CS = District Wide Contract
Consultant CEI Acquisition Plan - FY15/16 District One Construction District 1 Construction Ft. Myers Ops Center Sarasota Ops Center Bartow Ops Center Heartland Ops Center 801 N. Broadway, Bartow, FL 33830 2981 N.E. Pine Island Rd., Ft. Myers, FL 33902 1840 61st Street, Sarasota, FL 34243 2730 S.R. 60 West, Bartow, FL 33830 4730 Kenilworth Blvd., Sebring, FL 33870 Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 1Fa 414522-2-62-01 DDR N/A US 41 (SR 45) G/W 429959-1, AT CR 776 (HARBORVIEW RD) 430120-1, 430895-1, 431316-1 CES-RLM-KFS CHARLOTTE 1Fb 429959-1-62-01 SL N/A US 41 (SR 45) AT TAR PON BOULEVARD Seq. No. G/W 430921-1 CES-AEB-CSM 0.227 CHARLOTTE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm (863) 519-2222 (239) 656-7850 (941) 359-7350 (863) 519-4100 (863) 386-6112 (863) 534-0071 (239) 656-7737 (941) 359-5636 (863) 519-7924 (863) 386-6116 LEGEND: District Secretary: Operations Director: Construction Engineer: Ass't Constr. Engineer: Consultant Svcs. Manager: Consultant Svcs. Specialist Billy Hattaway Randy Prescott Jon Sands Brian Blair Jan Thompson Kelly Kautz = Continuing Services District Wide Contract Full CEI Contract LOA = Letter of Authorization SA = Supplemental Amendment CS = DW = F (863) 519-2201 (863) 519-2202 (863) 519-2223 (863) 519-2224 (863) 519-2256 (863) 519-2232 (863) 519-1902 (863) 534-7265 (863) 534-0071 (863) 534-0071 (863) 534-0071 (863) 534-0071 Event Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 Construction Project Manager/Phone No./Email: No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Work Type Ph 62 Budget $ (% of Ph 52) Due* Advert List List Meeting Present. Select. Review Meeting Meeting Kellie F. Spurgeon (863) 519-2654 Schedule Date-Prop. 08/11/15 09/04/15 10/12/15 10/29/15 N/A N/A 11/17/15 12/07/15 N/A 12/21/15 Eunice Usher (239) 656-7852 Actual Date 07/22/15 09/04/15 10/12/15 10/29/15 11/17/15 12/07/15 N/A 12/21/15 N/A N/A Leighton Elliot (239) 656-7869 Shortlisted Name: HDR Construction Con KCCS, Inc. Volkert, Inc. Comments: ELOR INTERSECTION IMPROVEMENT Consultant Address: 2601 Cattleman Road, 201 North Franklin St., S 2300 Maitland Ctr. Pkwy., Ste. 106 Project Info: Sarasota, FL 34232-623Tampa, FL 33602 Maitland FL 32751 Funds Encumbered: February 24, 2016 (120) Contact: Gary Downing, PE Paul Wingard, PE, LEEDGreg Dutton, PE Funds Encumb. Date: $495,681 ( 0.19% ) Phone: 941-342-2709 239-278-5999 Ext. 203 321-274-4772 Contractor Award Date: 10.1 $65,685 ( 13.25% ) Email:: gary.downing@hdrincpwingard@kisingercam [email protected] CEI Contract #: Mario A. Dipola (863) 519-2396 Schedule Date-Prop. 08/11/15 09/04/15 10/12/15 10/29/15 N/A N/A 11/17/15 12/07/15 N/A 12/21/15 Eunice Usher (239) 656-7852 Actual Date 07/22/15 09/04/15 10/12/15 10/29/15 11/17/15 12/07/15 N/A 12/21/15 N/A N/A Leighton Elliott (239) 656-7869 Shortlisted Name: HDR Construction Con KCCS, Inc. Volkert, Inc. Comments: ELOR ADD TURN LANE(S) Consultant Address: 2601 Cattleman Road, 201 North Franklin St., S 2300 Maitland Ctr. Pkwy., Ste. 106 Project Info: Sarasota, FL 34232-623Tampa, FL 33602 Maitland FL 32751 Funds Encumbered: February 24, 2016 (130) Contact: Gary Downing, PE Paul Wingard, PE, LEEDGreg Dutton, PE Funds Encumb. Date: $1,393,022 ( 0.54% ) Phone: 941-342-2709 239-278-5999 Ext. 203 321-274-4772 Contractor Award Date: 10.1 $110,373 ( 7.92% ) Email:: gary.downing@hdrincpwingard@kisingercam [email protected] CEI Contract #: 1 of 19 11 Agree, Execution 02/28/16 02/28/16 DD, LE, KS HDR CCC $1,782,742.00 2/25/2016 C9030 02/28/16 02/28/16 DD, LE, KS HDR CCC $1,782,742.00 2/25/2016 C9030 5/3/2016 - 7:45 AM Financial Project ID/(Fund) Design Project Manager/Phone No./Email: No. WPI No.(Old)/SPN(Old) Resident Construction Office/Resident Engineer Federal Project (WP21) Construction Project Manager/Phone No./Email: No. Project Name Type Project/English-Metric Limit-From Number of Bridges/Alt. Contract Limit -To Letting Date (Mo-Year)/Construction Time (Days) Dist.(Mi.)/Prop. X- Sect. Ph 52 Budget $ (% of CEI FY Total Ph 52) County Work Type Ph 62 Budget $ (% of Ph 52) 1Fc 430120-1-62-01 Mario A. Dipola (863) 519-2396 Schedule Date-Prop. CM Eunic Usher (239) 656-7852 Actual Date N/A Leighton Elliot (239) 656-7869 Shortlisted Name: US 41 (SR 45) ADD TURN LANES Consultant Address: G/W 414522-2, AT KINGS HIGHWAY-PARMELY ST 429959-1, February 24, 2016 (110) Contact: 430895-1, 431316-1 $1,123,827 ( 0.44% ) Phone: CES-AEB-CSM 10.1 $108,195 ( 9.63% ) Email:: 1Fd 430895-1-62-01 Mario A. Dipola (863) 519-2396 Schedule Date-Prop. SL Eunice Usher (239) 656-7852 Actual Date N/A Leighton Elliott (239) 656-7869 Shortlisted Name: US 41 (SR 45) AT OLE ADD TURN LANE(S) Consultant Address: G/W 414522-2, AN BLVD 429959-1, February 24, 2016 (100) Contact: 430120-1, 431316-1 0.234 $1,149,064 ( 0.45% ) Phone: CES-AEB-CSM CHARLOTTE 10.1 $172,536 ( 15.02% ) Email:: 1Fe 431316-1-62-01 Kellie F. Spurgeon (863) 519-2654 Schedule Date-Prop. ACSA Eunice Usher (239) 656-7852 Actual Date N/A Leighton Elliott (239) 656-7869 Shortlisted Name: US 41/TAMIAMI TRAIL RESURFACING Consultant Address: G/W 414522-2, FROM CROSS STREET TO COCH 429959-1, RAN BLVD February 24, 2016 (450) Contact: 430120-1, 430895-1 5.767 $11,938,259 ( 4.65% ) Phone: CES-RLM-KFS CHARLOTTE 10.1 $1,489,762 ( 12.48% ) Email:: 2Fa 431208-1-62-01 M. Wayne Shelton (863) 519-2353 Schedule Date-Prop. LF Jennifer Perry (863) 519-4101 Actual Date N/A Doug McClintock (863) 519-4326 Shortlisted Name: US 92 (SR 600) FROM BRIDGE REPLACEMENT Consultant Address: REYNOLDS RD TO SCHALAMAR CREEK ENT May 19, 2016 (450) Contact: 1.25 $8,858,711 ( 3.45% ) Phone: CES-EAP-MWS POLK 10.1, 10.4 $1,322,719 ( 14.93% ) Email:: Seq. No. S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm 2 of 19 Event 1 Scope Due* 08/11/15 07/22/15 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert 09/04/15 09/04/15 Long List 10/12/15 10/12/15 Short List 10/29/15 10/29/15 Scope Meeting N/A N/A Oral/ Written Present. N/A N/A Consult. Select. 11/17/15 11/17/15 Proposal Review 12/07/15 12/07/15 11/17/15 11/17/15 12/07/15 12/07/15 11/17/15 11/17/15 12/07/15 12/07/15 02/04/16 02/04/16 02/20/16 02/19/16 HDR Construction Con KCCS, Inc. Volkert, Inc. 2601 Cattleman Road, 201 North Franklin St., S 2300 Maitland Ctr. Pkwy., Ste. 106 Sarasota, FL 34232-623Tampa, FL 33602 Maitland FL 32751 Gary Downing, PE Paul Wingard, PE, LEEDGreg Dutton, PE 941-342-2709 239-278-5999 Ext. 203 321-274-4772 gary.downing@hdrincpwingard@kisingercam [email protected] 08/11/15 07/22/15 09/04/15 09/04/15 10/12/15 10/12/15 10/29/15 10/29/15 N/A N/A N/A N/A HDR Construction Con KCCS, Inc. Volkert, Inc. 2601 Cattleman Road, 201 North Franklin St., S 2300 Maitland Ctr. Pkwy., Ste. 106 Sarasota, FL 34232-623Tampa, FL 33602 Maitland FL 32751 Gary Downing, PE Paul Wingard, PE, LEEDGreg Dutton, PE 941-342-2709 239-278-5999 Ext. 203 321-274-4772 gary.downing@hdrincpwingard@kisingercam [email protected] 08/11/15 07/22/15 09/04/15 09/04/15 10/12/15 10/12/15 10/29/15 10/29/15 N/A N/A N/A N/A HDR Construction Con KCCS, Inc. Volkert, Inc. 2601 Cattleman Road, 201 North Franklin St., S 2300 Maitland Ctr. Pkwy., Ste. 106 Sarasota, FL 34232-623Tampa, FL 33602 Maitland FL 32751 Gary Downing, PE Paul Wingard, PE, LEEDGreg Dutton, PE 941-342-2709 239-278-5999 Ext. 203 321-274-4772 gary.downing@hdrincpwingard@kisingercam [email protected] 09/16/15 09/16/15 10/09/15 10/12/15 11/17/15 11/17/15 12/03/15 12/03/15 N/A N/A N/A N/A Keystone Civil, Inc. Parsons Brinkerhoff, Inc.RK&K, LLP 8433 Dunham Station D 2202 N West Shore Blvd 4685 E CR 540A Tampa, FL 33647 Tampa, FL 33607 Lakeland, FL 33813 Joy L. Christiano, PE Kenneth Spillett, PE Lindsey Barnwell, PE 813-416-7887 813-520-4380 813-390-4598 jchristiano@[email protected] [email protected] 10 Scope Clarif. Negot. Meeting Meeting N/A 12/21/15 N/A 12/21/15 Comments: ELOR Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: N/A 12/21/15 N/A 12/21/15 Comments: ELOR Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: N/A 12/21/15 N/A 12/21/15 Comments: ELOR Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: N/A 03/06/16 N/A 03/07/16 Comments: ELOR Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: 11 Agree, Execution 02/28/16 02/28/16 DD, LE, KS HDR CCC $1,782,742.00 2/25/2016 C9030 02/28/16 02/28/16 DD, LE, KS HDR CCC $1,782,742.00 2/25/2016 C9030 02/28/16 02/28/16 DD, LE, KS HDR CCC $1,782,742.00 2/25/2016 C9030 04/30/16 LT, BH, JT 16144 5/3/2016 - 7:45 AM Seq. No. 3Fa 431373-1 3Fb 431207-1 4Fa 5Fa Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 431207-1-62-01 DDR N/A SR 70 FROM 301 BLVD/ 15TH ST E TO LOCKWOOD RID GE ROAD 2.497 CES-EAP-KFS MANATEE 431373-1-62-01 ACSA N/A SR 70 FROM LOCKWOOD RIDGE ROAD TO TARA BLVD CES-AEB-CMZ 414547-1-62-01 DI N/A CES-KSI-JRP 413043-2-62-01 DI 2.342 MANATEE US 17 FROM DESOTO C/ L TO CR 634 (SWEETWATER R D) 4.952 HARDEE N/A CES-KSI-KCS I-75 (SR93) FROM S O F HARBORVIEW ROAD TO NORT H OF KINGS HWY 4.711 CHARLOTTE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Event Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 Construction Project Manager/Phone No./Email: No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Work Type Ph 62 Budget $ (% of Ph 52) Due* Advert List List Meeting Present. Select. Review Meeting Meeting Kellie F. Spurgeon (863) 519-2654 Schedule Date-Prop. 04/13/15 05/22/15 06/22/15 07/02/15 N/A N/A 08/06/15 08/24/15 N/A 08/31/15 Albert Rosenstein (941) 359-7315 Actual Date 04/13/15 05/22/15 06/22/15 N/A N/A 07/02/15 08/06/15 08/24/15 N/A 08/31/15 Carl Harman (941) 359-7366 Shortlisted Name: Highspans Engineering, JBS Engineering Techni Kinard-Stone, Inc. Comments: ELOR RESURFACING Consultant Address: 1500 Jackson Street - Su15 Windsormere Way, S 28690 Sweet Bay Lane Project Info: Fort Myers, FL 33901 Oviedo, FL 32765 Bonita Springs, FL Funds Encumbered: October 28, 2015 (350) Contact: Vince Zaliauskas, PE Jelinda Boles Tom Deer, PE Funds Encumb. Date: $4,185,690 ( 1.63% ) Phone: 239-433-3000 407-948-4196 239-340-3886 Contractor Award Date: 10.1 $701,322 ( 16.76% ) Email:: [email protected]@jbseng.com [email protected] CEI Contract #: Chris M. Zeigler (863) 519-2253 Schedule Date-Prop. 04/13/15 05/22/15 06/22/15 07/02/15 N/A N/A 08/06/15 08/24/15 N/A 08/31/15 Albert Rosenstein (941) 359-7315 Actual Date 04/13/15 05/22/15 06/22/15 N/A N/A 7/2/205 08/06/15 08/24/15 N/A 08/31/15 Carl Harman (941) 359-7366 Shortlisted Name: Highspans Engineering, JBS Engineering Techni Kinard-Stone, Inc. Comments: ELOR RESURFACING Consultant Address: 1500 Jackson Street - Su15 Windsormere Way, S 28690 Sweet Bay Lane Project Info: Fort Myers, FL 33901 Oviedo, FL 32765 Bonita Springs, FL Funds Encumbered: October 28, 2015 (350) Contact: Vince Zaliauskas, PE Jelinda Boles Tom Deer, PE Funds Encumb. Date: $3,991,773 ( 1.55% ) Phone: 239-433-3000 407-948-4196 239-340-3886 Contractor Award Date: 10.1 $715,861 ( 17.93% ) Email:: [email protected]@jbseng.com [email protected] CEI Contract #: J. Ray Porter (863) 519-2484 Schedule Date-Prop. 10/04/15 11/06/15 12/18/15 01/07/16 N/A N/A 02/04/16 02/20/16 N/A 03/06/16 Erik Padron (863) 386-6112 Actual Date 10/04/15 11/09/15 12/17/15 01/07/16 02/04/16 02/18/16 N/A 03/08/16 N/A N/A Randall James (863) 386-6112 Shortlisted Name: AECOM Technical ServCalvin, Giordano & Asso HDR Construction Control Corp. Comments: ELOR ADD LANES & RECONSTRUCT Consultant Address: 7650 W. Courtney Cam 2400 SE Veterans Memo2601 Cattleman Road, Suite 400 Project Info: Tampa, FL 33607 Port St. Lucie, FL 34952 Sarasota, FL 34232-6233 Funds Encumbered: April 27, 2016 (825) Contact: Larry Sauls, PE Moe Mabrouk, PE Gary Downing, PE Funds Encumb. Date: Contractor Award Date: $28,138,038 ( 10.95% ) Phone: 813-675-6728 305-528-2311 941-342-2709 10.1 $2,840,291 ( 10.09% ) Email:: [email protected]@cgasolutio [email protected] CEI Contract #: Kati Sherrard (863) 519-2990 Schedule Date-Prop. 11/10/014 02/13/15 03/12/15 04/02/15 N/A N/A 04/30/15 05/18/15 N/A 05/20/15 Actual Date Nikesh Patel (941) 465-0411 11/10/014 02/13/15 03/12/15 04/02/15 N/A N/A 04/30/15 05/19/15 N/A 05/28/15 Marlena Gore (863) 272-5008 Comments: ELOR Shortlisted Name: Atkins North America, Eisman and Russon, Inc Parsons Brinkerhoff, Inc. Project Info: ADD LANES & RECONSTRUCT Consultant Address: 1514 Broadway, Suite 26455 Powers Avenue 2202 N West Shore Blvd, Suite300 Funds Encumbered ($): Fort Myers, FL 33901 Jacksonville, FL 32217 Tampa, FL 33607 Tony Mahfoud Funds Encumb. Date: July 29, 2015 Contact: Michael Ryan, PE Kenneth Spillett, PE Contractor Award Date: $25,679,571 ( 10.00% ) Phone: 239-334-7275 904-733-1478 813-520-4380 10.1 $2,259,400 ( 8.80% ) Email:: michael.ryan@atkinsgtmahfoud@eismanruss [email protected] CEI Contract No.: 3 of 19 11 Agree, Execution 10/30/15 10/23/15 CH, TH, JT BDI 16130 10/30/15 10/23/15 CH, TH, JT BDI 16130 04/30/16 04/13/16 RJ, EP, TH AECOM $2,840,291.00 03/29/16 16145 07/30/15 08/19/15 NP, MG, KS Atkins $1,999,669.00 07/30/15 C9L38 5/3/2016 - 7:45 AM Seq. No. 5FB Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 413044-3-62-01 GMR N/A I-75 (SR93) FROM TOL EDO BLADE TO SUMTER BLVD GW 413043-2 5Fc CES-KSI-KCS 413044-2-62-01 DI 7.465 SARASOTA N/A 6Fa CES-KSI-KCS 431206-1-62-01 DS N/A 6Fb GW 435284-1 CES-EAP-KFS 434762-1-62-01 DS N/A CES-AEB-CMZ I-75 (SR93) FROM CHA RLOTTE COUNTY LINE TO TOL EDO BLADE BLVD 7.465 SARASOTA US 92 (SR 600) FROM CHURCHILL AVE TO SLOAN AV E 2.663 POLK SR546(MEMORIAL BLVD) FROM I-4 TO WABASH AVE 1.412 POLK S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Event Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 Construction Project Manager/Phone No./Email: No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Work Type Ph 62 Budget $ (% of Ph 52) Due* Advert List List Meeting Present. Select. Review Meeting Meeting Kati Sherrard (863) 519-2990 Schedule Date-Prop. 11/10/014 02/13/15 03/12/15 04/02/15 N/A N/A 04/30/15 05/18/15 N/A 05/20/15 Actual Date Nikesh Patel (941) 465-0411 11/10/014 02/13/15 03/12/15 04/02/15 N/A N/A 04/30/15 05/19/15 N/A 05/28/15 Marlena Gore (863) 272-5008 Comments: ELOR Shortlisted Name: Atkins North America, Eisman and Russon, Inc Parsons Brinkerhoff, Inc. Project Info: ADD LANES & RECONSTRUCT Consultant Address: 1514 Broadway, Suite 26455 Powers Avenue 2202 N West Shore Blvd, Suite300 Funds Encumbered ($): Fort Myers, FL 33901 Jacksonville, FL 32217 Tampa, FL 33607 Tony Mahfoud Funds Encumb. Date: July 29, 2015 (900) Contact: Michael Ryan, PE Kenneth Spillett, PE Contractor Award Date: $16,494,804 ( 6.42% ) Phone: 239-334-7275 904-733-1478 813-520-4380 10.1 $2,383,189 ( 14.45% ) Email:: michael.ryan@atkinsgtmahfoud@eismanruss [email protected] CEI Contract No.: Kati Sherrard (863) 519-2990 Schedule Date-Prop. 11/10/014 02/13/15 03/12/15 04/02/15 N/A N/A 04/30/15 05/18/15 N/A 05/20/15 Actual Date Nikesh Patel (941) 465-0411 11/10/014 02/13/15 03/12/15 04/02/15 N/A N/A 04/30/15 05/19/15 N/A 05/28/15 Marlena Gore (863) 272-5008 Comments: ELOR Shortlisted Name: Atkins North America, Eisman and Russon, Inc Parsons Brinkerhoff, Inc. Project Info: ADD LANES & RECONSTRUCT Consultant Address: 1514 Broadway, Suite 26455 Powers Avenue 2202 N West Shore Blvd, Suite300 Funds Encumbered ($): Fort Myers, FL 33901 Jacksonville, FL 32217 Tampa, FL 33607 Tony Mahfoud Funds Encumb. Date: July 29, 2015 Contact: Michael Ryan, PE Kenneth Spillett, PE Contractor Award Date: $30,559,229 ( 11.90% ) Phone: 239-334-7275 904-733-1478 813-520-4380 10.1 $2,054,000 ( 6.72% ) Email:: michael.ryan@atkinsgtmahfoud@eismanruss [email protected] CEI Contract No.: Kellie F. Spurgeon (863) 519-2654 Schedule Date-Prop. 06/10/15 07/10/15 08/05/15 08/18/15 N/A N/A 09/14/15 10/01/15 N/A 10/08/15 Jennifer Perry (863) 519-4101 Actual Date 06/08/15 07/10/15 08/05/15 08/15/15 N/A N/A 09/14/15 10/01/15 N/A N/A Comments: Doug McClintock (863) 519-4326 Shortlisted Name: DRMP, Inc. Johnson-Adams & AssocRK&K, LLP Project Info: RESURFACING Consultant Address: 1125 Bartow Rd, Suite 607 S Alexander Street, 4685 E CR 540A Lakeland, FL 33801 Plant City, FL 33653 Lakeland, FL 33813 Funds Encumbered: November 19, 2015 (200) Contact: Mark Puckett, PE Matt Lewis, PE Lindsey Barnwell, PE Funds Encumb. Date: $2,386,060 ( 0.93% ) Phone: 863-686-7100 813-503-2239 813-390-4598 Contractor Award Date: 10.1 $434,988 ( 18.23% ) Email:: [email protected] Matt.Lewis@[email protected] CEI Contract #: Chris M. Zeigler (863) 519-2253 Schedule Date-Prop. 06/10/15 07/10/15 08/05/15 08/18/15 s N/A 09/14/15 10/01/15 N/A 10/08/15 Jennifer Perry (863) 519-4101 Actual Date 06/08/15 07/10/15 08/05/15 08/18/15 N/A N/A 09/14/15 10/01/15 N/A N/A Doug McClintock (863) 519-4326 Shortlisted Name: DRMP, Inc. Johnson-Adams & AssocRK&K, LLP Comments: ELOR RIGID PAVEMENT RECONSTRUCTION Consultant Address: 1125 Bartow Rd, Suite 607 S Alexander Street, 4685 E CR 540A Project Info: Lakeland, FL 33801 Plant City, FL 33653 Lakeland, FL 33813 Funds Encumbered: April 22, 2016 (375) Contact: Mark Puckett, PE Matt Lewis, PE Lindsey Barnwell, PE Funds Encumb. Date: $18,050,067 ( 7.03% ) Phone: 863-686-7100 813-503-2239 813-390-4598 Contractor Award Date: 10.1 $1,539,245 ( 8.53% ) Email:: [email protected] Matt.Lewis@[email protected] CEI Contract #: 4 of 19 11 Agree, Execution 07/30/15 08/19/15 NP, MG, KS Atkins $2,037,779.00 07/30/15 C9L38 07/30/15 08/19/15 NP, MG, KS Atkins $1,983,679.00 07/30/15 C9L38 11/30/15 12/21/15 BH, LT, JT DRMP $2,101,057.00 16131 11/30/15 12/21/15 BH, LT, JT (LOA) 16131 5/3/2016 - 7:45 AM Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 6Fc 435284-1-62-01 DS N/A SR 546 (MEMORIAL) FR OM CHESTNUT RD E TO BRUNN ELL PKWY GW 434762-1 0.856 CES-AEB-CMZ POLK 7Fa 425841-5-62-01 DS N/A SR 82 FROM LEE C/L T O COLLIER C/L Seq. No. CES-NEM-TPP 9Fa 10Fa 431294-1-62-01 DDR N/A CES-AEB-WHB 433173-1-62-01 DDR N/A CES-KSI-JRP 4.462 HENDRY Event Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 Construction Project Manager/Phone No./Email: No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Work Type Ph 62 Budget $ (% of Ph 52) Due* Advert List List Meeting Present. Select. Review Meeting Meeting Chris M. Zeigler (863) 519-2253 Schedule Date-Prop. 06/10/15 07/10/15 08/05/15 08/18/15 N/A N/A 09/14/15 10/01/15 N/A 10/08/15 Jennifer Perry (863) 519-4101 Actual Date 06/08/15 07/10/15 08/05/15 08/18/15 N/A N/A 09/14/15 10/01/15 N/A N/A Doug McClintock (863) 519-4326 Shortlisted Name: DRMP, Inc. Johnson-Adams & AssocRK&K, LLP Comments: BIKE PATH/TRAIL Consultant Address: 1125 Bartow Rd, Suite 607 S Alexander Street, 4685 E CR 540A Project Info: Lakeland, FL 33801 Plant City, FL 33653 Lakeland, FL 33813 Funds Encumbered: April 22, 2016 (90) Contact: Mark Puckett, PE Matt Lewis, PE Lindsey Barnwell, PE Funds Encumb. Date: $1,102,578 ( 0.43% ) Phone: 863-686-7100 813-503-2239 813-390-4598 Contractor Award Date: 10.1 $131,456 ( 11.92% ) Email:: [email protected] Matt.Lewis@[email protected] CEI Contract #: Timothy P. Phillips (863) 519-2514 Schedule Date-Prop. 12/31/14 01/30/15 03/02/15 03/17/15 N/A N/A 04/14/15 04/28/15 N/A 05/05/15 Eunice Usher (239) 985-7852 Actual Date 12/30/14 01/30/15 03/02/15 03/17/15 04/14/15 04/28/15 N/A 05/05/15 N/A N/A Leighton Elliott (239) 985-7869 Shortlisted Name: American Consulting En Johnson, Mirmiran & Thom SAI Consulting Engineers, Inc. Comments: ADD LANES & RECONSTRUCT Consultant Address: 2818 Cypress Ridge Bou1000 Corporate Drive, Suit 1153 Miranda Lane Project Info: Wesley Chapel, FL 3354 Fort Lauderdale, FL 33334 Kissimmee, FL 34741 Funds Encumbered: Karina Jackson, PE July 29, 2015 (1050) Contact: Jack Knowlton, PE Allan Wander, PE Funds Encumb. Date: 954-444-5479 $7,548,727 ( 2.94% ) Phone: 813-435-2608 239-410-2201 Contractor Award Date: [email protected] CEI Contract #: 10.1 $826,209 ( 10.95% ) Email:: [email protected] [email protected] Walter H. Breuggeman (863) 519-2451 Jennifer Perry (863) 519-4101 Doug McClintock (863) 519-4326 RESURFACING SR 60 FROM CR 630 TO KISSIMMEE RIVER BR 5.876 POLK SR 84 (DAVIS BLVD) F ROM COUNTY BARN RD TO SAN TO BARBARA BLVD 0.939 COLLIER S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm 10.1 10.1 December 17, 2015 (250) $5,895,900 $956,851 J. Ray Porter (863) 519-2484 Eunice Usher (239) 656-7852 Leighton Elliott (239) 656-7869 WIDEN/RESURFACE EXIST LANES May 25, 2016 (225) $3,783,953 $514,137 ( ( 2.30% 16.23% ) ) Schedule Date-Prop. 04/22/15 05/22/15 06/18/15 07/02/15 N/A N/A 08/06/15 07/02/15 08/06/15 Actual Date 04/21/15 05/22/15 06/18/15 N/A N/A Shortlisted Name: Highspans Engineering, JBS Engineering TechnKinard-Stone, Inc. Consultant Address: 1500 Jackson Street - Su15 Windsormere Way, Su 28690 Sweet Bay Lane Fort Myers, FL 33901 Oviedo, FL 32765 Bonita Springs, FL Contact: Vince Zaliauskas, PE Jelinda Boles Tom Deer, PE Phone: 239-433-3000 407-948-4196 239-340-3886 Email:: [email protected]@jbseng.com [email protected] Schedule Date-Prop. 11/04/15 12/04/15 01/20/16 02/04/16 N/A N/A 03/03/16 Actual Date 11/10/15 12/04/15 01/20/16 02/04/16 N/A N/A 03/03/16 Shortlisted Name: AE Engineering, Inc. KCCS, Inc. Keith and Schnars, P.A. Consultant Address: 9180 Silver Glen Way 201 North Franklin St., S 6500 N. Andrews Ave. Lake Worth, FL 33476 Tampa, FL 33602 ( ( 1.47% 13.59% Ft. Lauderdale, FL 33309 Contact: Roderick Myrick, PE Paul Wingard, PE, LEEDMark J. Moshier, PE Phone: 561-632-5185 239-278-5999 Ext. 203 954-776-1616 Email:: rod@aeengineeringinc. pwingard@kisingercam [email protected] ) ) 5 of 19 08/24/15 08/24/15 03/18/16 03/24/16 N/A 08/31/15 NA 09/10/15 Comments: ELOR Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: N/A 04/01/16 N/A 04/04/16 Comments: ELOR Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: 11 Agree, Execution 11/30/15 12/21/15 BH, LT, JT (LOA) 16131 07/30/15 07/31/15 LE, KK, JM SAI $ 826,209.00 7/30/2015 C9L21 11/30/15 12/22/15 BH, LT, KK BDI - JBS $853,859 12/18/2015 16120 05/30/16 LE, JM, MP Keith & Schnars 16150 5/3/2016 - 7:45 AM Seq. No. 11Fa GW 200746-3 11Fb GW 200746-1 12Fa 13Fa Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 200746-1-62-01 DSB2 N/A I-75 (ALLIGATOR ALLEY) AT NORTH REST AREA CES-KSI-KCS 200746-3-62-01 DSB2 N/A CES-KCI-KCS 436092-1-62-01 DSB2 N/A CES-RLM-NAL 433183-1-62-03 DS N/A REP-WRJ-EJT COLLIER I-75 (SR 93/ALLIGATO R ALLEY) MM 63 NORTHSIDE REST AREA LANDSCAPING 0.195 COLLIER I-75 (EVERGLADES PKWY) FROM BROWARD COUNTY LINE TO E OF SR 951 CEI CONTINUING SERVI CES (INSPECTION) BARTOW O PERATIONS CENTER $ 1,365,720 DIST/ST-WIDE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Event Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 Construction Project Manager/Phone No./Email: No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Work Type Ph 62 Budget $ (% of Ph 52) Due* Advert List List Meeting Present. Select. Review Meeting Meeting Kati Sherrard (863) 519-5990 Schedule Date-Prop. 07/21/15 08/24/15 09/21/15 10/01/15 N/A N/A 10/29/15 11/23/15 N/A 01/04/16 Eunice Usher (239) 656-7852 Actual Date 07/16/15 08/24/15 09/21/15 10/01/15 N/A N/A 10/29/15 11/23/15 N/A 01/04/16 Leighton Elliott (239) 656-7869 Shortlisted Name: Amec Foster Wheeler American Consulting Eisman & Russo, Inc. Comments: ELOR REST AREA Consultant Address: 1101 Channelside Dr., S 2818 Cypress Ridge Bl 6455 Powers Avenue Project Info: Tampa, FL 33602 Wesley Chapel, FL 335Jacksonville, FL 32217 Funds Encumbered: June 15, 2016 (450) Contact: Richard K. Ward, PE Jack Knowlton, PE Antonio J. Mahfoud, PE Funds Encumb. Date: $8,673,345 3.38% ) Phone: 813-997-1475 813-927-4714 904-733-1478 Contractor Award Date: 10.1 $1,540,500 ( 17.76% ) Email:: [email protected]@[email protected] CEI Contract #: Kati Sherrard (863) 519-2990 Schedule Date-Prop. 07/21/15 08/24/15 09/21/15 10/01/15 N/A N/A 10/29/15 11/23/15 N/A 01/04/16 Eunice Usher, P.E. (239) 985-7852 Actual Date 07/16/15 08/24/15 09/21/15 10/01/15 N/A N/A 10/29/15 11/23/15 N/A 01/04/16 Leighton Elliott, P.E. (239) 985-7869 Shortlisted Name: Amec Foster Wheeler American Consulting Eisman & Russo, Inc. Comments: LANDSCAPING Consultant Address: 1101 Channelside Dr., S 2818 Cypress Ridge Bl 6455 Powers Avenue Project Info: Tampa, FL 33602 Wesley Chapel, FL 335Jacksonville, FL 32217 Funds Encumbered: May 25, 2016 (450) Contact: Richard K. Ward, PE Jack Knowlton, PE Antonio J. Mahfoud, PE Funds Encumb. Date: $358,555 ( 0.14% ) Phone: 813-997-1475 813-927-4714 904-733-1478 Contractor Award Date: $54,431 ( 15.18% ) Fax: [email protected]@[email protected] CEI Contract #: Nicolas Leon (863) 519-2376 Schedule Date-Prop. 12/31/14 01/23/15 02/19/15 03/05/15 N/A N/A 04/02/15 04/17/15 04/27/15 05/01/15 Eunice Usher (239) 656-7852 Actual Date 12/30/14 01/23/15 02/19/15 N/A N/A 03/05/15 04/02/15 04/20/15 N/A 04/27/15 Leighton Elliott (239) 656-7869 Shortlisted Name: Highspans Engineering, Johnson, Mirmiran & T SAI Consulting Engineers, Inc. Comments: ELOR SAFETY PROJECT/CABLE BARRIER Consultant Address: 1500 Jackson Street - Su1000 Corporate Drive, Su 1153 Miranda Lane Project Info: Fort Myers, FL 33901 Fort Lauderdale, FL 3333 Kissimmee, FL 34741 Funds Encumbered: July 29, 2015 (900) Contact: Vince Zaliauskas, PE Karina Jackson, PE Allan Wander, PE Funds Encumb. Date: Contractor Award Date: $18,837,866 ( 7.33% ) Phone: 239-433-3000 954-444-5479 239-410-2201 10.1 $2,014,342 ( 10.69% ) Email:: [email protected]@jmt.com [email protected] CEI Contract #: E. Jan Thompson (863) 519-2256 Schedule Date-Prop. 02/10/16 02/16/16 N/A N/A 03/15/16 N/A N/A N/A Jennifer Perry Actual Date 02/10/16 02/16/16 N/A N/A 03/14/16 N/A N/A N/A Ben Harris Shortlisted Name: AE Engineering, Inc. HDR Construction Contr RK&K, LLP Comments: INSPECT CONSTRUCTION PROJS. Consultant Address: 9180 Silver Glen Way 2601 Cattleman Road, S 4685 E CR 540A Project Info: Lake Worth, FL 33476 Sarasota, FL 34232 Lakeland, FL 33813 Funds Encumbered: Contact: Roderick Myrick, PE 941-342-2709 Lindsey Barnwell, PE Funds Encumb. Date: ( 0.00% ) Phone: 561-632-5185 [email protected] 813-390-4598 Contractor Award Date: $1,365,720 ( ) Fax: rod@aeengineeringinc. [email protected] [email protected] CEI Contract #: 6 of 19 11 Agree, Execution 05/25/16 EJ, LE, JT 16136 05/25/16 EJ, LE, JT 16136 07/30/15 07/20/15 LE, EJ, JT JMT $ 2,014,342.00 7/17/2015 C9K97 05/30/16 16165 5/3/2016 - 7:45 AM Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 14Fa 433183-4-62-01 DS N/A CEI CONTINUING SERVI CES (INSPECTION) HEARTLAN D OPERATIONS CENTER $ 450,000 REP-BMB-EJT DIST/ST-WIDE C/S 1 425342-2-62-01 ACSL N/A PEACHLAND BLVD FROM BACHMAN BLVD TO ATWATER S TREET G/W 430926-1 0.518 CES-AEB-JRR CHARLOTTE C/S 2 430926-1-62-01 ACSL N/A KINGSWAY ELEMENTARY SCHOOL SRTS SIDEWALK SAFE TY G/W 425342-2 1.014 CES-AEB-JLM CHARLOTTE C/S 6 429894-1-62-01 DDR N/A SR 82 (IMMOKALEE RD) AT HOMESTEAD ROAD Seq. No. GW 434510-1 CES-AEB-JRR 0.02 LEE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Event Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer 1 2 3 4 5 6 7 8 9 10 Construction Project Manager/Phone No./Email: No. (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Oral/ Scope Ph 52 Budget $ (% of CEI FY Total Ph 52) Scope Long Short Scope Written Consult. Proposal Clarif. Negot. Work Type Ph 62 Budget $ (% of Ph 52) Due* Advert List List Meeting Present. Select. Review Meeting Meeting E. Jan Thompson (863) 519-2256 Schedule Date-Prop. 02/11/16 02/16/16 N/A N/A 03/15/16 N/A N/A N/A Erik Padron Actual Date 02/11/16 02/16/16 N/A N/A 03/15/16 N/A N/A N/A Randall James Shortlisted Name: AE Engineering, Inc. Johnson, Mirmiran & ThoKinard-Stone, Inc. Comments: INSPECT CONSTRUCTION PROJS. Consultant Address: 9180 Silver Glen Way 1000 Corporate Drive, S 28690 Sweet Bay Lane Project Info: Lake Worth, FL 33476 Fort Myers, FL 33334 Bonita Springs, FL Funds Encumbered: March 24, 2017 Contact: Roderick Myrick, PE 954-444-5479 Tom Deer, PE Funds Encumb. Date: ( 0.00% ) Phone: 561-632-5185 Karina Jackson, PE 239-340-3886 Contractor Award Date: ( ) Fax: rod@aeengineeringinc. [email protected] [email protected] CEI Contract #: Justin R. Reck (863) 519-2502 Schedule Date-Prop. Eunice Usher (239) 656-7852 Actual Date Ivan Sokolic (239) 985-7854 Shortlisted Name: Comments: SIDEWALK Consultant Address: Project Info: Funds Encumbered: - CONTINUING SERVICES (CS) CONTRACT #C9M11 March 30, 2016 (100) Contact: Funds Encumb. Date: $597,837 ( 0.23% ) Phone: Contractor Award Date: $59,484 ( 9.95% ) Email:: CEI Contract #: Jeffrey L. Mednick (863) 519-2834 Schedule Date-Prop. Eunice Usher (239) 656-7852 Actual Date Ivan Sokolic (239) 985-7854 Shortlisted Name: Comments: ELOR SIDEWALK Consultant Address: Project Info: Funds Encumbered: - CONTINUING SERVICES (CS) CONTRACT #C9M11 March 30, 2016 (100) Contact: Funds Encumb. Date: $724,761 ( 0.28% ) Phone: Contractor Award Date: $59,484 ( 8.21% ) Email:: CEI Contract #: Justin R. Reck (863) 519-2502 Schedule Date-Prop. Eunice Usher (239) 656-7852 Actual Date Ivan Sokolic (239) 985-7854 Shortlisted Name: Comments: ADD LEFT TURN LANE(S) Consultant Address: Project Info: Funds Encumbered: - CONTINUING SERVICES (CS) CONTRACT #C9A69 September 30, 2015 (80) Contact: Funds Encumb. Date: $598,928 ( 0.23% ) Phone: Contractor Award Date: $89,901 ( 15.01% ) Email:: CEI Contract #: 7 of 19 11 Agree, Execution 05/30/16 16166 04/30/16 02/05/16 JACOBS TWO 6 $ 59,484.00 2/5/2016 C9M11 04/30/16 02/05/16 JACOBS TWO 5 $ 59,484.00 2/5/2016 $ C9M11 10/30/15 07/23/15 JACOBS TWO 41 89,901.00 7/23/2015 C9A69 5/3/2016 - 7:45 AM Seq. No. C/S 7 G/W 431317-1 C/S 8 G/W 430924-1 C/S 9 G/W 430921-1 C/S 10 430119-1 Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 430119-1-62-01 SU N/A SR 78 FROM US 41 BUS INESS TO BREWER ROAD CES-AEB-RTW 430921-1-62-01 TALT N/A CES-AEB-JRR 430924-1-62-01 TALT N/A CES-AEB-JRR 431317-1-62-01 DDR N/A CES-AEB-CMZ 1.157 LEE ORANGEWOOD ELEMENTAR Y SRTS SAFETY SIDEWALKS 0 LEE FRANKLIN PARK ELEMEN TARY SRTS SAFETY SIDEWALK S 0 LEE SR 78/PINE ISLAND RD FROM US 41/SR 45 TO NEW POST ROAD 2.292 LEE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) Ryan T. Weeks (863) 519-2879 Schedule Date-Prop. Eunice Usher (239) 656-7852 Actual Date Ivan Sokolic (239) 985-7854 Shortlisted Name: BIKE LANE/SIDEWALK Consultant Address: January 27, 2016 (250) $540,789 Justin R. Reck (863) 519-2502 Eunice Usher (239) 656-7852 Ivan Sokolic (239) 985-7854 SIDEWALK March 30, 2016 (100) $371,827 Justin R. Reck (863) 519-2502 Eunice Usher (239) 656-7852 Ivan Sokolic (239) 985-7854 SIDEWALK March 30, 2016 (100) $645,142 Chris M. Zeigler (863) 519-2253 Eunice Usher (239) 656-7852 Ivan Sokolic (239) 985-7854 RESURFACING January 27, 2016 (225) $4,551,760 $52,875 $59,842 $59,842 $460,461 ( ( ( ( ( ( ( ( 0.21% 9.78% 0.14% 16.09% 0.25% 9.28% 1.77% 10.12% ) ) ) ) ) ) Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: ) ) 8 of 19 Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. - CONTINUING SERVICES (CS) CONTRACT #C9M11 - CONTINUING SERVICES (CS) CONTRACT #C9A69 - CONTINUING SERVICES (CS) CONTRACT #C9A69 - CONTINUING SERVICES (CS) CONTRACT #C9M11 Consult. Select. Proposal Review Scope Clarif. Meeting 10 11 Negot. Meeting Agree, Execution 2/272016 12/14/15 JACOBS Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: TWO $ 52,875.00 12/14/2015 C9M11 04/30/16 02/11/16 JACOBS TWO 49 $ 59,842.00 2/10/2016 C9A69 04/30/16 02/11/16 JACOBS TWO 50 $ 59,842.00 2/10/2016 TWO $ C9A69 02/27/16 12/14/15 JACOBS 52,875.00 12/14/2015 C9M11 5/3/2016 - 7:45 AM Seq. No. C/S 14 C/S 15 C/S 16 C/S 22 Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 433222-1-62-01 SU N/A SR 78 AT SANTA BARBA RA BLVD CES-AEB-JRR 433223-1-62-01 SU N/A CES-AEB-JRR 433238-1-62-01 SU N/A CES-RLM 433256-1-62-01 ACNP N/A CES-RLM-JWM 0.001 LEE SR 78 AT CHIQUITA BL VD 0.001 LEE LEELAND HEIGHTS BLVD FROM RICHMOND AVE TO HOM ESTEAD ROAD 1.273 LEE I-75 AT CSX RR 1.128 MANATEE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) Justin R. Reck (863) 519-2502 Schedule Date-Prop. Eunice Usher (239) 656-7852 Actual Date Ivan Sokolic (239) 985-7854 Shortlisted Name: ADD LEFT TURN LANE(S) Consultant Address: September 30, 2015 (125) $159,608 Justin R. Reck (863) 519-2502 Eunice Usher (239) 656-7852 Ivan Sokolic (239) 985-7854 ADD LEFT TURN LANE(S) September 30, 2015 (125) $195,523 Janet W. Middleton (863) 519-2309 Eunice Usher (239) 656-7852 Ivan Sokolic (239) 985-7854 SIDEWALK June 15, 2016 (85) $1,821,637 Janet W. Middleton (863) 519-2309 Albert Rosenstein (941) 359-7315 Greg Falcone (941) 359-7351 RESURFACING $55,611 $55,611 $124,057 September 30, 2015 (125) $930,949 $160,637 ( ( ( ( ( ( ( ( 0.06% 34.84% 0.08% 28.44% 0.71% 6.81% 0.36% 17.26% ) ) ) ) ) ) Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: ) ) 9 of 19 Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. Consult. Select. Proposal Review Scope Clarif. Meeting 10 Negot. Meeting - CONTINUING SERVICES (CS) CONTRACT #C9A69 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9A69 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9M11 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9L46 11 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: $ $ $ Agree, Execution 10/30/15 08/10/15 Jacob's TWO 42 55,611.00 8/10/2015 N/A C9A69 10/30/15 08/10/15 Jacob's TWO 43 55,611.00 8/10/2015 N/A C9A69 06/30/16 C9M11 10/30/15 09/14/15 AECOM TWO 2 151,275.00 9/14/2015 NA C9L46 5/3/2016 - 7:45 AM Seq. No. C/S 23 C/S 26 C/S 27 C/S 28 GW 429821-1 Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 433593-1-62-01 SU N/A US 41 BUSINESS FROM GREEN BRIDGE TO RIVERSIDE DRIVE 0.168 CES-AEB-RTW MANATEE 429831-1-62-01 SU N/A SR 780 (FRUITVILLE) FROM HONORE AVE TO CATTLE MEN ROAD 0.671 CES-AEB-JRR SARASOTA 431311-1-62-01 ACSA N/A US 41/SR 45 FROM BRO WNING STREET TO 11TH STRE ET 2.197 CES-AEB-CMZ SARASOTA 433562-1-62-01 SU N/A US 41 (SOUTHSIDE) OV ER MYAKKAHATCHEE CREEK CES-KSI-KCS 0.1 SARASOTA S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) Ryan T. Weeks (863) 519-2879 Schedule Date-Prop. Albert Rosenstein (941) 359-7315 Actual Date Greg Falcone (941) 359-7351 Shortlisted Name: BIKE LANE/SIDEWALK Consultant Address: January 27, 2016 (90) $2,282,143 Justin R. Reck (863) 519-2502 Albert Rosenstein (941) 359-7315 Greg Falcone (941) 359-7351 SIDEWALK July 29, 2015 (70) $180,527 Chris M. Zeigler (863) 519-2253 Albert Rosenstein (941) 359-7315 Greg Falcone (941) 359-7351 RESURFACING March 30, 2016 (250) $6,228,255 $60,795 $43,817 $421,049 Kati Sherrard (863) 519-5990 Albert Rosenstein (941) 359-7315 Greg Falcone (941) 359-7351 PEDESTRIAN/WILDLIFE OVERPASS April 27, 2016 (250) $756,076 $71,866 ( ( ( ( ( ( ( ( 0.89% 2.66% 0.07% 24.27% 2.42% 6.76% 0.29% 9.51% ) ) ) ) ) ) Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: ) ) 10 of 19 Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. - CONTINUING SERVICES (CS) CONTRACT #C9L46 Consult. Select. Proposal Review Scope Clarif. Meeting 10 Negot. Meeting Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9B65 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9L46 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9L46 11 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: $ $ $ $ Agree, Execution 02/27/16 01/14/16 AECOM TWO 6 60,795.00 1/12/2016 C9L46 08/29/15 07/30/15 Volkert TWO 51 43,817.00 7/24/2015 NA C9B65 03/24/16 03/04/16 AECOM TWO 8 421,049.00 3/1/2016 C9L46 05/25/16 03/18/16 AECOM TWO 10 71,866.00 3/15/2016 C9L46 5/3/2016 - 7:45 AM Seq. No. C/S 29 C/S 32 C/S 33 C/S 34 Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 434865-1-62-01 BRRP N/A SR 789 OVER NEW PASS AT BRIDGE 170158 CES-MTH-AJS 427315-2-62-01 HSP N/A REP-BMB-KDC 429883-1-62-01 ACCM N/A CES-AEB-RTW 430918-1-62-01 TALT N/A CES-AEB-WHB 0.185 SARASOTA I-4 FROM EAST OF POL K PARKWAY TO OSCEOLA COUN TY LINE 16.235 POLK LK ALFRED TR AT US 1 7/92 BRIDGE 0.1 POLK EASTSIDE ELEMENTARY SCHOOL SAFETY SIDEWALKS 0 POLK S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) Maria E. Kunhardt (813) 975-7574 Schedule Date-Prop. Albert Rosenstein (941) 359-7315 Actual Date Greg Falcone (941) 359-7351 Shortlisted Name: BRIDGE-REPAIR/REHABILITATION Consultant Address: December 17, 2015 (100) $1,972,999 Mark A. Roberts (863) 519-2591 Jennifer Perry (863) 519-4101 John Hayes, P.E. (863) 519-4104 ITS FREEWAY MANAGEMENT April 25, 2016 (350) $2,744,297 $244,735 $1,009,013 Ryan T. Weeks (863) 519-2879 Jennifer Perry (863) 519-4101 John Hayes, P.E. (863) 519-4104 PEDESTRIAN/WILDLIFE OVERPASS June 15, 2016 (250) $1,917,512 Walter H. Breuggeman (863) 519-2451 Jennifer Perry (863) 519-4101 John Hayes, P.E. (863) 519-4104 SIDEWALK October 28, 2015 (70) $66,915 $298,608 $44,620 ( ( ( ( ( ( ( ( 0.77% 12.40% 1.07% 36.77% 0.75% 15.57% 0.03% 66.68% ) ) ) ) ) ) Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: ) ) 11 of 19 Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. - CONTINUING SERVICES (CS) CONTRACT #C9L46 - CONTINUING SERVICES (CS) CONTRACT #C9E98 - CONTINUING SERVICES (CS) CONTRACT #16165 - CONTINUING SERVICES (CS) CONTRACT #C9E98 Consult. Select. Proposal Review Scope Clarif. Meeting 10 11 Negot. Meeting Agree, Execution 01/17/16 01/05/16 AECOM TWO 3 $ 244,735.00 11/30/2015 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: ELOR Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: C9L46 05/21/16 RK&K C9E98 06/30/16 RK&K 16165 01/02/16 09/14/15 RK&K TWO 36 $ 44,620.00 9/14/2015 C9E98 5/3/2016 - 7:45 AM Seq. No. C/S 35 C/S 38 C/S 43 C/S 44 Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 431278-1-62-01 SA N/A US 17/US 98 FROM BAR TOW RD (US 17/US 98)TO VA N FLEET DR(US 98/SR 60) 2.644 CES-MMG-MWS POLK 433272-1-62-01 SU N/A CR 544 AT SR 17 CES-AEB-CMZ 436145-1-62-01 DDR N/A CES-CDS-KDS 436795-1-62-01 DI N/A REP-LKN-KDC Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) M. Wayne Shelton (863) 519-2353 Schedule Date-Prop. Jennifer Perry (863) 519-4101 Actual Date John Hayes, P.E. (863) 519-4104 Shortlisted Name: RESURFACING Consultant Address: 0.001 POLK DRAINAGE IMPROVEMENT CTY OF LAKE ALFRED FM E HOFFMAN ST TO E ORANGE ST 0.199 POLK BARTOW ADAPTIVE DBOM US 98 FROM MANOR DRIVE TO US 17 1.111 POLK S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm August 26, 2015 (200) $3,845,363 Chris M. Zeigler (863) 519-2253 Jennifer Perry (863) 519-4101 John Hayes, P.E. (863) 519-4104 INTERSECTION IMPROVEMENT April 27, 2016 (90) $1,234,220 Karina Della-Sera (863) 519-2750 Jennifer Perry (863) 519-4101 John Hayes, P.E. (863) 519-4104 DRAINAGE IMPROVEMENTS June 9, 2016 (100) $522,311 Mark A. Roberts (863) 519-2591 Jennifer Perry (863) 519-4101 John Hayes, P.E. (863) 519-4104 INTERSECTION IMPROVEMENT April 22, 2016 $434,444 $297,507 $109,950 $103,437 $119,872 ( ( ( ( ( ( ( ( 1.50% 7.74% 0.48% 8.91% 0.20% 19.80% 0.17% 27.59% ) ) ) ) ) ) Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: ) ) 12 of 19 Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. Consult. Select. Proposal Review Scope Clarif. Meeting 10 11 Negot. Meeting Agree, Execution 09/29/15 07/17/15 RK&K TWO 32 $ 297,507.00 7/17/2015 NA C9E98 03/24/16 03/14/16 RK&K TWO 37 $ 109,950.00 3/14/2016 - CONTINUING SERVICES (CS) CONTRACT #C9E98 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9E98 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #16165 TO BE DELETED, STILL IN FM/MAINFRAME AS OF 9/17/2015 - CONTINUING SERVICES (CS) CONTRACT #16165 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: C9E98 06/30/16 16165 10/30/15 16165 5/3/2016 - 7:45 AM Seq. No. C/S 46 C/S 47 GW 433193-1 C/S 48 C/S 49 GW 429816-1 Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 429101-1-62-01 SA N/A SR 78 FROM CANAL BOA T RAMP TO OKEECHOBEE C/L CES-MMG-MWS 429816-1-62-01 ACTL N/A CES-AEB-JRR 431341-1-62-01 SN N/A CES-AEB-RTW 433193-1-62-01 TALL N/A CES-AEB-JRR 8.813 GLADES MARTIN LUTHER KING J R BLVD FROM JONES STREET TO GRAPE STREET 0.001 HARDEE US 17 FROM KD REVELL RD TO REA ROAD 0.644 HARDEE DOYLE PARKER AVE FRO M COUNTYLINE RD TO US 17 0.001 HARDEE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) M. Wayne Shelton (863) 519-2353 Schedule Date-Prop. Erik Padron (863) 386-6112 Actual Date Susan Hindman (863) 386-6112 Shortlisted Name: RESURFACING Consultant Address: August 26, 2015 (250) $4,879,891 Justin R. Reck (863) 519-2502 Erik Padron, PE (863) 386-6112 Susan Hindman (863) 386-6112 SIDEWALK $239,769 September 30, 2015 (150) $90,020 Ryan T. Weeks (863) 519-2879 Erik Padron, PE (863) 386-6112 Susan Hindman (863) 386-6112 SIDEWALK January 27, 2016 (150) $194,630 Justin R. Reck (863) 519-2502 Erik Padron, PE (863) 386-6112 Susan Hindman (863) 386-6112 SIDEWALK September 30, 2015 (150) $249,861 $57,472 $53,196 $52,917 ( ( ( ( ( ( ( ( 1.90% 4.91% 0.04% 63.84% 0.08% 27.33% 0.10% 21.18% ) ) ) ) ) ) Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: ) ) 13 of 19 Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. Consult. Select. Proposal Review Scope Clarif. Meeting 10 Negot. Meeting - CONTINUING SERVICES (CS) CONTRACT #C9970 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9B65 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9L46 - CONTINUING SERVICES (CS) CONTRACT #C9B65 11 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: $ $ Agree, Execution 09/26/15 07/17/15 RK&K TWO 61 239,769.00 7/17/2015 NA C9970 10/30/15 08/10/15 Volkert TWO 52 43,817.00 8/10/2015 C9B65 05/25/16 01/27/16 AECOM TWO 7 $ 53,196.00 1/27/2016 $ C9L46 10/30/15 08/10/15 Volkert TWO 53 43,817.00 8/10/2015 NA C9B65 5/3/2016 - 7:45 AM Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County C/S 52 194425-2-62-01 DDR N/A SR 17 (SE LAKEVIEW) FROM US 27/98 TO KENILWOR GW 431319-1, TH BLVD 431320-1 0.965 CES-AEB-WHB HIGHLANDS C/S 53 431319-1-62-01 ACSL N/A US 27 AT VICKI DRIVE Seq. No. GW 194425-2, 431320-1 C/S 54 GW 194425-2, 431319-1 C/S 55 G/W 431461-1 0.2 CES-AEB-WHB HIGHLANDS 431320-1-62-01 SL 3991 072 P US 27 AT SEBRING PARKWAY CES-AEB-WHB 429819-1-62-01 DS N/A CES-AEB-JRR .2 SR 70 WEST FROM SW 2 4TH AVENUE TO NW 38TH TER RACE 0.904 OKEECHOBEE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) Walter H. Breuggeman (863) 519-2451 Schedule Date-Prop. Erik Padron (863) 386-6112 Actual Date Susan Hindman (863) 386-6112 Shortlisted Name: RESURFACING Consultant Address: February 24, 2016 (200) $1,567,506 Walter H. Breuggeman (863) 519-2451 Erik Padron (863) 386-6112 Susan Hindman (863) 386-6112 ADD RIGHT TURN LANE(S) February 24, 2016 (80) $262,177 Walter H. Brueggeman Erik Padron (863) 386-6112 Susan Hindman (863) 386-6112 EXTEND RIGHT TURN LANE February 24, 2016 (80) $200,403 Justin R. Reck (863) 519-2502 Erik Padron (863) 386-6112 Susan Hindman (863) 386-6112 SIDEWALK March 30, 2016 (80) $1,157,100 $135,421 $35,104 $38,575 $39,731 ( ( ( ( ( ( ( ( 0.61% 8.64% 0.10% 13.39% 0.08% 19.25% 0.45% 3.43% ) ) ) ) ) ) Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: ) ) 14 of 19 Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. Consult. Select. Proposal Review Scope Clarif. Meeting 10 11 Negot. Meeting Agree, Execution 09/26/15 07/17/15 RK&K TWO 62 $ 135,421.00 8/10/2015 NA C9970 09/26/15 07/17/15 RK&K TWO 63 $ 35,104.00 7/17/2015 NA C9970 09/26/15 07/16/15 RK&K TWO 60 $ 38,575.00 7/16/2015 NA C9970 04/30/16 04/05/16 RK&K TWO 65 $ 39,731.00 3/31/2016 - CONTINUING SERVICES (CS) CONTRACT #C9970 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9970 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9970 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - CONTINUING SERVICES (CS) CONTRACT #C9970 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: C9970 5/3/2016 - 7:45 AM Seq. No. C/S 57 LOA LOA (Kayla) LOA Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 431603-1-62-01 GRSC N/A CR 68 (NW 160TH ST) FROM US 98 TO US 441 CES-AEB-CMZ 198285-1-62-05 DS N/A REP 409988-1-62-03 DS N/A REP-JMS 409988-3-62-03 DS N/A (Kayla) EJG-JMS 10.557 OKEECHOBEE CONSTRUCTION CEI SUR VEY SUPPORT $ 350,000 DIST/ST-WIDE CEI GENERAL CONSULT FOR CONSTRUCTION CEI SUPP ORT $ 3,000,000 DIST/ST-WIDE CEI GENERAL CONSUL CONSTRUCTION OPERATING BUDGET $ 150,000 DIST/ST-WIDE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) Chris M. Zeigler (863) 519-2253 Schedule Date-Prop. Erik Padron (863) 386-6112 Actual Date Susan Hindman (863) 386-6112 Shortlisted Name: WIDEN/RESURFACE EXIST LANES Consultant Address: November 18, 2015 (350) $5,243,827 $315,586 Randy E. Prescott (863) 519-2202 Jon Sands (863) 519-2223 Kelly Kautz (863) 519-2232 INSPECT CONSTRUCTION PROJS. Jon M. Sands (863) 519-2223 Brian Penny (863) 519-2228 Paul Harkins (863) 519-2223 INSPECT CONSTRUCTION PROJS. Jon M. Sands (863) 519-2223 Brian Penny (863) 519-2228 ( ( ( ( ( ( 2.04% 6.02% 0.00% 0.00% ) ) ) ) ) ) Paul Harkins (863) 519-2223 INSPECT CONSTRUCTION PROJS. Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Consultant ( ( 0.00% 15 of 19 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. Consult. Select. - CONTINUING SERVICES (CS) CONTRACT #C9970 - DISTRICT WIDE (D/W) CEI SURVEY CONTRACT #C9G12 - DISTRICT WIDE (GEC) CEI CONTRACT #C9242 Name: Address: Contact: Phone: Email:: ) ) Event 1 - DISTRICT WIDE (GEC) CEI CONTRACT #C9242 Proposal Review Scope Clarif. Meeting 10 11 Negot. Meeting Agree, Execution 12/19/15 08/12/15 RK&K TWO 64 $ 315,586.00 8/12/2015 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: C9970 07/01/15 07/21/15 McKim and Creed C9G12 07/01/15 07/28/15 Jacobs C9242 07/01/15 Jacobs 3/3/2016 C9242 5/3/2016 - 7:45 AM Seq. No. LOA (Kayla) LOA LOA LOA Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 410028-1-62-03 DS N/A CONSTRUCTION CEI SUP PORT FOR PLAN AND CLAIM R EVIEW #2 $ 300,000 REP-JMSDIST/ST-WIDE 433183-1-62-02 DS N/A CEI CONTINUING SERVI CES (INSPECTION) BARTOW O PERATIONS CENTER $ 521,060 REP-WRJ-EJT DIST/ST-WIDE 433183-2-62-02 DS N/A CEI CONTINUNING SERV ICES (INSPECTION) SARASOT A OPERATIONS CTR $ 473,933 REP-WRJ-EJT DIST/ST-WIDE 433183-3-62-02 DS N/A CEI CONTINUING SERVI CES (INSPECTION) FORT MYE RS OP CTR $ 1,228,920 REP-WRJ-EJT DIST/ST-WIDE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) Randy E. Prescott (863) 519-2202 Schedule Date-Prop. Jon Sands (863) 519-2223 Actual Date Paul Harkins (863) 519-2223 Shortlisted Name: INSPECT CONSTRUCTION PROJS. Consultant Address: E. Jan Thompson (863) 519-2256 John Hayes, PE (863) 519 - 4104 $300,000 ( ( 0.00% ) ) INSPECT CONSTRUCTION PROJS. ( ( E. Jan Thompson (863) 519-2256 0.00% ) ) INSPECT CONSTRUCTION PROJS. E. Jan Thompson (863) 519-2256 $473,933 ( ( 0.00% ) ) INSPECT CONSTRUCTION PROJS. $1,228,920 ( ( 0.00% Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. Consult. Select. - CONTINUING SERVICES (CS) CONTRACT #C9E98 Contact: Phone: Email:: Schedule Date-Prop. 01/30/15 02/13/15 03/20/15 04/02/15 N/A N/A 04/30/15 Actual Date 01/30/15 02/20/15 03/20/15 04/02/15 N/A N/A 04/30/15 Shortlisted Name: HDR Construction Contr URS Corporation SouthVolkert, Inc. Consultant Address: 2601 Cattleman Road, S 7650 West Courtney Ca5850 Corporation Circle Tampa, FL 33607 813-675-6728 [email protected] J. Larry Sauls, PE Sarasota, FL 34232 941-342-2709 N/A N/A Fort Myers, FL 33905 239-872-0292 Paula McQueen [email protected] [email protected] [email protected] 01/30/15 01/30/15 02/13/15 02/20/15 03/23/15 03/23/15 04/02/15 04/02/15 N/A N/A N/A N/A 04/30/15 04/30/15 N/A N/A Jacobs Engineering GrJohnson, Mirmiran & ThoURS Corporation Southern/AECOM 201 N. Franklin Street, 1000 Corporate Drive, S 7650 West Courtney Campbell Causeway Tampa, FL 33602 Fort Myers, FL 33334 Tampa, FL 33607 Contact: 813-455-9240 954-444-5479 813-675-6728 Phone: Anthony Caruso, PE Karina Jackson, PE J. Larry Sauls, PE ) ) Fax: Anthony.Caruso@[email protected] 16 of 19 [email protected] Scope Clarif. Meeting 11 Negot. Meeting Agree, Execution 07/01/15 07/24/15 Metric Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: - DISTRICT WIDE (D/W) CEI SUPPORT CONTRACT #C9316 Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Fax: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Proposal Review 10 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: N/A N/A N/A N/A Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: N/A N/A N/A N/A Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: C9316 07/01/15 07/23/15 RK&K C9E98 08/30/15 08/24/15 TH, CH, KK/JT C9L46 08/30/15 08/24/15 IS, MS, KK C9M11 5/3/2016 - 7:45 AM Seq. No. LOA G/W 406313-4 LOA LOA C/S 20 Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 433255-1-62-01 DSB2 N/A I-75 FROM TOLL BOOTH TO SR 951 CES-RLM-NAL 434442-1-62-01 DS N/A CN106JB 436146-1-62-01 DS N/A REP-SLH-AAP 436771-1-62-01 DDR N/A CES-EAP-DTR $ 63,754 COLLIER CONTINUING SERVICES RESIDENT COMPLIANCE SPECI ALIST (RCS) $ 200,000 DIST/ST-WIDE DISTRICT MAINTENANCE AREA WIDE SUPPORT Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) Nicolas Leon (863) 519-2205 Schedule Date-Prop. Actual Date Nikesh Patel (941) 465-0411 Shortlisted Name: Marlena Gore (863) 272-5008 RESURFACING Consultant Address: August 26, 2015 (70) $219,504 $39,180 6JB 0.09% 17.85% ) ) INSPECT CONSTRUCTION PROJS. March 24, 2017 Amy A. Perez (863) 519-2913 Sharon L. Hedrick Harris (863) 519-2315 Amy A. Perez (863) 519-2913 ROUTINE MAINTENANCE $200,000 $ 810,000 DIST/ST-WIDE Darryl T. Richard (863) 519-2266 Eunice Usher (239) 656-7852 Ivan Sokolic (239) 985-7854 I-75 (SR 93) AT DIRECT CONNECT LOOP RAMP LANDSCAPING TO SWIFIA June 9, 2016 (80) .75 $1,100,000 LEE S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm ( ( $69,323 ( ( 0.00% ( ( 0.00% ( ( 0.43% 6.30% ) ) ) ) Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: ) ) 17 of 19 Scope Meeting Oral/ Written Present. Consult. Select. Proposal Review 12/152014 12/15/14 01/05/15 01/05/15 02/03/15 02/03/15 02/10/15 02/10/15 N/A N/A Scope Clarif. Meeting 11 Negot. Meeting Agree, Execution 07/29/15 08/31/15 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: FULL CEI GROUPING #C9I63 Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Fax: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Short List 10 N/A N/A 03/05/15 03/05/15 ADMINISTERED BY MAINTENANCE - MELODY JOYNER/AMY PEREZ - CONTINUING SERVICES (CS) CONTRACT #C9M11 N/A N/A Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: N/A N/A N/A N/A Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: C9I63 C9B43 06/30/15 07/08/18 Maintenance Jacob's Eng. $500,000.00 7/1/2015 N/A C9K38 07/21/16 C9M11 5/3/2016 - 7:45 AM Seq. No. C/S 12 DW DW Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County 432755-1-62-02 HSP N/A US 41 FROM SOUTH OF PELICAN BLVD TO SAN CARLOS BLVD 2.895 432755-1-62-02 LEE 433412-1-62-01 HSP N/A SAFETY DESIGN BUILD PUSH BUTTON CONTRACT DIST RICT WIDE 0 LCL-PEG DIST/ST-WIDE 433416-1-62-01 HSP N/A SAFETY DESIGN BUILD PUSH BUTTON CONTRACT DIST RICT WIDE REP-GPA-DDG 430355-1-62-01 DWS DIST/ST-WIDE Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) Jeffrey L. Mednick (863) 519-2834 Schedule Date-Prop. Eunice Usher, P.E. (239) 985-7852 Actual Date Ivan Sokolic (239) 985-7854 Shortlisted Name: LIGHTING Consultant Address: May 25, 2016 ( ) $4,166,701 Kati Sherrard (863) 519-5990 Nikesh Patel (941) 465-0411 John "Joe" Freeman (863) 519-2345 SAFETY PROJECT May 26, 2015 $2,717,488 David Gilley (863) 519-2384 Nikesh Patel (941) 465-0411 John "Joe" Freeman (863) 519-2345 SAFETY PROJECT May 26, 2015 $685,125 $169,725 S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm $370,681 $205,400 $102,700 $85,815 ( ( ( ( ( ( ( ( 1.62% 8.90% 1.06% 7.56% 0.27% 14.99% 0.07% 50.56% ) ) ) ) ) ) Contact: Phone: Fax: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Email:: Schedule Date-Prop. Actual Date Shortlisted Name: Consultant Address: Contact: Phone: Fax: ) ) 18 of 19 Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. Consult. Select. - CONTINUING SERVICES (CS) CONTRACT #C9M11 - FEDERAL PUSH BUTTON CEI CONTRACT #C9045/C9116 - FEDERAL PUSH BUTTON CEI CONTRACT #C9045/C9116 Proposal Review Scope Clarif. Meeting 10 11 Negot. Meeting Agree, Execution 06/15/16 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: C9M11 05/26/15 C9045/C9116 05/26/15 C9045/C9116 Comments: Project Info: Funds Encumbered: Funds Encumb. Date: Contractor Award Date: CEI Contract #: 5/3/2016 - 7:45 AM Seq. No. Financial Project ID/(Fund) WPI No.(Old)/SPN(Old) Federal Project (WP21) Project Name Limit-From Limit -To Dist.(Mi.)/Prop. X- Sect. County CEI FY 15/16 Total Phase 52 CEI FY 15/16 Total Phase 62 *Scope due 30 days prior to Advertisement Date S:\Const\DSTCONST\CCEI\5 YEAR AND CAP\FY2015-2016 CEI CAP 05.02.2016.xlsm Design Project Manager/Phone No./Email: No. Resident Construction Office/Resident Engineer Construction Project Manager/Phone No./Email: No. Type Project/English-Metric Number of Bridges/Alt. Contract Letting Date (Mo-Year)/Construction Time (Days) Ph 52 Budget $ (% of CEI FY Total Ph 52) Work Type Ph 62 Budget $ (% of Ph 52) $256,872,501.00 $31,708,009.00 ( 100.00% ) ( 12.34% ) 19 of 19 Event 1 Scope Due* 2 3 4 5 6 7 8 9 (Note: Scheduled Date-Proposed is subject to change/approval by Professional Services Administrator.) Advert Long List Short List Scope Meeting Oral/ Written Present. Consult. Select. Proposal Review Scope Clarif. Meeting 10 11 Negot. Meeting Agree, Execution 5/3/2016 - 7:45 AM