Comments
Description
Transcript
Florida Department of Transportation
Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AARK ENTERPRISES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H08-R0 Amount: $120,178.60 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ABK CONSTRUCTION, INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6214 Amount: $39,865.80 DBE Dollars: $39,865.80 DBE %: 100.00% District: 6 ABC LANDCLEARING & DEVELOPMENT INC 100.00% $39,865.80 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ACS INFRASTRUCTURE DEVELOPMENT, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4J69_Y1 Amount: $59,530,000.00 DBE Dollars: $6,193,312.96 DBE %: 10.40% District: 4 3 C CONSTRUCTION INC .03% $20,500.00 BOLT UNDERWATER SERVICES .02% $10,420.00 BONN J CONTRACTING INC OF FLORIDA 1.08% $640,000.00 BONS BARRICADES INC .08% $48,169.75 BROWN & PHILLIPS INC .02% $12,000.00 COMPLETE HIGHWAY IMPROVEMENT INC .12% $72,000.00 CONSTRUCT GROUP CORP 2.14% $1,271,710.44 D STEPHENSON CONSTRUCTION INC .24% $144,024.00 EL CHAMPION PAINTING AND DRYWALL FINISHING .38% $228,695.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 1 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount GUARANTEED FENCE CORP .20% $119,000.00 J E HILL CONTRACTOR INC 1.56% $930,000.00 KAILAS CORP 1.44% $859,879.21 LANDSCAPE SERVICE PROFESSIONALS INC .01% $7,200.00 MAYTIN ENGINEERING CORP 1.68% $1,000,000.00 Manaty Transportation Inc .06% $36,425.00 PROCOPIO & ASSOCIATES INC .48% $288,000.00 RAM-TECH CONSTRUCTION INC .44% $259,325.00 SOUTHEAST UNDERGROUND UTILITIES CORP .12% $69,953.56 SOUTHERN FLORIDA PAVING GROUP LLC .00% $1,011.00 SOUTHERN TRANSPORT AND EQUIPMENT .29% $175,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ADVANCED CONTRACTING SPECIALTIES,LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H94-R0 Amount: $248,075.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AGRICULTURAL LAND SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I63-R0 Amount: $181,780.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 2 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M58 Amount: $478,650.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AGRICULTURAL LAND SERVICES, INC. Amount: $660,430.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AJAX PAVING INDUSTRIES OF FLORIDA LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H51 Amount: $658,150.50 DBE Dollars: $49,942.00 DBE %: 7.59% District: 1 ROAD RUNNER HIGHWAY SIGNS INC 7.59% $49,942.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H52 Amount: $544,578.00 DBE Dollars: $72,508.00 DBE %: 13.31% District: 1 E Z SWEEP CORPORATION 3.60% $19,600.00 ROAD RUNNER HIGHWAY SIGNS INC 9.72% $52,908.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7F89 Amount: $311,911.26 DBE Dollars: $8,801.13 DBE %: 2.82% District: 7 RAULERSON & SON INC .73% $2,283.55 ROAD RUNNER HIGHWAY SIGNS INC 2.09% $6,517.58 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7F96 Amount: $1,394,222.21 DBE Dollars: $28,576.04 DBE %: 2.05% District: 7 ROMINE CONSTRUCTION LLC 2.05% $28,576.04 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 3 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1326 Amount: $2,154,840.00 DBE Dollars: $913,013.44 DBE %: 42.37% District: 1 MP TRUCKING AND SOD .70% $15,013.44 ROAD RUNNER HIGHWAY SIGNS INC 41.67% $898,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1333 Amount: $4,257,575.00 DBE Dollars: $327,026.00 DBE %: 7.68% District: 1 GCE SERVICES INC 1.03% $43,679.00 MP TRUCKING AND SOD 2.71% $115,591.00 ROAD RUNNER HIGHWAY SIGNS INC 3.94% $167,756.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1337 Amount: $1,136,873.00 DBE Dollars: $283,435.00 DBE %: 24.93% District: 1 BOWSER HAULING INC 1.66% $18,881.00 E Z SWEEP CORPORATION 2.90% $33,000.00 ROAD RUNNER HIGHWAY SIGNS INC 20.37% $231,554.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1344 Amount: $1,079,000.00 DBE Dollars: $98,160.00 DBE %: 9.10% District: 1 E Z SWEEP CORPORATION 1.91% $20,600.00 ROAD RUNNER HIGHWAY SIGNS INC 7.19% $77,560.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1359 Amount: $3,594,453.00 DBE Dollars: $223,523.00 DBE %: 6.22% District: 1 E Z SWEEP CORPORATION .97% $34,800.00 ROAD RUNNER HIGHWAY SIGNS INC 5.25% $188,723.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 4 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1372 Amount: $2,281,980.65 DBE Dollars: $466,544.35 DBE %: 20.44% District: 1 ROAD RUNNER HIGHWAY SIGNS INC 20.44% $466,544.35 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1387 Amount: $2,836,634.45 DBE Dollars: $57,220.00 DBE %: 2.02% District: 1 BOWSER HAULING INC .88% $25,000.00 E Z SWEEP CORPORATION 1.14% $32,220.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1388 Amount: $3,059,300.00 DBE Dollars: $17,582.00 DBE %: .57% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .57% $17,582.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7222 Amount: $768,550.00 DBE Dollars: $.00 DBE %: .00% District: 7 WORLD HAULERS INC .00% $30,000.00 WORLD HAULERS INC .00% -$30,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7239 Amount: $2,225,465.61 DBE Dollars: $32,303.94 DBE %: 1.45% District: 7 E Z SWEEP CORPORATION 1.45% $32,303.94 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AJAX PAVING INDUSTRIES OF FLORIDA LLC Amount: $26,303,533.68 DBE Dollars: $2,578,634.90 DBE % : 9.80% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 5 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AJAX PAVING INDUSTRIES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I00 Amount: $340,000.00 DBE Dollars: $36,850.00 DBE %: 10.84% District: 1 C FULLERTON SOD & LANDSCAPING CO INC 3.04% $10,350.00 E Z SWEEP CORPORATION .74% $2,500.00 ROAD RUNNER HIGHWAY SIGNS INC 7.06% $24,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7164 Amount: $23,043,356.00 DBE Dollars: $1,070,274.00 DBE %: 4.64% District: 7 E Z SWEEP CORPORATION .42% $96,520.00 J E HILL CONTRACTOR INC .23% $52,800.00 PRECISION CONTRACTING SERVICES INC .52% $120,924.00 WORLD HAULERS INC 3.47% $800,030.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AJAX PAVING INDUSTRIES, INC. Amount: $23,383,356.00 DBE Dollars: $1,107,124.00 DBE % : 4.73% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AKCA INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H93-R0 Amount: $243,080.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 6 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I45-R0 Amount: $250,896.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H05-R2 Amount: $150,000.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I71-R0 Amount: $25,000.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1338 Amount: $30,115.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1349 Amount: $167,160.39 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3322 Amount: $180,460.96 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5311 Amount: $233,799.75 DBE Dollars: $.00 DBE %: .00% District: 5 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 7 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5317 Amount: $520,609.50 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5355 Amount: $163,450.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5361 Amount: $214,602.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AKCA INC. Amount: $2,179,173.60 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ALL SEASONS LANDSCAPE CONTRACTORS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3G39-R0 Amount: $125,587.47 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 8 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H12-R0 Amount: $213,931.50 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ALL SEASONS LANDSCAPE CONTRACTORS, INC. Amount: $339,518.97 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ALL-PRO LANDSCAPING OF TALLAHASSEE, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H96 Amount: $24,487.72 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AMERI - PRIDE, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1F81-R0 Amount: $9,650,535.24 DBE Dollars: $598,508.75 DBE %: 6.20% District: 1 PRECISION CONTRACTING SERVICES INC 6.20% $598,508.75 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AMERICAN LIGHTING AND SIGNALIZATION, INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I32-R0 Amount: $495,000.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 9 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2M34 Amount: $1,131,124.44 DBE Dollars: $50,827.10 DBE %: 4.49% District: 2 PRECISION CONTRACTING SERVICES INC 4.49% $50,827.10 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1378 Amount: $81,300.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2284 Amount: $1,229,929.20 DBE Dollars: $25,998.30 DBE %: 2.11% District: 2 PRECISION CONTRACTING SERVICES INC 2.11% $25,998.30 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2317 Amount: $387,583.90 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2319 Amount: $345,299.54 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AMERICAN LIGHTING AND SIGNALIZATION, INC Amount: $3,670,237.08 DBE Dollars: $76,825.40 DBE % : 2.09% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 10 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AMERICAN SWEEPING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H49-R0 Amount: $32,398.70 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H53-R1 Amount: $27,583.45 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AMERICAN SWEEPING, INC. Amount: $59,982.15 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AMERISEAL HIGHWAY STRIPING, INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F23 Amount: $314,212.50 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F25 Amount: $471,817.50 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4258 Amount: $385,131.47 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 11 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4266 Amount: $184,297.23 DBE Dollars: $7,145.00 DBE %: 3.88% District: 4 ROADSCAPE NORTH FLORIDA INC 3.88% $7,145.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For AMERISEAL HIGHWAY STRIPING, INC Amount: $1,355,458.70 DBE Dollars: $7,145.00 DBE % : .53% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : AMERISEAL NORTHEAST FLORIDA, IN XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H04-R2 Amount: $150,000.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ANDERSON COLUMBIA CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2M30 Amount: $2,975,866.36 DBE Dollars: $2,210.00 DBE %: .07% District: 2 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .07% $2,210.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H67 Amount: $3,289,732.07 DBE Dollars: $22,038.10 DBE %: .67% District: 3 SUNCOAST SOD FARMS INC .33% $8,248.03 SUNCOAST SOD FARMS INC .33% $13,790.07 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H92-R0 Amount: $950,000.00 DBE Dollars: $20,316.00 DBE %: 2.14% District: 3 PORTER CONSTRUCTION CO INC 2.14% $20,316.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 12 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I09 Amount: $2,947,002.49 DBE Dollars: $173,591.25 DBE %: 5.89% District: 3 HALE CONTRACTING INC 3.76% $110,880.00 PORTER CONSTRUCTION CO INC 2.13% $62,711.25 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I85 Amount: $81,622.57 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2295 Amount: $2,789,000.00 DBE Dollars: $184,447.00 DBE %: 6.61% District: 2 BIG ISLAND CONSTRUCTION COMPANY INC 1.83% $51,072.00 JENKINS PAINTING INC 2.17% $122,000.00 JENKINS PAINTING INC 2.17% -$1,200.00 SAFETY CONTRACTORS INC .45% $12,575.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2305 Amount: $1,041,000.00 DBE Dollars: $33,468.08 DBE %: 3.21% District: 2 JENKINS PAINTING INC 3.21% $33,468.08 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2306 Amount: $369,748.55 DBE Dollars: $17,983.50 DBE %: 4.86% District: 2 JENKINS PAINTING INC 4.86% $17,983.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2308 Amount: $933,850.00 DBE Dollars: $23,800.00 DBE %: 2.55% District: 2 JENKINS PAINTING INC 2.55% $23,800.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 13 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2312 Amount: $791,787.00 DBE Dollars: $15,036.93 DBE %: 1.90% District: 2 JENKINS PAINTING INC .95% $16,236.93 JENKINS PAINTING INC .95% -$1,200.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2320 Amount: $1,819,776.00 DBE Dollars: $42,195.00 DBE %: 2.32% District: 2 BIG ISLAND CONSTRUCTION COMPANY INC .20% $3,600.00 JENKINS PAINTING INC 1.06% $87,995.00 JENKINS PAINTING INC 1.06% -$49,400.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2325 Amount: $407,775.60 DBE Dollars: $10,049.60 DBE %: 2.46% District: 2 JENKINS PAINTING INC 2.46% $10,049.60 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2328 Amount: $2,848,429.30 DBE Dollars: $82,906.75 DBE %: 2.91% District: 2 JENKINS PAINTING INC 2.91% $82,906.75 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3042 Amount: $14,968,277.92 DBE Dollars: $1,624,301.36 DBE %: 10.85% District: 3 GIRALT ENTERPRISES INC .12% $17,743.70 PORTER CONSTRUCTION CO INC 9.81% $1,467,774.50 SUNCOAST SOD FARMS INC .93% $138,783.16 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3066 Amount: $.00 DBE Dollars: $598,741.80 DBE %: .00% District: 3 HALE CONTRACTING INC .00% $180,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 14 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount PORTER CONSTRUCTION CO INC .00% $359,265.15 PORTER CONSTRUCTION CO INC .00% $59,476.65 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3089 Amount: $21,138,498.65 DBE Dollars: $202,457.65 DBE %: .96% District: 3 PORTER CONSTRUCTION CO INC .96% $202,457.65 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3173 Amount: $.00 DBE Dollars: $95,049.50 DBE %: .00% District: 3 PORTER CONSTRUCTION CO INC .00% $95,049.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3270 Amount: $2,946,527.38 DBE Dollars: $54,590.80 DBE %: 1.85% District: 3 PORTER CONSTRUCTION CO INC 1.85% $54,590.80 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3282 Amount: $936,739.10 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5337 Amount: $1,398,886.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ANDERSON COLUMBIA CO., INC. Amount: $62,634,518.99 DBE Dollars: $3,203,183.32 DBE % : 5.11% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 15 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : APAC MID-SOUTH, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H28 Amount: $920,634.39 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : APAC-SOUTHEAST, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1G83 Amount: $2,486,442.58 DBE Dollars: $684,552.75 DBE %: 27.53% District: 1 GCE SERVICES INC 1.54% $38,169.60 J E HILL CONTRACTOR INC .67% $16,635.00 R MORALES TRUCKING INC .13% $3,136.50 ROAD RUNNER HIGHWAY SIGNS INC 25.20% $626,611.65 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H59 Amount: $8,883,270.00 DBE Dollars: $28,700.00 DBE %: .32% District: 1 WORLD HAULERS INC .32% $28,700.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H63 Amount: $3,287,051.00 DBE Dollars: $1,225,805.41 DBE %: 37.29% District: 1 E Z SWEEP CORPORATION .70% $22,981.60 GCE SERVICES INC 1.06% $34,834.01 ROAD RUNNER HIGHWAY SIGNS INC 35.53% $1,167,989.80 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 16 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H69 Amount: $34,628,500.00 DBE Dollars: $243,674.30 DBE %: .70% District: 1 ECHEZABAL & ASSOCIATES INC .63% $219,104.00 JASONS HAULING INC -.26% -$90,000.00 WORLD HAULERS INC .17% $204,570.30 WORLD HAULERS INC .17% -$90,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H76 Amount: $7,716,456.00 DBE Dollars: $1,365,598.00 DBE %: 17.70% District: 1 E Z SWEEP CORPORATION .42% $32,509.58 GCE SERVICES INC 1.81% $139,774.42 ROAD RUNNER HIGHWAY SIGNS INC 15.46% $1,193,314.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N57 Amount: $365,295.40 DBE Dollars: $39,497.70 DBE %: 10.81% District: 2 CAL-TECH TESTING INC .68% $2,500.00 ELIXSON TRANSPORT INC .25% $900.00 GIBSON TRUCK & EQUIPMENT COMPANY INC .41% $1,512.00 JENKINS PAINTING INC 7.18% $26,221.70 SMITH & SONS SOD CO INC 2.29% $8,364.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N59 Amount: $1,300,240.91 DBE Dollars: $80,116.25 DBE %: 6.16% District: 2 CAL-TECH TESTING INC .77% $10,000.00 JENKINS PAINTING INC 4.17% $54,212.50 SAFETY CONTRACTORS INC 1.22% $15,903.75 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 17 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H68 Amount: $331,400.98 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7F84 Amount: $3,384,263.44 DBE Dollars: $32,519.88 DBE %: .96% District: 7 E Z SWEEP CORPORATION .96% $32,519.88 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1306 Amount: $3,327,398.21 DBE Dollars: $416,946.30 DBE %: 12.53% District: 1 E Z SWEEP CORPORATION 1.14% $38,000.00 GCE SERVICES INC .20% $6,610.00 ROAD RUNNER HIGHWAY SIGNS INC 11.19% $372,336.30 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1325 Amount: $2,774,000.00 DBE Dollars: $741,182.20 DBE %: 26.72% District: 1 E Z SWEEP CORPORATION 2.15% $59,557.20 GCE SERVICES INC .13% $3,625.00 ROAD RUNNER HIGHWAY SIGNS INC 24.44% $678,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1340 Amount: $1,995,000.00 DBE Dollars: $303,098.05 DBE %: 15.19% District: 1 E Z SWEEP CORPORATION 2.22% $44,228.80 GCE SERVICES INC 1.91% $38,144.25 ROAD RUNNER HIGHWAY SIGNS INC 11.06% $220,725.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 18 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1341 Amount: $1,796,427.00 DBE Dollars: $287,860.98 DBE %: 16.02% District: 1 E Z SWEEP CORPORATION 1.98% $35,483.40 GCE SERVICES INC 1.80% $32,319.00 ROAD RUNNER HIGHWAY SIGNS INC 12.25% $220,058.58 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1366 Amount: $1,098,000.00 DBE Dollars: $18,900.00 DBE %: 1.72% District: 1 WORLD HAULERS INC 1.72% $18,900.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1369 Amount: $1,281,950.00 DBE Dollars: $373,632.13 DBE %: 29.15% District: 1 E Z SWEEP CORPORATION 1.74% $22,272.00 GCE SERVICES INC 1.47% $18,830.00 ROAD RUNNER HIGHWAY SIGNS INC 25.94% $332,530.13 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1376 Amount: $231,766.75 DBE Dollars: $4,708.87 DBE %: 2.03% District: 1 RAULERSON & SON INC 1.80% $4,174.00 WORLD HAULERS INC .12% $4,150.00 WORLD HAULERS INC .12% -$3,615.13 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1399 Amount: $7,563,747.62 DBE Dollars: $1,214,222.90 DBE %: 16.05% District: 1 ALLIED ENGINEERING & TESTING INC .89% $67,205.00 E Z SWEEP CORPORATION .46% $34,641.90 GCE SERVICES INC 1.00% $75,561.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 19 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount ROAD RUNNER HIGHWAY SIGNS INC 13.71% $1,036,815.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2261 Amount: $4,819,750.00 DBE Dollars: $216,224.59 DBE %: 4.49% District: 2 AMBER CONSTRUCTION COMPANY .05% $2,320.00 E Z SWEEP CORPORATION .93% $44,730.66 ELIXSON TRANSPORT INC .75% $36,351.25 GIBSON TRUCK & EQUIPMENT COMPANY INC .50% $23,962.50 JENKINS PAINTING INC 1.68% $80,974.40 SAFETY CONTRACTORS INC .29% $21,562.50 SAFETY CONTRACTORS INC .29% $6,323.28 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2307 Amount: $316,549.50 DBE Dollars: $20,000.00 DBE %: 6.32% District: 2 GIBSON TRUCK & EQUIPMENT COMPANY INC 6.32% $20,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2309 Amount: $655,825.66 DBE Dollars: $48,304.38 DBE %: 7.37% District: 2 CAL-TECH TESTING INC .41% $6,000.00 CAL-TECH TESTING INC .41% -$578.12 ELIXSON TRANSPORT INC 3.87% $25,382.50 JENKINS PAINTING INC 2.67% $17,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2314 Amount: $7,192,757.41 DBE Dollars: $294,794.27 DBE %: 4.10% District: 2 CAL-TECH TESTING INC .54% $65,000.00 CAL-TECH TESTING INC .54% $12,692.82 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 20 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount ELIXSON TRANSPORT INC .24% $26,487.00 ELIXSON TRANSPORT INC .24% $7,776.00 GIBSON TRUCK & EQUIPMENT COMPANY INC .09% $6,210.00 JENKINS PAINTING INC 1.23% $139,670.34 JENKINS PAINTING INC 1.23% $36,958.11 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2315 Amount: $2,686,839.68 DBE Dollars: $108,871.36 DBE %: 4.05% District: 2 CAL-TECH TESTING INC .06% $1,500.00 JENKINS PAINTING INC 2.75% $73,840.36 SAFETY CONTRACTORS INC 1.25% $33,531.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3269 Amount: $6,696,884.90 DBE Dollars: $56,700.00 DBE %: .85% District: 3 E Z SWEEP CORPORATION .85% $56,700.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4247 Amount: $552,416.70 DBE Dollars: $9,000.00 DBE %: 1.63% District: 4 ABC LANDCLEARING & DEVELOPMENT INC 1.63% $9,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5334 Amount: $275,500.00 DBE Dollars: $9,420.00 DBE %: 3.42% District: 5 E A C TRANSPORT CORP 2.99% $8,250.00 H E R ENVIRONMENTAL SERVICES INC .42% $1,170.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5375 Amount: $363,536.50 DBE Dollars: $18,542.30 DBE %: 5.10% District: 5 ABC LANDCLEARING & DEVELOPMENT INC 5.10% $18,542.30 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 21 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7225 Amount: $3,140,065.13 DBE Dollars: $120,267.90 DBE %: 3.83% District: 7 AMERICAN STANDARD TESTING & CONSULTING LABORATORY INC .45% $14,159.60 ROMINE CONSTRUCTION LLC 1.34% $42,008.30 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 2.04% $64,100.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7254 Amount: $3,564,812.81 DBE Dollars: $219,362.70 DBE %: 6.15% District: 7 E Z SWEEP CORPORATION 1.32% $47,017.80 ROAD RUNNER HIGHWAY SIGNS INC 4.09% $145,844.90 WORLD HAULERS INC .74% $26,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For APAC-SOUTHEAST, INC. Amount: $112,716,148.18 DBE Dollars: $8,182,503.22 DBE % : 7.26% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ARAZOZA BROTHERS CORPORATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5P32 Amount: $299,999.00 DBE Dollars: $.00 DBE %: .00% District: 5 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 22 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6E37 Amount: $121,945.55 DBE Dollars: $6,000.00 DBE %: 4.92% District: 6 BONS BARRICADES INC 4.92% $6,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ARAZOZA BROTHERS CORPORATION Amount: $421,944.55 DBE Dollars: $6,000.00 DBE % : 1.42% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ARBOR ONE INCORPORATED XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I02-R0 Amount: $189,864.26 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ARCHER WESTERN CONTRACTORS, LTD. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K48 Amount: $63,740,000.00 DBE Dollars: $4,244,974.12 DBE %: 6.66% District: 4 A D S WELDING INC 1.77% $1,125,231.00 D T READ STEEL CO INC 3.98% $2,538,318.00 GCME INC .22% $140,705.00 IDA CONSULTING ENGINEERS INC .11% $69,255.00 MANUEL G VERA & ASSOCIATES INC .29% $184,777.45 PROGRESSIVE DESIGN & ENGINEERING INC .29% $186,687.67 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 23 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7070 Amount: $89,041,191.00 DBE Dollars: $1,991,071.79 DBE %: 2.24% District: 7 DENSON CONSTRUCTION INC .66% $588,711.01 E Z SWEEP CORPORATION .17% $148,500.00 J MORI PAINTING INC .49% $434,876.26 JASONS HAULING INC .83% $736,700.00 SOBE STEEL ERECTORS INC .09% $82,284.52 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ARCHER WESTERN CONTRACTORS, LTD. Amount: $152,781,191.00 DBE Dollars: $6,236,045.91 DBE % : 4.08% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ASPHALT GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4203 Amount: $19,836,800.00 DBE Dollars: $4,100.00 DBE %: .02% District: 4 SIGNAL SERVICE INDUSTRIES INC .02% $4,100.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6194 Amount: $2,535,104.16 DBE Dollars: $217,146.10 DBE %: 8.57% District: 6 ********************** A LUIS MILLING .44% $11,128.00 HIGH TECH STRIPING INC .28% $7,013.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 24 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SOUTHEAST UNDERGROUND UTILITIES CORP 3.71% $94,069.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ASPHALT GROUP, INC. Amount: $22,371,904.16 DBE Dollars: $221,246.10 DBE % : .99% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ASTALDI CONSTRUCTION CORPORATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F60 Amount: $14,194,750.29 DBE Dollars: $3,373,337.48 DBE %: 23.76% District: 6 CONTRACTORS SURVEY CORPORATION 1.93% $273,816.00 GCE SERVICES INC .10% $14,213.28 J MORI PAINTING INC .17% $24,605.14 SKYY'S CONSTRUCTION INC 13.93% $1,976,845.76 SOUTHEAST UNDERGROUND UTILITIES CORP 6.96% $987,947.06 TROPIC FENCE INC .68% $95,910.24 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1373 Amount: $31,555,340.15 DBE Dollars: $2,070,813.60 DBE %: 6.56% District: 1 COBALT CONSTRUCTION GROUP LLC .85% $268,932.00 E Z SWEEP CORPORATION .11% $33,600.00 GCE SERVICES INC 3.16% $998,008.80 LIBERTY HAULING INC 2.44% $770,272.80 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ASTALDI CONSTRUCTION CORPORATION Amount: $45,750,090.44 DBE Dollars: $5,444,151.08 DBE % : 11.90% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 25 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ATLANTIC CIVIL CONSTRUCTORS CORPORATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I07 Amount: $85,000.00 DBE Dollars: $10,032.00 DBE %: 11.80% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 11.80% $10,032.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M89 Amount: $74,915.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1364 Amount: $105,974.20 DBE Dollars: $12,650.00 DBE %: 11.94% District: 1 SILES AND SONS INC 11.94% $12,650.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ATLANTIC CIVIL CONSTRUCTORS CORPORATION Amount: $265,889.20 DBE Dollars: $22,682.00 DBE % : 8.53% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ATLANTIC CIVIL, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6157 Amount: $5,694,774.41 DBE Dollars: $16,000.00 DBE %: .28% District: 6 A1A SOD SAND AND SOIL INC .28% $16,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 26 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BAKER, R.B. CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2297 Amount: $654,137.93 DBE Dollars: $40,077.50 DBE %: 6.13% District: 2 BEAVER BULK INC 2.34% $11,504.00 BEAVER BULK INC 2.34% $19,095.50 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .72% $10,165.75 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .72% -$687.75 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BEN WITHERS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I31 Amount: $223,296.34 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BERGERON LAND DEVELOPMENT, INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6163 Amount: $7,085,518.98 DBE Dollars: $2,070,845.85 DBE %: 29.23% District: 6 J E HILL CONTRACTOR INC 1.13% $80,078.00 PLAN TOTAL INC 21.51% $1,523,870.10 SIGNAL SERVICE INDUSTRIES INC 6.59% $466,897.75 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 27 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BETTER ROADS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H47 Amount: $7,655,261.96 DBE Dollars: $5,168.63 DBE %: .07% District: 1 GCE SERVICES INC .07% $5,168.63 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H68 Amount: $84,000.00 DBE Dollars: $3,375.00 DBE %: 4.02% District: 1 C FULLERTON SOD & LANDSCAPING CO INC 4.02% $3,375.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I23 Amount: $257,500.00 DBE Dollars: $18,449.55 DBE %: 7.16% District: 1 GCE SERVICES INC 7.16% $18,449.55 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I68-R0 Amount: $263,490.08 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1336 Amount: $456,855.00 DBE Dollars: $3,897.30 DBE %: .85% District: 1 GCE SERVICES INC .85% $3,897.30 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1360 Amount: $241,054.99 DBE Dollars: $760.35 DBE %: .32% District: 1 GCE SERVICES INC .32% $760.35 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 28 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1377 Amount: $152,149.24 DBE Dollars: $4,241.00 DBE %: 2.79% District: 1 GCE SERVICES INC 2.79% $4,241.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BETTER ROADS, INC. Amount: $9,110,311.27 DBE Dollars: $35,891.83 DBE % : .39% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BIG ISLAND CONSTRUCTION COMPANY, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I17 Amount: $5,626.50 DBE Dollars: $5,993.36 DBE %: 106.52% District: 3 BIG ISLAND CONSTRUCTION COMPANY INC 106.52% $5,993.36 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BNB ENGINEERING CORPORATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1363 Amount: $142,025.00 DBE Dollars: $139,425.00 DBE %: 98.17% District: 1 BNB ENGINEERING CORPORATION 29.59% $142,025.00 BNB ENGINEERING CORPORATION 29.59% -$9,624.00 BNB ENGINEERING CORPORATION 29.59% -$6,312.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 4.69% $9,624.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 4.69% $3,712.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 29 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BOWERS CONSTRUCTION SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I16 Amount: $50,132.50 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BREWER PAVING & DEVELOPMENT, INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5316 Amount: $239,629.99 DBE Dollars: $48,000.00 DBE %: 20.03% District: 5 V A PAVING INC 20.03% $48,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BRIDGE MASTERS CONSTRUCTION, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H62 Amount: $67,701.16 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I30 Amount: $38,270.00 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 30 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N34 Amount: $136,912.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BRIDGE MASTERS CONSTRUCTION, LLC Amount: $242,883.16 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BUDGET CONSTRUCTION CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4J88 Amount: $760,000.00 DBE Dollars: $760,000.00 DBE %: 100.00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6177 Amount: $743,741.40 DBE Dollars: $91,423.70 DBE %: 12.29% District: 6 HIGH TECH STRIPING INC 2.71% $20,160.00 J E HILL CONTRACTOR INC 4.00% $29,778.00 ROAD RUNNER STRIPING TECHNOLOGIES 3.44% $25,585.70 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 2.14% $15,900.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6202 Amount: $374,421.97 DBE Dollars: $56,999.14 DBE %: 15.22% District: 6 Florida City Engineering Contractors Inc 10.72% $40,149.00 HIGH TECH STRIPING INC 1.12% $4,210.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 31 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount ROAD RUNNER STRIPING TECHNOLOGIES 3.38% $12,640.14 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For BUDGET CONSTRUCTION CO., INC. Amount: $1,878,163.37 DBE Dollars: $908,422.84 DBE % : 48.37% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : BUN CONSTRUCTION CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7188 Amount: $2,107,843.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : C.W. ROBERTS CONTRACTING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H22 Amount: $1,137,500.00 DBE Dollars: $118,750.00 DBE %: 10.44% District: 1 ROAD RUNNER HIGHWAY SIGNS INC 10.44% $118,750.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H54 Amount: $1,528,417.00 DBE Dollars: $121,800.00 DBE %: 7.97% District: 1 ROAD RUNNER HIGHWAY SIGNS INC 3.98% $53,385.00 ROAD RUNNER HIGHWAY SIGNS INC 3.98% $68,415.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I13 Amount: $1,232,215.71 DBE Dollars: $10,410.00 DBE %: .84% District: 3 PORTER CONSTRUCTION CO INC .84% $10,410.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 32 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N45 Amount: $23,175,845.00 DBE Dollars: $1,594,691.50 DBE %: 6.88% District: 5 BONN J CONTRACTING INC OF FLORIDA 1.83% $424,606.50 DIAMOND C TRANSPORT INC 1.72% $504,000.00 DIAMOND C TRANSPORT INC 1.72% $295,000.00 IDA CONSULTING ENGINEERS INC 1.60% $371,085.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7F94 Amount: $2,583,483.26 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3164 Amount: $24,036,783.75 DBE Dollars: $236,902.20 DBE %: .99% District: 3 FLORIDA DEVELOPERS INC OF TALLAHASSEE .24% $56,635.00 HALE CONTRACTING INC .75% $180,267.20 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3259 Amount: $1,273,324.47 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3261 Amount: $807,824.76 DBE Dollars: $57,678.00 DBE %: 7.14% District: 3 PORTER CONSTRUCTION CO INC 7.14% $57,678.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3271 Amount: $3,284,624.32 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 33 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3334 Amount: $186,479.21 DBE Dollars: $14,451.54 DBE %: 7.75% District: 3 GAINES AND SONS STRIPING INC 7.75% $14,451.54 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For C.W. ROBERTS CONTRACTING, INC. Amount: $59,246,497.48 DBE Dollars: $2,154,683.24 DBE % : 3.64% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CALLAWAY CONTRACTING INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2318 Amount: $124,942.61 DBE Dollars: $3,000.00 DBE %: 2.40% District: 2 THE GIBBS GROUP PLLC 2.40% $3,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CAPITAL ASPHALT INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I40 Amount: $53,000.00 DBE Dollars: $5,300.00 DBE %: 10.00% District: 3 FLORIDA DEVELOPERS INC OF TALLAHASSEE 5.66% $3,000.00 GAINES AND SONS STRIPING INC 4.34% $2,300.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I56 Amount: $263,000.00 DBE Dollars: $32,000.00 DBE %: 12.17% District: 3 FLORIDA DEVELOPERS INC OF TALLAHASSEE 3.42% $9,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 34 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount GAINES AND SONS STRIPING INC 8.75% $23,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CAPITAL ASPHALT INC Amount: $316,000.00 DBE Dollars: $37,300.00 DBE % : 11.80% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CEM ENTERPRISES, INC. D/B/A SUNSHINE PAI XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I12 Amount: $26,960.60 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I15 Amount: $15,659.20 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M66 Amount: $622,777.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F26 Amount: $367,080.00 DBE Dollars: $.00 DBE %: .00% District: 6 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 35 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5314 Amount: $251,148.65 DBE Dollars: $26,450.00 DBE %: 10.53% District: 5 EAST COAST FENCE & GUARDRAIL OF BREVARD INC 10.53% $26,450.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CEM ENTERPRISES, INC. D/B/A SUNSHINE PAI Amount: $1,283,625.45 DBE Dollars: $26,450.00 DBE % : 2.06% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CENTRAL FLORIDA EQUIPMENT RENTAL, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F12 Amount: $758,181.98 DBE Dollars: $67,958.71 DBE %: 8.96% District: 6 GIRALT ENTERPRISES INC 7.47% $56,614.29 HIGH TECH STRIPING INC 1.50% $11,344.42 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6210 Amount: $15,710,688.23 DBE Dollars: $985,980.53 DBE %: 6.28% District: 6 A1A SOD SAND AND SOIL INC .94% $147,714.95 HI TECH CONCRETE INC 3.38% $531,214.65 HIGH TECH STRIPING INC 1.13% $177,050.93 SORREL ENTERPRISES INC D/B/A SORREL DEVELOPMENT .83% $130,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CENTRAL FLORIDA EQUIPMENT RENTAL, INC. Amount: $16,468,870.21 DBE Dollars: $1,053,939.24 DBE % : 6.40% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 36 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CHUCK NEEL CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I37 Amount: $50,405.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COASTAL MARINE CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2M33 Amount: $880,754.45 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COASTAL MATERIALS OF ALABAMA, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3254 Amount: $113,897.03 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3323 Amount: $456,150.29 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For COASTAL MATERIALS OF ALABAMA, INC. Amount: $570,047.32 DBE Dollars: $.00 DBE % : .00% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 37 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COMMERCIAL INDUSTRIAL CORP. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2296 Amount: $5,200,212.25 DBE Dollars: $252,158.00 DBE %: 4.85% District: 2 BEAVER BULK INC .04% $30,000.00 BEAVER BULK INC .04% $10,000.00 BEAVER BULK INC .04% $4,075.97 BEAVER BULK INC .04% -$4,075.97 BEAVER BULK INC .04% -$30,000.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 4.66% $242,158.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5307 Amount: $3,283,333.33 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For COMMERCIAL INDUSTRIAL CORP. Amount: $8,483,545.58 DBE Dollars: $252,158.00 DBE % : 2.97% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COMMUNITY ASPHALT CORP. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K73 Amount: $978,553.91 DBE Dollars: $129,408.60 DBE %: 13.22% District: 4 BARREIRO CONCRETE CORP 7.03% $68,764.00 SIGNAL SERVICE INDUSTRIES INC 6.20% $60,644.60 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 38 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E8J94 Amount: $2,779,007.12 DBE Dollars: $147,472.84 DBE %: 5.31% District: 8 CONSTRUCT GROUP CORP 3.49% $97,051.55 I & C EARTHMOVERS CORP .07% $2,060.00 ROAD RUNNER STRIPING TECHNOLOGIES 1.74% $48,361.29 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4190 Amount: $43,737,231.03 DBE Dollars: $1,260,169.25 DBE %: 2.88% District: 4 J E HILL CONTRACTOR INC .84% $368,052.50 MSE SYSTEMS INC 2.04% $892,116.75 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4225 Amount: $2,419,888.91 DBE Dollars: $420,820.39 DBE %: 17.39% District: 4 BARREIRO CONCRETE CORP .95% $59,356.00 BARREIRO CONCRETE CORP .95% -$13,492.30 COMPLETE HIGHWAY IDENTITY INC 1.36% $33,025.35 GUARANTEED FENCE CORP 7.97% $192,955.84 R & D ELECTRIC INC 3.08% $149,230.00 R & D ELECTRIC INC 3.08% -$254.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4226 Amount: $416,243.15 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4228 Amount: $788,746.68 DBE Dollars: $28,416.65 DBE %: 3.60% District: 4 ALL FOR YOU LANDSCAPE AND MAINTENANCE INC .31% $2,448.75 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 39 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount PRECISION CONTRACTING SERVICES INC 3.29% $25,967.90 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4234 Amount: $3,247,092.71 DBE Dollars: $52,820.60 DBE %: 1.63% District: 4 NATURES KEEPER INC 1.32% $42,820.60 RGS DEVELOPMENT CORP .31% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4239 Amount: $2,174,741.65 DBE Dollars: $244,182.00 DBE %: 11.23% District: 4 RGS DEVELOPMENT CORP 1.15% $25,000.00 SOUTHEAST UNDERGROUND UTILITIES CORP 10.08% $219,182.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4241 Amount: $3,635,295.45 DBE Dollars: $43,450.00 DBE %: 1.20% District: 4 RGS DEVELOPMENT CORP 1.20% $43,450.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4242 Amount: $2,398,952.76 DBE Dollars: $4,794.14 DBE %: .20% District: 4 NATURES KEEPER INC .20% $4,794.14 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4249 Amount: $2,046,802.35 DBE Dollars: $24,070.75 DBE %: 1.18% District: 4 NATURES KEEPER INC 1.18% $24,070.75 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4260 Amount: $808,645.49 DBE Dollars: $247,100.40 DBE %: 30.56% District: 4 BARREIRO CONCRETE CORP 11.11% $89,822.95 HIGH TECH STRIPING INC 2.85% $23,077.95 SIGNAL SERVICE INDUSTRIES INC 16.60% $134,199.50 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 40 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4261 Amount: $4,120,284.82 DBE Dollars: $65,353.23 DBE %: 1.59% District: 4 ALL FOR YOU LANDSCAPE AND MAINTENANCE INC 1.59% $65,353.23 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4262 Amount: $2,278,774.61 DBE Dollars: $78,331.44 DBE %: 3.44% District: 4 ALL FOR YOU LANDSCAPE AND MAINTENANCE INC 3.44% $78,331.44 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5212 Amount: $48,941,147.52 DBE Dollars: $784,594.20 DBE %: 1.60% District: 5 NATURES KEEPER INC .12% $60,000.00 PILLADO TRUCKING INC 1.16% $570,000.00 PRECISION CONTRACTING SERVICES INC .32% $154,594.20 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6169 Amount: $2,244,190.00 DBE Dollars: $353,458.50 DBE %: 15.75% District: 6 BARREIRO CONCRETE CORP 1.93% $43,220.80 FYV INC DBA MIAMI TROPICAL NURSERY 2.38% $53,318.20 GUARANTEED FENCE CORP .00% $11,885.50 GUARANTEED FENCE CORP .00% -$11,885.50 ROAD RUNNER STRIPING TECHNOLOGIES .00% $96,743.44 ROAD RUNNER STRIPING TECHNOLOGIES .00% -$96,743.44 SIGNAL SERVICE INDUSTRIES INC 11.45% $256,919.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6199 Amount: $935,713.42 DBE Dollars: $60,821.15 DBE %: 6.50% District: 6 FYV INC DBA MIAMI TROPICAL NURSERY 1.33% $12,477.40 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 41 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount GUARANTEED FENCE CORP 5.10% $47,733.75 SIGNAL SERVICE INDUSTRIES INC .07% $610.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6224 Amount: $228,364.08 DBE Dollars: $48,832.76 DBE %: 21.38% District: 6 Dynamic Construction Group 1.43% $3,267.15 FYV INC DBA MIAMI TROPICAL NURSERY .19% $444.31 HIGH TECH STRIPING INC 1.32% $3,020.00 SOUTHEAST UNDERGROUND UTILITIES CORP 9.58% $21,875.00 TRANSMARK INC 4.43% $20,262.98 TRANSMARK INC 4.43% -$36.68 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For COMMUNITY ASPHALT CORP. Amount: $124,179,675.66 DBE Dollars: $3,994,096.90 DBE % : 3.22% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COMMUNITY CONDOTTE DE MOYA JV XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F61 Amount: $558,730,177.88 DBE Dollars: $43,887,646.00 DBE %: 7.85% District: 6 BCC ENGINEERING INC 3.22% $18,000,000.00 BONN J CONTRACTING INC OF FLORIDA .57% $3,190,500.00 FREEDOM PIPELINE CORP 1.39% $7,770,000.00 HR ENGINEERING SERVICES INC .54% $3,000,000.00 I & C EARTHMOVERS CORP .41% $2,300,000.00 J MORI PAINTING INC .38% $2,100,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 42 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount JARCO STEEL INC .23% $1,300,000.00 MANUEL G VERA & ASSOCIATES INC .04% $250,000.00 MAYTIN ENGINEERING CORP 1.07% $5,953,180.00 SOUTHEAST UNDERGROUND UTILITIES CORP .00% $11,473.00 SOUTHEAST UNDERGROUND UTILITIES CORP .00% $11,473.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .00% $1,020.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COMPLETE HIGHWAY IDENTITY, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K59 Amount: $285,000.00 DBE Dollars: $285,000.00 DBE %: 100.00% District: 4 COMPLETE HIGHWAY IDENTITY INC 84.21% $240,000.00 Highway Striping Inc 15.79% $45,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M55 Amount: $249,181.06 DBE Dollars: $249,181.06 DBE %: 100.00% District: 5 COMPLETE HIGHWAY IDENTITY INC 100.00% $249,181.06 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For COMPLETE HIGHWAY IDENTITY, INC. Amount: $534,181.06 DBE Dollars: $534,181.06 DBE % : 100.00% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 43 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COMPLETE HIGHWAY IMPROVEMENT INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4L56 Amount: $78,859.69 DBE Dollars: $84,008.69 DBE %: 106.53% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CONE & GRAHAM, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H23 Amount: $8,210,338.29 DBE Dollars: $374,950.00 DBE %: 4.57% District: 1 AERIAL INNOVATIONS INC .02% $2,000.00 BOWSER HAULING INC 1.28% $50,000.00 BOWSER HAULING INC 1.28% $160,000.00 HOUGH ENGINEERING INC .02% $2,000.00 PROTEAN DESIGN GROUP INC 1.08% $88,350.00 TIERRA INC .33% $27,000.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .56% $45,600.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K31 Amount: $13,944,116.48 DBE Dollars: $453,600.74 DBE %: 3.25% District: 4 NATURES KEEPER INC .98% $3,850.00 NATURES KEEPER INC .98% $270,750.74 TIERRA SOUTH FLORIDA INC .64% $125,000.00 TIERRA SOUTH FLORIDA INC .64% $54,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 44 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K58 Amount: $39,375,385.00 DBE Dollars: $3,625,819.25 DBE %: 9.21% District: 4 BONN J CONTRACTING INC OF FLORIDA 2.35% $923,664.00 NATURES KEEPER INC 1.27% $500,000.00 PROGRESSIVE DESIGN & ENGINEERING INC .34% $132,666.93 ROBERTS TRAFFIC MARKING CORP .32% $127,523.59 SHELBY ERECTORS INC 3.26% $1,281,964.73 TIERRA SOUTH FLORIDA INC .84% $405,710.00 TIERRA SOUTH FLORIDA INC .84% $254,290.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CONE & GRAHAM, INC. Amount: $61,529,839.77 DBE Dollars: $4,454,369.99 DBE % : 7.24% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CORAL MARINE CONSTRUCTION, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F17 Amount: $811,551.62 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CORE CONSTRUCTION GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M90 Amount: $48,650.00 DBE Dollars: $.00 DBE %: .00% District: 5 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 45 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : CORNERSTONE BUSINESSES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I65-R0 Amount: $80,100.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7G76 Amount: $88,235.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3338 Amount: $74,779.20 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For CORNERSTONE BUSINESSES, INC. Amount: $243,114.20 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : COXWELL, J.B. CONTRACTING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N55 Amount: $406,661.75 DBE Dollars: $7,750.00 DBE %: 1.91% District: 2 CAL-TECH TESTING INC 1.84% $7,500.00 JENKINS PAINTING INC .06% $250.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 46 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : D.A.B. CONSTRUCTORS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2311 Amount: $658,350.00 DBE Dollars: $53,000.00 DBE %: 8.05% District: 2 DIAMOND C TRANSPORT INC 8.05% $53,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5300 Amount: $3,546,000.00 DBE Dollars: $231,292.50 DBE %: 6.52% District: 5 AERIAL INNOVATIONS INC .03% $1,065.00 DIAMOND C TRANSPORT INC 5.36% $190,000.00 KMG FENCE LLC .90% $31,776.50 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .24% $8,451.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5312 Amount: $1,214,444.44 DBE Dollars: $113,800.00 DBE %: 9.37% District: 5 DIAMOND C TRANSPORT INC 9.37% $113,800.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7212 Amount: $4,924,444.44 DBE Dollars: $120,000.00 DBE %: 2.44% District: 7 DIAMOND C TRANSPORT INC 2.44% $120,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7216 Amount: $3,124,444.44 DBE Dollars: $120,000.00 DBE %: 3.84% District: 7 DIAMOND C TRANSPORT INC 3.84% $120,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7226 Amount: $170,000.00 DBE Dollars: $10,500.00 DBE %: 6.18% District: 7 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 6.18% $10,500.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 47 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7227 Amount: $583,721.93 DBE Dollars: $50,736.00 DBE %: 8.69% District: 7 DIAMOND C TRANSPORT INC 8.69% $50,736.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7231 Amount: $4,683,844.48 DBE Dollars: $144,345.00 DBE %: 3.08% District: 7 DIAMOND C TRANSPORT INC 3.08% $144,345.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7234 Amount: $4,874,444.44 DBE Dollars: $50,736.00 DBE %: 1.04% District: 7 DIAMOND C TRANSPORT INC 1.04% $50,736.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For D.A.B. CONSTRUCTORS, INC. Amount: $23,779,694.17 DBE Dollars: $894,409.50 DBE % : 3.76% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DANNY MARTINEZ INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H57 Amount: $116,536.50 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M88 Amount: $124,942.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N49 Amount: $85,842.00 DBE Dollars: $525.00 DBE %: .61% District: 5 H E R ENVIRONMENTAL SERVICES INC .61% $525.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 48 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5P18 Amount: $96,498.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For DANNY MARTINEZ INC. Amount: $423,818.50 DBE Dollars: $525.00 DBE % : .12% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DBI SERVICES, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N05 Amount: $17,568,439.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5P55-R0 Amount: $1,700,311.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For DBI SERVICES, LLC Amount: $19,268,750.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DESIGN-BUILD ENGINEERS & CONTRACTORS, CO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K97 Amount: $2,421,257.00 DBE Dollars: $2,471,257.00 DBE %: 102.07% District: 4 DESIGN BUILD ENGINEERS & CONTRACTORS INC 92.12% $2,230,557.00 PREMIERE DESIGN SOLUTIONS INC 9.94% $240,700.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 49 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DICKERSON FLORIDA, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E8J83 Amount: $2,170,843.55 DBE Dollars: $43,473.90 DBE %: 2.00% District: 8 ALL FOR YOU LANDSCAPE AND MAINTENANCE INC .04% $819.50 TRANSMARK INC 1.96% $42,654.40 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1382 Amount: $373,151.00 DBE Dollars: $6,041.03 DBE %: 1.62% District: 1 ALL FOR YOU LANDSCAPE AND MAINTENANCE INC 1.62% $6,041.03 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For DICKERSON FLORIDA, INC. Amount: $2,543,994.55 DBE Dollars: $49,514.93 DBE % : 1.95% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DISTRICT FOUR LAP PROJECTS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: ZLAP-D4 Amount: $33,705,517.00 DBE Dollars: $1,232,358.00 DBE %: 3.66% District: 4 VARIOUS 3.66% $1,232,358.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DISTRICT ONE LAP PROJECTS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: ZLAP-D1 Amount: $35,470,833.00 DBE Dollars: $2,212,415.00 DBE %: 6.24% District: 1 VARIOUS 6.24% $2,212,415.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 50 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DISTRICT SEVEN LAP PROJECTS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: ZLAP-D7 Amount: $11,557,070.00 DBE Dollars: $461,482.00 DBE %: 3.99% District: 7 VARIOUS 3.99% $461,482.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DISTRICT THREE LAP PROJECTS XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: ZLAP-D3 Amount: $31,976,005.00 DBE Dollars: $2,025,987.00 DBE %: 6.34% District: 3 VARIOUS 6.34% $2,025,987.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DIXIE PAVING & GRADING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3286 Amount: $148,921.52 DBE Dollars: $12,755.00 DBE %: 8.56% District: 3 GAINES AND SONS STRIPING INC 6.61% $9,850.00 GREENWAYS OF AMERICA INC DBA MARTY ARD LANDSCAPING 1.95% $2,905.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : DUVAL ASPHALT PRODUCTS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2M32 Amount: $736,459.00 DBE Dollars: $50,688.55 DBE %: 6.88% District: 2 CAL-TECH TESTING INC 1.90% $21,600.00 CAL-TECH TESTING INC 1.90% $6,363.55 SAFETY CONTRACTORS INC 1.54% $22,345.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 51 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SAFETY CONTRACTORS INC 1.54% $380.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N04 Amount: $1,152,350.00 DBE Dollars: $64,196.00 DBE %: 5.57% District: 2 CAL-TECH TESTING INC 2.79% $32,200.00 SAFETY CONTRACTORS INC .79% $9,100.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.99% $22,896.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N61 Amount: $633,940.00 DBE Dollars: $18,283.26 DBE %: 2.88% District: 2 CAL-TECH TESTING INC .87% $22,000.00 CAL-TECH TESTING INC .87% -$10,993.75 SAFETY CONTRACTORS INC .57% $13,575.00 SAFETY CONTRACTORS INC .57% -$6,297.99 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For DUVAL ASPHALT PRODUCTS, INC. Amount: $2,522,749.00 DBE Dollars: $133,167.81 DBE % : 5.28% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : EHC INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H61 Amount: $170,105.37 DBE Dollars: $12,031.60 DBE %: 7.07% District: 1 TATE TRANSPORT CORPORATION 2.84% $4,838.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 4.23% $7,193.60 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 52 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I10 Amount: $294,300.00 DBE Dollars: $69,059.38 DBE %: 23.47% District: 1 EM PAVING CORP 12.12% $35,665.38 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 11.35% $33,394.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For EHC INC. Amount: $464,405.37 DBE Dollars: $81,090.98 DBE % : 17.46% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : EVANS CONTRACTING SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I61-R0 Amount: $51,300.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2M36 Amount: $53,214.18 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N62 Amount: $63,814.35 DBE Dollars: $2,262.00 DBE %: 3.54% District: 2 JENKINS PAINTING INC 3.54% $2,262.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For EVANS CONTRACTING SERVICES, INC. Amount: $168,328.53 DBE Dollars: $2,262.00 DBE % : 1.34% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 53 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : F & W CONSTRUCTION COMPANY, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H88 Amount: $1,696,864.79 DBE Dollars: $89,540.00 DBE %: 5.28% District: 3 PORTER CONSTRUCTION CO INC 5.28% $89,540.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : F.W.A.K., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I62-R0 Amount: $94,200.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FERREIRA CONSTRUCTION CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H56 Amount: $1,046,892.00 DBE Dollars: $169,801.17 DBE %: 16.22% District: 1 KEN SANDLIN WELDING CONTRACTORS INC .63% $12,260.00 KEN SANDLIN WELDING CONTRACTORS INC .63% $1,000.17 OM ENGINEERING SERVICES INC 13.33% $139,500.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.63% $17,041.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 54 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FLORIDA BLACKTOP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6228 Amount: $246,715.03 DBE Dollars: $62,371.20 DBE %: 25.28% District: 6 BARREIRO CONCRETE CORP 12.63% $31,171.20 SIGNAL SERVICE INDUSTRIES INC 12.65% $31,200.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FLORIDA HIGHWAY PRODUCTS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H34 Amount: $159,959.85 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FLORIDA LANDSCAPE CONTRACTORS, XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H65 Amount: $41,082.92 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FLORIDA SAFETY CONTRACTORS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H60 Amount: $234,694.68 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 55 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1380 Amount: $472,867.43 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3330 Amount: $492,144.04 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For FLORIDA SAFETY CONTRACTORS, INC. Amount: $1,199,706.15 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : FOUNDATION SERVICES OF CENTRAL FLORIDA I XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H49 Amount: $311,125.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1385 Amount: $195,870.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 56 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3217 Amount: $345,610.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For FOUNDATION SERVICES OF CENTRAL FLORIDA I Amount: $852,605.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GAC CONTRACTORS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I78 Amount: $62,279.15 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3267 Amount: $1,053,842.15 DBE Dollars: $40,260.00 DBE %: 3.82% District: 3 J E HILL CONTRACTOR INC 3.82% $40,260.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3339 Amount: $98,413.63 DBE Dollars: $3,833.50 DBE %: 3.90% District: 3 PORTER CONSTRUCTION CO INC 3.90% $3,833.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GAC CONTRACTORS, INC. Amount: $1,214,534.93 DBE Dollars: $44,093.50 DBE % : 3.63% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 57 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GATOR GRADING & PAVING LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I50-R0 Amount: $100,400.40 DBE Dollars: $24,351.00 DBE %: 24.25% District: 1 ROAD RUNNER HIGHWAY SIGNS INC 24.25% $24,351.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GEMSTONE, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4233 Amount: $1,838,720.85 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GENERAL ASPHALT CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4194 Amount: $1,787,583.00 DBE Dollars: $322,000.00 DBE %: 18.01% District: 4 QUALITY CONSTRUCTION PERFORMANCE INC 13.99% $250,000.00 TRANSMARK INC 4.03% $72,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4223 Amount: $892,385.85 DBE Dollars: $267,234.00 DBE %: 29.95% District: 4 SOUTHEAST UNDERGROUND UTILITIES CORP 27.32% $243,789.00 TRANSMARK INC 2.63% $23,445.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4227 Amount: $6,734,979.16 DBE Dollars: $107,000.00 DBE %: 1.59% District: 4 HIGH TECH STRIPING INC 1.59% $107,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 58 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4236 Amount: $3,020,172.15 DBE Dollars: $792,000.00 DBE %: 26.22% District: 4 CONSTRUCT GROUP CORP 4.30% $130,000.00 SOUTHEAST UNDERGROUND UTILITIES CORP 20.16% $609,000.00 TRANSMARK INC 1.75% $53,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4238 Amount: $1,677,671.01 DBE Dollars: $484,799.48 DBE %: 28.90% District: 4 A1A SOD SAND AND SOIL INC .15% $2,469.75 HIGH TECH STRIPING INC 2.15% $36,103.00 QUALITY CONSTRUCTION PERFORMANCE INC 18.56% $311,369.53 SOUTHEAST UNDERGROUND UTILITIES CORP 3.20% $189,374.00 SOUTHEAST UNDERGROUND UTILITIES CORP 3.20% -$82,170.00 TRANSMARK INC .82% $30,000.00 TRANSMARK INC .82% -$2,346.80 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6197 Amount: $772,035.23 DBE Dollars: $226,726.09 DBE %: 29.37% District: 6 HIGH TECH STRIPING INC 4.30% $75,000.00 HIGH TECH STRIPING INC 4.30% -$8,587.32 QUALITY CONSTRUCTION PERFORMANCE INC 10.38% $175,000.00 QUALITY CONSTRUCTION PERFORMANCE INC 10.38% -$14,686.59 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6204 Amount: $413,894.66 DBE Dollars: $67,796.00 DBE %: 16.38% District: 6 CONSTRUCT GROUP CORP 6.46% $26,751.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 59 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SOUTHEAST UNDERGROUND UTILITIES CORP 9.92% $41,045.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6205 Amount: $948,939.03 DBE Dollars: $355,223.00 DBE %: 37.43% District: 6 HIGH TECH STRIPING INC 4.39% $41,637.00 QUALITY CONSTRUCTION PERFORMANCE INC 11.44% $198,449.00 QUALITY CONSTRUCTION PERFORMANCE INC 11.44% $18,750.00 SOUTHEAST UNDERGROUND UTILITIES CORP 10.16% $96,387.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For GENERAL ASPHALT CO., INC. Amount: $16,247,660.09 DBE Dollars: $2,622,778.57 DBE % : 16.14% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GERELCO TRAFFIC CONTROLS, IINC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1368 Amount: $275,000.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GIBBS & REGISTER, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2310 Amount: $385,649.65 DBE Dollars: $141,080.47 DBE %: 36.58% District: 2 JOHN C HIPP CONSTRUCTION EQUIPMENT CO INC 18.25% $104,598.00 JOHN C HIPP CONSTRUCTION EQUIPMENT CO INC 18.25% $36,182.47 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .08% $300.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 60 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GRADING & BUSH HOG SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I50-R0 Amount: $134,389.56 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : GRAHAM SERVICES LTD. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H87 Amount: $73,000.00 DBE Dollars: $1,200.00 DBE %: 1.64% District: 1 SENTRY BARRICADES 1.64% $1,200.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : H & J ASPHALT, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6176 Amount: $2,437,194.24 DBE Dollars: $1,106,097.51 DBE %: 45.38% District: 6 CONSTRUCT GROUP CORP 26.77% $652,429.77 SOUTHEAST UNDERGROUND UTILITIES CORP 18.61% $453,667.74 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : H & J CONTRACTING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K68 Amount: $960,942.22 DBE Dollars: $197,403.29 DBE %: 20.54% District: 4 R J BEHAR & COMPANY INC 19.90% $191,203.29 TIERRA SOUTH FLORIDA INC .65% $6,200.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 61 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : H.B. HIRT, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3G45-R0 Amount: $109,819.76 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HAL JONES CONTRACTOR, INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2K32 Amount: $816,572.50 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2330 Amount: $2,104,307.40 DBE Dollars: $27,338.27 DBE %: 1.30% District: 2 AMBER CONSTRUCTION COMPANY 1.09% $22,838.27 GEC TRUCKING .21% $4,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HAL JONES CONTRACTOR, INC Amount: $2,920,879.90 DBE Dollars: $27,338.27 DBE % : .94% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HALIFAX PAVING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5315 Amount: $4,014,000.00 DBE Dollars: $50,000.00 DBE %: 1.25% District: 5 D S TRANSPORTATION INC 1.25% $50,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 62 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5324 Amount: $1,424,851.11 DBE Dollars: $51,929.10 DBE %: 3.64% District: 5 EAST COAST FENCE & GUARDRAIL OF BREVARD INC .66% $9,469.10 J E HILL CONTRACTOR INC 2.98% $42,460.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5327 Amount: $1,523,592.00 DBE Dollars: $80,000.00 DBE %: 5.25% District: 5 D S TRANSPORTATION INC 5.25% $80,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5352 Amount: $917,638.31 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HALIFAX PAVING, INC. Amount: $7,880,081.42 DBE Dollars: $181,929.10 DBE % : 2.31% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HARDRIVES OF DELRAY, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4246 Amount: $798,755.82 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 63 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HASKELL COMPANY (THE) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2M64 Amount: $306,462.83 DBE Dollars: $45,825.71 DBE %: 14.95% District: 2 SMITH & SONS SOD CO INC 14.95% $45,825.71 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HI-LITE MARKINGS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1384 Amount: $134,000.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HIGH TECH STRIPING,INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F31 Amount: $315,000.00 DBE Dollars: $315,000.00 DBE %: 100.00% District: 6 HIGH TECH STRIPING INC 100.00% $315,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HIGHWAY SAFETY DEVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1G60 Amount: $9,678,354.00 DBE Dollars: $1,294,184.93 DBE %: 13.37% District: 1 N & H CONSTRUCTION INC .24% $22,825.00 PRECISION CONTRACTING SERVICES INC 12.70% $1,229,063.75 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .44% $42,296.18 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 64 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7205 Amount: $1,199,877.67 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HIGHWAY SAFETY DEVICES, INC. Amount: $10,878,231.67 DBE Dollars: $1,294,184.93 DBE % : 11.90% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HIGHWAY STRIPING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F21 Amount: $199,500.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F30 Amount: $262,500.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HIGHWAY STRIPING, INC. Amount: $462,000.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HIGHWAY TECHNOLOGIES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I74-R0 Amount: $31,913.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 65 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3321 Amount: $116,065.38 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HIGHWAY TECHNOLOGIES, INC. Amount: $147,978.38 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HORIZON CONTRACTORS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6189 Amount: $1,423,322.41 DBE Dollars: $59,558.61 DBE %: 4.18% District: 6 HIGH TECH STRIPING INC 4.18% $59,558.61 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6201 Amount: $369,335.75 DBE Dollars: $27,035.59 DBE %: 7.32% District: 6 HIGH TECH STRIPING INC 7.32% $27,035.59 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HORIZON CONTRACTORS, INC. Amount: $1,792,658.16 DBE Dollars: $86,594.20 DBE % : 4.83% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HORSEPOWER ELECTRIC, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F27 Amount: $174,562.50 DBE Dollars: $.00 DBE %: .00% District: 6 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 66 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HUBBARD CONSTRUCTION COMPANY XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2M27 Amount: $1,028,899.00 DBE Dollars: $146,626.00 DBE %: 14.25% District: 2 CAL-TECH TESTING INC .50% $5,170.00 SAFETY CONTRACTORS INC 13.75% $141,456.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N58 Amount: $462,273.13 DBE Dollars: $39,968.98 DBE %: 8.65% District: 2 GEC TRUCKING .13% $590.00 LANDMARK ENGINEERING INC 8.52% $39,378.98 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N60 Amount: $334,413.51 DBE Dollars: $52,220.00 DBE %: 15.62% District: 2 CSI GEO INC .30% $990.00 GEC TRUCKING .94% $9,222.00 GEC TRUCKING .94% -$2,942.00 HRUSTIC BROTHERS INC .00% $9,222.00 HRUSTIC BROTHERS INC .00% -$9,222.00 LANDMARK ENGINEERING INC 8.97% $30,000.00 PETERS AND YAFFEE INC 1.50% $5,000.00 SAFETY CONTRACTORS INC 2.98% $9,950.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2326 Amount: $4,558,989.05 DBE Dollars: $576,000.00 DBE %: 12.63% District: 2 CAL-TECH TESTING INC .54% $24,500.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 67 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount CSI GEO INC .55% $24,900.00 GEC TRUCKING .00% $150,000.00 GEC TRUCKING .00% -$150,000.00 JDH HAULING INC 7.76% $353,600.00 SAFETY CONTRACTORS INC .88% $40,000.00 SMITH & SONS SOD CO INC 2.92% $133,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5253 Amount: $29,900,555.92 DBE Dollars: $69,275.18 DBE %: .23% District: 5 A D S WELDING INC .20% $58,747.00 KB CONTRACTING CORPORATION .01% $130,000.00 KB CONTRACTING CORPORATION .01% -$124,406.82 PRECISION CONTRACTING SERVICES INC .02% $4,935.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5297 Amount: $876,269.55 DBE Dollars: $60,000.00 DBE %: 6.85% District: 5 C & N TRUCKING INC 6.85% $60,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5308 Amount: $709,467.91 DBE Dollars: $32,460.00 DBE %: 4.58% District: 5 C & N TRUCKING INC 4.58% $32,460.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5318 Amount: $1,492,640.56 DBE Dollars: $58,580.00 DBE %: 3.92% District: 5 C & N TRUCKING INC 3.92% $58,580.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 68 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5341 Amount: $1,128,920.00 DBE Dollars: $50,722.00 DBE %: 4.49% District: 5 C & N TRUCKING INC 3.80% $42,862.00 STERLING SILVER SCAPE & SOD INC .70% $7,860.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5368 Amount: $1,811,841.05 DBE Dollars: $30,791.00 DBE %: 1.70% District: 5 ASSOCIATED COST ENGINEERS INC (DELAWARE) 1.60% $29,037.00 DIAMOND C TRANSPORT INC .10% $1,754.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7213 Amount: $109,318,948.46 DBE Dollars: $8,965,507.35 DBE %: 8.20% District: 7 FINISHING SYSTEMS OF FLORIDA INC .71% $773,362.18 H E R ENVIRONMENTAL SERVICES INC .08% $82,389.38 KEN SANDLIN WELDING CONTRACTORS INC 2.52% $2,759,592.59 MEGA FORCE CONSTRUCTION INC 2.45% $4,757,658.20 MEGA FORCE CONSTRUCTION INC 2.45% $592,505.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For HUBBARD CONSTRUCTION COMPANY Amount: $151,623,218.14 DBE Dollars: $10,082,150.51 DBE % : 6.65% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 69 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : HURRICANE IRRIGATION SYSTEMS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4257 Amount: $111,409.00 DBE Dollars: $4,280.11 DBE %: 3.84% District: 4 MOT PLANS.COM LLC 3.84% $4,280.11 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : INFRASOURCE CONSTRUCTION SERVICES, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K85 Amount: $4,318,012.90 DBE Dollars: $99,968.75 DBE %: 2.32% District: 4 PRECISION CONTRACTING SERVICES INC 2.32% $99,968.75 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : INFRASTRUCTURE CORPORATION OF AMERICA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7G25-R0 Amount: $1,067,668.27 DBE Dollars: $82,000.00 DBE %: 7.68% District: 7 A+ ROAD SAFETY EQUIPMENT CO INC 1.87% $20,000.00 BOLT UNDERWATER SERVICES 5.81% $62,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : INGRAM SIGNALIZATION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3340 Amount: $115,118.11 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 70 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : INSITUFORM TECHNOLOGIES INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M94 Amount: $812,220.55 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : J. SLAGTER & SON CONSTRUCTION DBA SLAGTE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N40 Amount: $466,240.21 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6E89 Amount: $2,254,175.38 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4237 Amount: $2,363,811.55 DBE Dollars: $74,226.52 DBE %: 3.14% District: 4 ROAD RUNNER STRIPING TECHNOLOGIES 3.14% $74,226.52 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For J. SLAGTER & SON CONSTRUCTION DBA SLAGTE Amount: $5,084,227.14 DBE Dollars: $74,226.52 DBE % : 1.46% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 71 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : J.W. CHEATHAM, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4245 Amount: $1,535,025.00 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4256 Amount: $3,197,956.81 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For J.W. CHEATHAM, LLC Amount: $4,732,981.81 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JAR CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N70 Amount: $22,225.00 DBE Dollars: $2,059.12 DBE %: 9.26% District: 5 CENTRAL HAULING & EXCAVATING INC 9.26% $2,059.12 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JOHNS, A. J., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N64 Amount: $3,280,000.00 DBE Dollars: $371,423.12 DBE %: 11.32% District: 2 CAL-TECH TESTING INC 1.98% $80,000.00 CAL-TECH TESTING INC 1.98% $50,000.00 HRUSTIC BROTHERS INC .32% $10,600.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 72 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount LIBERTY TRUCKING INC 2.95% $230,515.20 LIBERTY TRUCKING INC 2.95% -$37,176.08 SAFETY CONTRACTORS INC .64% $20,979.00 SMITH & SONS SOD CO INC .50% $16,505.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JOHNSON BROS., LLC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H24 Amount: $25,281,434.00 DBE Dollars: $2,543,711.00 DBE %: 10.06% District: 1 ALLIED ENGINEERING & TESTING INC .43% $109,467.00 C FULLERTON SOD & LANDSCAPING CO INC 2.36% $597,045.00 D T READ STEEL CO INC 2.19% $552,477.00 GIRALT ENTERPRISES INC .54% $136,500.00 J MORI PAINTING INC .54% $136,914.00 KATE S ENVIRONMENTAL FENCING INC .02% $5,939.00 KEN SANDLIN WELDING CONTRACTORS INC .88% $296,832.00 KEN SANDLIN WELDING CONTRACTORS INC .88% $147,082.00 M J S TRUCKING LLC .22% $225,000.00 M J S TRUCKING LLC .22% -$111,687.00 NODARSE AND ASSOCIATES INC 1.51% $383,000.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .12% $292,939.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .12% -$232,797.00 VALERIE TUTOR & ASSOCIATES .02% $5,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 73 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K88 Amount: $11,528,622.00 DBE Dollars: $876,225.00 DBE %: 7.60% District: 4 ACAI ASSOCIATES INC .21% $23,790.00 CYRIACKS ENVIRONMENTAL CONSULTING SERVICES INC .95% $110,000.00 GCME INC 3.11% $358,750.00 MEDIA RELATIONS GROUP LLC .22% $25,000.00 NATURES KEEPER INC .89% $103,000.00 TATE TRANSPORT CORPORATION 2.22% $255,685.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N51 Amount: $9,480,240.00 DBE Dollars: $200,294.00 DBE %: 2.11% District: 5 AERIAL INNOVATIONS INC .02% $2,000.00 D T READ STEEL CO INC 1.31% $124,000.00 FINISHING SYSTEMS OF FLORIDA INC .16% $15,000.00 SOUTHEAST UNDERGROUND UTILITIES CORP .43% $41,000.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .19% $18,294.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For JOHNSON BROS., LLC. Amount: $46,290,296.00 DBE Dollars: $3,620,230.00 DBE % : 7.82% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 74 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : JONES CONSTRUCTION OF NORTHWEST FLORIDA, XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3G85-R2 Amount: $100,000.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KIEWIT INFRASTRUCTURE SOUTH CO. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2L65 Amount: $3,145,083.51 DBE Dollars: $.00 DBE %: .00% District: 2 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F79 Amount: $8,071,916.00 DBE Dollars: $618,876.58 DBE %: 7.67% District: 6 BARREIRO CONCRETE CORP .76% $61,508.00 CONSTRUCT GROUP CORP 1.70% $137,400.00 SOUTHEAST UNDERGROUND UTILITIES CORP 2.38% $191,890.00 Steel Works Rebar Fabricator LLC 2.25% $182,000.00 TRANSMARK INC .57% $46,078.58 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E8J81 Amount: $24,645,000.00 DBE Dollars: $3,419,211.22 DBE %: 13.87% District: 8 CONSTRUCT GROUP CORP 1.02% $250,199.50 REMINGTON STEEL & SIGNS CORPORATION 9.92% $2,445,135.00 ROAD RUNNER STRIPING TECHNOLOGIES .70% $172,232.35 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 75 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SOLUTION CONSTRUCTION INC 2.24% $551,644.37 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For KIEWIT INFRASTRUCTURE SOUTH CO. Amount: $35,861,999.51 DBE Dollars: $4,038,087.80 DBE % : 11.26% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : KRAUSE GROVE SERVICE, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I46-R0 Amount: $24,250.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : L-J CONSTRUCTION CO. OF CENTRAL FLORIDA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1351 Amount: $27,557.65 DBE Dollars: $1,298.00 DBE %: 4.71% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 4.71% $1,298.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1352 Amount: $54,232.93 DBE Dollars: $1,438.00 DBE %: 2.65% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 2.65% $1,438.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1354 Amount: $24,426.16 DBE Dollars: $778.00 DBE %: 3.19% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 3.19% $778.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1356 Amount: $72,809.23 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 76 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1362 Amount: $57,664.05 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1365 Amount: $261,117.95 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1396 Amount: $82,208.00 DBE Dollars: $1,510.00 DBE %: 1.84% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.84% $1,510.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1419 Amount: $181,762.50 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3318 Amount: $23,293.52 DBE Dollars: $2,344.96 DBE %: 10.07% District: 3 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 10.07% $2,344.96 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For L-J CONSTRUCTION CO. OF CENTRAL FLORIDA Amount: $785,071.99 DBE Dollars: $7,368.96 DBE % : .94% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 77 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : L. COBB CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1374 Amount: $115,218.63 DBE Dollars: $4,960.00 DBE %: 4.30% District: 1 C FULLERTON SOD & LANDSCAPING CO INC 4.30% $4,960.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : LANE CONSTRUCTION CORPORATION (THE) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7F88 Amount: $662,720.56 DBE Dollars: $99,700.00 DBE %: 15.04% District: 7 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 15.04% $99,700.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7F90 Amount: $487,817.86 DBE Dollars: $21,338.22 DBE %: 4.37% District: 7 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 4.37% $21,338.22 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E8J29 Amount: $77,749,455.21 DBE Dollars: $8,262,531.23 DBE %: 10.63% District: 8 AERIAL INNOVATIONS INC .01% $7,560.00 CRUZ TRUCKING INC .03% $25,000.00 E A C TRANSPORT CORP .97% $750,600.00 FINISHING SYSTEMS OF FLORIDA INC .19% $144,560.56 JVD CONSTRUCTION INC 2.96% $3,403,326.17 JVD CONSTRUCTION INC 2.96% $1,206,484.50 LIBERTY HAULING INC .02% $20,000.00 LIBERTY HAULING INC .02% $5,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 78 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount PHILLIP OSMAN TRUCKING INC 1.61% $1,000,000.00 PHILLIP OSMAN TRUCKING INC 1.61% $1,500,000.00 TRUJILLO TRUCKING INC .26% $200,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1342 Amount: $47,011.70 DBE Dollars: $3,075.00 DBE %: 6.54% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 3.27% $2,150.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 3.27% $925.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1375 Amount: $226,086.70 DBE Dollars: $13,718.00 DBE %: 6.07% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 2.77% $18,312.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 2.77% -$5,794.00 TWELVE TRIBES INC .53% $1,200.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1394 Amount: $1,559,226.86 DBE Dollars: $113,988.00 DBE %: 7.31% District: 1 E Z SWEEP CORPORATION 1.21% $18,900.00 LIBERTY HAULING INC 6.10% $95,088.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5180 Amount: $64,720,840.06 DBE Dollars: $2,796,943.48 DBE %: 4.32% District: 5 AERIAL INNOVATIONS INC .01% $6,639.40 AERIAL INNOVATIONS INC .01% $931.72 CRUZ TRUCKING INC .43% $275,460.84 FINISHING SYSTEMS OF FLORIDA INC .37% $237,071.50 JVD CONSTRUCTION INC .00% $495.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 79 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount MSE SYSTEMS INC .83% $739,648.02 MSE SYSTEMS INC .83% $335,942.00 PHILLIP OSMAN TRUCKING INC .93% $950,755.00 PHILLIP OSMAN TRUCKING INC .93% $250,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For LANE CONSTRUCTION CORPORATION (THE) Amount: $145,453,158.95 DBE Dollars: $11,311,293.93 DBE % : 7.78% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : LAWN TECHS OF PANAMA CITY INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I70 Amount: $57,335.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : LUCAS MARINE CONSTRUCTION, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K89 Amount: $1,522,563.15 DBE Dollars: $15,545.67 DBE %: 1.02% District: 4 KEITH AND ASSOCIATES INC 1.02% $15,545.67 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : M & J CONSTRUCTION COMPANY OF PINELLAS C XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H98 Amount: $413,022.64 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 80 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7F83 Amount: $1,098,741.82 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7F97 Amount: $3,407,957.20 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5359 Amount: $1,342,319.19 DBE Dollars: $25,197.00 DBE %: 1.88% District: 5 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.88% $25,197.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For M & J CONSTRUCTION COMPANY OF PINELLAS C Amount: $6,262,040.85 DBE Dollars: $25,197.00 DBE % : .40% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : M OF TALLAHASSEE, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3314 Amount: $2,522,874.24 DBE Dollars: $11,212.29 DBE %: .44% District: 3 GAINES AND SONS STRIPING INC .15% $5,000.00 GAINES AND SONS STRIPING INC .15% $3,000.00 GAINES AND SONS STRIPING INC .15% $3,212.29 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 81 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3353 Amount: $78,800.00 DBE Dollars: $7,900.00 DBE %: 10.03% District: 3 GAINES AND SONS STRIPING INC 10.03% $7,900.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For M OF TALLAHASSEE, INC. Amount: $2,601,674.24 DBE Dollars: $19,112.29 DBE % : .73% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MAGGOLC, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F11 Amount: $121,817.98 DBE Dollars: $9,400.00 DBE %: 7.72% District: 6 SIGNAL SERVICE INDUSTRIES INC 7.72% $9,400.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MASCI GENERAL CONTRACTORS, INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5P26 Amount: $49,749.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MCLEOD LAND SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1347 Amount: $18,780.96 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 82 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1358 Amount: $187,530.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MCLEOD LAND SERVICES, INC. Amount: $206,310.96 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MCSHEA CONTRACTING, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I42-R0 Amount: $628,500.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1343 Amount: $33,225.51 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MCSHEA CONTRACTING, LLC Amount: $661,725.51 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MID STATE PAVING CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1334 Amount: $4,050,069.25 DBE Dollars: $568,626.23 DBE %: 14.04% District: 1 DENSON CONSTRUCTION INC 5.59% $226,382.50 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 7.43% $300,931.20 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 83 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount WORLD HAULERS INC 1.02% $41,312.53 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MIDDLESEX CORPORATION (THE) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1353 Amount: $2,539,000.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5344 Amount: $3,702,098.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MIDDLESEX CORPORATION (THE) Amount: $6,241,098.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MIDWESTERN CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M64 Amount: $71,221.25 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M95 Amount: $127,149.85 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6212 Amount: $81,499.70 DBE Dollars: $.00 DBE %: .00% District: 6 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 84 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6213 Amount: $61,878.22 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MIDWESTERN CONSTRUCTION, INC. Amount: $341,749.02 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MILLER ELECTRIC COMPANY XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N06 Amount: $1,544,353.00 DBE Dollars: $4,200.00 DBE %: .27% District: 2 CAL-TECH TESTING INC .27% $4,200.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MISENER MARINE CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F45 Amount: $1,212,209.35 DBE Dollars: $17,688.50 DBE %: 1.46% District: 6 J MORI PAINTING INC 1.46% $17,688.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F46 Amount: $1,090,258.40 DBE Dollars: $25,000.00 DBE %: 2.29% District: 6 J MORI PAINTING INC 2.29% $25,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F50 Amount: $799,787.52 DBE Dollars: $31,909.50 DBE %: 3.99% District: 6 J MORI PAINTING INC .71% $5,709.50 TRANSMARK INC 3.28% $26,200.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 85 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2283 Amount: $11,638,962.47 DBE Dollars: $494,939.64 DBE %: 4.25% District: 2 GEC TRUCKING .09% $10,500.00 GIRALT ENTERPRISES INC .12% $14,355.00 KEN SANDLIN WELDING CONTRACTORS INC 1.68% $195,005.44 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.18% $274,399.20 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.18% $680.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6218 Amount: $227,891.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For MISENER MARINE CONSTRUCTION, INC. Amount: $14,969,108.74 DBE Dollars: $569,537.64 DBE % : 3.80% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MUNILLA CONSTRUCTION MANAGEMENT LLC D/B/ XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E8J80 Amount: $32,869,060.00 DBE Dollars: $5,576,684.47 DBE %: 16.97% District: 8 BARREIRO CONCRETE CORP .99% $326,998.32 DILEMA CORPORATION .00% $1,020.00 GUARANTEED FENCE CORP 1.09% $358,737.15 MEDIA RELATIONS GROUP LLC .15% $50,000.00 SORREL ENTERPRISES INC D/B/A SORREL DEVELOPMENT .43% $247,681.00 SORREL ENTERPRISES INC D/B/A SORREL DEVELOPMENT .43% $33,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 86 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SOUTHEAST UNDERGROUND UTILITIES CORP 6.62% $4,150,000.00 SOUTHEAST UNDERGROUND UTILITIES CORP 6.62% $199,248.00 TIERRA SOUTH FLORIDA INC .64% $210,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : MURPHY CONSTRUCTION CO. (THE) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4L21 Amount: $371,918.00 DBE Dollars: $30,000.00 DBE %: 8.07% District: 4 ENGENUITY GROUP INC 8.07% $30,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : OGLESBY CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5J70 Amount: $62,524.25 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M18 Amount: $123,405.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1335 Amount: $122,225.10 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 87 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1404 Amount: $210,176.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For OGLESBY CONSTRUCTION, INC. Amount: $518,330.35 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ONAS CORPORATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I43 Amount: $144,766.64 DBE Dollars: $144,766.64 DBE %: 100.00% District: 3 ONAS CORPORATION 100.00% $144,766.64 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : OTAK GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2329 Amount: $737,536.38 DBE Dollars: $729,757.51 DBE %: 98.95% District: 2 AMBER CONSTRUCTION COMPANY 1.62% $11,977.51 B V GROUP & ASSOCIATES INC 3.09% $22,780.00 OTAK GROUP INC 94.23% $695,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 88 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : P & S PAVING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M91 Amount: $434,300.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N56 Amount: $10,526,220.30 DBE Dollars: $2,160,000.00 DBE %: 20.52% District: 5 SAFETY CONTRACTORS INC 20.52% $2,160,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N57 Amount: $560,673.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5321 Amount: $308,486.95 DBE Dollars: $5,570.00 DBE %: 1.81% District: 5 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.81% $5,570.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5336 Amount: $2,079,308.25 DBE Dollars: $.00 DBE %: .00% District: 5 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 89 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5350 Amount: $2,223,353.55 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For P & S PAVING, INC. Amount: $16,132,342.05 DBE Dollars: $2,165,570.00 DBE % : 13.42% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PANHANDLE GRADING & PAVING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3301 Amount: $5,687,870.23 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3310 Amount: $9,059,077.28 DBE Dollars: $176,005.76 DBE %: 1.94% District: 3 SUNCOAST SOD FARMS INC 1.16% $104,853.76 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .79% $71,152.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3311 Amount: $5,564,795.64 DBE Dollars: $50,576.64 DBE %: .91% District: 3 SUNCOAST SOD FARMS INC .91% $50,576.64 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PANHANDLE GRADING & PAVING, INC. Amount: $20,311,743.15 DBE Dollars: $226,582.40 DBE % : 1.12% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 90 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PAVEX CORPORATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4222 Amount: $9,578,996.13 DBE Dollars: $266,070.85 DBE %: 2.78% District: 4 CONSTRUCT GROUP CORP .02% $1,456.00 REMINGTON STEEL & SIGNS CORPORATION .65% $62,724.85 SOUTHERN TRANSPORT AND EQUIPMENT .84% $80,000.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.27% $121,890.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PCL/ARCHER WESTERN, A JOINT VEN XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7209 Amount: $339,313,750.49 DBE Dollars: $31,298,011.00 DBE %: 9.22% District: 7 A D S WELDING INC .43% $1,464,171.00 FINISHING SYSTEMS OF FLORIDA INC .41% $1,393,000.00 GULF COAST REBAR INC 2.52% $17,004,048.00 GULF COAST REBAR INC 2.52% $79,331.00 H E R ENVIRONMENTAL SERVICES INC .08% $261,088.00 H S E CONTRACTORS INC .02% $60,000.00 LEONS FENCE & GUARDRAIL LLC .07% $223,390.00 MEGA FORCE CONSTRUCTION INC 1.88% $6,378,575.00 POWERLOGICS INC .05% $180,000.00 STERLING SILVER SCAPE & SOD INC .54% $1,828,384.00 TERRELL INDUSTRIES INC .55% $1,850,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 91 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount TRIDENT NATIONAL CORPORATION .08% $276,024.00 WORLD HAULERS INC .09% $300,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PEAVY & SON CONSTRUCTION CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3272 Amount: $1,405,694.39 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3278 Amount: $4,078,747.70 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PEAVY & SON CONSTRUCTION CO., INC. Amount: $5,484,442.09 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PENSACOLA LANDSCAPING AND LAWN XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3355 Amount: $258,600.00 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 92 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PEPPER CONTRACTING SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7F82 Amount: $795,945.15 DBE Dollars: $40,427.51 DBE %: 5.08% District: 7 M P G & COMPANY INC 5.08% $40,427.51 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7206 Amount: $6,311,229.21 DBE Dollars: $41,559.00 DBE %: .66% District: 7 J E HILL CONTRACTOR INC .66% $41,559.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7214 Amount: $7,223,500.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7243 Amount: $552,997.00 DBE Dollars: $1,189.00 DBE %: .22% District: 7 RAULERSON & SON INC .22% $1,189.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PEPPER CONTRACTING SERVICES, INC. Amount: $14,883,671.36 DBE Dollars: $83,175.51 DBE % : .56% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PNEUMATIC CONCRETE CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H58 Amount: $110,515.39 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 93 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H70 Amount: $25,930.64 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PNEUMATIC CONCRETE CO., INC. Amount: $136,446.03 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : POSEN CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4187 Amount: $43,302,145.87 DBE Dollars: $4,163,576.38 DBE %: 9.62% District: 4 JARCO STEEL INC .50% $216,391.69 JS ENVIRONMENTAL CORP .28% $119,321.69 MICAR TRUCKING INC 8.63% $3,737,863.00 T A ENTERPRISES OF PALM BEACH INC .21% $90,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5229 Amount: $24,424,931.00 DBE Dollars: $750,969.90 DBE %: 3.07% District: 5 ABC LANDCLEARING & DEVELOPMENT INC 1.34% $326,523.90 PILLADO TRUCKING INC 1.41% $344,865.00 T A ENTERPRISES OF PALM BEACH INC .33% $79,581.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For POSEN CONSTRUCTION, INC. Amount: $67,727,076.87 DBE Dollars: $4,914,546.28 DBE % : 7.26% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 94 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PRINCE CONTRACTING, LLC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N42 Amount: $19,675,827.27 DBE Dollars: $1,298,113.75 DBE %: 6.60% District: 5 ABC LANDCLEARING & DEVELOPMENT INC .22% $43,772.50 AERIAL INNOVATIONS INC .03% $6,363.40 GMB ENGINEERS & PLANNERS INC .22% $44,000.00 H&M ELECTRICAL & UNDERGROUND UTILITIES 4.16% $819,230.00 J E HILL CONTRACTOR INC .11% $22,000.00 NODARSE AND ASSOCIATES INC .18% $35,000.00 P D TRUCKING INC .47% $92,028.85 PAGE ONE CONSULTANTS INC .00% $711.00 SOLAN TRUCKING & EXCAVATING INC .64% $126,000.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .28% $957,631.17 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .28% -$848,623.17 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N44 Amount: $16,707,750.00 DBE Dollars: $2,136,969.50 DBE %: 12.79% District: 5 GLOBAL-5 INC .11% $18,740.00 H&M ELECTRICAL & UNDERGROUND UTILITIES 12.64% $2,111,604.50 J E HILL CONTRACTOR INC .04% $6,625.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1322 Amount: $14,520,379.50 DBE Dollars: $2,714,115.51 DBE %: 18.69% District: 1 AERIAL INNOVATIONS INC .01% $1,685.95 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 95 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount BOWSER HAULING INC .25% $200,587.25 BOWSER HAULING INC .25% -$126,936.00 E Z SWEEP CORPORATION .08% $12,000.00 LIBERTY HAULING INC 1.36% $197,196.25 ROAD RUNNER HIGHWAY SIGNS INC 5.58% $2,548,392.88 ROAD RUNNER HIGHWAY SIGNS INC 5.58% -$2,548,392.88 ROAD RUNNER HIGHWAY SIGNS INC 5.58% $2,429,582.06 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PRINCE CONTRACTING, LLC. Amount: $50,903,956.77 DBE Dollars: $6,149,198.76 DBE % : 12.08% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PROFESSIONAL HIGHWAY MAINTENANCE XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N20 Amount: $231,688.61 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F78 Amount: $895,270.50 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PROFESSIONAL HIGHWAY MAINTENANCE Amount: $1,126,959.11 DBE Dollars: $.00 DBE % : .00% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 96 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PURCELL, R.E. CONSTRUCTION CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7223 Amount: $12,558,176.73 DBE Dollars: $659,928.00 DBE %: 5.25% District: 7 TIERRA INC .60% $75,000.00 WORLD HAULERS INC 4.66% $584,928.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : PURIFOY CONSTRUCTION, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H50-R1 Amount: $300,000.00 DBE Dollars: $300,000.00 DBE %: 100.00% District: 3 PURIFOY CONSTRUCTION LLC 100.00% $300,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H54-R1 Amount: $200,000.00 DBE Dollars: $200,000.00 DBE %: 100.00% District: 3 PURIFOY CONSTRUCTION LLC 100.00% $200,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For PURIFOY CONSTRUCTION, LLC Amount: $500,000.00 DBE Dollars: $500,000.00 DBE % : 100.00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : R. J. P. ENTERPRISES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I58-R0 Amount: $212,470.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 97 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N01 Amount: $120,701.24 DBE Dollars: $10,000.00 DBE %: 8.28% District: 2 B V GROUP & ASSOCIATES INC 8.28% $10,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I80-R0 Amount: $500,000.00 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For R. J. P. ENTERPRISES, INC. Amount: $833,171.24 DBE Dollars: $10,000.00 DBE % : 1.20% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : RANGER CONSTRUCTION INDUSTRIES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H48 Amount: $367,650.00 DBE Dollars: $16,442.15 DBE %: 4.47% District: 1 C FULLERTON SOD & LANDSCAPING CO INC 1.59% $4,165.00 C FULLERTON SOD & LANDSCAPING CO INC 1.59% $7,501.67 JVD CONSTRUCTION INC .25% $935.00 SILES AND SONS INC .52% $3,573.90 SILES AND SONS INC .52% $266.58 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N19 Amount: $20,350,000.00 DBE Dollars: $1,390,147.76 DBE %: 6.83% District: 5 AMBIENT TECHNOLOGIES INC .07% $15,000.00 BASLEE ENGINEERING SOLUTIONS (BES) INC .06% $11,440.00 E Z SWEEP CORPORATION .22% $44,992.58 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 98 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount GLOBAL-5 INC .30% $54,360.00 GLOBAL-5 INC .30% $68,640.00 GRANDVIEW PIPE & SUPPLY CO INC 2.33% $473,301.57 J E HILL CONTRACTOR INC .67% $335,841.00 J E HILL CONTRACTOR INC .67% $71,241.00 J E HILL CONTRACTOR INC .67% $3,380.00 L & L WORLDWIDE INC .59% $119,762.00 LOTSPEICH & ASSOCIATES INC .15% $31,000.87 NATURES KEEPER INC .38% $142,688.74 NATURES KEEPER INC .38% $10,000.00 SISTERS TOWING & TRANSPORTATION INC .04% $8,500.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N33 Amount: $77,710.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1328 Amount: $8,638,430.68 DBE Dollars: $1,097,720.42 DBE %: 12.71% District: 1 C FULLERTON SOD & LANDSCAPING CO INC 3.44% $296,758.42 STAR HAULING INC 4.75% $409,992.00 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 4.53% $390,970.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4196 Amount: $14,891,000.00 DBE Dollars: $38,115.38 DBE %: .26% District: 4 ALLIED ENGINEERING & TESTING INC .09% $13,254.00 SISTERS TOWING & TRANSPORTATION INC .04% $6,247.50 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 99 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount SSB OF SARASOTA INC .03% $4,133.88 TATE TRANSPORT CORPORATION .10% $14,480.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4216 Amount: $2,345,425.74 DBE Dollars: $77,264.00 DBE %: 3.29% District: 4 SISTERS TOWING & TRANSPORTATION INC .03% $756.00 SSB OF SARASOTA INC .49% $11,483.00 TATE TRANSPORT CORPORATION 1.39% $10,000.00 TATE TRANSPORT CORPORATION 1.39% $55,025.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4218 Amount: $6,964,199.02 DBE Dollars: $122,468.56 DBE %: 1.76% District: 4 E Z SWEEP CORPORATION 1.44% $100,586.00 NATURES KEEPER INC .31% $21,882.56 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4224 Amount: $1,101,567.30 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4229 Amount: $874,301.17 DBE Dollars: $29,235.00 DBE %: 3.34% District: 4 SISTERS TOWING & TRANSPORTATION INC .24% $2,112.00 TATE TRANSPORT CORPORATION 3.10% $27,123.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4235 Amount: $998,409.83 DBE Dollars: $69,274.80 DBE %: 6.94% District: 4 J E HILL CONTRACTOR INC 6.94% $69,274.80 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 100 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4250 Amount: $2,043,339.17 DBE Dollars: $76,062.08 DBE %: 3.72% District: 4 SORREL ENTERPRISES INC D/B/A SORREL DEVELOPMENT .00% $155,008.00 SORREL ENTERPRISES INC D/B/A SORREL DEVELOPMENT .00% -$155,008.00 TRANSMARK INC 3.72% $76,062.08 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4253 Amount: $1,812,602.03 DBE Dollars: $117,255.00 DBE %: 6.47% District: 4 E Z SWEEP CORPORATION 1.12% $20,255.00 SOUTHERN TRANSPORT AND EQUIPMENT 4.25% $77,000.00 TATE TRANSPORT CORPORATION 1.10% $20,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4264 Amount: $4,446,359.65 DBE Dollars: $162,834.92 DBE %: 3.66% District: 4 FLORIDA POWERLINE INC .31% $14,000.00 TATE TRANSPORT CORPORATION 2.66% $118,317.72 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .69% $30,517.20 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4265 Amount: $2,364,593.81 DBE Dollars: $33,768.00 DBE %: 1.43% District: 4 E Z SWEEP CORPORATION 1.43% $33,768.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4267 Amount: $348,587.70 DBE Dollars: $23,437.83 DBE %: 6.72% District: 4 CONSTRUCT GROUP CORP 1.95% $6,813.43 HIGH TECH STRIPING INC 2.47% $8,602.00 LAWRENCE FENCE CORP 2.30% $8,022.40 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 101 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5290 Amount: $2,227,388.62 DBE Dollars: $11,280.00 DBE %: .51% District: 5 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .51% $11,280.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5332 Amount: $2,603,783.38 DBE Dollars: $27,497.80 DBE %: 1.06% District: 5 C FULLERTON SOD & LANDSCAPING CO INC .96% $24,895.20 DIAMOND C TRANSPORT INC .05% $1,815.00 DIAMOND C TRANSPORT INC .05% $787.60 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5333 Amount: $1,911,986.20 DBE Dollars: $31,425.00 DBE %: 1.64% District: 5 SAFETY CONTRACTORS INC .62% $11,925.00 STAR HAULING INC .51% $3,645.00 STAR HAULING INC .51% $15,855.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For RANGER CONSTRUCTION INDUSTRIES, INC. Amount: $74,367,334.30 DBE Dollars: $3,324,228.70 DBE % : 4.47% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : REMSON AQUATICS LIMITED LIABILITY COMPAN XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I05-R0 Amount: $65,346.84 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 102 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ROAD RUNNER HIGHWAY SIGNS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I28-R0 Amount: $59,537.86 DBE Dollars: $59,537.86 DBE %: 100.00% District: 1 ROAD RUNNER HIGHWAY SIGNS INC 100.00% $59,537.86 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ROADS, INC. OF NWF XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3307 Amount: $240,669.48 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ROADWAY SPECIALTY DEVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6G25 Amount: $236,250.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E7G54 Amount: $75,775.00 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1367 Amount: $159,932.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 103 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5328 Amount: $137,804.15 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ROADWAY SPECIALTY DEVICES, INC. Amount: $609,761.15 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ROCKLINE VAC SYSTEMS INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H45-R0 Amount: $95,809.50 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I53-R0 Amount: $214,509.50 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M54-R0 Amount: $423,380.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ROCKLINE VAC SYSTEMS INC. Amount: $733,699.00 DBE Dollars: $.00 DBE % : .00% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 104 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ROGAR MANAGEMENT & CONSULTING OF FLORIDA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M80 Amount: $239,123.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F22 Amount: $150,100.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F24 Amount: $209,285.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For ROGAR MANAGEMENT & CONSULTING OF FLORIDA Amount: $598,508.00 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : RUSSELL ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1379 Amount: $2,640,546.55 DBE Dollars: $12,638.00 DBE %: .48% District: 1 LIBERTY HAULING INC .48% $12,638.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1407 Amount: $14,091,444.29 DBE Dollars: $103,625.10 DBE %: .74% District: 1 GCE SERVICES INC .74% $103,625.10 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 105 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2288 Amount: $5,365,816.40 DBE Dollars: $405,294.50 DBE %: 7.55% District: 2 AERIAL INNOVATIONS INC .03% $1,520.00 BROWN BROTHERS THE FAMILY LLC 3.86% $206,947.00 CAL-TECH TESTING INC .58% $30,863.30 SAFETY CONTRACTORS INC 1.74% $93,433.00 SMITH & SONS SOD CO INC 1.35% $72,531.20 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For RUSSELL ENGINEERING, INC. Amount: $22,097,807.24 DBE Dollars: $521,557.60 DBE % : 2.36% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SCOTT BRIDGE COMPANY, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3238 Amount: $7,506,741.02 DBE Dollars: $1,863,255.19 DBE %: 24.82% District: 3 AMBER CONSTRUCTION COMPANY .44% $33,250.00 PURIFOY CONSTRUCTION LLC 24.38% $1,830,005.19 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SEMA CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7191 Amount: $32,072,222.02 DBE Dollars: $2,180,600.00 DBE %: 6.80% District: 7 FINISHING SYSTEMS OF FLORIDA INC .30% $95,600.00 RAULERSON & SON INC .27% $85,000.00 WORLD HAULERS INC 6.24% $2,000,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 106 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7202 Amount: $29,694,444.04 DBE Dollars: $617,133.31 DBE %: 2.08% District: 7 AERIAL INNOVATIONS INC .01% $2,700.00 FINISHING SYSTEMS OF FLORIDA INC .33% $97,007.18 WORLD HAULERS INC 1.74% $517,426.13 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SEMA CONSTRUCTION, INC. Amount: $61,766,666.06 DBE Dollars: $2,797,733.31 DBE % : 4.53% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SEMINOLE EQUIPMENT, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H93 Amount: $329,739.01 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H95 Amount: $208,511.60 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SEMINOLE EQUIPMENT, INC. Amount: $538,250.61 DBE Dollars: $.00 DBE % : .00% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 107 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SEMPER FI SERVICES, LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2L39 Amount: $651,485.99 DBE Dollars: $29,327.50 DBE %: 4.50% District: 2 AMERICAN STANDARD TESTING & CONSULTING LABORATORY INC 1.65% $10,720.00 JENKINS PAINTING INC 1.16% $7,537.50 SMITH & SONS SOD CO INC 1.70% $11,070.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2M01 Amount: $360,774.82 DBE Dollars: $23,071.75 DBE %: 6.40% District: 2 AMERICAN STANDARD TESTING & CONSULTING LABORATORY INC .45% $3,798.00 AMERICAN STANDARD TESTING & CONSULTING LABORATORY INC .45% -$528.00 JENKINS PAINTING INC 1.09% $4,900.00 JENKINS PAINTING INC 1.09% $2,999.25 SMITH & SONS SOD CO INC 1.65% $14,423.00 SMITH & SONS SOD CO INC 1.65% -$2,520.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H72 Amount: $46,150.86 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H74 Amount: $264,360.68 DBE Dollars: $750.00 DBE %: .28% District: 3 AMERICAN STANDARD TESTING & CONSULTING LABORATORY INC .28% $750.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 108 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I33 Amount: $35,874.65 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I36 Amount: $125,852.62 DBE Dollars: $6,630.00 DBE %: 5.27% District: 3 SMITH & SONS SOD CO INC 5.27% $6,630.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K69 Amount: $1,932,121.41 DBE Dollars: $51,350.00 DBE %: 2.66% District: 4 ALL FOR YOU LANDSCAPE AND MAINTENANCE INC .82% $37,138.00 ALL FOR YOU LANDSCAPE AND MAINTENANCE INC .82% -$5,378.00 TIERRA SOUTH FLORIDA INC 1.01% $19,590.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1346 Amount: $25,001.15 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1348 Amount: $35,512.80 DBE Dollars: $3,132.50 DBE %: 8.82% District: 1 AMERICAN STANDARD TESTING & CONSULTING LABORATORY INC 8.82% $3,132.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1383 Amount: $21,139.99 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1386 Amount: $32,397.85 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 109 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1395 Amount: $45,959.30 DBE Dollars: $560.00 DBE %: 1.22% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.22% $560.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7194 Amount: $226,980.73 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7217 Amount: $282,606.51 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T7224 Amount: $99,036.72 DBE Dollars: $.00 DBE %: .00% District: 7 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SEMPER FI SERVICES, LLC Amount: $4,185,256.08 DBE Dollars: $114,821.75 DBE % : 2.74% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SHELTRA & SON CONSTRUCTION CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4181 Amount: $17,650,985.36 DBE Dollars: $337,036.00 DBE %: 1.91% District: 4 J E HILL CONTRACTOR INC 1.43% $252,000.00 PRECISION CONTRACTING SERVICES INC .48% $85,036.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 110 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4217 Amount: $3,008,332.00 DBE Dollars: $197,072.00 DBE %: 6.55% District: 4 DON ROBINSON CONCRETE INC 3.51% $105,452.00 J E HILL CONTRACTOR INC 3.05% $91,620.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4251 Amount: $2,331,239.20 DBE Dollars: $18,000.00 DBE %: .77% District: 4 ALL PHASE INC .77% $18,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4252 Amount: $478,650.52 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4254 Amount: $1,536,670.51 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SHELTRA & SON CONSTRUCTION CO., INC. Amount: $25,005,877.59 DBE Dollars: $552,108.00 DBE % : 2.21% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SHENANDOAH GENERAL CONSTRUCTION, CO. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H62-R0 Amount: $256,255.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 111 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M62 Amount: $2,516,946.71 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SHENANDOAH GENERAL CONSTRUCTION, CO. Amount: $2,773,201.71 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SIGNAL GROUP, INC. (THE) XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K44 Amount: $2,409,040.00 DBE Dollars: $701,099.84 DBE %: 29.10% District: 4 PRECISION CONTRACTING SERVICES INC 29.10% $701,099.84 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N29 Amount: $269,309.64 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SIGNAL GROUP, INC. (THE) Amount: $2,678,349.64 DBE Dollars: $701,099.84 DBE % : 26.18% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SIGNAL TECHNOLOGY AND INSTALLATION CORP. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K75 Amount: $579,500.00 DBE Dollars: $898.50 DBE %: .16% District: 4 TRANSMARK INC .08% $4,110.00 TRANSMARK INC .08% -$3,211.50 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 112 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SOUTH GULF, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3H46 Amount: $138,418.91 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SOUTHEAST ATTENUATORS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F35 Amount: $78,750.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SOUTHLAND - MIDDLESEX - A JOINT XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E8J79 Amount: $23,424,028.95 DBE Dollars: $962,052.34 DBE %: 4.11% District: 8 AERIAL INNOVATIONS INC .01% $3,251.42 ANTILLIAN ENGINEERING ASSOCIATES INC .15% $35,091.20 BONN J CONTRACTING INC OF FLORIDA .83% $193,257.70 HERBERT-HALBACK INC .10% $23,969.02 SUNRISE HAULING AND EXCAVATING INC 3.02% $706,483.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 113 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SOUTHLAND CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N43 Amount: $4,593,000.00 DBE Dollars: $426,771.00 DBE %: 9.29% District: 5 C & N TRUCKING INC .97% $44,776.00 DIAMOND C TRANSPORT INC 3.05% $140,200.00 EAST COAST FENCE & GUARDRAIL OF BREVARD INC .32% $14,520.00 HERBERT-HALBACK INC .42% $19,375.00 JVD CONSTRUCTION INC 1.15% $52,800.00 N & H CONSTRUCTION INC .47% $21,450.00 OMNI COMMUNICATIONS LLC .90% $41,500.00 STERLING SILVER SCAPE & SOD INC 1.00% $46,366.00 STERLING SILVER SCAPE & SOD INC 1.00% $45,784.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SPEARHEAD DEVELOPMENT GROUP, IN XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K79 Amount: $104,475.19 DBE Dollars: $.00 DBE %: .00% District: 4 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 114 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : STEMWINDER ENTERPRISES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I35-R0 Amount: $8,138.88 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : STERLING ENTERPRISES, L.L.C. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M53 Amount: $113,226.75 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : STEVEN COUNTS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5216 Amount: $12,981,547.89 DBE Dollars: $82,929.00 DBE %: .64% District: 5 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC .64% $82,929.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5338 Amount: $97,614.56 DBE Dollars: $1,183.00 DBE %: 1.21% District: 5 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 1.21% $1,183.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For STEVEN COUNTS, INC. Amount: $13,079,162.45 DBE Dollars: $84,112.00 DBE % : .64% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 115 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SUPERIOR ASPHALT, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H90 Amount: $177,416.59 DBE Dollars: $11,596.55 DBE %: 6.54% District: 1 ROAD RUNNER HIGHWAY SIGNS INC 6.54% $11,596.55 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1331 Amount: $3,449,812.00 DBE Dollars: $285,000.00 DBE %: 8.26% District: 1 ROAD RUNNER HIGHWAY SIGNS INC 8.26% $285,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1345 Amount: $183,027.00 DBE Dollars: $15,774.50 DBE %: 8.62% District: 1 ROAD RUNNER HIGHWAY SIGNS INC 8.62% $15,774.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SUPERIOR ASPHALT, INC. Amount: $3,810,255.59 DBE Dollars: $312,371.05 DBE % : 8.20% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SUPERIOR CONSTRUCTION CO., INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N36 Amount: $26,055,000.00 DBE Dollars: $2,286,404.58 DBE %: 8.78% District: 2 AERIAL INNOVATIONS INC .02% $4,044.58 AMBER CONSTRUCTION COMPANY .17% $44,100.00 BEAVER BULK INC 3.52% $917,560.00 FINISHING SYSTEMS OF FLORIDA INC .03% $8,500.00 HRUSTIC BROTHERS INC 1.66% $431,600.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 116 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount K & C SAND INC 1.66% $431,600.00 SMITH & SONS SOD CO INC 1.72% $449,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SUPERIOR CONSTRUCTION COMPANY OF INDIANA XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2282 Amount: $13,134,202.02 DBE Dollars: $521,055.89 DBE %: 3.97% District: 2 AMBER CONSTRUCTION COMPANY .93% $122,391.00 CAL-TECH TESTING INC .02% $3,000.00 CSI GEO INC .70% $175,500.00 CSI GEO INC .70% $7,141.60 FINISHING SYSTEMS OF FLORIDA INC .09% $11,277.69 J E HILL CONTRACTOR INC .70% $33,955.00 J E HILL CONTRACTOR INC .70% $148,686.60 MC N LAW TRUCKING INC .15% $19,104.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2293 Amount: $3,389,514.64 DBE Dollars: $63,130.90 DBE %: 1.86% District: 2 AMBER CONSTRUCTION COMPANY 1.74% $58,904.86 FINISHING SYSTEMS OF FLORIDA INC .12% $4,226.04 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T3347 Amount: $1,189,368.75 DBE Dollars: $66,911.96 DBE %: 5.63% District: 3 AMBER CONSTRUCTION COMPANY 1.14% $13,504.65 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 117 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount HALE CONTRACTING INC 4.49% $53,407.31 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SUPERIOR CONSTRUCTION COMPANY OF INDIANA Amount: $17,713,085.41 DBE Dollars: $651,098.75 DBE % : 3.68% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : SUPERIOR LANDSCAPING & LAWN SERVICE, INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6E88 Amount: $763,839.80 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F18 Amount: $241,120.94 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For SUPERIOR LANDSCAPING & LAWN SERVICE, INC Amount: $1,004,960.74 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : T & M LAWN-FENCE SERVICE INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F29 Amount: $132,300.00 DBE Dollars: $.00 DBE %: .00% District: 6 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 118 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : T.T.C. ENVIRONMENTAL, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F33 Amount: $220,500.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : THADCON,LLC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5P53 Amount: $58,803.25 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : THUNDERHOLE, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5N36 Amount: $97,000.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TONY'S CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M12 Amount: $416,081.50 DBE Dollars: $.00 DBE %: .00% District: 5 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 119 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TRAFFIC CONTROL PRODUCTS OF FLORIDA, INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H44-R0 Amount: $222,285.75 DBE Dollars: $233,985.00 DBE %: 105.26% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 105.26% $233,985.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M06 Amount: $236,620.00 DBE Dollars: $236,620.00 DBE %: 100.00% District: 5 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 100.00% $236,620.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1370 Amount: $16,349.50 DBE Dollars: $16,349.50 DBE %: 100.00% District: 1 TRAFFIC CONTROL PRODUCTS OF FLORIDA INC 100.00% $16,349.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For TRAFFIC CONTROL PRODUCTS OF FLORIDA, INC Amount: $475,255.25 DBE Dollars: $486,954.50 DBE % : 102.46% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TRAFFIC SERVICES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1F48-R0 Amount: $436,050.00 DBE Dollars: $.00 DBE %: .00% District: 1 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 120 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TRANSCORE ITS, LLC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4J90 Amount: $24,037,415.04 DBE Dollars: $1,420,602.57 DBE %: 5.91% District: 4 Dynamic Construction Group .93% $222,394.00 GEOSOL INC .92% $220,602.57 SOUTHEAST UNDERGROUND UTILITIES CORP 4.07% $977,606.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TRANSPORTATION STRUCTURES, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I14 Amount: $259,672.03 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I18 Amount: $199,863.25 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N63 Amount: $86,057.76 DBE Dollars: $3,207.00 DBE %: 3.73% District: 2 SMITH & SONS SOD CO INC 3.73% $3,207.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For TRANSPORTATION STRUCTURES, INC. Amount: $545,593.04 DBE Dollars: $3,207.00 DBE % : .59% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 121 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TRULY GREEN LANDSCAPE CONTRACTO XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F16 Amount: $76,439.85 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TSM ENTERPRISES INC XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M75 Amount: $104,520.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : TURNER CONSTRUCTION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: BD734GMP6A Amount: $2,349,274.00 DBE Dollars: $1,025,352.00 DBE %: 43.65% District: 6 BARREIRO CONCRETE CORP .11% $2,700.00 RAM-TECH CONSTRUCTION INC 43.53% $1,022,652.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : UNITED BROTHERS DEVELOPMENT COR XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2332 Amount: $415,790.48 DBE Dollars: $35,170.63 DBE %: 8.46% District: 2 CONSTRUCTION SERVICES OF ORANGE PARK INC 8.46% $35,170.63 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 122 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : USA SERVICES OF FLORIDA, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H91-R0 Amount: $26,994.60 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I34-R0 Amount: $31,509.91 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M49 Amount: $144,000.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For USA SERVICES OF FLORIDA, INC. Amount: $202,504.51 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : UTILITY SYSTEMS CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T5301 Amount: $3,806,688.35 DBE Dollars: $108,448.00 DBE %: 2.85% District: 5 DIAMOND C TRANSPORT INC 2.85% $108,448.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 123 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : VALDEZ, FRANKIE CO., INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1355 Amount: $39,301.50 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : VALLEYCREST LANDSCAPE DEVELOPMENT, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4263 Amount: $435,671.26 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : VILA AND SON LANDSCAPING CORP. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F42 Amount: $753,846.49 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : VMS MAINTENANCE SYSTEMS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: BD049-R0 Amount: $5,421,428.00 DBE Dollars: $60,000.00 DBE %: 1.11% District: 3 GREENWAYS OF AMERICA INC DBA MARTY ARD LANDSCAPING .74% $40,000.00 OTG CONTRACTORS (PART TIME FIRM) .37% $20,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 124 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: BD967-R0 Amount: $2,088,750.00 DBE Dollars: $110,000.00 DBE %: 5.27% District: 3 OTG CONTRACTORS (PART TIME FIRM) 5.27% $110,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1F88-R0 Amount: $11,406,300.00 DBE Dollars: $25,000.00 DBE %: .22% District: 1 ADVANTAGE HEDGING & TOPPING INC .22% $25,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For VMS MAINTENANCE SYSTEMS, INC. Amount: $18,916,478.00 DBE Dollars: $195,000.00 DBE % : 1.03% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : W.W. ENGINEERING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I66-R0 Amount: $122,500.00 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E5M77 Amount: $282,500.00 DBE Dollars: $.00 DBE %: .00% District: 5 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For W.W. ENGINEERING, INC. Amount: $405,000.00 DBE Dollars: $.00 DBE % : .00% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 125 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WEEKLEY ASPHALT PAVING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E4K96 Amount: $580,380.00 DBE Dollars: $1,420.00 DBE %: .24% District: 4 HIGH TECH STRIPING INC .24% $1,420.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F14 Amount: $557,315.00 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F71 Amount: $1,312,690.67 DBE Dollars: $155,190.50 DBE %: 11.82% District: 6 GIRALT ENTERPRISES INC .40% $5,200.00 HIGH TECH STRIPING INC 8.46% $111,000.00 SOUTHEAST UNDERGROUND UTILITIES CORP 2.97% $38,990.50 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E8J82 Amount: $1,630,469.86 DBE Dollars: $1,004,793.40 DBE %: 61.63% District: 8 FYV INC DBA MIAMI TROPICAL NURSERY 1.95% $31,830.40 SOUTHEAST UNDERGROUND UTILITIES CORP 59.67% $972,963.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4214 Amount: $1,620,344.21 DBE Dollars: $114,074.39 DBE %: 7.04% District: 4 GIRALT ENTERPRISES INC .19% $3,000.00 SORREL ENTERPRISES INC D/B/A SORREL DEVELOPMENT .31% $5,000.00 SOUTHEAST UNDERGROUND UTILITIES CORP 3.77% $61,155.00 TRANSMARK INC 2.77% $44,919.39 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 126 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4220 Amount: $1,777,051.42 DBE Dollars: $65,421.00 DBE %: 3.68% District: 4 SORREL ENTERPRISES INC D/B/A SORREL DEVELOPMENT 1.04% $18,500.00 TRANSMARK INC 2.64% $46,921.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4221 Amount: $4,488,270.65 DBE Dollars: $77,623.00 DBE %: 1.73% District: 4 GIRALT ENTERPRISES INC .58% $26,195.00 SORREL ENTERPRISES INC D/B/A SORREL DEVELOPMENT .14% $6,500.00 TRANSMARK INC 1.00% $44,928.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4230 Amount: $1,036,777.99 DBE Dollars: $.00 DBE %: .00% District: 4 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4232 Amount: $4,737,600.56 DBE Dollars: $381,574.10 DBE %: 8.05% District: 4 CONSTRUCT GROUP CORP 4.09% $193,726.80 HIGH TECH STRIPING INC 3.21% $152,133.30 SOUTHEAST UNDERGROUND UTILITIES CORP .75% $35,714.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4240 Amount: $340,143.77 DBE Dollars: $31,966.65 DBE %: 9.40% District: 4 CONSTRUCT GROUP CORP 9.25% $31,469.65 GIRALT ENTERPRISES INC .15% $497.00 SOUTHEAST UNDERGROUND UTILITIES CORP .00% $6,200.00 SOUTHEAST UNDERGROUND UTILITIES CORP .00% -$6,200.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 127 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4244 Amount: $291,769.77 DBE Dollars: $56,924.80 DBE %: 19.51% District: 4 CONSTRUCT GROUP CORP 19.51% $56,924.80 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T4259 Amount: $1,890,223.58 DBE Dollars: $219,305.23 DBE %: 11.60% District: 4 SOUTHEAST UNDERGROUND UTILITIES CORP 7.61% $143,752.00 TRANSMARK INC 4.00% $75,553.23 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6195 Amount: $679,918.78 DBE Dollars: $25,848.00 DBE %: 3.80% District: 6 SOUTHEAST UNDERGROUND UTILITIES CORP 3.80% $25,848.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T6203 Amount: $1,868,628.61 DBE Dollars: $175,605.93 DBE %: 9.40% District: 6 CONSTRUCT GROUP CORP 9.40% $175,605.93 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For WEEKLEY ASPHALT PAVING, INC. Amount: $22,811,584.87 DBE Dollars: $2,309,747.00 DBE % : 10.13% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WHITEHURST, V. E. & SONS, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E2N56 Amount: $889,273.50 DBE Dollars: $44,823.40 DBE %: 5.04% District: 2 JENKINS PAINTING INC 2.52% $69,623.40 JENKINS PAINTING INC 2.52% -$24,800.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 128 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2291 Amount: $3,819,600.63 DBE Dollars: $149,245.76 DBE %: 3.91% District: 2 JENKINS PAINTING INC 3.91% $149,245.76 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2304 Amount: $554,277.50 DBE Dollars: $34,924.02 DBE %: 6.30% District: 2 JAG TRANSPORT INC 2.39% $13,222.32 JENKINS PAINTING INC 3.92% $21,701.70 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T2324 Amount: $247,350.30 DBE Dollars: $8,944.93 DBE %: 3.62% District: 2 JENKINS PAINTING INC 1.81% $10,944.93 JENKINS PAINTING INC 1.81% -$2,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For WHITEHURST, V. E. & SONS, INC. Amount: $5,510,501.93 DBE Dollars: $237,938.11 DBE % : 4.32% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WHITELEAF, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I46 Amount: $282,743.42 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I47 Amount: $110,357.65 DBE Dollars: $.00 DBE %: .00% District: 3 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 129 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E3I48 Amount: $176,930.33 DBE Dollars: $.00 DBE %: .00% District: 3 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For WHITELEAF, INC. Amount: $570,031.40 DBE Dollars: $.00 DBE % : .00% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WOOTEN, S.T., CORPORATION XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1339 Amount: $873,525.00 DBE Dollars: $47,655.42 DBE %: 5.46% District: 1 GCE SERVICES INC 1.68% $14,634.42 M J S TRUCKING LLC 3.78% $33,021.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1381 Amount: $341,030.00 DBE Dollars: $5,804.10 DBE %: 1.70% District: 1 ERO-XTREME TRUCKING INC .68% $2,330.00 GCE SERVICES INC .40% $2,202.40 GCE SERVICES INC .40% $550.00 M J S TRUCKING LLC .21% $721.70 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For WOOTEN, S.T., CORPORATION Amount: $1,214,555.00 DBE Dollars: $53,459.52 DBE % : 4.40% EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 130 Florida Department of Transportation DBE Utilization for Construction & Maintenance Contracts By Prime Contractor By Contract For Reporting Period : 10/01/2009 to 09/30/2010 Includes Federal and State Funded Contracts DBE Total Commitment Subcontractor DBE % Amount XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WORTH CONTRACTING, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E6F49 Amount: $898,904.18 DBE Dollars: $.00 DBE %: .00% District: 6 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : WRIGHT CONSTRUCTION GROUP, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1H50 Amount: $389,905.65 DBE Dollars: $.00 DBE %: .00% District: 1 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: E1I16 Amount: $729,800.00 DBE Dollars: $7,200.00 DBE %: .99% District: 1 ALLIED ENGINEERING & TESTING INC .30% $2,200.00 DALY ENGINEERING CONSULTANTS LLC .69% $5,000.00 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Totals For WRIGHT CONSTRUCTION GROUP, INC. Amount: $1,119,705.65 DBE Dollars: $7,200.00 DBE % : .64% XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contractor : ZEP CONSTRUCTION, INC. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Contract: T1332 Amount: $754,300.00 DBE Dollars: $12,500.00 DBE %: 1.66% District: 1 TATE TRANSPORT CORPORATION .33% $2,500.00 TIERRA INC 1.33% $10,000.00 EORRPT50 Run on : 05/04/2011 Contract Amount is the adjusted contract amount. DBE % is based on the Total Adjusted Contract Amount. Page : 131