Super Grid in Northeast Asia Results of Feasibility Study on The 3
Results of Feasibility Study on
Super Grid in Northeast Asia
The 3rd Northeast Asia Energy Security Forum
17 December, 2015
Jinsoo Song
Distinguished Professor, Silla University
International Consortium of Super Grid
Korean Consortium for Super Grid in NEA
Climate‐Energy convergence Forum
Concept of Super Grid in Northeast Asia
Wind
Photovoltaic
Hydro
Biomass
Participating Countries : Korea, China, Mongolia, (Japan)
Core Technologies
Large Scale RE power generation in Gobi desert
ESS, WAMS, HVDC
Electricity transmission through connected grid to neighboring country
Experiences Domestic Installation
1980
1990
2010
2000
Collaborative Projects in Northeast Asia
2002 : Vietnam (HCM City)
2003 : Mongolia (Gobi Desert)
2004 : China(Tibet)
Agreements for Int’l Consortium
27‐28th November, 2012 (Jeju,Korea)
6th November, 2012 (Ulaanbaatar, Mongolia)
MOU for Feasibility study on Super Grid Korea-Mongolia(August 2014)
Korea-China(September 2014)
8
Job description for Super Grid in Northeast Asia
Korea
Japan
hybridization & integration
China
HVDC & construction
Mongolia
maintenance &
operation
Int’l Consortium: KCSG, MSASG, CRES
Nat’l Consortium: KEPCO, KT, KIER, KSNRE, Universities & Industries
1st International Joint Workshop
25-26 June, 2015
Mongolia National University
Ulaanbaatar, Mongolia
2nd International Joint Workshop & Round Table Discussion
5-7 November, 2015
Lotte Hotel, Jeju, Korea
Grand Hotel, Busan, Korea
Progress of Feasibility Study
Analysis of Status
- Technologies, Transmission
Site Selection
- Candidates for FT & Demonstration, Super Grid in Gobi desert
On-site Survey
- Meteorological, Geological & Topographical survey
Basic Design
- Lay out of FT & Demonstration site for the next stage
Expectations
-Technology, Economy, Socio-Environment
Candidate Sites for Demonstration & Construction
Site #1: 42°38'54.84“N/107°18'7.82"E (Umnugovi province, Khanbogd Soum)
Site #2: 44°28'4.98“N/111° 7'9.07"E (Dornogovi province, ErdeneSoum)
Site #3: 46°22'8.54“N/108°22'16.32"E (Govisumber province, Choir Soum)
Layout of Demonstration Site
Dron & 3D Graphic Images
풀렌더파일_
Milestone with Action plan
2015
1st
Feasibility
Study
2020
2nd
2030
3rd
Engineering/Procurement/
FieldTest/
Demonstration
4th
Deployment
Construction(EPC)

1st Phase(2014-2015) : Feasibility Study
•
Selection of candidate sites
•
Meteorological & topographical survey
•
Basic design for the next phase

2nd Phase(2016-2020) : Field Test/Demonstration
•
Test-bed construction, performance test
•
Master plan completion

3rd Phase(2021-2030) : Engineering/Procurement/Construction(EPC)
•
Financing & scale-up construction
•
Operation & maintenance

4th Phase(2031-
) : Deployment
•
Extension to Asia, Africa & America, and finally to Global Grid
Conceptual Image of Super Grid
Electrical Transmission to Neighboring Countries
Conclusion
After successful feasibility study, discuss with participating
countries about construction of field test & demonstration
site and Super Grid as next stages
Strongly recommend to each Governments for political
decision and financial support
Cooperate with other countries and organization to realize
the dream project based on trust and consensus