Comments
Transcript
FDOT DESIGN STANDARDS 2013 Top of Precast
» b " Open Joint Dim. A ) . n "Mi 0 ’ 0 1 l ( a c i p "Ty 0 ’ 0 g~ 3 n i c a p S t n i o nJ e b"Op Top of C-I-P » b " Open Joint sp. (lap with Dowel Coping) A Slope of C-I-P * 2" Min. Cover (Typ.) Retaining Wall Panel) (Typ.) ** 3" Min. Cover (Typ.) Drainage Ditch when Coping Bars 4A (follows Bars 4U1 @ 1’-6" Max. Bars 4B (follows top of required (See Wall Control Bars 4U1 Drawings for details) " Chamfer Bars 4D) (Typ.) Bars 4A (Typ.) Varies (1’-3" Max., (Typ.) (See 2" Min.) 2’ -0" Dowel Bars 4D Note 2) Bars 4B shown as ( ) Top of Retaining Dowel Bars 4D Wall Panel (Typ.) Clearance Bottom of (See Note 2) 6" Varies C-I-P Coping Retaining Wall Panel Retaining Wall (See Wall Company Panels (Typ.) Drawings for Details) A Smooth or Textured Face of Panel PRECAST AND C-I-P COPING NOTES: 1. Provide Class II concrete for slightly aggressive environments or Class IV for moderately or extremely aggressive environments. C-I-P COPING - PARTIAL ELEVATION VIEW 2. SECTION A-A Panel width C-I-P COPING Dowel Bars 4D extend 1’-0" above the top of retaining Dim. A + 6" wall panel. Field cut as necessary to maintain 2" minimum Panel width cover. See Wall Company Drawings for number and spacing Dim. B of Dowel Bars 4D. 3. + 1’-0" Min. Payment for Dowel Bars 4D, Buildup Concrete and Coping will be made under Retaining Wall System (Permanent). C: \d\projects\standards\structures\2013book\06100-1of2. dgn » b " Open Joint Dim. B * 2" Min. Cover (Typ.) » b " Open Joint Control Drawings Bars 4U2 * For Slightly and Moderately Bars 4A Aggressive environments for details) (Typ.) " Chamfer (Typ.) ** For Extremely Aggressive environments. 2’ -0" 2" Cover Min. 1’ -3" Buildup Concrete B required (See Wall Wall Panel (Typ.) 2" Cover Varies Coping ( 1’ -0" M ax. ) Top of Precast Drainage Ditch when ** 3" Min. Cover (Typ.) Top of Retaining ) . n "Mi 0 ’ 5 g( n i p tCo s a c e lPr a c i p "Ty 0 ’ 0 1 Top of C-I-P C-I-P Buildup Concrete (1’-0" Max.) Provide 3b " x 3b " preservative treated timber blocking @ 5’ Max. Spacing for gaps > 1" Bars 4U2 @ 1’-4" sp. (Typ.) Bars 4A Clearance Dowel Bars 4D (Typ.) rd960rh Bottom of Varies (1’-3" Max., 2" Min.) Dowel Bars 4D " (See Note 2) Varies (See Note 1) Precast Coping 6" 6" Min. Min. " Std. ( b " Min. ~ 2b " Max.) Retaining Wall Retaining Wall Panel Panels (Typ.) (See Wall Company 11: 49: 27 AM B Smooth or Textured Face of Panel Drawings for Details) SECTION B-B PRECAST COPING - PARTIAL ELEVATION VIEW LAST REVISION 01/01/12 REVISIO N 6/28/2012 PRECAST COPING DESCRIPTION: INDEX FDOT DESIGN STANDARDS 2013 MSE WALL COPING (PRECAST OR C-I-P) NO. 6100 SHEET NO. 1 REINFORCING STEEL BENDING DIAGRAMS - PRECAST AND C-I-P COPINGS BILL OF REINFORCING STEEL MARK SIZE LENGTH LENGTH * S or M * E Dim. B REINFORCING STEEL NOTES: * 2" Min. Cover (Typ.) 1. All bar dimensions in the bending diagrams are out to out. ** 3" Min. Cover (Typ.) Drainage Ditch when 2. All reinforcing steel at the open joints will have a 2" minimum cover. required (See Wall 3. Bars 4A may be continuous or spliced at the construction joints. Lap splices for Bars 4A will Control Drawings Bars 4U2 Bars 4A be a minimum of 1’-8". A 4 AS REQD. AS REQD. B 4 AS REQD. AS REQD. D 4 2’-0" 2’-0" 3 4" 4. The Contractor may use Welded Wire Reinforcement when approved by the Engineer. Welded Wire for details) (Typ.) Chamfer (Typ.) Reinforcement will conform to ASTM A 497. Recess Varies Varies (1’-3" Max., 2" Min.) 2’ -0" * S = Slightly Aggressive Panel width + 4" Panel width + 3" U2 4 Panel width + 8" Panel width + 6" 4 U3 Varies Panel width + 3" Dowel Bars 4D Varies (See Note 2, Sheet 1) Ground Line 6" required to maintain 2" minimum cover DOWEL BAR 4D BARS 4A & 4B BAR 4U1 BAR 4U2 BAR 4U3 6" Min. 2’ -0" M in. * 1’ -8" Field cut as ** 1’ -6" * 1’ -8" Length as Required 4B ** 1’ -6" Length as Required 2’ -0" 4A Panel width + 4" E = Extremely Aggressive Varies 4 * 8" M in. U1 ** 6" M in. M = Moderately Aggressive (Match Precast Dimensions) Retaining Wall Panel Leveling Pad for (See Wall Company MSE Wall Shown Drawings for Details) C-I-P COPING USED WITH PRECAST COPING Note: When precast coping units do not fit the entire length of the retaining wall, use this similar C-I-P coping for short portions between precast coping units. This C-I-P coping may also be used for vertical copings. Dim. C * For Slightly and Moderately Aggressive environments Top of Retaining * 2" Cover (Top & Sides) Wall End Panel ** For Extremely Aggressive ** 3" Cover (Top & Sides) C 3 4" Retaining Wall Spacing Bars 4A (follows Slope of C-I-P Coping Enclosure) Bars 4B (Horizontal) (Field cut as required to maintain Chamfer (Typ.) Bars 4B Begin or End environments. Panel width minimum cover) Dim. B Bars 4A (Typ.) + 1’-0" Min. Panel width Bottom of Coping Drawings for details) Bars 4B shown as ( ) (Typ.) Bars 4U3 Bars 4U3 @ 1’-6" Edge of Retaining Max. sp. (Typ.) Bars 4B (Horizontal) 4" Cover C Leveling Pad for 11: 49: 30 AM (Bottom) 3" Min. Overlap 412" rd960rh 6" Wall End Panel 2’ -0" M in. (See Wall Company Coping Enclosure + 6" Varies Retaining Wall End Panel Edge of C-I-P 1’ -6" M ax. Dim. C Eq. sp. @ C: \d\projects\standards\structures\2013book\06100-2of2. dgn Top of Coping MSE Wall Shown SECTION C-C Varies LAST REVISION 01/01/12 REVISIO N 6/28/2012 C-I-P COPING ENCLOSURE DETAIL DESCRIPTION: INDEX FDOT DESIGN STANDARDS 2013 MSE WALL COPING (PRECAST OR C-I-P) NO. 6100 SHEET NO. 2