Super Grid in Northeast Asia Results of Feasibility Study on The 3
by user
Comments
Transcript
Super Grid in Northeast Asia Results of Feasibility Study on The 3
Results of Feasibility Study on Super Grid in Northeast Asia The 3rd Northeast Asia Energy Security Forum 17 December, 2015 Jinsoo Song Distinguished Professor, Silla University International Consortium of Super Grid Korean Consortium for Super Grid in NEA Climate‐Energy convergence Forum Concept of Super Grid in Northeast Asia Wind Photovoltaic Hydro Biomass Participating Countries : Korea, China, Mongolia, (Japan) Core Technologies Large Scale RE power generation in Gobi desert ESS, WAMS, HVDC Electricity transmission through connected grid to neighboring country Experiences Domestic Installation 1980 1990 2010 2000 Collaborative Projects in Northeast Asia 2002 : Vietnam (HCM City) 2003 : Mongolia (Gobi Desert) 2004 : China(Tibet) Agreements for Int’l Consortium 27‐28th November, 2012 (Jeju,Korea) 6th November, 2012 (Ulaanbaatar, Mongolia) MOU for Feasibility study on Super Grid Korea-Mongolia(August 2014) Korea-China(September 2014) 8 Job description for Super Grid in Northeast Asia Korea Japan hybridization & integration China HVDC & construction Mongolia maintenance & operation Int’l Consortium: KCSG, MSASG, CRES Nat’l Consortium: KEPCO, KT, KIER, KSNRE, Universities & Industries 1st International Joint Workshop 25-26 June, 2015 Mongolia National University Ulaanbaatar, Mongolia 2nd International Joint Workshop & Round Table Discussion 5-7 November, 2015 Lotte Hotel, Jeju, Korea Grand Hotel, Busan, Korea Progress of Feasibility Study Analysis of Status - Technologies, Transmission Site Selection - Candidates for FT & Demonstration, Super Grid in Gobi desert On-site Survey - Meteorological, Geological & Topographical survey Basic Design - Lay out of FT & Demonstration site for the next stage Expectations -Technology, Economy, Socio-Environment Candidate Sites for Demonstration & Construction Site #1: 42°38'54.84“N/107°18'7.82"E (Umnugovi province, Khanbogd Soum) Site #2: 44°28'4.98“N/111° 7'9.07"E (Dornogovi province, ErdeneSoum) Site #3: 46°22'8.54“N/108°22'16.32"E (Govisumber province, Choir Soum) Layout of Demonstration Site Dron & 3D Graphic Images 풀렌더파일_ Milestone with Action plan 2015 1st Feasibility Study 2020 2nd 2030 3rd Engineering/Procurement/ FieldTest/ Demonstration 4th Deployment Construction(EPC) 1st Phase(2014-2015) : Feasibility Study • Selection of candidate sites • Meteorological & topographical survey • Basic design for the next phase 2nd Phase(2016-2020) : Field Test/Demonstration • Test-bed construction, performance test • Master plan completion 3rd Phase(2021-2030) : Engineering/Procurement/Construction(EPC) • Financing & scale-up construction • Operation & maintenance 4th Phase(2031- ) : Deployment • Extension to Asia, Africa & America, and finally to Global Grid Conceptual Image of Super Grid Electrical Transmission to Neighboring Countries Conclusion After successful feasibility study, discuss with participating countries about construction of field test & demonstration site and Super Grid as next stages Strongly recommend to each Governments for political decision and financial support Cooperate with other countries and organization to realize the dream project based on trust and consensus