...

RPC

by user

on
Category:

electricity

92

views

Report

Comments

Description

Transcript

RPC
RPC Database status
•
•
•
•
OMDS migration
POPCON (Davide)
Global Run
Offline Calibration to
ORCON
• RelVal tools status
Pigi, Bill, Davide, Michael & Giovanni
New OMDS status
new OMDS hardware is ready at P5
DB migration has started one week ago: RPC and
ECAL the first
detector experts must be on call (RPC ?)
commissioning at P5 after the migration (MarchApril)
naming convention is almost OK for the RPC
PVSS for Barrel RPC has been already migrated (G. Polese)
XDAQ has been done by the central group !!!
Who is in charge for that ??
CMS week - 26 Feb 2008
Pigi, Bill, Davide, Michal & Giovanni
2
CMS DB “simplified” layout
streaming
POPCON
Offline
calibration
Online application
(XDAQ-PVSS-RC..)
• POPCON streams data from the OMDS to ORCON
• ORACLE streaming copy data from ONLINE (ORCON) to ORCOFF
CMS week - 26 Feb 2008
3
• Could be necessary to move data also in the opposite direction: Import
Pigi, Bill, Davide, Michal &
POPCON 2_0_X
 In the March GR will be used the POPCON 1_8_X
 “new” POPCON framework (2_0_X) is now ready
and under debugging
 subsystem are moving to the 2_0_X
 Central DB group is collecting and test the
subdetectors POPCON applications
 Central DB group will develop a unique and central
script to run POPCON, manually and automatically.
 monitor POPCON is under development (Michele, IT
and Pietro Pica)
CMS week - 26 Feb 2008
Pigi, Bill, Davide, Michal & Giovanni
4
ORCON payload (to update)
Data to write in ORCON
notes
frequency
tot/day
(MB)
STRIP
Cabling – noise – pedestals - bad components – gain
from calibration - power supply states – alignment
(survey/laser) – lorentz angle ? - gain from particles
?
Only CCR07 –
DQM on ORCON at
P5 – POPCON
ready in 170_xx
Cabling, noise,
pedestal and gain
(once per day)
bad components
(once per day)
align
(once per global
run)
~ 100
ECAL
Pedestal – calibration
POPCON for
pedestal READY
Pedestal (once per
run)
~ 100
HCAL
Electronic map - pedestal – gains – widths – QIE
response
POPCON under
test. Ready for
CCR07
Pedestal (once per
day/run) - Others
(when the readout
config change)
~ 10
CSC
Calibration in local runs (3 objects: gains, crosstalk
and noise) – alignment (few objects) - mapping
POPCON not ready
(CCR07 ?)
Calib-Align (once)
mapping (once)
~ 50
DT
Cabling – calibration (pedestal and time-offset)
ORCON populates
with offline result POPCON ready for
CCR07
Time-offset
calibration (every
trigger config.)
~1
Cable map (once) –
DCS (min.)
~ 200
Cable map will be written once in ORCON using
– DCS
CMS weeksqlite
- 26file
Feb
2008for offline calibration (used in
ORCOFF)
RPC
POPCON under
test. Ready for
CCR07
No continuosly updating – total of about 500 MB per day
Pigi, Bill, Davide, Michal & Giovanni
5
calibration constants calculated OFFLINE to copy to ORCON
Type
Computed
size
Frequency
PXL
Lorentz Angle
offline
15 KB
weeks
TRK
dE/dx (gain)
offline
500 KB
weeks/months
Lorentz angle
offline
100 KB
week
online/offline
5 MB
Crystal inter calibration
offline
?
from days to
months
Gain ratio
offline
?
year
Weights for pulse-height reco
offline
?
year
response correction factor
offline
< 1 MB
weeks
pedestal and pedestal width
online/offline
2.5 MB
days to year
Channel status
online/offline
< 1 MB
?
Zeros suppr. threshold
online/offline
< 1 MB
?
Elect. map, gains and qie
offline
few MB
year
T0 interchannel synchronization
offline
10 MB
months
trigger time pedestal (trig config)
offline
1 MB
from days to year
(long term)
V drift
offline
1 MB
from days to year
(long term)
Geometry costants
ECAL
HCAL
DT
several/once per
day
Contact person
Freya Blekman
G. Bruno
V. Ciulli
Martin Weber
F. Cavallari
R. Ofierzynski
P. Ronchese & S.
Maselli
DB payload for the 2009 (100 days)
CondDB Config
ORCON
ORCOFF
PIXEL
< 80
< 20
< 50
< 50
STRIP
20
2
10
10
ECAL
460
1
31
31
HCAL
23
0.2
0.5
0.5
CSC
60
0.1
8
8
DT
300
1
15
15
RPC
50
1
5
5
Lumi
200
-
-
-
 6 GB
 70 GB
 70 GB
1200 GB
TOTALE
CMS week - 26 Feb 2008
Pigi, Bill, Davide, Michal & Giovanni
7
What we need for the April Global Run
Run with the new OMDS at P5
barrel DCS are ready to do it
test the configuration and the XDAQ condition
do we want to store the XDAQ condition from PVSS
(using PSX to get them) ?? or continue with the
present DB schema ??
run the 3 RPC POPCON 2_0_0 applications in a
standalone and central way
do we need more POPCON applications ?
improve our trigger DQM (online and offline)
CMS week - 26 Feb 2008
Pigi, Bill, Davide, Michal & Giovanni
8
DB coordinators and links
Hypernews: https://hypernews.cern.ch/HyperNews/CMS/get/database.html
Twiki: https://twiki.cern.ch/twiki/bin/view/CMS/DatabaseWikiHome
DB sub-projects (online - offline) coordinators are:
PIXEL (Ioshi - Chiochia)
STRIP (Drouhin - Giordano)
ECAL (Cavallari)
CSC (Vorobiev, Boeriu)
DT (Parenti ? - Ronchese)
RPC (Whitaker ? – Pagano)
TRIGGER (LV1 Varela - HLT Meschi)
DQM (Meyer)
ONLINE (Glege)
OFFLINE (Innocente)
LUMI (Luecking)
HCAL (Narain (Lukhanin Ofierynski))
CMS week - 26 Feb 2008
Pigi, Bill, Davide, Michal & Giovanni
9
Fly UP