Comments
Description
Transcript
Diapositiva 1 - Italcontainer
Fs Logistica/Italcontainer intermodal network 1 FS Logistica Company details The State Railways Group's logistics services are outsourced to FS Logistica spa. FS LOGISTICA has been created in 2008 Integration, systems view, synergy, optimization of resources and service quality are the watchwords that guide the mission of FS Logistica toward achieving three fundamental objectives: • improving and developing the provision of service; • create a network of logistics functional rail, in partnership with national and international logistics operators; • create the conditions for competitors to compete with European dimensions. The Company owns logistics infrastructure throughout the country. Moreover, FS Logistica operates in the market services by using its Business Unit. The areas of main activities are petrochemical, environment and land management (BU Chemical Industry and Environment), steel (BU Steel), that of large institutional clients (Omniaexpress BU) and the distribution and logistics of consumer goods, made ItaliaLogistica through the new company, a joint venture with the Italian Post Office Group. Owner: FS Logistica with 100% shares 50 milioni euro/year is the Italcontainer turnover 60 are the Italcontainer employes More than 4.000 block trains 200.000 Teu transported The Service Combined traffic (rail + terminal + truck+ depot services) Rail + terminal Every day we manage 16 trains on 15 rail connections Every day we manage 250 truck services for combined traffic customers Every day we handle 1.500 teu Customers: Shipping companies (MSC,EVERGREEN,ZIM,MAERSK, COSCO), forwarders, truck companies Italcontainer planned a new direct link 2009 Pomezia Bonen ( in 2010 with stop in North Italy) Door-North/ Pick up area Delivery zone: Unna Bonen Germany Rail Transit time 2009: 32 hours Door south: Pomezia Pick up/Delivery Area Pomezia 4 In 2009 has been activated the RFI new line Bologna – Verona , on corridor UE n°1 Italcontainer planned a new link Bologna – Munich Germany Door-North/Munchen Pick up/Delivery Area Munchen Rail Transit time 2008: 15 hours Italy Door-South/Bologna Pick up/Delivery Area Bologna 5 The European network Italcontainer logistic system Manchester Rotterdam Hamburg Berlin Antwerp Bonen UK is served via EUROTUNNEL Nurnberg/Munchen Paris Milano Sm Genova La Spezia Livorno Bologna Ravenna Marcianise Pomezia Taranto Gioia Tauro Starting in few weeks Treno Pomezia Bonen: technical data Train runs 3 days a week round trip ( 1 in first phase) Length max : 500 mt. Tons northbound : 1.200 Tons southbound: 1.560 Average load factor per train : 27 Swap Bodies 13,60 m 7 Treno Pomezia Bologna Munchen: technical data Train runs 2 days a week round trip ( 1 in first phase) Length max : 500 mt. Tons northbound : 1.200 Tons southbound: 1.560 Average load factor per train : 27 Swap Bodies 13,60 m 8 Italcontainer equipment : 13,60 m box swap bodies Italcontainer equipment : container 45’ pallet wide Italcontainer waggons : n 100 S 26 for high cube UTI Pomezia intermodal hub 1 Operational Responsible 1 Logistics Responsible 3 Administratives 3 Hub masters 15 Crane/ loco drivers 2 Gate controllers 2 Mantainance responsible The staff Handling equipments Rail shunting equipments Gantry cranes 2 ( one is been completed) Moving crane 4 Elevators 1 for 9 t 1 for 12 t Diesel loco/ locomotives 2 Pomezia intermodal hub: 6 tracks , 60.000 mq yard capacity Bonen intermodal hub Bonen intermodal hub yard capacity : 1000 Teus Bonen intermodal hub • 4 loading tracks with a total length of 1750 metres operated by cranes • • • Yard capacity 1000 TEU 2 gantry cranes with max. 40 tons load Handling of 20‘ - 45‘ containers, 7,15-13,60 metres swap-bodies, semi-trailer and mega-trailer • Optimal road access Direct to the highway A 2, exit in Bönen • Near to the Kamener Kreuz (A 1 / A 2) Pomezia Bonen : 3* train/week scheduling Departures from Pomezia Days 2,4,6 Train operations time limit Train delivery time in Bonen Door delivery time 15,00 day A 06,00 day C Dalle ore 6,30 g C Departures from Bonen Days 2,4,6 Train operations time limit Train delivery time in Pomezia Door delivery time 19,30 day A 9,00 day C Dalle 10,00 g. C * Day 4 by April 2010 17 Bologna Bonen : 1 train/week scheduling Departures from Bologna Days 3 Train operations time limit Train delivery time in Bonen Door delivery time 01,00 day A 04,00 day C From 6,30 g C Departures from Bonen Days 2 Train operations time limit Train delivery time in Bologna Door delivery time 19,30 day A 02,00 day C From 8,00 g. C 18 Bologna Munchen : start up scheduling (05/2010) Departures from Bologna Days 2,5 Train operations time limit Train delivery time in Munchen Door delivery time To be defined day A To be defined day B ……… day B Departures from Munchen Days 3,6 Train operations time limit Train delivery time in Bologna Door delivery time To be defined day A To be defined day B ……….day B 19 For further informations please contact: Dott. Roberto Paliotta ( International Sales Manager) Tel 0039- 06-91990065 Mobile 0039-334-6289632 E-mail: [email protected] 20