Comments
Transcript
Open Joint Coping Gutter Line Bridge Deck
** b" Intermediate * Deck Expansion Joint Open Joint * See Structures Plans Superstructure Coping and Approach Slab Sheets for actual dimensions and joint orientation. Provide open Railing Joints at Deck Expansion Joint locations matching the dimension of the Deck Joint. See Sheets 6 and 7 for details at Skewed Deck Joints. Gutter Line Bridge Deck PLAN OF RAILING ON BRIDGE DECK (WITHOUT SIDEWALK SHOWN, WITH SIDEWALK SIMILAR) Approach Slab (APPROACH SLAB WITHOUT GUARDRAIL WITH OR WITHOUT SIDEWALK SIMILAR) »¿ Expansion Joint at End Bent, or Superstru Support (where Deck is not Continuous) (Reinforcing Steel Not Shown For Clarity) 4b" – spacing, »¿ Superstructure Support (Continuous number varies, Spacing Bars 4S1, 4V1 & 7P1 »¿ Interior permitted in Rail) (Typ.) »¿ 3" 4b" – spacing, number »¿ Interior Post (Construction and Intermediate Joint 5 sp. Min. varies, 5 sp. Min. »¿ 5 sp. @ 5 sp. @ 5 sp. @ 4b" – 4b" – 4b" – 5 sp. @ 3" Spacing Bars 4S1, 4V1 & 7P1 or 7P2 (As Shown) 6 sp. @ 11b" – (Typ.) or 7P2 (Place Bars 4S1 with Bars 4V1 & 7P1 or 7P2) 4b" – (Place Bars 4S1 with Bars 4V1 & 7P1 or 7P2) ** b" Deck Expansion Joint * B Intermediate Bars 6R1 (Lap with Bars 6T, Open Joint Bars 6R1 2’-6" Min. Lap) (Typ.) Bars 4S1 (Typ.) A A See Detail "A" Curb (If Reqd.) Bars 6T (Typ. at End Post) Bars 4S3 Bars 5U (Typ. Bridge Bars 4S2 Deck 2’-6" Min. Bars 7P1 or 7P2 (NF) as shown) omit 4" 6" if sidewalk is A (With Curb Only) 6" 2’-10" 2’-10" 6" Spacing Bars 5U (Typ.) Bars 4P5 @ 1’-0" Max. rd960rh C: \d\projects\standards\structures\2013book\00424-1of7. dgn behind railing A Front Face of Backwall and Bars 4S2 Begin or End Bridge (With Curb Only) 7’-6" Max. (Place Between Posts) (Typical End Post 2’-6" 2’-6" 2’-6" 2’-6" Without Curb) REFLECTIVE RAILING B MARKER SPACING ** b" Intermediate Open Joints in the Rail and Post shall be provided at Substructure supports where the Superstructure Deck is continuous. 5’-0" 5’-0" 5’-0" (Typical Opening) (Typical Interior (Typical Interior Post With Curb) Post Without Curb) (With Curb shown, 7’-6" Max. (Typical End Post With Curb) Distance Edge of Travel Lane APPROACH SLAB WITHOUT GUARDRAIL OR ADJACENT TO ROADWAY BARRIER SIMILAR) < 4’ 40’ 4’ to 8’ 80’ > than 8’ TRAFFIC RAILING NOTES This railing has been structurally evaluated to be equivalent or greater in strength to other Spacing (Ft.) to Face of Railing (BRIDGE DECK SHOWN, End Post dimensions for a given span shall match. 2’-6" Min. without Curb similar) ELEVATION OF INSIDE FACE OF RAILING NOTE: None Required NOTES: RETAINING WALL : If the Traffic Railing Barrier is to be provided on a (NF) means Near Face, (FF) means Far Face. retaining wall, the railing sections will be the same as on Sheets 3 railings which have been crash tested to NCHRP Report 350 TL-4 Criteria. and 4. See Retaining Wall Plans for payment. CONCRETE AND REINFORCING STEEL : See Structures Plans General Notes. NAME, DATE AND BRIDGE NUMBER : The Name and Bridge Number CROSS REFERENCES: For Sections see Sheets 3 and 4. AGGREGATE LIMITATION: The aggregate used in the concrete mix shall be a #67 aggregate. shall be placed on the Traffic Railing so as to be seen on the For Detail "A" see Sheet 3. MARKERS : Elevation markers shall be placed on top of the Traffic Railing at the driver’s right side when approaching the bridge. The Name shall be as For Quantities and Quantity Breakdown end bents. On bridges longer than 100 Ft. one marker shall be placed at each end of the shown in the General Notes in the Structures Plans. The Date shall be bridge. On bridges 100 Ft. or less one marker shall be placed at one end of the bridge placed on the driver’s left side when approaching the bridge. The Date only. Markers are to be furnished by the Florida Department of Transportation and shall be the year the bridge is completed. For a widening when the existing installed by the Contractor. The cost of installing the markers shall be included in the railing is removed, use both the existing date and the year of the widening. Contract Unit Price for the Traffic Railing. The Department will determine the vertical Black plastic letters and figures 3" in height may be used, as approved by see Sheet 5. »¿ the Engineer, in lieu of the letters and figures formed by ˘" V-Grooves Datum information for the marker. V-Grooves shall be formed by preformed letters and figures. GUARDRAIL : For Guardrail connection details see Index No. 400. REFLECTIVE RAILING MARKERS : Reflective Railing Markers shall meet Specification SUPERELEVATED BRIDGES : At the option of the Contractor the Traffic Railing on superelevated bridges may be constructed perpendicular to the roadway surface. The Section 993. Install markers on top of the Traffic Railing 2" from the face on cost of all modifications will be at the Contractor’s expense. the traffic side at the spacing shown in the table above. Reflector color (white or yellow) shall match the color of the near edgeline. The cost of the reflective 6/28/2012 10: 10: 52 AM Bars 4R3 Bars 4S3 Bars 4V1 (FF) (Typ.) LAST REVISION 01/01/11 REVISIO N markers shall be included in the Contract Unit Price for the Traffic Railing. DESCRIPTION: INDEX FDOT DESIGN STANDARDS 2013 TRAFFIC RAILING - (CORRAL SHAPE) NO. 424 SHEET NO. 1 * Deck Expansion Joint Edge of Approach Slab (Coping) Front Face of Backwall & Begin or End Bridge Begin or End Approach Slab Bridge Gutter Line 412" Taper Deck 412" Taper Approach Slab Guardrail (Thrie-Beam attachment shown, W-Beam similar) PLAN OF RAILING WITH GUARDRAIL ON APPROACH SLAB WITHOUT * See Structures Plans, Superstructure and Approach Slab Sheets for ** Begin placing Railing Bars 7P1 or 7P2 and 4V on Approach Slab at the barrier end SIDEWALK (APPROACH SLAB WITH ADJACENT SIDEWALK SIMILAR) actual dimensions and joint orientation. Open railing Joints at Deck and proceed toward Begin or End Bridge to ensure placement of guardrail bolt holes (Reinforcing Steel Not Shown For Clarity) Expansion Joint locations shall match the dimension of the Deck Joint. If required, adjustments to the bar spacing for Bars 7P1 or 7P2 and 4V shall be For treatment of Barriers on skewed bridges see Sheets 6 and 7. made immediately adjacent to Begin or End Bridge. 30’-0" (min.) to 40’-0" Approach Slab (Measured Along Gutter Line) Begin or End Approach Slab 2 @ 712" 6" Bars 4S1 sp. @ 1’-4" ; Bars 4V, 7P1 & 7P2 sp. @ 8" 4" Spacing Bars 4S1, 4V & 7P1 ** * Deck Expansion Joint or 7P2 (As Shown) 1 4" 14’-4 2’-0" Gap C 6" Min. 5" Bars 4S1 (Placed with Bars 7P1 A B (Field Cut) Field Cut Bars 6R1 8’-0" Long (Centered or 7P2 & 4V) (Typ.) about Guardrail Bolt Connection) D Bars 6R1 Guardrail (Thrie-Beam attachment 2" NAME OR DATE BRIDGE NUMBER 3" 3" shown, W-Beam similar) Bars 7P1 or 7P2 (NF) Bridge Bars 4V (FF) Deck (Typ.) *** NOTE: Front Face of B A Backwall & C Shown, Rigid Pavement Approach Slab Similar) and Field Bend Begin or End For curb details and reinforcement Approach Slab of Typical End Section, Typical as Necessary at 3’-0" End Bridge Field Cut Bar 6R1 D Interior Section and Posts with 3’-0" or without curbs see "Elevation Taper (Typ.) Taper *** 2’-6" Min. 7’-6" Max. Taper 5’-0" Typical Opening of Inside Face of Railing" Sheet 1. Approach Slab End Section ~ 22’-6" Min., 27’-6" Max. Typical End Post ELEVATION OF INSIDE FACE OF RAILING WITH GUARDRAIL ON APPROACH SLABS 40’-0" OR LESS ALONG GUTTER (WITHOUT CURB SHOWN, WITH CURB SIMILAR) 3 8" C: \d\projects\standards\structures\2013book\00424-2of7. dgn Begin or Approach Slab (Flexible Pavement Approach Slab Approach Slabs greater than 40’-0" (Measured Along Gutter Line) A »¿ Interior Varies *** 10’-0" Min., 15’-0" Max. Approach Slab End Section ~ 22’-6" Min., 27’-6" Max. Paint Recessed (See Elevation View above for Reinforcement) * Deck Expansion Joint *** 2’-6" Min. *** 5’-0" Typical Opening *** 5’-0" Typical Interior Post 7’-6" Max. 3’-0" 3’-0" Taper Taper Typical End Post B C A 45 45 Surfaces Black SECTION THRU RECESSED D V-GROOVE TO FORM INSCRIBED LETTERS AND FIGURES Begin or End 10: 10: 55 AM rd960rh Approach Slab NOTES: Bridge (NF) means Near Face. Deck (FF) means Far Face. CROSS REFERENCES: For Sections see Sheets 3 and 4. Front Face of Backwall & Begin A B A Approach Slab (Flexible Pavement Approach Slab Shown, Rigid Pavement Approach Slab Similar) D For Quantities and Quantity Breakdown see Sheet 5. ELEVATION OF INSIDE FACE OF RAILING WITH GUARDRAIL ON APPROACH SLABS GREATER THAN 40’-0" ALONG GUTTER (WITHOUT CURB SHOWN, WITH CURB SIMILAR) LAST REVISION 01/01/11 REVISIO N 6/28/2012 or End Bridge C DESCRIPTION: INDEX FDOT DESIGN STANDARDS 2013 TRAFFIC RAILING - (CORRAL SHAPE) NO. 424 SHEET NO. 2 1’-612" Post *Bars 4R3 2" Cover 612" 3" 3" 2 sp. @ Cover Bars 5U Bars 7P1 (Typ.) Bars Bars 7P1 (Typ.) 4S1 1’-012" Bars 6R1 Gutter Line Const. Jt. Required Required PARTIAL PLAN VIEW OF BRIDGE DECK AND APPROACH SLAB 2" Cover (END POST SHOWN, INTERIOR POST SIMILAR) 2" ( M ax. ) (Bars R, S and T not shown for clarity) Bars 4V1 Bars 5R2 NOTES: 1) Shift deck and approach slab transverse reinforcement minimally to allow placement of Bars 7P & 4V. Embedment Bars 5U 8" Min. Bridge Deck Bars 5R2 (see Section C-C 8" Min. Bridge Deck (see Note 2) Coping or Edge of Approach Slab Deck Expansion Joint Const. Jt. Curb Bars 4P5 Bars 4S2 (End Post) ( M ax. ) 2" Bridge Deck Bars 4S3 (Interior Post) Curb @ 2" Cover Bars 4V1 (Typ.) Gutter Line 6" Overlay Bars 4V1 (Typ.) Rail 7" 3" – Asphalt V-Groove 1 2" (Rail) 3" 3" Future 3 4" 6" 3 sp. 1’ -1" 1 4" 514" Bars 6T (End Post) reinforcement 1 1’-5" 1’ -1" Bars 6R1 (Interior Post) 2’ -6" ( M in. with Bars 7P1 Future Asphalt Overlay) 2" Cover 2" Cover 2 sp. @ 1’ -7" 612" 3" Bars 4S1 Approach Slab Approach Slab Reinforcement Gutter Line 1’ -7" M easured along (Post) 2 Overlay 2" curb is not present. 1’-012" 2’ -8" Gutter Line 412" 2’ -8" 2’ -6" ( M in. with Future Asphalt Overlay) Asphalt * Omit Bars 4R3 when (Rail) 1’-612" ~ Future 112" 1’-5" Bridge Deck Coping ~ M easured along Edge of Gutter Line Bars 4R3 (see Section C-C Approach Slab for Approach Slab) 2) For decks to 812" place Bars 7P1 & 4V with the bottom mat of Coping or Edge reinforcement as shown in Section A-A. For decks and slabs thicker of Approach Slab for Approach Slab) than 812" place Bars 7P1 and 4V with 6" embedment. At skewed SECTION A-A (WITH CURB SHOWN, SECTION B-B (WITH CURB SHOWN, WITHOUT CURB SIMILAR) WITHOUT CURB SIMILAR) joints, place Bars 7P3 and 4V with 5" embedment. TYPICAL SECTIONS THRU RAILING (BRIDGE DECK SHOWN, 212" 412" Taper 3 4" V-Groove Future Asphalt Bars 6R1 (Field Bend as Required in Taper) Const. Jt. Required Gutter Line 6" 612" 3" 2" Cover M easured along Overlay the lower 6" portion of the open joint with Pre-cured 634" 334" 1. At Intermediate Open Joints in Curb Sections, seal Bars 6R1 (Typ.) @ 634" @ 2 sp. Bars 6R1 (Typ.) INTERMEDIATE JOINT SEAL NOTES: ** Bars 7P1 3 4" 412" 6" Embedment (see Note 2) Edge of 6/28/2012 SECTION C-C remove all curing compound and loose material from in Taper) the surface prior to application of bonding agent. 234" Const. Jt. Required 3. The cost of the Pre-cured Silicone Sealant shall be 6" Embedment included in the Contract Unit Price for the Traffic (see Note 2) Railing. Edge of Approach Bars 5R2 2. Apply sealant prior to any Class V finish coating and Bend as Required Taper 2" ( M ax. ) 10: 10: 57 AM 2" ( M ax. ) Overlay Section 932. V-Groove Asphalt Overlay Silicone Sealant in accordance with Specification Bars 6R1 (Field 1034" to anchor bolts) 2" 2" Cover 2 sp. @ 1 each face (placed Bars 4S1 2 sp. 7P1 Gutter Line 212" ** Bars Sealant (4" wide) 112" 1’-5" 1’ -7" 2 sp. @ Bar 6R1 ~ 8’-0" long Pre-cured Silicone 1’ -1" 234" 2" Cover Future Asphalt Overlay) clearance. 1’-612" 2’ -8" 2" Cover Slab 3’-0" Tapers to maintain 2’ -6" ( M in. with 1’ -7" 612" 3" Bars 4S1 Asphalt rd960rh 112" 1’-5" 1’ -1" Overlay Gutter Line M easured along Asphalt ** Shift Bars 7P1 in Approach Gutter Line 2’ -8" 2’ -6" ( M in. with Future Future Asphalt Overlay) C: \d\projects\standards\structures\2013book\00424-3of7. dgn APPROACH SLAB SIMILAR) 1’-612" Approach Slab (Coping) DETAIL "A" - SECTION AT INTERMEDIATE OPEN JOINT WITH CURB Slab (Coping) Bars 5R2 Bars 4V1 END VIEW D-D Bars 4V1 CROSS REFERENCES: For Locations of Sections and Detail "A", see Sheets 1 and 2. For Quantities and Rebar Details see Sheet 5. TYPICAL SECTIONS THRU RAILING END SECTIONS ON APPROACH SLAB WITH GUARDRAIL LAST REVISION 01/01/11 REVISIO N (APPROACH SLAB (FLEXIBLE PAVEMENT APPROACHES) SHOWN, APPROACH SLAB (RIGID PAVEMENT APPROACHES) SIMILAR) DESCRIPTION: INDEX FDOT DESIGN STANDARDS 2013 TRAFFIC RAILING - (CORRAL SHAPE) NO. 424 SHEET NO. 3 (see Note 2) Sidewalk 3" 2" Cover 612" 2" Cover 3" 2 sp. @ 1’ -7" Bars 8" Min. Bridge Deck (see Note 3) (see Section C-C Bars 7P2 Bars 7P2 Bars 4V1 Bars 4V1 (Typ.) (Typ.) 4S1 Gutter Line Bars 6R1 7" 1’ -1" Const. Jt. Required 2" Rail 1’-012" Const. Jt. Curb Bars 4P5 Required Bars 7P1 6" Bars 4S2 (End Post) Bars 7P2 reinforcement (Rail) Gutter Line 3" 3" 6" Bars 5R2 Embedment (see Note 3) Gutter Line M easured along Bars 4S3 (Interior Post) Bars 4V1 Bars 7P1 2’ -6" ( M in. with Overlay Post *Bars 4R3 Curb 3" – Asphalt V-Groove 2" Cover @ 3 sp. Future 3 4" 2 1 4" 514" Const. Jt. Permitted Future Asphalt Overlay) Bars 6T (End Post) Cover ( M ax. ) 2" curb is not present. Bars 6R1 (Interior Post) 2" 2 sp. @ 1’ -7" 612" Bars 4S1 * Omit Bars 4R3 when 2" Cover Bars 7P1 ( M ax. ) 3" (Post) 1’ -1" Overlay 2" Cover Gutter Line 1’-012" Approach Slab Reinforcement Sidewalk 1’-5" 2’ -8" M easured along 412" 2’ -8" 2’ -6" ( M in. with Future Asphalt Overlay) Gutter Line Bridge Deck ~ Asphalt Sidewalk ~ Future 1’-5" Bridge Deck Bars 5R2 Deck Expansion Joint Bars 4R3 Approach Slab PARTIAL PLAN VIEW OF BRIDGE DECK AND APPROACH SLAB WITH SIDEWALK for Approach Slab) (Bars R, S and T not shown for clarity) SECTION A-A (WITH CURB SHOWN, SECTION B-B WITHOUT CURB SIMILAR) RAILING ADJACENT TO SIDEWALK NOTES: 1) End Post detailed above, Interior Post and Approach Slab End Section similar. TYPICAL SECTIONS THRU RAILING ON BRIDGE DECK WITH SIDEWALK (SHOWN) 2) For decks to 812" place Bars 7P1 and 7P2 and 4V with the bottom mat of (RAILING ON APPROACH SLAB SIMILAR) Taper Overlay Gutter Line as Required in Taper) Const. Jt. Required Asphalt 3" 2" Cover 612" 2 sp. @ @ Asphalt Bars 6R1 (Field Bend Bars 6R1 (Typ.) 3 6 4" Future placement of Bars 7P & 4V. Bars 4S1 3 4" 1034" 412" V-Groove 5) Shift deck and approach slab transverse reinforcement minimally to allow 2" Cover 2 sp. 634" @ 334" 3 4" or 7P2. Gutter Line 212" to anchor bolts) required, at Intermediate Post 6 each required. Sidewalk 4) Reverse direction of every other Bar 4V1 to match direction of Bars 7P1 1’ -7" 1 each face (placed 2’ -6" ( M in. with 2 sp. @ Bar 6R1 ~ 8’-0" long 1’-5" 1’ -1" 3 4" 2 2" Cover 2 sp. M easured along clearance. 812" place Bars 7P1 and 7P2 and 4V with 6" embedment. 3) Alternate Bars 7P1 and 7P2 at each post. At End Posts 3 each (Min.) 2’ -8" Slab 3’-0" Tapers to maintain Future Asphalt Overlay) 2" Cover 3" 1’ -7" 612" Bars 4S1 ** Shift Bars 7P in Approach Bars 6R1 (Typ.) 1’ -1" Overlay Sidewalk Gutter Line 212" Asphalt Gutter Line M easured along Future 1’-5" 2’ -8" Future Asphalt Overlay) 2’ -6" ( M in. with V-Groove Bars 6R1 (Field 412" Bend as Required in Taper) Taper 234" Const. Jt. Required Asphalt Bars 4V1 2" ( M ax. ) rd960rh Overlay Overlay 6" Embedment (see Note 2) Bars 4V1 2" ( M ax. ) C: \d\projects\standards\structures\2013book\00424-4of7. dgn reinforcement as shown in Section A-A. For decks and slabs thicker than 6" Embedment (see Note 2) 10: 11: 00 AM CROSS REFERENCES: For Locations of Sections see Sheets 1 and 2. ** Bars 7P1 Bars 5R2 (see Note 3) ** Bars 7P1 ** Bars 7P2 Bars 5R2 ** Bars 7P2 (see Note 3) (see Note 3) For Quantities and Rebar Details see Sheet 5. (see Note 3) SECTION C-C END VIEW D-D 6/28/2012 TYPICAL SECTIONS THRU RAILING END SECTION ON APPROACH SLAB WITH SIDEWALK AND GUARDRAIL LAST REVISION 07/01/05 REVISIO N (APPROACH SLAB (FLEXIBLE PAVEMENT APPROACHES) SHOWN, APPROACH SLAB (RIGID PAVEMENT APPROACHES) SIMILAR) DESCRIPTION: INDEX FDOT DESIGN STANDARDS 2013 TRAFFIC RAILING - (CORRAL SHAPE) NO. 424 SHEET NO. 4 CONVENTIONAL REINFORCING STEEL BENDING DIAGRAMS 812" BILL OF REINFORCING STEEL 4’-8" 5’-4" 1’-0" 14.82 P3 7 7’-2" 14.65 *** P4 7 7’-3" 14.82 * P5 4 2’-11" 1.94 R1 6 As Reqd. 1.5 (LB/LF) R2 5 As Reqd. 1.04 (LB/LF) * R3 4 As Reqd. 0.67 (LB/LF) ** S1 4 5’-0" 3.34 Varies Varies ** S2 4 6’-3" Min. 4.18 Min. 16’-3" Max. 10.86 Max. Bars 6R1, 5R2 & 4R3 * Length As Required Bars 6R1, 5R2 & 4R3 1012" 7’-3" Stirrup Bar 4S3 Stirrup Bar 6T Stirrup Bar 4S1 8" 812" Stirrup Bar 4S2 2’-3" 1" 2’ 2’ -1" 2’-0" 2’-1" A 7" 234" Pin 4" 7 7" 6 11’-4" 17.02 U 5 4’-8" 4.87 V1 4 3’-2" 2.12 *** V2 4 3’-6" 2.34 Stirrup Bar 5U 2’ -9" T 2’ -1" 7.52 2’ -10" 11’-3" 2’ -10" 4 2’ -1" Bar 4P5 * ** S3 A 8" Parallel to Joint Top of C-I-P Concrete Retaining Wall * Bars 4P5 and 4R3 are to be used with Line Perpendicular or A a curb only. 180 - A ** Bend Bars 4S1, 4S2 & 4S3 around a the horizontal plane, see Superstructure Sheets) Concrete Retaining Walls. Bar 7P3 (Requires Bar 7P1 Bar 7P2 3 Dimensional Bend) A 7" 2. The reinforcement for the railing on a C-I-P Concrete Retaining Wall shall be the same as detailed above for a 8" deck with A = 90, where applicable. If bottom horizontal legs of Bars 7P1, 7P3 and 4V1 prohibit placement, Bars 7P4 and 4V2 may be substituted for Bars 7P1, 7P3 and 4V1 as shown. 3. All reinforcing steel at the open joints shall have a 2" minimum cover unless otherwise noted. 4. At Construction Joints Bars 6R1, 5R2 and 4R3 may be continuous or spliced. Where bars are spliced provide a 2’-6" Min. lap length for HIGH LOW SIDEWALK SIDE SIDE CROSS-SLOPE A A 0% to 2% 90 90 2% to 6% 93 87 6% to 10% 96 84 Bar 4V1 Top of C-I-P Bar 4V2 *** Concrete Retaining Wall A shall be 90 if Contractor elects to place Railing Perpendicular to the Deck. Bar 6R1, a 2’-0" Min. lap length for Bars 5R2 and a 1’-3" Min. lap 2’ -6" length for Bars 4R3. 5. The skew angle for Bars 7P3 may vary from joint to joint and side 6/28/2012 10: 11: 02 AM to side, see Structures Plans, Superstructure Sheets for details. 4’ -10" 1. All bar dimensions in the bending diagrams are out to out. ROADWAY OR 2’ -1" REINFORCING STEEL NOTES: 1’ -5" 2’ -7" Structures Plans, *** Bars 7P4 & 4V2 are to be used on C-I-P Em bedm ent Length C: \d\projects\standards\structures\2013book\00424-5of7. dgn #3 Stirrup Pin. rd960rh Radial to Gutter Skew Angle (measured in 3’ -6" P2 Em bedm ent Length 15.00 10" 7’-4" 8 7 7 " P1 1 2" LB/BAR 7’ -2" M ax. LENGTH Varies ~ 2’ -2" M in. SIZE 1’ -3" MARK ESTIMATED TRAFFIC RAILING QUANTITIES ITEM CONCRETE REBAR QUANTITY QUANTITY (CY) (LB) Typical 10’-0" Section w/Curb 1.13 451 Typical 10’-0" Section w/o Curb 1.03 428 Approach Slab with Guardrail End Section 0.14 44 (per LF) (per LF) LAST REVISION 07/01/05 REVISIO N Bar 7P4 *** DESCRIPTION: INDEX FDOT DESIGN STANDARDS 2013 TRAFFIC RAILING - (CORRAL SHAPE) NO. 424 SHEET NO. 5 Bridge Deck 2’-6" Min., 7’-6" Max. Transverse Reinforcement 2’-6" Min., 7’-6" Max. End Post Coping End Post 2’-6" Min., 7’-6" Max. 2’-6" Min., 7’-6" Max. End Post Bars 4V1 (Typ.) End Post Bridge Deck Transverse Sidewalk Reinforcement Bars 4V1 Gutter Line Bars 7P3 Approach Slab reinforcement Bars 7P2 Bars 7P1 Bars 7P2 ~ Bars 4V1 (Typ.) ~ Deck Expansion Bars 4V1 (Typ.) Approach Slab Bridge Deck Approach Slab Joint reinforcement Gutter Line PARTIAL PLAN VIEW OF BRIDGE DECK AND APPROACH SLAB - SKEW ANGLE GREATER THAN 15 DEGREES Bars 7P1 Bars 7P1 ~ NOTES: ~ 1) Railing expansion joint shall match the deck expansion joint which shall be turned perpendicular or radial to the gutter line. See Structures Plans, Superstructure and Approach Slab Sheets for details. 2) Bars 4S1 (not shown) shall be placed perpendicular or radial to the gutter. Bridge Deck Deck Expansion Joint Approach Slab BRIDGE DECK AND APPROACH SLAB WITHOUT GUARDRAIL ATTACHED (SHOWN): 3) End Post & Approach Slab End Section - Place Bars 7P1 & 4V1 in obtuse corners of intersection of deck joint and gutter line. Place Bars 7P3 & 4V1 in acute corners of intersection of deck joint and gutter line as required. PARTIAL PLAN VIEW OF BRIDGE DECK AND APPROACH SLAB WITH SIDEWALK Interior Post - use Bars 7P1 and 4V1 placed with bottom mat of reinforcement. Shift deck or slab reinforcement - 0 DEGREE SKEW ANGLE minimally to allow proper placement of Bars 7P and 4V and to facilitate placement of concrete. APPROACH SLAB WITH GUARDRAIL ATTACHED (NOT SHOWN): 4) Place Bars 7P1 & 4V1 in obtuse corners of intersection of deck joint and gutter line and Bars 7P3 & 4V1 in acute corners of intersection of deck joint and gutter line as required. Shift deck or slab reinforcement minimally NOTES: 5) Begin placing Railing Bars 7P & 4V on Approach Slab at the railing end and proceed toward Begin or End Bridge 1) Alternate Bars 7P1 with Bars 7P2 and reverse direction of every other Bar 4V1 as detailed to ensure placement of guardrail bolt holes. If required, adjustments to the bar spacing for Bars 7P & 4V shall be above to facilitate placement of concrete. made immediately adjacent to Begin or End Bridge. 2’-6" Min., 7’-6" Max. End Post Coping 2) Shift deck transverse reinforcement minimally to allow placement of Bars 7P & 4V. 2’-6" Min., 7’-6" Max. End Post NOTES: 1) Railing expansion joint shall match the deck expansion joint which shall be turned perpendicular or radial Bars 4V1 (Typ.) to the gutter line. See Structures Plans, Superstructure and Approach Slab Sheets for details. 2) Bars 4S1 (not shown) shall be placed perpendicular or radial to the gutter. 3) Bars 7P & 4V in the Approach Slab may be rotated to match Approach Slab reinforcement or placed perpendicular or radial to the gutter line. BRIDGE DECK AND APPROACH SLAB WITHOUT GUARDRAIL ATTACHED (SHOWN): 4) Rotate vertical Bars 7P & 4V to match bridge deck reinforcement. Shift deck & slab transverse reinforcement to allow proper placement of Bars 7P & 4V and to facilitate placement of concrete. Gutter Line Bridge Deck APPROACH SLAB WITH GUARDRAIL ATTACHED (NOT SHOWN): Approach Slab ~ C: \d\projects\standards\structures\2013book\00424-6of7. dgn to allow proper placement of Bars 7P & 4V and to facilitate placement of concrete. 5) Begin placing Railing Bars 7P & 4V on Approach Slab at the railing end and proceed toward Begin or End Bridge to ensure placement of guardrail bolt holes. If required, adjustments to the bar spacing for ~ Bars 7P & 4V shall be made immediately adjacent to Begin or End Bridge. rd960rh Bridge Deck 6) Bars 7P at end of the railing shall be field cut and shifted to maintain clearance, see Railing End Taper Transverse Bars 7P1 (Typ.) Detail Sheet 2 for similar details. Reinforcement Approach Slab reinforcement 10: 11: 05 AM Deck Expansion Joint GENERAL NOTES: PARTIAL PLAN VIEW OF BRIDGE DECK AND APPROACH SLAB »¿1) Deck Expansion Joint at begin or end bridge shown. Deck Expansion Joints at Pier or Intermediate Bents are sim - SKEW ANGLE 15 DEGREES OR LESS 6/28/2012 2) Partial Plan Views shown are intended as guides only. See Structures Plans, Superstructure and Approach Slab Sheets LAST REVISION 07/01/05 REVISIO N for skew angles, joint orientation, dimensions and details. DESCRIPTION: INDEX FDOT DESIGN STANDARDS 2013 TRAFFIC RAILING - (CORRAL SHAPE) NO. 424 SHEET NO. 6 2’-6" Min., 7’-6" Max. 2’-6" Min., 7’-6" Max. End Post End Post 2’-6" Min., 7’-6" Max. Bridge Deck End Post Transverse Deck Expansion Reinforcement Joint 2’-6" Min., 7’-6" Max. End Post Deck Expansion Sidewalk Sidewalk Bridge Deck Approach Slab Bars 7P2 reinforcement Joint ~ Bars 7P2 Bars 7P2 Bars 7P2 Bars 4V1 Bars 4V1 Bars 4V1 (Typ.) Bars 4V1 (Typ.) Approach Slab Gutter Line Gutter Line ~ Bars 7P1 Bars 7P1 Bars 7P1 Bars 7P1 ~ Bridge Deck ~ Transverse Reinforcement Bridge Deck Approach Slab Place 1 ~ Bar 4V1 in each corner as Approach Slab reinforcement shown (maintain clearance to bar) PARTIAL PLAN VIEW OF BRIDGE DECK AND APPROACH SLAB WITH SIDEWALK - SKEW ANGLE 15 DEGREES OR LESS PARTIAL PLAN VIEW OF BRIDGE DECK AND APPROACH SLAB WITH SIDEWALK - SKEW ANGLE GREATER THAN 15 DEGREES NOTES: 1) Railing ends at deck expansion joints shall follow the deck joint with allowance for joint movement. Expansion joint at the inside face of parapet shall be turned perpendicular or radial to this line. See Structures Plans, Superstructure and Approach Slab Sheets for details. 3) Edge of Approach Slab adjacent to the roadway shall follow end of railing, Bars 7P at end of the railing shall be reinforcement field cut and shifted to maintain clearance, see detail bottom left this sheet for similar details. Approach Slab BRIDGE DECK AND APPROACH SLAB WITHOUT GUARDRAIL ATTACHED (SHOWN): 4) Alternate Bars 7P1 with Bars 7P2 and reverse direction of every other Bar 4V1 to facilitate placement of concrete. ~ 5) Bars 7P & 4V shall be rotated to match bridge deck reinforcement. Begin or End 6) Railing End Post and reinforcement detailed above. Railing Interior Post reinforcement similar. Approach Slab APPROACH SLAB WITH GUARDRAIL ATTACHED (NOT SHOWN): Bars 7P2 7) Begin placing Railing Bars 7P & 4V on Approach Slab at the railing end and proceed toward Begin or End Bridge to ensure placement of guardrail bolt holes. If required, adjustments to the bar spacing for Bars 7P & 4V shall be made Field Cut Bar 7P at Begin Bars 4V1 immediately adjacent to Begin or End Bridge. or End Approach Slab and shift to maintain cover in Tapered End Section NOTES: 1) Railing ends at deck expansion joints shall follow the deck joint with allowance for joint movement. Expansion joint at the inside face of parapet shall be turned perpendicular or radial to this line. See Structures Plans, Superstructure and Approach Slab Sheets Edge of Approach Slab to follow edge of railing Gutter Line for details. (Typ. with or without Guardrail attached) rd960rh Shift deck transverse reinforcement minimally to allow placement of Bars 7P & 4V. 4" C: \d\projects\standards\structures\2013book\00424-7of7. dgn 2) Bars 4S1 (not shown) shall be placed perpendicular or radial to the gutter. Approach Slab 2) Bars 4S1 (not shown) shall be placed perpendicular or radial to the gutter. BRIDGE DECK AND APPROACH SLAB WITHOUT GUARDRAIL ATTACHED (NOT SHOWN): »¿ Guardrail 3) Deck transverse reinforcement may be shifted minimally as required to allow proper placement of Bars 7P & 4V and to facilitate 3’-0" Bars 7P1 placement of concrete. Bars 7P1 & 4V1 or 7P2 & 4V1 shall be used on opposing sides of the joint depending on the direction of the Taper skew, see Detail above. Approach Slab reinforcement may be shifted if conflicts occur. 4) Interior Post - alternate Bars 7P1 with Bars 7P2 and reverse direction of every other Bar 4V1 to facilitate placement of concrete. 10: 11: 07 AM 5) End Post - alternate Bars 7P1 with Bars 7P2 and reverse direction of Bars 4V1 (as detailed) where possible. APPROACH SLAB WITH GUARDRAIL ATTACHED (SHOWN): PARTIAL PLAN VIEW AT BEGIN OR END APPROACH SLAB WITH 6) Use Bars 7P2 and reverse direction of Bars 4V1 where skew restricts use of Bars 7P1 & 4P1. 7) Begin placing Railing Bars 7P & 4V on Approach Slab at the railing end and proceed toward Begin or End Bridge to ensure SIDEWALK AND RAILING WITH GUARDRAIL ATTACHED placement of guardrail bolt holes. If required, adjustments to the bar spacing for Bars 7P & 4V shall be made immediately adjacent to Begin or End Bridge. LAST REVISION 07/01/05 REVISIO N 6/28/2012 - SKEW ANGLE GREATER THAN 15 DEGREES SHOWN, 15 DEGREES OR LESS SIMILAR DESCRIPTION: INDEX FDOT DESIGN STANDARDS 2013 TRAFFIC RAILING - (CORRAL SHAPE) NO. 424 SHEET NO. 7