at FLORIDA WORK 5
FLORIDA at WORK
FLORIDA at WORK 2015
5
Legislative Transportation Briefing
The Mission of the Florida Department of Transportation
(FDOT) is to provide a safe transportation system that ensures
the mobility of people and goods, enhances economic
prosperity, and preserves the quality of our environment and
communities.
Florida Senate District 26
Senator Bill Galvano
Our
MISSION
KEY TRANSPORTATION FACILITIES
Transportation improvements
result in tangible benefits.
Airports:
Wauchula Municipal Airport, Shell Creek Airpark, Sarasota / Bradenton International Airport,
Arcadia Municipal Airport, Airport Manatee
Highways:
USB 41, US 41, US 301, US 27, US 19, US 17, I 75, I 275
Rail:
South Central Florida, Seminole Gulf, Seaboard Coast Line, CSX Transportation
Waterways:
Tampa Harbor, Port Manatee Entrance Channel, Okeechobee Waterway From Gulf Intracoastal
Waterway To Atlantic Intracoastal Waterway, Manatee River, Longboat Pass, Little Manatee
River, Kissimmee River, Gulf Intracoastal Waterway From Anclote River To Caloosahatchee
River
FDOT DISTRICT CONTACTS
COUNTY LIST
District 1
Billy Hattaway, P.E.
FDOT District Secretary
Work 863-519-2201
Cell (407) 608-8386
[email protected]
District 7
Paul J. Steinman, P.E.
FDOT District Secretary
Work 813-975-6039
[email protected]
DeSoto
Glades
Hardee
Charlotte
Highlands
Hillsborough
Manatee
FDOT STATEWIDE CONTACTS
Central Office
Ananth Prasad, P.E.
605 Suwannee Street
Tallahaseee, FL 32399
Phone: (850) 414-4100
Phone: (850) 414-5205
Cell: (850) 566-9655
[email protected].fl.us
Gerard O’Rourke
Jim Boxold
Chief of Staff
Phone: (850) 414-5208
Phone: (850) 414-4797
Cell: (850) 251-0119
Cell: (561) 346-9859
[email protected].fl.us [email protected].fl.us
Your
BENEFITS
JOBS
$1 billion invested in transportation projects supports about 28,000 jobs.
ECONOMY
Over the next five years, planned improvements will grow Florida’s Gross State Product
(GSP) by an estimated $11 billion in increased productivity.
RETURN ON INVESTMENT (ROI)
Every dollar invested in transportation is estimated to result in a return of nearly $5 in user
and economic benefits to Florida’s residents and business.
Transportation investment highlights
are found statewide.
Our
PERFORMANCE
COMPETITIVENESS
Transportation investments are prioritized to strengthen and support our economy.
Cargo valued at $83 billion passes through Florida’s seaports, 83 million tons of freight
travel our railroads, and aviation contributes $114 billion to our economy every year.
SAFETY
Fatality and crash rates are decreasing on Florida’s highways, protecting our most
valuable asset - our people. Safety belt usage is now at 88% - an all time high. A new
statewide initiative to improve safety for pedestrians and cyclists is now underway.
PRESERVATION
Maintenance, pavement, and bridge conditions are meeting or exceeding performance
targets. FDOT has met or exceeded its maintenance standards since 1994.
Transportation projects require
multi-year funding.
Our
FUNDING
CASH FLOW VS. COMMITMENTS
FDOT currently has over $7 billion of secured funding commitments to transportation
contractors and partners with a projected cash balance between $200-to-$250 million.
REVENUE SHORTFALLS
By the end of the decade, FDOT expects to lose $5 billion in gas tax revenue due to more
efficient vehicles using less fuel.
For detailed information on transportation performance in Florida see:
WWW.DOT.STATE.FL.US/PLANNING/PERFORMANCE
640
43
T
S
Airport Manatee
±
³
652
±
³
731
±
³
±
³
PDE = Project Development & Environment
884
South Bay
833
827
±
³
Totals: $30,892,578
±
³
FY: 2015/2016
±
³
To: CR 634 (Sweetwater Rd)
±
³
MAJOR
PROJECTS
±
³
From: Desoto C/L
717
±
³
Phase: PE/ROW/CON
80A
29
T
S
832
867A
ADD LANES & RECONSTRUCT
Airglades
Airport
±
³
Phase Key:
Totals: $34,214,653
±
³
Totals: $34,787,707
4. US 17
¬
(
!
!
5
5. US 17
ADD LANES & RECONSTRUCT
Phase: PE/ROW/CON
From: S of West 9th Street
To: N of West 3rd Street (Zolfo Springs)
FY: 2015-2017
Totals: $16,777,005
PE = Preliminary Engineering
!
6
6. SARASOTA/BRADENTON
INTERNATIONAL AIRPORT
AVIATION SAFETY PROJECT
7. US 41/TAMIAMI TRAIL
8. SR 70
RESURFACING
RESURFACING
Phase: GRA
From: Cross Street
FY: 2015-2019
FY: 2015/2016
To: Cochran Blvd
Totals: $15,550,000
ROW = Right-of-Way
CON = Construction
Totals: $13,959,017
GRA = Grant
!
8
7
Phase: PE/CON
Railway
Clewiston
846
80
!
4
±
³
FY: 2015
FY: 2015/2016
Maltlacha
Pass
78
La Belle
Municipal Airport
25
S
T
1
±
³
To: N of Kings Hwy
S
T
80
T
S
765
78A
±
³
From: S of Harborview Road
31
±
³
Totals: $79,230,057
To: Heard Street
Phase: PE/CON
29A
County Highway
Palm Beach
County Glades
Airport
720
45
S
T
Freight Intermodal Station
Other US or State Highway
Moore
Haven
£
¤
±
³
FY: 2015-2017
From: CR 760A (Nocatee)
ADD LANES & RECONSTRUCT
SCX
F
41
767
Bus Station
Passenger Intermodal Station
Major US or State Highway
27
29
T
S
78
T
S
n
¤
£
n
Interstate Highway
£
¤
T
S
768
Major Airport
Deepwater Seaport
74
31
Public Airport
í
#
Punta Gorda
SG
LR
o
25
S
T
Shell
Creek
Airpark
±
³
To: CR 833
Phase: PE/ROW/CON
3. I-75 (SR 93)
±
³
3
±
³
From: Dalton Lane
ADD LANES & REHAB. PVMNT
15B
Lake
Okeechobee
760A
±
³
Phase: PE/ROW/CON
3
±
³
¬
( ¬
(
Charlotte
Harbor
!
p
15A
78
T
S
78
S
T
Gasparilla
Sound
2
±
³
27
771
2. US 17
±
³
7
Myakka
River
Pine
Island
Sound
98
£
¤
763
776
S
T
Lemon
Bay
ADD LANES & RECONSTRUCT
±
³
777
±
³
Buchan
Airport
±
³
776
S
T
70A
£
¤
31
T
S
Transportation Facilities
Okeechobee
±
³
North
Port
2
Safety, Utility, Etc.
Okeechobee
County Airport
70
T
S
70
T
S
Arcadia 760
Municipal Airport
¬
(
599
29
±
³
±
³
772
Venice
Municipal
Airport
1. SR 80
±
³
£
¤
700
S
T
721
621
±
³
17
!
619
±
³
761
±
³
OF
LF
GU XICO
ME
Arcadia
72
T
S
45
T
S
!
Lake
Placid
±
³
Lake
June
In
Winter
70
S
T
72
T
S
41
Resurfacing, Rehab, Etc.
98
Lake
Placid
£
¤
Rail
68A
£
¤
75
1
±
³
Lake
Istokpoga
±
³
±
³
780
¦
¨
§
!
68
CS
XT
±
³
66
T
S
634
Planning, Engineering, Etc.
98
£
¤
665
Sarasota
Venice
±
³
±
³
Sarasota
Bay
±
³
¬
(
610
623
ITS & Information Systems
441
£
¤
724
±
³
4
17
635
±
³
661
671
±
³
663A
66
S
T
±
³
70
T
S
700A
Sebring
636
684
±
³
±
³
8
Zolfo
Springs
±
³
663
Capacity
15C
±
³
675
Bridge
91
S
T
17
S
T
±
³
35A
¬
(
64
S
T
(
! ¬
6
64A
5
Bradenton
"
91
S
T
±
³
Wauchula Municipal
Airport
64
S
T
±
³
£
¤
±
³
Longboat Key
301
±
³
789
T
S
64
667
±
³
±
³
±
³
Bradenton Beach
17A
664B
35B
±
³
±
³
Palmetto
683
Aviation, Seaport, Transit
& Intermodal
627
664A
T
S
Manatee
River
64
T
S
37
S
T
62
¦
¨
§
Tampa 275
Bay
Terra
Anna
Ceia
Maria
Bay
Holmes
Beach
91
T
S
664
Port Manatee
Florida Transportation Vision
for the 21st Century
±
³
³
±
³ ±
275
657
±
³
¦
¨
§
Project Type
60
S
T
±
³
±
³
679
T
S
674
S
T
579
River Ranch
Resort
Airport
Frostproof
630
Saint Pete Beach
682
S
T
±
³
±
³
£
¤
555
±
³
Gulfport
301
559
672
FLORIDA SENATE DISTRICT 26
91
S
T
27
±
³
South
Treasure Island Pasadena
Florida at Work
523A
£
¤
39
Albert
Whitted Airport
±
³
Madeira Beach
Lake
Wales Municipal
Airport
Transportation Improvements
523
Lake
Kissimmee
±
³
Kenneth City
655
±
³
±
³
Hillsborough
Bay
Bartow
Lake
Rosalie
±
³
¦
¨
§
Chalet Suzanne Air Strip
653
ID
FM
£
¤
Bartow Municipal Airport
Lake
Hancock
X
Mulberry
676
75
PV
T
±
³
±
³
Redington Shores
296
Pinellas
Park
694
Peter
O Knight
Airport
92
±
³
Largo
Indian
Rocks Indian
Beach Shores
South Lakeland
Airport
Tampa
St Petersburg-Clearwater
International
Airport
±
³
Belleair Beach
611
±
³
Clearwater
Phase: PE/CON
From: Lockwood Ridge Road
To: Tara Blvd
FY: 2015/2016
Totals: $10,555,043
FDOT District Map:
Senate District 26
Senator:
Bill Galvano
Amended Work Program