MEETING RECORD  Schematic Design Meeting #4 
MEETING RECORD Date:
Project:
Schematic Design Meeting #4 Project No:
Prepared by:
ATTENDEE Chester Bartels Jim Determan Angela Edwards Rick Eisenacher Joseph Griffin Ruth Hyde Tom Hyde Adrienne Karamihas Troy Kimmel Linda Lindstrom Ray Marhamati Diane Morris Jan Sadowski cc: Anne Baldini Carla Britt Robin Bruckner Bruce Caviness Yongwan Cho Kathy Finan Lori Goodwin Jean Gries Jeff Hagan Steve Hudson Laura Lampshire Rachel Lazarick Jennifer McKneely Patrick Palavecino Trisha Pignone Joe Pospisil Barbara Ray Kris Rhone Lisa Rodriguez Michael Shpur Jillian Storms John Vukovich John S. Weske Matt Willems ORGANIZATION HCM HCM Parent Teacher PTA Neighbor Neighbor MCPS Parent Teacher MCPS DOC Principal, FMS Dustin Construction
Teacher Teacher Parent Teacher Parent Teacher Parent MCDOT/ Traffic HCM JPA Parent Teacher Parent CMJ Staff MCDOT/ Traffic Teacher Teacher MCPS DOC MSDE Teacher Neighbor AMT 06.28.12
Farquhar Middle School Modernization 211004.10 Chet Bartels Associate AIA, REFP
PHONE
410.837.7311
410.837.7311
301.421.5927
301.520.3340
301.570.0383
301.974.3147
301.974.3147
240.314.1035
301.602.1663
301.924.3100
240.314.1010
301.924.3100
301.810.4320
EMAIL
[email protected] [email protected] [email protected] [email protected]
[email protected] [email protected] [email protected] [email protected]
[email protected] [email protected]
[email protected] [email protected] [email protected]
301.924.3100
301.924.3100
301.395.3871
301.924.3100
301.774.4567
301.924.3100
301.260.1933
240.777.2183
410.837.7311
410.265.6100
301.570.1042
301.924.3100
301.260.0181
301.802.7292
301.924.3100
240.777.2160
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]
301.924.3100
301.924.3100
240.314.1014
410.767.0615
301.922.8971
301.774.7564
301.881.2545
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]
www.hcm2.com No 4‐01 4‐02 4‐03 4‐04 4‐05 4‐06 4‐07 4‐08 ITEM Topic of the meeting: To discuss the final schematic design including the site modifications, floor plan modifications and revision to the exterior elevations Site Plan discussion reviewed modifications of the bus loop to the south end of the site with staff and visitor parking to the north. The service access along the North side of the building will be utilized primarily for trash and recycling with the majority of deliveries utilizing hand trucks. Proposed elevations of the site topography are now indicated on the plan and were reviewed as related to adjacent property with the site section provided. The question was raised asking the dimension from Batchellors Forest Road to the proposed building in comparison to the existing Farquhar MS. The existing MS is setback roughly 150’ from Batchellors Forest, while the proposed is roughly 250’ ‐300’. Reviewing the floor plans indicated that all comments had been incorporated satisfactorily. Those revisions included:  Staff Workroom now separate from the administration allowing guidance to be directly adjacent to the administration suite with Guidance and Administration having separate entry points.  Testing is now incorporated into the administration,  A toilet room has been added adjacent to the entry of the Media Center on level 2 on the public side of the security doors,  Locker rooms now have two exits each.  Stair to the lowest level has flipped to the north side of the opening allowing for access to the toilet rooms and elevator from the public side of the security doors, Further review of the Exterior Elevations discussed the following revisions:
 The west entry/ main entry was reviewed, specifically, the round stair configuration. HCM is now showing a square configuration as a means of cost savings. The round stair configuration will be carried as an Add‐ Alternate. The square stair configuration was met with approval.  The heavy timber “bridge” entry was again reviewed to clarify the intention that this timber frame actually support the pedestrian foot bridge.  Review of the terraced condition on the site at the front of the building provides two opportunities: a solution to storm water management and to act as an outdoor classroom.  The North elevation of the building will be developed and made available for review as only partial views were presented. For specific building face orientations that are challenged by sunlight, glazing solutions will look to incorporate fritt glass, tinted glass and the use of shades. As a wrap up to the presentation, several attendees commented that the nature of the architecture was successful in being compatible and appropriate with the surroundings. Page 2 of 3 www.hcm2.com These meeting notes were prepared by Hord Coplan Macht, Inc for the purpose of recording the information covered during this meeting. Should anyone object to any statement or interpretation contained herein, please inform Hord Coplan Macht, Inc. within seven days or the meeting notes shall stand as written. Issued by, Hord Coplan Macht, Inc. Chester Bartels, Associate AIA, REFP Senior Designer Page 3 of 3 www.hcm2.com 