Comments
Description
Transcript
FDOT DESIGN STANDARDS 2013 B
A Tangent Grade Dim . " D" Dim . " B" Dim. "C" Bottom of Deck BEAM CAMBER AND BUILD-UP NOTES: The build-up values given in the Data Table* are based on theoretical beam cambers. The Contractor shall monitor beam cambers for the purpose of predicting camber values at the time of the deck pour. If the predicted cambers based on field measurements differ more than +/- »¿ 1 2" from the theoretical "Net Beam Camber @ 120 Days" shown in the Data Table*, obtain approval from the Engineer Top of Beam to modify the build-up dimensions as required. When the measured beam cambers A create a conflict with the bottom mat of deck steel, notify the Engineer a minimum Begin Span of 21 days prior to casting. End Span Dim. "A" includes the weight of the Stay-In-Place Formwork. BUILD-UP DIAGRAM FOR TANGENT SPANS A »¿ End Span Bea Dim. "A" »¿ Bea Bottom of Deck »¿ Dim . " D" Dim . " B" Dim. "C" Begin Span »¿(ALONG BEAM) (CA »¿ Top of Beam DEAD LOAD DEFLECTION DIAGRAM A Begin Span End Span BUILD-UP DIAGRAM FOR SAG VERTICAL CURVE SPANS »¿(ALONG BEAM) (CA Top Flange Width (Varies) Sl o p e = Va r i e s Dim . " D" C: \d\projects\standards\structures\2013book\20199-1of1. dgn Dim . " B" Dim. "C" Bottom of Deck A Bridge Deck (Varies) »¿ Top of Beam 1 2" »¿ Beam Design Min. Type Varies) A Begin Span End Span For Cases 1, 2 & 3 = DIM "C" For Case 4 = DIM "B" or DIM "D" BUILD-UP DIAGRAM FOR CREST VERTICAL CURVE SPANS SECTION A-A »¿- CONTROL AT BUILD-UP OVER BEAMS »¿(ALONG BEAM) (CA Bottom of Deck DIM " D" rd960rh Dim . " B" Dim. "C" A »¿ 12: 51: 47 PM Top of Beam Begin Span End Span A * NOTE: Work this Index with the Build-up and Deflection BUILD-UP DIAGRAM FOR CREST VERTICAL CURVE SPANS Data Table for Florida-I Beams in Structures Plans. 6/28/2012 - CONTROL AT BEGIN OR END SPAN LAST REVISION 01/01/12 REVISIO N »¿(ALONG BEAM) (CA DESCRIPTION: INDEX FDOT DESIGN STANDARDS BUILD-UP & DEFLECTION DATA FOR 2013 FLORIDA-I BEAMS NO. 20199 SHEET NO. 1