...

WELDING PROCEDURE SPECIFICATION (WPS) PREQUALIFIED QUALIFIED BY TESTING

by user

on
Category: Documents
23

views

Report

Comments

Transcript

WELDING PROCEDURE SPECIFICATION (WPS) PREQUALIFIED QUALIFIED BY TESTING
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
WELDING PROCEDURE SPECIFICATION (WPS)
PREQUALIFIED
QUALIFIED BY TESTING
AWS D1.6 STAINLESS STEEL
Contractor/Organization:
Welding Process(es):
Type:
Manual
Mechanized
Semiautomatic
Automatic
JOINT DESIGN USED
Single
Double Weld
Backing:
Yes
No
Backing Mat’l:
Root Opening:
Root Face Dimension:
Groove Angle:
Radius (J-U):
Backgouging:
Yes
No
Method:
BASE METALS
Material Spec:
Type or Grade:
Base Metal Group
Thickness: Groove
Fillet
Diameter (Pipe)
FILLER METALS
AWS Specification:
F Number
AWS Classification:
A Number
SHIELDING
Flux:
Gas:
Electrode-Flux Class:
Gas Composition:
Flow Rate:
Gas Cup Size:
POSTWELD HEAT TREATMENT
WELDING PROCESS
Filler Metals
Current
Pass or
Class
Diam.
Amps
Weld
Process
Type &
Wire
Layer(s)
Polarity
Feed
Speed
Identification :
Revision:
Date:
By:
Authorized By:
Date:
Supporting PQR No. (s):
POSITION
Position of Groove:
Fillet:
Vertical Progression:
Up
Down
ELECTRICAL CHARACTERISTICS
Transfer Mode (GMAW):
Short-Circuiting
Globular
Spray
Current:
AC
DCEP
DCEN
Pulsed
Other:
Tungsten Electrode (GTAW)
Size:
Type:
TECHNIQUE
Stringer or Weave Bead:
Multi-Pass or Single Pass (per side):
Number of Electrodes:
Electrode Spacing:
Longitudinal
Lateral:
Angle:
Contact Tube to Work Distance:
Peening:
Interpass Cleaning:
PREHEAT
Preheat Temp. Min.:
Interpass Temp. : Min.
Max.
Temp.:
Time:
FOR FDOT USE ONLY
Volts
Travel
Speed
FOR CERTIFIED WELDING INSPECTOR (CWI) USE ONLY
Signature
Date
JOINT DETAILS
FOR FDOT CONSULTANT USE ONLY
Comments:
Return this completed form to the FDOT State Materials Office Structural Materials Systems Field Operations Office.
675-070-14
MATERIALS
05/15
Fly UP