ST Aerospace – International C-130 Modernization Program Presenter Aik Hoong, Goh
by user
Comments
Transcript
ST Aerospace – International C-130 Modernization Program Presenter Aik Hoong, Goh
ST Aerospace – International C-130 Modernization Program Presenter Aik Hoong, Goh Vice-President Military Business aerospace land systems electronics marine s$2.0B 8,300 staff s$1.5B 7,100 staff s$1.6B 5,300 staff s$1.0B 2,300 staff C-130/L-382 Customers Maintenance, refurbishment, modification & customization of commercial and military aircraft Military C-130 Commercial Aircraft Commercial L-382 C-130/L382 Center of Excellence Component Overhaul > 35,000 C-130 components to-date T56 Engine Overhaul 1,180 of T56-A-15; 45 of T56-A-7 to-date Airframe support > 500 of L382/C-130 aircraft serviced to-date C-130 Customization & Design Parts Support Landing Gear Support Royal Air Force of Oman Royal Air Force of Oman selects ST Aerospace for C-130 DLM & Enhanced Avionics Upgrade Challenging Program Schedule • Contract awarded in Dec 2012 • Aircraft survey and Logistic Planning Conference in Nov 2012 • System Design Review in Feb 2013 • Aircraft Installation Design Review in Apr 2013 • Aircraft input for DLM and avionics upgrade on 9 July 2013 • First upgraded C-130 to be redelivered in Dec 2013 Main Instrument Panel Royal Air Force of Oman Enhanced Avionics Upgrade Display & Warnings DCP IHC IHC IHC Mainly ARINC429 Databus System Management ARINC429 Ethernet Switch # 1 & 2 IMFD PFD EIDs IMFD PFD PFD/IMFD ARINC429 / ARINC453 ARINC429 Caution Warning Panel Mainly ARINC429 Databus Engine Data Concentrator Unit Pilot, Copilot, Navigator CDU-7000E Tone Generator Flight Control & Navigation AHS-3000A #1 FDU & #2 Auto Pilot Panel FDU ECU EGPWS Mk VII Air Data Computer ADC-86A # 1 & #2 TOTAL TEMP. PROBE Mode Select Panels GPS Ant # 1 & #2 Safety Surveillance ARP-851 #1 & #2 Auto Pilot Computer ECU Aileron, Rudder, Elevator Servos TTR-921 TCAS GPS-4000S # 1 & #2 TDR-94D Mode S Transponder WXR-2100 WEATHER RADAR Digital Map Generator ALT- 4000 R/T #1 & #2 Analog NAV-4000 #1 & #2 Electrical ANT-52 TX/RX Antennas DME-442 #1 & #2 Standby Instruments & Chronometer MAG-3000 ADC-4000 Magnetometer 350A TRU 18:43 1:43:07 LT Communication Digital ICS DF-301 Analog Expanded Control Audio Panels (EXCAPs) Radio #1 & 2 RCU Matching Unit #1 & 2 Detachable Configuration Module (DCM) GH-3900 Indicator U T C Analog U T C 18:43 1:43:07 LT U T C 18:43 1:43:07 LT Chronometer Interphone Stations Interface Control Unit Antenna #1 & 2 RT8200 Radio #1 & #2 Full NVG Compatible Interior Lighting Cockpit Instrument Panel MIL-STD-3009 NVIS Interior Lighting kits Navigator Station Panel Pilot Side Shelf Co-Pilot Side Shelf Center Console NVIS Friendly/IR Covert Exterior Lighting Formation Light Taxi Light Anti-Collision Light Landing Light Wing Tip nav Light Formation Light Tail Lights Wing tip Nav Light Anti-Collision Light Nav Light Landing Light Taxi Light First Aircraft Arrival – 9 July 2013 Receiving & Removal Concurrent DLM and Avionic Upgrade Works AIRCRAFT NO. : 501 WORKFLOW WEEKS 1 Receiving checks, engine-run, defueling, weighing & shoring ( 2 days) X 2 3 4 5 X Paint stripping and flight-control cleaning X Removal of components, fuselage interior, landing gears & control surfaces X Inspection shake of wings & engines, fuselage, landing gears & empennage X X X Access opening & removal of legacy avionics system, wiring & bracket X X X Concurrent Activities Removal of Legacy Installation Modernization Built-up Transformation Realized Overcoming Key Challenges Enhanced & Expanded Avionics Upgrade Scope – includes digital intercomms system, digital hydraulic display, digital trim tab display, digital moving map, etc Short Aircraft Mod Time – expeditious upgrade within 4 months from induction to redelivery for avionics upgrade - Optimized DLM & upgrade work processes (KAIZEN) - Work extended hours & very close liaison with RAFO Equipment & mod kits – export control & delivery lead time - Dual mod kits suppliers - Use of common parts - Close tracking of export control approvals Impartation of detailed knowledge to equip RAFO team for operation Key Success Factors ST Aerospace’s ability to be on schedule and is attributed to the following factors: – Objective driven team – Active participation from RAFO – Highly committed OEMs and subcontractors One stop center for C-130 Thank you ST Aerospace is keen to share in-depth our C-130 solutions with you. Please visit us at Booth 58 or contact us through email: [email protected] [email protected] [email protected] Welcoming you to Singapore