472
1900
12
0%
0
1900
12
0
1900
12
2350
1900
12
0%
773
1900
12
0
0
0
1
0
50
1
645
1
25
0
0
0
0
0
0
0
0
Yes
Yes
35
427
8.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
1052
28.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
415
NA
4
4
4
4
4
7.0
13.5
47.0
26.1%
4.0
2.5
0.0
6.5
7.0
13.5
47.0
26.1%
4.0
2.5
0.0
6.5
None
40.5
0.22
1.15
153.7
0.0
153.7
F
None
40.5
0.22
1.07
118.8
0.0
118.8
F
125.9
F
~526
#781
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
45
847
12.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
26%
436
Split
4
~635
#880
Yes
45
649
9.8
1.00
100%
2%
0
40%
392
Perm
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
311
Prot
1
1472
NA
6
1
6
2
2
2
7.0
13.5
47.0
26.1%
4.0
2.5
0.0
6.5
5.0
12.0
44.0
24.4%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
133.0
73.9%
4.5
2.0
0.0
6.5
20.0
26.5
89.0
49.4%
4.5
2.0
0.0
6.5
Lag
20.0
26.5
89.0
49.4%
4.5
2.0
0.0
6.5
Lag
None
40.5
0.22
1.01
102.5
0.0
102.5
F
None C-Max
34.2 126.5
0.19
0.70
0.93
0.59
103.5
17.8
0.0
0.4
103.5
18.2
F
B
33.1
C
268
783
#500 m604
~428
#677
0
0
2350
NA
2
773
Perm
C-Max C-Max
85.3
85.3
0.47
0.47
0.98
0.82
26.8
5.5
41.8
8.8
68.6
14.3
E
B
55.1
E
~902
70
m190
m0
Synchro 8 Report
Page 25
Lanes, Volumes, Timings
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
347
EBR
WBL
WBT
972
378
0
0
0
1.15
388
0
0
0
1.07
WBR
NBL
50
390
0
0
0
1.01
645
363
0
0
0
0.86
NBT
569
2487
447
0
0
0.72
6/6/2013
NBR
SBL
SBT
767
SBR
2408
317
0
0
1.12
942
143
0
0
0.97
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 48 (27%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 110
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.15
Intersection Signal Delay: 63.0
Intersection LOS: E
Intersection Capacity Utilization 104.7%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 26
Lanes, Volumes, Timings
14: Reston Parkway & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
259
1900
12
743
1900
12
0%
1163
1900
12
777
1900
12
880
1900
12
0%
621
1900
12
467
1900
12
1867
1900
12
0%
156
1900
12
313
1900
12
2063
1900
12
0%
94
1900
12
275
1
550
2
25
0
1
480
2
25
470
1
300
2
25
290
2
25
Yes
Yes
35
506
9.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
259
Prot
3
743
NA
8
3
8
6.0
13.0
23.0
12.8%
4.0
3.0
0.0
7.0
Lead
None
15.6
0.09
0.87
108.2
0.0
108.2
F
158
#235
Yes
35
569
11.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1163
Perm
777
Prot
7
880
NA
4
8
8
7
4
6.0
49.0
76.0
42.2%
4.0
3.0
0.0
7.0
Lag
6.0
49.0
76.0
42.2%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
29.0
16.1%
4.0
3.0
0.0
7.0
Lead
None
69.0
0.38
0.38
40.8
0.0
40.8
D
207.6
F
232
272
None
69.0
0.38
1.67
336.2
0.1
336.3
F
None
22.0
0.12
1.85
431.5
0.6
432.1
F
~1889
#2161
~714
#850
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
847
12.8
1.00
100%
2%
0
1.00
100%
2%
0
45
794
12.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
621
Perm
445
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
467
Prot
1
1867
NA
6
156
Perm
4
4
1
6
6
6
5
6.0
54.0
82.0
45.6%
4.0
3.0
0.0
7.0
Lag
6.0
54.0
82.0
45.6%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
21.0
11.7%
4.0
3.0
0.0
7.0
Lead
20.0
44.5
58.0
32.2%
4.5
2.0
0.0
6.5
Lag
20.0
44.5
58.0
32.2%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
None
75.4
0.42
0.59
42.6
0.0
42.6
D
176.1
F
423
495
None
75.4
0.42
0.83
45.2
0.0
45.2
D
None C-Max C-Max
14.0
51.5
51.5
0.08
0.29
0.29
1.75
1.28
0.29
391.7 171.6
6.4
0.0
0.0
0.0
391.7 171.6
6.4
F
F
A
202.6
F
519
~419 ~1039
25
712 m#505 m#1075
m49
313
Prot
5
2063
94
NA pm+ov
2
3
2
2
2
20.0
44.5
54.0
30.0%
4.5
2.0
0.0
6.5
Lag
6.0
13.0
23.0
12.8%
4.0
3.0
0.0
7.0
Lead
None C-Max
10.0
47.5
0.06
0.26
1.65
1.54
352.6 280.7
0.0
0.4
352.6 281.2
F
F
279.8
F
~273 ~1258
#380 #1321
None
69.6
0.39
0.14
6.6
0.0
6.6
A
33
m15
Synchro 8 Report
Page 27
Lanes, Volumes, Timings
14: Reston Parkway & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
305
0
0
0
0.85
EBT
426
1949
0
0
0
0.38
6/6/2013
EBR
WBL
275
698
0
8
0
1.69
550
419
0
27
0
1.98
WBT
489
WBR
NBL
1482
0
0
0
0.59
751
0
0
0
0.83
480
267
0
0
0
1.75
NBT
767
1454
0
0
0
1.28
NBR
SBL
470
543
0
0
0
0.29
300
190
0
0
0
1.65
SBT
714
1341
0
131
0
1.70
SBR
445
652
0
0
0
0.14
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 8 (4%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.85
Intersection Signal Delay: 217.6
Intersection LOS: F
Intersection Capacity Utilization 151.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
14: Reston Parkway & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 28
Lanes, Volumes, Timings
15: Reston Parkway & Bluemont Way/Stratford Park Pl
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
173
1900
12
10
1900
12
0%
690
1900
8
5
1900
12
10
1900
12
0%
10
1900
12
524
1900
12
2173
1900
12
0%
50
1900
12
51
1900
12
2100
1900
12
0%
101
1900
12
0
1
0
1
0
0
0
380
2
25
550
0
390
1
25
290
1
25
Yes
Yes
25
1182
32.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
173
pm+pt
7
4
7
348
NA
4
4
7.0
14.0
14.0
7.8%
4.0
3.0
0.0
7.0
Lead
4.0
49.0
49.0
27.2%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
36.0
20.0%
4.0
3.0
0.0
7.0
Lead
None
18.4
0.10
1.38
265.6
0.0
265.6
F
None
17.0
0.09
0.87
37.9
0.0
37.9
D
88.4
F
77
209
5
pm+pt
3
8
3
20
NA
8
Yes
45
794
12.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
49%
352
pm+ov
1
4
1
~263
#295
Yes
25
258
7.0
1.00
100%
2%
0
1.00
100%
2%
0
45
523
7.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
2223
NA
6
8
1
6
5
5.0
12.0
12.0
6.7%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
47.0
26.1%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
36.0
20.0%
4.0
3.0
0.0
7.0
Lead
20.0
39.0
101.0
56.1%
5.0
2.0
0.0
7.0
Lag
4.0
11.0
18.0
10.0%
4.0
3.0
0.0
7.0
Lead
None
59.3
0.33
0.74
51.3
0.0
51.3
D
None
13.0
0.07
0.06
63.2
0.0
63.2
E
313
392
5
18
None
9.9
0.06
0.19
50.4
0.0
50.4
D
53.0
D
12
39
None C-Max
35.3 132.5
0.20
0.74
0.78
0.60
62.3
19.3
0.0
0.3
62.3
19.7
E
B
27.8
C
320
419
m288 m365
1.00
100%
2%
0
1.00
100%
2%
0
0%
524
Prot
1
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
285
1
0
51
Prot
5
2100
101
NA pm+ov
2
7
2
2
7
20.0
42.0
83.0
46.1%
5.0
2.0
0.0
7.0
Lag
7.0
14.0
14.0
7.8%
4.0
3.0
0.0
7.0
Lead
None C-Max
9.7 104.3
0.05
0.58
0.54
0.71
110.9
31.6
0.0
0.4
110.9
32.1
F
C
32.7
C
62
745
107 #1020
None
118.5
0.66
0.09
5.8
0.0
5.8
A
6
62
Synchro 8 Report
Page 29
Lanes, Volumes, Timings
15: Reston Parkway & Bluemont Way/Stratford Park Pl
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
125
0
0
0
1.38
EBT
1102
EBR
WBL
WBT
178
570
0
0
0
0.61
474
0
0
0
0.74
79
0
0
0
0.06
390
0
0
0
0.05
WBR
6/6/2013
NBL
380
673
0
0
0
0.78
NBT
714
3731
757
0
0
0.75
NBR
SBL
390
114
0
0
0
0.45
SBT
443
2947
365
0
0
0.81
SBR
285
1079
0
0
0
0.09
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 8 (4%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.38
Intersection Signal Delay: 38.7
Intersection LOS: D
Intersection Capacity Utilization 89.9%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
15: Reston Parkway & Bluemont Way/Stratford Park Pl
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 30
Lanes, Volumes, Timings
16: Reston Parkway & New Dominion Pkwy
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
441
1900
12
573
1900
12
0%
1014
1900
12
196
1900
12
245
1900
12
0%
295
1900
12
614
1900
12
1616
1900
12
0%
319
1900
12
300
1900
12
1342
1900
12
0%
124
1900
12
275
1
95
1
25
165
1
500
2
25
445
1
205
1
25
270
1
25
Yes
Yes
25
722
19.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
441
pm+pt
3
8
3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
573
1014
NA pm+ov
8
1
8
8
8
196
pm+pt
7
4
7
1.00
100%
2%
0
45
423
6.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
245
295
NA pm+ov
4
5
4
4
4
5.0
12.0
67.0
37.2%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
40.0
22.2%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
14.0
7.8%
4.0
3.0
0.0
7.0
Lead
5.0
47.0
47.0
26.1%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
35.0
19.4%
4.0
3.0
0.0
7.0
Lead
None
74.0
0.41
1.05
97.9
0.0
97.9
F
None
60.0
0.33
0.49
49.4
0.0
49.4
D
86.2
F
284
346
None
100.0
0.56
1.12
101.9
0.0
101.9
F
None
47.0
0.26
0.79
71.7
0.0
71.7
E
None
75.0
0.42
0.41
24.3
0.0
24.3
C
~1333
#1603
153
#248
None
40.0
0.22
0.59
69.4
0.0
69.4
E
51.9
D
262
365
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
521
7.9
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lead
~438
#598
Yes
25
408
11.1
1.00
100%
2%
0
152
238
65
1
614
Prot
1
1
5.0
12.0
40.0
22.2%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
1616
319
NA pm+ov
6
7
6
6
6
300
Prot
5
5
1342
124
NA pm+ov
2
3
2
2
2
20.0
39.0
64.0
35.6%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
14.0
7.8%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
35.0
19.4%
4.0
3.0
0.0
7.0
Lead
20.0
47.0
59.0
32.8%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lead
None C-Max
33.0
57.0
0.18
0.32
0.98
1.00
95.5
79.4
0.0
35.9
95.5 115.2
F
F
99.3
F
370
~665
#511
#814
None
71.0
0.39
0.46
24.6
1.1
25.7
C
None C-Max
28.0
52.0
0.16
0.29
1.09
0.91
147.7
72.0
0.0
0.0
147.7
72.0
F
E
80.7
F
~397
565
#602
629
None
86.0
0.48
0.16
12.7
0.0
12.7
B
159
310
36
79
Synchro 8 Report
Page 31
Lanes, Volumes, Timings
16: Reston Parkway & New Dominion Pkwy
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
270
422
0
0
0
1.05
EBT
642
1179
0
0
0
0.49
EBR
WBL
275
909
0
0
0
1.12
95
249
0
0
0
0.79
6/6/2013
WBT
328
414
0
0
0
0.59
WBR
NBL
165
723
0
0
0
0.41
500
629
0
0
0
0.98
NBT
441
1610
263
0
0
1.20
NBR
SBL
445
690
179
0
0
0.62
205
275
0
0
0
1.09
SBT
343
1469
0
0
0
0.91
SBR
65
791
0
0
0
0.16
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 104 (58%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.12
Intersection Signal Delay: 86.0
Intersection LOS: F
Intersection Capacity Utilization 117.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
16: Reston Parkway & New Dominion Pkwy
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 32
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
WBT
WBR
SBL
SBR
962
1900
12
458
1900
12
0%
437
1900
12
0%
890
1900
12
1207
1900
12
0%
0
2
0
1289
1900
12
210
1
25
0
1
Yes
35
2307
44.9
35
621
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
962
Prot
1
458
NA
12
1
12
437
890
NA pm+ov
2
3
2
2
2
1.00
100%
2%
0
10.0
17.0
46.0
32.9%
4.0
3.0
0.0
7.0
Lead
None
39.0
0.28
1.01
80.5
0.0
80.5
F
~458
#604
15.0
39.0
41.0
29.3%
4.0
3.0
0.0
7.0
Lag
80.0
0.57
0.43
18.6
0.0
18.6
B
60.6
E
228
311
0
1
Yes
35
623
12.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
5.0
29.0
53.0
37.9%
4.0
3.0
0.0
7.0
1207
NA
3
Free
3
5.0
29.0
53.0
37.9%
4.0
3.0
0.0
7.0
None C-Max C-Max
34.0
87.0
46.0
0.24
0.62
0.33
0.97
0.90
1.07
87.0
36.6
81.9
0.0
0.0
5.0
87.0
36.6
87.0
F
D
F
53.2
48.2
D
D
397
657
~610
#612 #1002
#751
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1289
Free
140.0
1.00
0.81
11.9
0.0
11.9
B
239
286
Synchro 8 Report
Page 33
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
956
0
0
0
1.01
6/6/2013
EBT
2227
WBT
541
WBR
SBL
543
SBR
1064
0
0
0
0.43
452
0
0
0
0.97
987
0
0
0
0.90
1127
13
0
0
1.08
1583
0
0
0
0.81
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 64 (46%), Referenced to phase 3:SBL, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.07
Intersection Signal Delay: 52.8
Intersection LOS: D
Intersection Capacity Utilization 102.4%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
17: Sunrise Valley Dr & Wiehle Ave
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 34
Lanes, Volumes, Timings
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
281
1900
12
0
1900
12
0%
561
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1548
1900
12
0%
446
1900
12
522
1900
12
1944
1900
12
0%
0
1900
12
450
1
0
0
0
0
0
235
2
25
435
1
0
0
0
450
2
25
No
Yes
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
48%
292
Perm
297
NA
4
4
4
4
4
7.0
14.0
43.0
30.7%
4.0
3.0
0.0
7.0
7.0
14.0
43.0
30.7%
4.0
3.0
0.0
7.0
7.0
14.0
43.0
30.7%
4.0
3.0
0.0
7.0
None
33.3
0.24
0.33
44.8
0.0
44.8
D
None
33.3
0.24
0.91
82.3
0.0
82.3
F
66.3
E
300
#483
None
33.3
0.24
0.82
68.7
0.0
68.7
E
0
260
#387
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
623
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
253
Split
4
102
145
Yes
25
553
15.1
1.00
100%
2%
0
1.00
100%
2%
0
35
572
11.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
1548
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
446
Perm
522
Prot
5
1944
NA
2
6
6
6
5
2
15.0
22.0
54.0
38.6%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
54.0
38.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
43.0
30.7%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
97.0
69.3%
4.0
3.0
0.0
7.0
C-Max C-Max
58.9
58.9
0.42
0.42
0.49
0.48
22.1
1.0
0.0
0.2
22.1
1.1
C
A
17.4
B
187
0
m202
m0
0
None C-Max
26.8
92.7
0.19
0.66
0.79
0.58
67.7
19.4
0.0
1.2
67.7
20.6
E
C
30.6
C
260
423
319
528
Synchro 8 Report
Page 35
Lanes, Volumes, Timings
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
450
828
0
0
0
0.31
EBT
684
354
0
0
0
0.84
EBR
WBL
WBT
473
WBR
NBL
450
386
0
0
0
0.76
NBT
543
3171
0
0
0
0.49
6/6/2013
NBR
SBL
SBT
492
435
923
81
0
0
0.53
882
0
0
0
0.59
3365
1099
226
0
0.86
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 120 (86%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 31.3
Intersection LOS: C
Intersection Capacity Utilization 87.7%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 36
Lanes, Volumes, Timings
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
712
1900
12
0
1900
12
0%
570
1900
12
440
1900
12
1101
1900
12
0%
0
1900
12
0
1900
12
2157
1900
12
0%
539
1900
12
0
0
0
1
0
0
1
0
2
0
0
0
250
2
25
0
0
0
Yes
No
35
627
12.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
432
11.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
428
NA
4
4
4
4
4
5.0
11.5
52.0
37.1%
4.0
2.5
0.0
6.5
5.0
11.5
52.0
37.1%
4.0
2.5
0.0
6.5
5.0
11.5
52.0
37.1%
4.0
2.5
0.0
6.5
None
42.8
0.31
0.87
64.3
1.1
65.4
E
None
42.8
0.31
0.90
69.8
1.7
71.4
E
67.9
E
398
#601
None
42.8
0.31
0.88
67.0
0.0
67.0
E
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
35
387
7.5
1.00
100%
2%
0
1.00
100%
2%
0
0%
37%
449
Split
4
396
#576
Yes
35
572
11.1
1.00
100%
2%
0
29%
405
Perm
358
#540
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
440
Prot
1
1101
NA
6
1
6
2
2
2
5.0
12.0
32.0
22.9%
4.0
3.0
0.0
7.0
Lead
15.0
21.0
88.0
62.9%
4.0
2.0
0.0
6.0
15.0
21.0
56.0
40.0%
4.0
2.0
0.0
6.0
Lag
15.0
21.0
56.0
40.0%
4.0
2.0
0.0
6.0
Lag
None C-Max
21.7
84.7
0.16
0.60
0.83
0.36
99.2
8.8
0.0
0.0
99.2
8.8
F
A
34.6
C
177
66
263
79
0
0
2157
NA
2
539
Perm
C-Max C-Max
55.9
55.9
0.40
0.40
0.72
0.60
28.8
6.9
0.9
0.6
29.8
7.5
C
A
25.3
C
407
161
467
206
Synchro 8 Report
Page 37
Lanes, Volumes, Timings
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
547
EBR
WBL
WBT
352
WBR
NBL
NBT
492
546
0
19
0
0.85
503
0
18
0
0.88
488
0
0
0
0.83
613
0
0
0
0.72
3075
0
0
0
0.36
NBR
6/6/2013
SBL
SBT
307
SBR
3014
528
0
0
0.87
899
116
0
0
0.69
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.90
Intersection Signal Delay: 37.8
Intersection LOS: D
Intersection Capacity Utilization 87.7%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 38
Lanes, Volumes, Timings
20: Wiehle Ave & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
717
1900
12
816
1900
12
0%
1755
1900
12
586
1900
12
555
1900
12
0%
431
1900
12
627
1900
12
1522
1900
12
0%
179
1900
12
119
1900
12
807
1900
12
0%
166
1900
12
385
1
477
1
25
0
1
320
2
25
0
1
250
1
25
442
1
25
Yes
Yes
35
1259
24.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
816
1755
NA pm+ov
4
1
4
4
4
49%
299
pm+pt
3
8
3
0%
717
pm+pt
7
4
7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
842
NA
8
1.00
100%
2%
0
35
619
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
431
Perm
627
Prot
1
8
8
8
1
5.0
12.0
16.0
11.4%
4.0
3.0
0.0
7.0
Lead
8.0
51.0
71.0
50.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
16.0
11.4%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
0.0
7.0
Lead
8.0
40.0
68.0
48.6%
4.0
3.0
0.0
7.0
Lag
8.0
40.0
68.0
48.6%
4.0
3.0
0.0
7.0
Lag
None
72.0
0.51
2.06
508.2
0.0
508.2
F
None
64.0
0.46
0.50
28.2
0.0
28.2
C
341.4
F
271
331
None
80.0
0.57
1.87
418.8
0.0
418.8
F
None
66.0
0.47
1.18
142.4
0.0
142.4
F
None
61.0
0.44
0.56
23.1
0.0
23.1
C
~2420
#2686
~216
#421
None
66.0
0.47
1.08dl
46.3
0.0
46.3
D
58.2
E
249
#340
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
35
540
10.5
5.0
12.0
15.0
10.7%
4.0
3.0
0.0
7.0
Lead
~1026
#1270
Yes
35
976
19.0
1.00
100%
2%
0
201
310
120
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
1522
179
NA pm+ov
6
3
6
6
6
119
pm+pt
5
2
5
973
NA
2
15.0
33.0
41.0
29.3%
4.0
2.0
0.0
6.0
Lag
2
15.0
38.0
45.0
32.1%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
0.0
7.0
Lead
None C-Max
9.0
39.0
0.06
0.28
2.85
1.55
866.1 281.8
0.0
0.0
866.1 281.8
F
F
418.1
F
~505 ~1033
#621 #1174
None
50.0
0.36
0.29
8.1
0.0
8.1
A
None C-Max
39.0
35.0
0.28
0.25
1.04
0.77
134.3
52.1
0.0
0.0
134.3
52.1
F
D
61.1
E
~79
295
#197
350
39
77
0
Synchro 8 Report
Page 39
Lanes, Volumes, Timings
20: Wiehle Ave & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
442
348
0
0
0
2.06
EBT
1179
1617
0
0
0
0.50
6/6/2013
EBR
WBL
385
938
0
0
0
1.87
477
254
0
0
0
1.18
WBT
896
WBR
NBL
924
0
0
0
0.91
764
0
0
0
0.56
320
220
0
0
0
2.85
NBT
460
NBR
SBL
985
2
0
0
1.55
628
0
0
0
0.29
250
114
0
0
0
1.04
SBT
539
SBR
1260
0
0
0
0.77
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 128 (91%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.85
Intersection Signal Delay: 272.2
Intersection LOS: F
Intersection Capacity Utilization 166.2%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
dl Defacto Left Lane. Recode with 1 though lane as a left lane.
Splits and Phases:
20: Wiehle Ave & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 40
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
633
1900
12
223
1900
12
0%
559
1900
12
0
1900
12
55
1900
12
0%
55
1900
12
252
1900
12
566
1900
12
0%
0
1900
12
214
1900
12
641
1900
12
0%
481
1900
12
0
0
0
1
0
670
0
0
1
0
0
0
300
1
0
430
1
25
Yes
Yes
35
3015
58.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
633
Prot
5
782
NA
2
5
2
5.0
12.0
33.0
26.2%
4.0
3.0
0.0
7.0
Lead
None
25.3
0.20
0.92
68.9
0.0
68.9
E
261
#362
Yes
35
879
17.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Perm
110
NA
6
6
6
6
15.0
22.0
56.0
44.4%
4.0
3.0
0.0
7.0
15.0
22.0
23.0
18.3%
4.0
3.0
0.0
7.0
Lag
None
49.0
0.39
1.09
92.2
0.0
92.2
F
81.8
F
~656
#902
None
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
30
206
4.7
1.00
100%
2%
0
1.00
100%
2%
0
35
1671
32.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
220
0
252
Perm
566
NA
8
1.00
100%
2%
0
0%
0
214
Split
4
1122
NA
4
8
8
8
4
4
15.0
22.0
23.0
18.3%
4.0
3.0
0.0
7.0
Lag
5.0
21.0
37.0
29.4%
4.0
1.0
0.0
5.0
5.0
21.0
37.0
29.4%
4.0
1.0
0.0
5.0
7.0
14.0
33.0
26.2%
4.0
3.0
0.0
7.0
7.0
14.0
33.0
26.2%
4.0
3.0
0.0
7.0
None
16.7
0.13
0.23
27.3
0.0
27.3
C
27.3
C
21
50
None
32.0
0.25
2.10
547.8
0.0
547.8
F
None
32.0
0.25
0.63
45.4
0.0
45.4
D
200.2
F
216
279
C-Max C-Max
26.0
26.0
0.21
0.21
0.59
1.42
52.6 229.6
0.0
0.0
52.6 229.6
D
F
201.2
F
159
~603
245
#742
~325
#497
1.00
100%
2%
0
0
Synchro 8 Report
Page 41
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
430
708
0
0
0
0.89
EBT
2935
EBR
6/6/2013
WBL
718
0
0
0
1.09
WBT
799
WBR
481
0
0
0
0.23
NBL
NBT
126
120
0
0
0
2.10
898
0
0
0
0.63
NBR
SBL
300
365
0
0
0
0.59
SBT
1591
SBR
790
0
0
0
1.42
Intersection Summary
Area Type:
Other
Cycle Length: 126
Actuated Cycle Length: 126
Offset: 0 (0%), Referenced to phase 4:SBTL, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.10
Intersection Signal Delay: 149.8
Intersection LOS: F
Intersection Capacity Utilization 109.0%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
21: Sunrise Valley Dr & Hunter Mill Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 42
Lanes, Volumes, Timings
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
125
1900
12
0
1900
12
0%
300
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
662
1900
12
0%
265
1900
12
164
1900
12
1149
1900
12
0%
0
1900
12
65
1
0
0
0
0
0
0
0
0
0
1
206
1
25
0
1
0
Yes
Yes
35
693
13.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
125
Prot
4
0
Yes
25
406
11.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
300
custom
4
4
4
5.0
10.5
17.4
17.4%
4.0
1.5
0.0
5.5
5.0
10.5
17.4
17.4%
4.0
1.5
0.0
5.5
None
11.7
0.12
0.61
55.1
0.0
55.1
E
None
11.7
0.12
0.94
60.4
0.0
60.4
E
77
#139
96
#260
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
1671
32.6
1.00
100%
2%
0
1.00
100%
2%
0
35
447
8.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
662
NA
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
265
Perm
164
Prot
1
1149
NA
6
2
2
2
1
6
20.0
26.0
62.2
62.2%
4.0
2.0
0.0
6.0
Lag
20.0
26.0
62.2
62.2%
4.0
2.0
0.0
6.0
Lag
5.0
11.5
20.4
20.4%
4.0
2.5
0.0
6.5
Lead
20.0
26.0
82.6
82.6%
4.0
2.0
0.0
6.0
C-Max C-Max
58.0
58.0
0.58
0.58
0.61
0.26
17.3
2.0
0.0
0.0
17.3
2.0
B
A
12.9
B
270
0
388
34
0
None C-Max
12.4
76.8
0.12
0.77
0.75
0.42
34.7
4.3
0.0
1.2
34.7
5.5
C
A
9.1
A
106
123
m122
m72
Synchro 8 Report
Page 43
Lanes, Volumes, Timings
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
0
0
0
0.60
EBT
613
EBR
WBL
WBT
326
WBR
65
322
0
0
0
0.93
NBL
6/6/2013
NBT
1591
NBR
SBL
1079
0
0
0
0.61
1028
0
0
0
0.26
206
246
0
0
0
0.67
SBT
367
SBR
2718
1248
0
0
0.78
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 8 (8%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 65
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.94
Intersection Signal Delay: 18.4
Intersection LOS: B
Intersection Capacity Utilization 133.5%
ICU Level of Service H
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 44
Lanes, Volumes, Timings
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
735
1900
12
0
1900
12
0%
294
1900
12
279
1900
12
975
1900
12
0%
0
1900
12
0
1900
12
651
1900
12
0%
140
1900
12
0
0
0
1
0
0
1
120
1
25
0
0
0
0
0
0
0
0
Yes
Yes
35
452
8.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
854
23.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
735
Prot
4
1.00
100%
2%
0
35
218
4.2
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
4
279
pm+pt
1
6
1
5.0
11.0
33.0
33.0%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
33.0
33.0%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
13.0
13.0%
4.0
2.0
0.0
6.0
Lead
None
27.0
0.27
1.54
282.7
0.0
282.7
F
None
27.0
0.27
0.50
12.1
0.2
12.2
B
~662
#886
38
114
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
447
8.7
1.00
100%
2%
0
294
custom
0
1
975
NA
6
10.0
16.0
42.0
42.0%
4.0
2.0
0.0
6.0
6
None C-Max
36.0
36.0
0.36
0.36
1.41
0.77
228.3
28.4
0.0
2.1
228.3
30.5
F
C
74.5
E
~104
211
#120
172
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
651
NA
23
23
48.0
0.48
0.73
14.7
30.0
44.6
D
37.0
D
221
m226
140
Perm
23
23
48.0
0.48
0.17
0.2
1.1
1.4
A
0
m1
Synchro 8 Report
Page 45
Lanes, Volumes, Timings
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
372
EBR
WBL
477
0
0
0
1.54
WBT
774
WBR
NBL
585
0
29
0
0.53
120
198
0
0
0
1.41
NBT
367
1274
170
131
0
0.88
NBR
SBL
6/6/2013
SBT
138
SBR
894
269
0
0
1.04
832
508
0
0
0.43
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 16 (16%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.54
Intersection Signal Delay: 108.7
Intersection LOS: F
Intersection Capacity Utilization 103.8%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 47
Lanes, Volumes, Timings
24: Hunter Mill Rd & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBR
NBL
NBT
SBT
SBR
412
1900
12
0%
0
1
0
582
1900
12
341
1900
12
776
1900
12
0%
548
1900
12
0%
286
1900
12
370
1
0
2
0
1.00
100%
2%
0
582
Perm
?
1
4
6
5.0
11.0
13.0
13%
4.0
2.0
5.0
11.0
33.0
33%
4.0
2.0
10.0
16.0
42.0
42%
4.0
2.0
Lead
Lag
Yes
35
218
4.2
35
772
15.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
341
Prot
14
776
NA
124
834
NA
2
14
124
2
1.00
100%
2%
0
0%
412
NA
3
?
230
0
Yes
35
385
7.5
1.00
100%
2%
0
?
3
3
3
5.0
12.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
None
18.0
0.18
1.30
189.6
0.0
189.6
F
85.4
F
~337
#523
None
18.0
0.18
0.76
10.8
0.8
11.6
B
40.0
0.40
0.25
39.4
2.5
41.9
D
0
109
94
m123
10.0
16.0
29.0
29.0%
4.0
2.0
0.0
6.0
Lag
69.0
0.69
0.60
10.4
1.4
11.8
B
21.0
C
165
223
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
C-Max
23.0
0.23
0.99
65.1
36.2
101.3
F
101.3
F
255
#390
1.00
100%
2%
0
0
None
None C-Max
Synchro 8 Report
Page 49
Lanes, Volumes, Timings
24: Hunter Mill Rd & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
305
318
0
0
0
1.30
6/6/2013
EBR
NBL
NBT
138
SBT
692
370
762
0
42
0
0.81
1373
892
0
0
0.71
1285
304
0
0
0.79
839
0
96
0
1.12
SBR
?
?
?
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 16 (16%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.54
Intersection Signal Delay: 65.5
Intersection LOS: E
Intersection Capacity Utilization 74.5%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
24: Hunter Mill Rd & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 50
Lanes, Volumes, Timings
1: Sunrise Valley Dr. & Frying Pan Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
2078
1900
12
1558
1900
12
0%
25
1900
12
163
1900
12
718
1900
12
0%
261
1900
12
25
1900
12
25
1900
12
0%
25
1900
12
28
1900
12
28
1900
12
0%
414
1900
12
0
0
0
1
25
0
1
0
1
25
0
1
0
1
25
0
3
25
Yes
Yes
30
309
7.0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
2078
pm+pt
7
4
7
1583
NA
4
Yes
35
1575
30.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
30
355
8.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
17%
217
25
Perm custom
762
NA
8
4
8
8
8
2
2
2
2
2
2
6
6
5.0
10.0
79.0
53.0%
4.0
1.0
0.0
5.0
Lead
20.0
25.0
98.0
65.8%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
29.0
19.5%
4.0
1.0
0.0
5.0
Lead
20.0
25.0
48.0
32.2%
4.0
1.0
0.0
5.0
Lag
20.0
25.0
48.0
32.2%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
None
110.3
0.74
0.80
27.1
0.0
27.1
C
None
90.7
0.61
0.51
17.1
0.0
17.1
B
22.8
C
298
327
None
46.9
0.31
0.70
58.4
0.0
58.4
E
None
32.3
0.22
0.73
58.1
0.0
58.1
E
50.3
D
267
302
83
130
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
1.00
100%
2%
0
0%
163
pm+pt
3
8
3
497
537
0
Yes
30
288
6.5
1.00
100%
2%
0
0
2
25
25
NA custom
28
Perm
28
414
NA pm+ov
6
7
6
6
7
5.0
10.0
22.0
14.8%
4.0
1.0
0.0
5.0
5.0
10.0
79.0
53.0%
4.0
1.0
0.0
5.0
Lead
None C-Max C-Max C-Max C-Max C-Max
32.3
28.7
28.7
28.7
28.7
28.7
0.22
0.19
0.19
0.19
0.19
0.19
0.51
0.09
0.04
0.07
0.11
0.04
16.9
54.7
53.0
0.4
54.9
53.0
0.0
0.0
0.0
0.0
0.0
0.0
16.9
54.7
53.0
0.4
54.9
53.0
B
D
D
A
D
D
36.0
12.2
D
B
46
20
10
0
23
12
134
52
26
0
57
28
None
106.7
0.72
0.21
6.5
0.0
6.5
A
56
93
Synchro 8 Report
Page 1
Lanes, Volumes, Timings
1: Sunrise Valley Dr. & Frying Pan Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
229
2644
0
0
0
0.79
3169
0
0
0
0.50
EBR
6/6/2013
WBL
WBT
1495
WBR
NBL
NBT
208
NBR
SBL
SBT
275
SBR
345
0
0
0
0.47
1378
0
0
0
0.55
511
0
0
0
0.42
265
0
0
0
0.09
682
0
0
0
0.04
376
0
0
0
0.07
265
0
0
0
0.11
682
0
0
0
0.04
2033
0
0
0
0.20
Intersection Summary
Area Type:
Other
Cycle Length: 149
Actuated Cycle Length: 149
Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 27.9
Intersection LOS: C
Intersection Capacity Utilization 76.9%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:
1: Sunrise Valley Dr. & Frying Pan Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 2
Lanes, Volumes, Timings
2: Centreville Rd. & Frying Pan Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
538
1900
12
256
1900
12
0%
51
1900
12
136
1900
12
340
1900
12
0%
136
1900
12
238
1900
12
1940
1900
12
0%
102
1900
12
27
1900
12
504
1900
12
0%
265
1900
12
155
1
310
1
25
400
1
205
1
25
390
1
375
1
25
225
3
25
Yes
Yes
35
232
4.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
256
NA
8
3
8
5.0
12.0
27.0
19.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
34.0
24.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
22.0
15.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
24.0
17.1%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
None
22.5
0.16
0.67
59.7
0.0
59.7
E
None
25.2
0.18
0.42
53.1
0.0
53.1
D
54.2
D
114
160
None
55.3
0.40
0.08
1.3
0.0
1.3
A
None
17.4
0.12
0.62
70.6
0.0
70.6
E
None
27.3
0.20
0.32
8.2
0.0
8.2
A
0
7
118
190
None
20.1
0.14
0.67
63.7
0.0
63.7
E
52.9
D
154
210
7
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
538
Prot
3
136
Prot
7
Yes
40
549
9.4
0%
51
pm+ov
1
8
8
164
205
Yes
35
1725
33.6
1.00
100%
2%
0
340
136
NA pm+ov
4
5
4
4
4
0
51
0
1
238
Prot
1
1
5.0
12.0
34.0
24.3%
4.0
3.0
-4.0
3.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
1940
102
NA pm+ov
6
7
6
6
6
27
Prot
5
5
504
265
NA pm+ov
2
3
2
2
2
15.0
38.0
77.0
55.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
22.0
15.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
15.0
38.0
55.0
39.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
27.0
19.3%
4.0
3.0
-4.0
3.0
Lead
None C-Max
27.0
81.2
0.19
0.58
0.70
0.66
63.5
22.6
0.0
0.0
63.5
22.6
E
C
25.9
C
202
478
290
535
None
101.6
0.73
0.09
1.5
0.0
1.5
A
None C-Max
9.1
58.4
0.06
0.42
0.23
0.34
59.6
42.0
0.0
0.0
59.6
42.0
E
D
31.9
C
26
245
46
287
None
83.8
0.60
0.26
10.0
0.0
10.0
A
0
18
3
250
Synchro 8 Report
Page 3
Lanes, Volumes, Timings
2: Centreville Rd. & Frying Pan Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
225
855
0
0
0
0.63
EBT
152
629
0
0
0
0.41
6/6/2013
EBR
WBL
155
616
0
0
0
0.08
310
240
0
0
0
0.57
WBT
1645
533
0
0
0
0.64
WBR
NBL
400
432
0
0
0
0.31
205
391
0
0
0
0.61
NBT
469
2949
0
0
0
0.66
NBR
SBL
390
1176
0
0
0
0.09
375
115
0
0
0
0.23
SBT
1018
SBR
1475
0
0
0
0.34
1015
0
0
0
0.26
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 72 (51%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 35.9
Intersection LOS: D
Intersection Capacity Utilization 74.6%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:
2: Centreville Rd. & Frying Pan Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 4
Lanes, Volumes, Timings
3: Centreville Rd. & Coppermine Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
375
1900
12
86
1900
12
0%
86
1900
12
55
1900
12
73
1900
12
0%
55
1900
12
100
1900
12
2109
1900
12
0%
0
1900
12
75
1900
12
696
1900
12
0%
497
1900
12
200
1
355
1
25
370
1
465
2
25
435
1
375
1
25
100
1
25
Yes
Yes
25
254
6.9
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
375
pm+pt
3
8
3
Yes
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
86
86
NA pm+ov
8
1
8
8
8
55
pm+pt
7
4
7
Yes
40
991
16.9
1.00
100%
2%
0
1.00
100%
2%
1
40
689
11.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
73
55
NA pm+ov
4
5
4
4
4
425
1
1.00
100%
2%
1
1.00
100%
2%
0
0%
100
Prot
1
2109
NA
6
0
75
Prot
5
1
6
5
696
497
NA pm+ov
2
3
2
2
2
7.0
14.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
52.0
37.1%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
14.0
10.0%
4.0
3.0
-4.0
3.0
Lead
7.0
49.0
49.0
35.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
14.0
10.0%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
15.0
39.0
60.0
42.9%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
14.0
10.0%
4.0
3.0
-4.0
3.0
Lead
15.0
42.0
62.0
44.3%
4.0
3.0
-4.0
3.0
Lag
7.0
14.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
None
46.1
0.33
0.77
51.3
0.0
51.3
D
None
34.4
0.25
0.10
40.8
0.0
40.8
D
42.5
D
33
47
None
48.7
0.35
0.14
5.8
0.0
5.8
A
None
29.9
0.21
0.17
32.6
0.0
32.6
C
None
34.2
0.24
0.12
2.0
0.0
2.0
A
None
11.3
0.08
0.36
66.6
0.0
66.6
E
0
10
40
m68
C-Min
73.5
0.52
0.26
18.8
0.0
18.8
B
15.6
B
97
151
None
101.3
0.72
0.39
1.8
0.0
1.8
A
35
55
C-Min
72.0
0.51
0.64
18.6
0.0
18.6
B
20.7
C
366
566
None
12.8
0.09
0.46
77.2
0.0
77.2
E
0
32
None
18.3
0.13
0.16
51.1
0.0
51.1
D
30.8
C
33
43
297
328
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
71
111
2
130
Synchro 8 Report
Page 5
Lanes, Volumes, Timings
3: Centreville Rd. & Coppermine Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
100
487
0
0
0
0.77
EBT
174
1236
0
0
0
0.07
6/6/2013
EBR
WBL
200
642
0
0
0
0.13
355
316
0
0
0
0.17
WBT
684
1162
0
0
0
0.06
WBR
NBL
370
607
0
0
0
0.09
465
277
0
0
0
0.36
NBT
911
3293
0
0
0
0.64
NBR
SBL
375
165
0
0
0
0.45
SBT
609
2667
0
0
0
0.26
SBR
425
1283
0
0
0
0.39
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.77
Intersection Signal Delay: 22.4
Intersection LOS: C
Intersection Capacity Utilization 72.2%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
3: Centreville Rd. & Coppermine Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 6
Lanes, Volumes, Timings
4: Centreville Rd. & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
589
1900
12
589
1900
12
0%
107
1900
12
466
1900
12
932
1900
12
0%
547
1900
12
336
1900
12
972
1900
12
0%
486
1900
12
459
1900
12
700
1900
12
0%
831
1900
12
0
0
271
2
25
328
1
418
2
25
0
1
258
2
25
456
3
25
Yes
Yes
35
836
16.3
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
589
Split
3
696
NA
3
3
Yes
35
852
16.6
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
1.00
100%
2%
0
932
NA
4
3
4
4
4
4
1
5.0
50.0
50.0
35.7%
4.0
3.0
-4.0
3.0
Lead
5.0
50.0
50.0
35.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
19.0
13.6%
4.0
3.0
-4.0
3.0
Lead
20.0
43.0
44.0
31.4%
4.0
3.0
-4.0
3.0
Lag
None
38.1
0.27
0.43
42.4
0.0
42.4
D
None
38.1
0.27
0.73
49.6
0.0
49.6
D
46.3
D
298
337
None
40.3
0.29
0.47
45.3
0.0
45.3
D
None
40.3
0.29
0.92
62.2
0.0
62.2
E
56.4
E
433
#743
None
40.3
0.29
0.93
54.8
1.0
55.8
E
None
16.0
0.11
0.86
93.1
0.0
93.1
F
344
#701
165
#243
C-Min
34.5
0.25
0.78
48.3
0.4
48.8
D
48.8
D
212
332
180
272
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
40
701
11.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
466
Split
4
157
178
0
Yes
40
949
16.2
1.00
100%
2%
0
547
Perm
0
1
336
Prot
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
972
486
NA pm+ov
6
4
6
6
6
459
Prot
5
700
NA
2
5
2
5.0
12.0
28.0
20.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
18.0
12.9%
4.0
3.0
-4.0
3.0
Lead
20.0
42.0
43.0
30.7%
4.0
3.0
-4.0
3.0
Lag
None
74.9
0.54
0.55
18.2
0.0
18.2
B
None
15.0
0.11
1.25
187.5
0.0
187.5
F
122
445
~265
#379
C-Min
33.5
0.24
0.57
43.2
0.0
43.2
D
59.2
E
196
209
831
Free
Free
140.0
1.00
0.52
1.9
0.0
1.9
A
7
66
Synchro 8 Report
Page 7
Lanes, Volumes, Timings
4: Centreville Rd. & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
456
1675
0
0
0
0.35
EBT
756
EBR
1169
0
0
0
0.60
6/6/2013
WBL
271
989
0
0
0
0.47
WBT
772
1017
0
0
0
0.92
WBR
NBL
328
590
0
6
0
0.94
418
392
0
0
0
0.86
NBT
869
NBR
SBL
1489
0
165
0
0.73
955
0
0
0
0.51
258
367
0
0
0
1.25
SBT
621
SBR
1452
0
0
0
0.48
1583
0
0
0
0.52
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 120 (86%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.25
Intersection Signal Delay: 53.4
Intersection LOS: D
Intersection Capacity Utilization 82.2%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
4: Centreville Rd. & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 8
Lanes, Volumes, Timings
5: Centreville Rd. & Dulles Toll Rd. (S)
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
836
1900
12
40
1900
12
0%
1075
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
877
1900
12
0%
518
1900
12
190
1900
12
1807
1900
12
0%
0
1900
12
365
1
0
0
25
0
0
0
0
25
380
1
270
2
25
0
1
25
Yes
Yes
30
568
12.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
100%
0
Perm
876
NA
4
Yes
30
833
18.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1075
Free
0
0
Yes
40
380
6.5
1.00
100%
2%
0
1.00
100%
2%
0
40
504
8.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
877
NA
6
Free
1.00
100%
2%
0
0%
518
Perm
190
Prot
5
1807
NA
2
4
4
4
6
6
6
5
2
5.0
11.5
40.0
28.6%
4.0
2.5
-3.5
3.0
5.0
11.5
40.0
28.6%
4.0
2.5
-3.5
3.0
20.0
26.5
53.5
38.2%
4.0
2.5
-3.5
3.0
Lag
20.0
26.5
53.5
38.2%
4.0
2.5
-3.5
3.0
Lag
5.0
12.0
46.5
33.2%
4.0
3.0
-4.0
3.0
Lead
20.0
26.5
100.0
71.4%
4.0
2.5
-3.5
3.0
None
None
37.0
0.26
1.96
470.3
0.0
470.3
F
212.5
F
~1298
#1567
140.0
1.00
0.68
2.4
0.0
2.4
A
0
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
C-Max C-Max
77.7
77.7
0.56
0.56
0.31
0.47
16.1
4.4
0.0
0.0
16.1
4.4
B
A
11.7
B
90
44
143
148
0
Min C-Max
16.3
97.0
0.12
0.69
0.48
0.74
59.3
15.5
0.0
3.1
59.3
18.6
E
B
22.5
C
84
444
125
738
Synchro 8 Report
Page 9
Lanes, Volumes, Timings
5: Centreville Rd. & Dulles Toll Rd. (S)
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
446
0
0
0
1.96
EBR
6/6/2013
WBL
WBT
753
WBR
365
1583
0
0
0
0.68
NBL
NBT
300
2822
0
0
0
0.31
NBR
SBL
380
1109
0
0
0
0.47
270
1066
0
0
0
0.18
SBT
424
SBR
2452
524
0
0
0.94
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 136 (97%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.96
Intersection Signal Delay: 89.0
Intersection LOS: F
Intersection Capacity Utilization 80.8%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
5: Centreville Rd. & Dulles Toll Rd. (S)
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 10
Lanes, Volumes, Timings
6: Centreville Rd. & Dulles Toll Rd. (N)
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
322
1900
12
0
1900
12
0%
161
1900
12
205
1900
12
1789
1900
12
0%
0
1900
12
0
1900
12
1372
1900
12
0%
179
1900
12
0
0
0
1
25
90
1
135
2
25
0
0
0
0
25
0
0
25
Yes
Yes
30
734
16.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0
50%
161
Perm
0%
0
0
Yes
25
815
22.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
161
NA
4
4
4
4
5.0
11.5
43.5
31.1%
4.0
2.5
-3.5
3.0
5.0
11.5
43.5
31.1%
4.0
2.5
-3.5
3.0
None
22.4
0.16
0.60
63.4
0.5
63.9
E
None
22.4
0.16
0.60
63.4
0.5
63.9
E
42.6
D
145
214
145
214
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
40
504
8.6
1.00
100%
2%
0
1.00
100%
2%
0
40
798
13.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
161
Free
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
205
pm+pt
1
6
1
1789
NA
6
6
2
2
2
5.0
12.0
22.5
16.1%
4.0
3.0
-4.0
3.0
Lead
20.0
26.0
96.5
68.9%
4.0
2.0
-3.0
3.0
20.0
26.0
74.0
52.9%
4.0
2.0
-3.0
3.0
Lag
20.0
26.0
74.0
52.9%
4.0
2.0
-3.0
3.0
Lag
140.0
1.00
0.10
0.1
0.0
0.1
A
None
111.6
0.80
0.31
3.0
0.0
3.0
A
10
m22
C-Min
96.6
0.69
0.56
13.0
0.1
13.1
B
11.9
B
308
451
C-Min
96.6
0.69
0.16
2.8
0.0
2.8
A
0
0
C-Min
111.6
0.80
0.44
3.5
0.4
3.9
A
3.8
A
67
m116
Free
0
0
1372
NA
2
179
Perm
10
42
Synchro 8 Report
Page 11
Lanes, Volumes, Timings
6: Centreville Rd. & Dulles Toll Rd. (N)
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
654
EBR
6/6/2013
WBL
WBT
735
486
0
102
0
0.42
486
0
102
0
0.42
WBR
NBL
90
1583
0
0
0
0.10
135
811
0
0
0
0.25
NBT
424
4054
1535
0
0
0.71
NBR
SBL
SBT
718
SBR
2440
0
231
0
0.62
1136
0
0
0
0.16
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 73 (52%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.60
Intersection Signal Delay: 11.6
Intersection LOS: B
Intersection Capacity Utilization 80.8%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
6: Centreville Rd. & Dulles Toll Rd. (N)
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 12
Lanes, Volumes, Timings
7: Fairfax County Parkway & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
642
1900
12
722
1900
12
0%
54
1900
12
140
1900
12
515
1900
12
0%
515
1900
12
257
1900
12
0
1900
12
0%
398
1900
12
897
1900
12
0
1900
12
0%
1096
1900
12
275
1
245
1
25
215
1
400
1
25
400
0
340
1
25
240
3
25
Yes
Yes
35
936
18.2
1.00
100%
2%
0
1.00
100%
2%
0
Yes
35
761
14.8
1.00
100%
2%
0
1.00
100%
2%
0
54
Perm
10%
126
Split
4
529
NA
4
0%
1.00
100%
2%
0
Yes
50
732
10.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
50
673
9.2
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
1.00
100%
2%
0
0%
722
NA
3
3
3
3
3
4
4
4
4
1
6
6
5
2
2
7.0
14.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
28.0
28.0%
5.0
2.5
0.0
7.5
Lag
5.0
12.0
24.0
24.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
29.0
29.0%
5.0
2.5
0.0
7.5
Lag
None
18.0
0.18
0.71
43.7
0.0
43.7
D
None
18.0
0.18
1.13
116.9
0.0
116.9
F
79.3
E
~283
#400
None
18.0
0.18
0.12
0.5
0.0
0.5
A
None
16.0
0.16
0.49
45.6
0.0
45.6
D
None
16.0
0.16
0.75
11.4
0.0
11.4
B
None
15.7
0.16
0.92
80.5
0.0
80.5
F
C-Max
20.5
0.20
0.66
12.1
0.0
12.1
B
None
17.0
0.17
1.06
88.1
0.0
88.1
F
C-Max
21.8
0.22
0.91
22.9
0.0
22.9
C
0
0
81
146
None
16.0
0.16
0.98
76.5
0.0
76.5
E
44.5
D
186
#300
0
103
163
#310
25
121
~223
#307
123
#276
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
257
Prot
1
1.00
100%
2%
0
642
Split
3
137
179
515
Perm
395
2
398
custom
897
Prot
5
0
1096
custom
Synchro 8 Report
Page 13
Lanes, Volumes, Timings
7: Fairfax County Parkway & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
240
898
0
0
0
0.71
EBT
856
637
0
0
0
1.13
EBR
WBL
275
450
0
0
0
0.12
245
257
0
0
0
0.49
6/6/2013
WBT
681
541
0
0
0
0.98
WBR
NBL
215
685
0
0
0
0.75
400
283
0
0
0
0.91
NBT
652
NBR
SBL
400
603
0
0
0
0.66
340
848
0
0
0
1.06
SBT
593
SBR
395
1211
0
0
0
0.91
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:SBR and 6:NBR, Start of Yellow
Natural Cycle: 100
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.13
Intersection Signal Delay: 56.2
Intersection LOS: E
Intersection Capacity Utilization 82.2%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
7: Fairfax County Parkway & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 14
Lanes, Volumes, Timings
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
797
1900
12
0
1900
12
0%
399
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1850
1900
12
0%
345
1900
12
572
1900
12
2402
1900
12
0%
0
1900
12
220
1
0
0
25
0
0
0
0
25
640
1
325
2
25
160
1
25
Yes
Yes
35
414
8.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
797
Prot
3
0
Yes
35
491
9.6
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
399
custom
3
3
3
5.0
12.0
30.0
30.0%
4.0
3.0
0.0
7.0
5.0
12.0
30.0
30.0%
4.0
3.0
0.0
7.0
None
23.0
0.23
1.01
73.8
0.0
73.8
E
None
23.0
0.23
0.87
45.7
0.0
45.7
D
~267
#394
174
#343
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
50
891
12.2
1.00
100%
2%
0
1.00
100%
2%
0
50
713
9.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
1850
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
345
Perm
572
Prot
5
2402
NA
2
6
6
6
5
2
20.0
27.5
47.0
47.0%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
47.0
47.0%
5.0
2.5
0.0
7.5
Lag
5.0
12.0
23.0
23.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
70.0
70.0%
5.0
2.5
0.0
7.5
0
C-Max C-Max None C-Max
39.5
39.5
16.0
62.5
0.40
0.40
0.16
0.62
0.92
0.41
1.04
0.76
37.7
3.9
90.3
8.1
0.0
0.0
0.0
0.1
37.7
3.9
90.3
8.2
D
A
F
A
32.4
23.9
C
C
402
0
~202
137
#491
54 m#222 m139
Synchro 8 Report
Page 15
Lanes, Volumes, Timings
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
160
789
0
0
0
1.01
EBT
334
EBR
WBL
WBT
411
WBR
220
460
0
0
0
0.87
6/6/2013
NBL
NBT
811
2008
0
0
0
0.92
NBR
SBL
640
834
0
0
0
0.41
325
549
0
0
0
1.04
SBT
633
SBR
3178
100
0
0
0.78
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 80 (80%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.04
Intersection Signal Delay: 34.5
Intersection LOS: C
Intersection Capacity Utilization 92.7%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 16
Lanes, Volumes, Timings
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
168
1900
12
0
1900
12
0%
449
1900
12
167
1900
12
2955
1900
12
0%
0
1900
12
0
1900
12
2859
1900
12
0%
385
1900
12
0
0
185
1
25
0
1
185
2
25
0
0
0
0
0
0
0
0
Yes
Yes
25
568
15.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
890
24.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
233
NA
8
4
8
8
8
7.0
14.0
21.0
21.0%
4.0
3.0
0.0
7.0
5.0
21.0
21.0
21.0%
4.0
1.0
0.0
5.0
5.0
21.0
21.0
21.0%
4.0
1.0
0.0
5.0
None
14.0
0.14
0.34
41.2
0.0
41.2
D
None
16.0
0.16
0.73
33.7
0.0
33.7
C
34.3
C
79
#206
None
16.0
0.16
0.68
30.3
0.0
30.3
C
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
50
1458
19.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
151
Prot
4
48
80
Yes
50
713
9.7
1.00
100%
2%
0
48%
233
Perm
69
#165
670
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
167
Prot
1
2955
NA
6
1
6
2
2
2
5.0
12.0
13.0
13.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
79.0
79.0%
5.0
2.0
0.0
7.0
20.0
27.0
66.0
66.0%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
66.0
66.0%
5.0
2.0
0.0
7.0
Lag
None C-Max
6.0
72.0
0.06
0.72
0.81
0.81
67.6
9.4
0.0
0.2
67.6
9.6
E
A
12.7
B
48
289
m49 m285
0
0
2859
NA
2
385
Perm
C-Max C-Max
59.0
59.0
0.59
0.59
0.95
0.35
6.0
0.1
0.0
0.0
6.0
0.1
A
A
5.3
A
56
0
m45
m0
Synchro 8 Report
Page 17
Lanes, Volumes, Timings
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
EBR
WBL
185
450
0
0
0
0.34
6/6/2013
WBT
810
WBR
NBL
320
0
0
0
0.73
341
0
0
0
0.68
185
205
0
0
0
0.81
NBT
633
3661
124
0
0
0.84
NBR
SBL
SBT
1378
3000
0
0
0
0.95
SBR
670
1091
0
0
0
0.35
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 80 (80%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.95
Intersection Signal Delay: 11.2
Intersection LOS: B
Intersection Capacity Utilization 92.7%
ICU Level of Service F
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 18
Lanes, Volumes, Timings
10: Fairfax County Parkway & Spring Street
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBR
NBL
NBT
SBT
SBR
348
1900
12
0%
215
1
25
348
1900
12
850
1900
12
2332
1900
12
0%
2987
1900
12
0%
664
1900
12
0
1
650
2
25
550
1
Yes
Yes
25
754
20.6
50
427
5.8
50
557
7.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
850
Prot
5
2332
NA
2
2987
NA
6
8
5
2
6
6
6
7.0
14.0
14.0
14.0%
4.0
3.0
0.0
7.0
5.0
12.0
26.0
26.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
86.0
86.0%
5.0
2.0
0.0
7.0
20.0
27.0
60.0
60.0%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
60.0
60.0%
5.0
2.0
0.0
7.0
Lag
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
348
NA
8
348
Free
Free
None
7.0
0.07
1.45
259.4
0.0
259.4
F
129.9
F
~156
#246
100.0
1.00
0.22
0.3
0.0
0.3
A
0
0
1.00
100%
2%
0
664
Perm
None C-Max C-Max C-Max
19.0
79.0
53.0
53.0
0.19
0.79
0.53
0.53
1.30
0.58
1.11
0.68
175.0
2.5
79.3
13.1
0.0
0.0
0.0
0.0
175.0
2.5
79.3
13.1
F
A
E
B
48.6
67.3
D
E
~356
27
~801
160
#478
134
#891
291
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 19
Lanes, Volumes, Timings
10: Fairfax County Parkway & Spring Street
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
674
215
240
0
0
0
1.45
EBR
NBL
1583
0
0
0
0.22
650
652
0
0
0
1.30
6/6/2013
NBT
347
SBT
477
4017
0
0
0
0.58
2695
0
0
0
1.11
SBR
550
977
0
0
0
0.68
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 56 (56%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.45
Intersection Signal Delay: 65.2
Intersection LOS: E
Intersection Capacity Utilization 109.4%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
10: Fairfax County Parkway & Spring Street
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 20
Lanes, Volumes, Timings
11: Reston Parkway & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
260
1900
12
1061
1900
12
0%
22
1900
12
167
1900
12
500
1900
12
0%
619
1900
12
190
1900
12
1868
1900
12
0%
475
1900
12
660
1900
12
856
1900
12
0%
391
1900
12
0
0
155
1
25
220
1
435
2
25
415
1
720
2
25
260
1
25
Yes
Yes
35
675
13.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
260
pm+pt
3
8
3
1083
NA
8
8.0
42.0
42.0
21.0%
4.0
3.0
0.0
7.0
Lead
4.0
20.0
65.0
32.5%
3.5
0.5
0.0
4.0
Lag
Yes
None
61.0
0.30
1.01
96.2
0.0
96.2
F
87.2
F
~765
#923
None
77.5
0.39
0.59
49.6
0.0
49.6
D
246
334
8
Yes
35
419
8.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
12%
147
pm+pt
7
4
7
520
619
NA pm+ov
4
5
4
4
5
8.0
15.0
43.0
21.5%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
38.0
19.0%
4.0
3.0
0.0
7.0
Lead
None
58.2
0.29
1.07
147.3
0.0
147.3
F
None
58.2
0.29
0.74
61.1
0.0
61.1
E
69.8
E
271
#332
None
83.2
0.42
0.87
58.7
0.0
58.7
E
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
45
1208
18.3
1.00
100%
2%
0
1.00
100%
2%
0
0%
8.0
15.0
20.0
10.0%
4.0
3.0
0.0
7.0
Lead
~180
#389
Yes
45
2270
34.4
1.00
100%
2%
0
655
#978
430
1
190
pm+pt
1
6
1
5.0
12.0
13.0
6.5%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
1868
475
NA pm+ov
6
7
6
6
7
20.0
35.5
77.0
38.5%
4.5
2.0
0.0
6.5
Lag
8.0
15.0
20.0
10.0%
4.0
3.0
0.0
7.0
Lead
None C-Max
76.0
70.5
0.38
0.35
0.38
1.04
29.2
94.5
0.0
0.0
29.2
94.5
C
F
77.9
E
61
~969
85 #1054
None
90.0
0.45
0.60
32.3
0.0
32.3
C
660
pm+pt
5
2
5
5.0
12.0
38.0
19.0%
4.0
3.0
0.0
7.0
Lead
856
391
NA pm+ov
2
3
2
2
3
20.0
35.5
102.0
51.0%
4.5
2.0
0.0
6.5
Lag
8.0
42.0
42.0
21.0%
4.0
3.0
0.0
7.0
Lead
None C-Max
108.0
95.5
0.54
0.48
1.09
0.35
115.3
17.9
0.0
0.0
115.3
17.9
F
B
49.8
D
342
~460
210
472 m#531 m250
None
127.8
0.64
0.37
9.2
0.0
9.2
A
212
m231
Synchro 8 Report
Page 21
Lanes, Volumes, Timings
11: Reston Parkway & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
260
489
0
0
0
0.53
EBT
595
1077
0
0
0
1.01
EBR
6/6/2013
WBL
155
138
0
0
0
1.07
WBT
339
699
0
0
0
0.74
WBR
NBL
220
714
0
0
0
0.87
435
505
0
0
0
0.38
NBT
2190
1792
0
0
0
1.04
NBR
SBL
415
787
0
0
0
0.60
720
604
0
0
0
1.09
SBT
1128
2428
0
0
0
0.35
SBR
430
1121
0
0
0
0.35
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 150 (75%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.09
Intersection Signal Delay: 70.6
Intersection LOS: E
Intersection Capacity Utilization 119.0%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
11: Reston Parkway & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 22
Lanes, Volumes, Timings
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
595
1900
12
0
1900
12
0%
416
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1475
1900
12
0%
231
1900
12
0
1900
12
1608
1900
12
0%
536
1900
12
400
1
0
0
25
0
0
0
0
25
625
1
0
0
25
0
2
25
Yes
Yes
25
573
15.6
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
595
Prot
4
0
Yes
40
339
5.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
416
custom
0
0
Yes
45
662
10.0
1.00
100%
2%
0
1.00
100%
2%
0
45
160
2.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1
0
1475
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
231
Free
0
1608
NA
2
4
4
4
6
2
2
2
7.0
13.5
43.0
21.5%
4.0
2.5
0.0
6.5
7.0
13.5
43.0
21.5%
4.0
2.5
0.0
6.5
20.0
26.5
157.0
78.5%
4.5
2.0
0.0
6.5
20.0
26.5
157.0
78.5%
4.5
2.0
0.0
6.5
20.0
26.5
157.0
78.5%
4.5
2.0
0.0
6.5
None
36.5
0.18
0.95
105.1
0.0
105.1
F
None
36.5
0.18
1.22
177.0
0.0
177.0
F
405
#527
~600
#836
C-Max
150.5
0.75
0.55
4.7
0.5
5.2
A
4.5
A
156
m180
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Free
536
Perm
200.0
1.00
0.15
0.1
0.0
0.1
A
0
m0
C-Max C-Max
150.5 150.5
0.75
0.75
0.60
0.41
13.2
3.4
0.5
0.3
13.7
3.7
B
A
11.2
B
390
72
m415
m94
Synchro 8 Report
Page 23
Lanes, Volumes, Timings
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
626
0
0
0
0.95
EBT
493
EBR
WBL
WBT
259
WBR
400
340
0
0
0
1.22
NBL
6/6/2013
NBT
582
2663
0
675
0
0.74
NBR
625
1583
0
0
0
0.15
SBL
SBT
80
SBR
2663
563
0
0
0.77
1316
309
0
0
0.53
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 40 (20%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 65
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.22
Intersection Signal Delay: 34.6
Intersection LOS: C
Intersection Capacity Utilization 81.0%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 24
Lanes, Volumes, Timings
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
303
1900
12
0
1900
12
0%
775
1900
12
191
1900
12
2007
1900
12
0%
0
1900
12
0
1900
12
1676
1900
12
0%
229
1900
12
0
0
0
1
25
50
1
645
1
25
0
0
0
0
25
0
0
25
Yes
Yes
35
427
8.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
1052
28.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
402
NA
4
4
4
4
4
7.0
13.5
55.0
27.5%
4.0
2.5
0.0
6.5
7.0
13.5
55.0
27.5%
4.0
2.5
0.0
6.5
None
48.5
0.24
0.67
77.8
0.0
77.8
E
None
48.5
0.24
1.02
111.2
19.9
131.1
F
113.7
F
~545
#805
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
45
847
12.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
273
Split
4
346
468
Yes
45
649
9.8
1.00
100%
2%
0
48%
403
Perm
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
191
Prot
1
2007
NA
6
1
6
2
2
2
7.0
13.5
55.0
27.5%
4.0
2.5
0.0
6.5
5.0
12.0
43.0
21.5%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
145.0
72.5%
4.5
2.0
0.0
6.5
20.0
26.5
102.0
51.0%
4.5
2.0
0.0
6.5
Lag
20.0
26.5
102.0
51.0%
4.5
2.0
0.0
6.5
Lag
None
48.5
0.24
0.99
104.7
16.1
120.8
F
None C-Max
26.0 138.5
0.13
0.69
0.83
0.82
100.4
36.6
0.0
3.1
100.4
39.7
F
D
45.0
D
212
1122
251
1124
498
#755
0
0
1676
NA
2
229
Perm
C-Max C-Max
105.5 105.5
0.53
0.53
0.63
0.25
6.4
0.3
0.8
0.0
7.1
0.3
A
A
6.3
A
73
2
m83
m0
Synchro 8 Report
Page 25
Lanes, Volumes, Timings
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
347
EBR
WBL
WBT
972
407
0
0
0
0.67
395
0
22
0
1.08
WBR
NBL
50
407
0
22
0
1.05
645
318
0
0
0
0.60
NBT
569
2450
277
338
0
0.95
6/6/2013
NBR
SBL
SBT
767
SBR
2681
609
0
0
0.81
901
0
0
0
0.25
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 72 (36%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.02
Intersection Signal Delay: 45.1
Intersection LOS: D
Intersection Capacity Utilization 98.3%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 26
Lanes, Volumes, Timings
14: Reston Parkway & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
110
1900
12
1950
1900
12
0%
275
1900
12
455
1900
12
698
1900
12
0%
303
1900
12
755
1900
12
1298
1900
12
0%
1298
1900
12
287
1900
12
1251
1900
12
0%
130
1900
12
275
1
550
2
25
0
1
480
2
25
470
1
300
2
25
290
2
25
Yes
Yes
35
506
9.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
110
Prot
3
1950
NA
8
3
8
6.0
13.0
19.0
9.5%
4.0
3.0
0.0
7.0
Lead
None
10.4
0.05
0.62
107.6
0.0
107.6
F
74
112
Yes
35
569
11.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
275
Perm
455
Prot
7
698
NA
4
8
8
7
4
6.0
49.0
63.0
31.5%
4.0
3.0
0.0
7.0
Lag
6.0
49.0
63.0
31.5%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
24.0
12.0%
4.0
3.0
0.0
7.0
Lead
None
56.0
0.28
1.37
221.4
0.0
221.4
F
193.9
F
~1234
#1316
None
56.0
0.28
0.51
33.5
0.0
33.5
C
None
17.0
0.08
1.56
321.0
0.0
321.0
F
157
262
~434
#558
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
847
12.8
1.00
100%
2%
0
1.00
100%
2%
0
45
794
12.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
303
Perm
445
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
755
Prot
1
1298
NA
6
1298
Perm
4
4
1
6
6
6
5
6.0
54.0
68.0
34.0%
4.0
3.0
0.0
7.0
Lag
6.0
54.0
68.0
34.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
51.0
25.5%
4.0
3.0
0.0
7.0
Lead
20.0
44.5
95.0
47.5%
4.5
2.0
0.0
6.5
Lag
20.0
44.5
95.0
47.5%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
18.0
9.0%
4.0
3.0
0.0
7.0
Lead
None
62.6
0.31
0.63
62.1
0.0
62.1
E
136.9
F
418
497
None
62.6
0.31
0.51
32.5
0.0
32.5
C
None C-Max C-Max
44.0
88.5
88.5
0.22
0.44
0.44
1.00
0.58
1.64
109.1
32.6 316.6
0.0
0.0
0.0
109.1
32.6 316.6
F
C
F
159.8
F
176
510
375 ~2330
286 m#633 m449 m#2540
287
Prot
5
1251
130
NA pm+ov
2
3
2
2
2
20.0
44.5
62.0
31.0%
4.5
2.0
0.0
6.5
Lag
6.0
13.0
19.0
9.5%
4.0
3.0
0.0
7.0
Lead
None C-Max
11.0
55.5
0.06
0.28
1.53
0.89
323.8
37.0
0.0
0.0
323.8
37.0
F
D
83.7
F
~276
398
#387
528
None
72.4
0.36
0.20
3.4
0.0
3.4
A
27
25
Synchro 8 Report
Page 27
Lanes, Volumes, Timings
14: Reston Parkway & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
205
0
0
0
0.54
EBT
426
1423
0
0
0
1.37
6/6/2013
EBR
WBL
275
539
0
0
0
0.51
550
291
0
0
0
1.56
WBT
489
WBR
NBL
1107
0
0
0
0.63
592
0
0
0
0.51
480
755
0
0
0
1.00
NBT
767
2250
0
0
0
0.58
NBR
SBL
470
793
0
0
0
1.64
300
188
0
0
0
1.53
SBT
714
1411
0
0
0
0.89
SBR
445
635
0
0
0
0.20
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 24 (12%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.64
Intersection Signal Delay: 150.6
Intersection LOS: F
Intersection Capacity Utilization 143.3%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
14: Reston Parkway & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 28
Lanes, Volumes, Timings
15: Reston Parkway & Bluemont Way/Stratford Park Pl
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
26
1900
12
26
1900
12
0%
207
1900
8
20
1900
12
20
1900
12
0%
0
1900
12
795
1900
12
2068
1900
12
0%
80
1900
12
24
1900
12
1653
1900
12
0%
72
1900
12
0
1
0
1
25
0
0
380
2
25
550
0
390
1
25
290
1
25
Yes
Yes
25
1182
32.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
26
pm+pt
7
4
7
119
NA
4
4
7.0
14.0
14.0
7.0%
4.0
3.0
0.0
7.0
Lead
4.0
49.0
49.0
24.5%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
55.0
27.5%
4.0
3.0
0.0
7.0
Lead
None
15.0
0.08
0.27
86.0
0.0
86.0
F
None
10.8
0.05
0.74
58.4
0.0
58.4
E
44.3
D
52
133
20
pm+pt
3
8
3
20
NA
8
Yes
45
794
12.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
45%
114
pm+ov
1
4
1
32
66
Yes
25
258
7.0
1.00
100%
2%
0
1.00
100%
2%
0
45
523
7.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
2148
NA
6
8
1
6
5
5.0
12.0
12.0
6.0%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
47.0
23.5%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
55.0
27.5%
4.0
3.0
0.0
7.0
Lead
20.0
39.0
125.0
62.5%
5.0
2.0
0.0
7.0
Lag
4.0
11.0
14.0
7.0%
4.0
3.0
0.0
7.0
Lead
None
72.1
0.36
0.22
20.2
0.0
20.2
C
None
11.8
0.06
0.25
86.0
0.0
86.0
F
50
97
24
54
None
8.9
0.04
0.24
97.0
0.0
97.0
F
91.5
F
26
58
None C-Max
54.2 156.0
0.27
0.78
0.85
0.54
92.4
7.4
0.0
0.0
92.4
7.5
F
A
30.4
C
544
270
616
332
1.00
100%
2%
0
1.00
100%
2%
0
0%
795
Prot
1
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
285
1
0
24
Prot
5
1653
72
NA pm+ov
2
7
2
2
7
20.0
42.0
84.0
42.0%
5.0
2.0
0.0
7.0
Lag
7.0
14.0
14.0
7.0%
4.0
3.0
0.0
7.0
Lead
None C-Max
7.3 106.7
0.04
0.53
0.38
0.61
96.8
19.4
0.0
0.3
96.8
19.7
F
B
20.0
B
32
235
69
257
None
120.7
0.60
0.07
0.1
0.0
0.1
A
0
0
Synchro 8 Report
Page 29
Lanes, Volumes, Timings
15: Reston Parkway & Bluemont Way/Stratford Park Pl
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
96
0
0
0
0.27
EBT
1102
EBR
WBL
WBT
178
392
0
0
0
0.30
509
0
0
0
0.22
81
0
0
0
0.25
372
0
0
0
0.05
WBR
6/6/2013
NBL
380
933
0
0
0
0.85
NBT
714
3943
223
0
0
0.58
NBR
SBL
390
70
0
0
0
0.34
SBT
443
2713
442
0
0
0.73
SBR
285
994
0
0
0
0.07
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 32 (16%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.85
Intersection Signal Delay: 28.0
Intersection LOS: C
Intersection Capacity Utilization 80.2%
ICU Level of Service D
Analysis Period (min) 15
Splits and Phases:
15: Reston Parkway & Bluemont Way/Stratford Park Pl
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 30
Lanes, Volumes, Timings
16: Reston Parkway & New Dominion Pkwy
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
72
1900
12
466
1900
12
0%
323
1900
12
248
1900
12
297
1900
12
0%
198
1900
12
818
1900
12
1091
1900
12
0%
223
1900
12
206
1900
12
1310
1900
12
0%
150
1900
12
275
1
95
1
25
165
1
500
2
25
445
1
205
1
25
270
1
25
Yes
Yes
25
722
19.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
72
pm+pt
3
8
3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
466
323
NA pm+ov
8
1
8
8
8
248
pm+pt
7
4
7
1.00
100%
2%
0
45
423
6.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
297
198
NA pm+ov
4
5
4
4
4
5.0
12.0
37.0
18.5%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
53.0
26.5%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
36.0
18.0%
4.0
3.0
0.0
7.0
Lead
5.0
47.0
60.0
30.0%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
46.0
23.0%
4.0
3.0
0.0
7.0
Lead
None
34.7
0.17
0.36
59.4
0.0
59.4
E
None
28.7
0.14
0.92
107.7
0.0
107.7
F
74.9
E
321
#415
None
81.7
0.41
0.46
31.1
0.0
31.1
C
None
62.9
0.31
0.89
90.0
0.0
90.0
F
None
85.5
0.43
0.28
24.8
0.0
24.8
C
213
310
265
#416
None
49.9
0.25
0.64
73.4
0.0
73.4
E
66.0
E
346
460
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
521
7.9
5.0
12.0
13.0
6.5%
4.0
3.0
0.0
7.0
Lead
67
112
Yes
25
408
11.1
1.00
100%
2%
0
113
163
65
1
818
Prot
1
1
5.0
12.0
53.0
26.5%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
1091
223
NA pm+ov
6
7
6
6
6
206
Prot
5
5
1310
150
NA pm+ov
2
3
2
2
2
20.0
39.0
81.0
40.5%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
36.0
18.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
46.0
23.0%
4.0
3.0
0.0
7.0
Lead
20.0
47.0
74.0
37.0%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
13.0
6.5%
4.0
3.0
0.0
7.0
Lead
None C-Max
46.0
87.5
0.23
0.44
1.04
0.49
117.6
33.5
24.4
0.7
142.0
34.2
F
C
72.3
E
~598
320
#724
357
None
121.7
0.61
0.22
2.6
0.4
3.1
A
None C-Max
28.6
70.1
0.14
0.35
0.81
0.74
106.6
60.4
0.0
0.5
106.6
60.9
F
E
62.4
E
268
569
355
628
None
83.1
0.42
0.21
14.6
0.0
14.6
B
37
55
43
100
Synchro 8 Report
Page 31
Lanes, Volumes, Timings
16: Reston Parkway & New Dominion Pkwy
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
270
199
0
0
0
0.36
EBT
642
530
0
0
0
0.88
EBR
WBL
275
693
0
2
0
0.47
95
293
0
0
0
0.85
6/6/2013
WBT
328
493
0
0
0
0.60
WBR
NBL
165
705
0
0
0
0.28
500
789
97
0
0
1.18
NBT
441
2223
713
0
0
0.72
NBR
SBL
445
1026
451
0
0
0.39
205
345
0
0
0
0.60
SBT
343
1781
0
145
0
0.80
SBR
65
715
0
0
0
0.21
Intersection Summary
Area Type:
Other
Cycle Length: 200
Actuated Cycle Length: 200
Offset: 8 (4%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.04
Intersection Signal Delay: 68.8
Intersection LOS: E
Intersection Capacity Utilization 98.6%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
16: Reston Parkway & New Dominion Pkwy
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 32
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
WBT
WBR
SBL
SBR
1301
1900
12
859
1900
12
0%
381
1900
12
0%
1322
1900
12
1100
1900
12
0%
0
2
25
625
1900
12
210
1
25
0
1
Yes
35
2307
44.9
35
621
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
1301
Prot
1
859
NA
12
1
12
381
1322
NA pm+ov
2
3
2
2
2
1.00
100%
2%
0
10.0
17.0
36.0
27.7%
4.0
3.0
0.0
7.0
Lead
None
29.0
0.22
1.70
352.9
0.0
352.9
F
~828
#964
15.0
39.0
52.0
40.0%
4.0
3.0
0.0
7.0
Lag
81.0
0.62
0.74
22.1
0.0
22.1
C
221.3
F
476
648
0
1
Yes
35
623
12.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
5.0
29.0
42.0
32.3%
4.0
3.0
0.0
7.0
1100
NA
3
Free
3
5.0
29.0
42.0
32.3%
4.0
3.0
0.0
7.0
None C-Max C-Max
45.0
87.0
35.0
0.35
0.67
0.27
0.59
1.25
1.19
39.5 143.1 129.0
0.0
0.0
0.0
39.5 143.1 129.0
D
F
F
119.9
83.1
F
F
263 ~1387
~578
370 #1651
#681
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
625
Free
130.0
1.00
0.39
2.2
0.0
2.2
A
50
117
Synchro 8 Report
Page 33
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
765
0
0
0
1.70
6/6/2013
EBT
2227
WBT
541
WBR
SBL
543
SBR
1160
0
0
0
0.74
644
0
0
0
0.59
1059
0
0
0
1.25
924
0
0
0
1.19
1583
0
0
0
0.39
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 80 (62%), Referenced to phase 3:SBL, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.70
Intersection Signal Delay: 147.7
Intersection LOS: F
Intersection Capacity Utilization 130.6%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
17: Sunrise Valley Dr & Wiehle Ave
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 34
Lanes, Volumes, Timings
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
468
1900
12
0
1900
12
0%
335
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1668
1900
12
0%
340
1900
12
557
1900
12
1299
1900
12
0%
0
1900
12
450
1
0
0
25
0
0
235
2
25
435
1
0
0
25
450
2
25
No
Yes
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
43%
191
Perm
200
NA
4
4
4
4
4
7.0
14.0
42.0
32.3%
4.0
3.0
0.0
7.0
7.0
14.0
42.0
32.3%
4.0
3.0
0.0
7.0
7.0
14.0
42.0
32.3%
4.0
3.0
0.0
7.0
None
25.2
0.19
0.66
53.0
0.0
53.0
D
None
25.2
0.19
0.74
64.3
0.1
64.4
E
57.1
E
187
263
None
25.2
0.19
0.66
58.3
0.0
58.3
E
0
158
225
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
623
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
12%
412
Split
4
179
215
Yes
25
553
15.1
1.00
100%
2%
0
1.00
100%
2%
0
35
572
11.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
1668
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
340
Perm
557
Prot
5
1299
NA
2
6
6
6
5
2
15.0
22.0
48.0
36.9%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
48.0
36.9%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
40.0
30.8%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
88.0
67.7%
4.0
3.0
0.0
7.0
C-Max C-Max
57.3
57.3
0.44
0.44
0.50
0.38
16.2
0.3
0.0
0.0
16.2
0.3
B
A
13.5
B
153
0
m128
m0
0
None C-Max
26.5
90.8
0.20
0.70
0.80
0.37
43.2
11.7
0.0
0.3
43.2
12.0
D
B
21.4
C
156
155
175
205
Synchro 8 Report
Page 35
Lanes, Volumes, Timings
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
450
867
0
9
0
0.48
EBT
684
379
0
4
0
0.53
EBR
WBL
WBT
473
WBR
NBL
450
404
0
0
0
0.47
NBT
543
3326
0
19
0
0.50
6/6/2013
NBR
SBL
SBT
492
435
888
0
0
0
0.38
871
0
0
0
0.64
3552
1461
0
0
0.62
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 128 (98%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 24.1
Intersection LOS: C
Intersection Capacity Utilization 65.4%
ICU Level of Service C
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 36
Lanes, Volumes, Timings
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
287
1900
12
0
1900
12
0%
287
1900
12
196
1900
12
1852
1900
12
0%
0
1900
12
0
1900
12
1310
1900
12
0%
193
1900
12
0
0
0
1
25
0
1
0
2
25
0
0
250
2
25
0
0
25
Yes
No
35
627
12.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
432
11.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
192
NA
4
4
4
4
4
5.0
11.5
44.0
33.8%
4.0
2.5
0.0
6.5
5.0
11.5
44.0
33.8%
4.0
2.5
0.0
6.5
5.0
11.5
44.0
33.8%
4.0
2.5
0.0
6.5
None
22.4
0.17
0.70
62.6
0.0
62.6
E
None
22.4
0.17
0.74
66.7
0.0
66.7
E
64.5
E
171
243
None
22.4
0.17
0.70
64.3
0.0
64.3
E
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
35
387
7.5
1.00
100%
2%
0
1.00
100%
2%
0
0%
30%
201
Split
4
170
240
Yes
35
572
11.1
1.00
100%
2%
0
37%
181
Perm
153
220
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
196
Prot
1
1852
NA
6
1
6
2
2
2
5.0
12.0
26.0
20.0%
4.0
3.0
0.0
7.0
Lead
15.0
21.0
86.0
66.2%
4.0
2.0
0.0
6.0
15.0
21.0
60.0
46.2%
4.0
2.0
0.0
6.0
Lag
15.0
21.0
60.0
46.2%
4.0
2.0
0.0
6.0
Lag
None C-Max
11.9
95.1
0.09
0.73
0.63
0.50
57.4
9.0
0.0
0.7
57.4
9.7
E
A
14.3
B
89
242
78
503
0
0
1310
NA
2
193
Perm
C-Max C-Max
76.3
76.3
0.59
0.59
0.30
0.19
2.5
0.5
0.1
0.0
2.6
0.5
A
A
2.3
A
13
0
22
0
Synchro 8 Report
Page 37
Lanes, Volumes, Timings
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
547
EBR
WBL
WBT
352
WBR
NBL
NBT
492
484
0
0
0
0.42
438
0
0
0
0.44
433
0
0
0
0.42
501
0
0
0
0.39
3721
1354
0
0
0.78
NBR
6/6/2013
SBL
SBT
307
SBR
4425
1244
0
0
0.41
1008
0
0
0
0.19
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 64 (49%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.74
Intersection Signal Delay: 16.9
Intersection LOS: B
Intersection Capacity Utilization 65.4%
ICU Level of Service C
Analysis Period (min) 15
Splits and Phases:
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 38
Lanes, Volumes, Timings
20: Wiehle Ave & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
412
1900
12
1705
1900
12
0%
797
1900
12
227
1900
12
480
1900
12
0%
152
1900
12
761
1900
12
913
1900
12
0%
761
1900
12
389
1900
12
882
1900
12
0%
130
1900
12
385
1
477
1
25
0
1
320
2
25
0
1
250
1
25
442
1
25
Yes
Yes
35
1259
24.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
1705
797
NA pm+ov
4
1
4
4
4
28%
163
pm+pt
3
8
3
0%
412
pm+pt
7
4
7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
544
NA
8
1.00
100%
2%
0
35
619
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
152
Perm
761
Prot
1
8
8
8
1
5.0
12.0
22.0
16.9%
4.0
3.0
0.0
7.0
Lead
8.0
51.0
55.0
42.3%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
22.0
16.9%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
13.0
10.0%
4.0
3.0
0.0
7.0
Lead
8.0
40.0
50.0
38.5%
4.0
3.0
0.0
7.0
Lag
8.0
40.0
50.0
38.5%
4.0
3.0
0.0
7.0
Lag
None
59.0
0.45
0.91
55.0
0.0
55.0
D
None
48.0
0.37
1.31
177.9
0.0
177.9
F
122.3
F
~968
#1107
None
70.0
0.54
0.89
38.0
0.0
38.0
D
None
49.0
0.38
1.29
204.6
0.0
204.6
F
None
43.0
0.33
0.24
5.6
0.0
5.6
A
532
#827
~140
#305
None
49.0
0.38
0.76
37.8
0.0
37.8
D
63.8
E
156
201
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
35
540
10.5
5.0
12.0
18.0
13.8%
4.0
3.0
0.0
7.0
Lead
235
#421
Yes
35
976
19.0
1.00
100%
2%
0
0
48
120
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
913
761
NA pm+ov
6
3
6
6
6
389
pm+pt
5
2
5
1012
NA
2
15.0
33.0
40.0
30.8%
4.0
2.0
0.0
6.0
Lag
2
15.0
38.0
45.0
34.6%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
13.0
10.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
17.0
13.1%
4.0
3.0
0.0
7.0
Lead
None C-Max
15.0
39.0
0.12
0.30
1.92
0.86
454.3
38.4
0.0
0.7
454.3
39.1
F
D
188.0
F
~504
367
#631
450
None
51.0
0.39
1.13
100.3
0.0
100.3
F
None C-Max
43.0
34.0
0.33
0.26
2.03
0.77
502.3
48.0
0.0
0.0
502.3
48.0
F
D
174.2
F
~468
284
#672
339
~704
#950
0
Synchro 8 Report
Page 39
Lanes, Volumes, Timings
20: Wiehle Ave & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
442
451
0
0
0
0.91
EBT
1179
1306
0
0
0
1.31
6/6/2013
EBR
WBL
385
891
0
0
0
0.89
477
126
0
0
0
1.29
WBT
896
WBR
NBL
713
0
0
0
0.76
625
0
0
0
0.24
320
396
0
0
0
1.92
NBT
460
NBR
SBL
1061
27
0
0
0.88
676
0
0
0
1.13
250
192
0
0
0
2.03
SBT
539
SBR
1319
0
0
0
0.77
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 48 (37%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.03
Intersection Signal Delay: 146.3
Intersection LOS: F
Intersection Capacity Utilization 132.5%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
20: Wiehle Ave & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 40
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
980
1900
12
34
1900
12
0%
270
1900
12
0
1900
12
58
1900
12
0%
58
1900
12
399
1900
12
699
1900
12
0%
0
1900
12
52
1900
12
388
1900
12
0%
543
1900
12
0
0
0
1
25
670
0
0
1
25
0
0
300
1
25
430
1
25
Yes
Yes
35
3015
58.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
980
Prot
5
304
NA
2
5
2
5.0
12.0
26.0
21.7%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
50.0
41.7%
4.0
3.0
0.0
7.0
None C-Max
19.0
43.0
0.16
0.36
1.80
0.40
399.8
6.5
0.0
0.0
399.8
6.5
F
A
306.7
F
~588
17
#718
81
Yes
35
879
17.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Perm
116
NA
6
6
6
6
15.0
22.0
24.0
20.0%
4.0
3.0
0.0
7.0
Lag
Yes
30
206
4.7
1.00
100%
2%
0
1.00
100%
2%
0
35
1671
32.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
220
0
399
Perm
699
NA
8
1.00
100%
2%
0
0%
0
52
Split
4
931
NA
4
8
8
8
4
4
15.0
22.0
24.0
20.0%
4.0
3.0
0.0
7.0
Lag
5.0
21.0
50.0
41.7%
4.0
1.0
0.0
5.0
5.0
21.0
50.0
41.7%
4.0
1.0
0.0
5.0
7.0
14.0
20.0
16.7%
4.0
3.0
0.0
7.0
7.0
14.0
20.0
16.7%
4.0
3.0
0.0
7.0
C-Max C-Max
17.0
0.14
0.23
25.2
0.0
25.2
C
25.2
C
21
49
None
45.0
0.38
1.86
432.1
0.0
432.1
F
None
45.0
0.38
0.53
31.0
0.0
31.0
C
176.7
F
219
278
None
13.0
0.11
0.27
44.9
0.0
44.9
D
None
13.0
0.11
1.66
327.5
0.0
327.5
F
312.6
F
~474
#610
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
~470
#667
1.00
100%
2%
0
36
m73
0
Synchro 8 Report
Page 41
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
430
543
0
0
0
1.80
EBT
2935
EBR
6/6/2013
WBL
751
0
0
0
0.40
WBT
799
WBR
513
0
0
0
0.23
NBL
NBT
126
214
0
0
0
1.86
1327
0
0
0
0.53
NBR
SBL
300
191
0
0
0
0.27
SBT
1591
SBR
561
0
0
0
1.66
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 96 (80%), Referenced to phase 2:EBT and 6:WBTL, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.86
Intersection Signal Delay: 258.0
Intersection LOS: F
Intersection Capacity Utilization 100.8%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
21: Sunrise Valley Dr & Hunter Mill Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 42
Lanes, Volumes, Timings
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
100
1900
12
0
1900
12
0%
225
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
590
1900
12
0%
590
1900
12
270
1900
12
674
1900
12
0%
0
1900
12
65
1
0
0
25
0
0
0
0
25
0
1
206
1
25
0
1
25
Yes
Yes
35
693
13.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
100
Prot
4
0
Yes
25
406
11.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
225
custom
4
4
4
5.0
10.5
10.5
8.8%
4.0
1.5
0.0
5.5
0
0
Yes
35
1671
32.6
1.00
100%
2%
0
1.00
100%
2%
0
35
447
8.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
590
NA
2
1.00
100%
2%
0
0%
590
Perm
270
Prot
1
674
NA
6
2
2
2
1
6
5.0
10.5
10.5
8.8%
4.0
1.5
0.0
5.5
20.0
26.0
67.5
56.3%
4.0
2.0
0.0
6.0
Lag
20.0
26.0
67.5
56.3%
4.0
2.0
0.0
6.0
Lag
5.0
11.5
42.0
35.0%
4.0
2.5
0.0
6.5
Lead
20.0
26.0
109.5
91.3%
4.0
2.0
0.0
6.0
None
5.0
0.04
1.37
274.5
0.0
274.5
F
None
5.0
0.04
0.80
28.5
0.0
28.5
C
~102
#216
0
#117
C-Max C-Max
74.1
74.1
0.62
0.62
0.51
0.52
4.2
4.1
0.0
0.0
4.2
4.1
A
A
4.1
A
116
70
m124
m43
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
0
None C-Max
22.9 103.5
0.19
0.86
0.80
0.22
46.9
1.2
0.0
0.3
46.9
1.5
D
A
14.5
B
215
27
285
m25
Synchro 8 Report
Page 43
Lanes, Volumes, Timings
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
73
0
0
0
1.37
EBT
613
EBR
WBL
WBT
326
WBR
65
281
0
0
0
0.80
NBL
6/6/2013
NBT
1591
NBR
SBL
1150
0
0
0
0.51
1140
0
0
0
0.52
206
523
0
0
0
0.52
SBT
367
SBR
3052
1703
0
0
0.50
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.37
Intersection Signal Delay: 21.4
Intersection LOS: C
Intersection Capacity Utilization 75.1%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 44
Lanes, Volumes, Timings
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
389
1900
12
0
1900
12
0%
519
1900
12
143
1900
12
1174
1900
12
0%
0
1900
12
0
1900
12
581
1900
12
0%
179
1900
12
0
0
0
1
25
0
1
120
1
25
0
0
0
0
25
0
0
25
Yes
Yes
35
452
8.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
854
23.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
389
Prot
4
1.00
100%
2%
0
35
218
4.2
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
4
143
pm+pt
1
6
1
5.0
11.0
26.0
21.7%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
26.0
21.7%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
14.0
11.7%
4.0
2.0
0.0
6.0
Lead
None
20.0
0.17
1.32
205.1
0.0
205.1
F
None
20.0
0.17
0.90
33.7
50.0
83.7
F
~389
#584
116
#327
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
447
8.7
1.00
100%
2%
0
519
custom
0
1
1174
NA
6
10.0
16.0
63.0
52.5%
4.0
2.0
0.0
6.0
6
None C-Max
57.0
57.0
0.48
0.48
0.47
0.70
18.4
21.7
0.0
39.9
18.4
61.6
B
E
56.9
E
40
220
40 m171
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
581
NA
23
23
74.0
0.62
0.51
5.2
1.9
7.0
A
5.7
A
79
m75
179
Perm
23
23
74.0
0.62
0.17
0.2
1.2
1.4
A
0
m0
Synchro 8 Report
Page 45
Lanes, Volumes, Timings
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
372
EBR
WBL
295
0
0
0
1.32
WBT
774
WBR
NBL
577
0
195
0
1.36
120
302
0
0
0
0.47
NBT
367
1681
497
591
0
1.08
NBR
SBL
6/6/2013
SBT
138
SBR
1148
394
0
0
0.77
1044
670
0
0
0.48
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 8 (7%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 110
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.32
Intersection Signal Delay: 67.8
Intersection LOS: E
Intersection Capacity Utilization 74.6%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 47
Lanes, Volumes, Timings
24: Hunter Mill Rd & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBR
NBL
NBT
SBT
SBR
431
1900
12
0%
0
1
25
431
1900
12
646
1900
12
431
1900
12
0%
696
1900
12
0%
319
1900
12
370
1
0
2
25
1.00
100%
2%
0
431
Perm
?
1
4
6
5.0
11.0
14.0
12%
4.0
2.0
5.0
11.0
26.0
22%
4.0
2.0
10.0
16.0
63.0
53%
4.0
2.0
Lead
Lag
Yes
35
218
4.2
35
772
15.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
646
Prot
14
431
NA
124
1015
NA
2
14
124
2
1.00
100%
2%
0
0%
431
NA
3
?
230
0
Yes
35
385
7.5
1.00
100%
2%
0
?
3
3
3
5.0
12.0
31.0
25.8%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
31.0
25.8%
4.0
3.0
0.0
7.0
Lead
None
24.0
0.20
1.22
162.2
0.0
162.2
F
85.6
F
~409
#611
None
24.0
0.20
0.65
9.1
0.0
9.1
A
34.0
0.28
0.66
58.1
55.1
113.2
F
0
93
233
m283
10.0
16.0
49.0
40.8%
4.0
2.0
0.0
6.0
Lag
83.0
0.69
0.33
2.4
1.3
3.7
A
69.4
E
28
m32
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
C-Max
43.0
0.36
0.81
38.5
0.2
38.7
D
38.7
D
348
436
1.00
100%
2%
0
0
None
None C-Max
Synchro 8 Report
Page 49
Lanes, Volumes, Timings
24: Hunter Mill Rd & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
305
354
0
0
0
1.22
6/6/2013
EBR
NBL
NBT
138
SBT
692
370
661
0
2
0
0.65
972
549
0
0
1.53
1288
629
0
0
0.65
1252
0
21
0
0.82
SBR
?
?
?
Intersection Summary
Area Type:
Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 8 (7%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 110
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.32
Intersection Signal Delay: 63.6
Intersection LOS: E
Intersection Capacity Utilization 87.6%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
24: Hunter Mill Rd & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 50
Lanes, Volumes, Timings
1: Sunrise Valley Dr. & Frying Pan Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1078
1900
12
2240
1900
12
0%
83
1900
12
75
1900
12
923
1900
12
0%
50
1900
12
25
1900
12
25
1900
12
0%
75
1900
12
331
1900
12
62
1900
12
0%
3517
1900
12
0
0
0
1
0
0
1
0
1
0
0
1
0
1
0
0
3
0
Yes
Yes
30
310
7.0
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1078
Prot
7
2323
NA
4
7
1.00
100%
2%
0
0
928
NA
8
4
3
8
5.0
10.0
87.0
53.7%
4.0
1.0
0.0
5.0
Lead
20.0
25.0
103.0
63.6%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
14.0
8.6%
4.0
1.0
0.0
5.0
Lead
None
82.0
0.51
0.43
25.9
0.0
25.9
C
None
98.1
0.61
0.76
25.3
0.0
25.3
C
25.5
C
631
686
None
8.9
0.05
0.78
119.6
0.0
119.6
F
80
#173
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
30
288
6.5
1.00
100%
2%
0
1.00
100%
2%
0
0%
75
Prot
3
250
287
Yes
35
1575
30.7
1.00
100%
2%
0
1.00
100%
2%
0
30
355
8.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
45
Perm
1.00
100%
2%
0
1.00
100%
2%
0
0%
25
Prot
5
25
NA
2
75
Over
3
8
8
5
2
3
331
pm+pt
1
6
1
20.0
25.0
30.0
18.5%
4.0
1.0
0.0
5.0
Lag
20.0
25.0
30.0
18.5%
4.0
1.0
0.0
5.0
Lag
4.0
9.0
9.0
5.6%
4.0
1.0
0.0
5.0
Lead
5.0
10.0
21.0
13.0%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
14.0
8.6%
4.0
1.0
0.0
5.0
Lead
4.0
9.0
24.0
14.8%
4.0
1.0
0.0
5.0
Lead
None
25.0
0.15
1.25
178.5
0.0
178.5
F
166.7
F
~474
#576
None
25.0
0.15
0.13
0.8
0.0
0.8
A
None C-Max
4.0
16.0
0.02
0.10
0.58
0.07
123.4
66.9
0.0
0.0
123.4
66.9
F
E
40.4
D
27
13
#79
30
None
8.9
0.05
0.33
3.9
0.0
3.9
A
0
0
0
2
0
0
62
3517
NA pm+ov
6
7
6
6
7
5.0
10.0
36.0
22.2%
4.0
1.0
0.0
5.0
Lag
5.0
10.0
87.0
53.7%
4.0
1.0
0.0
5.0
Lead
None C-Max
40.0
32.8
0.25
0.20
0.97
0.09
97.5
54.1
0.0
0.0
97.5
54.1
F
D
310.4
F
328
28
#556
52
None
119.8
0.74
1.69
335.0
0.0
335.0
F
~3119
#3197
Synchro 8 Report
Page 1
Lanes, Volumes, Timings
1: Sunrise Valley Dr. & Frying Pan Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
230
2525
0
0
0
0.43
3067
0
0
0
0.76
EBR
6/6/2013
WBL
WBT
1495
WBR
NBL
NBT
208
NBR
SBL
SBT
275
SBR
98
0
0
0
0.77
740
0
0
0
1.25
335
0
0
0
0.13
43
0
0
0
0.58
349
0
0
0
0.07
227
0
0
0
0.33
343
0
0
0
0.97
716
0
0
0
0.09
2079
0
0
0
1.69
Intersection Summary
Area Type:
Other
Cycle Length: 162
Actuated Cycle Length: 162
Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBTL, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.69
Intersection Signal Delay: 174.4
Intersection LOS: F
Intersection Capacity Utilization 157.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
1: Sunrise Valley Dr. & Frying Pan Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 2
Lanes, Volumes, Timings
2: Centreville Rd. & Frying Pan Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
502
1900
12
430
1900
12
0%
359
1900
12
252
1900
12
453
1900
12
0%
101
1900
12
160
1900
12
1636
1900
12
0%
128
1900
12
27
1900
12
1137
1900
12
0%
541
1900
12
155
1
310
1
25
400
1
205
1
25
390
1
375
1
25
225
3
25
Yes
Yes
35
232
4.5
1.00
100%
2%
0
1.00
100%
2%
0
Yes
35
1725
33.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
Yes
40
1098
18.7
1.00
100%
2%
0
0
1
1.00
100%
2%
0
0%
1.00
100%
2%
0
40
1098
18.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
1.00
100%
2%
0
0%
502
Prot
3
430
NA
8
3
8
0%
359
pm+ov
1
8
8
5.0
12.0
26.0
18.6%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
32.0
22.9%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
20.0
14.3%
4.0
3.0
-4.0
3.0
Lead
15.0
38.0
70.0
50.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
15.0
38.0
62.0
44.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
26.0
18.6%
4.0
3.0
-4.0
3.0
Lead
None
21.5
0.15
0.66
60.0
0.0
60.0
E
None
25.1
0.18
0.71
60.9
0.0
60.9
E
54.3
D
202
266
None
45.0
0.32
0.69
38.6
0.0
38.6
D
None
24.8
0.18
0.81
74.7
0.0
74.7
E
None
35.7
0.26
0.20
2.7
0.0
2.7
A
None C-Max
9.0
61.2
0.06
0.44
0.24
0.73
68.2
45.2
0.0
0.0
68.2
45.2
E
D
37.6
D
25
516
m47
588
None
85.7
0.61
0.53
20.1
0.0
20.1
C
220
#343
None C-Max
16.8
73.8
0.12
0.53
0.75
0.61
68.7
28.1
0.0
0.0
68.7
28.1
E
C
29.6
C
146
362
m152 m373
None
101.7
0.73
0.11
0.9
0.0
0.9
A
239
370
None
28.5
0.20
0.63
55.2
0.0
55.2
E
54.7
D
198
260
153
193
252
Prot
7
7
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
453
101
NA pm+ov
4
5
4
4
4
0
18
160
Prot
1
1
1636
128
NA pm+ov
6
7
6
6
6
1
m2
27
Prot
5
5
1137
541
NA pm+ov
2
3
2
2
2
312
484
Synchro 8 Report
Page 3
Lanes, Volumes, Timings
2: Centreville Rd. & Frying Pan Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
225
819
0
0
0
0.61
EBT
152
631
0
0
0
0.68
6/6/2013
EBR
WBL
155
521
0
0
0
0.69
310
328
0
0
0
0.77
WBT
1645
747
0
0
0
0.61
WBR
NBL
400
518
0
0
0
0.19
205
214
0
0
0
0.75
NBT
1018
2681
0
0
0
0.61
NBR
SBL
390
1184
0
0
0
0.11
375
113
0
0
0
0.24
SBT
1018
SBR
1547
0
0
0
0.73
1023
0
0
0
0.53
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 40 (29%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.81
Intersection Signal Delay: 41.1
Intersection LOS: D
Intersection Capacity Utilization 83.3%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
2: Centreville Rd. & Frying Pan Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 4
Lanes, Volumes, Timings
3: Centreville Rd. & Coppermine Rd.
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
538
1900
12
227
1900
12
0%
340
1900
12
60
1900
12
80
1900
12
0%
60
1900
12
34
1900
12
1656
1900
12
0%
34
1900
12
85
1900
12
1174
1900
12
0%
235
1900
12
200
1
355
1
25
370
1
465
2
25
435
1
375
1
25
100
1
25
Yes
Yes
25
254
6.9
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
538
pm+pt
3
8
3
Yes
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
227
340
NA pm+ov
8
1
8
8
8
60
pm+pt
7
4
7
Yes
40
991
16.9
1.00
100%
2%
0
1.00
100%
2%
1
40
689
11.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
80
60
NA pm+ov
4
5
4
4
4
425
1
1.00
100%
2%
1
1.00
100%
2%
0
0%
34
Prot
1
1690
NA
6
0
85
Prot
5
1
6
5
1174
235
NA pm+ov
2
3
2
2
2
7.0
14.0
30.0
21.4%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
65.0
46.4%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
7.0
14.0
14.0
10.0%
4.0
3.0
-4.0
3.0
Lead
7.0
49.0
49.0
35.0%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
13.0
9.3%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
15.0
39.0
48.0
34.3%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
13.0
9.3%
4.0
3.0
-4.0
3.0
Lead
15.0
42.0
49.0
35.0%
4.0
3.0
-4.0
3.0
Lag
7.0
14.0
30.0
21.4%
4.0
3.0
-4.0
3.0
Lead
None
54.3
0.39
0.91
58.6
0.0
58.6
E
None
42.6
0.30
0.21
36.7
0.0
36.7
D
43.2
D
88
92
None
50.3
0.36
0.52
23.2
0.0
23.2
C
None
30.0
0.21
0.20
28.9
0.0
28.9
C
None
35.0
0.25
0.12
0.5
0.0
0.5
A
None
9.6
0.07
0.15
65.2
0.0
65.2
E
0
0
13
m25
C-Min
72.0
0.51
0.45
26.0
0.0
26.0
C
24.6
C
238
351
None
107.8
0.77
0.18
1.9
0.0
1.9
A
37
49
C-Min
63.2
0.45
0.59
16.8
0.0
16.8
B
17.7
B
253
466
None
13.5
0.10
0.50
68.0
0.0
68.0
E
155
176
None
18.5
0.13
0.17
51.4
0.0
51.4
D
29.4
C
36
46
455
422
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
75
#159
0
21
Synchro 8 Report
Page 5
Lanes, Volumes, Timings
3: Centreville Rd. & Coppermine Rd.
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
100
589
0
0
0
0.91
EBT
174
1564
0
0
0
0.15
6/6/2013
EBR
WBL
200
797
0
0
0
0.43
355
295
0
0
0
0.20
WBT
684
1162
0
0
0
0.07
WBR
NBL
370
641
0
0
0
0.09
465
234
0
0
0
0.15
NBT
911
2880
0
0
0
0.59
NBR
SBL
375
170
0
0
0
0.50
SBT
609
2610
0
0
0
0.45
SBR
425
1273
0
0
0
0.18
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 104 (74%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 26.7
Intersection LOS: C
Intersection Capacity Utilization 78.2%
ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
3: Centreville Rd. & Coppermine Rd.
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 6
Lanes, Volumes, Timings
4: Centreville Rd. & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1662
1900
12
874
1900
12
0%
298
1900
12
686
1900
12
325
1900
12
0%
632
1900
12
99
1900
12
1219
1900
12
0%
330
1900
12
439
1900
12
987
1900
12
0%
247
1900
12
0
0
271
2
25
328
0
418
2
25
0
1
258
2
25
456
3
25
Yes
Yes
35
836
16.3
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
1662
Split
3
1172
NA
3
3
Yes
35
852
16.6
1.00
100%
2%
0
1.00
100%
2%
1
1.00
100%
2%
0
0%
1.00
100%
2%
0
325
NA
4
3
4
4
4
4
1
5.0
50.0
50.0
35.7%
4.0
3.0
-4.0
3.0
Lead
5.0
50.0
50.0
35.7%
4.0
3.0
-4.0
3.0
Lead
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
-4.0
3.0
Lead
20.0
43.0
44.0
31.4%
4.0
3.0
-4.0
3.0
Lag
None
48.6
0.35
0.96
58.7
0.0
58.7
E
None
48.6
0.35
0.97
64.2
0.0
64.2
E
61.0
E
~556
#715
None
26.0
0.19
1.08
111.0
0.0
111.0
F
None
26.0
0.19
0.50
54.1
0.0
54.1
D
168.7
F
141
192
None
26.0
0.19
1.55
289.9
0.5
290.4
F
None
9.0
0.06
0.45
74.9
0.0
74.9
E
~704
#946
37
69
C-Min
39.4
0.28
0.85
39.1
0.1
39.2
D
35.6
D
369
321
~357
#482
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
40
701
11.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
686
Split
4
534
#646
0
Yes
40
949
16.2
1.00
100%
2%
0
632
Perm
0
1
99
Prot
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
1219
330
NA pm+ov
6
4
6
6
6
439
Prot
5
987
NA
2
5
2
5.0
12.0
29.0
20.7%
4.0
3.0
-4.0
3.0
Lag
5.0
12.0
17.0
12.1%
4.0
3.0
-4.0
3.0
Lead
20.0
42.0
49.0
35.0%
4.0
3.0
-4.0
3.0
Lag
None
65.4
0.47
0.42
10.6
0.0
10.6
B
None
14.0
0.10
1.28
198.8
0.0
198.8
F
153
79
~258
#371
C-Min
44.4
0.32
0.61
35.8
0.0
35.8
D
73.3
E
238
282
247
Free
Free
140.0
1.00
0.16
0.2
0.0
0.2
A
0
0
Synchro 8 Report
Page 7
Lanes, Volumes, Timings
4: Centreville Rd. & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
456
1733
0
0
0
0.96
EBT
756
EBR
1203
0
0
0
0.97
6/6/2013
WBL
271
637
0
0
0
1.08
WBT
772
655
0
0
0
0.50
WBR
NBL
328
407
0
21
0
1.64
418
220
0
0
0
0.45
NBT
869
NBR
SBL
1489
0
20
0
0.83
802
0
0
0
0.41
258
343
0
0
0
1.28
SBT
621
SBR
1670
0
0
0
0.59
1583
0
0
0
0.16
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 128 (91%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.55
Intersection Signal Delay: 81.0
Intersection LOS: F
Intersection Capacity Utilization 104.3%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
4: Centreville Rd. & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 8
Lanes, Volumes, Timings
5: Centreville Rd. & Dulles Toll Rd. (S)
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
338
1900
12
40
1900
12
0%
338
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1710
1900
12
0%
930
1900
12
200
1900
12
2083
1900
12
0%
0
1900
12
365
1
0
0
0
0
0
0
0
0
380
3
270
3
25
0
1
0
Yes
Yes
30
568
12.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
100%
0
Perm
378
NA
4
Yes
30
833
18.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
338
Free
0
0
Yes
40
380
6.5
1.00
100%
2%
0
1.00
100%
2%
0
40
504
8.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
1710
NA
6
Free
1.00
100%
2%
0
0%
930
Perm
200
Prot
5
2083
NA
2
4
4
4
6
6
6
5
2
5.0
11.5
40.0
28.6%
4.0
2.5
-3.5
3.0
5.0
11.5
40.0
28.6%
4.0
2.5
-3.5
3.0
20.0
26.5
53.5
38.2%
4.0
2.5
-3.5
3.0
Lag
20.0
26.5
53.5
38.2%
4.0
2.5
-3.5
3.0
Lag
5.0
12.0
46.5
33.2%
4.0
3.0
-4.0
3.0
Lead
20.0
26.5
100.0
71.4%
4.0
2.5
-3.5
3.0
None
None
35.4
0.25
0.89
72.8
0.0
72.8
E
38.6
D
345
#521
140.0
1.00
0.21
0.3
0.0
0.3
A
0
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
C-Max C-Max
78.9
78.9
0.56
0.56
0.60
0.78
13.8
15.7
0.0
0.0
13.8
15.7
B
B
14.5
B
442
620
113
254
0
Min C-Max
16.7
98.6
0.12
0.70
0.49
0.84
58.4
21.8
0.0
47.2
58.4
69.0
E
E
68.1
E
73
867
117
971
Synchro 8 Report
Page 9
Lanes, Volumes, Timings
5: Centreville Rd. & Dulles Toll Rd. (S)
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
447
0
0
0
0.85
EBR
6/6/2013
WBL
WBT
753
WBR
365
1583
0
0
0
0.21
NBL
NBT
300
2867
0
126
0
0.62
NBR
SBL
380
1185
0
0
0
0.78
270
1066
0
0
0
0.19
SBT
424
SBR
2493
808
0
0
1.24
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 136 (97%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.89
Intersection Signal Delay: 39.2
Intersection LOS: D
Intersection Capacity Utilization 83.7%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
5: Centreville Rd. & Dulles Toll Rd. (S)
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 10
Lanes, Volumes, Timings
6: Centreville Rd. & Dulles Toll Rd. (N)
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
624
1900
12
0
1900
12
0%
416
1900
12
653
1900
12
1986
1900
12
0%
0
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
0
0
1
0
90
1
135
2
25
0
0
0
0
0
0
0
0
Yes
Yes
30
734
16.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0
50%
312
Perm
0%
0
0
Yes
25
815
22.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
312
NA
4
4
4
4
5.0
11.5
43.5
31.1%
4.0
2.5
-3.5
3.0
5.0
11.5
43.5
31.1%
4.0
2.5
-3.5
3.0
None
35.2
0.25
0.74
58.4
61.2
119.5
F
None
35.2
0.25
0.74
58.4
61.2
119.5
F
71.9
E
275
356
275
356
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
40
504
8.6
1.00
100%
2%
0
1.00
100%
2%
0
40
798
13.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
416
Free
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
653
pm+pt
1
6
1
1986
NA
6
6
2
2
2
5.0
12.0
22.5
16.1%
4.0
3.0
-4.0
3.0
Lead
20.0
26.0
96.5
68.9%
4.0
2.0
-3.0
3.0
20.0
26.0
74.0
52.9%
4.0
2.0
-3.0
3.0
Lag
20.0
26.0
74.0
52.9%
4.0
2.0
-3.0
3.0
Lag
None
98.8
0.71
0.33
4.6
0.3
4.9
A
C-Min
0
0
39
m134
C-Min
98.8
0.71
0.55
7.0
0.3
7.3
A
6.7
A
89
423
C-Min
140.0
1.00
0.26
0.4
0.0
0.4
A
Free
0
0
0
0
Perm
2
Synchro 8 Report
Page 11
Lanes, Volumes, Timings
6: Centreville Rd. & Dulles Toll Rd. (N)
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
654
EBR
6/6/2013
WBL
WBT
735
496
0
260
0
1.32
496
0
260
0
1.32
WBR
NBL
90
1583
0
0
0
0.26
135
1977
690
0
0
0.51
NBT
424
NBR
SBL
SBT
718
SBR
3620
839
0
0
0.71
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 73 (52%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.74
Intersection Signal Delay: 25.2
Intersection LOS: C
Intersection Capacity Utilization 83.7%
ICU Level of Service E
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
6: Centreville Rd. & Dulles Toll Rd. (N)
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 12
Lanes, Volumes, Timings
7: Fairfax County Parkway & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
1220
1900
12
700
1900
12
0%
407
1900
12
577
1900
12
670
1900
12
0%
614
1900
12
125
1900
12
0
1900
12
0%
100
1900
12
390
1900
12
0
1900
12
0%
439
1900
12
275
1
245
1
25
215
1
400
1
25
400
0
340
1
25
240
3
25
Yes
Yes
35
936
18.2
1.00
100%
2%
0
1.00
100%
2%
0
Yes
35
761
14.8
1.00
100%
2%
0
1.00
100%
2%
0
407
Perm
30%
404
Split
4
843
NA
4
0%
1.00
100%
2%
0
Yes
50
732
10.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
50
673
9.2
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
1.00
100%
2%
0
0%
700
NA
3
3
3
3
3
4
4
4
4
1
6
6
5
2
2
7.0
14.0
32.0
29.1%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
32.0
29.1%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
32.0
29.1%
4.0
3.0
0.0
7.0
Lead
7.0
14.0
37.0
33.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
37.0
33.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
37.0
33.6%
4.0
3.0
0.0
7.0
Lag
5.0
10.0
13.0
11.8%
4.0
1.0
0.0
5.0
Lead
7.0
14.0
20.0
18.2%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
21.0
19.1%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
28.0
25.5%
5.0
2.5
0.0
7.5
Lag
None
25.0
0.23
1.08
90.4
0.0
90.4
F
None
25.0
0.23
0.87
53.9
0.0
53.9
D
65.0
E
252
#350
None
25.0
0.23
0.60
7.8
0.0
7.8
A
None
29.6
0.27
0.93
69.2
0.0
69.2
E
None
29.6
0.27
0.77
14.5
0.0
14.5
B
None
8.4
0.08
0.93
113.9
0.0
113.9
F
C-Max
14.9
0.14
0.24
1.4
0.0
1.4
A
None
12.5
0.11
0.69
53.5
0.0
53.5
D
C-Max
20.5
0.19
0.50
5.8
0.0
5.8
A
0
82
304
#508
None
29.6
0.27
0.93
57.1
0.0
57.1
E
45.7
D
318
#442
60
214
90
#210
0
0
95
128
0
46
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
125
Prot
1
1.00
100%
2%
0
1220
Split
3
~341
#431
614
Perm
395
2
100
custom
390
Prot
5
0
439
custom
Synchro 8 Report
Page 13
Lanes, Volumes, Timings
7: Fairfax County Parkway & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
240
1134
0
0
0
1.08
EBT
856
804
0
0
0
0.87
EBR
WBL
275
674
0
0
0
0.60
245
439
0
0
0
0.92
6/6/2013
WBT
681
915
0
0
0
0.92
WBR
NBL
215
799
0
0
0
0.77
400
134
0
0
0
0.93
NBT
652
NBR
SBL
400
411
0
0
0
0.24
340
635
0
0
0
0.61
SBT
593
SBR
395
876
0
0
0
0.50
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 0 (0%), Referenced to phase 2:SBR and 6:NBR, Start of Yellow
Natural Cycle: 100
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.08
Intersection Signal Delay: 52.3
Intersection LOS: D
Intersection Capacity Utilization 72.9%
ICU Level of Service C
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
7: Fairfax County Parkway & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 14
Lanes, Volumes, Timings
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
660
1900
12
0
1900
12
0%
231
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
2607
1900
12
0%
203
1900
12
428
1900
12
1666
1900
12
0%
460
1900
12
220
1
0
0
25
0
0
0
0
25
640
1
325
2
25
160
1
25
Yes
Yes
35
414
8.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
660
Prot
3
0
Yes
35
491
9.6
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
231
custom
3
3
3
5.0
12.0
26.0
23.6%
4.0
3.0
0.0
7.0
5.0
12.0
26.0
23.6%
4.0
3.0
0.0
7.0
None
19.0
0.17
1.11
115.1
0.0
115.1
F
None
19.0
0.17
0.63
29.5
0.0
29.5
C
~275
#391
75
161
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
50
891
12.2
1.00
100%
2%
0
1.00
100%
2%
0
50
713
9.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
2607
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
203
Perm
428
Prot
5
2126
NA
2
6
6
6
5
2
20.0
27.5
64.0
58.2%
5.0
2.5
0.0
7.5
Lag
20.0
27.5
64.0
58.2%
5.0
2.5
0.0
7.5
Lag
5.0
12.0
20.0
18.2%
4.0
3.0
0.0
7.0
Lead
20.0
27.5
84.0
76.4%
5.0
2.5
0.0
7.5
0
C-Max C-Max None C-Max
56.5
56.5
13.0
76.5
0.51
0.51
0.12
0.70
1.00
0.22
1.06
0.61
44.4
2.6 111.0
7.4
0.0
0.0
0.0
0.1
44.4
2.6 111.0
7.5
D
A
F
A
41.4
24.8
D
C
646
0
~176
182
#794
35 m#237 m188
Synchro 8 Report
Page 15
Lanes, Volumes, Timings
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
160
592
0
0
0
1.11
EBT
334
EBR
WBL
WBT
411
WBR
220
367
0
0
0
0.63
6/6/2013
NBL
NBT
811
2611
0
0
0
1.00
NBR
SBL
640
911
0
0
0
0.22
325
405
0
0
0
1.06
SBT
633
SBR
3468
296
0
0
0.67
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 40 (36%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.11
Intersection Signal Delay: 42.0
Intersection LOS: D
Intersection Capacity Utilization 96.8%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
8: Fairfax County Parkway & Dulles Toll Rd EB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 16
Lanes, Volumes, Timings
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
801
1900
12
0
1900
12
0%
801
1900
12
415
1900
12
3092
1900
12
0%
0
1900
12
0
1900
12
2119
1900
12
0%
618
1900
12
0
0
185
1
25
0
1
185
2
25
0
0
0
0
0
0
0
0
Yes
Yes
25
568
15.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
890
24.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
448
NA
8
4
8
8
8
7.0
14.0
27.0
24.5%
4.0
3.0
0.0
7.0
5.0
21.0
27.0
24.5%
4.0
1.0
0.0
5.0
None
20.0
0.18
1.23
157.8
0.0
157.8
F
None
22.0
0.20
1.23
154.0
0.0
154.0
F
144.5
F
~379
#612
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
50
1458
19.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
721
Prot
4
~346
#472
Yes
50
713
9.7
1.00
100%
2%
0
46%
433
Perm
670
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
415
Prot
1
3092
NA
6
1
6
2
2
2
5.0
21.0
27.0
24.5%
4.0
1.0
0.0
5.0
5.0
12.0
22.0
20.0%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
83.0
75.5%
5.0
2.0
0.0
7.0
20.0
27.0
61.0
55.5%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
61.0
55.5%
5.0
2.0
0.0
7.0
Lag
None
22.0
0.20
1.12
112.4
0.0
112.4
F
None C-Max
14.8
76.0
0.13
0.69
0.90
0.88
65.3
13.5
0.0
0.8
65.3
14.3
E
B
20.3
C
149
383
m142 m353
~302
#511
0
0
2119
NA
2
618
Perm
C-Max C-Max
54.2
54.2
0.49
0.49
0.85
0.57
7.7
1.4
0.0
0.0
7.7
1.4
A
A
6.3
A
76
0
93
m0
Synchro 8 Report
Page 17
Lanes, Volumes, Timings
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
488
EBR
WBL
185
585
0
0
0
1.23
6/6/2013
WBT
810
WBR
NBL
365
0
0
0
1.23
388
0
0
0
1.12
185
468
0
0
0
0.89
NBT
633
3513
172
0
0
0.93
NBR
SBL
SBT
1378
2506
0
0
0
0.85
SBR
670
1093
0
0
0
0.57
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 32 (29%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.23
Intersection Signal Delay: 40.8
Intersection LOS: D
Intersection Capacity Utilization 102.8%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
9: Fairfax County Parkway & Dulles Toll Rd WB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 18
Lanes, Volumes, Timings
10: Fairfax County Parkway & Spring Street
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBR
NBL
NBT
SBT
SBR
521
1900
12
0%
215
1
25
466
1900
12
467
1900
12
3243
1900
12
0%
2108
1900
12
0%
344
1900
12
0
1
650
2
25
550
1
Yes
Yes
25
754
20.6
50
427
5.8
50
557
7.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
467
Prot
5
3243
NA
2
2108
NA
6
8
5
2
6
6
6
7.0
14.0
31.0
28.2%
4.0
3.0
0.0
7.0
5.0
12.0
23.0
20.9%
4.0
3.0
0.0
7.0
Lead
20.0
27.0
79.0
71.8%
5.0
2.0
0.0
7.0
20.0
27.0
56.0
50.9%
5.0
2.0
0.0
7.0
Lag
20.0
27.0
56.0
50.9%
5.0
2.0
0.0
7.0
Lag
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
521
NA
8
466
Free
Free
None
21.2
0.19
0.79
51.2
0.0
51.2
D
27.3
C
180
235
1.00
100%
2%
0
344
Perm
None C-Max C-Max C-Max
16.0
74.8
51.8
51.8
0.15
0.68
0.47
0.47
0.94
0.94
0.88
0.37
55.0
17.9
32.3
3.2
0.0
0.0
0.0
0.0
55.0
17.9
32.3
3.2
E
B
C
A
22.6
28.2
C
C
0
171
547
483
0
0 m#200 m632
#591
51
110.0
1.00
0.29
0.5
0.0
0.5
A
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 19
Lanes, Volumes, Timings
10: Fairfax County Parkway & Spring Street
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
674
215
749
0
0
0
0.70
EBR
NBL
1583
0
0
0
0.29
650
499
0
0
0
0.94
6/6/2013
NBT
347
SBT
477
3456
0
0
0
0.94
2393
0
0
0
0.88
SBR
550
927
0
0
0
0.37
Intersection Summary
Area Type:
Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 8 (7%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.94
Intersection Signal Delay: 25.1
Intersection LOS: C
Intersection Capacity Utilization 89.2%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
10: Fairfax County Parkway & Spring Street
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 20
Lanes, Volumes, Timings
11: Reston Parkway & Sunrise Valley Dr
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
250
1900
12
225
1900
12
0%
100
1900
12
698
1900
12
524
1900
12
0%
1106
1900
12
138
1900
12
1450
1900
12
0%
138
1900
12
685
1900
12
1844
1900
12
0%
158
1900
12
0
0
155
1
25
220
1
435
2
25
415
1
720
2
25
260
1
25
Yes
Yes
35
675
13.1
1.00
100%
2%
0
1.00
100%
2%
0
Yes
35
419
8.2
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
45
1208
18.3
1.00
100%
2%
0
325
NA
8
8
8.0
42.0
56.0
31.1%
4.0
3.0
0.0
7.0
Lead
5.0
21.0
22.0
12.2%
4.0
1.0
0.0
5.0
Lag
8.0
15.0
49.0
27.2%
4.0
3.0
0.0
7.0
Lead
8.0
15.0
15.0
8.3%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
54.0
30.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
15.0
8.3%
4.0
3.0
0.0
7.0
Lead
20.0
35.5
55.0
30.6%
4.5
2.0
0.0
6.5
Lag
8.0
15.0
49.0
27.2%
4.0
3.0
0.0
7.0
Lead
None
40.1
0.22
0.85
73.7
0.0
73.7
E
None
17.1
0.10
0.93
105.3
0.0
105.3
F
91.6
F
186
#289
None
62.4
0.35
0.95
86.9
0.0
86.9
F
None
62.4
0.35
0.86
61.2
0.0
61.2
E
121.4
F
475
560
None
86.0
0.48
1.31
179.1
0.0
179.1
F
None C-Max
55.8
48.5
0.31
0.27
0.57
1.06
39.8 102.7
0.0
0.0
39.8 102.7
D
F
89.9
F
37
~684
63
#780
None
95.3
0.53
0.16
5.7
0.0
5.7
A
428
#652
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
845
1106
NA pm+ov
4
5
4
4
5
~1562
#1914
138
pm+pt
1
6
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
250
pm+pt
3
8
3
229
315
1.00
100%
2%
0
0%
46%
377
pm+pt
7
4
7
0
Yes
45
2270
34.4
1.00
100%
2%
0
430
1
1450
138
NA pm+ov
6
7
6
6
7
16
53
685
pm+pt
5
2
5
5.0
12.0
54.0
30.0%
4.0
3.0
0.0
7.0
Lead
1844
158
NA pm+ov
2
3
2
2
3
20.0
35.5
94.0
52.2%
4.5
2.0
0.0
6.5
Lag
8.0
42.0
56.0
31.1%
4.0
3.0
0.0
7.0
Lead
None C-Max
103.6
89.3
0.58
0.50
0.68
0.73
33.1
34.0
0.0
0.0
33.1
34.0
C
C
32.0
C
270
611
313
616
None
120.8
0.67
0.14
4.2
0.0
4.2
A
24
m26
Synchro 8 Report
Page 21
Lanes, Volumes, Timings
11: Reston Parkway & Sunrise Valley Dr
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
260
526
0
0
0
0.48
EBT
595
349
0
0
0
0.93
EBR
6/6/2013
WBL
155
410
0
0
0
0.92
WBT
339
987
0
0
0
0.86
WBR
NBL
220
846
0
0
0
1.31
435
245
0
0
0
0.56
NBT
2190
1370
0
0
0
1.06
NBR
SBL
415
903
0
0
0
0.15
720
1005
0
0
0
0.68
SBT
1128
2521
0
0
0
0.73
SBR
430
1303
0
0
0
0.12
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 149 (83%), Referenced to phase 2:SBTL and 6:NBTL, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.31
Intersection Signal Delay: 78.8
Intersection LOS: E
Intersection Capacity Utilization 125.8%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
11: Reston Parkway & Sunrise Valley Dr
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 22
Lanes, Volumes, Timings
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
577
1900
12
0
1900
12
0%
144
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1362
1900
12
0%
154
1900
12
0
1900
12
2368
1900
12
0%
870
1900
12
400
1
0
0
0
0
0
0
0
0
625
1
0
0
0
0
2
0
Yes
Yes
25
573
15.6
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
577
Prot
4
0
Yes
40
339
5.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
144
custom
0
0
Yes
45
662
10.0
1.00
100%
2%
0
1.00
100%
2%
0
45
160
2.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
1
0
1362
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
154
Free
0
2368
NA
2
4
4
4
6
2
2
2
7.0
13.5
28.0
15.6%
4.0
2.5
0.0
6.5
7.0
13.5
28.0
15.6%
4.0
2.5
0.0
6.5
20.0
26.5
152.0
84.4%
4.5
2.0
0.0
6.5
20.0
26.5
152.0
84.4%
4.5
2.0
0.0
6.5
20.0
26.5
152.0
84.4%
4.5
2.0
0.0
6.5
None
21.5
0.12
1.41
249.7
0.0
249.7
F
None
21.5
0.12
0.70
82.9
0.0
82.9
F
~469
#597
142
#231
C-Max
145.5
0.81
0.48
3.7
0.0
3.7
A
3.3
A
151
m143
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Free
870
Perm
180.0
1.00
0.10
0.0
0.0
0.0
A
0
m0
C-Max C-Max
145.5 145.5
0.81
0.81
0.83
0.61
9.4
1.1
0.2
0.4
9.6
1.5
A
A
7.4
A
290
0
m264
m0
Synchro 8 Report
Page 23
Lanes, Volumes, Timings
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
410
0
0
0
1.41
EBT
493
EBR
WBL
WBT
259
WBR
400
207
0
0
0
0.70
NBL
6/6/2013
NBT
582
2860
0
41
0
0.48
NBR
625
1583
0
0
0
0.10
SBL
SBT
80
SBR
2860
73
0
0
0.85
1433
168
0
0
0.69
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 64 (36%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.41
Intersection Signal Delay: 33.8
Intersection LOS: C
Intersection Capacity Utilization 90.7%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
12: Reston Parkway & EB Toll Rd Off-Ramp/EB Toll Rd On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 24
Lanes, Volumes, Timings
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
589
1900
12
0
1900
12
0%
654
1900
12
311
1900
12
1472
1900
12
0%
0
1900
12
0
1900
12
2350
1900
12
0%
773
1900
12
0
0
0
1
0
50
1
645
1
25
0
0
0
0
0
0
0
0
Yes
Yes
35
427
8.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
1052
28.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
415
NA
4
4
4
4
4
7.0
13.5
47.0
26.1%
4.0
2.5
0.0
6.5
7.0
13.5
47.0
26.1%
4.0
2.5
0.0
6.5
None
40.5
0.22
1.15
153.7
0.0
153.7
F
None
40.5
0.22
1.07
118.8
0.0
118.8
F
125.9
F
~526
#781
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
45
847
12.8
1.00
100%
2%
0
1.00
100%
2%
0
0%
26%
436
Split
4
~635
#880
Yes
45
649
9.8
1.00
100%
2%
0
40%
392
Perm
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
311
Prot
1
1472
NA
6
1
6
2
2
2
7.0
13.5
47.0
26.1%
4.0
2.5
0.0
6.5
5.0
12.0
44.0
24.4%
4.0
3.0
0.0
7.0
Lead
20.0
26.5
133.0
73.9%
4.5
2.0
0.0
6.5
20.0
26.5
89.0
49.4%
4.5
2.0
0.0
6.5
Lag
20.0
26.5
89.0
49.4%
4.5
2.0
0.0
6.5
Lag
None
40.5
0.22
1.01
102.5
0.0
102.5
F
None C-Max
34.2 126.5
0.19
0.70
0.93
0.59
116.7
17.0
0.0
0.4
116.7
17.4
F
B
34.7
C
373
575
#523 m538
~428
#677
0
0
2350
NA
2
773
Perm
C-Max C-Max
85.3
85.3
0.47
0.47
0.98
0.82
26.8
5.5
41.8
8.8
68.6
14.3
E
B
55.1
E
~902
70
m190
m0
Synchro 8 Report
Page 25
Lanes, Volumes, Timings
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
347
EBR
WBL
WBT
972
378
0
0
0
1.15
388
0
0
0
1.07
WBR
NBL
50
390
0
0
0
1.01
645
363
0
0
0
0.86
NBT
569
2487
447
0
0
0.72
6/6/2013
NBR
SBL
SBT
767
SBR
2408
317
0
0
1.12
942
143
0
0
0.97
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 48 (27%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 110
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.15
Intersection Signal Delay: 63.5
Intersection LOS: E
Intersection Capacity Utilization 104.7%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
13: Reston Parkway & WB Toll Rd On-Ramp/WB Toll Rd Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 26
Lanes, Volumes, Timings
14: Reston Parkway & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
259
1900
12
743
1900
12
0%
1163
1900
12
777
1900
12
880
1900
12
0%
621
1900
12
467
1900
12
1867
1900
12
0%
156
1900
12
313
1900
12
2063
1900
12
0%
94
1900
12
275
1
550
2
25
0
1
480
2
25
470
1
300
2
25
290
2
25
Yes
Yes
35
506
9.9
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
259
Prot
3
743
NA
8
3
8
6.0
13.0
23.0
12.8%
4.0
3.0
0.0
7.0
Lead
None
15.6
0.09
0.87
108.2
0.0
108.2
F
158
#235
Yes
35
569
11.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1163
Perm
777
Prot
7
880
NA
4
8
8
7
4
6.0
49.0
76.0
42.2%
4.0
3.0
0.0
7.0
Lag
6.0
49.0
76.0
42.2%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
29.0
16.1%
4.0
3.0
0.0
7.0
Lead
None
69.0
0.38
0.38
40.8
0.0
40.8
D
207.6
F
232
272
None
69.0
0.38
1.67
336.2
0.1
336.3
F
None
22.0
0.12
1.85
431.5
0.6
432.1
F
~1889
#2161
~714
#850
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
847
12.8
1.00
100%
2%
0
1.00
100%
2%
0
45
794
12.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
621
Perm
445
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
467
Prot
1
1867
NA
6
156
Perm
4
4
1
6
6
6
5
6.0
54.0
82.0
45.6%
4.0
3.0
0.0
7.0
Lag
6.0
54.0
82.0
45.6%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
21.0
11.7%
4.0
3.0
0.0
7.0
Lead
20.0
44.5
58.0
32.2%
4.5
2.0
0.0
6.5
Lag
20.0
44.5
58.0
32.2%
4.5
2.0
0.0
6.5
Lag
5.0
12.0
17.0
9.4%
4.0
3.0
0.0
7.0
Lead
None
75.4
0.42
0.59
42.6
0.0
42.6
D
176.1
F
423
495
None
75.4
0.42
0.83
45.2
0.0
45.2
D
None C-Max C-Max
14.0
51.5
51.5
0.08
0.29
0.29
1.75
1.28
0.29
391.8 172.3
6.7
0.0
0.0
0.0
391.8 172.3
6.7
F
F
A
203.1
F
519
~419 ~1027
25
712 m#505 m#1081
m49
313
Prot
5
2063
94
NA pm+ov
2
3
2
2
2
20.0
44.5
54.0
30.0%
4.5
2.0
0.0
6.5
Lag
6.0
13.0
23.0
12.8%
4.0
3.0
0.0
7.0
Lead
None C-Max
10.0
47.5
0.06
0.26
1.65
1.54
352.6 280.7
0.0
0.4
352.6 281.2
F
F
279.8
F
~273 ~1258
#380 #1321
None
69.6
0.39
0.14
6.6
0.0
6.6
A
33
m15
Synchro 8 Report
Page 27
Lanes, Volumes, Timings
14: Reston Parkway & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
305
0
0
0
0.85
EBT
426
1949
0
0
0
0.38
6/6/2013
EBR
WBL
275
698
0
8
0
1.69
550
419
0
27
0
1.98
WBT
489
WBR
NBL
1482
0
0
0
0.59
751
0
0
0
0.83
480
267
0
0
0
1.75
NBT
767
1454
0
0
0
1.28
NBR
SBL
470
543
0
0
0
0.29
300
190
0
0
0
1.65
SBT
714
1341
0
131
0
1.70
SBR
445
652
0
0
0
0.14
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 8 (4%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.85
Intersection Signal Delay: 217.7
Intersection LOS: F
Intersection Capacity Utilization 151.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
14: Reston Parkway & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 28
Lanes, Volumes, Timings
15: Reston Parkway & Bluemont Way/Stratford Park Pl
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
173
1900
12
10
1900
12
0%
690
1900
8
5
1900
12
10
1900
12
0%
10
1900
12
524
1900
12
2173
1900
12
0%
50
1900
12
51
1900
12
2100
1900
12
0%
101
1900
12
0
1
0
1
0
0
0
380
2
25
550
0
390
1
25
290
1
25
Yes
Yes
25
1182
32.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
173
pm+pt
7
4
7
348
NA
4
4
7.0
14.0
14.0
7.8%
4.0
3.0
0.0
7.0
Lead
4.0
49.0
49.0
27.2%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
36.0
20.0%
4.0
3.0
0.0
7.0
Lead
None
18.4
0.10
1.38
265.6
0.0
265.6
F
None
17.0
0.09
0.87
37.9
0.0
37.9
D
88.4
F
77
209
5
pm+pt
3
8
3
20
NA
8
Yes
45
794
12.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
49%
352
pm+ov
1
4
1
~263
#295
Yes
25
258
7.0
1.00
100%
2%
0
1.00
100%
2%
0
45
523
7.9
1.00
100%
2%
0
1.00
100%
2%
0
0%
2223
NA
6
8
1
6
5
5.0
12.0
12.0
6.7%
4.0
3.0
0.0
7.0
Lead
4.0
11.0
47.0
26.1%
4.0
3.0
0.0
7.0
Lag
10.0
17.0
36.0
20.0%
4.0
3.0
0.0
7.0
Lead
20.0
39.0
101.0
56.1%
5.0
2.0
0.0
7.0
Lag
4.0
11.0
18.0
10.0%
4.0
3.0
0.0
7.0
Lead
None
59.3
0.33
0.74
51.3
0.0
51.3
D
None
13.0
0.07
0.06
63.2
0.0
63.2
E
313
392
5
18
None
9.9
0.06
0.19
50.4
0.0
50.4
D
53.0
D
12
39
None C-Max
35.3 132.5
0.20
0.74
0.78
0.60
62.3
19.3
0.0
0.3
62.3
19.7
E
B
27.8
C
320
419
m288 m365
1.00
100%
2%
0
1.00
100%
2%
0
0%
524
Prot
1
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
285
1
0
51
Prot
5
2100
101
NA pm+ov
2
7
2
2
7
20.0
42.0
83.0
46.1%
5.0
2.0
0.0
7.0
Lag
7.0
14.0
14.0
7.8%
4.0
3.0
0.0
7.0
Lead
None C-Max
9.7 104.3
0.05
0.58
0.54
0.71
110.9
31.6
0.0
0.4
110.9
32.1
F
C
32.7
C
62
745
107 #1020
None
118.5
0.66
0.09
5.8
0.0
5.8
A
6
62
Synchro 8 Report
Page 29
Lanes, Volumes, Timings
15: Reston Parkway & Bluemont Way/Stratford Park Pl
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
290
125
0
0
0
1.38
EBT
1102
EBR
WBL
WBT
178
570
0
0
0
0.61
474
0
0
0
0.74
79
0
0
0
0.06
390
0
0
0
0.05
WBR
6/6/2013
NBL
380
673
0
0
0
0.78
NBT
714
3731
757
0
0
0.75
NBR
SBL
390
114
0
0
0
0.45
SBT
443
2947
365
0
0
0.81
SBR
285
1079
0
0
0
0.09
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 8 (4%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.38
Intersection Signal Delay: 38.7
Intersection LOS: D
Intersection Capacity Utilization 89.9%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
15: Reston Parkway & Bluemont Way/Stratford Park Pl
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 30
Lanes, Volumes, Timings
16: Reston Parkway & New Dominion Pkwy
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
441
1900
12
573
1900
12
0%
1014
1900
12
196
1900
12
245
1900
12
0%
295
1900
12
614
1900
12
1616
1900
12
0%
319
1900
12
300
1900
12
1342
1900
12
0%
124
1900
12
275
1
95
1
25
165
1
500
2
25
445
1
205
1
25
270
1
25
Yes
Yes
25
722
19.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
441
pm+pt
3
8
3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
573
1014
NA pm+ov
8
1
8
8
8
196
pm+pt
7
4
7
1.00
100%
2%
0
45
423
6.4
1.00
100%
2%
0
1.00
100%
2%
0
0%
245
295
NA pm+ov
4
5
4
4
4
5.0
12.0
67.0
37.2%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
40.0
22.2%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
14.0
7.8%
4.0
3.0
0.0
7.0
Lead
5.0
47.0
47.0
26.1%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
35.0
19.4%
4.0
3.0
0.0
7.0
Lead
None
74.0
0.41
1.05
97.9
0.0
97.9
F
None
60.0
0.33
0.49
49.4
0.0
49.4
D
86.2
F
284
346
None
100.0
0.56
1.12
101.9
0.0
101.9
F
None
47.0
0.26
0.79
71.7
0.0
71.7
E
None
75.0
0.42
0.41
24.3
0.0
24.3
C
~1333
#1603
153
#248
None
40.0
0.22
0.59
69.4
0.0
69.4
E
51.9
D
262
365
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
45
521
7.9
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lead
~438
#598
Yes
25
408
11.1
1.00
100%
2%
0
152
238
65
1
614
Prot
1
1
5.0
12.0
40.0
22.2%
4.0
3.0
0.0
7.0
Lead
1.00
100%
2%
0
1.00
100%
2%
0
0%
1616
319
NA pm+ov
6
7
6
6
6
300
Prot
5
5
1342
124
NA pm+ov
2
3
2
2
2
20.0
39.0
64.0
35.6%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
14.0
7.8%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
35.0
19.4%
4.0
3.0
0.0
7.0
Lead
20.0
47.0
59.0
32.8%
4.5
2.5
0.0
7.0
Lag
5.0
12.0
34.0
18.9%
4.0
3.0
0.0
7.0
Lead
None C-Max
33.0
57.0
0.18
0.32
0.98
1.00
95.5
79.4
0.0
35.9
95.5 115.2
F
F
99.3
F
370
~665
#511
#814
None
71.0
0.39
0.46
24.6
1.1
25.7
C
None C-Max
28.0
52.0
0.16
0.29
1.09
0.91
147.7
72.0
0.0
0.0
147.7
72.0
F
E
80.7
F
~397
565
#602
629
None
86.0
0.48
0.16
12.7
0.0
12.7
B
159
310
36
79
Synchro 8 Report
Page 31
Lanes, Volumes, Timings
16: Reston Parkway & New Dominion Pkwy
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
270
422
0
0
0
1.05
EBT
642
1179
0
0
0
0.49
EBR
WBL
275
909
0
0
0
1.12
95
249
0
0
0
0.79
6/6/2013
WBT
328
414
0
0
0
0.59
WBR
NBL
165
723
0
0
0
0.41
500
629
0
0
0
0.98
NBT
441
1610
263
0
0
1.20
NBR
SBL
445
690
179
0
0
0.62
205
275
0
0
0
1.09
SBT
343
1469
0
0
0
0.91
SBR
65
791
0
0
0
0.16
Intersection Summary
Area Type:
Other
Cycle Length: 180
Actuated Cycle Length: 180
Offset: 104 (58%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.12
Intersection Signal Delay: 86.0
Intersection LOS: F
Intersection Capacity Utilization 117.1%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
16: Reston Parkway & New Dominion Pkwy
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 32
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
WBT
WBR
SBL
SBR
962
1900
12
458
1900
12
0%
437
1900
12
0%
890
1900
12
1207
1900
12
0%
0
2
0
1289
1900
12
210
1
25
0
1
Yes
35
2307
44.9
35
621
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
962
Prot
1
458
NA
12
1
12
437
890
NA pm+ov
2
3
2
2
2
1.00
100%
2%
0
10.0
17.0
46.0
32.9%
4.0
3.0
0.0
7.0
Lead
None
39.0
0.28
1.01
80.5
0.0
80.5
F
~458
#604
15.0
39.0
41.0
29.3%
4.0
3.0
0.0
7.0
Lag
80.0
0.57
0.43
18.6
0.0
18.6
B
60.6
E
228
311
0
1
Yes
35
623
12.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
5.0
29.0
53.0
37.9%
4.0
3.0
0.0
7.0
1207
NA
3
Free
3
5.0
29.0
53.0
37.9%
4.0
3.0
0.0
7.0
None C-Max C-Max
34.0
87.0
46.0
0.24
0.62
0.33
0.97
0.90
1.07
87.0
36.6
81.9
0.0
0.0
5.0
87.0
36.6
87.0
F
D
F
53.2
48.2
D
D
397
657
~610
#612 #1002
#751
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1289
Free
140.0
1.00
0.81
11.9
0.0
11.9
B
239
286
Synchro 8 Report
Page 33
Lanes, Volumes, Timings
17: Sunrise Valley Dr & Wiehle Ave
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
956
0
0
0
1.01
6/6/2013
EBT
2227
WBT
541
WBR
SBL
543
SBR
1064
0
0
0
0.43
452
0
0
0
0.97
987
0
0
0
0.90
1127
13
0
0
1.08
1583
0
0
0
0.81
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 64 (46%), Referenced to phase 3:SBL, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.07
Intersection Signal Delay: 52.8
Intersection LOS: D
Intersection Capacity Utilization 102.4%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
17: Sunrise Valley Dr & Wiehle Ave
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 34
Lanes, Volumes, Timings
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
281
1900
12
0
1900
12
0%
561
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
1548
1900
12
0%
446
1900
12
522
1900
12
1944
1900
12
0%
0
1900
12
450
1
0
0
0
0
0
235
2
25
435
1
0
0
0
450
2
25
No
Yes
25
764
20.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
1.00
100%
2%
0
48%
292
Perm
297
NA
4
4
4
4
4
7.0
14.0
43.0
30.7%
4.0
3.0
0.0
7.0
7.0
14.0
43.0
30.7%
4.0
3.0
0.0
7.0
7.0
14.0
43.0
30.7%
4.0
3.0
0.0
7.0
None
33.3
0.24
0.33
44.8
0.0
44.8
D
None
33.3
0.24
0.91
82.3
0.0
82.3
F
66.3
E
300
#483
None
33.3
0.24
0.82
68.7
0.0
68.7
E
0
260
#387
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
623
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
10%
253
Split
4
102
145
Yes
25
553
15.1
1.00
100%
2%
0
1.00
100%
2%
0
35
572
11.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
1548
NA
6
1.00
100%
2%
0
1.00
100%
2%
0
0%
446
Perm
522
Prot
5
1944
NA
2
6
6
6
5
2
15.0
22.0
54.0
38.6%
4.0
3.0
0.0
7.0
Lag
15.0
22.0
54.0
38.6%
4.0
3.0
0.0
7.0
Lag
7.0
14.0
43.0
30.7%
4.0
3.0
0.0
7.0
Lead
15.0
22.0
97.0
69.3%
4.0
3.0
0.0
7.0
C-Max C-Max
58.9
58.9
0.42
0.42
0.49
0.48
22.1
1.0
0.0
0.2
22.1
1.1
C
A
17.4
B
187
0
m202
m0
0
None C-Max
26.8
92.7
0.19
0.66
0.79
0.58
67.7
19.4
0.0
1.2
67.7
20.6
E
C
30.6
C
260
423
319
528
Synchro 8 Report
Page 35
Lanes, Volumes, Timings
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
450
828
0
0
0
0.31
EBT
684
354
0
0
0
0.84
EBR
WBL
WBT
473
WBR
NBL
450
386
0
0
0
0.76
NBT
543
3171
0
0
0
0.49
6/6/2013
NBR
SBL
SBT
492
435
923
81
0
0
0.53
882
0
0
0
0.59
3365
1099
226
0
0.86
SBR
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 120 (86%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.91
Intersection Signal Delay: 31.3
Intersection LOS: C
Intersection Capacity Utilization 87.7%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
18: Wiehle Ave & Dulles Toll Rd (E) Off-Ramp/Dulles Toll Rd (E) On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 36
Lanes, Volumes, Timings
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
712
1900
12
0
1900
12
0%
570
1900
12
440
1900
12
1101
1900
12
0%
0
1900
12
0
1900
12
2157
1900
12
0%
539
1900
12
0
0
0
1
0
0
1
0
2
0
0
0
250
2
25
0
0
0
Yes
No
35
627
12.2
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
432
11.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
428
NA
4
4
4
4
4
5.0
11.5
52.0
37.1%
4.0
2.5
0.0
6.5
5.0
11.5
52.0
37.1%
4.0
2.5
0.0
6.5
5.0
11.5
52.0
37.1%
4.0
2.5
0.0
6.5
None
42.8
0.31
0.87
64.3
1.1
65.4
E
None
42.8
0.31
0.90
69.8
1.7
71.4
E
67.9
E
398
#601
None
42.8
0.31
0.88
67.0
0.0
67.0
E
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
1.00
100%
2%
0
35
387
7.5
1.00
100%
2%
0
1.00
100%
2%
0
0%
37%
449
Split
4
396
#576
Yes
35
572
11.1
1.00
100%
2%
0
29%
405
Perm
358
#540
0
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
440
Prot
1
1101
NA
6
1
6
2
2
2
5.0
12.0
32.0
22.9%
4.0
3.0
0.0
7.0
Lead
15.0
21.0
88.0
62.9%
4.0
2.0
0.0
6.0
15.0
21.0
56.0
40.0%
4.0
2.0
0.0
6.0
Lag
15.0
21.0
56.0
40.0%
4.0
2.0
0.0
6.0
Lag
None C-Max
21.7
84.7
0.16
0.60
0.83
0.36
99.2
8.8
0.0
0.0
99.2
8.8
F
A
34.6
C
177
66
263
79
0
0
2157
NA
2
539
Perm
C-Max C-Max
55.9
55.9
0.40
0.40
0.72
0.60
28.8
6.9
0.9
0.6
29.8
7.5
C
A
25.3
C
407
161
467
206
Synchro 8 Report
Page 37
Lanes, Volumes, Timings
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
547
EBR
WBL
WBT
352
WBR
NBL
NBT
492
546
0
19
0
0.85
503
0
18
0
0.88
488
0
0
0
0.83
613
0
0
0
0.72
3075
0
0
0
0.36
NBR
6/6/2013
SBL
SBT
307
SBR
3014
528
0
0
0.87
899
116
0
0
0.69
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 0 (0%), Referenced to phase 2:SBT and 6:NBT, Start of Yellow
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.90
Intersection Signal Delay: 37.8
Intersection LOS: D
Intersection Capacity Utilization 87.7%
ICU Level of Service E
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
19: Wiehle Ave & Dulles Toll Rd (W) On-Ramp/Dulles Toll Rd (W) Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 38
Lanes, Volumes, Timings
20: Wiehle Ave & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
717
1900
12
816
1900
12
0%
1755
1900
12
586
1900
12
555
1900
12
0%
431
1900
12
627
1900
12
1522
1900
12
0%
179
1900
12
119
1900
12
807
1900
12
0%
166
1900
12
385
1
477
1
25
0
1
320
2
25
0
1
250
1
25
442
1
25
Yes
Yes
35
1259
24.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
816
1755
NA pm+ov
4
1
4
4
4
49%
299
pm+pt
3
8
3
0%
717
pm+pt
7
4
7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
842
NA
8
1.00
100%
2%
0
35
619
12.1
1.00
100%
2%
0
1.00
100%
2%
0
0%
431
Perm
627
Prot
1
8
8
8
1
5.0
12.0
16.0
11.4%
4.0
3.0
0.0
7.0
Lead
8.0
51.0
71.0
50.7%
4.0
3.0
0.0
7.0
Lag
5.0
12.0
16.0
11.4%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
0.0
7.0
Lead
8.0
40.0
68.0
48.6%
4.0
3.0
0.0
7.0
Lag
8.0
40.0
68.0
48.6%
4.0
3.0
0.0
7.0
Lag
None
72.0
0.51
2.06
508.2
0.0
508.2
F
None
64.0
0.46
0.50
28.2
0.0
28.2
C
341.4
F
271
331
None
80.0
0.57
1.87
418.8
0.0
418.8
F
None
66.0
0.47
1.18
142.4
0.0
142.4
F
None
61.0
0.44
0.56
23.1
0.0
23.1
C
~2420
#2686
~216
#421
None
66.0
0.47
1.08dl
46.3
0.0
46.3
D
58.2
E
249
#340
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
35
540
10.5
5.0
12.0
15.0
10.7%
4.0
3.0
0.0
7.0
Lead
~1026
#1270
Yes
35
976
19.0
1.00
100%
2%
0
201
310
120
1
1.00
100%
2%
0
1.00
100%
2%
0
0%
1522
179
NA pm+ov
6
3
6
6
6
119
pm+pt
5
2
5
973
NA
2
15.0
33.0
41.0
29.3%
4.0
2.0
0.0
6.0
Lag
2
15.0
38.0
45.0
32.1%
4.0
2.0
0.0
6.0
Lag
5.0
12.0
12.0
8.6%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
12.0
8.6%
4.0
3.0
0.0
7.0
Lead
None C-Max
9.0
39.0
0.06
0.28
2.85
1.55
866.1 281.8
0.0
0.0
866.1 281.8
F
F
418.1
F
~505 ~1033
#621 #1174
None
50.0
0.36
0.29
8.1
0.0
8.1
A
None C-Max
39.0
35.0
0.28
0.25
1.04
0.77
134.3
52.1
0.0
0.0
134.3
52.1
F
D
61.1
E
~79
295
#197
350
39
77
0
Synchro 8 Report
Page 39
Lanes, Volumes, Timings
20: Wiehle Ave & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
442
348
0
0
0
2.06
EBT
1179
1617
0
0
0
0.50
6/6/2013
EBR
WBL
385
938
0
0
0
1.87
477
254
0
0
0
1.18
WBT
896
WBR
NBL
924
0
0
0
0.91
764
0
0
0
0.56
320
220
0
0
0
2.85
NBT
460
NBR
SBL
985
2
0
0
1.55
628
0
0
0
0.29
250
114
0
0
0
1.04
SBT
539
SBR
1260
0
0
0
0.77
Intersection Summary
Area Type:
Other
Cycle Length: 140
Actuated Cycle Length: 140
Offset: 128 (91%), Referenced to phase 2:SBTL and 6:NBT, Start of Yellow
Natural Cycle: 145
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.85
Intersection Signal Delay: 272.2
Intersection LOS: F
Intersection Capacity Utilization 166.2%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
dl Defacto Left Lane. Recode with 1 though lane as a left lane.
Splits and Phases:
20: Wiehle Ave & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 40
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
633
1900
12
223
1900
12
0%
559
1900
12
0
1900
12
55
1900
12
0%
55
1900
12
252
1900
12
566
1900
12
0%
0
1900
12
214
1900
12
641
1900
12
0%
481
1900
12
0
0
0
1
0
670
0
0
1
0
0
0
300
1
0
430
1
25
Yes
Yes
35
3015
58.7
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
633
Prot
5
782
NA
2
5
2
5.0
12.0
33.0
26.2%
4.0
3.0
0.0
7.0
Lead
None
25.3
0.20
0.92
68.9
0.0
68.9
E
261
#362
Yes
35
879
17.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Perm
110
NA
6
6
6
6
15.0
22.0
56.0
44.4%
4.0
3.0
0.0
7.0
15.0
22.0
23.0
18.3%
4.0
3.0
0.0
7.0
Lag
None
49.0
0.39
1.09
92.2
0.0
92.2
F
81.8
F
~656
#902
None
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Yes
30
206
4.7
1.00
100%
2%
0
1.00
100%
2%
0
35
1671
32.6
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
220
0
252
Perm
566
NA
8
1.00
100%
2%
0
0%
0
214
Split
4
1122
NA
4
8
8
8
4
4
15.0
22.0
23.0
18.3%
4.0
3.0
0.0
7.0
Lag
5.0
21.0
37.0
29.4%
4.0
1.0
0.0
5.0
5.0
21.0
37.0
29.4%
4.0
1.0
0.0
5.0
7.0
14.0
33.0
26.2%
4.0
3.0
0.0
7.0
7.0
14.0
33.0
26.2%
4.0
3.0
0.0
7.0
None
16.7
0.13
0.23
27.3
0.0
27.3
C
27.3
C
21
50
None
32.0
0.25
2.10
547.8
0.0
547.8
F
None
32.0
0.25
0.63
45.4
0.0
45.4
D
200.2
F
216
279
C-Max C-Max
26.0
26.0
0.21
0.21
0.59
1.42
52.6 229.6
0.0
0.0
52.6 229.6
D
F
201.2
F
159
~603
245
#742
~325
#497
1.00
100%
2%
0
0
Synchro 8 Report
Page 41
Lanes, Volumes, Timings
21: Sunrise Valley Dr & Hunter Mill Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
430
708
0
0
0
0.89
EBT
2935
EBR
6/6/2013
WBL
718
0
0
0
1.09
WBT
799
WBR
481
0
0
0
0.23
NBL
NBT
126
120
0
0
0
2.10
898
0
0
0
0.63
NBR
SBL
300
365
0
0
0
0.59
SBT
1591
SBR
790
0
0
0
1.42
Intersection Summary
Area Type:
Other
Cycle Length: 126
Actuated Cycle Length: 126
Offset: 0 (0%), Referenced to phase 4:SBTL, Start of Yellow
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 2.10
Intersection Signal Delay: 149.8
Intersection LOS: F
Intersection Capacity Utilization 109.0%
ICU Level of Service H
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases:
21: Sunrise Valley Dr & Hunter Mill Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 42
Lanes, Volumes, Timings
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
125
1900
12
0
1900
12
0%
300
1900
12
0
1900
12
0
1900
12
0%
0
1900
12
0
1900
12
662
1900
12
0%
265
1900
12
164
1900
12
1149
1900
12
0%
0
1900
12
65
1
0
0
0
0
0
0
0
0
0
1
206
1
25
0
1
0
Yes
Yes
35
693
13.5
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
125
Prot
4
0
Yes
25
406
11.1
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
300
custom
4
4
4
5.0
10.5
17.4
17.4%
4.0
1.5
0.0
5.5
5.0
10.5
17.4
17.4%
4.0
1.5
0.0
5.5
None
11.7
0.12
0.61
55.1
0.0
55.1
E
None
11.7
0.12
0.94
60.4
0.0
60.4
E
77
#139
96
#260
0
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
1671
32.6
1.00
100%
2%
0
1.00
100%
2%
0
35
447
8.7
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
0
0
662
NA
2
1.00
100%
2%
0
1.00
100%
2%
0
0%
265
Perm
164
Prot
1
1149
NA
6
2
2
2
1
6
20.0
26.0
62.2
62.2%
4.0
2.0
0.0
6.0
Lag
20.0
26.0
62.2
62.2%
4.0
2.0
0.0
6.0
Lag
5.0
11.5
20.4
20.4%
4.0
2.5
0.0
6.5
Lead
20.0
26.0
82.6
82.6%
4.0
2.0
0.0
6.0
C-Max C-Max
58.0
58.0
0.58
0.58
0.61
0.26
17.3
2.0
0.0
0.0
17.3
2.0
B
A
12.9
B
270
0
388
34
0
None C-Max
12.4
76.8
0.12
0.77
0.75
0.42
34.7
4.3
0.0
1.2
34.7
5.5
C
A
9.1
A
106
123
m122
m72
Synchro 8 Report
Page 43
Lanes, Volumes, Timings
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
210
0
0
0
0.60
EBT
613
EBR
WBL
WBT
326
WBR
65
322
0
0
0
0.93
NBL
6/6/2013
NBT
1591
NBR
SBL
1079
0
0
0
0.61
1028
0
0
0
0.26
206
246
0
0
0
0.67
SBT
367
SBR
2718
1248
0
0
0.78
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 8 (8%), Referenced to phase 2:NBT and 6:SBT, Start of Yellow
Natural Cycle: 65
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.94
Intersection Signal Delay: 18.4
Intersection LOS: B
Intersection Capacity Utilization 133.5%
ICU Level of Service H
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
22: Hunter Mill Rd & Dulles Toll Rd EB Off-Ramp/Dulles Toll Rd EB On-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 44
Lanes, Volumes, Timings
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
1900
12
0
1900
12
0%
0
1900
12
735
1900
12
0
1900
12
0%
294
1900
12
279
1900
12
975
1900
12
0%
0
1900
12
0
1900
12
651
1900
12
0%
140
1900
12
0
0
0
1
0
0
1
120
1
25
0
0
0
0
0
0
0
0
Yes
Yes
35
452
8.8
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
Yes
25
854
23.3
1.00
100%
2%
0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
735
Prot
4
1.00
100%
2%
0
35
218
4.2
1.00
100%
2%
0
1.00
100%
2%
0
0%
4
4
4
279
pm+pt
1
6
1
5.0
11.0
33.0
33.0%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
33.0
33.0%
4.0
2.0
0.0
6.0
Lag
5.0
11.0
13.0
13.0%
4.0
2.0
0.0
6.0
Lead
None
27.0
0.27
1.54
282.7
0.0
282.7
F
None
27.0
0.27
0.50
12.1
0.2
12.2
B
~662
#886
38
114
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
0
Yes
35
447
8.7
1.00
100%
2%
0
294
custom
0
1
975
NA
6
10.0
16.0
42.0
42.0%
4.0
2.0
0.0
6.0
6
None C-Max
36.0
36.0
0.36
0.36
1.41
0.77
228.3
28.4
0.0
2.1
228.3
30.5
F
C
74.5
E
~104
211
#120
172
1.00
100%
2%
0
1.00
100%
2%
0
0%
0
0
651
NA
23
23
48.0
0.48
0.73
14.7
30.0
44.6
D
37.0
D
221
m226
140
Perm
23
23
48.0
0.48
0.17
0.2
1.1
1.4
A
0
m1
Synchro 8 Report
Page 45
Lanes, Volumes, Timings
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
EBT
372
EBR
WBL
477
0
0
0
1.54
WBT
774
WBR
NBL
585
0
29
0
0.53
120
198
0
0
0
1.41
NBT
367
1274
170
131
0
0.88
NBR
SBL
6/6/2013
SBT
138
SBR
894
269
0
0
1.04
832
508
0
0
0.43
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 16 (16%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.54
Intersection Signal Delay: 108.7
Intersection LOS: F
Intersection Capacity Utilization 103.8%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
23: Hunter Mill Rd & Dulles Toll Rd WB On-Ramp/Dulles Toll Rd WB Off-Ramp
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 47
Lanes, Volumes, Timings
24: Hunter Mill Rd & Sunset Hills Rd
Lane Group
Lane Configurations
Volume (vph)
Ideal Flow (vphpl)
Lane Width (ft)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Right Turn on Red
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Confl. Peds. (#/hr)
Confl. Bikes (#/hr)
Peak Hour Factor
Growth Factor
Heavy Vehicles (%)
Bus Blockages (#/hr)
Parking (#/hr)
Mid-Block Traffic (%)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
6/6/2013
EBL
EBR
NBL
NBT
SBT
SBR
412
1900
12
0%
0
1
0
582
1900
12
341
1900
12
776
1900
12
0%
548
1900
12
0%
286
1900
12
370
1
0
2
0
1.00
100%
2%
0
582
Perm
?
1
4
6
5.0
11.0
13.0
13%
4.0
2.0
5.0
11.0
33.0
33%
4.0
2.0
10.0
16.0
42.0
42%
4.0
2.0
Lead
Lag
Yes
35
218
4.2
35
772
15.0
1.00
100%
2%
0
1.00
100%
2%
0
0%
0%
341
Prot
14
776
NA
124
834
NA
2
14
124
2
1.00
100%
2%
0
0%
412
NA
3
?
230
0
Yes
35
385
7.5
1.00
100%
2%
0
?
3
3
3
5.0
12.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
5.0
12.0
25.0
25.0%
4.0
3.0
0.0
7.0
Lead
None
18.0
0.18
1.30
189.6
0.0
189.6
F
85.4
F
~337
#523
None
18.0
0.18
0.76
10.8
0.8
11.6
B
40.0
0.40
0.25
39.4
2.5
41.9
D
0
109
94
m123
10.0
16.0
29.0
29.0%
4.0
2.0
0.0
6.0
Lag
69.0
0.69
0.60
10.4
1.4
11.8
B
21.0
C
165
223
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
C-Max
23.0
0.23
0.99
65.1
36.2
101.3
F
101.3
F
255
#390
1.00
100%
2%
0
0
None
None C-Max
Synchro 8 Report
Page 49
Lanes, Volumes, Timings
24: Hunter Mill Rd & Sunset Hills Rd
Lane Group
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
305
318
0
0
0
1.30
6/6/2013
EBR
NBL
NBT
138
SBT
692
370
762
0
42
0
0.81
1373
892
0
0
0.71
1285
304
0
0
0.79
839
0
96
0
1.12
SBR
?
?
?
Intersection Summary
Area Type:
Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 16 (16%), Referenced to phase 2:SBT and 6:NBTL, Start of Yellow
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.54
Intersection Signal Delay: 65.5
Intersection LOS: E
Intersection Capacity Utilization 74.5%
ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
m Volume for 95th percentile queue is metered by upstream signal.
Splits and Phases:
24: Hunter Mill Rd & Sunset Hills Rd
DSN - 606 Construction Timing 12:00 pm 8/17/2004 AM Retimed
DLM
Synchro 8 Report
Page 50
Appendix – Attachment #5
Transit Development Plan
Recommendations
Fly UP