Comments
Description
Transcript
Florida Department of Transportation
Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : A & P CONSULTING TRANSPORTATION ENG XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K86 Amount: $94,793.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L36 Amount: -$87,088.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P96 Amount: $77,040.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R87 Amount: -$40,486.00 DBE Dollars: $6,088.00 DBE %: -15.04% District: 4 CURTIS & ROGERS DESIGN STUDIO INC -15.04% $6,088.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T70 Amount: -$41,123.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V52 Amount: $174,284.00 DBE Dollars: $14,814.36 DBE %: 8.50% District: 6 MEDIA RELATIONS GROUP LLC .37% $637.00 P(3)SM, LLC 2.71% $636.70 P(3)SM, LLC 2.71% $5,046.62 P(3)SM, LLC 2.71% $8,494.04 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 1 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y66 Amount: $796,457.00 DBE Dollars: $226,221.01 DBE %: 28.40% District: 6 BCC ENGINEERING, INC. 2.14% $16,989.00 BCC ENGINEERING, INC. 2.14% $7,969.96 BCC ENGINEERING, INC. 2.14% $4,677.30 BCC ENGINEERING, INC. 2.14% -$576.45 BCC ENGINEERING, INC. 2.14% $44,996.10 BCC ENGINEERING, INC. 2.14% $26,495.00 BCC ENGINEERING, INC. 2.14% $18,918.00 CH PEREZ & ASSOC.,CONSULTING ENGR. .70% $5,663.00 CH PEREZ & ASSOC.,CONSULTING ENGR. .70% $2,655.65 CH PEREZ & ASSOC.,CONSULTING ENGR. .70% $1,559.10 CH PEREZ & ASSOC.,CONSULTING ENGR. .70% -$192.15 CH PEREZ & ASSOC.,CONSULTING ENGR. .70% $14,998.70 CH PEREZ & ASSOC.,CONSULTING ENGR. .70% $8,832.00 CH PEREZ AND ASSOCIATES CONSULTING .79% $6,306.00 F.R. ALEMAN & ASSOCIATES, INC. .79% $6,306.00 GEOSOL, INC. .71% $5,663.00 GEOSOL, INC. .71% $2,656.00 GEOSOL, INC. .71% $1,559.10 GEOSOL, INC. .71% -$192.00 GEOSOL, INC. .71% $14,998.70 GEOSOL, INC. .71% $8,832.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 2 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount GEOSOL, INC. .71% $6,306.00 MEDIA RELATIONS GROUP LLC .87% $5,663.00 MEDIA RELATIONS GROUP LLC .87% $8,832.00 MEDIA RELATIONS GROUP LLC .87% $6,306.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9076 Amount: $402,591.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For A & P CONSULTING TRANSPORTATION ENG Amount: $1,376,468.00 DBE Dollars: $247,123.37 DBE % : 17.95% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : A.D.A. ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M05 Amount: -$429.00 DBE Dollars: -$429.00 DBE %: 100.00% District: 6 A.D.A. ENGINEERING, INC. 100.00% -$429.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P99 Amount: $44,180.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W15 Amount: $379,917.00 DBE Dollars: $64,549.00 DBE %: 16.99% District: 6 A.D.A. ENGINEERING, INC. 15.99% $60,750.00 HR ENGINEERING SERVICES, INC. .33% $2,500.00 HR ENGINEERING SERVICES, INC. .33% $549.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 3 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount HR ENGINEERING SERVICES, INC. .33% $750.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9330 Amount: $250,000.00 DBE Dollars: $137,500.00 DBE %: 55.00% District: 6 A.D.A. ENGINEERING, INC. 53.00% $132,500.00 HR ENGINEERING SERVICES, INC. 2.00% $5,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For A.D.A. ENGINEERING, INC. Amount: $673,668.00 DBE Dollars: $201,620.00 DBE % : 29.93% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ADVANCED TRANSPORTATION ENGINEERING XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z74 Amount: $310,314.00 DBE Dollars: $39,172.00 DBE %: 12.62% District: 6 FERNANDEZ-BERAUD, INC. 1.92% $5,968.00 MEDIA RELATIONS GROUP LLC 5.35% $40,204.00 MEDIA RELATIONS GROUP LLC 5.35% -$7,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AECOM TECHNICAL SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C2427 Amount: $135,338.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C6735 Amount: $2,563,414.00 DBE Dollars: $21,907.00 DBE %: .85% District: 6 CURTIS & ROGERS DESIGN STUDIO INC .37% $15,461.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 4 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount CURTIS & ROGERS DESIGN STUDIO INC .37% $3,681.00 TRANSIT SAFETY CONSULTING SERVICES .11% $2,765.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8580 Amount: -$39,740.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8714 Amount: $31,246.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G53 Amount: -$71,172.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H04 Amount: $45,315.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I08 Amount: -$23,600.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I82 Amount: -$27,583.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J10 Amount: -$8,987.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 5 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L00 Amount: -$18,290.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L20 Amount: $85,543.00 DBE Dollars: $13,481.00 DBE %: 15.76% District: 5 NODARSE & ASSOCIATES, INC. 15.76% $13,481.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N71 Amount: $33,850.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R58 Amount: $15,525.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T65 Amount: $280,450.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U45 Amount: $450,000.00 DBE Dollars: $67,500.00 DBE %: 15.00% District: 6 BOLTON PEREZ & ASSOCIATES 7.50% $22,500.00 BOLTON PEREZ & ASSOCIATES 7.50% $45,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y89 Amount: $1,970.00 DBE Dollars: $1,970.00 DBE %: 100.00% District: 1 AERIAL INNOVATIONS, INC. 100.00% $1,970.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 6 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9159 Amount: $486,418.00 DBE Dollars: $109,596.45 DBE %: 22.53% District: 4 CH PEREZ AND ASSOCIATES CONSULTING 19.17% $93,223.00 FALLER, DAVIS AND ASSOC.,INC. 3.37% $16,373.45 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9210 Amount: $2,615,763.00 DBE Dollars: $109,027.00 DBE %: 4.17% District: 4 CREATIVE ENGINEERING GROUP INC 4.17% $109,027.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9259 Amount: $271,505.00 DBE Dollars: $8,145.14 DBE %: 3.00% District: 6 F.R. ALEMAN & ASSOCIATES, INC. 3.00% $8,145.14 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DL260 Amount: -$29,722.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DMQ37 Amount: -$831,207.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DN388 Amount: $549,167.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 7 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DN622 Amount: $1,500,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AECOM TECHNICAL SERVICES, INC. Amount: $8,015,203.00 DBE Dollars: $331,626.59 DBE % : 4.14% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AERIAL CARTOGRAPHICS OF AMERICA,INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U88 Amount: $281,144.00 DBE Dollars: $162,412.00 DBE %: 57.77% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 8.25% $1,000.00 DIVERSIFIED DESIGN & DRAFTING SERV 8.25% $26,902.00 DIVERSIFIED DESIGN & DRAFTING SERV 8.25% $26,902.00 DIVERSIFIED DESIGN & DRAFTING SERV 8.25% $26,902.00 DIVERSIFIED DESIGN & DRAFTING SERV 8.25% $26,902.00 DIVERSIFIED DESIGN & DRAFTING SERV 8.25% $26,902.00 DIVERSIFIED DESIGN & DRAFTING SERV 8.25% $26,902.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 8 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9324 Amount: $1,500,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AERIAL CARTOGRAPHICS OF AMERICA,INC Amount: $1,781,144.00 DBE Dollars: $162,412.00 DBE % : 9.12% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AIM ENGINEERING AND SURVEYING XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8331 Amount: -$137,423.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O50 Amount: $59,527.00 DBE Dollars: $7,277.00 DBE %: 12.22% District: 4 ACAI ASSOCIATES, INC. 12.22% $7,277.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P42 Amount: $121,408.00 DBE Dollars: $37,931.00 DBE %: 31.24% District: 1 FALLER, DAVIS AND ASSOC.,INC. 31.24% $37,931.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R84 Amount: -$18,287.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S78 Amount: $456,689.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 9 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T15 Amount: $15,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V85 Amount: $146,752.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W08 Amount: $201,647.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W20 Amount: $68,516.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W29 Amount: $471,316.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z14 Amount: $250,574.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9138 Amount: $1,863,782.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 10 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9270 Amount: $1,682,183.00 DBE Dollars: $347,027.00 DBE %: 20.63% District: 1 AERIAL INNOVATIONS, INC. .16% $2,659.00 ALLIED ENGINEERING & TESTING,INC. 2.91% $48,908.00 CELLA MOLNAR & ASSOCIATES, INC. 1.62% $27,302.00 HIGHSPANS ENGINEERING, INC. 8.42% $141,575.00 KINARD-STONE, INC. 7.52% $126,583.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9283 Amount: $1,500,000.00 DBE Dollars: $300,000.00 DBE %: 20.00% District: 1 3E Consultants, Inc. 7.00% $105,000.00 ADAMS TRAFFIC 2.00% $30,000.00 ARCHAEOLOGICAL CONSULTANTS, INC. 2.00% $30,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 7.00% $105,000.00 TIERRA, INC. 2.00% $30,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9305 Amount: $1,087,591.00 DBE Dollars: $69,574.00 DBE %: 6.40% District: 7 ELEMENT ENGINEERING GROUP,LLC 2.14% $23,255.00 ELEMENT ENGINEERING GROUP,LLC 2.14% $23,255.00 GARRETT ENGINEERING GROUP, INC. .23% $2,550.00 GARRETT ENGINEERING GROUP, INC. .23% $2,550.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 11 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount OMNI COMMUNICATIONS LLC 1.65% $17,964.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AIM ENGINEERING AND SURVEYING Amount: $7,769,275.00 DBE Dollars: $761,809.00 DBE % : 9.81% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ALBECK GERKEN, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9291 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 5 FLORIDA TRANSPORTATION ENGINEERING 10.00% $150,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ALDAY-HOWELL ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9048 Amount: $1,185,971.00 DBE Dollars: $124,540.00 DBE %: 10.50% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 5.71% $67,691.00 PEGASUS ENGINEERING LLC 4.79% $56,849.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ALLIED ENGINEERING & TESTING,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S53 Amount: $19,000.00 DBE Dollars: $19,000.00 DBE %: 100.00% District: 1 MEDIA RELATIONS GROUP LLC 100.00% $19,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V17 Amount: -$134,775.00 DBE Dollars: -$75,585.00 DBE %: 56.08% District: 1 ALLIED ENGINEERING & TESTING,INC. 56.08% -$75,585.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 12 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9113 Amount: $1,500,000.00 DBE Dollars: $885,000.00 DBE %: 59.00% District: 1 AERIAL INNOVATIONS, INC. 1.00% $15,000.00 ALLIED ENGINEERING & TESTING,INC. 48.00% $720,000.00 BOLT UNDERWATER 1.00% $15,000.00 CELLA MOLNAR & ASSOCIATES, INC. 1.00% $15,000.00 FLORIDA TRANSPORTATION ENGINEERING 1.00% $15,000.00 MEDIA RELATIONS GROUP LLC 1.00% $15,000.00 PAGE ONE CONSULTANTS, INC. 1.00% $15,000.00 THE VALERIN GROUP, INC. 5.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9116 Amount: $1,500,000.00 DBE Dollars: $885,000.00 DBE %: 59.00% District: 1 AERIAL INNOVATIONS, INC. 1.00% $15,000.00 ALLIED ENGINEERING & TESTING,INC. 49.00% $735,000.00 BAYSIDE ENGINEERING, INC. 1.00% $15,000.00 CELLA MOLNAR & ASSOCIATES, INC. 1.00% $15,000.00 MEDIA RELATIONS GROUP LLC 1.00% $15,000.00 PAGE ONE CONSULTANTS, INC. 1.00% $15,000.00 THE VALERIN GROUP, INC. 5.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9218 Amount: $764,219.00 DBE Dollars: $745,509.00 DBE %: 97.55% District: 1 ALLIED ENGINEERING & TESTING,INC. 96.35% $736,348.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 13 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.20% $9,161.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ALLIED ENGINEERING & TESTING,INC. Amount: $3,648,444.00 DBE Dollars: $2,458,924.00 DBE % : 67.40% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ALVAREZ ENGINEERS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P15 Amount: $55,693.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W10 Amount: $347,500.00 DBE Dollars: $14,750.00 DBE %: 4.24% District: 6 MANUEL G. VERA & ASSOCIATES, INC. 2.12% $4,750.00 MANUEL G. VERA & ASSOCIATES, INC. 2.12% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y33 Amount: $451,877.00 DBE Dollars: $36,150.04 DBE %: 8.00% District: 6 BOLTON PEREZ & ASSOCIATES 1.67% $8,848.79 BOLTON PEREZ & ASSOCIATES 1.67% $4,034.95 BOLTON PEREZ & ASSOCIATES 1.67% $9,710.00 NODARSE & ASSOCIATES, INC. 1.00% $5,309.27 NODARSE & ASSOCIATES, INC. 1.00% $2,420.97 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 14 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount NODARSE & ASSOCIATES, INC. 1.00% $5,826.06 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ALVAREZ ENGINEERS, INC. Amount: $855,070.00 DBE Dollars: $50,900.04 DBE % : 5.95% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AMEC E&I, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8C13 Amount: -$865,227.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P39 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 9 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U64 Amount: -$198,147.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X30 Amount: $143,517.00 DBE Dollars: $25,115.00 DBE %: 17.50% District: 1 JBS ENGINEERING TECHNICAL SERVICES INC 15.02% $21,554.00 THE VALERIN GROUP, INC. 2.48% $3,561.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X59 Amount: $44,583.00 DBE Dollars: $.00 DBE %: .00% District: 2 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 15 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z24 Amount: -$56,754.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9067 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 7 ALLIED ENGINEERING & TESTING,INC. 2.67% $40,000.00 ALLIED ENGINEERING & TESTING,INC. 2.67% $40,000.00 BAYSIDE ENGINEERING, INC. 1.33% $20,000.00 HIGHSPANS ENGINEERING, INC. .83% $12,500.00 HIGHSPANS ENGINEERING, INC. .83% $12,500.00 TIERRA, INC. 1.67% $25,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9164 Amount: $1,374,006.00 DBE Dollars: $172,522.00 DBE %: 12.56% District: 1 ALLIED ENGINEERING & TESTING,INC. 3.16% $43,474.00 HYATT SURVEY SERVICES, INC. 6.11% $83,910.00 THE VALERIN GROUP, INC. 3.29% $45,138.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9171 Amount: $387,660.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AMEC E&I, INC. Amount: $2,329,638.00 DBE Dollars: $347,637.00 DBE % : 14.92% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 16 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AMERICAN ACQUISITION GROUP, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DMY22 Amount: $188,100.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AMERICAN CONSULTING ENGINEERS OF FL XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A44 Amount: $15,000.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8D01 Amount: $33,798.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H83 Amount: $63,401.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J39 Amount: -$68,888.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M04 Amount: $330,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 17 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O63 Amount: $114,060.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R11 Amount: $38,955.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W55 Amount: $89,667.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X32 Amount: -$34,197.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y26 Amount: $177,119.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z84 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 1 CARLOS F NUNEZ P E 8.00% $120,000.00 HYATT SURVEY SERVICES, INC. 1.00% $15,000.00 TIERRA, INC. 1.00% $15,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9133 Amount: $706,233.00 DBE Dollars: $101,118.00 DBE %: 14.32% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 7.89% $55,731.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 18 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount NODARSE & ASSOCIATES, INC. 6.43% $45,387.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9184 Amount: $1,500,000.00 DBE Dollars: $210,000.00 DBE %: 14.00% District: 7 ARCHAEOLOGICAL CONSULTANTS, INC. 6.00% $90,000.00 BAYSIDE ENGINEERING, INC. .67% $10,000.00 BAYSIDE ENGINEERING, INC. .67% $10,000.00 BAYSIDE ENGINEERING, INC. .67% $10,000.00 KB ENVIRONMENTAL SCIENCES, INC. 1.33% $20,000.00 QUEST ECOLOGY, INC. - SC 2.67% $40,000.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 1.33% $20,000.00 TIERRA, INC. .67% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9228 Amount: $1,000,438.00 DBE Dollars: $146,429.00 DBE %: 14.64% District: 1 AMERICAN GOVERNMENT SERVICES CORP. .31% $3,150.00 ARCHAEOLOGICAL CONSULTANTS, INC. .20% $3,088.00 ARCHAEOLOGICAL CONSULTANTS, INC. .20% $953.00 HYATT SURVEY SERVICES, INC. 2.98% $29,855.00 NICHOLS LANDSCAPE ARCHITECTURE, IN 7.38% $73,850.00 PROTEAN DESIGN GROUP, INC. 3.55% $35,533.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9254 Amount: $583,257.00 DBE Dollars: $70,408.16 DBE %: 12.07% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 6.73% $39,244.76 ECOLOGICAL RESOURCE CONSULTANTS, I 3.78% $22,020.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 19 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount PROTEAN DESIGN GROUP, INC. 1.57% $9,143.40 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9311 Amount: $200,000.00 DBE Dollars: $10,000.00 DBE %: 5.00% District: 3 ARCHAEOLOGICAL CONSULTANTS, INC. 5.00% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AMERICAN CONSULTING ENGINEERS OF FL Amount: $6,248,843.00 DBE Dollars: $687,955.16 DBE % : 11.01% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AMERICAN ENGINEERING GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L27 Amount: -$374,827.00 DBE Dollars: -$374,827.00 DBE %: 100.00% District: 4 AMERICAN ENGINEERING GROUP, INC. 100.00% -$374,827.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9271 Amount: $1,766,404.00 DBE Dollars: $1,402,821.00 DBE %: 79.42% District: 8 AMERICAN ENGINEERING GROUP, INC. 59.63% $1,053,245.00 BCC ENGINEERING, INC. 19.79% $349,576.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AMERICAN ENGINEERING GROUP, INC. Amount: $1,391,577.00 DBE Dollars: $1,027,994.00 DBE % : 73.87% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 20 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ARCADIS U.S., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C6324 Amount: -$48,065.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8E22 Amount: $916,751.00 DBE Dollars: $20,550.00 DBE %: 2.24% District: 2 AMERICAN GOVERNMENT SERVICES CORP. 2.24% $20,550.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K91 Amount: $105,005.00 DBE Dollars: $10,154.00 DBE %: 9.67% District: 2 WAITZ & MOYE, INC. 9.67% $10,154.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M37 Amount: $14,851.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O94 Amount: $124,997.00 DBE Dollars: $31,907.00 DBE %: 25.53% District: 2 LANDMARK ENGINEERING INC. 15.91% $19,891.00 WAITZ & MOYE, INC. 9.61% $12,016.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q43 Amount: $19,667.00 DBE Dollars: $.00 DBE %: .00% District: 2 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 21 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9236 Amount: $126,549.00 DBE Dollars: $12,164.00 DBE %: 9.61% District: 2 GEOMATICS CORPORATION 9.61% $12,164.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9323 Amount: $5,517,808.00 DBE Dollars: $1,361,680.65 DBE %: 24.68% District: 2 AMERICAN GOVERNMENT SERVICES CORP. .59% $32,500.00 CSI GEO INC. 10.55% $582,248.68 ENVIRONMENTAL RESOURCE SOLUTIONS, .47% $25,963.76 F.R. ALEMAN & ASSOCIATES, INC. 1.71% $94,525.92 GHIOTTO & ASSOCIATES, INC. 6.49% $358,090.75 LANDMARK ENGINEERING INC. 2.76% $152,121.87 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 2.11% $116,229.67 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ARCADIS U.S., INC. Amount: $6,777,563.00 DBE Dollars: $1,436,455.65 DBE % : 21.19% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ARDAMAN & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S59 Amount: $1,220,000.00 DBE Dollars: $11,600.00 DBE %: .95% District: 5 ELIPSIS ENGINEERING & CONSULTING LLC .95% $11,600.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 22 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ATKINS NORTH AMERICA, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C6037 Amount: $300,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C6250 Amount: $67,020.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7114 Amount: $62,910.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8042 Amount: -$626,159.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8D35 Amount: $565,000.00 DBE Dollars: $111,981.00 DBE %: 19.82% District: 7 FALLER, DAVIS AND ASSOC.,INC. 4.47% $25,272.00 FALLER, DAVIS AND ASSOC.,INC. 4.47% $25,272.00 FALLER, DAVIS AND ASSOC.,INC. 4.47% $25,272.00 TIERRA, INC. 2.13% $12,055.00 TIERRA, INC. 2.13% $12,055.00 TIERRA, INC. 2.13% $12,055.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 23 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F59 Amount: $245,935.00 DBE Dollars: $3,071.12 DBE %: 1.25% District: 4 MONTGOMERY CONSULTING GROUP, INC. 1.25% $3,071.12 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G66 Amount: -$237,708.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I60 Amount: -$78,334.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P32 Amount: $64,906.00 DBE Dollars: $8,423.00 DBE %: 12.98% District: 4 PROGRESSIVE DESIGN & ENGR. INC. 12.98% $8,423.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q01 Amount: $1,405,350.00 DBE Dollars: $366,698.00 DBE %: 26.09% District: 7 TIERRA, INC. 26.09% $366,698.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q53 Amount: $7,898,106.00 DBE Dollars: $994,680.00 DBE %: 12.59% District: 8 DIX-LATHROP & ASSOCIATES, INC. .13% $10,192.00 FALLER, DAVIS AND ASSOC.,INC. 1.83% $176,297.00 FALLER, DAVIS AND ASSOC.,INC. 1.83% $112,506.00 MONTGOMERY CONSULTING GROUP, INC. 2.94% $161,839.00 MONTGOMERY CONSULTING GROUP, INC. 2.94% $519,289.00 MONTGOMERY CONSULTING GROUP, INC. 2.94% $14,557.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 24 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q62 Amount: $68,045.00 DBE Dollars: $3,402.25 DBE %: 5.00% District: 6 TIERRA, INC. 1.67% $531.20 TIERRA, INC. 1.67% $371.85 TIERRA, INC. 1.67% $2,499.20 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R29 Amount: $450,000.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R78 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R92 Amount: $44,897.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S93 Amount: $9,731,000.00 DBE Dollars: $1,183,292.00 DBE %: 12.16% District: 2 AMERICAN GOVERNMENT SERVICES CORP. 2.06% $200,000.00 BCC ENGINEERING, INC. .26% $25,000.00 BOWEN CIVIL ENGINEERING, INC. .77% $75,000.00 CAL-TECH TESTING, INC. .26% $25,000.00 CSI GEO INC. .51% $50,000.00 ENVIRONMENTAL RESOURCE SOLUTIONS, .26% $25,000.00 ENVIRONMENTAL RESOURCE SOLUTIONS, .26% $25,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 25 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount ENVIRONMENTAL TRANS PLANNING .39% $25,000.00 ENVIRONMENTAL TRANS PLANNING .39% $50,000.00 GEOMATICS CORPORATION .59% $50,000.00 GEOMATICS CORPORATION .59% $65,000.00 GEOTECH CONSULTANTS INTERNATIONAL, .26% $25,000.00 GHIOTTO & ASSOCIATES, INC. .62% $75,000.00 GHIOTTO & ASSOCIATES, INC. .62% $50,000.00 GHIOTTO & ASSOCIATES, INC. .62% $50,000.00 GHIOTTO & ASSOCIATES, INC. .62% $65,000.00 KELLY GRAPHICS .10% $10,000.00 LG2 ENVIRONMENTAL SOLUTIONS, INC. .29% $28,292.00 MTN RESOUCES LLC .72% $70,000.00 NODARSE & ASSOCIATES, INC. .26% $25,000.00 PETERS AND YAFFEE, INC. .26% $25,000.00 SALIBA ENGINEERING, INC. .26% $25,000.00 THE HESTER GROUP LLC 1.23% $120,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V58 Amount: $82,522.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W88 Amount: $154,000.00 DBE Dollars: $15,400.00 DBE %: 10.00% District: 9 E-SQUARED CONSULTING CORPORATION D 3.33% $5,100.00 E-SQUARED CONSULTING CORPORATION D 3.33% $5,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 26 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount E-SQUARED CONSULTING CORPORATION D 3.33% $5,300.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X52 Amount: $57,399.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y10 Amount: $50,000.00 DBE Dollars: $4,000.00 DBE %: 8.00% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 4.00% $2,000.00 HSA CONSULTING GROUP, INC. 4.00% $2,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y73 Amount: $3,775,854.00 DBE Dollars: $283,189.00 DBE %: 7.50% District: 3 GEOTECH CONSULTANTS INTERNATIONAL, 2.50% $94,397.00 MTN RESOUCES LLC 2.50% $94,396.00 PROJECT NAVIGATORS, INC. 2.50% $94,396.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z04 Amount: $5,000,000.00 DBE Dollars: $472,500.00 DBE %: 9.45% District: 1 ARCHAEOLOGICAL CONSULTANTS, INC. 2.00% $100,000.00 ASSET ENGINEERING INC .20% $10,000.00 COASTAL CONTRACT SOLUTIONS INC 1.00% $50,000.00 HYDRO SOLUTIONS CONSULTING 6.00% $300,000.00 MTN RESOUCES LLC .25% $12,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z68 Amount: $272,000.00 DBE Dollars: $57,120.00 DBE %: 21.00% District: 6 ADRIAN GONZALEZ & ASSOCIATES, P.A. 3.00% $8,160.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 27 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount BASULTO & ASSOCIATES, INC. 4.00% $10,880.00 BASULTO & ASSOCIATES, INC. 4.00% $10,880.00 DOVETAIL CONSULTING, INC. 10.00% $27,200.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z94 Amount: $30,000,000.00 DBE Dollars: $3,297,045.00 DBE %: 10.99% District: 7 ANALYTIC ENGINEERING, INCORPORATED .06% $16,667.00 ANALYTIC ENGINEERING, INCORPORATED .06% $16,667.00 ANALYTIC ENGINEERING, INCORPORATED .06% $16,667.00 ARCHAEOLOGICAL CONSULTANTS, INC. .17% $50,000.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 BAYSIDE ENGINEERING, INC. .10% $30,371.00 CARLOS F NUNEZ P E .02% $5,000.00 CARLOS F NUNEZ P E .02% $5,000.00 CARLOS F NUNEZ P E .02% $5,000.00 COASTAL CONTRACT SOLUTIONS INC 1.67% $500,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 28 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts Total DBE % .28% .28% .28% .08% .08% .08% .09% .09% .09% .09% .09% .09% .09% .09% .02% .02% .02% .02% .02% .02% .02% .02% .20% Subcontractor COLLINS SURVEY CONSULTING LLC COLLINS SURVEY CONSULTING LLC COLLINS SURVEY CONSULTING LLC ELEMENT ENGINEERING GROUP,LLC ELEMENT ENGINEERING GROUP,LLC ELEMENT ENGINEERING GROUP,LLC FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. IMPRESSIVE PRODUCTS INC EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 29 DBE Commitment Amount $83,333.00 $83,333.00 $83,333.00 $25,000.00 $25,000.00 $25,000.00 $26,875.00 $26,875.00 $26,875.00 $26,875.00 $26,875.00 $26,875.00 $26,875.00 $26,875.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $60,000.00 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount INDEPENDENCE ACQUISITION & APP,LLC .03% $10,000.00 INDEPENDENCE ACQUISITION & APP,LLC .03% $10,000.00 INDEPENDENCE ACQUISITION & APP,LLC .03% $10,000.00 INDEPENDENCE ACQUISITION & APP,LLC .03% $10,000.00 MARTINO PLANNING & ASSOCIATES, INC .03% $10,000.00 MARTINO PLANNING & ASSOCIATES, INC .03% $10,000.00 MARTINO PLANNING & ASSOCIATES, INC .03% $10,000.00 MARTINO PLANNING & ASSOCIATES, INC .03% $10,000.00 OMNI COMMUNICATIONS LLC 3.92% $1,175,000.00 THE HEIMBURG GROUP, INC. .32% $95,000.00 THE HEIMBURG GROUP, INC. .32% $95,000.00 THE HEIMBURG GROUP, INC. .32% $95,000.00 THE HEIMBURG GROUP, INC. .32% $95,000.00 THE HEIMBURG GROUP, INC. .32% $95,000.00 TIERRA, INC. .01% $1,667.00 TIERRA, INC. .01% $1,667.00 TIERRA, INC. .01% $1,667.00 TIERRA, INC. .01% $1,667.00 TIERRA, INC. .01% $1,667.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9009 Amount: $124,279.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 30 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9105 Amount: $15,000,000.00 DBE Dollars: $1,500,000.00 DBE %: 10.00% District: 9 E-SQUARED CONSULTING CORPORATION D 3.33% $500,000.00 ELAND ENGINEERING INC. 3.33% $500,000.00 MONTGOMERY CONSULTING GROUP, INC. 3.33% $500,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9192 Amount: $190,000.00 DBE Dollars: $7,600.00 DBE %: 4.00% District: 6 PROGRESSIVE DESIGN & ENGR. INC. 1.00% $2,000.00 PROGRESSIVE DESIGN & ENGR. INC. 1.00% $1,800.00 TIERRA SOUTH FLORIDA, INC. 1.00% $2,000.00 TIERRA SOUTH FLORIDA, INC. 1.00% $1,800.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9222 Amount: $368,790.00 DBE Dollars: $36,879.00 DBE %: 10.00% District: 3 Carpe Diem Community Solutions 10.00% $36,879.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9277 Amount: $7,000,000.00 DBE Dollars: $594,999.98 DBE %: 8.50% District: 4 C SOLUTIONS, INC. 2.83% $198,333.32 CURTIS & ROGERS DESIGN STUDIO INC 2.83% $198,333.32 MONTGOMERY CONSULTING GROUP, INC. 2.83% $198,333.34 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9278 Amount: $13,879,400.00 DBE Dollars: $2,080,789.00 DBE %: 14.99% District: 7 BOLT UNDERWATER SERVICES, INC. .20% $27,585.00 JBS ENGINEERING TECHNICAL SERVICES INC 3.59% $498,079.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 31 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount KEYSTONE CIVIL, INCORPORATED 11.20% $1,555,125.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9292 Amount: $228,761.00 DBE Dollars: $23,005.00 DBE %: 10.06% District: 3 MTN RESOUCES LLC 10.06% $23,005.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9343 Amount: $266,240.00 DBE Dollars: $213,965.00 DBE %: 80.37% District: 3 MTN RESOUCES LLC 80.37% $213,965.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9351 Amount: $277,976.00 DBE Dollars: $23,465.00 DBE %: 8.44% District: 6 BOLTON PEREZ & ASSOCIATES 8.44% $23,465.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ATKINS NORTH AMERICA, INC. Amount: $96,688,189.00 DBE Dollars: $11,281,504.35 DBE % : 11.67% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AVCON, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R55 Amount: $78,015.00 DBE Dollars: $4,133.00 DBE %: 5.30% District: 5 GMB ENGINEERS & PLANNERS, INC. 5.30% $4,133.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 32 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AYRES ASSOCIATES INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8C76 Amount: $143,935.00 DBE Dollars: $28,902.00 DBE %: 20.08% District: 2 ENVIRONMENTAL RESOURCE SOLUTIONS, 6.69% $8,691.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 6.69% $9,540.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 6.69% $10,671.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M46 Amount: -$28,629.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U89 Amount: $400,000.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X31 Amount: $1,034,987.00 DBE Dollars: $103,497.00 DBE %: 10.00% District: 5 GCI, INC. 1.11% $8,070.00 GCI, INC. 1.11% $7,915.00 GCI, INC. 1.11% $18,514.00 HYATT SURVEY SERVICES, INC. 1.11% $8,070.00 HYATT SURVEY SERVICES, INC. 1.11% $7,915.00 HYATT SURVEY SERVICES, INC. 1.11% $18,514.00 NODARSE & ASSOCIATES, INC. 1.11% $8,070.00 NODARSE & ASSOCIATES, INC. 1.11% $7,915.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 33 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount NODARSE & ASSOCIATES, INC. 1.11% $18,514.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AYRES ASSOCIATES INC Amount: $1,550,293.00 DBE Dollars: $132,399.00 DBE % : 8.54% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BASLEE ENGINEERING SOLUTIONS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9373 Amount: $282,537.00 DBE Dollars: $195,659.00 DBE %: 69.25% District: 3 BASLEE ENGINEERING SOLUTIONS, INC. 68.20% $192,700.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 1.05% $2,959.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BAYSIDE ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W96 Amount: $25,000.00 DBE Dollars: $25,000.00 DBE %: 100.00% District: 7 BAYSIDE ENGINEERING, INC. 100.00% $25,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BCC ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H25 Amount: $99,607.00 DBE Dollars: $99,607.00 DBE %: 100.00% District: 6 BCC ENGINEERING, INC. 50.00% $74,360.00 BCC ENGINEERING, INC. 50.00% $25,247.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 34 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K03 Amount: -$6,863.00 DBE Dollars: -$6,656.44 DBE %: 96.99% District: 6 BCC ENGINEERING, INC. 89.99% -$6,176.00 CROSSROADS ENGINEERING DATA, INC. 4.00% -$274.54 MEDIA RELATIONS GROUP LLC 3.00% -$205.90 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P71 Amount: $357,255.00 DBE Dollars: $7,148.00 DBE %: 2.00% District: 6 TIERRA, INC. .67% -$3.00 TIERRA, INC. .67% $2,151.00 TIERRA, INC. .67% $5,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T03 Amount: -$36,254.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U72 Amount: $189,239.00 DBE Dollars: $8,691.00 DBE %: 4.59% District: 7 CARLOS F NUNEZ P E 4.59% $8,691.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9103 Amount: $716,540.00 DBE Dollars: $536,801.44 DBE %: 74.92% District: 4 BCC ENGINEERING, INC. 72.79% $521,595.00 TIERRA SOUTH FLORIDA, INC. 2.12% $15,206.44 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9331 Amount: $150,000.00 DBE Dollars: $99,000.00 DBE %: 66.00% District: 6 BCC ENGINEERING, INC. 55.00% $82,500.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 35 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount HR ENGINEERING SERVICES, INC. 5.00% $7,500.00 MANUEL G. VERA & ASSOCIATES, INC. 4.00% $6,000.00 MEDIA RELATIONS GROUP LLC 2.00% $3,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9383 Amount: $348,786.00 DBE Dollars: $193,818.00 DBE %: 55.57% District: 8 BCC ENGINEERING, INC. 47.28% $164,889.00 MANUEL G. VERA & ASSOCIATES, INC. 8.29% $28,929.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BCC ENGINEERING, INC. Amount: $1,818,310.00 DBE Dollars: $938,409.00 DBE % : 51.61% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BEISWENGER, HOCH & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A01 Amount: -$28,720.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BENTLEY ARCHITECTS & ENGINEERS,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N43 Amount: $24,827.00 DBE Dollars: $10,252.00 DBE %: 41.29% District: 2 GMB ENGINEERS & PLANNERS, INC. 31.56% $7,836.00 MILAN ENGINEERING INC 9.73% $2,416.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 36 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O13 Amount: $50,000.00 DBE Dollars: $10,000.00 DBE %: 20.00% District: 3 COST MANAGEMENT 5.00% $2,500.00 DIVERSIFIED DESIGN & DRAFTING SERV 5.00% $2,500.00 MAI LANDSCAPE ARCHITECTS, INC. 5.00% $2,500.00 MILAN ENGINEERING INC 5.00% $2,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U00 Amount: $7,145.00 DBE Dollars: $4,518.00 DBE %: 63.23% District: 5 PROTEAN DESIGN GROUP, INC. 63.23% $4,518.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9353 Amount: $681,227.00 DBE Dollars: $393,919.00 DBE %: 57.82% District: 5 GEODATA CONSULTANTS, INC. 27.64% $59,487.00 GEODATA CONSULTANTS, INC. 27.64% $317,033.00 PROTEAN DESIGN GROUP, INC. 2.55% $17,399.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BENTLEY ARCHITECTS & ENGINEERS,INC. Amount: $763,199.00 DBE Dollars: $418,689.00 DBE % : 54.86% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BERGMANN ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y21 Amount: $115,325.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 37 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9027 Amount: $477,666.00 DBE Dollars: $65,832.04 DBE %: 13.78% District: 4 CSI GEO INC. 13.78% $65,832.04 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9145 Amount: $574,489.00 DBE Dollars: $61,064.85 DBE %: 10.63% District: 4 CSI GEO INC. 10.63% $61,064.85 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BERGMANN ASSOCIATES, INC. Amount: $1,167,480.00 DBE Dollars: $126,896.89 DBE % : 10.87% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BERMELLO AJAMIL & PARTNERS INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9312 Amount: $285,471.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BISCAYNE ENGINEERING CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q56 Amount: $47,500.00 DBE Dollars: $.00 DBE %: .00% District: 6 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 38 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9083 Amount: $225,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BISCAYNE ENGINEERING CO., INC. Amount: $272,500.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BLACKMON ROBERTS GROUP INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: BDP09 Amount: $500,000.00 DBE Dollars: $500,000.00 DBE %: 100.00% District: 9 BLACKMON ROBERTS GROUP INC 100.00% $500,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BND ENGINEERS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9020 Amount: $265,447.00 DBE Dollars: $220,323.00 DBE %: 83.00% District: 6 BND ENGINEERS, INC. 76.12% $202,058.00 EBS ENGINEERING, INC. 3.44% $12,135.00 EBS ENGINEERING, INC. 3.44% $6,130.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 39 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BOLTON PEREZ & ASSOCIATES XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I76 Amount: -$8,120.00 DBE Dollars: -$8,120.00 DBE %: 100.00% District: 4 BOLTON PEREZ & ASSOCIATES 100.00% -$8,120.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L98 Amount: $2,576,990.00 DBE Dollars: $1,604,006.00 DBE %: 62.24% District: 6 BOLTON PEREZ & ASSOCIATES 4.97% $101,953.00 BOLTON PEREZ & ASSOCIATES 4.97% $303,925.00 BOLTON PEREZ & ASSOCIATES 4.97% $10,462.00 BOLTON PEREZ & ASSOCIATES 4.97% $134,870.00 BOLTON PEREZ & ASSOCIATES 4.97% $22,094.00 BOLTON PEREZ & ASSOCIATES 4.97% $85,478.00 BOLTON PEREZ & ASSOCIATES 4.97% $384,308.00 BOLTON PEREZ & ASSOCIATES 4.97% -$200.00 BOLTON PEREZ & ASSOCIATES 4.97% $13,939.00 BOLTON PEREZ & ASSOCIATES 4.97% $255,945.00 BOLTON PEREZ & ASSOCIATES 4.97% $96,466.00 PINNACLE CONSULTING ENTERPRISES INC 3.78% $146,077.00 PINNACLE CONSULTING ENTERPRISES INC 3.78% $48,689.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z46 Amount: $242,815.00 DBE Dollars: $165,682.00 DBE %: 68.23% District: 6 BOLTON PEREZ & ASSOCIATES 23.35% $106,863.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 40 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount BOLTON PEREZ & ASSOCIATES 23.35% $6,548.00 PROGRESSIVE DESIGN & ENGR. INC. 21.53% $52,271.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9235 Amount: $216,943.00 DBE Dollars: $152,970.00 DBE %: 70.51% District: 6 BOLTON PEREZ & ASSOCIATES 70.51% $152,970.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9269 Amount: $452,194.00 DBE Dollars: $361,464.00 DBE %: 79.94% District: 6 A2 GROUP, INC. 2.01% $9,467.00 A2 GROUP, INC. 2.01% $8,679.00 BOLTON PEREZ & ASSOCIATES 37.96% $180,000.00 BOLTON PEREZ & ASSOCIATES 37.96% $163,318.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BOLTON PEREZ & ASSOCIATES Amount: $3,480,822.00 DBE Dollars: $2,276,002.00 DBE % : 65.39% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BOTAS ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R35 Amount: $398,924.00 DBE Dollars: $355,574.00 DBE %: 89.13% District: 6 BOTAS ENGINEERING, INC. 44.57% $199,576.00 BOTAS ENGINEERING, INC. 44.57% $155,998.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 41 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BOWEN CIVIL ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P65 Amount: -$19,967.00 DBE Dollars: -$19,967.00 DBE %: 100.00% District: 2 BOWEN CIVIL ENGINEERING, INC. 100.00% -$19,967.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9030 Amount: $1,500,000.00 DBE Dollars: $1,500,000.00 DBE %: 100.00% District: 2 BOWEN CIVIL ENGINEERING, INC. 98.00% $1,470,000.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 2.00% $30,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BOWEN CIVIL ENGINEERING, INC. Amount: $1,480,033.00 DBE Dollars: $1,480,033.00 DBE % : 100.00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BOWYER-SINGLETON & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7428 Amount: $31,995.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8D14 Amount: $.00 DBE Dollars: -$3.00 DBE %: .00% District: 5 ECHEZABAL & ASSOCIATES, INC. .00% -$1.00 ECHEZABAL & ASSOCIATES, INC. .00% -$1.00 ECHEZABAL & ASSOCIATES, INC. .00% -$1.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 42 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J29 Amount: $450,887.00 DBE Dollars: $6,131.00 DBE %: 1.36% District: 1 ARCHAEOLOGICAL CONSULTANTS, INC. 1.36% $6,131.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y94 Amount: $251,415.00 DBE Dollars: $93,626.00 DBE %: 37.24% District: 8 NADIC ENGINEERING SERVICES, INC. 21.51% $54,069.00 OMNI COMMUNICATIONS LLC 5.22% $13,117.00 THE BALMORAL GROUP 10.52% $26,440.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9031 Amount: $4,328,006.00 DBE Dollars: $1,049,774.00 DBE %: 24.26% District: 1 AMERICAN GOVERNMENT SERVICES CORP. .60% $26,100.00 ARCHAEOLOGICAL CONSULTANTS, INC. .15% $6,468.00 GMB ENGINEERS & PLANNERS, INC. 4.75% $205,662.00 INFRASTRUCTURE ENGINEERS, INC. .14% $6,000.00 OMNI COMMUNICATIONS LLC .92% $39,895.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.29% $55,671.00 THE BALMORAL GROUP 5.71% $247,124.00 TIERRA, INC. 10.69% $462,854.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9144 Amount: $313,342.00 DBE Dollars: $14,026.00 DBE %: 4.48% District: 5 OMNI COMMUNICATIONS LLC 4.48% $14,026.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 43 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9154 Amount: $680,062.00 DBE Dollars: $90,297.00 DBE %: 13.28% District: 2 AEROSTAR ENVIRONMENTAL SERVICES,IN 1.58% $10,716.00 AMERICAN GOVERNMENT SERVICES CORP. .88% $6,000.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 2.73% $18,556.00 NODARSE & ASSOCIATES, INC. 8.09% $55,025.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BOWYER-SINGLETON & ASSOCIATES, INC. Amount: $6,055,707.00 DBE Dollars: $1,253,851.00 DBE % : 20.71% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BRINDLEY PIETERS & ASSOC.,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9132 Amount: $520,884.00 DBE Dollars: $500,320.61 DBE %: 96.05% District: 3 BRINDLEY PIETERS & ASSOC.,INC. 71.81% $374,063.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.68% $13,980.71 HSA CONSULTING GROUP, INC. 21.56% $112,276.90 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BUFORD DAVIS & ASSOCIATES XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T87 Amount: $19,915.00 DBE Dollars: $.00 DBE %: .00% District: 2 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 44 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BUREAU VERITAS NORTH AMERICA,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P40 Amount: $.00 DBE Dollars: $250,000.00 DBE %: .00% District: 9 BOLTON PEREZ & ASSOCIATES .00% $150,000.00 TIERRA, INC. .00% $100,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BURGESS & NIPLE, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X29 Amount: $44,879.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z86 Amount: $219,513.00 DBE Dollars: $12,837.86 DBE %: 5.85% District: 4 TIERRA SOUTH FLORIDA, INC. 5.85% $12,837.86 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9146 Amount: $316,626.00 DBE Dollars: $51,315.00 DBE %: 16.21% District: 5 ECHEZABAL & ASSOCIATES, INC. 16.21% $51,315.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BURGESS & NIPLE, INC. Amount: $581,018.00 DBE Dollars: $64,152.86 DBE % : 11.04% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 45 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BURNS & MCDONNELL ENGR.CO.,INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I40 Amount: -$4,665.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M66 Amount: $316,988.00 DBE Dollars: $67,599.60 DBE %: 21.33% District: 4 CTS ENGINEERING, INC. 10.66% $34,599.60 CTS ENGINEERING, INC. 10.66% $33,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P85 Amount: $29,468.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W70 Amount: $7,248.00 DBE Dollars: $2,393.00 DBE %: 33.02% District: 6 FLORIDA TRANSPORTATION ENGINEERING 33.02% $2,393.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9044 Amount: $900,000.00 DBE Dollars: $225,000.00 DBE %: 25.00% District: 6 CROSSROADS ENGINEERING DATA, INC. 2.50% $15,000.00 CROSSROADS ENGINEERING DATA, INC. 2.50% $30,000.00 CTS ENGINEERING, INC. 5.00% $30,000.00 CTS ENGINEERING, INC. 5.00% $60,000.00 FLORIDA TRANSPORTATION ENGINEERING 5.00% $30,000.00 FLORIDA TRANSPORTATION ENGINEERING 5.00% $60,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 46 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9080 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 CH PEREZ & ASSOC.,CONSULTING ENGR. 10.00% $150,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BURNS & MCDONNELL ENGR.CO.,INC Amount: $2,749,039.00 DBE Dollars: $444,992.60 DBE % : 16.19% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : C H PEREZ & ASSOCIATES CONSULTING XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9060 Amount: $361,000.00 DBE Dollars: $361,000.00 DBE %: 100.00% District: 6 C H PEREZ & ASSOCIATES CONSULTING 46.25% $10,175.00 C H PEREZ & ASSOCIATES CONSULTING 46.25% $323,750.00 FLORIDA TRANSPORTATION ENGINEERING 3.75% $825.00 FLORIDA TRANSPORTATION ENGINEERING 3.75% $26,250.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CAL-TECH TESTING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P52 Amount: $38,481.00 DBE Dollars: $37,263.00 DBE %: 96.83% District: 2 CAL-TECH TESTING, INC. 46.83% $46,298.00 CAL-TECH TESTING, INC. 46.83% -$10,253.00 NODARSE & ASSOCIATES, INC. 3.17% $1,218.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 47 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9183 Amount: $1,500,000.00 DBE Dollars: $1,095,000.00 DBE %: 73.00% District: 2 CAL-TECH TESTING, INC. 68.00% $1,020,000.00 CSI GEO INC. 2.00% $30,000.00 NODARSE & ASSOCIATES, INC. 2.00% $30,000.00 SALIBA ENGINEERING, INC. 1.00% $15,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CAL-TECH TESTING, INC. Amount: $1,538,481.00 DBE Dollars: $1,132,263.00 DBE % : 73.60% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CALVIN, GIORDANO & ASSOCIATES,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J14 Amount: -$39,381.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q55 Amount: $250,000.00 DBE Dollars: $25,000.00 DBE %: 10.00% District: 4 FLORIDA TRANSPORTATION ENGINEERING 10.00% $25,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9170 Amount: $393,691.00 DBE Dollars: $50,093.91 DBE %: 12.72% District: 4 PROGRESSIVE DESIGN & ENGR. INC. 10.53% $41,468.91 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 48 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount R J BEHAR & COMPANY INC 2.19% $8,625.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CALVIN, GIORDANO & ASSOCIATES,INC. Amount: $604,310.00 DBE Dollars: $75,093.91 DBE % : 12.43% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CAMBRIDGE SYSTEMATICS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V69 Amount: $2,000,000.00 DBE Dollars: $160,000.00 DBE %: 8.00% District: 9 JANE MATHIS AND ASSOCIATES 4.00% $80,000.00 PLANNING COMMUNITIES, LLC 4.00% $80,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CARNAHAN, PROCTOR AND CROSS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q22 Amount: -$666,572.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q58 Amount: $498,034.00 DBE Dollars: $255,650.22 DBE %: 51.33% District: 6 TAMAYO ENGINEERING, LLC 17.11% -$2.78 TAMAYO ENGINEERING, LLC 17.11% $194,534.00 TAMAYO ENGINEERING, LLC 17.11% $61,119.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V59 Amount: -$40,485.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 49 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y99 Amount: $283,523.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9032 Amount: $1,848,468.00 DBE Dollars: $249,971.00 DBE %: 13.52% District: 4 F & J ENGINEERING, INC. 13.52% $249,971.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CARNAHAN, PROCTOR AND CROSS, INC. Amount: $1,922,968.00 DBE Dollars: $505,621.22 DBE % : 26.29% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CH PEREZ AND ASSOCIATES CONSULTING XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M18 Amount: $195,000.00 DBE Dollars: $195,000.00 DBE %: 100.00% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 50.00% $80,000.00 CH PEREZ & ASSOC.,CONSULTING ENGR. 50.00% $115,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X87 Amount: $885,504.00 DBE Dollars: $768,903.00 DBE %: 86.83% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 28.94% $200,000.00 CH PEREZ & ASSOC.,CONSULTING ENGR. 28.94% $318,941.00 CH PEREZ & ASSOC.,CONSULTING ENGR. 28.94% $249,962.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9051 Amount: $1,500,000.00 DBE Dollars: $1,500,000.00 DBE %: 100.00% District: 4 CH PEREZ & ASSOC.,CONSULTING ENGR. 100.00% $1,500,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 50 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9060 Amount: $305,599.00 DBE Dollars: $305,598.92 DBE %: 100.00% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 92.50% $282,679.00 FLORIDA TRANSPORTATION ENGINEERING 7.50% $22,919.92 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CH PEREZ AND ASSOCIATES CONSULTING Amount: $2,886,103.00 DBE Dollars: $2,769,501.92 DBE % : 95.96% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CH2M HILL, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F16 Amount: $354,646.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H64 Amount: $15,492.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I06 Amount: $280,000.00 DBE Dollars: $16,800.00 DBE %: 6.00% District: 5 BUCHHEIT ASSOCIATES,INC. 3.00% $8,400.00 STRICKLAND ENVIRONMENTAL, INC. 3.00% $8,400.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O04 Amount: $8,967.00 DBE Dollars: $.00 DBE %: .00% District: 8 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 51 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q19 Amount: $32,882.00 DBE Dollars: $4,644.00 DBE %: 14.12% District: 2 PETERS AND YAFFEE, INC. 14.12% $4,644.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X91 Amount: $850,635.00 DBE Dollars: $94,404.00 DBE %: 11.10% District: 8 GCME, INC. 3.70% $56,665.00 GCME, INC. 3.70% $12,229.00 GCME, INC. 3.70% $25,510.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z22 Amount: $506,496.00 DBE Dollars: $87,787.00 DBE %: 17.33% District: 2 CSI GEO INC. 17.33% $87,787.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9028 Amount: $553,869.00 DBE Dollars: $51,093.00 DBE %: 9.22% District: 7 JOHNSON-ADAMS & ASSOCIATES, LLC .34% $1,863.00 JOHNSON-ADAMS & ASSOCIATES, LLC .34% $1,863.00 OMNI COMMUNICATIONS LLC 3.65% $20,238.00 THE HEIMBURG GROUP, INC. 1.63% $9,043.00 THE HEIMBURG GROUP, INC. 1.63% $9,043.00 THE HEIMBURG GROUP, INC. 1.63% $9,043.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9265 Amount: $559,975.00 DBE Dollars: $57,541.00 DBE %: 10.28% District: 5 ANTILLIAN ENGR. ASSOCIATES, INC. 2.03% $11,347.00 ARCHAEOLOGICAL CONSULTANTS, INC. 3.07% $17,190.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 52 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount BUCHHEIT ASSOCIATES,INC. 2.30% $12,869.00 KB ENGINEERING, LLC 2.88% $16,135.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CH2M HILL, INC. Amount: $3,162,962.00 DBE Dollars: $312,269.00 DBE % : 9.87% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CHA COMPANIES OF NEW YORK, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V02 Amount: $200,000.00 DBE Dollars: $20,000.00 DBE %: 10.00% District: 5 BASLEE ENGINEERING SOLUTIONS, INC. 10.00% $20,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z97 Amount: -$3,232.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CHA COMPANIES OF NEW YORK, INC. Amount: $196,768.00 DBE Dollars: $20,000.00 DBE % : 10.16% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CHA, INC., D/B/A CLOUGH HARBOUR & A XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z97 Amount: $194,282.00 DBE Dollars: $34,696.42 DBE %: 17.86% District: 5 BASLEE ENGINEERING SOLUTIONS, INC. 17.86% $34,696.42 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 53 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CIVIL SERVICES INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z71 Amount: $1,086,736.00 DBE Dollars: $233,864.00 DBE %: 21.52% District: 3 CIVIL SERVICES INC. 4.41% $47,964.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 5.70% $185,900.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 5.70% $54,596.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 5.70% -$54,596.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CIVIL WORKS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O95 Amount: $54,411.00 DBE Dollars: $42,330.62 DBE %: 77.80% District: 4 CIVIL WORKS, INC. 77.80% $42,330.62 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W46 Amount: $51,197.00 DBE Dollars: $51,197.00 DBE %: 100.00% District: 6 CIVIL WORKS, INC. 38.51% $19,714.00 F.R. ALEMAN & ASSOCIATES, INC. 61.49% $31,483.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9119 Amount: $670,974.00 DBE Dollars: $670,974.00 DBE %: 100.00% District: 6 CIVIL WORKS, INC. 26.60% $86,039.00 CIVIL WORKS, INC. 26.60% $270,974.00 CURTIS & ROGERS DESIGN STUDIO INC 1.30% $6,940.00 CURTIS & ROGERS DESIGN STUDIO INC 1.30% $10,485.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 54 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount GEOSOL, INC. 4.99% $33,475.00 MANUEL G. VERA & ASSOCIATES, INC. 18.44% $83,811.00 MANUEL G. VERA & ASSOCIATES, INC. 18.44% $163,662.00 MEDIA RELATIONS GROUP LLC 1.16% $8,327.00 MEDIA RELATIONS GROUP LLC 1.16% $7,261.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CIVIL WORKS, INC. Amount: $776,582.00 DBE Dollars: $764,501.62 DBE % : 98.44% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COMPREHENSIVE ENGINEERING SERVICES XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B36 Amount: -$500,000.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8E36 Amount: $109,277.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R85 Amount: $439,602.00 DBE Dollars: $33,553.30 DBE %: 7.63% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.91% $17,792.30 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.91% $5,947.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.91% $3,867.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.91% $5,947.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 55 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T38 Amount: $604,550.00 DBE Dollars: $257,514.85 DBE %: 42.60% District: 2 3E Consultants, Inc. .95% $5,768.00 AMERICAN GOVERNMENT SERVICES CORP. 5.22% $31,530.00 GHIOTTO & ASSOCIATES, INC. 29.32% $177,275.85 NODARSE & ASSOCIATES, INC. 5.52% $33,350.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 1.59% $9,591.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T69 Amount: $49,673.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V39 Amount: $114,723.00 DBE Dollars: $34,316.58 DBE %: 29.91% District: 2 3E Consultants, Inc. .61% $700.00 ANTILLIAN ENGR. ASSOCIATES, INC. 7.70% $8,828.58 GHIOTTO & ASSOCIATES, INC. 21.61% $24,788.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W93 Amount: $20,743.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9148 Amount: $469,253.00 DBE Dollars: $28,959.00 DBE %: 6.17% District: 5 DANNICK ENGINEERING CONSULTANTS, I 2.11% $9,894.00 NODARSE & ASSOCIATES, INC. 1.60% $7,518.00 QUEST CORPORATION OF AMERICA, INC. 2.46% $11,547.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 56 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9226 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 1 DANNICK ENGINEERING CONSULTANTS, I 10.00% $150,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9241 Amount: $419,311.00 DBE Dollars: $41,401.86 DBE %: 9.87% District: 2 3E Consultants, Inc. 2.21% $9,247.34 ANTILLIAN ENGR. ASSOCIATES, INC. 3.84% $16,081.20 LANDMARK ENGINEERING INC. 3.83% $16,073.32 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9245 Amount: $2,212,404.00 DBE Dollars: $450,988.62 DBE %: 20.38% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 18.40% $407,094.53 QUEST CORPORATION OF AMERICA, INC. .52% $11,437.00 THE BALMORAL GROUP 1.47% $32,457.09 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9264 Amount: $1,413,603.00 DBE Dollars: $102,974.00 DBE %: 7.28% District: 1 AMERICAN GOVERNMENT SERVICES CORP. .70% $9,860.00 ARCHAEOLOGICAL CONSULTANTS, INC. .49% $6,989.00 CIVILSURV DESIGN GROUP, INC. .71% $9,978.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 2.67% $37,791.00 TIERRA, INC. 2.07% $29,255.00 TLP ENGINEERING CONSULTANTS, INC. .64% $9,101.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 57 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9276 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For COMPREHENSIVE ENGINEERING SERVICES Amount: $6,853,139.00 DBE Dollars: $1,099,708.21 DBE % : 16.05% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CONNELLY & WICKER INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L62 Amount: $249,781.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P80 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T93 Amount: $295,609.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V86 Amount: $156,712.00 DBE Dollars: $32,360.18 DBE %: 20.65% District: 2 LANDMARK ENGINEERING INC. 20.65% $32,360.18 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9016 Amount: $688,470.00 DBE Dollars: $205,748.00 DBE %: 29.88% District: 3 LANDMARK ENGINEERING INC. 2.41% $16,584.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 58 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount PETERS AND YAFFEE, INC. 13.74% $94,582.00 PETERS AND YAFFEE, INC. 13.74% $94,582.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CONNELLY & WICKER INC. Amount: $1,390,572.00 DBE Dollars: $238,108.18 DBE % : 17.12% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CONSTRUCTION ENGINEERING CONSULTANT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H27 Amount: -$81,416.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q83 Amount: -$365.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CONSTRUCTION ENGINEERING CONSULTANT Amount: -$81,781.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CONSUL-TECH ENTERPRISES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C5861 Amount: -$104,770.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 59 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7348 Amount: $251,447.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8286 Amount: $3,005,487.00 DBE Dollars: $180,265.00 DBE %: 6.00% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. .69% $20,765.00 CH PEREZ AND ASSOCIATES CONSULTING 3.45% $103,675.00 GEOSOL, INC. 1.86% $55,825.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K99 Amount: -$29,535.00 DBE Dollars: -$1,157.28 DBE %: 3.92% District: 6 BOLTON PEREZ & ASSOCIATES .62% $1,815.00 BOLTON PEREZ & ASSOCIATES .62% -$1,993.92 BOLTON PEREZ & ASSOCIATES .62% -$374.00 HR ENGINEERING SERVICES, INC. .68% $1,611.29 HR ENGINEERING SERVICES, INC. .68% -$1,865.97 HR ENGINEERING SERVICES, INC. .68% -$349.68 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L42 Amount: $50,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W82 Amount: $218,542.00 DBE Dollars: $28,589.00 DBE %: 13.08% District: 6 BOLTON PEREZ & ASSOCIATES 2.54% $5,545.00 CH PEREZ & ASSOC.,CONSULTING ENGR. 4.26% $15,649.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 60 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount CH PEREZ & ASSOC.,CONSULTING ENGR. 4.26% $2,973.00 NETWORK ENGINEERING SERVICES 2.02% $4,422.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9011 Amount: $2,680,141.00 DBE Dollars: $159,210.00 DBE %: 5.94% District: 6 QUEST CORPORATION OF AMERICA, INC. 5.94% $159,210.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9112 Amount: $1,251,438.00 DBE Dollars: $91,222.39 DBE %: 7.29% District: 6 BCC ENGINEERING, INC. 2.43% $37,622.39 BCC ENGINEERING, INC. 2.43% $40,000.00 BCC ENGINEERING, INC. 2.43% $13,600.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CONSUL-TECH ENTERPRISES, INC. Amount: $7,322,750.00 DBE Dollars: $458,129.11 DBE % : 6.26% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CORZO CASTELLA CARBALLO THOMPSON XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8228 Amount: -$26,507.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8840 Amount: -$131,513.00 DBE Dollars: -$6,459.99 DBE %: 4.91% District: 6 SONSHINE COMMUNICATIONS 4.91% -$6,459.99 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 61 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8D67 Amount: $35,341.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F17 Amount: $69,014.00 DBE Dollars: $3,000.00 DBE %: 4.35% District: 5 BCC ENGINEERING, INC. 4.35% $3,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F32 Amount: $182,362.00 DBE Dollars: $22,161.00 DBE %: 12.15% District: 6 HR ENGINEERING SERVICES, INC. 12.15% $22,161.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F67 Amount: $50,701.00 DBE Dollars: $25,050.00 DBE %: 49.41% District: 8 TIERRA, INC. 24.70% $10,775.00 TIERRA, INC. 24.70% $14,275.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G19 Amount: -$214,728.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H94 Amount: -$158,446.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J31 Amount: $1,757,347.00 DBE Dollars: $388,623.00 DBE %: 22.11% District: 8 BCC ENGINEERING, INC. 2.40% $36,421.00 BCC ENGINEERING, INC. 2.40% $47,809.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 62 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount CURTIS & ROGERS DESIGN STUDIO INC 1.71% $8,845.00 CURTIS & ROGERS DESIGN STUDIO INC 1.71% $51,390.00 F.R. ALEMAN & ASSOCIATES, INC. .76% $12,839.00 F.R. ALEMAN & ASSOCIATES, INC. .76% $13,835.00 GEOSOL, INC. 3.55% $95,059.00 GEOSOL, INC. 3.55% $29,785.00 TIERRA SOUTH FLORIDA, INC. 2.64% $48,722.00 TIERRA SOUTH FLORIDA, INC. 2.64% $43,918.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N37 Amount: $23,565.00 DBE Dollars: $9,687.00 DBE %: 41.11% District: 5 ECHEZABAL & ASSOCIATES, INC. 41.11% $9,687.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S49 Amount: $200,000.00 DBE Dollars: $38,000.00 DBE %: 19.00% District: 6 CH PEREZ AND ASSOCIATES CONSULTING 19.00% $38,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S73 Amount: $231,075.00 DBE Dollars: $14,880.00 DBE %: 6.44% District: 5 GMB ENGINEERS & PLANNERS, INC. 6.44% $14,880.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T84 Amount: $147,468.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z35 Amount: $547,111.00 DBE Dollars: $43,768.88 DBE %: 8.00% District: 6 CURTIS & ROGERS DESIGN STUDIO INC .40% $4,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 63 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount CURTIS & ROGERS DESIGN STUDIO INC .40% $1,000.00 CURTIS & ROGERS DESIGN STUDIO INC .40% $2,000.00 CURTIS & ROGERS DESIGN STUDIO INC .40% $942.22 CURTIS & ROGERS DESIGN STUDIO INC .40% $3,000.00 GEOSOL, INC. .40% $4,000.00 GEOSOL, INC. .40% $1,000.00 GEOSOL, INC. .40% $2,000.00 GEOSOL, INC. .40% $942.22 GEOSOL, INC. .40% $3,000.00 HADONNE CORPORATION .40% $4,000.00 HADONNE CORPORATION .40% $1,000.00 HADONNE CORPORATION .40% $2,000.00 HADONNE CORPORATION .40% $942.22 HADONNE CORPORATION .40% $3,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .40% $4,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .40% $1,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .40% $2,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .40% $942.22 SCHEDA ECOLOGICAL ASSOCIATES, INC. .40% $3,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z99 Amount: $342,388.00 DBE Dollars: $37,544.00 DBE %: 10.97% District: 5 BASLEE ENGINEERING SOLUTIONS, INC. 10.97% $37,544.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 64 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9121 Amount: $1,998,718.00 DBE Dollars: $378,615.00 DBE %: 18.94% District: 6 HADONNE CORPORATION 10.83% $216,428.00 HR ENGINEERING SERVICES, INC. 2.29% $45,826.00 MEDIA RELATIONS GROUP LLC 5.82% $116,361.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9142 Amount: $1,819,220.00 DBE Dollars: $150,280.89 DBE %: 8.26% District: 4 BETSY LINDSAY, INC. 1.08% $19,631.64 CREATIVE ENGINEERING GROUP INC 7.18% $130,649.25 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CORZO CASTELLA CARBALLO THOMPSON Amount: $6,873,116.00 DBE Dollars: $1,105,149.78 DBE % : 16.08% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COTLEUR & HEARING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K28 Amount: $7,153.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CREATIVE ENGINEERING GROUP XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X62 Amount: $206,967.00 DBE Dollars: $206,967.00 DBE %: 100.00% District: 4 CREATIVE ENGINEERING GROUP INC 100.00% $206,967.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 65 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y32 Amount: $32,962.00 DBE Dollars: $32,962.00 DBE %: 100.00% District: 4 CREATIVE ENGINEERING GROUP INC 50.00% $7,117.00 CREATIVE ENGINEERING GROUP INC 50.00% $25,845.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9052 Amount: $1,056,777.00 DBE Dollars: $983,826.00 DBE %: 93.10% District: 4 CREATIVE ENGINEERING GROUP INC 93.10% $983,826.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9077 Amount: $890,771.00 DBE Dollars: $890,771.00 DBE %: 100.00% District: 4 CREATIVE ENGINEERING GROUP INC 50.00% $848,942.00 CREATIVE ENGINEERING GROUP INC 50.00% $41,829.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9106 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9153 Amount: $1,151,100.00 DBE Dollars: $939,971.00 DBE %: 81.66% District: 4 CREATIVE ENGINEERING GROUP INC 81.66% $939,971.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9338 Amount: $999,064.00 DBE Dollars: $999,064.00 DBE %: 100.00% District: 8 CREATIVE ENGINEERING GROUP INC 95.59% $955,029.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 66 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount JBS ENGINEERING TECHNICAL SERVICES INC 4.41% $44,035.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CREATIVE ENGINEERING GROUP Amount: $4,337,641.00 DBE Dollars: $4,053,561.00 DBE % : 93.45% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CREECH ENGINEERS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q37 Amount: $50,000.00 DBE Dollars: $5,000.00 DBE %: 10.00% District: 4 BETSY LINDSAY, INC. 10.00% $5,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CTS ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z73 Amount: $1,500,000.00 DBE Dollars: $1,500,000.00 DBE %: 100.00% District: 4 CTS ENGINEERING, INC. 100.00% $1,500,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CUMBEY & FAIR, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8317 Amount: $74,517.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9068 Amount: $2,688,654.00 DBE Dollars: $175,953.00 DBE %: 6.54% District: 7 ECHEZABAL & ASSOCIATES, INC. 5.31% $142,654.00 OMNI COMMUNICATIONS LLC .89% $23,972.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 67 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SCHEDA ECOLOGICAL ASSOCIATES, INC. .35% $9,327.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9086 Amount: $1,500,000.00 DBE Dollars: $180,000.00 DBE %: 12.00% District: 7 ECHEZABAL & ASSOCIATES, INC. 4.00% $60,000.00 ELEMENT ENGINEERING GROUP,LLC 2.00% $30,000.00 ELEMENT ENGINEERING GROUP,LLC 2.00% $30,000.00 ICON CONSULTANT GROUP, INC. 2.00% $30,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 2.00% $30,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CUMBEY & FAIR, INC. Amount: $4,263,171.00 DBE Dollars: $355,953.00 DBE % : 8.35% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DATA TRANSFER SOLUTIONS, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H09 Amount: -$80,000.00 DBE Dollars: -$6,000.00 DBE %: 7.50% District: 5 ACCURATE TRAFFIC COUNTS, INC. 7.50% -$6,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y90 Amount: $335,100.00 DBE Dollars: $33,510.00 DBE %: 10.00% District: 5 PLANNING COMMUNITIES, LLC 2.00% $2,500.00 PLANNING COMMUNITIES, LLC 2.00% $2,500.00 PLANNING COMMUNITIES, LLC 2.00% $2,500.00 PLANNING COMMUNITIES, LLC 2.00% $2,500.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 68 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount PLANNING COMMUNITIES, LLC 2.00% $23,510.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For DATA TRANSFER SOLUTIONS, LLC Amount: $255,100.00 DBE Dollars: $27,510.00 DBE % : 10.78% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DAVID H. MELVIN, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8E45 Amount: $75,074.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J30 Amount: -$11,406.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P16 Amount: $35,104.00 DBE Dollars: $8,368.00 DBE %: 23.84% District: 3 BRINDLEY PIETERS & ASSOC.,INC. 23.84% $8,368.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9179 Amount: $1,505,557.00 DBE Dollars: $150,640.00 DBE %: 10.01% District: 3 Carpe Diem Community Solutions 1.80% $27,160.00 HSA CONSULTING GROUP, INC. 6.12% $92,180.00 REGISTE SLIGER ENGINEERING, INC. 2.08% $31,300.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For DAVID H. MELVIN, INC. Amount: $1,604,329.00 DBE Dollars: $159,008.00 DBE % : 9.91% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 69 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DAVID PLUMMER & ASSOCIATES,INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9266 Amount: $444,251.00 DBE Dollars: $1,343.00 DBE %: .30% District: 6 BOTAS ENGINEERING, INC. .30% $1,343.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DUNKELBERGER ENGR. & TESTING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N74 Amount: $300,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DYER RIDDLE MILLS & PRECOURT INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8638 Amount: $186,406.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8647 Amount: $49,990.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G58 Amount: $221,546.00 DBE Dollars: $.00 DBE %: .00% District: 5 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 70 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I39 Amount: $270,963.00 DBE Dollars: $6,750.00 DBE %: 2.49% District: 2 AMERICAN GOVERNMENT SERVICES CORP. 2.49% $6,750.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K43 Amount: -$99.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N87 Amount: -$95,235.00 DBE Dollars: -$7,608.00 DBE %: 7.99% District: 5 BRINDLEY PIETERS & ASSOC.,INC. 2.66% -$2,536.00 JBS ENGINEERING TECHNICAL SERVICES INC 2.66% -$2,536.00 VALERIE TUTOR & ASSOCIATES, INC. 2.66% -$2,536.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O70 Amount: $8,525.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S65 Amount: $38,109.00 DBE Dollars: $10,035.00 DBE %: 26.33% District: 2 PROTEAN DESIGN GROUP, INC. 26.33% $10,035.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U29 Amount: $21,706.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U52 Amount: $842,463.00 DBE Dollars: $89,887.00 DBE %: 10.67% District: 3 ENGINEERING & PLANNING RESOURCES, 1.34% $7,650.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 71 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount ENGINEERING & PLANNING RESOURCES, 1.34% $11,108.00 ENGINEERING & PLANNING RESOURCES, 1.34% $15,205.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.66% $24,694.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.66% $7,446.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.66% $11,892.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.66% $11,892.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W65 Amount: $56,251.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X54 Amount: $111,090.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X65 Amount: $19,670.00 DBE Dollars: $920.00 DBE %: 4.68% District: 3 MTN RESOUCES LLC 4.68% $920.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X92 Amount: $696,000.00 DBE Dollars: $69,600.00 DBE %: 10.00% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 3.33% $10,800.00 DIVERSIFIED DESIGN & DRAFTING SERV 3.33% $30,000.00 DIVERSIFIED DESIGN & DRAFTING SERV 3.33% $28,800.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y56 Amount: $354,660.00 DBE Dollars: $158,366.00 DBE %: 44.65% District: 8 A2 GROUP, INC. 44.65% $158,366.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 72 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z05 Amount: $12,872.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z98 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 2 AMERICAN GOVERNMENT SERVICES CORP. 3.33% $50,000.00 COLLINS SURVEY CONSULTING LLC 3.33% $50,000.00 DIVERSIFIED DESIGN & DRAFTING SERV 3.33% $50,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9005 Amount: $1,074,520.00 DBE Dollars: $92,852.00 DBE %: 8.64% District: 7 COLLINS SURVEY CONSULTING LLC .85% $9,172.00 COLLINS SURVEY CONSULTING LLC .85% $9,173.00 OMNI COMMUNICATIONS LLC 1.77% $19,006.00 THE HEIMBURG GROUP, INC. 5.17% $55,501.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9036 Amount: $213,044.00 DBE Dollars: $45,444.00 DBE %: 21.33% District: 3 MTN RESOUCES LLC 3.02% $6,442.00 PAGE ONE CONSULTANTS, INC. 18.31% $39,002.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9065 Amount: $230,000.00 DBE Dollars: $18,630.00 DBE %: 8.10% District: 5 ECHEZABAL & ASSOCIATES, INC. 4.05% $6,480.00 ECHEZABAL & ASSOCIATES, INC. 4.05% $12,150.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 73 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9358 Amount: $368,820.00 DBE Dollars: $18,694.00 DBE %: 5.07% District: 5 ECHEZABAL & ASSOCIATES, INC. 5.07% $18,694.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For DYER RIDDLE MILLS & PRECOURT INC Amount: $6,181,301.00 DBE Dollars: $653,570.00 DBE % : 10.57% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DYNAMIC CORPORATE CONSULTANTS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M48 Amount: -$5.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W01 Amount: $117,941.00 DBE Dollars: $117,941.00 DBE %: 100.00% District: 4 DYNAMIC CORPORATE CONSULTANTS, INC 100.00% $117,941.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9014 Amount: $1,491,704.00 DBE Dollars: $922,882.00 DBE %: 61.87% District: 4 DYNAMIC CORPORATE CONSULTANTS, INC 61.87% $922,882.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For DYNAMIC CORPORATE CONSULTANTS, INC. Amount: $1,609,640.00 DBE Dollars: $1,040,823.00 DBE % : 64.66% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 74 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : E SCIENCES, INCORPORATED XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R75 Amount: $200,000.00 DBE Dollars: $16,000.00 DBE %: 8.00% District: 5 THE BALMORAL GROUP 8.00% $16,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W02 Amount: $750,000.00 DBE Dollars: $60,000.00 DBE %: 8.00% District: 5 THE BALMORAL GROUP 8.00% $60,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9096 Amount: $250,000.00 DBE Dollars: $123,000.00 DBE %: 49.20% District: 1 ECHEZABAL & ASSOCIATES, INC. 49.20% $123,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For E SCIENCES, INCORPORATED Amount: $1,200,000.00 DBE Dollars: $199,000.00 DBE % : 16.58% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : E. C. DRIVER & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A32 Amount: $710,180.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B03 Amount: $200,000.00 DBE Dollars: $14,366.00 DBE %: 7.18% District: 7 TIERRA, INC. 7.18% $14,366.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 75 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8C94 Amount: -$23,117.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J27 Amount: $153,921.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L15 Amount: $2,734,389.00 DBE Dollars: $103,460.39 DBE %: 3.78% District: 4 CYRIACKS ENVIRONMENTAL CONSULTING 3.78% $103,460.39 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q90 Amount: $321,247.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R38 Amount: $134,335.00 DBE Dollars: $2,473.00 DBE %: 1.84% District: 8 TIERRA SOUTH FLORIDA, INC. 1.84% $2,473.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S23 Amount: $93,471.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T86 Amount: $76,976.00 DBE Dollars: $3,768.79 DBE %: 4.90% District: 2 ENVIRONMENTAL RESOURCE SOLUTIONS, 4.90% $3,768.79 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 76 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W66 Amount: $13,261.00 DBE Dollars: $5,084.39 DBE %: 38.34% District: 2 WAITZ & MOYE, INC. 38.34% $5,084.39 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X89 Amount: $206,365.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y04 Amount: $57,784.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y61 Amount: $297,880.00 DBE Dollars: -$35,701.00 DBE %: -11.99% District: 6 EBS ENGINEERING, INC. -11.99% -$35,701.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9046 Amount: $100,000.00 DBE Dollars: $10,000.00 DBE %: 10.00% District: 3 CATALYST ENGINEERING, LLC 2.50% $2,500.00 DIVERSIFIED DESIGN & DRAFTING SERV 2.50% $2,500.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.50% $2,500.00 HSA CONSULTING GROUP, INC. 2.50% $2,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9115 Amount: $536,321.00 DBE Dollars: $31,183.00 DBE %: 5.81% District: 7 BOLT UNDERWATER 1.14% $6,093.00 ELEMENT ENGINEERING GROUP,LLC .54% $2,877.00 OMNI COMMUNICATIONS LLC 2.07% $8,726.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 77 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount OMNI COMMUNICATIONS LLC 2.07% $13,487.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9178 Amount: $3,309,107.00 DBE Dollars: $745,448.00 DBE %: 22.53% District: 2 AEROSTAR ENVIRONMENTAL SERVICES,IN .46% $15,217.00 AMERICAN GOVERNMENT SERVICES CORP. .39% $13,000.00 ENVIRONMENTAL RESOURCE SOLUTIONS, .84% $27,844.00 ENVIRONMENTAL TRANS PLANNING .34% $11,206.00 KELLY GRAPHICS .04% $1,211.00 LANDMARK ENGINEERING INC. 2.67% $88,226.00 NODARSE & ASSOCIATES, INC. 8.23% $338,306.00 NODARSE & ASSOCIATES, INC. 8.23% $206,306.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR .49% $16,276.00 WAITZ & MOYE, INC. .84% $27,856.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9230 Amount: $138,377.00 DBE Dollars: $31,675.00 DBE %: 22.89% District: 2 AEROSTAR ENVIRONMENTAL SERVICES,IN 3.73% $5,158.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 1.83% $2,537.00 GHIOTTO & ASSOCIATES, INC. 8.75% $12,104.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 8.58% $11,876.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9256 Amount: $569,381.00 DBE Dollars: $336,849.00 DBE %: 59.16% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 5.80% $33,019.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 53.36% $303,830.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 78 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9289 Amount: $398,660.00 DBE Dollars: $40,000.00 DBE %: 10.03% District: 9 THE HEIMBURG GROUP, INC. 10.03% $40,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9294 Amount: $1,500,000.00 DBE Dollars: $120,000.00 DBE %: 8.00% District: 4 ELAND ENGINEERING INC. 4.00% $60,000.00 GCME, INC. 4.00% $60,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For E. C. DRIVER & ASSOCIATES, INC. Amount: $11,528,538.00 DBE Dollars: $1,408,606.57 DBE % : 12.22% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : EAC CONSULTING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8C07 Amount: $121,410.00 DBE Dollars: $7,174.00 DBE %: 5.91% District: 6 Cunningham Group, Inc. 4.51% $5,476.00 F.R. ALEMAN & ASSOCIATES, INC. 1.40% $1,698.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W26 Amount: $40,767.00 DBE Dollars: $40,767.00 DBE %: 100.00% District: 6 CH PEREZ AND ASSOCIATES CONSULTING 100.00% $40,767.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y13 Amount: $400,000.00 DBE Dollars: $40,000.00 DBE %: 10.00% District: 6 R J BEHAR & COMPANY INC 5.00% $35,000.00 R J BEHAR & COMPANY INC 5.00% $5,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 79 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9131 Amount: $4,823,769.00 DBE Dollars: $335,520.45 DBE %: 6.96% District: 4 A.D.A. ENGINEERING, INC. .54% $32,898.39 A.D.A. ENGINEERING, INC. .54% $19,044.00 CURTIS & ROGERS DESIGN STUDIO INC .19% $8,630.00 CURTIS & ROGERS DESIGN STUDIO INC .19% $9,975.00 CYRIACKS ENVIRONMENTAL CONSULTING .61% $42,981.10 CYRIACKS ENVIRONMENTAL CONSULTING .61% $15,409.00 HOLT COMMUNICATIONS .31% $14,823.00 VN ENGINEERS, INC. 1.99% $78,798.96 VN ENGINEERS, INC. 1.99% $112,961.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9135 Amount: $560,000.00 DBE Dollars: $697,001.00 DBE %: 124.46% District: 6 CYRIACKS ENVIRONMENTAL CONSULTING 6.73% $37,697.00 GEOSOL, INC. 33.17% $185,733.00 HBC ENGINEERING COMPANY 19.05% $106,669.00 MANUEL G. VERA & ASSOCIATES, INC. 64.39% $360,583.00 MEDIA RELATIONS GROUP LLC 1.13% $6,319.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For EAC CONSULTING, INC. Amount: $5,945,946.00 DBE Dollars: $1,120,462.45 DBE % : 18.84% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 80 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : EBS ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T96 Amount: $34,131.00 DBE Dollars: $34,131.00 DBE %: 100.00% District: 4 EBS ENGINEERING, INC. 50.00% $34,134.00 EBS ENGINEERING, INC. 50.00% -$3.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V93 Amount: $147,653.00 DBE Dollars: $147,653.00 DBE %: 100.00% District: 6 BND ENGINEERS, INC. 6.14% $9,067.00 CH PEREZ & ASSOC.,CONSULTING ENGR. 5.61% $8,280.00 EBS ENGINEERING, INC. 85.64% $126,452.00 MEDIA RELATIONS GROUP LLC 2.61% $3,854.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y86 Amount: -$273,820.00 DBE Dollars: -$273,820.00 DBE %: 100.00% District: 4 EBS ENGINEERING, INC. 100.00% -$273,820.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For EBS ENGINEERING, INC. Amount: -$92,036.00 DBE Dollars: -$92,036.00 DBE % : 100.00% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 81 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : EISMAN & RUSSO, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8964 Amount: $38,544.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O44 Amount: $400,000.00 DBE Dollars: $64,000.00 DBE %: 16.00% District: 5 ECHEZABAL & ASSOCIATES, INC. 4.00% $16,000.00 LANDMARK ENGINEERING INC. 4.00% $16,000.00 PQH ARCHITECTS, INC. 4.00% $16,000.00 RHODES + BRITO ARCHITECTS, INC. 4.00% $16,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P06 Amount: $300,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T79 Amount: -$1,185.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U51 Amount: $85,638.00 DBE Dollars: $85,638.00 DBE %: 100.00% District: 2 KEVILLE ENTERPRISES, INC. 100.00% $85,638.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U59 Amount: $428,451.00 DBE Dollars: $41,799.00 DBE %: 9.76% District: 6 QUEST CORPORATION OF AMERICA, INC. 4.88% $20,900.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 82 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount QUEST CORPORATION OF AMERICA, INC. 4.88% $20,899.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W47 Amount: $303,397.00 DBE Dollars: $45,509.00 DBE %: 15.00% District: 5 MEHTA & ASSOCIATES, INC. 5.00% $7,253.00 MEHTA & ASSOCIATES, INC. 5.00% $44,746.00 MEHTA & ASSOCIATES, INC. 5.00% -$6,490.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W60 Amount: -$6.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z23 Amount: $40,712.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9034 Amount: $1,082,704.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9064 Amount: $5,987,115.00 DBE Dollars: $345,628.14 DBE %: 5.77% District: 4 MANUEL G. VERA & ASSOCIATES, INC. 1.31% $78,200.39 TAMAYO ENGINEERING, LLC 4.47% $267,427.75 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9073 Amount: $1,346,460.00 DBE Dollars: $116,014.00 DBE %: 8.62% District: 2 AE ENGINEERING, INC. 8.62% $116,014.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 83 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9139 Amount: $2,468,282.00 DBE Dollars: $268,070.50 DBE %: 10.86% District: 2 CSI GEO INC. 10.86% $268,070.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9263 Amount: $490,689.00 DBE Dollars: $2,621.82 DBE %: .53% District: 4 MANUEL G. VERA & ASSOCIATES, INC. .53% $2,621.82 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9350 Amount: $2,308,567.00 DBE Dollars: $339,657.00 DBE %: 14.71% District: 1 E. F. GAINES SURVEYING SERVICES IN 2.01% $46,287.00 HIGHSPANS ENGINEERING, INC. 12.07% $278,663.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .64% $14,707.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For EISMAN & RUSSO, INC. Amount: $15,279,368.00 DBE Dollars: $1,308,937.46 DBE % : 8.57% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ELIPSIS ENGINEERING & CONSULTING LL XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W05 Amount: $696,172.00 DBE Dollars: $833,521.09 DBE %: 119.73% District: 5 ELIPSIS ENGINEERING & CONSULTING LLC 26.88% $290,217.00 ELIPSIS ENGINEERING & CONSULTING LLC 26.88% -$51,500.00 ELIPSIS ENGINEERING & CONSULTING LLC 26.88% $322,698.00 MEHTA & ASSOCIATES, INC. 2.16% -$5,732.21 MEHTA & ASSOCIATES, INC. 2.16% $35,855.30 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 84 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount METRIC ENGINEERING, INC. 34.76% $241,983.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ELLIS & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K13 Amount: $215,000.00 DBE Dollars: $52,666.00 DBE %: 24.50% District: 5 CAL-TECH TESTING, INC. 4.19% $1,333.00 CAL-TECH TESTING, INC. 4.19% $16,667.00 ELIPSIS ENGINEERING & CONSULTING LLC 7.75% $16,666.00 PAGE ONE CONSULTANTS, INC. 4.19% $1,333.00 PAGE ONE CONSULTANTS, INC. 4.19% $16,667.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P43 Amount: -$346,518.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U65 Amount: -$96,104.00 DBE Dollars: $1,962.18 DBE %: -2.04% District: 2 CSI GEO INC. -2.04% $1,962.18 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ELLIS & ASSOCIATES, INC. Amount: -$227,622.00 DBE Dollars: $54,628.18 DBE % : -24.00% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 85 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ENGLAND, THIMS & MILLER, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9182 Amount: $551,098.00 DBE Dollars: $145,723.00 DBE %: 26.44% District: 2 CSI GEO INC. .63% $3,465.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 4.99% $27,482.00 HSA CONSULTING GROUP, INC. 15.51% $85,500.00 MESKEL & ASSOCIATES ENGINEERING, P 5.31% $29,276.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9224 Amount: $936,667.00 DBE Dollars: $107,447.00 DBE %: 11.47% District: 2 AE ENGINEERING, INC. 7.65% $71,684.00 VIA CONSULTING SERVICES, INC. 3.82% $35,763.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ENGLAND, THIMS & MILLER, INC. Amount: $1,487,765.00 DBE Dollars: $253,170.00 DBE % : 17.02% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ERDMAN ANTHONY OF FLORIDA, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I38 Amount: -$13,845.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L97 Amount: $62,198.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 86 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V75 Amount: -$109,751.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V98 Amount: $39,733.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z89 Amount: $1,500,000.00 DBE Dollars: $300,000.00 DBE %: 20.00% District: 4 CROSSROADS ENGINEERING DATA, INC. 6.67% $100,000.00 MEDIA RELATIONS GROUP LLC 6.67% $100,000.00 PRITCHARD ENVIRONMENTAL 6.67% $100,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9255 Amount: $547,789.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ERDMAN ANTHONY OF FLORIDA, INC. Amount: $2,026,124.00 DBE Dollars: $300,000.00 DBE % : 14.81% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : F.R. ALEMAN & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J54 Amount: $50,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 87 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K12 Amount: $100,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T30 Amount: $400,000.00 DBE Dollars: $400,000.00 DBE %: 100.00% District: 4 F.R. ALEMAN & ASSOCIATES, INC. 97.00% $388,000.00 FLORIDA TRANSPORTATION ENGINEERING 3.00% $12,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U95 Amount: $400,000.00 DBE Dollars: $269,500.00 DBE %: 67.38% District: 6 F.R. ALEMAN & ASSOCIATES, INC. 26.19% $85,000.00 F.R. ALEMAN & ASSOCIATES, INC. 26.19% $124,500.00 KEITH & ASSOCIATES, INC. 3.75% $15,000.00 KEITH & ASSOCIATES, INC. 3.75% $15,000.00 KEITH & ASSOCIATES, INC. 3.75% $22,500.00 KEITH & ASSOCIATES, INC. 3.75% $7,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9000 Amount: $148,904.00 DBE Dollars: $116,986.54 DBE %: 78.57% District: 4 F.R. ALEMAN & ASSOCIATES, INC. 73.24% $109,064.00 PROGRESSIVE DESIGN & ENGR. INC. 5.32% $7,922.54 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9130 Amount: $1,500,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 88 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9231 Amount: $250,000.00 DBE Dollars: $246,000.00 DBE %: 98.40% District: 6 A & P CONSULTING TRANSPORTATION ENGINEERS INC 1.60% $4,000.00 CIVIL WORKS, INC. 1.10% $1,500.00 CIVIL WORKS, INC. 1.10% $4,000.00 F.R. ALEMAN & ASSOCIATES, INC. 47.30% $48,500.00 F.R. ALEMAN & ASSOCIATES, INC. 47.30% $188,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For F.R. ALEMAN & ASSOCIATES, INC. Amount: $2,848,904.00 DBE Dollars: $1,032,486.54 DBE % : 36.24% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FALLER, DAVIS AND ASSOC.,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8738 Amount: $52,590.00 DBE Dollars: $52,590.00 DBE %: 100.00% District: 1 ADAMS TRAFFIC 21.93% $11,534.00 FALLER, DAVIS AND ASSOC.,INC. 78.07% $41,056.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B72 Amount: $182,541.00 DBE Dollars: $130,084.00 DBE %: 71.26% District: 1 FALLER, DAVIS AND ASSOC.,INC. 35.63% $5,112.00 FALLER, DAVIS AND ASSOC.,INC. 35.63% $124,972.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J68 Amount: $450,000.00 DBE Dollars: $407,364.00 DBE %: 90.53% District: 7 FALLER, DAVIS AND ASSOC.,INC. 80.30% $361,333.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 89 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TIERRA, INC. 10.23% $46,031.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O57 Amount: $45,449.00 DBE Dollars: $40,499.00 DBE %: 89.11% District: 2 FALLER, DAVIS AND ASSOC.,INC. 44.55% $22,992.00 FALLER, DAVIS AND ASSOC.,INC. 44.55% $17,507.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W24 Amount: $625,000.00 DBE Dollars: $625,000.00 DBE %: 100.00% District: 5 ACCURATE TRAFFIC COUNTS, INC. 1.09% $6,833.00 FALLER, DAVIS AND ASSOC.,INC. 48.36% $375,000.00 FALLER, DAVIS AND ASSOC.,INC. 48.36% $229,501.00 PROTEAN DESIGN GROUP, INC. 1.09% $6,833.00 TIERRA, INC. 1.09% $6,833.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z57 Amount: $1,500,000.00 DBE Dollars: $1,470,000.00 DBE %: 98.00% District: 1 ACCURATE TRAFFIC COUNTS, INC. 4.00% $60,000.00 ADAMS TRAFFIC 4.00% $60,000.00 FALLER, DAVIS AND ASSOC.,INC. 90.00% $1,350,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9047 Amount: $1,877,474.00 DBE Dollars: $1,261,536.00 DBE %: 67.19% District: 1 ADAMS TRAFFIC .21% $3,932.00 ARCHAEOLOGICAL CONSULTANTS, INC. 1.64% $30,709.00 FALLER, DAVIS AND ASSOC.,INC. 59.82% $1,123,048.00 OMNI COMMUNICATIONS LLC 1.70% $31,872.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 90 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TIERRA, INC. 3.83% $71,975.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9134 Amount: $793,767.00 DBE Dollars: $1,350,000.00 DBE %: 170.08% District: 1 FALLER, DAVIS AND ASSOC.,INC. 170.08% $1,350,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9189 Amount: $1,500,000.00 DBE Dollars: $1,275,000.00 DBE %: 85.00% District: 1 FALLER, DAVIS AND ASSOC.,INC. 75.00% $1,125,000.00 PROTEAN DESIGN GROUP, INC. 10.00% $150,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9340 Amount: $2,889,260.00 DBE Dollars: $1,789,912.00 DBE %: 61.95% District: 7 ELEMENT ENGINEERING GROUP,LLC 7.75% $224,043.00 ELEMENT ENGINEERING GROUP,LLC 7.75% $224,043.00 FALLER, DAVIS AND ASSOC.,INC. 46.44% $1,341,826.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For FALLER, DAVIS AND ASSOC.,INC. Amount: $9,916,081.00 DBE Dollars: $8,401,985.00 DBE % : 84.73% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FISHER & ARNOLD, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G94 Amount: $9,266.00 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 91 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O99 Amount: $37,691.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S11 Amount: $26,247.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W56 Amount: $190,228.00 DBE Dollars: $166,073.00 DBE %: 87.30% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 6.94% $13,204.00 HSA CONSULTING GROUP, INC. 15.10% $64,186.00 HSA CONSULTING GROUP, INC. 15.10% $10,381.00 HSA CONSULTING GROUP, INC. 15.10% $38,790.00 HSA CONSULTING GROUP, INC. 15.10% $25,396.00 HSA CONSULTING GROUP, INC. 15.10% $4,901.00 REGISTE SLIGER ENGINEERING, INC. 4.84% $9,215.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9094 Amount: $882,332.00 DBE Dollars: $119,026.00 DBE %: 13.49% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 10.17% $89,766.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.11% $9,833.00 REGISTE SLIGER ENGINEERING, INC. 2.20% $19,427.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For FISHER & ARNOLD, INC. Amount: $1,145,764.00 DBE Dollars: $285,099.00 DBE % : 24.88% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 92 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FLORIDA ACQUISITION & APPRAISAL,INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DN484 Amount: $1,500,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DN614 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 ADRIAN GONZALEZ & ASSOCIATES, P.A. 5.00% $75,000.00 SHARPTON, BRUNSON & COMPANY, P.A. 5.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For FLORIDA ACQUISITION & APPRAISAL,INC Amount: $3,000,000.00 DBE Dollars: $150,000.00 DBE % : 5.00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FLORIDA BRIDGE AND TRANSPORTATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9174 Amount: $942,006.00 DBE Dollars: $327,540.00 DBE %: 34.77% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 7.63% $71,874.00 NODARSE & ASSOCIATES, INC. 7.14% $83,284.00 NODARSE & ASSOCIATES, INC. 7.14% $51,284.00 QUEST CORPORATION OF AMERICA, INC. 1.38% $12,953.00 THE BALMORAL GROUP 11.48% $108,145.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 93 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FLORIDA TRANSPORTATION ENGINEERING, XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T89 Amount: $500,000.00 DBE Dollars: $500,000.00 DBE %: 100.00% District: 6 FLORIDA TRANSPORTATION ENGINEERING 100.00% $500,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9317 Amount: $1,500,000.00 DBE Dollars: $1,275,000.00 DBE %: 85.00% District: 1 FLORIDA TRANSPORTATION ENGINEERING 85.00% $1,275,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For FLORIDA TRANSPORTATION ENGINEERING, Amount: $2,000,000.00 DBE Dollars: $1,775,000.00 DBE % : 88.75% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FRED WILSON & ASSOCIATES,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8944 Amount: $186,880.00 DBE Dollars: $3,764.23 DBE %: 2.01% District: 2 WAITZ & MOYE, INC. 2.01% $3,764.23 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y54 Amount: $324,202.00 DBE Dollars: $22,339.00 DBE %: 6.89% District: 2 WAITZ & MOYE, INC. 6.89% $22,339.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For FRED WILSON & ASSOCIATES,INC. Amount: $511,082.00 DBE Dollars: $26,103.23 DBE % : 5.11% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 94 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : G-A-I CONSULTANTS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8D71 Amount: $23,472.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R56 Amount: $150,000.00 DBE Dollars: $12,000.00 DBE %: 8.00% District: 5 GMB ENGINEERS & PLANNERS, INC. 2.67% $4,000.00 MTN RESOUCES LLC 2.67% $4,000.00 RHODES + BRITO ARCHITECTS, INC. 2.67% $4,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y72 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For G-A-I CONSULTANTS, INC. Amount: $173,472.00 DBE Dollars: $12,000.00 DBE % : 6.92% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GANNETT FLEMING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7966 Amount: $25,088.00 DBE Dollars: $.00 DBE %: .00% District: 6 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 95 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A43 Amount: $515,672.00 DBE Dollars: $106,615.00 DBE %: 20.67% District: 6 GEOSOL, INC. 20.67% $106,615.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L76 Amount: $10,245.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U26 Amount: $200,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W33 Amount: $283,906.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X10 Amount: $218,657.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z64 Amount: $175,000.00 DBE Dollars: $8,750.00 DBE %: 5.00% District: 6 GENESIS TRANSPORTATION ENGINEERING INC 5.00% $8,750.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z70 Amount: $684,964.00 DBE Dollars: $179,185.68 DBE %: 26.16% District: 6 AES ENGINEERING, INC. 7.45% $51,000.00 BASULTO & ASSOCIATES, INC. .74% $24,000.00 BASULTO & ASSOCIATES, INC. .74% $4,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 96 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount BASULTO & ASSOCIATES, INC. .74% $3,398.56 BASULTO & ASSOCIATES, INC. .74% $9,990.00 BASULTO & ASSOCIATES, INC. .74% -$16,000.00 CH PEREZ & ASSOC.,CONSULTING ENGR. .56% $24,000.00 CH PEREZ & ASSOC.,CONSULTING ENGR. .56% $4,000.00 CH PEREZ & ASSOC.,CONSULTING ENGR. .56% $3,398.56 CH PEREZ & ASSOC.,CONSULTING ENGR. .56% -$16,000.00 CH PEREZ AND ASSOCIATES CONSULTING 7.45% $51,000.00 FLORIDA TRANSPORTATION ENGINEERING 1.06% $24,000.00 FLORIDA TRANSPORTATION ENGINEERING 1.06% $4,000.00 FLORIDA TRANSPORTATION ENGINEERING 1.06% $3,398.56 FLORIDA TRANSPORTATION ENGINEERING 1.06% $21,000.00 FLORIDA TRANSPORTATION ENGINEERING 1.06% -$16,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9118 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 2 CAL-TECH TESTING, INC. 2.50% $37,500.00 CSI GEO INC. 2.50% $37,500.00 MESKEL & ASSOCIATES ENGINEERING, P 2.50% $37,500.00 NODARSE & ASSOCIATES, INC. 2.50% $37,500.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 97 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9299 Amount: $150,000.00 DBE Dollars: $7,500.00 DBE %: 5.00% District: 6 CROSSROADS ENGINEERING DATA, INC. 5.00% $7,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GANNETT FLEMING, INC. Amount: $3,763,532.00 DBE Dollars: $452,050.68 DBE % : 12.01% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GBF ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H20 Amount: -$290,421.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I49 Amount: -$160,189.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S12 Amount: -$55,682.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T60 Amount: $10,432.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V27 Amount: $115,323.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 98 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W74 Amount: -$75,831.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9198 Amount: $712,801.00 DBE Dollars: $22,839.00 DBE %: 3.20% District: 1 SCHEDA ECOLOGICAL ASSOCIATES, INC. 3.20% $22,839.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9300 Amount: $1,500,000.00 DBE Dollars: $180,000.00 DBE %: 12.00% District: 4 BAYSIDE ENGINEERING, INC. 2.40% $36,000.00 CREATIVE ENGINEERING GROUP INC 2.40% $36,000.00 KEITH & ASSOCIATES, INC. 2.40% $36,000.00 QUEST CORPORATION OF AMERICA, INC. 2.40% $36,000.00 THE VALERIN GROUP, INC. 2.40% $36,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9360 Amount: $.00 DBE Dollars: $33,629.00 DBE %: .00% District: 1 CELLA MOLNAR & ASSOCIATES, INC. .00% $33,629.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9375 Amount: $1,500,000.00 DBE Dollars: $149,999.94 DBE %: 10.00% District: 4 BETSY LINDSAY, INC. 1.11% $16,666.66 CREATIVE ENGINEERING GROUP INC 1.11% $16,666.66 KEITH & ASSOCIATES, INC. 1.11% $16,666.66 LANDSCAPE DESIGN ASSOCIATES, LLC 1.11% $16,666.66 QUEST CORPORATION OF AMERICA, INC. 1.11% $16,666.66 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 99 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount RADISE INTERNATIONAL, L.C. 1.11% $16,666.66 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.11% $16,666.66 SMITH CONSTRUCTION GROUP 1.11% $16,666.66 TIERRA SOUTH FLORIDA, INC. 1.11% $16,666.66 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GBF ENGINEERING, INC. Amount: $3,256,433.00 DBE Dollars: $386,467.94 DBE % : 11.87% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GENESIS CE&I SERVICES, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9033 Amount: $703,913.00 DBE Dollars: $162,376.00 DBE %: 23.07% District: 3 ANASTASIA BRENAN COMMUNICATIONS GROUP LLC 5.93% $41,732.00 KEYSTONE CIVIL, INCORPORATED 17.14% $120,644.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9207 Amount: $2,380,167.00 DBE Dollars: $181,507.00 DBE %: 7.63% District: 1 AERIAL INNOVATIONS, INC. .20% $4,735.00 ALLIED ENGINEERING & TESTING,INC. 6.74% $160,458.00 NORTHWEST ENGINEERING, INC. .69% $16,314.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9381 Amount: $1,350,010.00 DBE Dollars: $185,794.00 DBE %: 13.76% District: 3 ABC GROUP, LLC. 7.79% $105,194.00 KEYSTONE CIVIL, INCORPORATED 3.45% $46,539.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 100 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount NORTHWEST ENGINEERING, INC. 2.52% $34,061.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GENESIS CE&I SERVICES, LLC Amount: $4,434,090.00 DBE Dollars: $529,677.00 DBE % : 11.95% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GEORGE & ASSOCIATES, CONSULTING ENG XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P12 Amount: $12,501.00 DBE Dollars: $3,810.00 DBE %: 30.48% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 30.48% $3,810.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y03 Amount: $951,912.00 DBE Dollars: $129,993.00 DBE %: 13.66% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 3.68% $42,410.00 DIVERSIFIED DESIGN & DRAFTING SERV 3.68% $12,680.00 DIVERSIFIED DESIGN & DRAFTING SERV 3.68% $49,876.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.31% $10,433.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.31% $14,594.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9003 Amount: $1,056,102.00 DBE Dollars: $74,943.00 DBE %: 7.10% District: 3 HSA CONSULTING GROUP, INC. 7.10% $74,943.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GEORGE & ASSOCIATES, CONSULTING ENG Amount: $2,020,515.00 DBE Dollars: $208,746.00 DBE % : 10.33% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 101 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GEORGE F. YOUNG, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N00 Amount: $100,000.00 DBE Dollars: $10,000.00 DBE %: 10.00% District: 5 ECHEZABAL & ASSOCIATES, INC. 10.00% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GEOSOL, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N96 Amount: -$131,221.00 DBE Dollars: -$131,221.00 DBE %: 100.00% District: 4 GEOSOL, INC. 100.00% -$131,221.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GEOTECH CONSULTANTS INTERNATIONAL, XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9194 Amount: $1,500,000.00 DBE Dollars: $1,500,000.00 DBE %: 100.00% District: 3 GEOTECH CONSULTANTS INTERNATIONAL, 100.00% $1,500,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GHYABI & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J81 Amount: $177,647.00 DBE Dollars: $174,929.00 DBE %: 98.47% District: 5 GHYABI & ASSOCIATES, INC. 49.23% $22,383.00 GHYABI & ASSOCIATES, INC. 49.23% $152,546.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 102 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q78 Amount: $88,625.00 DBE Dollars: $88,625.00 DBE %: 100.00% District: 2 GHYABI & ASSOCIATES, INC. 100.00% $88,625.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q84 Amount: $266,594.00 DBE Dollars: $254,262.00 DBE %: 95.37% District: 5 GHYABI & ASSOCIATES, INC. 93.05% $248,062.00 NODARSE & ASSOCIATES, INC. 2.33% $6,200.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9173 Amount: $642,327.00 DBE Dollars: $642,327.00 DBE %: 100.00% District: 2 GHIOTTO & ASSOCIATES, INC. 13.30% $85,400.00 GHYABI & ASSOCIATES, INC. 83.25% $534,727.00 LANDMARK ENGINEERING INC. 3.46% $22,200.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GHYABI & ASSOCIATES, INC. Amount: $1,175,193.00 DBE Dollars: $1,160,143.00 DBE % : 98.72% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GLASS LAND ACQ. SVC. SPECIALIST,INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DN064 Amount: $350,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 103 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GMB ENGINEERS & PLANNERS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L46 Amount: $100,000.00 DBE Dollars: $100,000.00 DBE %: 100.00% District: 5 GMB ENGINEERS & PLANNERS, INC. 100.00% $100,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y92 Amount: $407,525.00 DBE Dollars: $172,425.00 DBE %: 42.31% District: 5 GMB ENGINEERS & PLANNERS, INC. 42.31% $172,425.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9203 Amount: $1,916,616.00 DBE Dollars: $1,916,616.00 DBE %: 100.00% District: 3 GMB ENGINEERS & PLANNERS, INC. 50.00% $1,500,000.00 GMB ENGINEERS & PLANNERS, INC. 50.00% $416,616.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9301 Amount: $400,000.00 DBE Dollars: $400,000.00 DBE %: 100.00% District: 5 GMB ENGINEERS & PLANNERS, INC. 33.33% $120,000.00 GMB ENGINEERS & PLANNERS, INC. 33.33% $120,000.00 GMB ENGINEERS & PLANNERS, INC. 33.33% $160,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GMB ENGINEERS & PLANNERS, INC. Amount: $2,824,141.00 DBE Dollars: $2,589,041.00 DBE % : 91.68% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 104 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GORD & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9049 Amount: $1,500,000.00 DBE Dollars: $1,500,000.00 DBE %: 100.00% District: 7 FLORIDA TRANSPORTATION ENGINEERING 8.00% $120,000.00 GORD & ASSOCIATES, INC. 92.00% $1,380,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GORTEMOLLER ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z79 Amount: $477,161.00 DBE Dollars: $66,884.00 DBE %: 14.02% District: 3 Ecological Resource Consultants, I 2.20% $10,485.00 O'NEAL SURVEYING & MAPPING, INC. 8.71% $41,544.00 REGISTE SLIGER ENGINEERING, INC. 3.11% $14,855.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GPI SOUTHEAST, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N88 Amount: $600,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S88 Amount: $83,950.00 DBE Dollars: $43,377.00 DBE %: 51.67% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 11.11% $9,329.00 HSA CONSULTING GROUP, INC. 24.56% $20,620.00 LANDMARK ENGINEERING INC. 16.00% $13,428.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 105 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W00 Amount: $87,512.00 DBE Dollars: $21,518.00 DBE %: 24.59% District: 3 HSA CONSULTING GROUP, INC. 24.59% $21,518.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z93 Amount: $329,030.00 DBE Dollars: $27,169.00 DBE %: 8.26% District: 3 MEHTA & ASSOCIATES, INC. 8.26% $27,169.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9162 Amount: $1,971,769.00 DBE Dollars: $230,925.00 DBE %: 11.71% District: 3 HSA CONSULTING GROUP, INC. 11.71% $230,925.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9199 Amount: $3,537,587.00 DBE Dollars: $332,003.00 DBE %: 9.39% District: 2 CLOUD CONSULTANTS & SERVICES, INC. 9.39% $332,003.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9352 Amount: $615,439.00 DBE Dollars: $69,717.00 DBE %: 11.33% District: 3 KENNEDY ENGINEERING & ASSOCIATES G 11.33% $69,717.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GPI SOUTHEAST, INC. Amount: $7,225,287.00 DBE Dollars: $724,709.00 DBE % : 10.03% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 106 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GREENHORNE & O'MARA, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7610 Amount: -$163,860.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8771 Amount: $155,726.00 DBE Dollars: $54,253.52 DBE %: 34.84% District: 4 R J BEHAR & COMPANY INC 34.84% $54,253.52 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8886 Amount: -$125,421.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F96 Amount: $371,823.00 DBE Dollars: $149,849.00 DBE %: 40.30% District: 7 ICON CONSULTANT GROUP, INC. 16.42% $61,057.00 ICON CONSULTANT GROUP, INC. 16.42% $61,057.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 7.46% $27,735.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P28 Amount: $153,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q27 Amount: $146,250.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 107 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R77 Amount: $22,313.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V60 Amount: $19,493.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X21 Amount: $339,765.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y67 Amount: $212,500.00 DBE Dollars: $5,312.00 DBE %: 2.50% District: 3 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 2.50% $5,312.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9212 Amount: $2,781,860.00 DBE Dollars: $395,139.00 DBE %: 14.20% District: 4 K-F GROUP, INC. .56% $15,554.00 QUEST CORPORATION OF AMERICA, INC. .68% $18,913.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.71% $47,708.00 TIERRA SOUTH FLORIDA, INC. 11.25% $312,964.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9328 Amount: $1,209,012.00 DBE Dollars: $158,642.37 DBE %: 13.12% District: 2 CIVIL SERVICES INC. 7.49% $90,543.03 CSI GEO INC. 2.33% $29,724.00 CSI GEO INC. 2.33% $26,562.30 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 108 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount DIVERSIFIED DESIGN & DRAFTING SERV .98% $11,813.04 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9355 Amount: $981,624.00 DBE Dollars: $209,940.00 DBE %: 21.39% District: 2 BOLT UNDERWATER SERVICES, INC. 1.36% $13,369.00 SIVA CORROSION SERVICES, INC. 20.03% $196,571.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GREENHORNE & O'MARA, INC. Amount: $6,104,085.00 DBE Dollars: $973,135.89 DBE % : 15.94% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GRESHAM, SMITH AND PARTNERS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S57 Amount: $32,382.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X02 Amount: $199,946.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GRESHAM, SMITH AND PARTNERS Amount: $232,328.00 DBE Dollars: $.00 DBE % : .00% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 109 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GRIMAIL CRAWFORD, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W43 Amount: $355,000.00 DBE Dollars: $35,500.00 DBE %: 10.00% District: 3 HSA CONSULTING GROUP, INC. 10.00% $35,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9238 Amount: $207,090.00 DBE Dollars: $28,995.00 DBE %: 14.00% District: 5 PROTEAN DESIGN GROUP, INC. 14.00% $28,995.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9306 Amount: $708,630.00 DBE Dollars: $160,406.00 DBE %: 22.64% District: 7 ANALYTIC ENGINEERING, INCORPORATED 6.54% $46,357.00 HYATT SURVEY SERVICES, INC. 5.24% $37,110.00 REVOLUTION PROFESSIONAL SERVICES, 7.58% $53,698.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 3.28% $23,241.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GRIMAIL CRAWFORD, INC. Amount: $1,270,720.00 DBE Dollars: $224,901.00 DBE % : 17.70% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : H. W. LOCHNER, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7461 Amount: $675,661.00 DBE Dollars: $.00 DBE %: .00% District: 5 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 110 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B04 Amount: $500,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N56 Amount: $1,396,551.00 DBE Dollars: $60,360.00 DBE %: 4.32% District: 1 CELLA MOLNAR & ASSOCIATES, INC. 4.32% $60,360.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O30 Amount: $577,498.00 DBE Dollars: $179,345.00 DBE %: 31.06% District: 2 AMERICAN GOVERNMENT SERVICES CORP. 2.42% $13,950.00 GHIOTTO & ASSOCIATES, INC. 20.47% $118,195.00 NODARSE & ASSOCIATES, INC. 8.17% $47,200.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R81 Amount: $325,619.00 DBE Dollars: $70,201.00 DBE %: 21.56% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 2.82% $9,193.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.34% $30,830.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.34% $3,069.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.34% -$2,171.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.34% -$2,941.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.34% -$1,887.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.34% -$1,780.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.34% $31,393.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 2.34% $4,495.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 111 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S71 Amount: $82,054.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W16 Amount: $61,457.00 DBE Dollars: $30,943.00 DBE %: 50.35% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 50.35% $30,943.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W57 Amount: $21,019.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W94 Amount: $288,434.00 DBE Dollars: $135,086.87 DBE %: 46.83% District: 2 AEROSTAR ENVIRONMENTAL SERVICES,IN .49% $1,423.61 ENVIRONMENTAL RESOURCE SOLUTIONS, 1.89% $5,447.18 GHIOTTO & ASSOCIATES, INC. 17.24% $49,731.14 NODARSE & ASSOCIATES, INC. 24.49% $70,623.49 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 2.73% $7,861.45 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y38 Amount: $43,799.00 DBE Dollars: $7,971.00 DBE %: 18.20% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 18.20% $7,971.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9006 Amount: $3,526,707.00 DBE Dollars: $363,921.00 DBE %: 10.32% District: 7 JBS ENGINEERING TECHNICAL SERVICES INC 6.26% $220,940.00 NORTHWEST ENGINEERING, INC. 4.05% $142,981.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 112 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9038 Amount: $749,998.00 DBE Dollars: $133,951.00 DBE %: 17.86% District: 1 ARCHAEOLOGICAL CONSULTANTS, INC. 2.19% $16,429.00 HYATT SURVEY SERVICES, INC. .49% $3,638.00 KB ENVIRONMENTAL SCIENCES, INC. 1.80% $13,474.00 OMNI COMMUNICATIONS LLC 10.06% $75,428.00 TIERRA, INC. 3.33% $24,982.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9108 Amount: $684,462.00 DBE Dollars: $73,510.00 DBE %: 10.74% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 2.32% $17,284.00 DIVERSIFIED DESIGN & DRAFTING SERV 2.32% $19,380.00 DIVERSIFIED DESIGN & DRAFTING SERV 2.32% $10,914.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC .63% $4,322.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC .63% $4,322.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC .63% $4,322.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC .63% $4,322.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC .63% $4,322.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC .63% $4,322.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9268 Amount: $813,249.00 DBE Dollars: $155,000.00 DBE %: 19.06% District: 7 CARLSON STUDIO 1.84% $15,000.00 DJ Public Relations, Inc. 1.84% $15,000.00 KB ENVIRONMENTAL SCIENCES, INC. 1.84% $15,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 113 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount OMNI COMMUNICATIONS LLC 3.07% $25,000.00 THE HEIMBURG GROUP, INC. 9.22% $75,000.00 TIERRA, INC. 1.23% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9313 Amount: $3,965,441.00 DBE Dollars: $950,789.00 DBE %: 23.98% District: 7 ARCHAEOLOGICAL CONSULTANTS, INC. .17% $6,765.00 KB ENVIRONMENTAL SCIENCES, INC. .60% $23,813.00 KEYSTONE CIVIL, INCORPORATED .37% $14,542.00 OMNI COMMUNICATIONS LLC 6.49% $257,356.00 THE HEIMBURG GROUP, INC. 3.43% $136,016.00 TIERRA, INC. 6.46% $256,148.00 TIERRA, INC. 6.46% $256,149.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9337 Amount: $1,074,494.00 DBE Dollars: $101,049.00 DBE %: 9.40% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 4.81% $51,713.00 HSA CONSULTING GROUP, INC. 4.59% $49,336.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For H. W. LOCHNER, INC. Amount: $14,786,443.00 DBE Dollars: $2,262,126.87 DBE % : 15.30% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 114 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HARDESTY & HANOVER, LLP XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B33 Amount: $.00 DBE Dollars: -$4,650.00 DBE %: .00% District: 6 PROTOCOLE CORPORATION .00% -$7,769.00 R J BEHAR & COMPANY INC .00% $3,119.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O48 Amount: -$4,669.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y41 Amount: $159,072.00 DBE Dollars: $36,586.77 DBE %: 23.00% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 9.43% $14,997.00 CH PEREZ AND ASSOCIATES CONSULTING 10.57% $16,817.19 GEOSOL, INC. 1.50% $2,249.58 GEOSOL, INC. 1.50% $2,523.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z55 Amount: $420,276.00 DBE Dollars: $33,564.00 DBE %: 7.99% District: 2 R J BEHAR & COMPANY INC 7.99% $33,564.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 115 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9290 Amount: $298,878.00 DBE Dollars: $.00 DBE %: .00% District: 9 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HARDESTY & HANOVER, LLP Amount: $873,557.00 DBE Dollars: $65,500.77 DBE % : 7.50% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HATCH MOTT MACDONALD FLORIDA, LLC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K34 Amount: $12,204.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U43 Amount: $115,578.00 DBE Dollars: $25,502.00 DBE %: 22.06% District: 3 MTN RESOUCES LLC 22.06% $25,502.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X34 Amount: $14,066.00 DBE Dollars: $.00 DBE %: .00% District: 9 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X49 Amount: $205,398.00 DBE Dollars: $4,670.00 DBE %: 2.27% District: 3 HSA CONSULTING GROUP, INC. 2.27% $4,670.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9019 Amount: $214,247.00 DBE Dollars: $65,107.00 DBE %: 30.39% District: 3 KENNEDY ENGINEERING & ASSOCIATES G 30.39% $65,107.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 116 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9082 Amount: $214,124.00 DBE Dollars: $21,160.00 DBE %: 9.88% District: 3 MTN RESOUCES LLC 9.88% $21,160.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9267 Amount: $2,730,385.00 DBE Dollars: $105,875.00 DBE %: 3.88% District: 3 HSA CONSULTING GROUP, INC. 3.88% $105,875.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HATCH MOTT MACDONALD FLORIDA, LLC. Amount: $3,506,002.00 DBE Dollars: $222,314.00 DBE % : 6.34% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HBC ENGINEERING COMPANY XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9180 Amount: $429,637.00 DBE Dollars: $429,637.00 DBE %: 100.00% District: 6 CURTIS & ROGERS DESIGN STUDIO INC .84% $3,595.00 EAC CONSULTING, INC. 14.17% $60,885.00 GEOSOL, INC. 5.70% $24,507.00 HBC ENGINEERING COMPANY 65.44% $281,151.00 MANUEL G. VERA & ASSOCIATES, INC. 13.85% $59,499.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 117 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9354 Amount: $432,682.00 DBE Dollars: $365,880.00 DBE %: 84.56% District: 6 HBC ENGINEERING COMPANY 84.56% $365,880.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HBC ENGINEERING COMPANY Amount: $862,319.00 DBE Dollars: $795,517.00 DBE % : 92.25% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HDR CONSTRUCTION CONTROL CORP. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9160 Amount: $842,434.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9281 Amount: $735,057.00 DBE Dollars: $90,391.00 DBE %: 12.30% District: 1 ALLIED ENGINEERING & TESTING,INC. 11.03% $81,056.00 THE VALERIN GROUP, INC. 1.27% $9,335.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HDR CONSTRUCTION CONTROL CORP. Amount: $1,577,491.00 DBE Dollars: $90,391.00 DBE % : 5.73% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 118 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HDR ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8193 Amount: $863,233.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8735 Amount: -$138,737.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8827 Amount: -$980.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8D69 Amount: $37,434.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F04 Amount: $200,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F39 Amount: $49,917.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G47 Amount: $100,028.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 119 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L16 Amount: $81,601.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M50 Amount: $2,061,323.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P04 Amount: $52,939.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q96 Amount: $122,940.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S43 Amount: $22,012.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S94 Amount: $51,212.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S96 Amount: $33,114.00 DBE Dollars: $.00 DBE %: .00% District: 5 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 120 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U93 Amount: $103,168.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W36 Amount: $323,721.00 DBE Dollars: $25,342.83 DBE %: 7.83% District: 2 BOWEN CIVIL ENGINEERING, INC. 7.83% $25,342.83 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W42 Amount: $983,680.00 DBE Dollars: $93,443.90 DBE %: 9.50% District: 6 F.R. ALEMAN & ASSOCIATES, INC. 5.69% $55,940.80 GEOSOL, INC. .10% $2,970.00 GEOSOL, INC. .10% $596.00 GEOSOL, INC. .10% $670.00 GEOSOL, INC. .10% $698.46 GEOSOL, INC. .10% -$1.00 GEOSOL, INC. .10% -$200.00 GEOSOL, INC. .10% $1,243.14 GEOSOL, INC. .10% $1,524.42 HBC ENGINEERING COMPANY .38% $11,878.00 HBC ENGINEERING COMPANY .38% $2,383.00 HBC ENGINEERING COMPANY .38% $2,681.00 HBC ENGINEERING COMPANY .38% $2,793.84 HBC ENGINEERING COMPANY .38% -$4.00 HBC ENGINEERING COMPANY .38% -$800.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 121 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount HBC ENGINEERING COMPANY .38% $4,972.56 HBC ENGINEERING COMPANY .38% $6,097.68 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y85 Amount: $700,000.00 DBE Dollars: $98,000.00 DBE %: 14.00% District: 9 CROSSROADS ENGINEERING DATA, INC. 7.00% $49,000.00 GHYABI & ASSOCIATES, INC. 7.00% $49,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y87 Amount: $112,397.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z62 Amount: $80,467.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z77 Amount: $200,000.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z95 Amount: $30,000,000.00 DBE Dollars: $3,389,993.00 DBE %: 11.30% District: 7 ANALYTIC ENGINEERING, INCORPORATED .28% $83,333.00 ANALYTIC ENGINEERING, INCORPORATED .28% $83,333.00 ANALYTIC ENGINEERING, INCORPORATED .28% $83,333.00 COLLINS SURVEY CONSULTING LLC .28% $83,333.00 COLLINS SURVEY CONSULTING LLC .28% $83,333.00 COLLINS SURVEY CONSULTING LLC .28% $83,333.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 122 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts Total DBE % .02% .02% .02% .02% .02% .02% .02% .02% .02% .02% .02% .02% .02% .02% .04% .04% .04% .04% .04% .04% .04% .04% .04% Subcontractor FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. FALLER, DAVIS AND ASSOC.,INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 123 DBE Commitment Amount $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $5,357.00 $11,538.00 $11,538.00 $11,538.00 $11,538.00 $11,538.00 $11,538.00 $11,538.00 $11,538.00 $11,538.00 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts Total DBE % .04% .04% .04% .04% .62% .62% .62% .62% .62% .62% .62% .62% .62% .62% .62% .17% .17% .17% .50% .04% .04% .04% .04% Subcontractor GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. GORD & ASSOCIATES, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. ICON CONSULTANT GROUP, INC. KB ENVIRONMENTAL SCIENCES, INC. KB ENVIRONMENTAL SCIENCES, INC. KB ENVIRONMENTAL SCIENCES, INC. THE VALERIN GROUP, INC. TIERRA, INC. TIERRA, INC. TIERRA, INC. TIERRA, INC. EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 124 DBE Commitment Amount $11,538.00 $11,538.00 $11,538.00 $11,538.00 $185,455.00 $185,455.00 $185,455.00 $185,455.00 $185,455.00 $185,455.00 $185,455.00 $185,455.00 $185,455.00 $185,455.00 $185,455.00 $50,000.00 $50,000.00 $50,000.00 $150,000.00 $10,714.00 $10,714.00 $10,714.00 $10,714.00 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TIERRA, INC. .04% $10,714.00 TIERRA, INC. .04% $10,714.00 TIERRA, INC. .04% $10,714.00 UTILITY MANAGEMENT SOLUTIONS .83% $250,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9035 Amount: $1,224,988.00 DBE Dollars: $111,360.00 DBE %: 9.09% District: 7 ECHEZABAL & ASSOCIATES, INC. 4.55% $74,211.00 ECHEZABAL & ASSOCIATES, INC. 4.55% $37,149.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9043 Amount: $421,272.00 DBE Dollars: $25,800.02 DBE %: 6.12% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 2.45% $10,102.50 CH PEREZ & ASSOC.,CONSULTING ENGR. 2.45% $10,537.90 GEOSOL, INC. .61% $2,525.62 GEOSOL, INC. .61% $2,634.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9053 Amount: $750,000.00 DBE Dollars: $30,000.00 DBE %: 4.00% District: 7 ANALYTIC ENGINEERING, INCORPORATED 2.00% $15,000.00 ECHEZABAL & ASSOCIATES, INC. 2.00% $15,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9208 Amount: $2,672,276.00 DBE Dollars: $257,491.66 DBE %: 9.64% District: 4 AIRQUEST ENVIRONMENTAL INC .40% $10,580.00 BOWEN CIVIL ENGINEERING, INC. .43% $11,543.58 CTS ENGINEERING, INC. 4.64% $124,006.56 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 125 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount MEDIA RELATIONS GROUP LLC 3.20% $85,441.52 PRITCHARD ENVIRONMENTAL LLC .97% $25,920.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9246 Amount: $998,259.00 DBE Dollars: $76,536.00 DBE %: 7.67% District: 5 ENVIRONMENTAL TRANS PLANNING 3.66% $36,533.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 4.01% $40,003.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9275 Amount: $1,638,673.00 DBE Dollars: $25,820.00 DBE %: 1.58% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV .79% $10,591.00 DIVERSIFIED DESIGN & DRAFTING SERV .79% $15,229.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9307 Amount: $1,500,000.00 DBE Dollars: $180,000.00 DBE %: 12.00% District: 4 CYRIACKS ENVIRONMENTAL CONSULTING 3.00% $45,000.00 KEITH & ASSOCIATES, INC. 3.00% $45,000.00 O'LEARY RICHARDS DESIGN ASSOCIATES 3.00% $45,000.00 PROGRESSIVE DESIGN & ENGR. INC. 3.00% $45,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9314 Amount: $4,575,426.00 DBE Dollars: $1,109,238.00 DBE %: 24.24% District: 7 ARCHAEOLOGICAL CONSULTANTS, INC. .15% $6,765.00 GARRETT ENGINEERING GROUP, INC. 2.14% $97,799.00 KB ENVIRONMENTAL SCIENCES, INC. .33% $15,235.00 OMNI COMMUNICATIONS LLC 9.24% $422,975.00 TIERRA, INC. 1.77% $80,924.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 126 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TIERRA, INC. 1.77% $80,923.00 TIERRA, INC. 1.77% $80,923.00 TIERRA, INC. 1.77% $80,923.00 TIERRA, INC. 1.77% $80,923.00 TIERRA, INC. 1.77% $80,924.00 TIERRA, INC. 1.77% $80,924.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HDR ENGINEERING, INC. Amount: $49,820,363.00 DBE Dollars: $5,423,025.41 DBE % : 10.89% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HEERY INTERNATIONAL, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8808 Amount: $478,988.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HNTB CORPORATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C3749 Amount: $250,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8743 Amount: $121,013.00 DBE Dollars: $36,178.00 DBE %: 29.90% District: 7 BAYSIDE ENGINEERING, INC. 2.09% $2,528.00 CUMBEY & FAIR, INC. 27.81% $33,650.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 127 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A95 Amount: $100,598.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G24 Amount: $181,841.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L63 Amount: $91,020.00 DBE Dollars: $23,882.00 DBE %: 26.24% District: 2 AEROSTAR ENVIRONMENTAL SERVICES,IN 6.85% $6,236.00 BOWEN CIVIL ENGINEERING, INC. 4.48% $4,082.00 NODARSE & ASSOCIATES, INC. 7.45% $7,782.00 NODARSE & ASSOCIATES, INC. 7.45% $5,782.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N18 Amount: $5,926,232.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P05 Amount: $200,000.00 DBE Dollars: $18,000.00 DBE %: 9.00% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 9.00% $18,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P84 Amount: -$56,208.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 128 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q39 Amount: $9,527,897.00 DBE Dollars: $481,490.00 DBE %: 5.05% District: 8 ARCHITECTS INTERNATIONAL, INC. .50% $47,610.00 BAYSIDE ENGINEERING, INC. .60% $15,575.00 BAYSIDE ENGINEERING, INC. .60% $97,988.00 ENVIRONMENTAL MANAGEMENT & DESIGN .12% $18,812.00 ENVIRONMENTAL MANAGEMENT & DESIGN .12% $4,220.00 JCR CONSULTING .16% $14,820.00 MEHTA & ASSOCIATES, INC. .01% $916.00 MONTGOMERY CONSULTING GROUP, INC. .83% $61,464.00 MONTGOMERY CONSULTING GROUP, INC. .83% $100,226.00 MONTGOMERY CONSULTING GROUP, INC. .83% $76,793.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR .45% $43,066.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q69 Amount: $100,000.00 DBE Dollars: $5,000.00 DBE %: 5.00% District: 5 GMB ENGINEERS & PLANNERS, INC. 5.00% $5,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q76 Amount: $254,458.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q87 Amount: $78,172.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 129 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R40 Amount: $300,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R88 Amount: $341,414.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V94 Amount: $171,362.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X51 Amount: $19,572.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X81 Amount: $400,000.00 DBE Dollars: $34,000.00 DBE %: 8.50% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 8.00% $32,000.00 GEOSOL, INC. .50% $2,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y00 Amount: $2,288,931.00 DBE Dollars: $1,262,970.28 DBE %: 55.18% District: 9 COST MANAGEMENT .17% $3,800.28 GEODATA CONSULTANTS, INC. 7.98% $3,800.00 GEODATA CONSULTANTS, INC. 7.98% $361,635.00 MEHTA & ASSOCIATES, INC. 19.44% $3,800.00 MEHTA & ASSOCIATES, INC. 19.44% $886,135.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 130 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SCHEDA ECOLOGICAL ASSOCIATES, INC. .17% $3,800.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y46 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z03 Amount: $4,936,427.00 DBE Dollars: $938,401.00 DBE %: 19.01% District: 1 ALLIED ENGINEERING & TESTING,INC. .10% $5,000.00 ANALYTIC ENGINEERING, INCORPORATED 1.01% $50,000.00 ARCHAEOLOGICAL CONSULTANTS, INC. 8.56% $422,401.00 ASSET ENGINEERING INC 4.05% $200,000.00 ECHEZABAL & ASSOCIATES, INC. .10% $5,000.00 FALLER, DAVIS AND ASSOC.,INC. .01% $500.00 MTN RESOUCES LLC 4.46% $220,000.00 OMNI COMMUNICATIONS LLC .20% $10,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .51% $25,000.00 TIERRA, INC. .01% $500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9059 Amount: $706,655.00 DBE Dollars: $110,089.00 DBE %: 15.58% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 7.79% $29,533.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 7.79% $80,556.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9272 Amount: $450,000.00 DBE Dollars: $5,000.00 DBE %: 1.11% District: 7 ARCHAEOLOGICAL CONSULTANTS, INC. .56% $2,500.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 131 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SCHEDA ECOLOGICAL ASSOCIATES, INC. .56% $2,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9345 Amount: $4,578,330.00 DBE Dollars: $427,367.96 DBE %: 9.33% District: 2 AE ENGINEERING, INC. 5.09% $232,816.00 KEVILLE ENTERPRISES, INC. 4.25% $194,551.96 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HNTB CORPORATION Amount: $30,967,714.00 DBE Dollars: $3,342,378.24 DBE % : 10.79% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HORIZON ENGINEERING GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G03 Amount: $603,112.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M75 Amount: $63,311.00 DBE Dollars: $4,290.00 DBE %: 6.78% District: 5 FALLER, DAVIS AND ASSOC.,INC. 6.78% $4,290.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9247 Amount: $4,493,599.00 DBE Dollars: $168,989.00 DBE %: 3.76% District: 5 3E Consultants, Inc. .44% $19,880.00 AEROSTAR ENVIRONMENTAL SERVICES,IN .17% $7,470.00 BCC ENGINEERING, INC. 2.65% $119,219.00 FALLER, DAVIS AND ASSOC.,INC. .34% $15,331.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 132 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SOUTHEASTERN ARCHAEOLOGICAL RESEAR .16% $7,089.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HORIZON ENGINEERING GROUP, INC. Amount: $5,160,022.00 DBE Dollars: $173,279.00 DBE % : 3.36% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HSA CONSULTING GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U90 Amount: $220,986.00 DBE Dollars: $220,986.00 DBE %: 100.00% District: 3 HSA CONSULTING GROUP, INC. 100.00% $220,986.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V03 Amount: $375,000.00 DBE Dollars: $375,000.00 DBE %: 100.00% District: 3 HSA CONSULTING GROUP, INC. 100.00% $375,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HSA CONSULTING GROUP, INC. Amount: $595,986.00 DBE Dollars: $595,986.00 DBE % : 100.00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : I 595 EXPRESS, LLC(AECOM) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4J69 Amount: $2,200,000.00 DBE Dollars: $279,265.35 DBE %: 12.69% District: 4 CURTIS & ROGERS DESIGN STUDIO INC 1.57% $34,579.13 HBC ENGINEERING COMPANY 1.40% $30,000.00 HBC ENGINEERING COMPANY 1.40% $31,414.00 NETWORK ENGINEERING SERVICES INC DBA BOLTON PEREZ & ASSOCIATES 1.36% $30,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 133 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount R J BEHAR & COMPANY INC 6.97% $153,272.22 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : I 595 EXPRESS, LLC(HNTB) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4J69 Amount: $5,460,000.00 DBE Dollars: $804,000.00 DBE %: 14.73% District: 4 CREATIVE ENGINEERING GROUP INC 3.96% $216,000.00 JBS ENGINEERING TECHNICAL SERVICES INC 3.52% $192,000.00 PINNACLE CONSULTING ENTERPRISES INC 3.96% $216,000.00 TEST LAB INC 3.30% $180,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : I. F. ROOKS & ASSOCIATES XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z12 Amount: $660,217.00 DBE Dollars: $32,704.34 DBE %: 4.95% District: 6 MANUEL G. VERA & ASSOCIATES, INC. 1.24% $22,500.00 MANUEL G. VERA & ASSOCIATES, INC. 1.24% $2,000.00 MANUEL G. VERA & ASSOCIATES, INC. 1.24% $3,536.86 MANUEL G. VERA & ASSOCIATES, INC. 1.24% $4,667.48 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ICON CONSULTANT GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8394 Amount: -$6,111.00 DBE Dollars: -$6,111.00 DBE %: 100.00% District: 1 ICON CONSULTANT GROUP, INC. 100.00% -$6,111.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 134 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F93 Amount: $1,476,000.00 DBE Dollars: $1,322,309.00 DBE %: 89.59% District: 7 ICON CONSULTANT GROUP, INC. 87.14% $1,286,180.00 OMNI COMMUNICATIONS LLC 1.21% $17,855.00 TIERRA, INC. .62% $16,657.00 TIERRA, INC. .62% $1,617.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I28 Amount: $709,226.00 DBE Dollars: $333,382.00 DBE %: 47.01% District: 1 ICON CONSULTANT GROUP, INC. 23.50% $79,566.00 ICON CONSULTANT GROUP, INC. 23.50% $253,816.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9054 Amount: $750,000.00 DBE Dollars: $700,000.00 DBE %: 93.33% District: 7 ICON CONSULTANT GROUP, INC. 90.00% $675,000.00 TIERRA, INC. 3.33% $25,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9181 Amount: $2,935,801.00 DBE Dollars: $1,565,457.00 DBE %: 53.32% District: 1 AMERICAN GOVERNMENT SERVICES CORP. 1.04% $30,525.00 ICON CONSULTANT GROUP, INC. 39.92% $1,172,092.00 JANUS RESEARCH, INC. 2.80% $82,166.00 OMNI COMMUNICATIONS LLC 1.65% $48,419.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 135 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TIERRA, INC. 7.91% $232,255.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ICON CONSULTANT GROUP, INC. Amount: $5,864,916.00 DBE Dollars: $3,915,037.00 DBE % : 66.75% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : INFRAMAP CORPORATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U94 Amount: $400,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9161 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 BETSY LINDSAY, INC. 10.00% $150,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For INFRAMAP CORPORATION Amount: $1,900,000.00 DBE Dollars: $150,000.00 DBE % : 7.89% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : INFRASTRUCTURE ENGINEERS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R01 Amount: $181,496.00 DBE Dollars: $14,163.00 DBE %: 7.80% District: 1 ACCURATE TRAFFIC COUNTS, INC. 3.28% $5,950.00 ARCHAEOLOGICAL CONSULTANTS, INC. 1.90% $3,445.00 TIERRA, INC. 2.63% $4,768.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 136 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V82 Amount: $9,753.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9057 Amount: $471,090.00 DBE Dollars: $127,415.00 DBE %: 27.05% District: 2 WAITZ & MOYE, INC. 27.05% $127,415.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9097 Amount: $299,953.00 DBE Dollars: $16,903.00 DBE %: 5.64% District: 2 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 5.64% $16,903.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9244 Amount: $1,549,652.00 DBE Dollars: $127,072.00 DBE %: 8.20% District: 2 LANDMARK ENGINEERING INC. 8.20% $127,072.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9335 Amount: $1,498,387.00 DBE Dollars: $109,688.00 DBE %: 7.32% District: 8 LANDMARK ENGINEERING INC. 6.53% $97,886.00 THE GIBBS GROUP, PLLC .79% $11,802.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For INFRASTRUCTURE ENGINEERS, INC. Amount: $4,010,331.00 DBE Dollars: $395,241.00 DBE % : 9.86% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 137 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : INWOOD CONSULTING ENGINEERS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C5994 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8050 Amount: -$5,336.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8797 Amount: $199,468.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8C82 Amount: $266,000.00 DBE Dollars: $5,847.00 DBE %: 2.20% District: 1 ARCHAEOLOGICAL CONSULTANTS, INC. .73% $1,935.00 GEOTECHNICAL AND ENVIRONMENTAL CON .67% $1,787.00 INFRASTRUCTURE ENGINEERS, INC. .80% $2,125.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G56 Amount: $347,035.00 DBE Dollars: $51,287.00 DBE %: 14.78% District: 5 GMB ENGINEERS & PLANNERS, INC. 7.81% $27,092.00 IDA CONSULTING ENGINEERS, INC. 6.97% $24,195.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q72 Amount: $300,000.00 DBE Dollars: $9,000.00 DBE %: 3.00% District: 5 IDA CONSULTING ENGINEERS, INC. 1.00% $3,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 138 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount PLANNING COMMUNITIES, LLC 1.00% $3,000.00 POWELL, FRAGALA & ASSOC., INC. 1.00% $3,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T82 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y55 Amount: $354,765.00 DBE Dollars: $74,863.00 DBE %: 21.10% District: 4 KEITH & ASSOCIATES, INC. 21.10% $74,863.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z82 Amount: $992,796.00 DBE Dollars: $89,306.00 DBE %: 9.00% District: 3 O'NEAL SURVEYING & MAPPING, INC. 9.00% $89,306.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9071 Amount: $3,549,332.00 DBE Dollars: $662,951.00 DBE %: 18.68% District: 1 ADAMS TRAFFIC .20% $7,107.00 HYATT SURVEY SERVICES, INC. 2.35% $83,398.00 PROTEAN DESIGN GROUP, INC. .12% $4,301.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.23% $43,785.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR .49% $17,560.00 TIERRA, INC. 14.28% $506,800.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9100 Amount: $999,270.00 DBE Dollars: $209,726.00 DBE %: 20.99% District: 1 ADAMS TRAFFIC .87% $8,652.00 ECHEZABAL & ASSOCIATES, INC. 1.68% $16,759.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 139 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount MEDIA RELATIONS GROUP LLC 8.15% $81,471.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 2.23% $22,261.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 2.30% $22,976.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 2.30% $22,976.00 TIERRA, INC. 3.47% $34,631.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9201 Amount: $646,787.00 DBE Dollars: $42,783.00 DBE %: 6.61% District: 5 3E Consultants, Inc. .86% $5,548.00 ANTILLIAN ENGR. ASSOCIATES, INC. 1.32% $8,518.00 GEODATA CONSULTANTS, INC. 1.76% $11,360.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 2.68% $17,357.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For INWOOD CONSULTING ENGINEERS, INC. Amount: $7,650,117.00 DBE Dollars: $1,145,763.00 DBE % : 14.98% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : J-W ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K59 Amount: $500.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 140 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JACOBS ENGINEERING GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7633 Amount: $711,919.00 DBE Dollars: $30,459.00 DBE %: 4.28% District: 6 MANUEL G. VERA & ASSOCIATES, INC. 4.28% $30,459.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7785 Amount: -$9,853.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8745 Amount: -$518,071.00 DBE Dollars: -$3,885.32 DBE %: .75% District: 5 GEODATA CONSULTANTS, INC. .75% -$3,884.62 IDA CONSULTING ENGINEERS, INC. .00% -$.70 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A66 Amount: $500,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8C57 Amount: $99,946.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F34 Amount: $370,858.00 DBE Dollars: $19,425.00 DBE %: 5.24% District: 1 FALLER, DAVIS AND ASSOC.,INC. 5.24% $19,425.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 141 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G50 Amount: -$22,654.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H84 Amount: $41,198.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I54 Amount: -$145,443.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J35 Amount: $149,419.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M07 Amount: $71,955.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O69 Amount: $33,881.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q48 Amount: $778,193.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 142 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S75 Amount: $265,000.00 DBE Dollars: $18,550.00 DBE %: 7.00% District: 6 CROSSROADS ENGINEERING DATA, INC. 1.00% $2,650.00 CROSSROADS ENGINEERING DATA, INC. 1.00% $2,650.00 MANUEL G. VERA & ASSOCIATES, INC. 2.00% $5,300.00 MEDIA RELATIONS GROUP LLC 2.00% $5,300.00 TRAF TECH ENGINEERING, INC. 1.00% $2,650.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T16 Amount: $279,979.00 DBE Dollars: $29,844.89 DBE %: 10.66% District: 4 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.78% $4,973.89 TIERRA SOUTH FLORIDA, INC. 8.88% $24,871.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U33 Amount: $191,675.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U46 Amount: $306,037.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V04 Amount: $58,298.00 DBE Dollars: $9,575.00 DBE %: 16.42% District: 2 GHIOTTO & ASSOCIATES, INC. 3.56% $2,077.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 12.86% $7,498.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 143 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V40 Amount: $11,353.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V47 Amount: $397,224.00 DBE Dollars: $29,419.00 DBE %: 7.41% District: 5 ELIPSIS ENGINEERING & CONSULTING LLC 1.85% $8,850.00 ELIPSIS ENGINEERING & CONSULTING LLC 1.85% $991.00 ELIPSIS ENGINEERING & CONSULTING LLC 1.85% $2,999.00 ELIPSIS ENGINEERING & CONSULTING LLC 1.85% $16,579.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X77 Amount: $14,336,295.00 DBE Dollars: $1,549,495.00 DBE %: 10.81% District: 8 AIRQUEST ENVIRONMENTAL INC .03% $4,355.00 AIRQUEST ENVIRONMENTAL INC .03% $3,395.00 FALLER, DAVIS AND ASSOC.,INC. 1.38% $48,558.00 FALLER, DAVIS AND ASSOC.,INC. 1.38% $324,116.00 FALLER, DAVIS AND ASSOC.,INC. 1.38% $46,181.00 FALLER, DAVIS AND ASSOC.,INC. 1.38% $371,639.00 PROCOPIO & ASSOCIATES .65% $105,023.00 PROCOPIO & ASSOCIATES .65% $82,082.00 PROCOPIO & ASSOCIATES INC .64% $103,071.00 PROCOPIO & ASSOCIATES INC .64% $79,292.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .44% $111,458.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .44% $18,999.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 144 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SCHEDA ECOLOGICAL ASSOCIATES, INC. .44% $60,608.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .44% $108,975.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .44% $21,236.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .44% $60,507.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z76 Amount: $1,746,372.00 DBE Dollars: $331,222.00 DBE %: 18.97% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 6.14% $107,212.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 6.14% $107,212.00 O'NEAL SURVEYING & MAPPING, INC. 2.15% $37,548.00 O'NEAL SURVEYING & MAPPING, INC. 2.15% $37,548.00 QUEST CORPORATION OF AMERICA, INC. 1.19% $20,851.00 QUEST CORPORATION OF AMERICA, INC. 1.19% $20,851.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9140 Amount: $1,500,000.00 DBE Dollars: $120,000.00 DBE %: 8.00% District: 7 BOLT UNDERWATER SERVICES, INC. 7.53% $113,000.00 QUEST CORPORATION OF AMERICA, INC. .47% $7,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9141 Amount: $1,133,651.00 DBE Dollars: $160,600.00 DBE %: 14.17% District: 8 ECHEZABAL & ASSOCIATES, INC. .59% $8,818.00 ECHEZABAL & ASSOCIATES, INC. .59% $4,555.00 JBS ENGINEERING TECHNICAL SERVICES INC 6.49% $80,045.00 JBS ENGINEERING TECHNICAL SERVICES INC 6.49% $67,182.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 145 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9190 Amount: $3,409,532.00 DBE Dollars: $310,840.00 DBE %: 9.12% District: 5 ELIPSIS ENGINEERING & CONSULTING LLC 5.28% $179,872.00 JBS ENGINEERING TECHNICAL SERVICES INC 3.84% $130,968.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9204 Amount: $2,775,581.00 DBE Dollars: $297,374.67 DBE %: 10.71% District: 4 CTS ENGINEERING, INC. 8.49% $235,750.78 QUEST ECOLOGY, INC. - SC 1.51% $42,000.30 RADISE INTERNATIONAL, L.C. .71% $19,623.59 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9215 Amount: $542,541.00 DBE Dollars: $111,087.00 DBE %: 20.48% District: 7 BAYSIDE ENGINEERING, INC. 20.48% $111,087.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9242 Amount: $500,000.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9249 Amount: $608,095.00 DBE Dollars: $185,986.00 DBE %: 30.59% District: 6 BOLTON PEREZ & ASSOCIATES 2.65% $16,122.00 MANUEL G. VERA & ASSOCIATES, INC. 13.97% $158,375.00 MANUEL G. VERA & ASSOCIATES, INC. 13.97% $11,489.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9261 Amount: $526,319.00 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 146 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9309 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 CTS ENGINEERING, INC. 2.50% $37,500.00 MANUEL G. VERA & ASSOCIATES, INC. 2.50% $37,500.00 QUEST ECOLOGY, INC. - SC 2.50% $37,500.00 RADISE INTERNATIONAL, L.C. 2.50% $37,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9319 Amount: $5,000,000.00 DBE Dollars: $775,000.00 DBE %: 15.50% District: 7 ALLIED ENGINEERING & TESTING,INC. 5.00% $250,000.00 BAYSIDE ENGINEERING, INC. 1.00% $50,000.00 ECHEZABAL & ASSOCIATES, INC. .25% $12,500.00 ECHEZABAL & ASSOCIATES, INC. .25% $12,500.00 JBS ENGINEERING TECHNICAL SERVICES INC .50% $25,000.00 KEYSTONE CIVIL, INCORPORATED 1.00% $50,000.00 PAGE ONE CONSULTANTS, INC. .50% $25,000.00 QUEST CORPORATION OF AMERICA, INC. .50% $25,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .50% $25,000.00 TIERRA, INC. 6.00% $300,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For JACOBS ENGINEERING GROUP, INC. Amount: $37,149,300.00 DBE Dollars: $4,124,992.24 DBE % : 11.10% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 147 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JBS ENGINEERING TECHNICAL SERVICES XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V26 Amount: $499,719.00 DBE Dollars: $499,719.00 DBE %: 100.00% District: 5 JBS ENGINEERING TECHNICAL SERVICES INC 20.00% $38,008.00 JBS ENGINEERING TECHNICAL SERVICES INC 20.00% $9,191.00 JBS ENGINEERING TECHNICAL SERVICES INC 20.00% $19,504.00 JBS ENGINEERING TECHNICAL SERVICES INC 20.00% $285,754.00 JBS ENGINEERING TECHNICAL SERVICES INC 20.00% $147,262.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JEA CONSTRUCTION ENGR. SERVICES INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T98 Amount: $18,350.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JOHNSON ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V10 Amount: $110,930.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 148 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JOHNSON, MIRMIRAN & THOMPSON XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N50 Amount: $486,801.00 DBE Dollars: $2,413.00 DBE %: .50% District: 2 GMB ENGINEERS & PLANNERS, INC. 2.77% $13,475.00 NODARSE & ASSOCIATES, INC. -1.14% $13,469.00 NODARSE & ASSOCIATES, INC. -1.14% -$24,531.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R52 Amount: $22,781.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S47 Amount: $50,000.00 DBE Dollars: $5,000.00 DBE %: 10.00% District: 5 GMB ENGINEERS & PLANNERS, INC. 6.00% $3,000.00 NODARSE & ASSOCIATES, INC. 4.00% $2,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z11 Amount: $32,351.00 DBE Dollars: $25,353.00 DBE %: 78.37% District: 2 NODARSE & ASSOCIATES, INC. 78.37% $25,353.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For JOHNSON, MIRMIRAN & THOMPSON Amount: $591,933.00 DBE Dollars: $32,766.00 DBE % : 5.54% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 149 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JRA, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9217 Amount: $250,000.00 DBE Dollars: $250,000.00 DBE %: 100.00% District: 6 JRA, INC. 50.00% $50,000.00 JRA, INC. 50.00% $200,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KCCS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8706 Amount: -$4,311.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z13 Amount: -$6,360.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9229 Amount: $1,267,163.00 DBE Dollars: $116,837.00 DBE %: 9.22% District: 2 AE ENGINEERING, INC. 7.10% $89,924.00 ECHEZABAL & ASSOCIATES, INC. 2.12% $26,913.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For KCCS, INC. Amount: $1,256,492.00 DBE Dollars: $116,837.00 DBE % : 9.30% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 150 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KEITH AND SCHNARS, P.A. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8288 Amount: $326,557.00 DBE Dollars: $22,889.00 DBE %: 7.01% District: 6 A & P CONSULTING TRANSPORTATION ENGINEERS INC 1.91% $6,782.00 A & P CONSULTING TRANSPORTATION ENGINEERS INC 1.91% $2,941.00 A & P CONSULTING TRANSPORTATION ENGINEERS INC 1.91% $9,000.00 SANCHEZ-ZEINALI & ASSOC., INC. .64% $2,906.00 SANCHEZ-ZEINALI & ASSOC., INC. .64% $1,260.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H95 Amount: -$387,441.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J36 Amount: $55,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K63 Amount: -$72,790.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P09 Amount: $633,142.00 DBE Dollars: $.00 DBE %: .00% District: 6 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 151 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P82 Amount: -$195,549.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q63 Amount: $50,000.00 DBE Dollars: $3,000.00 DBE %: 6.00% District: 4 CTS ENGINEERING, INC. 6.00% $3,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S90 Amount: $40,019.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V51 Amount: -$28,125.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V83 Amount: $319,700.00 DBE Dollars: $30,970.00 DBE %: 9.69% District: 6 NODARSE & ASSOCIATES, INC. 3.23% $9,000.00 NODARSE & ASSOCIATES, INC. 3.23% $970.00 NODARSE & ASSOCIATES, INC. 3.23% $21,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X56 Amount: $96,139.00 DBE Dollars: $13,882.00 DBE %: 14.44% District: 2 KEVILLE ENTERPRISES, INC. 14.44% $13,882.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9007 Amount: $202,259.00 DBE Dollars: $19,992.63 DBE %: 9.88% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 1.42% $4,456.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 152 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount CH PEREZ & ASSOC.,CONSULTING ENGR. 1.42% $1,291.85 CH PEREZ AND ASSOCIATES CONSULTING .59% $856.31 CH PEREZ AND ASSOCIATES CONSULTING .59% $1,278.20 CH PEREZ AND ASSOCIATES CONSULTING .59% $1,400.00 CH PEREZ AND ASSOCIATES CONSULTING .59% $560.00 CH PEREZ AND ASSOCIATES CONSULTING .59% $700.00 CH PEREZ AND ASSOCIATES CONSULTING .59% $2,530.85 CH PEREZ AND ASSOCIATES CONSULTING .59% $1,084.65 GEOSOL, INC. .32% $1,909.83 GEOSOL, INC. .32% $553.65 GEOSOL, INC. .32% $366.99 GEOSOL, INC. .32% $547.80 GEOSOL, INC. .32% $600.00 GEOSOL, INC. .32% $7.00 GEOSOL, INC. .32% $300.00 GEOSOL, INC. .32% $1,084.65 GEOSOL, INC. .32% $464.85 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9050 Amount: $1,500,000.00 DBE Dollars: $180,000.00 DBE %: 12.00% District: 4 A & B ENGINEERING, INC. 6.00% $90,000.00 BETSY LINDSAY, INC. 6.00% $90,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 153 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9092 Amount: $341,315.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9109 Amount: $1,500,000.00 DBE Dollars: $120,000.00 DBE %: 8.00% District: 4 ACAI ASSOCIATES, INC. 8.00% $120,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9221 Amount: $6,418,189.00 DBE Dollars: $809,937.18 DBE %: 12.62% District: 2 VIA CONSULTING SERVICES, INC. 12.62% $809,937.18 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9321 Amount: $1,500,000.00 DBE Dollars: $120,000.00 DBE %: 8.00% District: 4 F.R. ALEMAN & ASSOCIATES, INC. 8.00% $120,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9356 Amount: $1,106,793.00 DBE Dollars: $122,064.61 DBE %: 11.03% District: 4 ARCHAEOLOGICAL CONSULTANTS, INC. 4.05% $44,825.26 CTS ENGINEERING, INC. 3.66% $40,489.35 GCME, INC. 3.32% $36,750.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For KEITH AND SCHNARS, P.A. Amount: $13,405,208.00 DBE Dollars: $1,442,735.42 DBE % : 10.76% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 154 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KELLY, COLLINS & GENTRY, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H59 Amount: $225,000.00 DBE Dollars: $18,000.00 DBE %: 8.00% District: 5 GHYABI & ASSOCIATES, INC. 1.00% $2,900.00 GHYABI & ASSOCIATES, INC. 1.00% $1,600.00 JCR CONSULTING 1.00% $2,900.00 JCR CONSULTING 1.00% $1,600.00 MEHTA & ASSOCIATES, INC. 1.00% $2,900.00 MEHTA & ASSOCIATES, INC. 1.00% $1,600.00 NODARSE & ASSOCIATES, INC. 1.00% $2,900.00 NODARSE & ASSOCIATES, INC. 1.00% $1,600.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T47 Amount: $130,964.00 DBE Dollars: $21,342.00 DBE %: 16.30% District: 5 GMB ENGINEERS & PLANNERS, INC. 5.40% $7,076.00 NODARSE & ASSOCIATES, INC. 5.45% $9,033.00 NODARSE & ASSOCIATES, INC. 5.45% $5,233.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For KELLY, COLLINS & GENTRY, INC. Amount: $355,964.00 DBE Dollars: $39,342.00 DBE % : 11.05% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 155 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KEYSTONE CIVIL, INCORPORATED XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9017 Amount: $3,180,386.00 DBE Dollars: $1,592,271.00 DBE %: 50.07% District: 7 KEYSTONE CIVIL, INCORPORATED 50.07% $1,592,271.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KIMLEY-HORN & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C4282 Amount: $27,963.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8344 Amount: $531,806.00 DBE Dollars: $76,595.00 DBE %: 14.40% District: 4 TIERRA SOUTH FLORIDA, INC. 14.40% $76,595.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8772 Amount: $25,502.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8778 Amount: $380,252.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8E12 Amount: $49,509.00 DBE Dollars: $.00 DBE %: .00% District: 8 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 156 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F72 Amount: $484,671.00 DBE Dollars: $81,237.00 DBE %: 16.76% District: 8 TIERRA, INC. 16.76% $81,237.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I04 Amount: $462,476.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L25 Amount: $84,437.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8L33 Amount: $242,384.00 DBE Dollars: $48,160.00 DBE %: 19.87% District: 1 GEOTECHNICAL AND ENVIRONMENTAL CON 18.44% $44,685.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.43% $3,475.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M14 Amount: $5,358.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O17 Amount: $100,000.00 DBE Dollars: $5,000.00 DBE %: 5.00% District: 5 ACCURATE TRAFFIC COUNTS, INC. 5.00% $5,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O47 Amount: $46,264.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 157 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R41 Amount: $300,000.00 DBE Dollars: $9,000.00 DBE %: 3.00% District: 6 CROSSROADS ENGINEERING DATA, INC. 3.00% $9,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R82 Amount: $112,003.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R83 Amount: $5,100,000.00 DBE Dollars: $660,000.00 DBE %: 12.94% District: 9 FAITH GROUP, LLC 2.16% $330,000.00 FAITH GROUP, LLC 2.16% $70,000.00 FAITH GROUP, LLC 2.16% -$70,000.00 PENUEL CONSULTING, LLC .00% $70,000.00 PENUEL CONSULTING, LLC .00% -$70,000.00 ROY D MCQUEEN & ASSOCIATES, LTD 2.16% $330,000.00 ROY D MCQUEEN & ASSOCIATES, LTD 2.16% $70,000.00 ROY D MCQUEEN & ASSOCIATES, LTD 2.16% -$70,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W50 Amount: $49,700.00 DBE Dollars: $8,297.21 DBE %: 16.69% District: 2 LANDMARK ENGINEERING INC. 16.69% $8,297.21 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z78 Amount: $750,405.00 DBE Dollars: $20,353.00 DBE %: 2.71% District: 7 ARCHAEOLOGICAL CONSULTANTS, INC. 1.03% $7,752.00 UTILITY MANAGEMENT SOLUTIONS 1.68% $12,601.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 158 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z88 Amount: $1,500,000.00 DBE Dollars: $120,000.00 DBE %: 8.00% District: 4 CYRIACKS ENVIRONMENTAL CONSULTING 1.60% $24,000.00 KEITH & ASSOCIATES, INC. 1.60% $24,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.60% $24,000.00 THE CUNNIGHAM GROUP 1.60% $24,000.00 TIERRA SOUTH FLORIDA, INC. 1.60% $24,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9063 Amount: $719,618.00 DBE Dollars: $62,716.00 DBE %: 8.72% District: 8 TIERRA, INC. 8.72% $62,716.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9084 Amount: $1,889,228.00 DBE Dollars: $80,717.71 DBE %: 4.27% District: 4 TIERRA SOUTH FLORIDA, INC. 4.27% $80,717.71 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9150 Amount: $573,733.00 DBE Dollars: $148,615.00 DBE %: 25.90% District: 6 MANUEL G. VERA & ASSOCIATES, INC. 23.61% $135,449.00 MEDIA RELATIONS GROUP LLC 2.29% $13,166.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9157 Amount: $165,000.00 DBE Dollars: $18,874.00 DBE %: 11.44% District: 7 HYATT SURVEY SERVICES, INC. 7.06% $11,651.00 UTILITY MANAGEMENT SOLUTIONS 4.38% $7,223.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 159 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9163 Amount: $4,137,068.00 DBE Dollars: $218,260.43 DBE %: 5.28% District: 4 CROSSROADS ENGINEERING DATA, INC. .81% $33,472.85 CTS ENGINEERING, INC. 1.97% $81,470.78 GCME, INC. .51% $21,143.75 KEITH & ASSOCIATES, INC. .25% $10,283.05 MEDIA RELATIONS GROUP LLC 1.74% $71,890.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9251 Amount: $300,000.00 DBE Dollars: $30,000.00 DBE %: 10.00% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 7.00% $21,000.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 3.00% $9,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9295 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 ACAI ASSOCIATES, INC. 2.50% $37,500.00 KEITH & ASSOCIATES, INC. 2.50% $37,500.00 PROGRESSIVE DESIGN & ENGR. INC. 2.50% $37,500.00 TIERRA SOUTH FLORIDA, INC. 2.50% $37,500.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 160 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9382 Amount: $466,293.00 DBE Dollars: $90,349.00 DBE %: 19.38% District: 2 BOWEN CIVIL ENGINEERING, INC. 19.38% $90,349.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For KIMLEY-HORN & ASSOCIATES, INC. Amount: $20,003,670.00 DBE Dollars: $1,828,174.35 DBE % : 9.14% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KISINGER CAMPO & ASSOC. CORP. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C6259 Amount: $200,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U74 Amount: $387,431.00 DBE Dollars: $17,181.00 DBE %: 4.43% District: 7 ECHEZABAL & ASSOCIATES, INC. 4.43% $17,181.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y29 Amount: $482,011.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9023 Amount: $3,078,877.00 DBE Dollars: $1,183,256.00 DBE %: 38.43% District: 7 ECHEZABAL & ASSOCIATES, INC. 18.82% $579,421.00 ECHEZABAL & ASSOCIATES, INC. 18.82% $579,421.00 OMNI COMMUNICATIONS LLC .79% $24,414.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 161 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9066 Amount: $1,680,000.00 DBE Dollars: $313,038.07 DBE %: 18.63% District: 4 BOLT UNDERWATER 11.11% $186,692.43 TRIANGLE ASSOCIATES INC. 7.52% $126,345.64 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9114 Amount: $5,362,649.00 DBE Dollars: $1,487,918.00 DBE %: 27.75% District: 1 ANNE KRAMER & ASSOCIATES, LLC 3.08% $165,000.00 ARCHAEOLOGICAL CONSULTANTS, INC. .15% $7,796.00 ECHEZABAL & ASSOCIATES, INC. 12.16% $652,021.00 KB ENVIRONMENTAL SCIENCES, INC. .18% $9,714.00 OMNI COMMUNICATIONS LLC .61% $32,553.00 TIERRA, INC. 11.58% $620,834.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9123 Amount: $1,500,000.00 DBE Dollars: $127,500.00 DBE %: 8.50% District: 1 BOLT UNDERWATER SERVICES, INC. 3.00% $45,000.00 OM ENGINEERING SERVICES, INC. 5.50% $82,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9252 Amount: $1,460,459.00 DBE Dollars: $182,913.00 DBE %: 12.52% District: 2 BOLT UNDERWATER SERVICES, INC. 12.52% $182,913.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9257 Amount: $3,600,516.00 DBE Dollars: $314,956.00 DBE %: 8.75% District: 5 ANTILLIAN ENGR. ASSOCIATES, INC. .79% $52,138.00 ANTILLIAN ENGR. ASSOCIATES, INC. .79% $4,916.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 162 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount ARCHAEOLOGICAL CONSULTANTS, INC. .20% $7,366.00 BASLEE ENGINEERING SOLUTIONS, INC. 2.18% $78,450.00 OM ENGINEERING SERVICES, INC. 4.29% $154,395.00 QUEST CORPORATION OF AMERICA, INC. .49% $17,691.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For KISINGER CAMPO & ASSOC. CORP. Amount: $17,751,943.00 DBE Dollars: $3,626,762.07 DBE % : 20.43% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KITTELSON & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I99 Amount: -$45.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q41 Amount: $197,103.00 DBE Dollars: $19,710.22 DBE %: 10.00% District: 5 GMB ENGINEERS & PLANNERS, INC. 2.50% $5,000.00 GMB ENGINEERS & PLANNERS, INC. 2.50% -$9,826.78 GMB ENGINEERS & PLANNERS, INC. 2.50% $20,000.00 GMB ENGINEERS & PLANNERS, INC. 2.50% $4,537.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R18 Amount: $500,000.00 DBE Dollars: $25,000.00 DBE %: 5.00% District: 5 ACCURATE TRAFFIC COUNTS, INC. 2.50% $7,500.00 ACCURATE TRAFFIC COUNTS, INC. 2.50% $17,500.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 163 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W63 Amount: $47,856.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9056 Amount: $446,808.00 DBE Dollars: $32,748.58 DBE %: 7.33% District: 4 Anthony Abbate Architect 3.30% $14,760.00 MEDIA RELATIONS GROUP LLC 4.03% $17,988.58 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9220 Amount: $894,756.00 DBE Dollars: $124,339.00 DBE %: 13.90% District: 1 ARCHAEOLOGICAL CONSULTANTS, INC. .56% $5,025.00 ENVIRONMENTAL TRANS PLANNING 4.19% $37,463.00 TIERRA, INC. 9.15% $81,851.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9225 Amount: $508,063.00 DBE Dollars: $48,705.00 DBE %: 9.59% District: 5 ANTILLIAN ENGR. ASSOCIATES, INC. 2.08% $10,581.00 ENVIRONMENTAL TRANS PLANNING 3.96% $20,137.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 3.54% $17,987.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 164 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9315 Amount: $400,000.00 DBE Dollars: $48,000.00 DBE %: 12.00% District: 5 ACCURATE TRAFFIC COUNTS, INC. 12.00% $48,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For KITTELSON & ASSOCIATES, INC. Amount: $2,994,541.00 DBE Dollars: $298,502.80 DBE % : 9.97% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KTA-TATOR, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P38 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 9 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9040 Amount: $527,076.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For KTA-TATOR, INC. Amount: $527,076.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : L & W ENGINEERING, INC.D/B/A INOVIA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9348 Amount: $629,033.00 DBE Dollars: $86,401.00 DBE %: 13.74% District: 3 CHEROKEE ROSE ENVIRONMENTAL SVCS. 1.53% $9,640.00 HSA CONSULTING GROUP, INC. 12.20% $76,761.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 165 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : LANDMARK ENGINEERING INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P11 Amount: $20,619.00 DBE Dollars: $8,549.00 DBE %: 41.46% District: 2 LANDMARK ENGINEERING INC. 20.73% -$7,706.00 LANDMARK ENGINEERING INC. 20.73% $16,255.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : LEFTWICH CONSULTING ENGINEERS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U99 Amount: $798,506.00 DBE Dollars: $69,851.00 DBE %: 8.75% District: 5 BCC ENGINEERING, INC. 2.92% $30,000.00 BCC ENGINEERING, INC. 2.92% $35,000.00 BCC ENGINEERING, INC. 2.92% $4,851.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : LOCHRANE ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B09 Amount: -$15,067.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S36 Amount: $150,000.00 DBE Dollars: $15,000.00 DBE %: 10.00% District: 5 ECHEZABAL & ASSOCIATES, INC. 5.00% $7,500.00 GEODATA CONSULTANTS, INC. 5.00% $7,500.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 166 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9227 Amount: $1,500,000.00 DBE Dollars: $10,000.00 DBE %: .67% District: 2 AMERICAN GOVERNMENT SERVICES CORP. .67% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9346 Amount: $396,760.00 DBE Dollars: $35,726.00 DBE %: 9.00% District: 2 GHIOTTO & ASSOCIATES, INC. 7.02% $27,872.00 GMB ENGINEERS & PLANNERS, INC. 1.98% $7,854.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For LOCHRANE ENGINEERING, INC. Amount: $2,031,693.00 DBE Dollars: $60,726.00 DBE % : 2.99% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MANUEL G. VERA & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P67 Amount: $276,960.00 DBE Dollars: $146,960.00 DBE %: 53.06% District: 6 MANUEL G. VERA & ASSOCIATES, INC. 26.53% $80,897.00 MANUEL G. VERA & ASSOCIATES, INC. 26.53% $66,063.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9127 Amount: $909,906.00 DBE Dollars: $300,000.00 DBE %: 32.97% District: 6 MANUEL G. VERA & ASSOCIATES, INC. 16.49% $50,000.00 MANUEL G. VERA & ASSOCIATES, INC. 16.49% $250,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MANUEL G. VERA & ASSOCIATES, INC. Amount: $1,186,866.00 DBE Dollars: $446,960.00 DBE % : 37.66% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 167 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MARLIN ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C5541 Amount: $.00 DBE Dollars: -$30,432.00 DBE %: .00% District: 6 ADVANCE CONSULTING ENGINEERING .00% -$30,432.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I05 Amount: -$55.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I10 Amount: -$349.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I77 Amount: -$19,845.00 DBE Dollars: -$992.54 DBE %: 5.00% District: 6 GEOSOL, INC. .63% -$712.31 GEOSOL, INC. .63% -$1,806.27 GEOSOL, INC. .63% -$13.96 GEOSOL, INC. .63% $301.00 GEOSOL, INC. .63% $396.00 GEOSOL, INC. .63% $241.00 GEOSOL, INC. .63% $301.00 GEOSOL, INC. .63% $301.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 168 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N45 Amount: $141,651.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O60 Amount: $100,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q80 Amount: $190,000.00 DBE Dollars: $.00 DBE %: .00% District: 9 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X33 Amount: $181,850.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X86 Amount: $280,000.00 DBE Dollars: $22,680.00 DBE %: 8.10% District: 6 CROSSROADS ENGINEERING DATA, INC. 4.05% $11,340.00 CTS ENGINEERING, INC. 4.05% $11,340.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9223 Amount: $1,363,232.00 DBE Dollars: $102,602.00 DBE %: 7.53% District: 9 GMB ENGINEERS & PLANNERS, INC. 7.53% $102,602.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MARLIN ENGINEERING, INC. Amount: $2,236,484.00 DBE Dollars: $93,857.46 DBE % : 4.20% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 169 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MBE GROUP, INC., DBA CARDNO TBE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C6002 Amount: $696,470.00 DBE Dollars: $5,229.00 DBE %: .75% District: 1 FLORIDA TRANSPORTATION ENGINEERING .75% $5,229.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MCMAHON ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N24 Amount: $73,467.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O56 Amount: $534,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P72 Amount: $61,869.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9022 Amount: $539,156.00 DBE Dollars: $16,174.67 DBE %: 3.00% District: 4 TIERRA SOUTH FLORIDA, INC. 3.00% $16,174.67 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MCMAHON ASSOCIATES, INC. Amount: $1,208,492.00 DBE Dollars: $16,174.67 DBE % : 1.34% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 170 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MEHTA & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T17 Amount: $27,987.00 DBE Dollars: $27,987.00 DBE %: 100.00% District: 5 MEHTA & ASSOCIATES, INC. 100.00% $27,987.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U13 Amount: $352,245.00 DBE Dollars: $352,115.00 DBE %: 99.96% District: 4 MEHTA & ASSOCIATES, INC. 49.98% $261,479.00 MEHTA & ASSOCIATES, INC. 49.98% $90,636.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y83 Amount: $655,546.00 DBE Dollars: $655,546.00 DBE %: 100.00% District: 3 MEHTA & ASSOCIATES, INC. 50.00% $627,577.00 MEHTA & ASSOCIATES, INC. 50.00% $27,969.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z40 Amount: $532,695.00 DBE Dollars: $494,916.00 DBE %: 92.91% District: 5 MEHTA & ASSOCIATES, INC. 46.45% -$332,212.00 MEHTA & ASSOCIATES, INC. 46.45% $827,128.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9087 Amount: $1,334,003.00 DBE Dollars: $612,193.00 DBE %: 45.89% District: 3 MEHTA & ASSOCIATES, INC. 43.56% $581,093.00 POOLE ENGINEERING & SURVEYING, INC 2.33% $31,100.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 171 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9167 Amount: $2,294,420.00 DBE Dollars: $2,348,360.00 DBE %: 102.35% District: 5 JBS ENGINEERING TECHNICAL SERVICES INC 12.30% $26,940.00 JBS ENGINEERING TECHNICAL SERVICES INC 12.30% $537,660.00 MEHTA & ASSOCIATES, INC. 76.57% $1,756,760.00 NETWORK ENGINEERING SERVICES 1.18% $27,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MEHTA & ASSOCIATES, INC. Amount: $5,196,896.00 DBE Dollars: $4,491,117.00 DBE % : 86.42% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : METRIC ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C4697 Amount: $.00 DBE Dollars: $88,524.00 DBE %: .00% District: 6 MANUEL G. VERA & ASSOCIATES, INC. .00% $88,524.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A04 Amount: -$51,315.00 DBE Dollars: -$409.00 DBE %: .80% District: 6 A.D.A. ENGINEERING, INC. .80% -$409.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G41 Amount: -$7,669.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H02 Amount: -$369,574.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 172 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I73 Amount: -$230,853.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M19 Amount: -$9,243,800.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N27 Amount: $24,333.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O68 Amount: $75,300.00 DBE Dollars: $7,530.04 DBE %: 10.00% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 4.66% $3,509.00 CH PEREZ AND ASSOCIATES CONSULTING 1.34% -$1,421.76 CH PEREZ AND ASSOCIATES CONSULTING 1.34% $4,997.70 CH PEREZ AND ASSOCIATES CONSULTING 1.34% $2,575.00 CH PEREZ AND ASSOCIATES CONSULTING 1.34% -$2,129.90 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P64 Amount: $200,000.00 DBE Dollars: $20,000.00 DBE %: 10.00% District: 3 HSA CONSULTING GROUP, INC. 10.00% $20,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R08 Amount: $48,065.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 173 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R44 Amount: -$4,823.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T44 Amount: $26,927.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T54 Amount: $31,710.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T71 Amount: $284,025.00 DBE Dollars: $79,966.41 DBE %: 28.15% District: 4 CH PEREZ & ASSOC.,CONSULTING ENGR. 1.73% $4,907.52 CH PEREZ AND ASSOCIATES CONSULTING 8.17% $23,191.00 TIERRA SOUTH FLORIDA, INC. 9.13% $20,531.89 TIERRA SOUTH FLORIDA, INC. 9.13% $31,336.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T90 Amount: $477,565.00 DBE Dollars: $55,793.30 DBE %: 11.68% District: 6 ADVANCED TRANSPORTATION ENGINEERIN 1.13% $11,525.50 ADVANCED TRANSPORTATION ENGINEERIN 1.13% -$15,795.04 ADVANCED TRANSPORTATION ENGINEERIN 1.13% $20,511.00 MANUEL G. VERA & ASSOCIATES, INC. .60% $3,000.00 MANUEL G. VERA & ASSOCIATES, INC. .60% $850.11 MANUEL G. VERA & ASSOCIATES, INC. .60% $4,939.50 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 174 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount MANUEL G. VERA & ASSOCIATES, INC. .60% -$6,769.30 MANUEL G. VERA & ASSOCIATES, INC. .60% $12,306.66 MEDIA RELATIONS GROUP LLC 1.00% $5,000.00 MEDIA RELATIONS GROUP LLC 1.00% $1,416.80 MEDIA RELATIONS GROUP LLC 1.00% $8,232.50 MEDIA RELATIONS GROUP LLC 1.00% -$11,282.17 MEDIA RELATIONS GROUP LLC 1.00% $20,511.00 TIERRA SOUTH FLORIDA, INC. .07% $2,000.00 TIERRA SOUTH FLORIDA, INC. .07% $566.74 TIERRA SOUTH FLORIDA, INC. .07% $3,293.00 TIERRA SOUTH FLORIDA, INC. .07% -$4,513.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V68 Amount: $130,859.00 DBE Dollars: $15,352.00 DBE %: 11.73% District: 3 AE ENGINEERING, INC. 11.73% $15,352.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W51 Amount: -$293,242.00 DBE Dollars: -$233,963.00 DBE %: 79.78% District: 5 JBS ENGINEERING TECHNICAL SERVICES INC 39.23% $3,961.00 JBS ENGINEERING TECHNICAL SERVICES INC 39.23% -$234,061.00 MEHTA & ASSOCIATES, INC. 1.32% -$3,863.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X35 Amount: $1,110,564.00 DBE Dollars: $.00 DBE %: .00% District: 6 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 175 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y50 Amount: $25,220.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z08 Amount: $5,589.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z32 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z60 Amount: $237,491.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9025 Amount: $708,692.00 DBE Dollars: $116,694.00 DBE %: 16.47% District: 3 AE ENGINEERING, INC. 4.57% $591,998.00 AE ENGINEERING, INC. 4.57% -$527,229.00 CSI GEO INC. 7.33% $51,925.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9042 Amount: $1,104,056.00 DBE Dollars: $100,859.94 DBE %: 9.14% District: 6 MANUEL G. VERA & ASSOCIATES, INC. .83% $13,507.00 MANUEL G. VERA & ASSOCIATES, INC. .83% $10,785.29 MANUEL G. VERA & ASSOCIATES, INC. .83% $7,696.35 MANUEL G. VERA & ASSOCIATES, INC. .83% $7,621.89 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 176 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount MANUEL G. VERA & ASSOCIATES, INC. .83% $14,968.70 MANUEL G. VERA & ASSOCIATES, INC. .83% $623.10 MEDIA RELATIONS GROUP LLC .17% $2,701.49 MEDIA RELATIONS GROUP LLC .17% $2,157.00 MEDIA RELATIONS GROUP LLC .17% $1,539.27 MEDIA RELATIONS GROUP LLC .17% $1,524.38 MEDIA RELATIONS GROUP LLC .17% $2,993.74 MEDIA RELATIONS GROUP LLC .17% $124.62 TIERRA SOUTH FLORIDA, INC. .52% $8,104.47 TIERRA SOUTH FLORIDA, INC. .52% $6,471.18 TIERRA SOUTH FLORIDA, INC. .52% $4,617.81 TIERRA SOUTH FLORIDA, INC. .52% $4,573.14 TIERRA SOUTH FLORIDA, INC. .52% $8,981.21 TIERRA SOUTH FLORIDA, INC. .52% $1,869.30 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9045 Amount: $1,500,000.00 DBE Dollars: $195,000.00 DBE %: 13.00% District: 1 AERIAL INNOVATIONS, INC. 1.00% $15,000.00 ALLIED ENGINEERING & TESTING,INC. 1.00% $15,000.00 BOLT UNDERWATER 1.00% $15,000.00 CELLA MOLNAR & ASSOCIATES, INC. 1.00% $15,000.00 ECHEZABAL & ASSOCIATES, INC. 1.00% $15,000.00 HIGHSPANS ENGINEERING, INC. 1.00% $15,000.00 JBS ENGINEERING TECHNICAL SERVICES INC 1.00% $15,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 177 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount MEHTA & ASSOCIATES, INC. 1.00% $15,000.00 NODARSE & ASSOCIATES, INC. 1.00% $15,000.00 OMNI COMMUNICATIONS LLC 1.00% $15,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.00% $15,000.00 THE VALERIN GROUP, INC. 1.00% $15,000.00 TIERRA, INC. 1.00% $15,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9090 Amount: $241,590.00 DBE Dollars: $24,159.00 DBE %: 10.00% District: 3 HSA CONSULTING GROUP, INC. 5.00% $22,500.00 HSA CONSULTING GROUP, INC. 5.00% $1,659.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9102 Amount: $305,812.00 DBE Dollars: $26,118.00 DBE %: 8.54% District: 1 ALLIED ENGINEERING & TESTING,INC. 6.32% $19,325.00 HIGHSPANS ENGINEERING, INC. 2.22% $6,793.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9149 Amount: $1,500,000.00 DBE Dollars: $165,000.00 DBE %: 11.00% District: 1 AERIAL INNOVATIONS, INC. 1.00% $15,000.00 ALLIED ENGINEERING & TESTING,INC. 1.00% $15,000.00 BOLT UNDERWATER SERVICES, INC. 1.00% $15,000.00 CELLA MOLNAR & ASSOCIATES, INC. 1.00% $15,000.00 ECHEZABAL & ASSOCIATES, INC. 1.00% $15,000.00 HIGHSPANS ENGINEERING, INC. 1.00% $15,000.00 MEHTA & ASSOCIATES, INC. 1.00% $15,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 178 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount OMNI COMMUNICATIONS LLC 1.00% $15,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.00% $15,000.00 THE VALERIN GROUP, INC. 1.00% $15,000.00 TIERRA, INC. 1.00% $15,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9166 Amount: $1,267,396.00 DBE Dollars: $199,012.00 DBE %: 15.70% District: 1 AERIAL INNOVATIONS, INC. .42% $5,312.00 HIGHSPANS ENGINEERING, INC. 9.31% $117,968.00 THE VALERIN GROUP, INC. 3.60% $45,675.00 TIERRA, INC. 2.37% $30,057.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9200 Amount: $1,997,538.00 DBE Dollars: $196,571.00 DBE %: 9.84% District: 2 HSA CONSULTING GROUP, INC. 9.84% $196,571.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9282 Amount: $995,417.00 DBE Dollars: $137,802.00 DBE %: 13.84% District: 3 ECOLOGICAL RESOURCE CONSULTANTS, I 2.51% $24,940.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 3.53% $26,047.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 3.53% $44,209.00 ENVIRONMENTAL MANAGEMENT & DESIGN 2.47% $24,625.00 HSA CONSULTING GROUP, INC. 1.81% $17,981.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9308 Amount: $1,674,073.00 DBE Dollars: $98,471.00 DBE %: 5.88% District: 5 AERIAL INNOVATIONS, INC. .18% $2,955.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 179 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount ELIPSIS ENGINEERING & CONSULTING LLC 4.86% $81,311.00 MCKIM & CREED, INC. .85% $14,205.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9316 Amount: $1,500,000.00 DBE Dollars: $120,000.00 DBE %: 8.00% District: 1 ALLIED ENGINEERING & TESTING,INC. 6.00% $90,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 2.00% $30,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9333 Amount: $826,521.00 DBE Dollars: $90,115.00 DBE %: 10.90% District: 3 AE ENGINEERING, INC. 10.90% $90,115.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9334 Amount: $826,725.00 DBE Dollars: $86,951.00 DBE %: 10.52% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 9.32% $77,078.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.19% $9,873.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9359 Amount: $373,987.00 DBE Dollars: $110,453.00 DBE %: 29.53% District: 1 ALLIED ENGINEERING & TESTING,INC. 23.28% $87,071.00 HIGHSPANS ENGINEERING, INC. 6.25% $23,382.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9362 Amount: $879,795.00 DBE Dollars: $101,487.00 DBE %: 11.54% District: 3 AE ENGINEERING, INC. 11.54% $101,487.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9370 Amount: $716,882.00 DBE Dollars: $77,064.00 DBE %: 10.75% District: 3 AE ENGINEERING, INC. 9.51% $68,150.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 180 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount HSA CONSULTING GROUP, INC. 1.24% $8,914.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For METRIC ENGINEERING, INC. Amount: $8,894,856.00 DBE Dollars: $1,878,550.69 DBE % : 21.12% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MILLER, LEGG & ASSOCIATES,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J37 Amount: $20,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U16 Amount: $329,957.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9191 Amount: $50,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9339 Amount: $40,000.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MILLER, LEGG & ASSOCIATES,INC. Amount: $439,957.00 DBE Dollars: $.00 DBE % : .00% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 181 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MULKEY ENGINEERS & CONSULTANTS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R94 Amount: $51,789.00 DBE Dollars: $34,116.00 DBE %: 65.87% District: 3 LANDMARK ENGINEERING INC. 58.61% $30,351.00 PROTEAN DESIGN GROUP, INC. 7.27% $3,765.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : NEW MILLENNIUM DESIGN CONSULTANTS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V84 Amount: $153,113.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9026 Amount: $588,789.00 DBE Dollars: $44,010.00 DBE %: 7.47% District: 6 EBS ENGINEERING, INC. 7.47% $44,010.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For NEW MILLENNIUM DESIGN CONSULTANTS Amount: $741,902.00 DBE Dollars: $44,010.00 DBE % : 5.93% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : NEW MILLENNIUM ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P56 Amount: -$72,773.00 DBE Dollars: -$52,906.00 DBE %: 72.70% District: 6 CH PEREZ AND ASSOCIATES CONSULTING 72.70% -$52,906.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 182 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R57 Amount: $214,583.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9021 Amount: $800,000.00 DBE Dollars: $120,000.00 DBE %: 15.00% District: 6 PINNACLE CONSULTING ENTERPRISES INC 7.50% $82,500.00 PINNACLE CONSULTING ENTERPRISES INC 7.50% $37,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9039 Amount: $928,093.00 DBE Dollars: $83,939.00 DBE %: 9.04% District: 8 AMERICAN ENGINEERING GROUP, INC. 9.04% $83,939.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For NEW MILLENNIUM ENGINEERING, INC. Amount: $1,869,903.00 DBE Dollars: $151,033.00 DBE % : 8.08% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : NOBLES CONSULTING GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9187 Amount: $24,996.00 DBE Dollars: $.00 DBE %: .00% District: 9 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 183 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9211 Amount: $1,509,250.00 DBE Dollars: $42,000.00 DBE %: 2.78% District: 3 GARLAND TRAFFIC SOLUTIONS, INC. 2.78% $42,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For NOBLES CONSULTING GROUP, INC. Amount: $1,534,246.00 DBE Dollars: $42,000.00 DBE % : 2.74% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : NODARSE & ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N53 Amount: -$100,429.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X41 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9072 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 TIERRA SOUTH FLORIDA, INC. 10.00% $150,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9107 Amount: $3,000,000.00 DBE Dollars: $450,000.00 DBE %: 15.00% District: 9 ELIPSIS ENGINEERING & CONSULTING LLC 5.00% $150,000.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 5.00% $150,000.00 PAGE ONE CONSULTANTS, INC. 5.00% $150,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 184 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9156 Amount: $1,093,950.00 DBE Dollars: $212,465.00 DBE %: 19.42% District: 2 CAL-TECH TESTING, INC. 5.12% $55,990.00 CSI GEO INC. 6.25% $68,418.00 MESKEL & ASSOCIATES ENGINEERING, P 5.26% $57,596.00 THE GIBBS GROUP, PLLC 2.78% $30,461.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For NODARSE & ASSOCIATES, INC. Amount: $5,493,521.00 DBE Dollars: $812,465.00 DBE % : 14.79% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : OCEAN ENGINEERING ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N90 Amount: $98,218.00 DBE Dollars: $.00 DBE %: .00% District: 9 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PALMER ENGR. CO.D/B/A/PEC, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K77 Amount: $6,898.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9111 Amount: $775,175.00 DBE Dollars: $89,225.00 DBE %: 11.51% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 1.71% $13,220.00 GMB ENGINEERS & PLANNERS, INC. 7.18% $55,655.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 185 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount LANDMARK ENGINEERING INC. 1.35% $10,501.00 QUEST CORPORATION OF AMERICA, INC. 1.27% $9,849.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PALMER ENGR. CO.D/B/A/PEC, INC. Amount: $782,073.00 DBE Dollars: $89,225.00 DBE % : 11.41% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PARSONS TRANSPORTATION GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7767 Amount: $1,519,363.00 DBE Dollars: $192,735.00 DBE %: 12.69% District: 2 CSI GEO INC. 11.44% $173,767.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 1.25% $18,968.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7887 Amount: $24,806.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8314 Amount: $951,409.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B58 Amount: $69,692.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U62 Amount: $85,198.00 DBE Dollars: $.00 DBE %: .00% District: 2 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 186 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W11 Amount: $313,281.00 DBE Dollars: $128,980.38 DBE %: 41.17% District: 2 CLOUD CONSULTANTS & SERVICES, INC. 10.59% $34,555.00 CLOUD CONSULTANTS & SERVICES, INC. 10.59% $31,827.46 CSI GEO INC. 19.98% $62,597.92 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X76 Amount: $72,900.00 DBE Dollars: $7,290.00 DBE %: 10.00% District: 6 HR ENGINEERING SERVICES, INC. 3.33% $2,430.00 INFRASTRUCTURE ENGINEERS, INC. 3.33% $2,430.00 MANUEL G. VERA & ASSOCIATES, INC. 3.33% $2,430.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y17 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9186 Amount: $1,666,284.00 DBE Dollars: $431,848.00 DBE %: 25.92% District: 2 AEROSTAR ENVIRONMENTAL SERVICES,IN .47% $7,763.00 CSI GEO INC. 13.54% $225,672.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 1.27% $21,161.00 ENVIRONMENTAL TRANS PLANNING .65% $10,815.00 GHIOTTO & ASSOCIATES, INC. 9.27% $154,406.00 KELLY GRAPHICS .07% $1,189.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 187 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SOUTHEASTERN ARCHAEOLOGICAL RESEAR .65% $10,842.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PARSONS TRANSPORTATION GROUP, INC. Amount: $4,702,933.00 DBE Dollars: $760,853.38 DBE % : 16.18% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PB AMERICAS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8777 Amount: $68,488.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8792 Amount: -$11,794.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8802 Amount: $559,967.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B28 Amount: -$1,744,273.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8C63 Amount: -$275,952.00 DBE Dollars: -$6,396.54 DBE %: 2.32% District: 6 MEHTA & ASSOCIATES, INC. 2.32% -$6,396.54 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 188 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8C66 Amount: $930,000.00 DBE Dollars: $3,823.00 DBE %: .41% District: 7 FALLER, DAVIS AND ASSOC.,INC. .41% $3,823.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H48 Amount: $77,544.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I91 Amount: $722,838.00 DBE Dollars: $40,405.00 DBE %: 5.59% District: 1 FALLER, DAVIS AND ASSOC.,INC. 5.59% $40,405.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J22 Amount: $49,880.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K81 Amount: $850,000.00 DBE Dollars: $150,000.00 DBE %: 17.65% District: 4 Diaz & Cooper Advertising, Inc. 17.65% $150,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M43 Amount: -$1,991,790.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q03 Amount: $1,250,000.00 DBE Dollars: $180,000.00 DBE %: 14.40% District: 7 BOLT UNDERWATER 3.00% $37,500.00 BOLT UNDERWATER 3.00% $37,500.00 CONCORR OF FLORIDA, INC. 2.40% $30,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 189 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount GARCIA BRIDGE ENGINEERS P A 6.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T35 Amount: $330,747.00 DBE Dollars: $42,162.00 DBE %: 12.75% District: 2 ELEMENT ENGINEERING GROUP,LLC 6.37% $37,027.00 ELEMENT ENGINEERING GROUP,LLC 6.37% $5,135.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U78 Amount: $33,824.00 DBE Dollars: $33,824.00 DBE %: 100.00% District: 1 PROFESSIONALS NOW 100.00% $33,824.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V49 Amount: $573,790.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V54 Amount: $92,134.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W64 Amount: $8,718,017.00 DBE Dollars: $695,981.00 DBE %: 7.98% District: 8 CES CONSULTANTS, INC. .82% $36,040.00 CES CONSULTANTS, INC. .82% $102,418.00 CES CONSULTANTS, INC. .82% $75,331.00 LPE ENTERPRISES. LTD. 1.18% $103,017.00 MEHTA & ASSOCIATES, INC. .93% $19,443.00 MEHTA & ASSOCIATES, INC. .93% $143,136.00 NETWORK ENGINEERING SERVICES .21% $18,623.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 190 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount NETWORK ENGINEERING SERVICES .21% $18,623.00 PAGE ONE CONSULTANTS, INC. .62% $48,647.00 PAGE ONE CONSULTANTS, INC. .62% $17,429.00 PAGE ONE CONSULTANTS, INC. .62% $95,592.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .10% $5,486.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .10% $12,196.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y60 Amount: $462,374.00 DBE Dollars: $39,907.83 DBE %: 8.63% District: 2 ENVIRONMENTAL RESOURCE SOLUTIONS, 2.25% $10,398.55 GHIOTTO & ASSOCIATES, INC. 6.38% $29,509.28 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z16 Amount: $1,484,831.00 DBE Dollars: $175,000.00 DBE %: 11.79% District: 9 BCC ENGINEERING, INC. 11.79% $175,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9152 Amount: $2,238,407.00 DBE Dollars: $406,344.00 DBE %: 18.15% District: 1 ADAMS TRAFFIC .46% $10,354.00 ANALYTIC ENGINEERING, INCORPORATED .16% $3,684.00 ARCHAEOLOGICAL CONSULTANTS, INC. .27% $6,049.00 INDEPENDENCE ACQUISITION & APP,LLC .26% $5,800.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.76% $39,504.00 THE HEIMBURG GROUP, INC. .81% $18,239.00 TIERRA, INC. 14.42% $322,714.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 191 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9169 Amount: $1,500,000.00 DBE Dollars: $165,000.00 DBE %: 11.00% District: 7 TIERRA, INC. 11.00% $165,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9172 Amount: $441,958.00 DBE Dollars: $79,827.00 DBE %: 18.06% District: 3 BOLT UNDERWATER SERVICES, INC. 6.80% $30,075.00 K. S. WARE & ASSOCIATES, LLC 11.26% $49,752.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9248 Amount: $1,000,000.00 DBE Dollars: $100,000.00 DBE %: 10.00% District: 9 GARCIA BRIDGE ENGINEERS P A 10.00% $100,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9260 Amount: $5,157,767.00 DBE Dollars: $630,604.00 DBE %: 12.23% District: 7 IMPRESSIVE PRODUCTS INC .05% $2,371.00 JBS ENGINEERING TECHNICAL SERVICES INC 11.28% $581,713.00 NORTHWEST ENGINEERING, INC. .45% $10,510.00 NORTHWEST ENGINEERING, INC. .45% $36,010.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9288 Amount: $1,500,000.00 DBE Dollars: $120,000.00 DBE %: 8.00% District: 4 BCC ENGINEERING, INC. 8.00% $120,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9304 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 1 ANALYTIC ENGINEERING, INCORPORATED 10.00% $150,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 192 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9366 Amount: $1,500,000.00 DBE Dollars: $180,000.00 DBE %: 12.00% District: 1 ADAMS TRAFFIC 6.00% $90,000.00 BAYSIDE ENGINEERING, INC. 2.00% $30,000.00 FLORIDA TRANSPORTATION ENGINEERING 2.00% $30,000.00 TRAF-O-DATA CORPORATION 2.00% $30,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PB AMERICAS, INC. Amount: $27,018,757.00 DBE Dollars: $3,186,481.29 DBE % : 11.79% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PBS&J CONSTRUCTION SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8248 Amount: -$28,934.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PEGASUS ENGINEERING LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T99 Amount: $16,805.00 DBE Dollars: $7,152.00 DBE %: 42.56% District: 5 PEGASUS ENGINEERING LLC 42.56% $7,152.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 193 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9392 Amount: $519,954.00 DBE Dollars: $356,281.00 DBE %: 68.52% District: 3 PEGASUS ENGINEERING LLC 68.52% $356,281.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PEGASUS ENGINEERING LLC Amount: $536,759.00 DBE Dollars: $363,433.00 DBE % : 67.71% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PINNACLE CONSULTING ENTERPRISES, IN XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W67 Amount: $1,362,131.00 DBE Dollars: $884,474.00 DBE %: 64.93% District: 6 HR ENGINEERING SERVICES, INC. 2.46% $33,525.00 PINNACLE CONSULTING ENTERPRISES INC 62.47% $850,949.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PITMAN-HARTENSTEIN & ASSOC.INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7681 Amount: $44,486.00 DBE Dollars: $2,015.14 DBE %: 4.53% District: 2 ENVIRONMENTAL RESOURCE SOLUTIONS, 4.53% $2,015.14 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F88 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9029 Amount: $1,040,969.00 DBE Dollars: $181,102.00 DBE %: 17.40% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 2.87% $29,920.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 194 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount ENVIRONMENTAL RESOURCE SOLUTIONS, 2.05% $21,328.00 THE BALMORAL GROUP 12.47% $129,854.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PITMAN-HARTENSTEIN & ASSOC.INC. Amount: $1,085,455.00 DBE Dollars: $183,117.14 DBE % : 16.87% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PMA CONSULTANTS LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J09 Amount: -$217,711.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V07 Amount: $100,000.00 DBE Dollars: $9,000.00 DBE %: 9.00% District: 5 COST MANAGEMENT 4.50% $4,500.00 NODARSE & ASSOCIATES, INC. 4.50% $4,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PMA CONSULTANTS LLC Amount: -$117,711.00 DBE Dollars: $9,000.00 DBE % : -7.65% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : POST, BUCKLEY, SCHUH & JERNIGAN,INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7985 Amount: $485,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 195 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8561 Amount: -$141,121.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8803 Amount: $78,758.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8862 Amount: -$85,568.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F59 Amount: $155,864.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G66 Amount: $9,000,000.00 DBE Dollars: $203,332.00 DBE %: 2.26% District: 7 BCC ENGINEERING, INC. .56% $50,000.00 CARLOS F NUNEZ P E .11% $10,000.00 CUMBEY & FAIR, INC. .11% $10,000.00 FALLER, DAVIS AND ASSOC.,INC. .19% $16,667.00 FALLER, DAVIS AND ASSOC.,INC. .19% $16,667.00 GORD & ASSOCIATES, INC. .28% $25,000.00 GORD & ASSOCIATES, INC. .28% $25,000.00 TIERRA, INC. .09% $8,333.00 TIERRA, INC. .09% $8,333.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 196 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TIERRA, INC. .09% $8,333.00 TIERRA, INC. .09% $8,333.00 TIERRA, INC. .09% $8,333.00 TIERRA, INC. .09% $8,333.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I21 Amount: $1,342,081.00 DBE Dollars: $115,165.00 DBE %: 8.58% District: 1 ARCHAEOLOGICAL CONSULTANTS, INC. .96% $12,927.00 TIERRA, INC. 7.62% $102,238.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I75 Amount: $600,000.00 DBE Dollars: $60,000.00 DBE %: 10.00% District: 9 MONTGOMERY CONSULTING GROUP, INC. 10.00% $60,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q53 Amount: $5,771,120.00 DBE Dollars: $729,275.00 DBE %: 12.64% District: 8 FALLER, DAVIS AND ASSOC.,INC. 3.88% $223,871.00 MONTGOMERY CONSULTING GROUP, INC. 8.76% $505,404.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q62 Amount: $53,000.00 DBE Dollars: $2,650.00 DBE %: 5.00% District: 6 TIERRA, INC. 2.50% $2,000.00 TIERRA, INC. 2.50% $650.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S95 Amount: $46,000.00 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 197 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y73 Amount: $.00 DBE Dollars: $94,396.00 DBE %: .00% District: 3 WBQ DESIGN & ENGINEERING, INC. .00% $94,396.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z68 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9009 Amount: $952,662.00 DBE Dollars: $164,227.87 DBE %: 17.24% District: 4 TIERRA SOUTH FLORIDA, INC. 17.24% $164,227.87 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9037 Amount: $358,774.00 DBE Dollars: $43,055.00 DBE %: 12.00% District: 3 MTN RESOUCES LLC 12.00% $43,055.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9240 Amount: $4,785,310.00 DBE Dollars: $707,778.00 DBE %: 14.79% District: 1 AMERICAN GOVERNMENT SERVICES CORP. .67% $31,875.00 ARCHAEOLOGICAL CONSULTANTS, INC. .24% $11,392.00 HYDRO SOLUTIONS CONSULTING 1.22% $58,587.00 ICON CONSULTANT GROUP, INC. 5.86% $280,436.00 TIERRA SOUTH FLORIDA, INC. 6.80% $325,488.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DMY06 Amount: -$257,057.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 198 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: DN457 Amount: $1,500,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For POST, BUCKLEY, SCHUH & JERNIGAN,INC Amount: $24,644,823.00 DBE Dollars: $2,119,878.87 DBE % : 8.60% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PREBLE-RISH, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9128 Amount: $767,453.00 DBE Dollars: $72,705.00 DBE %: 9.47% District: 3 ECOLOGICAL RESOURCE CONSULTANTS, I 2.21% $16,930.00 POOLE ENGINEERING & SURVEYING, INC 7.27% $55,775.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PROFESSIONAL SERVICE INDUSTRIES XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H91 Amount: -$175,253.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PROFESSIONAL SERVICE INDUSTRIES, IN XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9098 Amount: $3,000,000.00 DBE Dollars: $300,000.00 DBE %: 10.00% District: 9 TIERRA, INC. 10.00% $300,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 199 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9237 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 GEOSOL, INC. 5.00% $75,000.00 HR ENGINEERING SERVICES, INC. 5.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PROFESSIONAL SERVICE INDUSTRIES, IN Amount: $4,500,000.00 DBE Dollars: $450,000.00 DBE % : 10.00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PROGRESSIVE DESIGN & ENGR. INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z85 Amount: $344,349.00 DBE Dollars: $318,139.19 DBE %: 92.39% District: 4 BCC ENGINEERING, INC. 3.21% $11,041.27 MANUEL G. VERA & ASSOCIATES, INC. 12.19% $41,973.92 PROGRESSIVE DESIGN & ENGR. INC. 76.99% $265,124.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PROSSER HALLOCK, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H05 Amount: $91,278.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9124 Amount: $200,000.00 DBE Dollars: $62,708.25 DBE %: 31.35% District: 2 ENVIRONMENTAL RESOURCE SOLUTIONS, 11.91% $23,825.24 ENVIRONMENTAL TRANS PLANNING 8.11% $16,223.09 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 200 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount KELLYGRAPHICS .39% $787.54 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 10.94% $21,872.38 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PROSSER HALLOCK, INC. Amount: $291,278.00 DBE Dollars: $62,708.25 DBE % : 21.53% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PROTEAN DESIGN GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J25 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q26 Amount: $50,170.00 DBE Dollars: $36,585.00 DBE %: 72.92% District: 8 PROTEAN DESIGN GROUP, INC. 72.92% $36,585.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S63 Amount: $750,000.00 DBE Dollars: $750,000.00 DBE %: 100.00% District: 5 FALLER, DAVIS AND ASSOC.,INC. 5.00% $30,000.00 FALLER, DAVIS AND ASSOC.,INC. 5.00% $45,000.00 PROTEAN DESIGN GROUP, INC. 45.00% $270,000.00 PROTEAN DESIGN GROUP, INC. 45.00% $405,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V99 Amount: $82,094.00 DBE Dollars: $82,094.00 DBE %: 100.00% District: 3 PROTEAN DESIGN GROUP, INC. 100.00% $82,094.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 201 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z37 Amount: -$286,799.00 DBE Dollars: -$286,799.00 DBE %: 100.00% District: 4 PROTEAN DESIGN GROUP, INC. 100.00% -$286,799.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9093 Amount: $944,738.00 DBE Dollars: $541,553.00 DBE %: 57.32% District: 8 PROTEAN DESIGN GROUP, INC. 28.66% $419,625.00 PROTEAN DESIGN GROUP, INC. 28.66% $121,928.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9293 Amount: $294,254.00 DBE Dollars: $161,684.00 DBE %: 54.95% District: 2 PROTEAN DESIGN GROUP, INC. 54.95% $161,684.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9374 Amount: $961,612.00 DBE Dollars: $725,441.00 DBE %: 75.44% District: 3 ECOLOGICAL RESOURCE CONSULTANTS, I .39% $3,705.00 PROTEAN DESIGN GROUP, INC. 75.05% $721,736.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PROTEAN DESIGN GROUP, INC. Amount: $2,796,069.00 DBE Dollars: $2,010,558.00 DBE % : 71.91% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PTG CONSTRUCTION SERVICES COMPANY XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7952 Amount: -$182,029.00 DBE Dollars: $.00 DBE %: .00% District: 2 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 202 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : R. J. BEHAR AND COMPANY, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8001 Amount: $57,252.00 DBE Dollars: $51,066.00 DBE %: 89.20% District: 4 R J BEHAR & COMPANY INC 44.60% $41,092.00 R J BEHAR & COMPANY INC 44.60% $9,974.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I25 Amount: -$25,512.00 DBE Dollars: -$25,512.00 DBE %: 100.00% District: 4 R J BEHAR & COMPANY INC 50.00% $32,733.00 R J BEHAR & COMPANY INC 50.00% -$58,245.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M62 Amount: $123,304.00 DBE Dollars: $119,177.59 DBE %: 96.65% District: 4 PROGRESSIVE DESIGN & ENGR. INC. 11.67% $14,387.70 R J BEHAR & COMPANY INC 83.95% $103,511.00 TIERRA SOUTH FLORIDA, INC. 1.04% $1,278.89 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W75 Amount: -$47.00 DBE Dollars: -$47.00 DBE %: 100.00% District: 4 R J BEHAR & COMPANY INC 100.00% -$47.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 203 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X03 Amount: $173,382.00 DBE Dollars: $173,382.00 DBE %: 100.00% District: 6 R J BEHAR & COMPANY INC 100.00% $173,382.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For R. J. BEHAR AND COMPANY, INC. Amount: $328,379.00 DBE Dollars: $318,066.59 DBE % : 96.86% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : REGISTE SLIGER ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9296 Amount: $879,186.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : RENAISSANCE PLANNING GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9158 Amount: $1,500,000.00 DBE Dollars: $120,000.00 DBE %: 8.00% District: 4 CTS ENGINEERING, INC. 4.00% $60,000.00 TRAF TECH ENGINEERING, INC. 4.00% $60,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : REYNOLDS, SMITH AND HILLS CS,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M61 Amount: -$1,361,301.00 DBE Dollars: -$183,082.00 DBE %: 13.45% District: 5 ECHEZABAL & ASSOCIATES, INC. 1.92% -$26,084.00 JBS ENGINEERING TECHNICAL SERVICES INC 4.81% -$65,457.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 204 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount MEHTA & ASSOCIATES, INC. 6.72% -$91,541.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U68 Amount: $84,968.00 DBE Dollars: $8,503.00 DBE %: 10.01% District: 2 CSI GEO INC. 10.01% $8,503.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y02 Amount: $213,050.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y68 Amount: -$1,525.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z92 Amount: $1,010,494.00 DBE Dollars: $150,842.00 DBE %: 14.93% District: 3 QUEST CORPORATION OF AMERICA, INC. 8.35% $84,415.00 TIERRA, INC. 6.57% $66,427.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9018 Amount: $299,421.00 DBE Dollars: $34,348.00 DBE %: 11.47% District: 3 TIERRA, INC. 11.47% $34,348.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9078 Amount: $153,633.00 DBE Dollars: $14,589.00 DBE %: 9.50% District: 3 TIERRA, INC. 9.50% $14,589.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9117 Amount: $3,529,648.00 DBE Dollars: $405,782.00 DBE %: 11.50% District: 2 CSI GEO INC. 7.51% $265,093.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 205 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount GHIOTTO & ASSOCIATES, INC. 3.99% $140,689.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9233 Amount: $911,696.00 DBE Dollars: $141,566.00 DBE %: 15.53% District: 3 TIERRA, INC. 15.53% $141,566.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9280 Amount: $3,615,896.00 DBE Dollars: $311,878.00 DBE %: 8.63% District: 3 KENNEDY ENGINEERING & ASSOCIATES G 4.35% $157,209.00 TIERRA, INC. 4.28% $154,669.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9384 Amount: $672,526.00 DBE Dollars: $92,366.00 DBE %: 13.73% District: 3 QUEST CORPORATION OF AMERICA, INC. 8.61% $57,920.00 TIERRA, INC. 5.12% $34,446.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For REYNOLDS, SMITH AND HILLS CS,INC. Amount: $9,128,506.00 DBE Dollars: $976,792.00 DBE % : 10.70% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : REYNOLDS, SMITH AND HILLS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7578 Amount: $424,992.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7611 Amount: -$113,873.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 206 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7835 Amount: $109,653.00 DBE Dollars: $37,299.00 DBE %: 34.02% District: 7 GORD & ASSOCIATES, INC. 5.11% $5,600.00 ICON CONSULTANT GROUP, INC. 9.64% $10,567.00 ICON CONSULTANT GROUP, INC. 9.64% $10,566.00 ICON CONSULTANT GROUP, INC. 9.64% $10,566.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7852 Amount: $56,498.00 DBE Dollars: $20,035.00 DBE %: 35.46% District: 2 BOWEN CIVIL ENGINEERING, INC. 35.46% $20,035.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7970 Amount: -$2.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8481 Amount: $106,286.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A20 Amount: $204,478.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8E52 Amount: $104,383.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 207 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K05 Amount: $3,832,157.00 DBE Dollars: $292,336.59 DBE %: 7.63% District: 4 MEDIA RELATIONS GROUP LLC 3.81% $273,025.00 MEDIA RELATIONS GROUP LLC 3.81% $19,311.59 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O61 Amount: $643,495.00 DBE Dollars: $64,350.00 DBE %: 10.00% District: 2 BOWEN CIVIL ENGINEERING, INC. 2.00% $12,870.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 2.00% $12,870.00 ENVIRONMENTAL TRANS PLANNING 2.00% $12,870.00 KELLY GRAPHICS 2.00% $12,870.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR 2.00% $12,870.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O64 Amount: $13,018.00 DBE Dollars: $3,976.00 DBE %: 30.54% District: 3 BRINDLEY PIETERS & ASSOC.,INC. 30.54% $3,976.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q05 Amount: $114,054.00 DBE Dollars: $114,054.00 DBE %: 100.00% District: 5 NADIC ENGINEERING SERVICES, INC. 100.00% $114,054.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q81 Amount: $223,249.00 DBE Dollars: $17,860.00 DBE %: 8.00% District: 9 HSA CONSULTING GROUP, INC. 1.71% $3,887.00 HSA CONSULTING GROUP, INC. 1.71% $3,736.00 TIERRA, INC. 1.53% $3,887.00 TIERRA, INC. 1.53% $2,614.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 208 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TIERRA, INC. 1.53% $3,736.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R07 Amount: $261,916.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R36 Amount: $221,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S67 Amount: $38,294.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U32 Amount: $823,500.00 DBE Dollars: $30,355.91 DBE %: 3.69% District: 9 GIS Shop, The 1.84% $16,555.91 GIS Shop, The 1.84% $13,800.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V78 Amount: $90,894.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y45 Amount: $721,424.00 DBE Dollars: $193,756.00 DBE %: 26.86% District: 8 THE BALMORAL GROUP 5.34% $41,992.00 THE BALMORAL GROUP 5.34% $35,032.00 TIERRA SOUTH FLORIDA, INC. 8.09% $39,977.00 TIERRA SOUTH FLORIDA, INC. 8.09% $76,755.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 209 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z90 Amount: $20,000,000.00 DBE Dollars: $2,000,000.00 DBE %: 10.00% District: 4 ADAMS CONSULTING GROUP, INC. 1.11% $222,222.00 ADRIAN GONZALEZ & ASSOCIATES, P.A. 1.11% $222,223.00 BOWEN CIVIL ENGINEERING, INC. 1.11% $222,223.00 CHARESSE CHERSTER & ASSOCIATES, IN 1.11% $222,222.00 CLEAR LIGHT COMMUNICATIONS, INC. 1.11% $222,222.00 CTS ENGINEERING, INC. 1.11% $222,222.00 GCME, INC. 1.11% $222,222.00 KEITH & ASSOCIATES, INC. 1.11% $222,222.00 PRITCHARD ENVIRONMENTAL 1.11% $222,222.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9010 Amount: $1,834,000.00 DBE Dollars: $313,740.00 DBE %: 17.11% District: 7 COLLINS SURVEY CONSULTING LLC 6.45% $118,365.00 OMNI COMMUNICATIONS LLC 10.65% $195,375.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9041 Amount: $2,840,459.00 DBE Dollars: $453,923.00 DBE %: 15.98% District: 3 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 14.01% $397,955.00 PEGGY MALONE & ASSOCIATES, INC. .14% $5,186.00 PEGGY MALONE & ASSOCIATES, INC. .14% $2,785.00 QUEST CORPORATION OF AMERICA, INC. 1.69% $47,997.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 210 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9061 Amount: $300,000.00 DBE Dollars: $24,000.00 DBE %: 8.00% District: 5 ECHEZABAL & ASSOCIATES, INC. 2.67% $8,000.00 NODARSE & ASSOCIATES, INC. 2.67% $8,000.00 THE BALMORAL GROUP 2.67% $8,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9101 Amount: $1,859,452.00 DBE Dollars: $144,126.00 DBE %: 7.75% District: 1 A.J. SANCHEZ CONSULTING ENGINEERS, 3.51% $65,294.00 ARCHAEOLOGICAL CONSULTANTS, INC. .79% $14,631.00 OMNI COMMUNICATIONS LLC 3.45% $64,201.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9110 Amount: $581,937.00 DBE Dollars: $145,438.00 DBE %: 24.99% District: 2 PETERS AND YAFFEE, INC. 24.99% $145,438.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9120 Amount: $5,602,783.00 DBE Dollars: $1,290,932.00 DBE %: 23.04% District: 6 CROSSROADS ENGINEERING DATA, INC. 1.11% $57,777.00 CROSSROADS ENGINEERING DATA, INC. 1.11% $67,154.00 GEOSOL, INC. 3.30% $185,052.00 MANUEL G. VERA & ASSOCIATES, INC. 15.04% $842,559.00 MEDIA RELATIONS GROUP LLC 2.47% $138,390.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9250 Amount: $622,724.00 DBE Dollars: $91,871.13 DBE %: 14.75% District: 4 MANUEL G. VERA & ASSOCIATES, INC. 1.90% $11,827.44 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 211 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount Sandra Walters Consultants, Inc 6.43% $40,030.00 TIERRA SOUTH FLORIDA, INC. 6.43% $40,013.69 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9367 Amount: $1,500,000.00 DBE Dollars: $225,000.00 DBE %: 15.00% District: 1 GMB ENGINEERS & PLANNERS, INC. 10.00% $150,000.00 TRAF-O-DATA CORPORATION 5.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For REYNOLDS, SMITH AND HILLS, INC. Amount: $43,016,771.00 DBE Dollars: $5,463,052.63 DBE % : 12.70% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : RUMMEL, KLEPPER & KAHL, LLP XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V37 Amount: $120,881.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9012 Amount: $558,768.00 DBE Dollars: $122,039.00 DBE %: 21.84% District: 1 TIERRA, INC. 21.84% $122,039.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 212 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9369 Amount: $492,920.00 DBE Dollars: $121,822.00 DBE %: 24.71% District: 1 ALLIED ENGINEERING & TESTING,INC. 24.71% $121,822.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For RUMMEL, KLEPPER & KAHL, LLP Amount: $1,172,569.00 DBE Dollars: $243,861.00 DBE % : 20.80% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SAI CONSULTING ENGINEERS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y62 Amount: $158,290.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SCHEDA ECOLOGICAL ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9336 Amount: $1,500,000.00 DBE Dollars: $1,149,375.00 DBE %: 76.63% District: 1 ICON CONSULTANT GROUP, INC. 14.00% $210,000.00 MC SQUARED, INC. 2.63% $39,375.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 60.00% $900,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 213 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SIMPSON GUMPERTZ & HEGER INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9177 Amount: $29,973.00 DBE Dollars: $.00 DBE %: .00% District: 9 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SNELGROVE SURVEYING & MAPPING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9329 Amount: $740,000.00 DBE Dollars: $74,000.00 DBE %: 10.00% District: 3 O'NEAL SURVEYING & MAPPING, INC. 10.00% $74,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SOUTHEASTERN SURVEYING AND MAPPING XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O92 Amount: $100,000.00 DBE Dollars: $10,000.00 DBE %: 10.00% District: 3 HSA CONSULTING GROUP, INC. 10.00% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9243 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 2 AMERICAN GOVERNMENT SERVICES CORP. .67% $10,000.00 DIVERSIFIED DESIGN & DRAFTING SERV 4.67% $70,000.00 GEOMATICS CORPORATION 4.67% $70,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9298 Amount: $750,000.00 DBE Dollars: $75,000.00 DBE %: 10.00% District: 5 BARNES, FERLAND AND ASSOCIATES, IN 5.00% $37,500.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 214 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount CIVILSURV DESIGN GROUP, INC. 5.00% $37,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SOUTHEASTERN SURVEYING AND MAPPING Amount: $2,350,000.00 DBE Dollars: $235,000.00 DBE % : 10.00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SOUTHERN TRAFFIC SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9069 Amount: $1,500,000.00 DBE Dollars: $120,000.00 DBE %: 8.00% District: 1 ADAMS TRAFFIC 8.00% $120,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SRD, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P36 Amount: -$7,983.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S37 Amount: $40,000.00 DBE Dollars: $4,951.00 DBE %: 12.38% District: 7 BASLEE ENGINEERING SOLUTIONS, INC. 12.38% $4,951.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9058 Amount: $2,602,656.00 DBE Dollars: $359,265.00 DBE %: 13.80% District: 7 ELEMENT ENGINEERING GROUP,LLC .84% $21,882.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 215 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount OMNI COMMUNICATIONS LLC 12.96% $337,383.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SRD, INC. Amount: $2,634,673.00 DBE Dollars: $364,216.00 DBE % : 13.82% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : STANLEY CONSULTANTS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R10 Amount: $48,931.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S33 Amount: -$9.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U09 Amount: $70,905.00 DBE Dollars: $16,889.66 DBE %: 23.82% District: 4 EBS ENGINEERING, INC. 23.82% $16,889.66 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z83 Amount: $576,846.00 DBE Dollars: $19,077.08 DBE %: 3.31% District: 4 TIERRA SOUTH FLORIDA, INC. 3.31% $19,077.08 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9126 Amount: $2,904,951.00 DBE Dollars: $291,733.58 DBE %: 10.04% District: 4 BETSY LINDSAY, INC. .84% $24,304.80 D. B. ECOLOGICAL SERVICES 2.72% $78,989.00 FLORIDA TRANSPORTATION ENGINEERING 2.41% $69,912.78 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 216 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount PRITCHARD ENVIRONMENTAL .43% $12,500.00 RADISE INTERNATIONAL, L.C. 3.65% $106,027.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For STANLEY CONSULTANTS, INC. Amount: $3,601,624.00 DBE Dollars: $327,700.32 DBE % : 9.10% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : STV/RALPH WHITEHEAD ASSOCIATES XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8K92 Amount: $3,507,535.00 DBE Dollars: $1,014,806.00 DBE %: 28.93% District: 2 AMERICAN GOVERNMENT SERVICES CORP. 1.67% $58,500.00 NODARSE & ASSOCIATES, INC. 9.00% $486,637.00 NODARSE & ASSOCIATES, INC. 9.00% $65,120.00 NODARSE & ASSOCIATES, INC. 9.00% $395,799.00 THE STRICKLAND GROUP .25% $8,750.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SUNCOAST DESIGN SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W92 Amount: $.00 DBE Dollars: $8,572.00 DBE %: .00% District: 7 OMNI COMMUNICATIONS LLC .00% $8,572.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 217 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : T. Y. LIN INTERNATIONAL, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8697 Amount: -$344,784.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F00 Amount: $281,676.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F27 Amount: -$20,938.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N46 Amount: $222,340.00 DBE Dollars: $23,680.00 DBE %: 10.65% District: 6 F.R. ALEMAN & ASSOCIATES, INC. 5.40% $12,000.00 MEDIA RELATIONS GROUP LLC 5.25% $11,680.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S05 Amount: $340,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y27 Amount: $53,263.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 218 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9081 Amount: $642,936.00 DBE Dollars: $110,836.00 DBE %: 17.24% District: 7 ADVANCED TECHNOLOGIES INTERNATIONAL COMPANIES, INC 2.79% $17,968.00 OMNI COMMUNICATIONS LLC 6.57% $42,212.00 OMNI COMMUNICATIONS LLC 6.57% $42,212.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 1.31% $8,444.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9234 Amount: $488,979.00 DBE Dollars: $25,016.33 DBE %: 5.12% District: 4 TRAF TECH ENGINEERING, INC. 5.12% $25,016.33 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9279 Amount: $5,647,621.00 DBE Dollars: $2,448,390.00 DBE %: 43.35% District: 6 BCC ENGINEERING, INC. 21.38% $1,207,437.00 CH PEREZ AND ASSOCIATES CONSULTING 4.96% $46,474.00 CH PEREZ AND ASSOCIATES CONSULTING 4.96% $513,847.00 CUNNINGHAM GROUP, INC. 1.77% $100,122.00 GEOSOL, INC. 9.39% $530,404.00 Illumination Arts, LLC .89% $50,106.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For T. Y. LIN INTERNATIONAL, INC. Amount: $7,311,093.00 DBE Dollars: $2,607,922.33 DBE % : 35.67% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 219 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : T.Y. LIN INTERNATIONAL CONSTRUCTION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9214 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 1 BOLT UNDERWATER SERVICES, INC. 2.00% $30,000.00 BOLTON PEREZ & ASSOCIATES 2.00% $30,000.00 CONCORR OF FLORIDA, INC. 2.00% $30,000.00 ELEMENT ENGINEERING GROUP,LLC 2.00% $30,000.00 NODARSE & ASSOCIATES, INC. 2.00% $30,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TAMAYO ENGINEERING, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X14 Amount: -$44,305.00 DBE Dollars: -$44,305.00 DBE %: 100.00% District: 4 TAMAYO ENGINEERING, LLC 100.00% -$44,305.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9287 Amount: $1,500,000.00 DBE Dollars: $1,500,000.84 DBE %: 100.00% District: 4 ALLIED ENGINEERING & TESTING,INC. 2.86% $42,857.14 AMERICAN ENGINEERING GROUP, INC. 2.86% $42,857.14 CIMA ENGINEERING CORPORATION 2.86% $42,857.14 GENESIS TRANSPORTATION ENGINEERING INC 2.86% $42,857.14 PINNACLE CONSULTING ENTERPRISES INC 2.86% $42,857.14 QUEST CORPORATION OF AMERICA, INC. 2.86% $42,857.14 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 220 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TAMAYO ENGINEERING, LLC 82.86% $1,242,858.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For TAMAYO ENGINEERING, LLC Amount: $1,455,695.00 DBE Dollars: $1,455,695.84 DBE % : 100.00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TARGET ENGINEERING GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M24 Amount: $97,822.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q50 Amount: $200,000.00 DBE Dollars: $15,000.00 DBE %: 7.50% District: 4 CREATIVE ENGINEERING GROUP INC 7.50% $15,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T31 Amount: -$13,729.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T34 Amount: -$153,655.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U35 Amount: $83,812.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 221 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W19 Amount: $1,737,333.00 DBE Dollars: $241,904.00 DBE %: 13.92% District: 5 AE ENGINEERING, INC. .25% $3,888.00 AE ENGINEERING, INC. .25% $4,826.00 ASC GEOSCIENCES, INC. .22% $3,888.00 BOLTON PEREZ & ASSOCIATES .22% $3,888.00 CATALYST ENGINEERING, LLC .22% $3,888.00 CREATIVE ENGINEERING GROUP INC .22% $3,888.00 ELIPSIS ENGINEERING & CONSULTING LLC 1.06% $3,889.00 ELIPSIS ENGINEERING & CONSULTING LLC 1.06% $9,265.00 ELIPSIS ENGINEERING & CONSULTING LLC 1.06% $21,858.00 ELIPSIS ENGINEERING & CONSULTING LLC 1.06% $21,044.00 ELIPSIS ENGINEERING & CONSULTING LLC 1.06% $50,000.00 ELIPSIS ENGINEERING & CONSULTING LLC 1.06% $4,838.00 GEOTECH CONSULTANTS INTERNATIONAL, .22% $3,888.00 JBS ENGINEERING TECHNICAL SERVICES INC .22% $3,888.00 MEHTA & ASSOCIATES, INC. 1.20% $9,264.00 MEHTA & ASSOCIATES, INC. 1.20% $21,857.00 MEHTA & ASSOCIATES, INC. 1.20% $21,045.00 MEHTA & ASSOCIATES, INC. 1.20% $31,250.00 OM ENGINEERING SERVICES, INC. .22% $3,888.00 PAGE ONE CONSULTANTS, INC. .22% $3,888.00 QUEST CORPORATION OF AMERICA, INC. .22% $3,888.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 222 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount VALERIE TUTOR & ASSOCIATES, INC. .22% $3,888.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W23 Amount: $129,341.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X04 Amount: -$78,470.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9091 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9185 Amount: $100,000.00 DBE Dollars: $20,000.00 DBE %: 20.00% District: 6 CIMA ENGINEERING CORPORATION 10.00% $10,000.00 CREATIVE ENGINEERING GROUP INC 10.00% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9193 Amount: $709,335.00 DBE Dollars: $49,781.96 DBE %: 7.02% District: 4 CREATIVE ENGINEERING GROUP INC 7.02% $49,781.96 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9197 Amount: $946,924.00 DBE Dollars: $99,865.99 DBE %: 10.55% District: 4 CREATIVE ENGINEERING GROUP INC 10.55% $99,865.99 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9216 Amount: $7,134,900.00 DBE Dollars: $1,635,580.37 DBE %: 22.92% District: 4 CREATIVE ENGINEERING GROUP INC 22.92% $1,635,580.37 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 223 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9365 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 CREATIVE ENGINEERING GROUP INC 5.00% $75,000.00 QUEST CORPORATION OF AMERICA, INC. 5.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For TARGET ENGINEERING GROUP, INC. Amount: $12,393,613.00 DBE Dollars: $2,212,132.32 DBE % : 17.85% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TBE GROUP, INC., DBA CARDNO TBE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8206 Amount: -$741,169.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8E44 Amount: $19,902.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G64 Amount: $20,000.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O91 Amount: $963,510.00 DBE Dollars: $189,620.00 DBE %: 19.68% District: 5 AERIAL INNOVATIONS, INC. .06% $564.00 JBS ENGINEERING TECHNICAL SERVICES INC 8.80% $148,672.00 JBS ENGINEERING TECHNICAL SERVICES INC 8.80% $21,002.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 224 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount MEHTA & ASSOCIATES, INC. 2.01% $19,382.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q18 Amount: -$103,296.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U84 Amount: $83,003.00 DBE Dollars: $6,623.00 DBE %: 7.98% District: 7 JOHNSON-ADAMS & ASSOCIATES, LLC 7.98% $6,623.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V35 Amount: $286,056.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X95 Amount: $2,026,933.00 DBE Dollars: $893,021.00 DBE %: 44.06% District: 5 ELIPSIS ENGINEERING & CONSULTING LLC 12.90% $261,477.00 JBS ENGINEERING TECHNICAL SERVICES INC 21.66% $439,046.00 TIERRA, INC. 9.50% $192,498.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9002 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 2 AMERICAN GOVERNMENT SERVICES CORP. 1.00% $15,000.00 GHIOTTO & ASSOCIATES, INC. 9.00% $135,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9013 Amount: $1,500,000.00 DBE Dollars: $225,000.00 DBE %: 15.00% District: 1 ADAMS TRAFFIC 2.00% $30,000.00 ECHEZABAL & ASSOCIATES, INC. 5.00% $75,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 225 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount KB ENVIRONMENTAL SCIENCES, INC. 3.00% $45,000.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. 5.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9165 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9175 Amount: $6,115,693.00 DBE Dollars: $1,472,055.06 DBE %: 24.07% District: 4 BETSY LINDSAY, INC. .46% $28,045.19 CREATIVE ENGINEERING GROUP INC 23.61% $1,444,009.87 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For TBE GROUP, INC., DBA CARDNO TBE Amount: $11,670,632.00 DBE Dollars: $2,936,319.06 DBE % : 25.16% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : THE BALMORAL GROUP XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X57 Amount: $64,112.00 DBE Dollars: $25,047.00 DBE %: 39.07% District: 2 THE BALMORAL GROUP 39.07% $25,047.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y93 Amount: $167,273.00 DBE Dollars: $56,412.00 DBE %: 33.72% District: 8 THE BALMORAL GROUP 16.86% $41,221.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 226 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount THE BALMORAL GROUP 16.86% $15,191.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For THE BALMORAL GROUP Amount: $231,385.00 DBE Dollars: $81,459.00 DBE % : 35.20% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : THE CORRADINO GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7875 Amount: -$552,869.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8835 Amount: -$15,441.00 DBE Dollars: $168.90 DBE %: -1.09% District: 6 JRA, INC. -.55% -$226.00 JRA, INC. -.55% $394.90 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J02 Amount: $1,297,545.00 DBE Dollars: $12,518.00 DBE %: .96% District: 4 DICKEY CONSULTING SERVICES .96% $12,518.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J60 Amount: -$3,298.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O53 Amount: $200,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 227 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q82 Amount: $28,302.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U19 Amount: $155,546.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U50 Amount: $689,511.00 DBE Dollars: $103,659.74 DBE %: 15.03% District: 6 BOLTON PEREZ & ASSOCIATES 1.02% $19,965.60 BOLTON PEREZ & ASSOCIATES 1.02% $33,353.03 BOLTON PEREZ & ASSOCIATES 1.02% $941.28 BOLTON PEREZ & ASSOCIATES 1.02% $7,296.35 BOLTON PEREZ & ASSOCIATES 1.02% $5,941.35 BOLTON PEREZ & ASSOCIATES 1.02% $577.15 BOLTON PEREZ & ASSOCIATES 1.02% $577.00 BOLTON PEREZ & ASSOCIATES 1.02% $577.00 BOLTON PEREZ & ASSOCIATES 1.02% $577.00 BOLTON PEREZ & ASSOCIATES 1.02% $577.00 CH PEREZ AND ASSOCIATES CONSULTING .21% $5,941.35 CH PEREZ AND ASSOCIATES CONSULTING .21% $577.15 CH PEREZ AND ASSOCIATES CONSULTING .21% $577.00 CH PEREZ AND ASSOCIATES CONSULTING .21% $577.00 CH PEREZ AND ASSOCIATES CONSULTING .21% $577.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 228 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount CH PEREZ AND ASSOCIATES CONSULTING .21% $577.00 P(3)SM, LLC .32% $4,991.00 P(3)SM, LLC .32% $8,338.25 P(3)SM, LLC .32% $1,824.09 P(3)SM, LLC .32% $235.32 P(3)SM, LLC .32% $235.32 P(3)SM, LLC .32% $5,941.35 P(3)SM, LLC .32% $577.15 P(3)SM, LLC .32% $577.00 P(3)SM, LLC .32% $577.00 P(3)SM, LLC .32% $577.00 P(3)SM, LLC .32% $577.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V22 Amount: $372,225.00 DBE Dollars: $33,723.20 DBE %: 9.06% District: 6 ADRIAN GONZALEZ & ASSOCIATES, P.A. .20% $1,000.00 ADRIAN GONZALEZ & ASSOCIATES, P.A. .20% $500.00 ADRIAN GONZALEZ & ASSOCIATES, P.A. .20% $222.50 ADRIAN GONZALEZ & ASSOCIATES, P.A. .20% $1,500.00 ADRIAN GONZALEZ & ASSOCIATES, P.A. .20% $500.00 FLORIDA TRANSPORTATION ENGINEERING .67% -$.98 FLORIDA TRANSPORTATION ENGINEERING .67% $4,000.00 FLORIDA TRANSPORTATION ENGINEERING .67% $2,000.00 FLORIDA TRANSPORTATION ENGINEERING .67% $890.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 229 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount FLORIDA TRANSPORTATION ENGINEERING .67% $6,000.00 FLORIDA TRANSPORTATION ENGINEERING .67% $2,000.00 GCME, INC. .15% $1,000.00 GCME, INC. .15% $500.00 GCME, INC. .15% $222.50 P(3)SM, LLC .20% $222.50 P(3)SM, LLC .20% $1,500.00 P(3)SM, LLC .20% $500.00 PRITCHARD ENVIRONMENTAL .60% $3,000.00 PRITCHARD ENVIRONMENTAL .60% $1,500.00 PRITCHARD ENVIRONMENTAL .60% $667.50 PRITCHARD ENVIRONMENTAL .60% $4,500.00 PRITCHARD ENVIRONMENTAL .60% $1,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W69 Amount: -$160.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X13 Amount: $86,364.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X22 Amount: $200,000.00 DBE Dollars: $16,000.00 DBE %: 8.00% District: 6 PINNACLE CONSULTING ENTERPRISES INC 8.00% $16,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 230 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9122 Amount: $1,981,929.00 DBE Dollars: $110,028.17 DBE %: 5.55% District: 4 TAMAYO ENGINEERING, LLC 5.55% $110,028.17 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9129 Amount: $9,597,699.00 DBE Dollars: $293,494.31 DBE %: 3.06% District: 4 JBS ENGINEERING TECHNICAL SERVICES INC 3.06% $293,494.31 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For THE CORRADINO GROUP, INC. Amount: $14,037,353.00 DBE Dollars: $569,592.32 DBE % : 4.06% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : THE LPA GROUP INCORPORATED XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C5991 Amount: $85,604.00 DBE Dollars: $12,105.00 DBE %: 14.14% District: 3 POOLE ENGINEERING & SURVEYING, INC 14.14% $12,105.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H17 Amount: $6,915.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M77 Amount: $14,710.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O88 Amount: $100,000.00 DBE Dollars: $5,000.00 DBE %: 5.00% District: 5 BUCHHEIT ASSOCIATES,INC. 2.50% $2,500.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 231 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount JCR CONSULTING 2.50% $2,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P19 Amount: $17,330.00 DBE Dollars: $8,069.00 DBE %: 46.56% District: 3 HSA CONSULTING GROUP, INC. 46.56% $8,069.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9089 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 1 HYATT SURVEY SERVICES, INC. 1.67% $25,000.00 THE HEIMBURG GROUP, INC. 6.67% $100,000.00 TIERRA, INC. 1.67% $25,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9195 Amount: $3,721,806.00 DBE Dollars: $602,435.00 DBE %: 16.19% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 10.98% $408,761.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 5.20% $193,674.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9196 Amount: $685,412.00 DBE Dollars: $68,541.00 DBE %: 10.00% District: 5 LANDMARK ENGINEERING INC. 10.00% $68,541.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9209 Amount: $488,625.00 DBE Dollars: $24,417.00 DBE %: 5.00% District: 5 ENVIRONMENTAL MANAGEMENT & DESIGN 4.49% $21,943.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR .51% $2,474.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9320 Amount: $1,221,334.00 DBE Dollars: $314,878.00 DBE %: 25.78% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 16.81% $205,265.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 232 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 8.97% $109,613.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9322 Amount: $727,836.00 DBE Dollars: $98,040.00 DBE %: 13.47% District: 8 THE HEIMBURG GROUP, INC. 10.57% $76,919.00 TIERRA, INC. 2.90% $21,121.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For THE LPA GROUP INCORPORATED Amount: $8,569,572.00 DBE Dollars: $1,283,485.00 DBE % : 14.98% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TIERRA, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X93 Amount: $900,000.00 DBE Dollars: $830,000.00 DBE %: 92.22% District: 7 TEST LAB INC 8.00% $72,000.00 TIERRA, INC. 84.22% $758,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9206 Amount: $299,969.00 DBE Dollars: $159,306.00 DBE %: 53.11% District: 7 TIERRA, INC. 53.11% $159,306.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For TIERRA, INC. Amount: $1,199,969.00 DBE Dollars: $989,306.00 DBE % : 82.44% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 233 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TINDALE-OLIVER AND ASSOCIATES,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9075 Amount: $1,000,000.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TLP ENGINEERING CONSULTANTS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9378 Amount: $375,263.00 DBE Dollars: $246,600.00 DBE %: 65.71% District: 5 PROTEAN DESIGN GROUP, INC. 37.14% $139,379.00 TLP ENGINEERING CONSULTANTS, INC. 28.57% $107,221.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TRAFFIC ENGNEERING DATA SOLUTIONS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W25 Amount: $625,000.00 DBE Dollars: $375,000.00 DBE %: 60.00% District: 5 TRAFFIC ENGINEERING DATA SOLUTIONS INC 60.00% $375,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TRANSYSTEMS CORPORATION CONSULTANTS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J62 Amount: $70,000.00 DBE Dollars: $1,400.00 DBE %: 2.00% District: 6 GEOSOL, INC. 2.00% $1,400.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 234 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P35 Amount: $310,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q40 Amount: $300,000.00 DBE Dollars: $24,000.00 DBE %: 8.00% District: 5 HERBERT-HALBACK, INC. D/B/A HHI DE 8.00% $24,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9253 Amount: $270,000.00 DBE Dollars: $27,000.00 DBE %: 10.00% District: 6 BOTAS ENGINEERING, INC. 10.00% $27,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9318 Amount: $1,500,000.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9327 Amount: $1,970,293.00 DBE Dollars: $189,740.00 DBE %: 9.63% District: 8 BOLTON PEREZ & ASSOCIATES 9.63% $189,740.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9332 Amount: $150,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9361 Amount: $1,900,321.00 DBE Dollars: $442,989.00 DBE %: 23.31% District: 5 PROTEAN DESIGN GROUP, INC. 5.56% $105,593.00 SOUTHEASTERN ARCHAEOLOGICAL RESEAR .69% $13,083.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 235 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TLP ENGINEERING CONSULTANTS, INC. 17.07% $324,313.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For TRANSYSTEMS CORPORATION CONSULTANTS Amount: $6,470,614.00 DBE Dollars: $685,129.00 DBE % : 10.59% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TRIANGLE SURVEYING & MAPPING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P66 Amount: $100,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9104 Amount: $155,095.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For TRIANGLE SURVEYING & MAPPING, INC. Amount: $255,095.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : UNIVERSAL ENGINEERING SCIENCES,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P45 Amount: -$147,732.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R37 Amount: $242,693.00 DBE Dollars: $9,383.50 DBE %: 3.87% District: 2 CAL-TECH TESTING, INC. .77% $534.25 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 236 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount CAL-TECH TESTING, INC. .77% $534.25 CAL-TECH TESTING, INC. .77% $3,466.00 CAL-TECH TESTING, INC. .77% $3,849.00 CAL-TECH TESTING, INC. .77% $1,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9099 Amount: $3,000,000.00 DBE Dollars: $270,000.00 DBE %: 9.00% District: 9 ELIPSIS ENGINEERING & CONSULTING LLC 4.50% $135,000.00 ENVIRONMENTAL & GEOTECHNICAL SPECIALISTS INC 4.50% $135,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9151 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 2 CAL-TECH TESTING, INC. 5.00% $75,000.00 CSI GEO INC. 5.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9176 Amount: $1,500,000.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For UNIVERSAL ENGINEERING SCIENCES,INC. Amount: $6,094,961.00 DBE Dollars: $429,383.50 DBE % : 7.04% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 237 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : URS CONSTRUCTION SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8526 Amount: -$8,886.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A56 Amount: $598,488.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q06 Amount: -$47,784.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Q92 Amount: -$223,641.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z81 Amount: $1,500,000.00 DBE Dollars: $200,000.00 DBE %: 13.33% District: 7 ALLIED ENGINEERING & TESTING,INC. 6.67% $100,000.00 TIERRA, INC. 6.67% $100,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9205 Amount: $3,491,106.00 DBE Dollars: $510,534.00 DBE %: 14.62% District: 1 ALLIED ENGINEERING & TESTING,INC. 3.30% $115,285.00 CELLA MOLNAR & ASSOCIATES, INC. 2.91% $101,426.00 HYATT SURVEY SERVICES, INC. 1.84% $64,409.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 238 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount QUEST CORPORATION OF AMERICA, INC. 6.57% $229,414.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9219 Amount: $2,607,031.00 DBE Dollars: $394,325.00 DBE %: 15.13% District: 1 ALLIED ENGINEERING & TESTING,INC. 1.71% $44,462.00 HYATT SURVEY SERVICES, INC. 2.23% $58,101.00 JOHNSON-ADAMS & ASSOCIATES, LLC 8.17% $212,922.00 QUEST CORPORATION OF AMERICA, INC. 3.02% $78,840.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9262 Amount: $3,001,018.00 DBE Dollars: $540,834.00 DBE %: 18.02% District: 7 KEYSTONE CIVIL, INCORPORATED 9.84% $295,167.00 QUEST CORPORATION OF AMERICA, INC. 8.19% $245,667.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For URS CONSTRUCTION SERVICES, INC. Amount: $10,917,332.00 DBE Dollars: $1,645,693.00 DBE % : 15.07% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : URS CORPORATION SOUTHERN XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C4300 Amount: $1,060,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C4420 Amount: $24,993.00 DBE Dollars: $.00 DBE %: .00% District: 2 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 239 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7347 Amount: $310,105.00 DBE Dollars: $58,046.00 DBE %: 18.72% District: 1 FALLER, DAVIS AND ASSOC.,INC. 18.72% $58,046.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8749 Amount: $1,252,914.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8782 Amount: $609,680.00 DBE Dollars: $7,224.00 DBE %: 1.18% District: 7 FALLER, DAVIS AND ASSOC.,INC. 1.18% $7,224.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B41 Amount: $6,087,621.00 DBE Dollars: $18,200.00 DBE %: .30% District: 5 ECHEZABAL & ASSOCIATES, INC. -.01% -$600.00 ENVIROTRANS SOLUTIONS, INC. -.01% -$600.00 GMB ENGINEERS & PLANNERS, INC. .33% $20,000.00 TRAFFIC ENGINEERING DATA SOLUTIONS INC -.01% -$600.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B44 Amount: -$45.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8D10 Amount: $996,734.00 DBE Dollars: $46,693.00 DBE %: 4.68% District: 7 CUMBEY & FAIR, INC. 2.83% $28,224.00 NODARSE & ASSOCIATES, INC. 1.85% $18,469.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 240 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8D31 Amount: $1,060,614.00 DBE Dollars: $164,072.00 DBE %: 15.47% District: 8 THE HEIMBURG GROUP, INC. 3.70% $39,252.00 TIERRA, INC. 5.88% $108,511.00 TIERRA, INC. 5.88% $16,309.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F71 Amount: $27,017.00 DBE Dollars: $.00 DBE %: .00% District: 8 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I15 Amount: $12,105.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I41 Amount: $85,837.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8I79 Amount: $.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P25 Amount: $46,517.00 DBE Dollars: $10,394.00 DBE %: 22.34% District: 4 PROGRESSIVE DESIGN & ENGR. INC. 22.34% $10,394.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P47 Amount: $63,378.00 DBE Dollars: $.00 DBE %: .00% District: 7 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 241 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P62 Amount: $500,000.00 DBE Dollars: $50,000.00 DBE %: 10.00% District: 2 ADVANCED PLANNING, INC. 1.00% $5,000.00 BCC ENGINEERING, INC. 2.00% $10,000.00 PEGGY MALONE & ASSOCIATES, INC. 7.00% $35,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P79 Amount: $1,500,000.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T14 Amount: $84,354.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T67 Amount: $178,000.00 DBE Dollars: $35,600.00 DBE %: 20.00% District: 6 ADRIAN GONZALEZ & ASSOCIATES, P.A. 1.50% $3,840.00 ADRIAN GONZALEZ & ASSOCIATES, P.A. 1.50% $1,500.00 BASULTO & ASSOCIATES, INC. 2.50% $6,400.00 BASULTO & ASSOCIATES, INC. 2.50% $2,500.00 FLORIDA TRANSPORTATION ENGINEERING 5.00% $12,800.00 FLORIDA TRANSPORTATION ENGINEERING 5.00% $5,000.00 MANUEL G. VERA & ASSOCIATES, INC. 1.00% $2,560.00 MANUEL G. VERA & ASSOCIATES, INC. 1.00% $1,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 242 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T73 Amount: $290,000.00 DBE Dollars: $14,500.00 DBE %: 5.00% District: 6 CH PEREZ & ASSOC.,CONSULTING ENGR. 1.21% $3,500.00 CH PEREZ AND ASSOCIATES CONSULTING 3.79% $11,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T81 Amount: $106,529.00 DBE Dollars: $18,211.00 DBE %: 17.09% District: 2 THE HEIMBURG GROUP, INC. 17.09% $18,211.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8U17 Amount: $17,957.00 DBE Dollars: $1,795.73 DBE %: 10.00% District: 6 FLORIDA TRANSPORTATION ENGINEERING 5.00% -$25.97 FLORIDA TRANSPORTATION ENGINEERING 5.00% $1,821.70 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y59 Amount: $4,624,498.00 DBE Dollars: $263,033.00 DBE %: 5.69% District: 8 BCC ENGINEERING, INC. .54% $24,983.00 GMB ENGINEERS & PLANNERS, INC. .58% $26,673.00 PEGGY MALONE & ASSOCIATES, INC. .15% $10,722.00 PEGGY MALONE & ASSOCIATES, INC. .15% $4,954.00 PEGGY MALONE & ASSOCIATES, INC. .15% $8,150.00 PEGGY MALONE & ASSOCIATES, INC. .15% $3,961.00 SIMON RESOURCES INC .55% $25,589.00 SIMON RESOURCES INC .55% $25,000.00 THE HEIMBURG GROUP, INC. 2.88% $133,001.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 243 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z53 Amount: $200,000.00 DBE Dollars: $40,000.00 DBE %: 20.00% District: 5 ASPIREON CONSULTING GROUP, INC. 10.00% $20,000.00 IDA CONSULTING ENGINEERS, INC. 10.00% $20,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z91 Amount: $1,500,000.00 DBE Dollars: $1,350,000.00 DBE %: 90.00% District: 2 PEGGY MALONE & ASSOCIATES, INC. 90.00% $1,350,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9015 Amount: $2,271,936.00 DBE Dollars: $106,646.33 DBE %: 4.69% District: 6 ADRIAN GONZALEZ & ASSOCIATES, P.A. .78% $21,021.00 ADRIAN GONZALEZ & ASSOCIATES, P.A. .78% $29,251.00 ADRIAN GONZALEZ & ASSOCIATES, P.A. .78% $3,051.00 CH PEREZ & ASSOC.,CONSULTING ENGR. .93% $21,021.33 CH PEREZ AND ASSOCIATES CONSULTING .71% $29,251.00 CH PEREZ AND ASSOCIATES CONSULTING .71% $3,051.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9074 Amount: $912,983.00 DBE Dollars: $385,094.00 DBE %: 42.18% District: 6 BOLTON PEREZ & ASSOCIATES 5.78% $52,727.00 GEOSOL, INC. 30.66% $279,908.00 MANUEL G. VERA & ASSOCIATES, INC. 5.75% $52,459.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9079 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 BOLTON PEREZ & ASSOCIATES 5.00% $75,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 244 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount BOLTON PEREZ & ASSOCIATES 5.00% $75,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9155 Amount: $300,000.00 DBE Dollars: $12,000.00 DBE %: 4.00% District: 6 MANUEL G. VERA & ASSOCIATES, INC. 1.50% $3,000.00 MANUEL G. VERA & ASSOCIATES, INC. 1.50% $6,000.00 PRITCHARD ENVIRONMENTAL LLC .50% $1,000.00 PRITCHARD ENVIRONMENTAL LLC .50% $2,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9202 Amount: $30,000.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9239 Amount: $1,000,000.00 DBE Dollars: $.00 DBE %: .00% District: 9 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9258 Amount: $2,825,126.00 DBE Dollars: $752,965.00 DBE %: 26.65% District: 1 AMERICAN GOVERNMENT SERVICES CORP. 1.11% $31,500.00 CELLA MOLNAR & ASSOCIATES, INC. 2.29% $64,641.00 OM ENGINEERING SERVICES, INC. 6.34% $179,221.00 OMNI COMMUNICATIONS LLC 7.50% $211,879.00 TIERRA, INC. 9.41% $265,724.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For URS CORPORATION SOUTHERN Amount: $29,478,853.00 DBE Dollars: $3,484,474.06 DBE % : 11.82% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 245 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : VANASSE HANGEN BRUSTLIN, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8P55 Amount: $300,000.00 DBE Dollars: $24,000.00 DBE %: 8.00% District: 5 FALLER, DAVIS AND ASSOC.,INC. 2.00% $6,000.00 GMB ENGINEERS & PLANNERS, INC. 2.00% $6,000.00 JCR CONSULTING 2.00% $6,000.00 OM ENGINEERING SERVICES, INC. 2.00% $6,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : VE GROUP, LLC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9143 Amount: $1,500,000.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : VOLKERT, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7402 Amount: -$31,702.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C7754 Amount: $49,858.00 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 246 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8750 Amount: $192,000.00 DBE Dollars: $4,150.00 DBE %: 2.16% District: 7 FALLER, DAVIS AND ASSOC.,INC. 1.08% $2,075.00 FALLER, DAVIS AND ASSOC.,INC. 1.08% $2,075.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8G78 Amount: $20,000.00 DBE Dollars: $1,261.00 DBE %: 6.31% District: 7 TIERRA, INC. 6.31% $1,261.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8H38 Amount: $263,766.00 DBE Dollars: $19,353.00 DBE %: 7.34% District: 1 FALLER, DAVIS AND ASSOC.,INC. 3.67% $5,637.00 FALLER, DAVIS AND ASSOC.,INC. 3.67% $13,716.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8O09 Amount: $15,007.00 DBE Dollars: $5,057.00 DBE %: 33.70% District: 3 FALLER, DAVIS AND ASSOC.,INC. 33.70% $5,057.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W06 Amount: $15,000.00 DBE Dollars: $4,999.00 DBE %: 33.33% District: 7 FALLER, DAVIS AND ASSOC.,INC. 11.11% $1,666.00 FALLER, DAVIS AND ASSOC.,INC. 11.11% $1,667.00 FALLER, DAVIS AND ASSOC.,INC. 11.11% $1,666.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8W27 Amount: $9,915.00 DBE Dollars: $.00 DBE %: .00% District: 2 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 247 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X12 Amount: $375,979.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Y01 Amount: $52,817.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z00 Amount: $108,184.00 DBE Dollars: $21,879.64 DBE %: 20.22% District: 2 BOLT UNDERWATER SERVICES, INC. 20.22% $21,879.64 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z31 Amount: -$10,064.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z56 Amount: -$443,345.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z80 Amount: $309,482.00 DBE Dollars: $27,755.00 DBE %: 8.97% District: 3 CAL-TECH TESTING, INC. 8.97% $27,755.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9024 Amount: $512,319.00 DBE Dollars: $37,026.00 DBE %: 7.23% District: 2 ENVIRONMENTAL RESOURCE SOLUTIONS, 2.18% $10,378.00 ENVIRONMENTAL RESOURCE SOLUTIONS, 2.18% $11,992.00 GMB ENGINEERS & PLANNERS, INC. 2.57% $13,181.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 248 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount NODARSE & ASSOCIATES, INC. .29% $1,475.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9070 Amount: $4,209,324.00 DBE Dollars: $1,939,819.00 DBE %: 46.08% District: 1 AERIAL INNOVATIONS, INC. .09% $3,582.00 ALLIED ENGINEERING & TESTING,INC. 38.41% $1,616,928.00 HYATT SURVEY SERVICES, INC. 3.13% $131,629.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .98% $58,976.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .98% $23,920.00 THE VALERIN GROUP, INC. 2.49% $104,784.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9095 Amount: $2,436,161.00 DBE Dollars: $158,544.00 DBE %: 6.51% District: 7 ICON CONSULTANT GROUP, INC. 2.91% $70,800.00 ICON CONSULTANT GROUP, INC. 2.91% $70,800.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .70% $16,944.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9357 Amount: $1,158,891.00 DBE Dollars: $160,656.00 DBE %: 13.86% District: 5 BOLT UNDERWATER SERVICES, INC. 5.79% $58,201.00 BOLT UNDERWATER SERVICES, INC. 5.79% $76,055.00 TRAFFIC CONTROL PRODUCTS OF FLA 1.14% $9,900.00 TRAFFIC CONTROL PRODUCTS OF FLA 1.14% $16,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For VOLKERT, INC. Amount: $9,243,592.00 DBE Dollars: $2,380,499.64 DBE % : 25.75% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 249 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WADE-TRIM INCORPORATED XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F26 Amount: $784,738.00 DBE Dollars: $19,529.00 DBE %: 2.49% District: 1 ARCHAEOLOGICAL CONSULTANTS, INC. 2.33% $18,276.00 SCHEDA ECOLOGICAL ASSOCIATES, INC. .16% $1,253.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8J70 Amount: $264,778.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T91 Amount: $60,000.00 DBE Dollars: $3,000.00 DBE %: 5.00% District: 7 BASLEE ENGINEERING SOLUTIONS, INC. 5.00% $3,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For WADE-TRIM INCORPORATED Amount: $1,109,516.00 DBE Dollars: $22,529.00 DBE % : 2.03% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WANTMAN GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8A68 Amount: -$9,656.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8N63 Amount: $650,724.00 DBE Dollars: $.00 DBE %: .00% District: 8 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 250 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R31 Amount: $50,070.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R47 Amount: $454,173.00 DBE Dollars: $68,580.00 DBE %: 15.10% District: 8 PROTEAN DESIGN GROUP, INC. 7.69% $34,942.00 TIERRA SOUTH FLORIDA, INC. 7.41% $33,638.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X27 Amount: $64,910.00 DBE Dollars: $17,225.00 DBE %: 26.54% District: 1 BASLEE ENGINEERING SOLUTIONS, INC. 26.54% $17,225.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8X90 Amount: $506,213.00 DBE Dollars: $5,894.00 DBE %: 1.16% District: 8 BCC ENGINEERING, INC. 1.16% $5,894.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z87 Amount: $578,331.00 DBE Dollars: $15,695.66 DBE %: 2.71% District: 4 BCC ENGINEERING, INC. 2.71% $15,695.66 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z96 Amount: $843,472.00 DBE Dollars: $54,452.00 DBE %: 6.46% District: 7 FLORIDA TRANSPORTATION ENGINEERING 6.46% $54,452.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9001 Amount: $1,500,000.00 DBE Dollars: $150,000.00 DBE %: 10.00% District: 4 CH PEREZ & ASSOC.,CONSULTING ENGR. 10.00% $150,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 251 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9008 Amount: $1,500,000.00 DBE Dollars: $127,500.00 DBE %: 8.50% District: 4 TIERRA SOUTH FLORIDA, INC. 8.50% $127,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9368 Amount: $1,500,000.00 DBE Dollars: $450,000.00 DBE %: 30.00% District: 1 CIVILSURV DESIGN GROUP, INC. 30.00% $450,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For WANTMAN GROUP, INC. Amount: $7,638,237.00 DBE Dollars: $889,346.66 DBE % : 11.64% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WBQ DESIGN & ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9137 Amount: $1,082,384.00 DBE Dollars: $648,949.00 DBE %: 59.96% District: 7 FLORIDA TRANSPORTATION ENGINEERING 2.60% $28,189.00 OMNI COMMUNICATIONS LLC 5.82% $62,975.00 THE HEIMBURG GROUP, INC. 1.03% $11,101.00 THE HEIMBURG GROUP, INC. 1.03% $11,102.00 WBQ DESIGN & ENGINEERING, INC. 49.48% $535,582.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 252 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WILBUR SMITH ASSOCIATES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8B31 Amount: $50,000.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8F03 Amount: -$57,009.00 DBE Dollars: $20,362.00 DBE %: -35.72% District: 2 GHIOTTO & ASSOCIATES, INC. -25.54% $14,558.00 WAITZ & MOYE, INC. -10.18% $5,804.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R48 Amount: $500,000.00 DBE Dollars: $100,000.00 DBE %: 20.00% District: 5 ALLIED ENGINEERING & TESTING,INC. 1.00% $5,000.00 ALLIED ENGINEERING & TESTING,INC. 1.00% $5,000.00 C & M ENVIRONMENTAL AND GEOTECHNIC 1.00% $5,000.00 C & M ENVIRONMENTAL AND GEOTECHNIC 1.00% $5,000.00 CES CONSULTANTS, INC. 1.00% $5,000.00 CES CONSULTANTS, INC. 1.00% $5,000.00 ECHEZABAL & ASSOCIATES, INC. 1.00% $5,000.00 ECHEZABAL & ASSOCIATES, INC. 1.00% $5,000.00 GEOTECH CONSULTANTS INTERNATIONAL, 1.00% $5,000.00 GEOTECH CONSULTANTS INTERNATIONAL, 1.00% $5,000.00 JBS ENGINEERING TECHNICAL SERVICES INC 1.00% $5,000.00 JBS ENGINEERING TECHNICAL SERVICES INC 1.00% $5,000.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 253 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount JBS ENGINEERING TECHNICAL SERVICES INC 1.00% $5,000.00 JBS ENGINEERING TECHNICAL SERVICES INC 1.00% $5,000.00 MEHTA & ASSOCIATES, INC. 1.00% $5,000.00 MEHTA & ASSOCIATES, INC. 1.00% $5,000.00 MYRA PLANNING AND DESIGN, LLC 1.00% $5,000.00 MYRA PLANNING AND DESIGN, LLC 1.00% $5,000.00 PAGE ONE CONSULTANTS, INC. 1.00% $5,000.00 PAGE ONE CONSULTANTS, INC. 1.00% $5,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8R59 Amount: $1,400,000.00 DBE Dollars: $.00 DBE %: .00% District: 9 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8S91 Amount: $600,000.00 DBE Dollars: $30,000.00 DBE %: 5.00% District: 6 GARCIA BRIDGE ENGINEERS P A 1.67% $10,000.00 GARCIA BRIDGE ENGINEERS P A 1.67% $5,000.00 GARCIA BRIDGE ENGINEERS P A 1.67% $15,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z61 Amount: $1,652,026.00 DBE Dollars: $40,781.14 DBE %: 2.47% District: 9 ACCURATE TRAFFIC COUNTS, INC. .62% $10,195.38 ACCURATE TRAFFIC COUNTS, INC. .62% $10,195.38 HSA CONSULTING GROUP, INC. .62% $10,195.00 LUKE TRANSPORTATION ENGINEERING .62% $10,195.38 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 254 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9004 Amount: $1,275,469.00 DBE Dollars: $150,840.00 DBE %: 11.83% District: 2 AE ENGINEERING, INC. 9.44% $120,431.00 GHIOTTO & ASSOCIATES, INC. 2.38% $30,409.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9055 Amount: $1,654,452.00 DBE Dollars: $500,759.00 DBE %: 30.27% District: 2 AE ENGINEERING, INC. 9.83% $162,615.00 TRS CONSULTANTS INC. 20.44% $338,144.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9085 Amount: $511,616.00 DBE Dollars: $102,323.00 DBE %: 20.00% District: 3 HSA CONSULTING GROUP, INC. 5.00% $39,662.00 HSA CONSULTING GROUP, INC. 5.00% $11,500.00 QUEST CORPORATION OF AMERICA, INC. 5.00% $39,661.00 QUEST CORPORATION OF AMERICA, INC. 5.00% $11,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9088 Amount: $2,500,000.00 DBE Dollars: $250,000.00 DBE %: 10.00% District: 9 QUEST CORPORATION OF AMERICA, INC. 10.00% $250,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For WILBUR SMITH ASSOCIATES, INC. Amount: $10,086,554.00 DBE Dollars: $1,195,065.14 DBE % : 11.85% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 255 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WILSONMILLER, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8E42 Amount: $149,826.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8M94 Amount: $148,082.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8T18 Amount: $20,918.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8V08 Amount: $186,346.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C8Z51 Amount: $124,762.00 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9125 Amount: $1,584,888.00 DBE Dollars: $132,354.00 DBE %: 8.35% District: 3 DIVERSIFIED DESIGN & DRAFTING SERV 6.78% $107,465.00 GARCIA BRIDGE ENGINEERS P A .35% $5,512.00 QUEST CORPORATION OF AMERICA, INC. 1.22% $19,377.00 EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 256 Florida Department of Transportation DBE Utilization for Professional Services Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2010 to 09/30/2011 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: C9147 Amount: $.00 DBE Dollars: $150,000.00 DBE %: .00% District: 7 COLLINS SURVEY CONSULTING LLC .00% $30,000.00 ELEMENT ENGINEERING GROUP,LLC .00% $30,000.00 ELEMENT ENGINEERING GROUP,LLC .00% $30,000.00 HYATT SURVEY SERVICES, INC. .00% $30,000.00 HYATT SURVEY SERVICES, INC. .00% $30,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For WILSONMILLER, INC. Amount: $2,214,822.00 DBE Dollars: $282,354.00 DBE % : 12.75% EORRPT50 Run on : 12/01/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 257