FLORIDA DEPARTMENT OF TRANSPORTATION ... TABULATION OF BIDS ...
by user
Comments
Transcript
FLORIDA DEPARTMENT OF TRANSPORTATION ... TABULATION OF BIDS ...
FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS CALL ORDER LETTING DATE SET-ASIDE CONTRACT TIME : 002 : 08/19/09 : : 365 FINPROJ(S) : 41021217281 (*) 41021227246 : LAKE CITY MAINT. : ROUTINE CONTRACTS LOCAL NAME PROJ LIMITS PROPOSAL ID DISTRICT U/R CODE CALENDAR DAYS 2:00 P.M. F.A. NO. : E2M72-R0 : 02 : : N/A N/A DATE : 12/01/09 PAGE : 002 -2 PROPOSAL DESC : Provide and install Bermuda & Centipede Sod on as needed bases by the Department in the Lake City Maintenance area. RENEWAL OPTION. COUNTIES : BAKER COLUMBIA ROAD NAME : HAMILTON SUWANNEE PRIMARY ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |M & S SITE WORK INC |ROGAR MANAGEMENT & CONSULTI |SMITH & SON'S SOD CO., INC. LINE NO / ITEM CODE / ALT |NON RESPONSIVE | NON RESPONSIVE | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SODDING (SY) | | | 0005 E575 1 2 11000.000 SY | 1.96000 21560.00| 2.30000 25300.00| 3.29000 36190.00 SODDING (CENTIPEDE) | | | 0010 E575 1 6 11000.000 SY | 1.96000 21560.00| 2.30000 25300.00| 2.20000 24200.00 SODDING (BERMUDA) | | | SECTION 0001 TOTALS | $ 43,120.00| $ 50,600.00| $ 60,390.00 ==================================================================================================================================== CONTRACT TOTALS | $ 43,120.00| $ 50,600.00| $ 60,390.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 12/01/09 PAGE : 002 -3 CALL ORDER: 002 PROPOSAL ID: E2M72-R0 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |ONAS CORPORATION |EVANS CONTRACTING SERVICES, |PAFF LANDSCAPE, INC. LINE NO / ITEM CODE / ALT | | |NON RESPONSIVE ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SODDING (SY) | | | 0005 E575 1 2 11000.000 SY | 2.90000 31900.00| 3.45000 37950.00| 5.58000 61380.00 SODDING (CENTIPEDE) | | | 0010 E575 1 6 11000.000 SY | 2.90000 31900.00| 3.45000 37950.00| 5.40000 59400.00 SODDING (BERMUDA) | | | SECTION 0001 TOTALS | $ 63,800.00| $ 75,900.00| $ 120,780.00 ==================================================================================================================================== CONTRACT TOTALS | $ 63,800.00| $ 75,900.00| $ 120,780.00 CERTIFIED TO BE A TRUE COPY AND APPROVED BY Jane E. Jones-Redd District Contracts Administrator 12/01/2009 DATE NOTE: Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. ACUTAL COMMITMENT AND FINAL EXECUTION OF THE CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND FUNDS AVAILABILITY. POSTING BEGINS DECEMBER 1, 2009 AT 4:15 P.M. AND ENDS DECEMBER 4, 2009 AT 5:00 P.M. FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS CALL ORDER LETTING DATE SET-ASIDE CONTRACT TIME : 002 : 08/19/09 : : 365 FINPROJ(S) : 41021217281 (*) 41021227246 : LAKE CITY MAINT. : ROUTINE CONTRACTS LOCAL NAME PROJ LIMITS PROPOSAL ID DISTRICT U/R CODE CALENDAR DAYS 2:00 P.M. F.A. NO. : E2M72-R0 : 02 : : N/A N/A DATE : 09/29/09 PAGE : 002 -2 PROPOSAL DESC : Provide and install Bermuda & Centipede Sod on as needed bases by the Department in the Lake City Maintenance area. RENEWAL OPTION. COUNTIES : BAKER COLUMBIA ROAD NAME : HAMILTON SUWANNEE PRIMARY ==================================================================================================================================== |( 1 ) WITHDREW |( 2 ) |( 3 ) |M & S SITE WORK INC |ROGAR MANAGEMENT & CONSULTI |SMITH & SON'S SOD CO., INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SODDING (SY) | | | 0005 E575 1 2 11000.000 SY | 1.96000 21560.00| 2.30000 25300.00| 3.29000 36190.00 SODDING (CENTIPEDE) | | | 0010 E575 1 6 11000.000 SY | 1.96000 21560.00| 2.30000 25300.00| 2.20000 24200.00 SODDING (BERMUDA) | | | SECTION 0001 TOTALS | $ 43,120.00| $ 50,600.00| $ 60,390.00 ==================================================================================================================================== CONTRACT TOTALS | $ 43,120.00| $ 50,600.00| $ 60,390.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 09/29/09 PAGE : 002 -3 CALL ORDER: 002 PROPOSAL ID: E2M72-R0 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |ONAS CORPORATION |EVANS CONTRACTING SERVICES, |PAFF LANDSCAPE, INC. LINE NO / ITEM CODE / ALT | | |NON RESPONSIVE ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SODDING (SY) | | | 0005 E575 1 2 11000.000 SY | 2.90000 31900.00| 3.45000 37950.00| 5.58000 61380.00 SODDING (CENTIPEDE) | | | 0010 E575 1 6 11000.000 SY | 2.90000 31900.00| 3.45000 37950.00| 5.40000 59400.00 SODDING (BERMUDA) | | | SECTION 0001 TOTALS | $ 63,800.00| $ 75,900.00| $ 120,780.00 ==================================================================================================================================== CONTRACT TOTALS | $ 63,800.00| $ 75,900.00| $ 120,780.00 CERTIFIED TO BE A TRUE COPY AND APPROVED BY Jane E. Jones-Redd District Contracts Administrator 09-29-09 DATE NOTE: Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. ACTUAL COMMITMENT AND FINAL EXECUTION OF THE CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND FUNDS AVAILABILITY. SEPTEMBER 29, 2009 @ 4:15 P.M. AND ENDS OCTOBER 2, 2009 AT 5:00 P.M. POSTING BEGINS FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS CALL ORDER LETTING DATE SET-ASIDE CONTRACT TIME : 001 : 08/19/09 : : 120 FINPROJ(S) : 41021217275 41021227242 (*) : LAKE CITY MAINT. : INTERSTATE LOCAL NAME PROJ LIMITS PROPOSAL ID DISTRICT U/R CODE CALENDAR DAYS 2:00 P.M. F.A. NO. : E2M66 : 02 : : N/A N/A DATE : 08/31/09 PAGE : 001 -2 PROPOSAL DESC : Pruning and trimming trees and brush removal within the Departments right-of-ways on SR 2 & I-10 in Baker County; SR 41, Oleno Rd., SR 27, SR 2, I-10 & I-75 in Columbia County; SR 27, I-10 & I-75 in Suwannee County. COUNTIES : BAKER COLUMBIA ROAD NAME : SUWANNEE ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |FRANK J.CAPALLIA |M & S SITE WORK INC |CLEAR ZONE MAINTENANCE, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 TREE TRIMMING AND REMOVAL (MH) | | | 0005 E580336 4 94.000 PM | 550.00000 51700.00| 785.26000 73814.44| 787.00000 73978.00 PRUNING AND TRIMMING (TREES AND SHRUBS) | | | SECTION 0001 TOTALS | $ 51,700.00| $ 73,814.44| $ 73,978.00 ==================================================================================================================================== CONTRACT TOTALS | $ 51,700.00| $ 73,814.44| $ 73,978.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 001 -3 CALL ORDER: 001 PROPOSAL ID: E2M66 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |AE ENGINEERING, INC. |BRYANT TREE SERVICE INC. |RICK RICHARDS, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 TREE TRIMMING AND REMOVAL (MH) | | | 0005 E580336 4 94.000 PM | 900.00000 84600.00| 1025.00000 96350.00| 1050.00000 98700.00 PRUNING AND TRIMMING (TREES AND SHRUBS) | | | SECTION 0001 TOTALS | $ 84,600.00| $ 96,350.00| $ 98,700.00 ==================================================================================================================================== CONTRACT TOTALS | $ 84,600.00| $ 96,350.00| $ 98,700.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 001 -4 CALL ORDER: 001 PROPOSAL ID: E2M66 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 7 ) |( 8 ) |( 9 ) |ROGAR MANAGEMENT & CONSULTI |CHARLIE'S TREE SERVICE, INC |GRADING & BUSH HOG SERVICES IN LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 TREE TRIMMING AND REMOVAL (MH) | | | 0005 E580336 4 94.000 PM | 1200.00000 112800.00| 1255.00000 117970.00| 1400.00000 131600.00 PRUNING AND TRIMMING (TREES AND SHRUBS) | | | SECTION 0001 TOTALS | $ 112,800.00| $ 117,970.00| $ 131,600.00 ==================================================================================================================================== CONTRACT TOTALS | $ 112,800.00| $ 117,970.00| $ 131,600.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 001 -5 CALL ORDER: 001 PROPOSAL ID: E2M66 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 10 ) |( ) |( ) |EVANS CONTRACTING SERVICES, | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 TREE TRIMMING AND REMOVAL (MH) | | | 0005 E580336 4 94.000 PM | 1400.00000 131600.00| | PRUNING AND TRIMMING (TREES AND SHRUBS) | | | SECTION 0001 TOTALS | $ 131,600.00| $ | $ ==================================================================================================================================== CONTRACT TOTALS | $ 131,600.00| $ 0.00| $ 0.00 CERTIFIED TO BE A TRUE COPY AND APPROVED BY Jane E. Jones-Redd District Contracts Administrator September 1, 2009 DATE NOTE: Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. ACTUAL COMMITMENT AND FINAL EXECUTION OF THE CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND FUNDS AVAILABILITY. POSTING BEGINS SEPTEMBER 1, 2009 @ 4:15 P.M. AND ENDS SEPTEMBER 4, 2009 AT 5:00 P.M. FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS CALL ORDER LETTING DATE SET-ASIDE CONTRACT TIME : 002 : 08/19/09 : : 365 FINPROJ(S) : 41021217281 (*) 41021227246 : LAKE CITY MAINT. : ROUTINE CONTRACTS LOCAL NAME PROJ LIMITS PROPOSAL ID DISTRICT U/R CODE CALENDAR DAYS 2:00 P.M. F.A. NO. : E2M72-R0 : 02 : : N/A N/A DATE : 08/31/09 PAGE : 002 -2 PROPOSAL DESC : Provide and install Bermuda & Centipede Sod on as needed bases by the Department in the Lake City Maintenance area. RENEWAL OPTION. COUNTIES : BAKER COLUMBIA ROAD NAME : HAMILTON SUWANNEE PRIMARY ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |M & S SITE WORK INC |ROGAR MANAGEMENT & CONSULTI |SMITH & SON'S SOD CO., INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SODDING (SY) | | | 0005 E575 1 2 11000.000 SY | 1.96000 21560.00| 2.30000 25300.00| 3.29000 36190.00 SODDING (CENTIPEDE) | | | 0010 E575 1 6 11000.000 SY | 1.96000 21560.00| 2.30000 25300.00| 2.20000 24200.00 SODDING (BERMUDA) | | | SECTION 0001 TOTALS | $ 43,120.00| $ 50,600.00| $ 60,390.00 ==================================================================================================================================== CONTRACT TOTALS | $ 43,120.00| $ 50,600.00| $ 60,390.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 002 -3 CALL ORDER: 002 PROPOSAL ID: E2M72-R0 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |ONAS CORPORATION |EVANS CONTRACTING SERVICES, |PAFF LANDSCAPE, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SODDING (SY) | | | 0005 E575 1 2 11000.000 SY | 2.90000 31900.00| 3.45000 37950.00| 5.58000 61380.00 SODDING (CENTIPEDE) | | | 0010 E575 1 6 11000.000 SY | 2.90000 31900.00| 3.45000 37950.00| 5.40000 59400.00 SODDING (BERMUDA) | | | SECTION 0001 TOTALS | $ 63,800.00| $ 75,900.00| $ 120,780.00 ==================================================================================================================================== CONTRACT TOTALS | $ 63,800.00| $ 75,900.00| $ 120,780.00 CERTIFIED TO BE A TRUE COPY AND APPROVED BY Jane E. Jones-Redd District Contracts Administrator September 1, 2009 DATE NOTE: Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. ACTUAL COMMITMENT AND FINAL EXECUTION OF THE CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND FUNDS AVAILABILITY. POSTING BEGINS SEPTEMBER 1, 2009 @ 4:15 P.M. AND ENDS SEPTEMBER 4, 2009 AT 5:00 P.M. FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS CALL ORDER LETTING DATE SET-ASIDE CONTRACT TIME : 003 : 08/19/09 : : 180 FINPROJ(S) : 20997525201 21002055201 : SR 19 : FROM SR 100 LOCAL NAME PROJ LIMITS PROPOSAL ID : E2M30 DISTRICT : 02 U/R CODE : WORKING DAYS (AVAILABLE DAYS) 2:00 P.M. (*) F.A. NO. : N/A N/A DATE : 08/31/09 PAGE : 003 -2 PROPOSAL DESC : Milling & resurfacing (0.9090), shoulder treatment, highway signing and all other incidental work on SR 19 in Putnam County from SR 100 to SR 15 (FPID 209975-2-52-01) and milling & resurfacing (2.9490), shoulder treatment, highway signing and all other incidental work on SR 15 in Putnam County from SR 19 to CR 209 (FPID 210020-5-52-01). PREQUALIFICATION REQUIRED. EXPEDITE DISKETTE BIDDING OR BID EXPRESS MANDATORY. LUMP SUM. COUNTIES : PUTNAM ROAD NAME : SR 19 TO US 17 ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |ANDERSON COLUMBIA CO., INC. |APAC-SOUTHEAST, INC. |P & S PAVING, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 ROADWAY | | | 0005 0999 2 LUMP | 320000.00000 320000.00| 350242.81000 350242.81| 384737.45000 384737.45 LUMP SUM CONTRACT, ALTERNATIVE BIDDING | | | 20997525201 | | | 0010 0999 2 LUMP | 2655866.36000 2655866.36| 2796977.83000 2796977.83| 3097123.97000 3097123.97 LUMP SUM CONTRACT, ALTERNATIVE BIDDING | | | 21002055201 | | | 0015 0999 25 LUMP | 43000.00000 43000.00| 43000.00000 43000.00| 43000.00000 43000.00 INITIAL CONTINGENCY AMOUNT, DO NOT BID | | | 21002055201 | | | 0020 0999 25 LUMP | 7000.00000 7000.00| 7000.00000 7000.00| 7000.00000 7000.00 INITIAL CONTINGENCY AMOUNT, DO NOT BID | | | 20997525201 | | | SECTION 0001 TOTALS | $ 3,025,866.36| $ 3,197,220.64| $ 3,531,861.42 ==================================================================================================================================== CONTRACT TOTALS | $ 3,025,866.36| $ 3,197,220.64| $ 3,531,861.42 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 003 -3 CALL ORDER: 003 PROPOSAL ID: E2M30 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( ) |HUBBARD CONSTRUCTION COMPAN |D.A.B. CONSTRUCTORS, INC. | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 ROADWAY | | | 0005 0999 2 LUMP | 456700.00000 456700.00| 644444.44000 644444.44| LUMP SUM CONTRACT, ALTERNATIVE BIDDING | | | 20997525201 | | | 0010 0999 2 LUMP | 3490565.00000 3490565.00| 3477777.78000 3477777.78| LUMP SUM CONTRACT, ALTERNATIVE BIDDING | | | 21002055201 | | | 0015 0999 25 LUMP | 43000.00000 43000.00| 43000.00000 43000.00| INITIAL CONTINGENCY AMOUNT, DO NOT BID | | | 21002055201 | | | 0020 0999 25 LUMP | 7000.00000 7000.00| 7000.00000 7000.00| INITIAL CONTINGENCY AMOUNT, DO NOT BID | | | 20997525201 | | | SECTION 0001 TOTALS | $ 3,997,265.00| $ 4,172,222.22| $ ==================================================================================================================================== CONTRACT TOTALS | $ 3,997,265.00| $ 4,172,222.22| $ 0.00 CERTIFIED TO BE A TRUE COPY AND APPROVED BY Jane E. Jones-Redd District Contracts Administrator September 1, 2009 DATE NOTE: Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. ACTUAL COMMITMENT AND FINAL EXECUTION OF THE CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND FUNDS AVAILABILITY. POSTING BEGINS SEPTEMBER 1, 2009 @ 4:15 P.M. AND ENDS SEPTEMBER 4, 2009 AT 5:00 P.M. FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS CALL ORDER LETTING DATE SET-ASIDE CONTRACT TIME : 004 : 08/19/09 : : 30 PROPOSAL ID DISTRICT U/R CODE CALENDAR DAYS FINPROJ(S) : 41021517232 LOCAL NAME PROJ LIMITS : PERRY MAINT : ROUTINE MAINT. CONTRACTS 2:00 P.M. (*) F.A. NO. : E2M78 : 02 : : N/A DATE : 08/31/09 PAGE : 004 -2 PROPOSAL DESC : Removing existing retaining wall, grading and reshaping shoulder, removing and replacing sidewalk and curb and gutter on SR 145 in the City of Madison (Madison County) in the area specified in the plans located between Marion Street and Sumpter Street (Mile Post 6.566 to 6.591). COUNTIES : MADISON ROAD NAME : PRIMARY ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |EVANS CONTRACTING SERVICES, |BLUE ROK, INC. |DIXIE PAVING & GRADING, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 MISC SLOPE AND DITCH REPAIR (CY) | | | 0005 0101 1 LUMP | 1500.00000 1500.00| 3000.00000 3000.00| 9000.00000 9000.00 MOBILIZATION | | | 0010 0102 1 1.000 LS | 1000.00000 1000.00| 1500.00000 1500.00| 1500.00000 1500.00 MAINTENANCE OF TRAFFIC | | | 0015 0104 10 2 75.000 LF | 10.00000 750.00| 20.00000 1500.00| 10.00000 750.00 SYNTHETIC BALES | | | 0020 0110 1 1 1.000 LS | 5000.00000 5000.00| 7500.00000 7500.00| 5000.00000 5000.00 CLEARING & GRUBBING | | | 0025 0110 4 67.000 SY | 50.00000 3350.00| 15.00000 1005.00| 18.00000 1206.00 REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0030 0120 1 7.000 CY | 100.00000 700.00| 100.00000 700.00| 20.00000 140.00 REGULAR EXCAVATION | | | 0035 0520 1 10 15.000 LF | 27.00000 405.00| 35.00000 525.00| 100.00000 1500.00 CONCRETE CURB & GUTTER, TYPE F | | | 0040 0522 1 67.000 SY | 50.00000 3350.00| 50.00000 3350.00| 50.00000 3350.00 SIDEWALK CONCRETE, 4" THICK | | | 0045 0570 1 2 327.000 SY | 3.50000 1144.50| 4.00000 1308.00| 4.00000 1308.00 PERFORMANCE TURF, SOD | | | SECTION 0001 TOTALS | $ 17,199.50| $ 20,388.00| $ 23,754.00 ==================================================================================================================================== CONTRACT TOTALS | $ 17,199.50| $ 20,388.00| $ 23,754.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 004 -3 CALL ORDER: 004 PROPOSAL ID: E2M78 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |CAPITAL ASPHALT INC |L-J CONSTRUCTION CO. OF CEN |KEENFOREST MGT INC LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 MISC SLOPE AND DITCH REPAIR (CY) | | | 0005 0101 1 LUMP | 3500.00000 3500.00| 5000.00000 5000.00| 1000.00000 1000.00 MOBILIZATION | | | 0010 0102 1 1.000 LS | 1500.00000 1500.00| 5000.00000 5000.00| 500.00000 500.00 MAINTENANCE OF TRAFFIC | | | 0015 0104 10 2 75.000 LF | 7.50000 562.50| 1.00000 75.00| 6.00000 450.00 SYNTHETIC BALES | | | 0020 0110 1 1 1.000 LS | 3000.00000 3000.00| 10000.00000 10000.00| 5000.00000 5000.00 CLEARING & GRUBBING | | | 0025 0110 4 67.000 SY | 92.50000 6197.50| 10.00000 670.00| 40.00000 2680.00 REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0030 0120 1 7.000 CY | 85.00000 595.00| 20.00000 140.00| 300.00000 2100.00 REGULAR EXCAVATION | | | 0035 0520 1 10 15.000 LF | 85.00000 1275.00| 25.00000 375.00| 200.00000 3000.00 CONCRETE CURB & GUTTER, TYPE F | | | 0040 0522 1 67.000 SY | 75.00000 5025.00| 25.00000 1675.00| 100.00000 6700.00 SIDEWALK CONCRETE, 4" THICK | | | 0045 0570 1 2 327.000 SY | 7.00000 2289.00| 3.50000 1144.50| 10.00000 3270.00 PERFORMANCE TURF, SOD | | | SECTION 0001 TOTALS | $ 23,944.00| $ 24,079.50| $ 24,700.00 ==================================================================================================================================== CONTRACT TOTALS | $ 23,944.00| $ 24,079.50| $ 24,700.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 004 -4 CALL ORDER: 004 PROPOSAL ID: E2M78 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 7 ) |( 8 ) |( 9 ) |CURT'S CONSTRUCTION, INC |HICKS SEAL COATING & STRIPI |ONAS CORPORATION LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 MISC SLOPE AND DITCH REPAIR (CY) | | | 0005 0101 1 LUMP | 12000.00000 12000.00| 5000.00000 5000.00| 8000.00000 8000.00 MOBILIZATION | | | 0010 0102 1 1.000 LS | 5000.00000 5000.00| 4500.00000 4500.00| 5000.00000 5000.00 MAINTENANCE OF TRAFFIC | | | 0015 0104 10 2 75.000 LF | 6.00000 450.00| 10.00000 750.00| 7.00000 525.00 SYNTHETIC BALES | | | 0020 0110 1 1 1.000 LS | 2500.00000 2500.00| 9225.00000 9225.00| 4000.00000 4000.00 CLEARING & GRUBBING | | | 0025 0110 4 67.000 SY | 12.00000 804.00| 20.00000 1340.00| 50.00000 3350.00 REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0030 0120 1 7.000 CY | 20.00000 140.00| 100.00000 700.00| 35.00000 245.00 REGULAR EXCAVATION | | | 0035 0520 1 10 15.000 LF | 45.00000 675.00| 45.00000 675.00| 50.00000 750.00 CONCRETE CURB & GUTTER, TYPE F | | | 0040 0522 1 67.000 SY | 20.25000 1356.75| 55.00000 3685.00| 85.00000 5695.00 SIDEWALK CONCRETE, 4" THICK | | | 0045 0570 1 2 327.000 SY | 6.00000 1962.00| 10.00000 3270.00| 6.00000 1962.00 PERFORMANCE TURF, SOD | | | SECTION 0001 TOTALS | $ 24,887.75| $ 29,145.00| $ 29,527.00 ==================================================================================================================================== CONTRACT TOTALS | $ 24,887.75| $ 29,145.00| $ 29,527.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 004 -5 CALL ORDER: 004 PROPOSAL ID: E2M78 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 10 ) |( 11 ) |( 12 ) |THUNDERHOLE,INC |CDM CONTRACTING, INC. |SEMPER FI SERVICES, LLC LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 MISC SLOPE AND DITCH REPAIR (CY) | | | 0005 0101 1 LUMP | 12500.00000 12500.00| 3300.00000 3300.00| 3500.00000 3500.00 MOBILIZATION | | | 0010 0102 1 1.000 LS | 1500.00000 1500.00| 4400.00000 4400.00| 3500.00000 3500.00 MAINTENANCE OF TRAFFIC | | | 0015 0104 10 2 75.000 LF | 5.92000 444.00| 18.00000 1350.00| 10.00000 750.00 SYNTHETIC BALES | | | 0020 0110 1 1 1.000 LS | 12000.00000 12000.00| 15500.00000 15500.00| 13467.00000 13467.00 CLEARING & GRUBBING | | | 0025 0110 4 67.000 SY | 6.00000 402.00| 25.00000 1675.00| 100.00000 6700.00 REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0030 0120 1 7.000 CY | 215.00000 1505.00| 68.00000 476.00| 30.00000 210.00 REGULAR EXCAVATION | | | 0035 0520 1 10 15.000 LF | 16.00000 240.00| 35.00000 525.00| 30.00000 450.00 CONCRETE CURB & GUTTER, TYPE F | | | 0040 0522 1 67.000 SY | 26.00000 1742.00| 64.00000 4288.00| 65.00000 4355.00 SIDEWALK CONCRETE, 4" THICK | | | 0045 0570 1 2 327.000 SY | 1.70000 555.90| 6.50000 2125.50| 5.00000 1635.00 PERFORMANCE TURF, SOD | | | SECTION 0001 TOTALS | $ 30,888.90| $ 33,639.50| $ 34,567.00 ==================================================================================================================================== CONTRACT TOTALS | $ 30,888.90| $ 33,639.50| $ 34,567.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 004 -6 CALL ORDER: 004 PROPOSAL ID: E2M78 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 13 ) |( 14 ) |( 15 ) |JRM CONSTRUCTION GROUP INC |GEORGE PRESCOTT CONSTRUCTIO |M & S SITE WORK INC LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 MISC SLOPE AND DITCH REPAIR (CY) | | | 0005 0101 1 LUMP | 8500.00000 8500.00| 7500.00000 7500.00| 5000.00000 5000.00 MOBILIZATION | | | 0010 0102 1 1.000 LS | 5500.00000 5500.00| 14400.00000 14400.00| 2000.00000 2000.00 MAINTENANCE OF TRAFFIC | | | 0015 0104 10 2 75.000 LF | 10.00000 750.00| 24.00000 1800.00| 59.54000 4465.50 SYNTHETIC BALES | | | 0020 0110 1 1 1.000 LS | 6550.00000 6550.00| 6100.00000 6100.00| 2000.00000 2000.00 CLEARING & GRUBBING | | | 0025 0110 4 67.000 SY | 120.00000 8040.00| 66.60000 4462.20| 59.54000 3989.18 REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0030 0120 1 7.000 CY | 500.00000 3500.00| 32.71000 228.97| 59.54000 416.78 REGULAR EXCAVATION | | | 0035 0520 1 10 15.000 LF | 35.00000 525.00| 28.00000 420.00| 59.54000 893.10 CONCRETE CURB & GUTTER, TYPE F | | | 0040 0522 1 67.000 SY | 45.00000 3015.00| 56.61000 3792.87| 89.31000 5983.77 SIDEWALK CONCRETE, 4" THICK | | | 0045 0570 1 2 327.000 SY | 6.25000 2043.75| 8.57000 2802.39| 63.00000 20601.00 PERFORMANCE TURF, SOD | | | SECTION 0001 TOTALS | $ 38,423.75| $ 41,506.43| $ 45,349.33 ==================================================================================================================================== CONTRACT TOTALS | $ 38,423.75| $ 41,506.43| $ 45,349.33 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 004 -7 CALL ORDER: 004 PROPOSAL ID: E2M78 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 16 ) |( 17 ) |( 18 ) |MIDWESTERN CONSTRUCTION, IN |GRAHAM SERVICES LTD. |MAIN STREET CONSTRUCTION SERVICES, LINE NO / ITEM CODE / ALT | | | IRREGULAR ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 MISC SLOPE AND DITCH REPAIR (CY) | | | 0005 0101 1 LUMP | 10615.38000 10615.38| 13172.09000 13172.09| MOBILIZATION | | | 0010 0102 1 1.000 LS | 11961.54000 11961.54| 20070.00000 20070.00| MAINTENANCE OF TRAFFIC | | | 0015 0104 10 2 75.000 LF | 21.54000 1615.50| 12.35000 926.25| SYNTHETIC BALES | | | 0020 0110 1 1 1.000 LS | 8461.54000 8461.54| 8428.00000 8428.00| CLEARING & GRUBBING | | | 0025 0110 4 67.000 SY | 50.52000 3384.84| 22.21000 1488.07| REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0030 0120 1 7.000 CY | 483.52000 3384.64| 32.50000 227.50| REGULAR EXCAVATION | | | 0035 0520 1 10 15.000 LF | 112.82000 1692.30| 14.98000 224.70| CONCRETE CURB & GUTTER, TYPE F | | | 0040 0522 1 67.000 SY | 84.96000 5692.32| 35.45000 2375.15| SIDEWALK CONCRETE, 4" THICK | | | 0045 0570 1 2 327.000 SY | 5.65000 1847.55| 23.95000 7831.65| PERFORMANCE TURF, SOD | | | SECTION 0001 TOTALS | $ 48,655.61| $ 54,743.41| $ ==================================================================================================================================== CONTRACT TOTALS | $ 48,655.61| $ 54,743.41| $ 0.00 CERTIFIED TO BE A TRUE COPY AND APPROVED BY Jane E. Jones-Redd District Contracts Administrator September 1, 2009 DATE NOTE: Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. ACTUAL COMMITMENT AND FINAL EXECUTION OF THE CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND FUNDS AVAILABILITY. POSTING BEGINS SEPTEMBER 1, 2009 @ 4:15 P.M. AND ENDS SEPTEMBER 4, 2009 AT 5:00 P.M. FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS CALL ORDER LETTING DATE SET-ASIDE CONTRACT TIME : 005 : 08/19/09 : : 220 PROPOSAL ID : E2L72 DISTRICT : 02 U/R CODE : WORKING DAYS (AVAILABLE DAYS) FINPROJ(S) : 20916645201 LOCAL NAME PROJ LIMITS : SR 152 (BAYMEADOWS : ROAD) FROM US 1 2:00 P.M. (*) F.A. NO. : N/A DATE : 08/31/09 PAGE : 005 -2 PROPOSAL DESC : Signal reconstruction to mast arm traffic signals along SR 152 (Baymeadows Road) and the associated intersections at Bayberry Road (MP 2.072), Baymeadows Way (MP 2.460), Freedoms Commerce Parkway (2.583), I-95 Southbound Ramps (2.727), I-95 Northbound Ramps (MP 2.813), Western Way (MP 3.002), and Baymeadows Circle East (MP 3.189), in Duval County. The net project length is 1.272. PREQUALIFICATION IS REQUIRED. EXPEDITE OR DISKETTE BIDDING MANDATORY. COUNTIES : DUVAL ROAD NAME : SR 152 TO SR 115 ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |AMERICAN LIGHTING AND SIGNA |HINSON, JAMES D., ELECTRICA |MILLER ELECTRIC COMPANY LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SIGNALIZATION | | | 0005 0101 1 LUMP | 30000.00000 30000.00| 72999.70000 72999.70| 50989.00000 50989.00 MOBILIZATION | | | 0010 0102 1 220.000 LS | 23131.00000 23131.00| 14500.00000 14500.00| 12630.00000 12630.00 MAINTENANCE OF TRAFFIC 20916645201 | | | 0015 0102 14 448.000 MH | 55.00000 24640.00| 45.00000 20160.00| 43.00000 19264.00 TRAFFIC CONTROL OFFICER | | | 0020 0102 60 2880.000 ED | 0.30000 864.00| 0.45000 1296.00| 0.43000 1238.40 WORK ZONE SIGN | | | 0025 0102 74 1 8400.000 ED | 0.25000 2100.00| 0.31000 2604.00| 0.44000 3696.00 BARRICADE, TEMPORARY, TYPES I, II, DI, | | | VP & DRUM | | | 0030 0102 76 840.000 ED | 6.00000 5040.00| 10.00000 8400.00| 6.30000 5292.00 ADVANCE WARNING ARROW PANEL | | | 0035 0102 77 5040.000 ED | 0.50000 2520.00| 0.55000 2772.00| 0.50000 2520.00 HIGH INTENSITY FLASHING LIGHTS, TEMP, | | | TYPE B | | | 0040 0102107 420.000 DA | 5.00000 2100.00| 16.00000 6720.00| 32.00000 13440.00 TEMPORARY TRAFFIC DETECTION, INTERSECT | | | 0045 0110 4 10.000 SY | 70.00000 700.00| 35.00000 350.00| 34.00000 340.00 REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0050 0520 1 10 15.000 LF | 31.00000 465.00| 50.00000 750.00| 50.00000 750.00 CONCRETE CURB & GUTTER, TYPE F | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -3 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |AMERICAN LIGHTING AND SIGNA |HINSON, JAMES D., ELECTRICA |MILLER ELECTRIC COMPANY LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0055 0522 1 41.000 SY | 60.00000 2460.00| 50.00000 2050.00| 60.00000 2460.00 SIDEWALK CONCRETE, 4" THICK | | | 0060 0527 1 9.000 EA | 460.00000 4140.00| 850.00000 7650.00| 1436.00000 12924.00 DETECTABLE WARNING ON EXISTING WALKING | | | SURFACE, RETROFIT | | | 0065 0630 1 11 105.000 LF | 15.00000 1575.00| 11.50000 1207.50| 12.00000 1260.00 CONDUIT - SIGNALS, FURNISH & INSTALL, | | | ABOVEGROUND | | | 0070 0630 1 12 6928.000 LF | 3.50000 24248.00| 4.35000 30136.80| 5.00000 34640.00 CONDUIT - SIGNALS, FURNISH & INSTALL, | | | UNDERGROUND | | | 0075 0630 1 13 714.000 LF | 16.00000 11424.00| 12.00000 8568.00| 7.50000 5355.00 CONDUIT - SIGNALS, FURNISH & INSTALL, | | | SAWCUT & PLACE UNDER EXISTING PAVEMENT | | | 0080 0630 1 14 5030.000 LF | 9.00000 45270.00| 10.00000 50300.00| 9.00000 45270.00 CONDUIT, SIGNALS, F & I, UNDERGROUND | | | -JACKED | | | 0085 0632 7 1 7.000 PI | 4500.00000 31500.00| 2150.00000 15050.00| 4000.00000 28000.00 CABLE, SIGNAL, FURNISH & INSTALL | | | 0090 0633121 1 956.000 LF | 2.85000 2724.60| 5.00000 4780.00| 2.00000 1912.00 CABLE - FIBER OPTIC, F&I, UNDERGROUND, | | | SGL MODE, 1- 25 PR | | | 0095 0635 1 11 127.000 EA | 350.00000 44450.00| 248.00000 31496.00| 270.00000 34290.00 PULL & JUNCTION BOXES, F&I, PULL BOX | | | 0100 0635 1 15 6.000 EA | 900.00000 5400.00| 495.00000 2970.00| 625.00000 3750.00 PULL & JUNCTION BOXES, F&I, FIBER OPTIC | | | 0105 0639 1 22 7.000 AS | 800.00000 5600.00| 795.00000 5565.00| 1010.00000 7070.00 SIGNALS,ELECTRICAL POWER SERVICE, | | | UNDERGROUND, PURCHASED BYCONTRACTOR | | | FROM POWER COMPANY | | | 0110 0639 2 1 2019.000 LF | 2.00000 4038.00| 1.00000 2019.00| 1.25000 2523.75 SIGNALS, ELECTRICAL SERVICE WIRE | | | 0115 0641 2 12 7.000 EA | 700.00000 4900.00| 895.00000 6265.00| 700.00000 4900.00 PRESTRESSED CONCRETE POLE, F&I, TYPE | | | P-II SERVICE POLE | | | 0120 0649 31201 2.000 EA | 14000.00000 28000.00| 13380.00000 26760.00| 12156.00000 24312.00 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-36 | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -4 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |AMERICAN LIGHTING AND SIGNA |HINSON, JAMES D., ELECTRICA |MILLER ELECTRIC COMPANY LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0125 0649 31202 3.000 EA | 14500.00000 43500.00| 15225.00000 45675.00| 13940.00000 41820.00 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-46 | | | 0130 0649 31203 8.000 EA | 16500.00000 132000.00| 18893.00000 151144.00| 18430.00000 147440.00 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-60 | | | 0135 0649 31204 3.000 EA | 19500.00000 58500.00| 21215.00000 63645.00| 21318.00000 63954.00 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE, ARM LENGTH 70.5 | | | 0140 0649 31205 1.000 EA | 22000.00000 22000.00| 23434.00000 23434.00| 25483.00000 25483.00 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE, ARM LENGTH 78 | | | 0145 0649 31217 2.000 EA | 25000.00000 50000.00| 27994.00000 55988.00| 26700.00000 53400.00 MAST ARM,F&I, WIND SPEED-130,DOUBLE ARM | | | W/0 LUMINAIRE, 60-60 | | | 0150 0649 31218 2.000 EA | 26000.00000 52000.00| 24522.00000 49044.00| 27260.00000 54520.00 MAST ARM,F&I, WIND SPEED-130,DOUBLE ARM | | | W/0 LUMINAIRE, 60-70.5 | | | 0155 0650 51311 69.000 AS | 800.00000 55200.00| 850.00000 58650.00| 686.00000 47334.00 TRAFFIC SIGNAL, F&I, 3 SECTION, 1 WAY, | | | STANDARD | | | 0160 0650 51511 6.000 AS | 1300.00000 7800.00| 1400.00000 8400.00| 1101.00000 6606.00 TRAFFIC SIGNAL, F&I, 5 SECTIONS, 1 WAY, | | | STANDARD | | | 0165 0653191 26.000 AS | 600.00000 15600.00| 525.00000 13650.00| 589.00000 15314.00 PEDESTRIAN SIGNAL, F&I, LED - COUNT | | | DOWN, 1 DIRECTION | | | 0170 0653192 7.000 AS | 1200.00000 8400.00| 1050.00000 7350.00| 1127.00000 7889.00 PEDESTRIAN SIGNAL, F&I, LED - COUNT | | | DOWN, 2 DIRECTIONS | | | 0175 0659106 237.000 EA | 5.00000 1185.00| 5.00000 1185.00| 2.50000 592.50 SIGNAL HEAD AUXILIARIES, F&I, TUNNEL | | | VISOR | | | 0180 0659107 28.000 EA | 750.00000 21000.00| 895.00000 25060.00| 1446.00000 40488.00 SIGNAL HEAD AUXILIARIES, F&I, ALUMINUM | | | PEDESTAL | | | 0185 0660 1110 61.000 EA | 200.00000 12200.00| 200.00000 12200.00| 187.00000 11407.00 LOOP DETECTOR INDUCTIVE, F&I, TYPE 10 | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -5 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |AMERICAN LIGHTING AND SIGNA |HINSON, JAMES D., ELECTRICA |MILLER ELECTRIC COMPANY LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0190 0660 2102 102.000 AS | 600.00000 61200.00| 400.00000 40800.00| 467.00000 47634.00 LOOP ASSEMBLY, F&I, TYPE B | | | 0195 0660 2106 39.000 AS | 600.00000 23400.00| 425.00000 16575.00| 605.00000 23595.00 LOOP ASSEMBLY, F&I, TYPE F | | | 0200 0665 11 39.000 EA | 107.00000 4173.00| 142.00000 5538.00| 147.00000 5733.00 PEDESTRIAN DETECTOR, F&I, POLE OR | | | CONTROLLER CABINET MOUNTED DETECTOR | | | STATION & SIGN | | | 0205 0665 12 1.000 EA | 500.00000 500.00| 298.00000 298.00| 560.00000 560.00 PEDESTRIAN DETECTOR, F&I, DETECTOR | | | STATION WITH POST & SIGN | | | 0210 0670 5110 7.000 AS | 18000.00000 126000.00| 16500.00000 115500.00| 18133.00000 126931.00 TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA | | | 0215 0685128 7.000 EA | 3300.00000 23100.00| 1450.00000 10150.00| 310.00000 2170.00 SYSTEM AUXILIARIES, FURNISH & INSTALL, | | | INTERFACE PANEL | | | 0220 0685140 7.000 EA | 1300.00000 9100.00| 1500.00000 10500.00| 2686.00000 18802.00 SYSTEM AUXILIARIES, FURNISH & INSTALL | | | FIBER OPTIC-MODULATOR/DEMODULATOR | | | 0225 0690 10 70.000 EA | 50.00000 3500.00| 58.00000 4060.00| 51.00000 3570.00 SIGNAL HEAD TRAFFIC ASSEMBLY REMOVAL | | | 0230 0690 20 15.000 EA | 40.00000 600.00| 25.00000 375.00| 38.00000 570.00 SIGNAL PEDESTRIAN ASSEMBLY REMOVAL | | | 0235 0690 32 1 15.000 EA | 1300.00000 19500.00| 1250.00000 18750.00| 1392.00000 20880.00 POLE REMOVAL, SHALLOW, DIRECT BURIAL | | | 0240 0690 50 7.000 EA | 150.00000 1050.00| 275.00000 1925.00| 329.00000 2303.00 CONTROLLER ASSEMBLY, REMOVE, COMPLETE | | | ASSEMBLY | | | 0245 0690 70 15.000 EA | 20.00000 300.00| 15.00000 225.00| 13.00000 195.00 DETECTOR PEDESTRIAN ASSEMBLY REMOVE | | | 0250 0690 80 7.000 EA | 200.00000 1400.00| 350.00000 2450.00| 406.00000 2842.00 SPAN WIRE ASSEMBLY, REMOVE | | | 0255 0690 90 7.000 PI | 200.00000 1400.00| 250.00000 1750.00| 630.00000 4410.00 CONDUIT & CABLING REMOVE | | | 0260 0690100 7.000 PI | 400.00000 2800.00| 250.00000 1750.00| 1165.00000 8155.00 SIGNAL EQUIPMENT MISCELLANOUS REMOVE | | | 0265 0700 48 18 31.000 EA | 600.00000 18600.00| 425.00000 13175.00| 582.00000 18042.00 SIGN PANELS, F & I, 15 OR < | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -6 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |AMERICAN LIGHTING AND SIGNA |HINSON, JAMES D., ELECTRICA |MILLER ELECTRIC COMPANY LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0270 0700 48 19 2.000 EA | 700.00000 1400.00| 650.00000 1300.00| 631.00000 1262.00 SIGN PANELS, F & I, 16 - 100 | | | 0275 0700 48 60 19.000 EA | 50.00000 950.00| 45.00000 855.00| 50.00000 950.00 SIGN PANELS, REMOVE | | | 0280 0700 89 2 2.000 EA | 2000.00000 4000.00| 2950.00000 5900.00| 2600.00000 5200.00 SIGN, ELECTRIC POWERED, BLANK OUT | | | 0285 0711 11111 0.002 NM | 6000.00000 12.00| 75000.00000 150.00| 6413.00000 12.83 THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 6" | | | 0290 0711 11123 195.000 LF | 4.00000 780.00| 6.50000 1267.50| 3.20000 624.00 THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 12" | | | 0295 0711 11125 117.000 LF | 6.00000 702.00| 7.50000 877.50| 4.25000 497.25 THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 24" | | | 0300 0999 25 LUMP | 50000.00000 50000.00| 50000.00000 50000.00| 50000.00000 50000.00 INITIAL CONTINGENCY AMOUNT, DO NOT BID | | | SECTION 0001 TOTALS | $ 1,141,141.60| $ 1,144,965.00| $ 1,180,011.73 ==================================================================================================================================== CONTRACT TOTALS | $ 1,141,141.60| $ 1,144,965.00| $ 1,180,011.73 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -7 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |NEW FLORIDA INDUSTRIAL ELEC |PAH CONSTRUCTORS, INC. |FLORIDA SAFETY CONTRACTORS, INC LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SIGNALIZATION | | | 0005 0101 1 LUMP | 55537.32000 55537.32| 86160.00000 86160.00| 49703.84000 49703.84 MOBILIZATION | | | 0010 0102 1 220.000 LS | 19890.69000 19890.69| 5698.00000 5698.00| 20554.69000 20554.69 MAINTENANCE OF TRAFFIC 20916645201 | | | 0015 0102 14 448.000 MH | 41.96000 18798.08| 45.00000 20160.00| 45.77000 20504.96 TRAFFIC CONTROL OFFICER | | | 0020 0102 60 2880.000 ED | 0.40000 1152.00| 0.35000 1008.00| 0.38000 1094.40 WORK ZONE SIGN | | | 0025 0102 74 1 8400.000 ED | 0.26000 2184.00| 0.15000 1260.00| 0.25000 2100.00 BARRICADE, TEMPORARY, TYPES I, II, DI, | | | VP & DRUM | | | 0030 0102 76 840.000 ED | 8.39000 7047.60| 5.50000 4620.00| 8.01000 6728.40 ADVANCE WARNING ARROW PANEL | | | 0035 0102 77 5040.000 ED | 0.43000 2167.20| 0.40000 2016.00| 0.41000 2066.40 HIGH INTENSITY FLASHING LIGHTS, TEMP, | | | TYPE B | | | 0040 0102107 420.000 DA | 11.61000 4876.20| 2.00000 840.00| 3.39000 1423.80 TEMPORARY TRAFFIC DETECTION, INTERSECT | | | 0045 0110 4 10.000 SY | 56.04000 560.40| 80.00000 800.00| 59.50000 595.00 REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0050 0520 1 10 15.000 LF | 112.08000 1681.20| 25.00000 375.00| 26.32000 394.80 CONCRETE CURB & GUTTER, TYPE F | | | 0055 0522 1 41.000 SY | 112.08000 4595.28| 80.00000 3280.00| 53.62000 2198.42 SIDEWALK CONCRETE, 4" THICK | | | 0060 0527 1 9.000 EA | 226.30000 2036.70| 750.00000 6750.00| 572.08000 5148.72 DETECTABLE WARNING ON EXISTING WALKING | | | SURFACE, RETROFIT | | | 0065 0630 1 11 105.000 LF | 13.77000 1445.85| 23.15000 2430.75| 23.74000 2492.70 CONDUIT - SIGNALS, FURNISH & INSTALL, | | | ABOVEGROUND | | | 0070 0630 1 12 6928.000 LF | 5.88000 40736.64| 3.75000 25980.00| 4.38000 30344.64 CONDUIT - SIGNALS, FURNISH & INSTALL, | | | UNDERGROUND | | | 0075 0630 1 13 714.000 LF | 19.99000 14272.86| 13.00000 9282.00| 17.48000 12480.72 CONDUIT - SIGNALS, FURNISH & INSTALL, | | | SAWCUT & PLACE UNDER EXISTING PAVEMENT | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -8 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |NEW FLORIDA INDUSTRIAL ELEC |PAH CONSTRUCTORS, INC. |FLORIDA SAFETY CONTRACTORS, INC LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0080 0630 1 14 5030.000 LF | 10.13000 50953.90| 12.00000 60360.00| 12.68000 63780.40 CONDUIT, SIGNALS, F & I, UNDERGROUND | | | -JACKED | | | 0085 0632 7 1 7.000 PI | 3751.76000 26262.32| 4996.00000 34972.00| 3293.56000 23054.92 CABLE, SIGNAL, FURNISH & INSTALL | | | 0090 0633121 1 956.000 LF | 1.74000 1663.44| 1.55000 1481.80| 1.93000 1845.08 CABLE - FIBER OPTIC, F&I, UNDERGROUND, | | | SGL MODE, 1- 25 PR | | | 0095 0635 1 11 127.000 EA | 205.99000 26160.73| 218.00000 27686.00| 305.85000 38842.95 PULL & JUNCTION BOXES, F&I, PULL BOX | | | 0100 0635 1 15 6.000 EA | 669.86000 4019.16| 506.00000 3036.00| 879.68000 5278.08 PULL & JUNCTION BOXES, F&I, FIBER OPTIC | | | 0105 0639 1 22 7.000 AS | 1052.86000 7370.02| 1216.00000 8512.00| 875.63000 6129.41 SIGNALS,ELECTRICAL POWER SERVICE, | | | UNDERGROUND, PURCHASED BYCONTRACTOR | | | FROM POWER COMPANY | | | 0110 0639 2 1 2019.000 LF | 0.96000 1938.24| 1.60000 3230.40| 0.77000 1554.63 SIGNALS, ELECTRICAL SERVICE WIRE | | | 0115 0641 2 12 7.000 EA | 492.29000 3446.03| 1000.00000 7000.00| 726.77000 5087.39 PRESTRESSED CONCRETE POLE, F&I, TYPE | | | P-II SERVICE POLE | | | 0120 0649 31201 2.000 EA | 14769.74000 29539.48| 13259.00000 26518.00| 12410.02000 24820.04 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-36 | | | 0125 0649 31202 3.000 EA | 16662.92000 49988.76| 15037.00000 45111.00| 15406.70000 46220.10 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-46 | | | 0130 0649 31203 8.000 EA | 18639.32000 149114.56| 17318.00000 138544.00| 17533.25000 140266.00 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-60 | | | 0135 0649 31204 3.000 EA | 20607.75000 61823.25| 19390.00000 58170.00| 19693.36000 59080.08 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE, ARM LENGTH 70.5 | | | 0140 0649 31205 1.000 EA | 24536.79000 24536.79| 22216.00000 22216.00| 17905.96000 17905.96 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE, ARM LENGTH 78 | | | 0145 0649 31217 2.000 EA | 26226.61000 52453.22| 24261.00000 48522.00| 25690.70000 51381.40 MAST ARM,F&I, WIND SPEED-130,DOUBLE ARM | | | W/0 LUMINAIRE, 60-60 | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -9 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |NEW FLORIDA INDUSTRIAL ELEC |PAH CONSTRUCTORS, INC. |FLORIDA SAFETY CONTRACTORS, INC LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0150 0649 31218 2.000 EA | 26917.45000 53834.90| 24450.00000 48900.00| 24004.36000 48008.72 MAST ARM,F&I, WIND SPEED-130,DOUBLE ARM | | | W/0 LUMINAIRE, 60-70.5 | | | 0155 0650 51311 69.000 AS | 753.21000 51971.49| 615.00000 42435.00| 692.08000 47753.52 TRAFFIC SIGNAL, F&I, 3 SECTION, 1 WAY, | | | STANDARD | | | 0160 0650 51511 6.000 AS | 1238.58000 7431.48| 1057.00000 6342.00| 1154.43000 6926.58 TRAFFIC SIGNAL, F&I, 5 SECTIONS, 1 WAY, | | | STANDARD | | | 0165 0653191 26.000 AS | 566.26000 14722.76| 562.00000 14612.00| 545.55000 14184.30 PEDESTRIAN SIGNAL, F&I, LED - COUNT | | | DOWN, 1 DIRECTION | | | 0170 0653192 7.000 AS | 1122.70000 7858.90| 1198.00000 8386.00| 1107.48000 7752.36 PEDESTRIAN SIGNAL, F&I, LED - COUNT | | | DOWN, 2 DIRECTIONS | | | 0175 0659106 237.000 EA | 3.11000 737.07| 2.00000 474.00| 6.24000 1478.88 SIGNAL HEAD AUXILIARIES, F&I, TUNNEL | | | VISOR | | | 0180 0659107 28.000 EA | 762.59000 21352.52| 868.00000 24304.00| 970.51000 27174.28 SIGNAL HEAD AUXILIARIES, F&I, ALUMINUM | | | PEDESTAL | | | 0185 0660 1110 61.000 EA | 269.72000 16452.92| 294.00000 17934.00| 159.55000 9732.55 LOOP DETECTOR INDUCTIVE, F&I, TYPE 10 | | | 0190 0660 2102 102.000 AS | 608.78000 62095.56| 558.00000 56916.00| 707.44000 72158.88 LOOP ASSEMBLY, F&I, TYPE B | | | 0195 0660 2106 39.000 AS | 756.56000 29505.84| 587.00000 22893.00| 782.49000 30517.11 LOOP ASSEMBLY, F&I, TYPE F | | | 0200 0665 11 39.000 EA | 98.76000 3851.64| 192.00000 7488.00| 128.52000 5012.28 PEDESTRIAN DETECTOR, F&I, POLE OR | | | CONTROLLER CABINET MOUNTED DETECTOR | | | STATION & SIGN | | | 0205 0665 12 1.000 EA | 240.45000 240.45| 591.00000 591.00| 240.31000 240.31 PEDESTRIAN DETECTOR, F&I, DETECTOR | | | STATION WITH POST & SIGN | | | 0210 0670 5110 7.000 AS | 15036.37000 105254.59| 19411.00000 135877.00| 18879.92000 132159.44 TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA | | | 0215 0685128 7.000 EA | 2906.59000 20346.13| 2525.00000 17675.00| 2926.54000 20485.78 SYSTEM AUXILIARIES, FURNISH & INSTALL, | | | INTERFACE PANEL | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -10 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |NEW FLORIDA INDUSTRIAL ELEC |PAH CONSTRUCTORS, INC. |FLORIDA SAFETY CONTRACTORS, INC LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0220 0685140 7.000 EA | 3209.22000 22464.54| 2795.00000 19565.00| 3459.32000 24215.24 SYSTEM AUXILIARIES, FURNISH & INSTALL | | | FIBER OPTIC-MODULATOR/DEMODULATOR | | | 0225 0690 10 70.000 EA | 56.39000 3947.30| 65.00000 4550.00| 18.76000 1313.20 SIGNAL HEAD TRAFFIC ASSEMBLY REMOVAL | | | 0230 0690 20 15.000 EA | 28.67000 430.05| 39.00000 585.00| 18.76000 281.40 SIGNAL PEDESTRIAN ASSEMBLY REMOVAL | | | 0235 0690 32 1 15.000 EA | 1296.92000 19453.80| 1565.00000 23475.00| 1744.62000 26169.30 POLE REMOVAL, SHALLOW, DIRECT BURIAL | | | 0240 0690 50 7.000 EA | 185.30000 1297.10| 311.00000 2177.00| 300.23000 2101.61 CONTROLLER ASSEMBLY, REMOVE, COMPLETE | | | ASSEMBLY | | | 0245 0690 70 15.000 EA | 28.67000 430.05| 39.00000 585.00| 18.76000 281.40 DETECTOR PEDESTRIAN ASSEMBLY REMOVE | | | 0250 0690 80 7.000 EA | 187.33000 1311.31| 467.00000 3269.00| 150.11000 1050.77 SPAN WIRE ASSEMBLY, REMOVE | | | 0255 0690 90 7.000 PI | 229.35000 1605.45| 208.00000 1456.00| 300.23000 2101.61 CONDUIT & CABLING REMOVE | | | 0260 0690100 7.000 PI | 425.67000 2979.69| 415.00000 2905.00| 150.11000 1050.77 SIGNAL EQUIPMENT MISCELLANOUS REMOVE | | | 0265 0700 48 18 31.000 EA | 495.23000 15352.13| 524.00000 16244.00| 399.37000 12380.47 SIGN PANELS, F & I, 15 OR < | | | 0270 0700 48 19 2.000 EA | 688.40000 1376.80| 610.00000 1220.00| 464.68000 929.36 SIGN PANELS, F & I, 16 - 100 | | | 0275 0700 48 60 19.000 EA | 46.83000 889.77| 22.00000 418.00| 18.76000 356.44 SIGN PANELS, REMOVE | | | 0280 0700 89 2 2.000 EA | 2274.23000 4548.46| 2360.00000 4720.00| 2163.59000 4327.18 SIGN, ELECTRIC POWERED, BLANK OUT | | | 0285 0711 11111 0.002 NM | 5604.20000 11.21| 9180.00000 18.36| 5720.82000 11.44 THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 6" | | | 0290 0711 11123 195.000 LF | 3.14000 612.30| 4.00000 780.00| 3.20000 624.00 THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 12" | | | 0295 0711 11125 117.000 LF | 4.26000 498.42| 7.95000 930.15| 4.35000 508.95 THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 24" | | | 0300 0999 25 LUMP | 50000.00000 50000.00| 50000.00000 50000.00| 50000.00000 50000.00 INITIAL CONTINGENCY AMOUNT, DO NOT BID | | | SECTION 0001 TOTALS | $ 1,189,116.55| $ 1,193,743.46| $ 1,194,366.06 ==================================================================================================================================== CONTRACT TOTALS | $ 1,189,116.55| $ 1,193,743.46| $ 1,194,366.06 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -11 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 7 ) |( 8 ) |( 9 ) |TRAFFIC CONTROL DEVICES, IN |ROADWAY SPECIALTY DEVICES, |INFRASOURCE UNDERGROUND CONSTRU LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SIGNALIZATION | | | 0005 0101 1 LUMP | 57450.00000 57450.00| 28174.85000 28174.85| 54770.60000 54770.60 MOBILIZATION | | | 0010 0102 1 220.000 LS | 26805.00000 26805.00| 52176.66000 52176.66| 32410.41000 32410.41 MAINTENANCE OF TRAFFIC 20916645201 | | | 0015 0102 14 448.000 MH | 42.75000 19152.00| 40.40000 18099.20| 63.91000 28631.68 TRAFFIC CONTROL OFFICER | | | 0020 0102 60 2880.000 ED | 0.27000 777.60| 0.43000 1238.40| 0.29000 835.20 WORK ZONE SIGN | | | 0025 0102 74 1 8400.000 ED | 0.19000 1596.00| 0.17000 1428.00| 0.21000 1764.00 BARRICADE, TEMPORARY, TYPES I, II, DI, | | | VP & DRUM | | | 0030 0102 76 840.000 ED | 5.34000 4485.60| 6.73000 5653.20| 5.81000 4880.40 ADVANCE WARNING ARROW PANEL | | | 0035 0102 77 5040.000 ED | 0.42000 2116.80| 0.48000 2419.20| 0.46000 2318.40 HIGH INTENSITY FLASHING LIGHTS, TEMP, | | | TYPE B | | | 0040 0102107 420.000 DA | 12.90000 5418.00| 54.01000 22684.20| 60.38000 25359.60 TEMPORARY TRAFFIC DETECTION, INTERSECT | | | 0045 0110 4 10.000 SY | 100.25000 1002.50| 171.82000 1718.20| 247.33000 2473.30 REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0050 0520 1 10 15.000 LF | 32.55000 488.25| 229.10000 3436.50| 32.54000 488.10 CONCRETE CURB & GUTTER, TYPE F | | | 0055 0522 1 41.000 SY | 35.40000 1451.40| 101.95000 4179.95| 54.77000 2245.57 SIDEWALK CONCRETE, 4" THICK | | | 0060 0527 1 9.000 EA | 602.75000 5424.75| 572.74000 5154.66| 624.84000 5623.56 DETECTABLE WARNING ON EXISTING WALKING | | | SURFACE, RETROFIT | | | 0065 0630 1 11 105.000 LF | 16.67000 1750.35| 10.89000 1143.45| 18.39000 1930.95 CONDUIT - SIGNALS, FURNISH & INSTALL, | | | ABOVEGROUND | | | 0070 0630 1 12 6928.000 LF | 3.83000 26534.24| 3.69000 25564.32| 4.20000 29097.60 CONDUIT - SIGNALS, FURNISH & INSTALL, | | | UNDERGROUND | | | 0075 0630 1 13 714.000 LF | 17.83000 12730.62| 17.05000 12173.70| 30.56000 21819.84 CONDUIT - SIGNALS, FURNISH & INSTALL, | | | SAWCUT & PLACE UNDER EXISTING PAVEMENT | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -12 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 7 ) |( 8 ) |( 9 ) |TRAFFIC CONTROL DEVICES, IN |ROADWAY SPECIALTY DEVICES, |INFRASOURCE UNDERGROUND CONSTRU LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0080 0630 1 14 5030.000 LF | 10.45000 52563.50| 9.37000 47131.10| 8.71000 43811.30 CONDUIT, SIGNALS, F & I, UNDERGROUND | | | -JACKED | | | 0085 0632 7 1 7.000 PI | 3548.50000 24839.50| 3372.05000 23604.35| 2771.41000 19399.87 CABLE, SIGNAL, FURNISH & INSTALL | | | 0090 0633121 1 956.000 LF | 1.66000 1586.96| 2.92000 2791.52| 1.80000 1720.80 CABLE - FIBER OPTIC, F&I, UNDERGROUND, | | | SGL MODE, 1- 25 PR | | | 0095 0635 1 11 127.000 EA | 328.50000 41719.50| 295.64000 37546.28| 222.53000 28261.31 PULL & JUNCTION BOXES, F&I, PULL BOX | | | 0100 0635 1 15 6.000 EA | 738.75000 4432.50| 704.80000 4228.80| 511.08000 3066.48 PULL & JUNCTION BOXES, F&I, FIBER OPTIC | | | 0105 0639 1 22 7.000 AS | 1066.50000 7465.50| 1075.42000 7527.94| 991.03000 6937.21 SIGNALS,ELECTRICAL POWER SERVICE, | | | UNDERGROUND, PURCHASED BYCONTRACTOR | | | FROM POWER COMPANY | | | 0110 0639 2 1 2019.000 LF | 0.78000 1574.82| 1.06000 2140.14| 0.89000 1796.91 SIGNALS, ELECTRICAL SERVICE WIRE | | | 0115 0641 2 12 7.000 EA | 620.75000 4345.25| 531.54000 3720.78| 1722.36000 12056.52 PRESTRESSED CONCRETE POLE, F&I, TYPE | | | P-II SERVICE POLE | | | 0120 0649 31201 2.000 EA | 13606.00000 27212.00| 13721.21000 27442.42| 15717.56000 31435.12 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-36 | | | 0125 0649 31202 3.000 EA | 14140.50000 42421.50| 17029.74000 51089.22| 17783.19000 53349.57 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-46 | | | 0130 0649 31203 8.000 EA | 18997.00000 151976.00| 20603.14000 164825.12| 20434.22000 163473.76 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-60 | | | 0135 0649 31204 3.000 EA | 22668.50000 68005.50| 22753.09000 68259.27| 22842.45000 68527.35 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE, ARM LENGTH 70.5 | | | 0140 0649 31205 1.000 EA | 29801.50000 29801.50| 25322.78000 25322.78| 26125.78000 26125.78 MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE, ARM LENGTH 78 | | | 0145 0649 31217 2.000 EA | 27476.00000 54952.00| 29927.16000 59854.32| 28140.99000 56281.98 MAST ARM,F&I, WIND SPEED-130,DOUBLE ARM | | | W/0 LUMINAIRE, 60-60 | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -13 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 7 ) |( 8 ) |( 9 ) |TRAFFIC CONTROL DEVICES, IN |ROADWAY SPECIALTY DEVICES, |INFRASOURCE UNDERGROUND CONSTRU LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0150 0649 31218 2.000 EA | 29372.00000 58744.00| 29000.00000 58000.00| 28360.39000 56720.78 MAST ARM,F&I, WIND SPEED-130,DOUBLE ARM | | | W/0 LUMINAIRE, 60-70.5 | | | 0155 0650 51311 69.000 AS | 712.00000 49128.00| 722.69000 49865.61| 753.33000 51979.77 TRAFFIC SIGNAL, F&I, 3 SECTION, 1 WAY, | | | STANDARD | | | 0160 0650 51511 6.000 AS | 1108.50000 6651.00| 1195.36000 7172.16| 1267.94000 7607.64 TRAFFIC SIGNAL, F&I, 5 SECTIONS, 1 WAY, | | | STANDARD | | | 0165 0653191 26.000 AS | 508.00000 13208.00| 600.95000 15624.70| 638.83000 16609.58 PEDESTRIAN SIGNAL, F&I, LED - COUNT | | | DOWN, 1 DIRECTION | | | 0170 0653192 7.000 AS | 1060.50000 7423.50| 1143.21000 8002.47| 1167.57000 8172.99 PEDESTRIAN SIGNAL, F&I, LED - COUNT | | | DOWN, 2 DIRECTIONS | | | 0175 0659106 237.000 EA | 1.02000 241.74| 0.57000 135.09| 11.81000 2798.97 SIGNAL HEAD AUXILIARIES, F&I, TUNNEL | | | VISOR | | | 0180 0659107 28.000 EA | 922.00000 25816.00| 803.82000 22506.96| 998.45000 27956.60 SIGNAL HEAD AUXILIARIES, F&I, ALUMINUM | | | PEDESTAL | | | 0185 0660 1110 61.000 EA | 329.75000 20114.75| 35.44000 2161.84| 156.45000 9543.45 LOOP DETECTOR INDUCTIVE, F&I, TYPE 10 | | | 0190 0660 2102 102.000 AS | 603.00000 61506.00| 556.90000 56803.80| 626.90000 63943.80 LOOP ASSEMBLY, F&I, TYPE B | | | 0195 0660 2106 39.000 AS | 617.75000 24092.25| 568.29000 22163.31| 839.81000 32752.59 LOOP ASSEMBLY, F&I, TYPE F | | | 0200 0665 11 39.000 EA | 112.00000 4368.00| 116.89000 4558.71| 122.69000 4784.91 PEDESTRIAN DETECTOR, F&I, POLE OR | | | CONTROLLER CABINET MOUNTED DETECTOR | | | STATION & SIGN | | | 0205 0665 12 1.000 EA | 461.07000 461.07| 287.99000 287.99| 122.69000 122.69 PEDESTRIAN DETECTOR, F&I, DETECTOR | | | STATION WITH POST & SIGN | | | 0210 0670 5110 7.000 AS | 17079.00000 119553.00| 21466.33000 150264.31| 21572.08000 151004.56 TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA | | | 0215 0685128 7.000 EA | 643.50000 4504.50| 2833.89000 19837.23| 2934.23000 20539.61 SYSTEM AUXILIARIES, FURNISH & INSTALL, | | | INTERFACE PANEL | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -14 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 7 ) |( 8 ) |( 9 ) |TRAFFIC CONTROL DEVICES, IN |ROADWAY SPECIALTY DEVICES, |INFRASOURCE UNDERGROUND CONSTRU LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0220 0685140 7.000 EA | 2231.75000 15622.25| 1681.26000 11768.82| 3247.99000 22735.93 SYSTEM AUXILIARIES, FURNISH & INSTALL | | | FIBER OPTIC-MODULATOR/DEMODULATOR | | | 0225 0690 10 70.000 EA | 24.50000 1715.00| 21.41000 1498.70| 80.83000 5658.10 SIGNAL HEAD TRAFFIC ASSEMBLY REMOVAL | | | 0230 0690 20 15.000 EA | 24.50000 367.50| 19.27000 289.05| 114.15000 1712.25 SIGNAL PEDESTRIAN ASSEMBLY REMOVAL | | | 0235 0690 32 1 15.000 EA | 1452.75000 21791.25| 1198.60000 17979.00| 3299.71000 49495.65 POLE REMOVAL, SHALLOW, DIRECT BURIAL | | | 0240 0690 50 7.000 EA | 465.75000 3260.25| 342.54000 2397.78| 290.25000 2031.75 CONTROLLER ASSEMBLY, REMOVE, COMPLETE | | | ASSEMBLY | | | 0245 0690 70 15.000 EA | 12.50000 187.50| 17.13000 256.95| 36.77000 551.55 DETECTOR PEDESTRIAN ASSEMBLY REMOVE | | | 0250 0690 80 7.000 EA | 293.50000 2054.50| 342.54000 2397.78| 302.30000 2116.10 SPAN WIRE ASSEMBLY, REMOVE | | | 0255 0690 90 7.000 PI | 293.50000 2054.50| 385.35000 2697.45| 458.62000 3210.34 CONDUIT & CABLING REMOVE | | | 0260 0690100 7.000 PI | 281.75000 1972.25| 513.80000 3596.60| 396.24000 2773.68 SIGNAL EQUIPMENT MISCELLANOUS REMOVE | | | 0265 0700 48 18 31.000 EA | 498.50000 15453.50| 479.14000 14853.34| 252.50000 7827.50 SIGN PANELS, F & I, 15 OR < | | | 0270 0700 48 19 2.000 EA | 557.00000 1114.00| 579.63000 1159.26| 312.18000 624.36 SIGN PANELS, F & I, 16 - 100 | | | 0275 0700 48 60 19.000 EA | 49.00000 931.00| 21.41000 406.79| 49.84000 946.96 SIGN PANELS, REMOVE | | | 0280 0700 89 2 2.000 EA | 2581.75000 5163.50| 1994.89000 3989.78| 2658.44000 5316.88 SIGN, ELECTRIC POWERED, BLANK OUT | | | 0285 0711 11111 0.002 NM | 5633.00000 11.27| 6048.11000 12.10| 12993.25000 25.99 THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 6" | | | 0290 0711 11123 195.000 LF | 3.20000 624.00| 3.44000 670.80| 7.38000 1439.10 THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 12" | | | 0295 0711 11125 117.000 LF | 5.34000 624.78| 5.73000 670.41| 12.30000 1439.10 THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 24" | | | 0300 0999 25 LUMP | 50000.00000 50000.00| 50000.00000 50000.00| 50000.00000 50000.00 INITIAL CONTINGENCY AMOUNT, DO NOT BID | | | SECTION 0001 TOTALS | $ 1,198,838.00| $ 1,242,757.32| $ 1,343,336.35 ==================================================================================================================================== CONTRACT TOTALS | $ 1,198,838.00| $ 1,242,757.32| $ 1,343,336.35 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -15 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 10 ) |( ) |( ) |C AND C POWERLINE, INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 SIGNALIZATION | | | 0005 0101 1 LUMP | 47035.00000 47035.00| | MOBILIZATION | | | 0010 0102 1 220.000 LS | 60902.12000 60902.12| | MAINTENANCE OF TRAFFIC 20916645201 | | | 0015 0102 14 448.000 MH | 49.22000 22050.56| | TRAFFIC CONTROL OFFICER | | | 0020 0102 60 2880.000 ED | 0.44000 1267.20| | WORK ZONE SIGN | | | 0025 0102 74 1 8400.000 ED | 0.18000 1512.00| | BARRICADE, TEMPORARY, TYPES I, II, DI, | | | VP & DRUM | | | 0030 0102 76 840.000 ED | 6.93000 5821.20| | ADVANCE WARNING ARROW PANEL | | | 0035 0102 77 5040.000 ED | 0.50000 2520.00| | HIGH INTENSITY FLASHING LIGHTS, TEMP, | | | TYPE B | | | 0040 0102107 420.000 DA | 78.22000 32852.40| | TEMPORARY TRAFFIC DETECTION, INTERSECT | | | 0045 0110 4 10.000 SY | 70.31000 703.10| | REMOVAL OF EXISTING CONCRETE PAVEMENT | | | 0050 0520 1 10 15.000 LF | 41.01000 615.15| | CONCRETE CURB & GUTTER, TYPE F | | | 0055 0522 1 41.000 SY | 46.87000 1921.67| | SIDEWALK CONCRETE, 4" THICK | | | 0060 0527 1 9.000 EA | 2630.40000 23673.60| | DETECTABLE WARNING ON EXISTING WALKING | | | SURFACE, RETROFIT | | | 0065 0630 1 11 105.000 LF | 34.28000 3599.40| | CONDUIT - SIGNALS, FURNISH & INSTALL, | | | ABOVEGROUND | | | 0070 0630 1 12 6928.000 LF | 6.04000 41845.12| | CONDUIT - SIGNALS, FURNISH & INSTALL, | | | UNDERGROUND | | | 0075 0630 1 13 714.000 LF | 13.73000 9803.22| | CONDUIT - SIGNALS, FURNISH & INSTALL, | | | SAWCUT & PLACE UNDER EXISTING PAVEMENT | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -16 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 10 ) |( ) |( ) |C AND C POWERLINE, INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0080 0630 1 14 5030.000 LF | 13.73000 69061.90| | CONDUIT, SIGNALS, F & I, UNDERGROUND | | | -JACKED | | | 0085 0632 7 1 7.000 PI | 6944.89000 48614.23| | CABLE, SIGNAL, FURNISH & INSTALL | | | 0090 0633121 1 956.000 LF | 11.82000 11299.92| | CABLE - FIBER OPTIC, F&I, UNDERGROUND, | | | SGL MODE, 1- 25 PR | | | 0095 0635 1 11 127.000 EA | 319.65000 40595.55| | PULL & JUNCTION BOXES, F&I, PULL BOX | | | 0100 0635 1 15 6.000 EA | 721.73000 4330.38| | PULL & JUNCTION BOXES, F&I, FIBER OPTIC | | | 0105 0639 1 22 7.000 AS | 955.49000 6688.43| | SIGNALS,ELECTRICAL POWER SERVICE, | | | UNDERGROUND, PURCHASED BYCONTRACTOR | | | FROM POWER COMPANY | | | 0110 0639 2 1 2019.000 LF | 2.51000 5067.69| | SIGNALS, ELECTRICAL SERVICE WIRE | | | 0115 0641 2 12 7.000 EA | 887.48000 6212.36| | PRESTRESSED CONCRETE POLE, F&I, TYPE | | | P-II SERVICE POLE | | | 0120 0649 31201 2.000 EA | 14113.82000 28227.64| | MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-36 | | | 0125 0649 31202 3.000 EA | 15658.48000 46975.44| | MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-46 | | | 0130 0649 31203 8.000 EA | 17118.58000 136948.64| | MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE-60 | | | 0135 0649 31204 3.000 EA | 18203.97000 54611.91| | MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE, ARM LENGTH 70.5 | | | 0140 0649 31205 1.000 EA | 23646.02000 23646.02| | MAST ARM,F&I, WIND SPEED-130,SINGLE ARM | | | W/0 LUMINAIRE, ARM LENGTH 78 | | | 0145 0649 31217 2.000 EA | 25186.92000 50373.84| | MAST ARM,F&I, WIND SPEED-130,DOUBLE ARM | | | W/0 LUMINAIRE, 60-60 | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -17 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 10 ) |( ) |( ) |C AND C POWERLINE, INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0150 0649 31218 2.000 EA | 25490.58000 50981.16| | MAST ARM,F&I, WIND SPEED-130,DOUBLE ARM | | | W/0 LUMINAIRE, 60-70.5 | | | 0155 0650 51311 69.000 AS | 877.89000 60574.41| | TRAFFIC SIGNAL, F&I, 3 SECTION, 1 WAY, | | | STANDARD | | | 0160 0650 51511 6.000 AS | 1405.28000 8431.68| | TRAFFIC SIGNAL, F&I, 5 SECTIONS, 1 WAY, | | | STANDARD | | | 0165 0653191 26.000 AS | 691.68000 17983.68| | PEDESTRIAN SIGNAL, F&I, LED - COUNT | | | DOWN, 1 DIRECTION | | | 0170 0653192 7.000 AS | 1237.05000 8659.35| | PEDESTRIAN SIGNAL, F&I, LED - COUNT | | | DOWN, 2 DIRECTIONS | | | 0175 0659106 237.000 EA | 9.37000 2220.69| | SIGNAL HEAD AUXILIARIES, F&I, TUNNEL | | | VISOR | | | 0180 0659107 28.000 EA | 721.10000 20190.80| | SIGNAL HEAD AUXILIARIES, F&I, ALUMINUM | | | PEDESTAL | | | 0185 0660 1110 61.000 EA | 299.12000 18246.32| | LOOP DETECTOR INDUCTIVE, F&I, TYPE 10 | | | 0190 0660 2102 102.000 AS | 796.95000 81288.90| | LOOP ASSEMBLY, F&I, TYPE B | | | 0195 0660 2106 39.000 AS | 967.55000 37734.45| | LOOP ASSEMBLY, F&I, TYPE F | | | 0200 0665 11 39.000 EA | 178.90000 6977.10| | PEDESTRIAN DETECTOR, F&I, POLE OR | | | CONTROLLER CABINET MOUNTED DETECTOR | | | STATION & SIGN | | | 0205 0665 12 1.000 EA | 223.05000 223.05| | PEDESTRIAN DETECTOR, F&I, DETECTOR | | | STATION WITH POST & SIGN | | | 0210 0670 5110 7.000 AS | 16073.04000 112511.28| | TRAFFIC CONTROLLER ASSEMBLY, F&I, NEMA | | | 0215 0685128 7.000 EA | 441.00000 3087.00| | SYSTEM AUXILIARIES, FURNISH & INSTALL, | | | INTERFACE PANEL | | | FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -18 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 10 ) |( ) |( ) |C AND C POWERLINE, INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------0220 0685140 7.000 EA | 3528.00000 24696.00| | SYSTEM AUXILIARIES, FURNISH & INSTALL | | | FIBER OPTIC-MODULATOR/DEMODULATOR | | | 0225 0690 10 70.000 EA | 31.24000 2186.80| | SIGNAL HEAD TRAFFIC ASSEMBLY REMOVAL | | | 0230 0690 20 15.000 EA | 31.24000 468.60| | SIGNAL PEDESTRIAN ASSEMBLY REMOVAL | | | 0235 0690 32 1 15.000 EA | 749.76000 11246.40| | POLE REMOVAL, SHALLOW, DIRECT BURIAL | | | 0240 0690 50 7.000 EA | 249.92000 1749.44| | CONTROLLER ASSEMBLY, REMOVE, COMPLETE | | | ASSEMBLY | | | 0245 0690 70 15.000 EA | 31.24000 468.60| | DETECTOR PEDESTRIAN ASSEMBLY REMOVE | | | 0250 0690 80 7.000 EA | 499.84000 3498.88| | SPAN WIRE ASSEMBLY, REMOVE | | | 0255 0690 90 7.000 PI | 2499.20000 17494.40| | CONDUIT & CABLING REMOVE | | | 0260 0690100 7.000 PI | 1249.60000 8747.20| | SIGNAL EQUIPMENT MISCELLANOUS REMOVE | | | 0265 0700 48 18 31.000 EA | 565.44000 17528.64| | SIGN PANELS, F & I, 15 OR < | | | 0270 0700 48 19 2.000 EA | 710.08000 1420.16| | SIGN PANELS, F & I, 16 - 100 | | | 0275 0700 48 60 19.000 EA | 143.80000 2732.20| | SIGN PANELS, REMOVE | | | 0280 0700 89 2 2.000 EA | 2332.92000 4665.84| | SIGN, ELECTRIC POWERED, BLANK OUT | | | 0285 0711 11111 0.002 NM | 7485.00000 14.97| | THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 6" | | | 0290 0711 11123 195.000 LF | 4.14000 807.30| | THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 12" | | | 0295 0711 11125 117.000 LF | 6.53000 764.01| | THERMOPLASTIC, STANDARD, WHITE, SOLID, | | | 24" | | | 0300 0999 25 LUMP | 50000.00000 50000.00| | INITIAL CONTINGENCY AMOUNT, DO NOT BID | | | SECTION 0001 TOTALS | $ 1,366,375.00| $ | $ ==================================================================================================================================== CONTRACT TOTALS | $ 1,366,375.00| $ 0.00| $ 0.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 005 -19 CALL ORDER: 005 PROPOSAL ID: E2L72 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 10 ) |( ) |( ) |C AND C POWERLINE, INC. | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------- CERTIFIED TO BE A TRUE COPY AND APPROVED BY Jane E. Jones-Redd District Contracts Administrator September 1, 2009 DATE NOTE: Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. ACTUAL COMMITMENT AND FINAL EXECUTION OF THE CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND FUNDS AVAILABILITY. POSTING BEGINS SEPTEMBER 1, 2009 @ 4:15 P.M. AND ENDS SEPTEMBER 4, 2009 AT 5:00 P.M. FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS CALL ORDER LETTING DATE SET-ASIDE CONTRACT TIME : 006 : 08/19/09 : : 365 FINPROJ(S) : 41021317252 (*) F.A. NO. : 41021327235 : GAINSVILLE MAINT. : ROUTINE MAINT CONTRACTS PRIMARY LOCAL NAME PROJ LIMITS PROPOSAL ID DISTRICT U/R CODE CALENDAR DAYS 2:00 P.M. : E2M90-R0 : 02 : N/A N/A DATE : 08/31/09 PAGE : 006 -2 PROPOSAL DESC : Tree trimming and tree and brush removal on SR 93 (I-75) and various state maintained right of ways (Rural and Urban). MAXIMUM LIMITING AMOUNT. RENEWAL OPTION. A MANDATORY PREBID CONFERENCE will be held at Gainesville Maintenance Auditorium, 5301 NE 39th Ave., Gainesville, FL on August 4, 2009 at 10:00 a.m. SPECIAL BID REQUIREMENTS-SEE PAGE 4 OF SPECIFICATION PACKAGE. COUNTIES : ALACHUA BRADFORD ROAD NAME : ==================================================================================================================================== |( 1 ) WITHDREW |( 2 ) |( 3 ) |FRANK J.CAPALLIA |ABSOLUTE TREE AND ASSET SER |AE ENGINEERING, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 TREE TRIMMING AND REMOVAL (MH) | | | 0005 E580332 21 72.000 EA | 50.00000 3600.00| 72.00000 5184.00| 100.00000 7200.00 TREE REMOVAL (4" TO 12") | | | 0010 E580332 22 71.000 EA | 100.00000 7100.00| 112.00000 7952.00| 250.00000 17750.00 TREE REMOVAL (13" TO 24") | | | 0015 E580332 23 40.000 EA | 150.00000 6000.00| 132.00000 5280.00| 500.00000 20000.00 TREE REMOVAL (25" TO 36") | | | 0020 E580332 24 7.000 EA | 500.00000 3500.00| 500.00000 3500.00| 500.00000 3500.00 TREE REMOVAL (37" TO 48") | | | 0025 E580332 25 3.000 EA | 1000.00000 3000.00| 500.00000 1500.00| 1000.00000 3000.00 TREE REMOVAL (> 48") | | | 0030 E580332 99 59.000 AC | 350.00000 20650.00| 800.00000 47200.00| 900.00000 53100.00 TREE AND BRUSH REMOVAL | | | 0035 E580334 1 119.000 EA | 20.00000 2380.00| 5.00000 595.00| 10.00000 1190.00 STUMP GRINDING (4" TO 24") | | | 0040 E580334 2 47.000 EA | 50.00000 2350.00| 50.00000 2350.00| 20.00000 940.00 STUMP GRINDING (25" TO 48") | | | 0045 E580334 3 3.000 EA | 200.00000 600.00| 300.00000 900.00| 300.00000 900.00 STUMP GRINDING (> 48") | | | 0050 E580336 4 6.000 PM | 2000.00000 12000.00| 2686.00000 16116.00| 900.00000 5400.00 PRUNING AND TRIMMING (TREES AND SHRUBS) | | | 0055 E580337 11 80.000 GA | 10.00000 800.00| 10.00000 800.00| 25.00000 2000.00 HERBICIDE (MANUAL APPLICATION) | | | SECTION 0001 TOTALS | $ 61,980.00| $ 91,377.00| $ 114,980.00 ==================================================================================================================================== CONTRACT TOTALS | $ 61,980.00| $ 91,377.00| $ 114,980.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 006 -3 CALL ORDER: 006 PROPOSAL ID: E2M90-R0 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |ARAZOZA BROTHERS CORPORATIO |EVANS CONTRACTING SERVICES, |CLEAR ZONE MAINTENANCE, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 TREE TRIMMING AND REMOVAL (MH) | | | 0005 E580332 21 72.000 EA | 150.00000 10800.00| 200.00000 14400.00| 75.00000 5400.00 TREE REMOVAL (4" TO 12") | | | 0010 E580332 22 71.000 EA | 200.00000 14200.00| 350.00000 24850.00| 315.00000 22365.00 TREE REMOVAL (13" TO 24") | | | 0015 E580332 23 40.000 EA | 300.00000 12000.00| 100.00000 4000.00| 500.00000 20000.00 TREE REMOVAL (25" TO 36") | | | 0020 E580332 24 7.000 EA | 500.00000 3500.00| 50.00000 350.00| 900.00000 6300.00 TREE REMOVAL (37" TO 48") | | | 0025 E580332 25 3.000 EA | 750.00000 2250.00| 50.00000 150.00| 1200.00000 3600.00 TREE REMOVAL (> 48") | | | 0030 E580332 99 59.000 AC | 2500.00000 147500.00| 3000.00000 177000.00| 5000.00000 295000.00 TREE AND BRUSH REMOVAL | | | 0035 E580334 1 119.000 EA | 100.00000 11900.00| 5.00000 595.00| 55.00000 6545.00 STUMP GRINDING (4" TO 24") | | | 0040 E580334 2 47.000 EA | 150.00000 7050.00| 5.00000 235.00| 70.00000 3290.00 STUMP GRINDING (25" TO 48") | | | 0045 E580334 3 3.000 EA | 200.00000 600.00| 5.00000 15.00| 150.00000 450.00 STUMP GRINDING (> 48") | | | 0050 E580336 4 6.000 PM | 3000.00000 18000.00| 3000.00000 18000.00| 3500.00000 21000.00 PRUNING AND TRIMMING (TREES AND SHRUBS) | | | 0055 E580337 11 80.000 GA | 125.00000 10000.00| 20.00000 1600.00| 200.00000 16000.00 HERBICIDE (MANUAL APPLICATION) | | | SECTION 0001 TOTALS | $ 237,800.00| $ 241,195.00| $ 399,950.00 ==================================================================================================================================== CONTRACT TOTALS | $ 237,800.00| $ 241,195.00| $ 399,950.00 CERTIFIED TO BE A TRUE COPY AND APPROVED BY Jane E. Jones-Redd District Contracts Administrator September 1, 2009 DATE NOTE: Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. ACTUAL COMMITMENT AND FINAL EXECUTION OF THE CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND FUNDS AVAILABILITY. POSTING BEGINS SEPTEMBER 1, 2009 @ 4:15 P.M. AND ENDS SEPTEMBER 4, 2009 AT 5:00 P.M. FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS CALL ORDER LETTING DATE SET-ASIDE CONTRACT TIME : 007 : 08/19/09 : : 365 FINPROJ(S) : 41021317249 41021327233 (*) : GAINSVILLE MAINT. : INTERSATE LOCAL NAME PROJ LIMITS PROPOSAL ID DISTRICT U/R CODE CALENDAR DAYS 2:00 P.M. F.A. NO. : E2M58-R0 : 02 : : N/A N/A DATE : 08/31/09 PAGE : 007 -2 PROPOSAL DESC : Tree removal and tree trimming on SR 93(I-75) and various State maintained right of ways. MAXIMUM LIMITING AMOUNT. RENEWAL OPTION. A MANDATORY PREBID CONFERENCE will be held at Gainesville Maintenance Auditorium, 5301 NE 39th Ave., Gainesville, FL on August 4, 2009 at 11:00 a.m. SPECIAL BID REQUIREMENTS-SEE PAGE 4 OF SPECIFICATION PACKAGE. COUNTIES : ALACHUA BRADFORD ROAD NAME : ==================================================================================================================================== |( 1 ) |( 2 ) |( 3 ) |FRANK J.CAPALLIA |PAFF TREE SERVICE LLC |AE ENGINEERING, INC. LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 TREE TRIMMING AND REMOVAL (MH) | | | 0005 E580332 21 106.000 EA | 50.00000 5300.00| 80.00000 8480.00| 100.00000 10600.00 TREE REMOVAL (4" TO 12") | | | 0010 E580332 22 190.000 EA | 100.00000 19000.00| 199.00000 37810.00| 250.00000 47500.00 TREE REMOVAL (13" TO 24") | | | 0015 E580332 23 75.000 EA | 200.00000 15000.00| 193.00000 14475.00| 500.00000 37500.00 TREE REMOVAL (25" TO 36") | | | 0020 E580332 24 44.000 EA | 350.00000 15400.00| 100.00000 4400.00| 100.00000 4400.00 TREE REMOVAL (37" TO 48") | | | 0025 E580332 25 25.000 EA | 500.00000 12500.00| 310.00000 7750.00| 50.00000 1250.00 TREE REMOVAL (> 48") | | | 0030 E580334 1 294.000 EA | 10.00000 2940.00| 10.00000 2940.00| 10.00000 2940.00 STUMP GRINDING (4" TO 24") | | | 0035 E580334 2 119.000 EA | 30.00000 3570.00| 50.00000 5950.00| 20.00000 2380.00 STUMP GRINDING (25" TO 48") | | | 0040 E580334 3 23.000 EA | 50.00000 1150.00| 70.00000 1610.00| 50.00000 1150.00 STUMP GRINDING (> 48") | | | 0045 E580336 1 20.000 EA | 100.00000 2000.00| 70.00000 1400.00| 75.00000 1500.00 PRUNING AND TRIMMING (4" TO 24") | | | 0050 E580336 2 10.000 EA | 200.00000 2000.00| 110.00000 1100.00| 250.00000 2500.00 PRUNING AND TRIMMING (> 24") | | | SECTION 0001 TOTALS | $ 78,860.00| $ 85,915.00| $ 111,720.00 ==================================================================================================================================== CONTRACT TOTALS | $ 78,860.00| $ 85,915.00| $ 111,720.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 007 -3 CALL ORDER: 007 PROPOSAL ID: E2M58-R0 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 4 ) |( 5 ) |( 6 ) |INNOVATIVE ENVIRONMENTAL SE |EVANS CONTRACTING SERVICES, |ARAZOZA BROTHERS CORPORATION LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 TREE TRIMMING AND REMOVAL (MH) | | | 0005 E580332 21 106.000 EA | 275.00000 29150.00| 300.00000 31800.00| 125.00000 13250.00 TREE REMOVAL (4" TO 12") | | | 0010 E580332 22 190.000 EA | 500.00000 95000.00| 600.00000 114000.00| 250.00000 47500.00 TREE REMOVAL (13" TO 24") | | | 0015 E580332 23 75.000 EA | 500.00000 37500.00| 350.00000 26250.00| 400.00000 30000.00 TREE REMOVAL (25" TO 36") | | | 0020 E580332 24 44.000 EA | 70.00000 3080.00| 50.00000 2200.00| 650.00000 28600.00 TREE REMOVAL (37" TO 48") | | | 0025 E580332 25 25.000 EA | 70.00000 1750.00| 50.00000 1250.00| 900.00000 22500.00 TREE REMOVAL (> 48") | | | 0030 E580334 1 294.000 EA | 1.00000 294.00| 5.00000 1470.00| 75.00000 22050.00 STUMP GRINDING (4" TO 24") | | | 0035 E580334 2 119.000 EA | 1.00000 119.00| 5.00000 595.00| 150.00000 17850.00 STUMP GRINDING (25" TO 48") | | | 0040 E580334 3 23.000 EA | 1.00000 23.00| 5.00000 115.00| 300.00000 6900.00 STUMP GRINDING (> 48") | | | 0045 E580336 1 20.000 EA | 200.00000 4000.00| 100.00000 2000.00| 150.00000 3000.00 PRUNING AND TRIMMING (4" TO 24") | | | 0050 E580336 2 10.000 EA | 350.00000 3500.00| 300.00000 3000.00| 250.00000 2500.00 PRUNING AND TRIMMING (> 24") | | | SECTION 0001 TOTALS | $ 174,416.00| $ 182,680.00| $ 194,150.00 ==================================================================================================================================== CONTRACT TOTALS | $ 174,416.00| $ 182,680.00| $ 194,150.00 FLORIDA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS DATE : 08/31/09 PAGE : 007 -4 CALL ORDER: 007 PROPOSAL ID: E2M58-R0 LETTING DATE: 08/19/09 2:00 P.M. DISTRICT: 02 ==================================================================================================================================== |( 7 ) |( ) |( ) |CLEAR ZONE MAINTENANCE, INC | | LINE NO / ITEM CODE / ALT | | | ITEM DESCRIPTION QUANTITY | UNIT PRICE AMOUNT| UNIT PRICE AMOUNT| UNIT PRICE AMOUNT ------------------------------------------+----------------------------+----------------------------+------------------------------SECTION 0001 TREE TRIMMING AND REMOVAL (MH) | | | 0005 E580332 21 106.000 EA | 75.00000 7950.00| | TREE REMOVAL (4" TO 12") | | | 0010 E580332 22 190.000 EA | 210.00000 39900.00| | TREE REMOVAL (13" TO 24") | | | 0015 E580332 23 75.000 EA | 500.00000 37500.00| | TREE REMOVAL (25" TO 36") | | | 0020 E580332 24 44.000 EA | 1200.00000 52800.00| | TREE REMOVAL (37" TO 48") | | | 0025 E580332 25 25.000 EA | 2200.00000 55000.00| | TREE REMOVAL (> 48") | | | 0030 E580334 1 294.000 EA | 55.00000 16170.00| | STUMP GRINDING (4" TO 24") | | | 0035 E580334 2 119.000 EA | 100.00000 11900.00| | STUMP GRINDING (25" TO 48") | | | 0040 E580334 3 23.000 EA | 250.00000 5750.00| | STUMP GRINDING (> 48") | | | 0045 E580336 1 20.000 EA | 100.00000 2000.00| | PRUNING AND TRIMMING (4" TO 24") | | | 0050 E580336 2 10.000 EA | 200.00000 2000.00| | PRUNING AND TRIMMING (> 24") | | | SECTION 0001 TOTALS | $ 230,970.00| $ | $ ==================================================================================================================================== CONTRACT TOTALS | $ 230,970.00| $ 0.00| $ 0.00 CERTIFIED TO BE A TRUE COPY AND APPROVED BY Jane E. Jones-Redd District Contracts Administrator September 1, 2009 DATE NOTE: Failure to file a protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under chapter 120, Florida Statutes. ACTUAL COMMITMENT AND FINAL EXECUTION OF THE CONTRACT IS CONTINGENT UPON AN APPROVED LEGISLATIVE BUDGET AND FUNDS AVAILABILITY. POSTING BEGINS SEPTEMBER 1, 2009 @ 4:15 P.M. AND ENDS SEPTEMBER 4, 2009 AT 5:00 P.M.