Comments
Description
Transcript
FDOT DESIGN STANDARDS FY 2012/2013
Provide one (1) " vent hole »¿(near Pile) on two (2) opp Antenna (centered faces of pile over Top Gauge) Prestressing Strands B (Strand pattern varies) Tip of Head Pile of Pile Void (Typical for 30" Tip Gauge B and larger piles) D D/2 A Top Gauge 2D Min. 2D Min. 1’-0" 2D ELEVATION D Antenna Attach Tip Gauge extension cable to underside of strand one down 10" from top corner strand using nylon D wire ties every 6 Ft. maximum. 3" D/2 3" Cover (Typ.) Void Tip Gauge Top Gauge ANTENNA TOP VIEW SECTION A-A Face of (Strand Pattern with odd number of strands per face) Concrete D/2 " D Antenna Dataport Interface SECTION B-B Attach Tip Gauge extension cable (Showing Voided Pile, to underside of strand one down Solid Pile Similar) Cable (to radio Bottom surfaces of enclosure to module assembly) be epoxy coated just prior to concrete casting per manufacturer’s from top corner strand using nylon installation procedures. wire ties every 6 Ft. maximum. D C: \d\projects\standards\structures\current\ready4release\2012book_draft\20602-1of1. dgn A ANTENNA SIDE VIEW ANTENNA END VIEW D/2 rd960rh 3" Cover (Typ.) NOTE: Provide EDC Instrumentation in square 11: 50: 55 AM prestressed concrete piles (18" and larger) Tip Gauge in accordance with Specification Section 455 Top Gauge for bridge foundations. SECTION A-A LAST REVISION 01/01/12 REVISIO N 12/30/2011 (Strand Pattern with even number of strands per face) DESCRIPTION: INDEX FDOT DESIGN STANDARDS EDC INSTRUMENTATION FOR FY 2012/2013 SQUARE PRESTRESSED CONCRETE PILES NO. 20602 SHEET NO. 1