Florida at Work Transportation Improvements - FLORIDA SENATE DISTRICT 23
by user
Comments
Transcript
Florida at Work Transportation Improvements - FLORIDA SENATE DISTRICT 23
Transportation Improvements - Florida at Work Florida Senate District 23 FLORIDA SENATE DISTRICT 23 Senator Nancy C. Detert KEY TRANSPORTATION FACILITIES Airports: Venice Municipal Airport Freight Hubs: Sarasota/Bradenton International Airport Highways: I-75, U.S. 301, U.S. 41, Business U.S. 41, U.S. 17, S.R. 789, S.R. 780, S.R. 776, S.R. 758, S.R. 681, S.R. 72 Rail: Seminole Gulf Railway Line Waterways: Gulf Intracoastal Waterway FDOT DISTRICT CONTACTS District One County List Donald J. Skelton, P.E., Charlotte FDOT (Interim) District Secretary Manatee Phone: (863) 519 - 2300 Sarasota Cell: (813) 323 - 1207 [email protected] FDOT STATEWIDE CONTACTS Central Office Ananth Prasad, P.E. Francis Gibbs Gerard O’Rourke Department of Transportation Secretary of Transportation Chief of Staff Director of Legislative Affairs 605 Suwannee Street Phone: (850) 414-5205 Phone: (850) 414-4575 Phone: (850) 414-4797 Tallahassee, FL 32399 Cell: (850) 566-9655 Cell: (202) 997-5124 Cell: (561) 346-9859 Phone: (850) 414-4100 [email protected] [email protected] [email protected] 17 Palma Sola Bay Longboat Key 6 Sarasota Bay Florida at Work 663 301 665 70 Sarasota/bradenton International Airport 41 Transportation Improvements 684 675 SGLR 789 64 CSXT Bradenton Beach 663A 634 663A 661 610 663 661 Sarasota 780 GU 8 Project Type 665 Florida Transportation Vision for the 21st Century CSXT 70 Aviation, Seaport, Transit & Intermodal 780 LF Bridge Capacity OF 75 CO XI ME Arcadia 72 41 72 ITS & Information Systems 70 661 760 Rail 760 761 45 Resurfacing, Rehab, Etc. 760A 3 17 Safety, Utility, Etc. LR 31 1 Transportation Facilities SG Venice Venice Municipal Airport 5 776 763 4 North Port Public Airport Major Airport 2 Deepwater Seaport Passenger Intermodal Station 17 Buchan Airport Bus Station Shell Creek Airpark 777 776 Peace River Myakka River Punta Gorda Charlotte County Airport Freight Intermodal Station 74 Interstate Highway Lemon Bay Major US or State Highway 31 75 771 Charlotte Harbor Other US or State Highway 768 County Highway Railway 41 3 Gasparilla Sound 7 FDOT District Map: 45 31 765 MAJOR PROJECTS Planning, Engineering, Etc. Arcadia Municipal Airport 35 78 1.US 41 (Venice Bypass) 2.US 41 3.I-75 4.I-75 5.I-75 6.Sarasota/Bradenton Int'l Airport 7.CR 765 (Burnt Store Rd) 8.SR 758 Widen to Six Lanes Widen to Six Lanes Intelligent Transportation System Widen to Six Lanes Widen to Six Lanes Aviation Safety Project Widen to Four Lanes Bridge-Repair/Rehabilitation Phase - ROW/CON Phase - PE/ROW/CON Phase - PE/CON Phase - PE Phase - PE/ROW Phase - GRA Phase - CON Phase - PE/CON From - Gulf Coast Blvd From - Enterprise Dr From - Charlotte C/L From - S of Harborview Rd From - N of Sumter Blvd Air Traffic Control Tower From - Lee C/L At Siesta Key North Bridge To - Bird Bay Dr To - Sarasota C/L To - Manatee C/L To - N of Sumter Blvd To - N of River Rd FY - 2012/2013/2014/2015/2016 FY - 2013/2014/2015 FY - 2012 FY - 2012/2015 FY - 2012/2015 Totals - $43.8 million Totals - $34.1 million Totals - $22.7 million Totals - $15.4 million Phase Key: FLORIDA SENATE DISTRICT 23 PDE = Project Development & Environment Totals - $13.2 million PE = Preliminary Engineering To - Zemel Rd FY - 2013/2014/2016 FY - 2013 FY - 2012 Totals - $12.0 million Totals - $10.4 million Totals - $2.6 million ROW = Right-of-Way CON = Construction GRA = Grant Senate District 23 Senator Nancy C. Detert September 1, 2011 0 2.5 2 7 5 1 5 State of Florida Department of Transportation 4 6 Miles 10