Comments
Description
Transcript
at FLORIDA WORK 5
FLORIDA at WORK FLORIDA at WORK 2015 5 Legislative Transportation Briefing The Mission of the Florida Department of Transportation (FDOT) is to provide a safe transportation system that ensures the mobility of people and goods, enhances economic prosperity, and preserves the quality of our environment and communities. Florida Senate District 26 Senator Bill Galvano Our MISSION KEY TRANSPORTATION FACILITIES Transportation improvements result in tangible benefits. Airports: Wauchula Municipal Airport, Shell Creek Airpark, Sarasota / Bradenton International Airport, Arcadia Municipal Airport, Airport Manatee Highways: USB 41, US 41, US 301, US 27, US 19, US 17, I 75, I 275 Rail: South Central Florida, Seminole Gulf, Seaboard Coast Line, CSX Transportation Waterways: Tampa Harbor, Port Manatee Entrance Channel, Okeechobee Waterway From Gulf Intracoastal Waterway To Atlantic Intracoastal Waterway, Manatee River, Longboat Pass, Little Manatee River, Kissimmee River, Gulf Intracoastal Waterway From Anclote River To Caloosahatchee River FDOT DISTRICT CONTACTS COUNTY LIST District 1 Billy Hattaway, P.E. FDOT District Secretary Work 863-519-2201 Cell (407) 608-8386 [email protected] District 7 Paul J. Steinman, P.E. FDOT District Secretary Work 813-975-6039 [email protected] DeSoto Glades Hardee Charlotte Highlands Hillsborough Manatee FDOT STATEWIDE CONTACTS Central Office Ananth Prasad, P.E. 605 Suwannee Street Tallahaseee, FL 32399 Phone: (850) 414-4100 Phone: (850) 414-5205 Cell: (850) 566-9655 [email protected].fl.us Gerard O’Rourke Jim Boxold Chief of Staff Phone: (850) 414-5208 Phone: (850) 414-4797 Cell: (850) 251-0119 Cell: (561) 346-9859 [email protected].fl.us [email protected].fl.us Your BENEFITS JOBS $1 billion invested in transportation projects supports about 28,000 jobs. ECONOMY Over the next five years, planned improvements will grow Florida’s Gross State Product (GSP) by an estimated $11 billion in increased productivity. RETURN ON INVESTMENT (ROI) Every dollar invested in transportation is estimated to result in a return of nearly $5 in user and economic benefits to Florida’s residents and business. Transportation investment highlights are found statewide. Our PERFORMANCE COMPETITIVENESS Transportation investments are prioritized to strengthen and support our economy. Cargo valued at $83 billion passes through Florida’s seaports, 83 million tons of freight travel our railroads, and aviation contributes $114 billion to our economy every year. SAFETY Fatality and crash rates are decreasing on Florida’s highways, protecting our most valuable asset - our people. Safety belt usage is now at 88% - an all time high. A new statewide initiative to improve safety for pedestrians and cyclists is now underway. PRESERVATION Maintenance, pavement, and bridge conditions are meeting or exceeding performance targets. FDOT has met or exceeded its maintenance standards since 1994. Transportation projects require multi-year funding. Our FUNDING CASH FLOW VS. COMMITMENTS FDOT currently has over $7 billion of secured funding commitments to transportation contractors and partners with a projected cash balance between $200-to-$250 million. REVENUE SHORTFALLS By the end of the decade, FDOT expects to lose $5 billion in gas tax revenue due to more efficient vehicles using less fuel. For detailed information on transportation performance in Florida see: WWW.DOT.STATE.FL.US/PLANNING/PERFORMANCE 640 43 T S Airport Manatee ± ³ 652 ± ³ 731 ± ³ ± ³ PDE = Project Development & Environment 884 South Bay 833 827 ± ³ Totals: $30,892,578 ± ³ FY: 2015/2016 ± ³ To: CR 634 (Sweetwater Rd) ± ³ MAJOR PROJECTS ± ³ From: Desoto C/L 717 ± ³ Phase: PE/ROW/CON 80A 29 T S 832 867A ADD LANES & RECONSTRUCT Airglades Airport ± ³ Phase Key: Totals: $34,214,653 ± ³ Totals: $34,787,707 4. US 17 ¬ ( ! ! 5 5. US 17 ADD LANES & RECONSTRUCT Phase: PE/ROW/CON From: S of West 9th Street To: N of West 3rd Street (Zolfo Springs) FY: 2015-2017 Totals: $16,777,005 PE = Preliminary Engineering ! 6 6. SARASOTA/BRADENTON INTERNATIONAL AIRPORT AVIATION SAFETY PROJECT 7. US 41/TAMIAMI TRAIL 8. SR 70 RESURFACING RESURFACING Phase: GRA From: Cross Street FY: 2015-2019 FY: 2015/2016 To: Cochran Blvd Totals: $15,550,000 ROW = Right-of-Way CON = Construction Totals: $13,959,017 GRA = Grant ! 8 7 Phase: PE/CON Railway Clewiston 846 80 ! 4 ± ³ FY: 2015 FY: 2015/2016 Maltlacha Pass 78 La Belle Municipal Airport 25 S T 1 ± ³ To: N of Kings Hwy S T 80 T S 765 78A ± ³ From: S of Harborview Road 31 ± ³ Totals: $79,230,057 To: Heard Street Phase: PE/CON 29A County Highway Palm Beach County Glades Airport 720 45 S T Freight Intermodal Station Other US or State Highway Moore Haven £ ¤ ± ³ FY: 2015-2017 From: CR 760A (Nocatee) ADD LANES & RECONSTRUCT SCX F 41 767 Bus Station Passenger Intermodal Station Major US or State Highway 27 29 T S 78 T S n ¤ £ n Interstate Highway £ ¤ T S 768 Major Airport Deepwater Seaport 74 31 Public Airport í # Punta Gorda SG LR o 25 S T Shell Creek Airpark ± ³ To: CR 833 Phase: PE/ROW/CON 3. I-75 (SR 93) ± ³ 3 ± ³ From: Dalton Lane ADD LANES & REHAB. PVMNT 15B Lake Okeechobee 760A ± ³ Phase: PE/ROW/CON 3 ± ³ ¬ ( ¬ ( Charlotte Harbor ! p 15A 78 T S 78 S T Gasparilla Sound 2 ± ³ 27 771 2. US 17 ± ³ 7 Myakka River Pine Island Sound 98 £ ¤ 763 776 S T Lemon Bay ADD LANES & RECONSTRUCT ± ³ 777 ± ³ Buchan Airport ± ³ 776 S T 70A £ ¤ 31 T S Transportation Facilities Okeechobee ± ³ North Port 2 Safety, Utility, Etc. Okeechobee County Airport 70 T S 70 T S Arcadia 760 Municipal Airport ¬ ( 599 29 ± ³ ± ³ 772 Venice Municipal Airport 1. SR 80 ± ³ £ ¤ 700 S T 721 621 ± ³ 17 ! 619 ± ³ 761 ± ³ OF LF GU XICO ME Arcadia 72 T S 45 T S ! Lake Placid ± ³ Lake June In Winter 70 S T 72 T S 41 Resurfacing, Rehab, Etc. 98 Lake Placid £ ¤ Rail 68A £ ¤ 75 1 ± ³ Lake Istokpoga ± ³ ± ³ 780 ¦ ¨ § ! 68 CS XT ± ³ 66 T S 634 Planning, Engineering, Etc. 98 £ ¤ 665 Sarasota Venice ± ³ ± ³ Sarasota Bay ± ³ ¬ ( 610 623 ITS & Information Systems 441 £ ¤ 724 ± ³ 4 17 635 ± ³ 661 671 ± ³ 663A 66 S T ± ³ 70 T S 700A Sebring 636 684 ± ³ ± ³ 8 Zolfo Springs ± ³ 663 Capacity 15C ± ³ 675 Bridge 91 S T 17 S T ± ³ 35A ¬ ( 64 S T ( ! ¬ 6 64A 5 Bradenton " 91 S T ± ³ Wauchula Municipal Airport 64 S T ± ³ £ ¤ ± ³ Longboat Key 301 ± ³ 789 T S 64 667 ± ³ ± ³ ± ³ Bradenton Beach 17A 664B 35B ± ³ ± ³ Palmetto 683 Aviation, Seaport, Transit & Intermodal 627 664A T S Manatee River 64 T S 37 S T 62 ¦ ¨ § Tampa 275 Bay Terra Anna Ceia Maria Bay Holmes Beach 91 T S 664 Port Manatee Florida Transportation Vision for the 21st Century ± ³ ³ ± ³ ± 275 657 ± ³ ¦ ¨ § Project Type 60 S T ± ³ ± ³ 679 T S 674 S T 579 River Ranch Resort Airport Frostproof 630 Saint Pete Beach 682 S T ± ³ ± ³ £ ¤ 555 ± ³ Gulfport 301 559 672 FLORIDA SENATE DISTRICT 26 91 S T 27 ± ³ South Treasure Island Pasadena Florida at Work 523A £ ¤ 39 Albert Whitted Airport ± ³ Madeira Beach Lake Wales Municipal Airport Transportation Improvements 523 Lake Kissimmee ± ³ Kenneth City 655 ± ³ ± ³ Hillsborough Bay Bartow Lake Rosalie ± ³ ¦ ¨ § Chalet Suzanne Air Strip 653 ID FM £ ¤ Bartow Municipal Airport Lake Hancock X Mulberry 676 75 PV T ± ³ ± ³ Redington Shores 296 Pinellas Park 694 Peter O Knight Airport 92 ± ³ Largo Indian Rocks Indian Beach Shores South Lakeland Airport Tampa St Petersburg-Clearwater International Airport ± ³ Belleair Beach 611 ± ³ Clearwater Phase: PE/CON From: Lockwood Ridge Road To: Tara Blvd FY: 2015/2016 Totals: $10,555,043 FDOT District Map: Senate District 26 Senator: Bill Galvano Amended Work Program October, 2014 ® 0 3.5 7 State of Florida Department of Transportation Miles 14