MEETING RECORD  Schematic Design Meeting #3 
MEETING RECORD Date:
Project:
Schematic Design Meeting #3 Project No:
Prepared by:
ATTENDEE Sharon Agranov Chester Bartels Kelly Cummings Jim Determan Meg Pease‐Fye Stephen Fye Hank Hyde Ruth Hyde Stephanie Hyde Sue Hyde Tom Hyde Andrea Keller Ray Marhamati Diane Morris Susan Maria Ramsay Barbara Ray Jan Sadowski Michael Shpur Craig Shuman Jillian Storms Virginia Twombly Matt Willems cc: Anne Baldini Carla Britt Robin Bruckner Bruce Caviness Yongwan Cho Angela Edwards Rick Eisenacher Kathy Finan Lori Goodwin Jean Gries Joseph Griffin Jeff Hagan Steve Hudson Adrienne Karamihas Troy Kimmel Laura Lampshire ORGANIZATION PTA HCM Dustin Construction
HCM Neighbor Neighbor Neighbor Neighbor Neighbor Neighbor Neighbor PTA‐ BGES MCPS DOC Principal, FMS Parent Dustin Construction
MCPS DOC MCPS DOC MSDE PTA AMT Teacher Teacher Parent Teacher Parent Parent Teacher Teacher Parent MCDOT/ Traffic PTA HCM JPA MCPS Parent Parent PHONE
410.837.7311
301.810.4320
410.837.7311
301.774.4688
301.774.4688
301.924.2254
301.974.3147
301.924.0029
301.924.2254
301.974.3147
301.802.1855
240.314.1010
301.924.3100
301.412.1742
06.14.12
Farquhar Middle School Modernization 211004.10 Jeffrey Hagan, AIA EMAIL
[email protected] [email protected] [email protected]
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected] 301.810.4320
240.314.1014
240.314.1000
410.767.0615
301.570.0394
301.881.2545
[email protected]
[email protected] [email protected]
[email protected] [email protected] [email protected]
301.924.3100
301.924.3100
301.395.3871
301.924.3100
301.774.4567
301.421.5927
301.520.3340
301.924.3100
301.260.1933
240.777.2183
301.570.0383
410.837.7311
410.265.6100
240.314.1035
301.602.1663
301.570.1042
[email protected] [email protected] [email protected] [email protected] [email protected] [email protected] [email protected]
[email protected] [email protected] [email protected]
[email protected] [email protected] [email protected] [email protected]
[email protected] [email protected] www.hcm2.com Rachel Lazarick Teacher 301.924.3100
[email protected] Linda Lindstrom Teacher 301.924.3100
[email protected]
Jennifer McKneely Parent 301.260.0181
[email protected] Patrick Palavecino CMJ 301.802.7292
[email protected] Trisha Pignone Staff 301.924.3100
[email protected] Joe Pospisil MCDOT/ Traffic 240.777.2160
[email protected]
Kris Rhone Teacher 301.924.3100
[email protected] Lisa Rodriguez Teacher 301.924.3100
[email protected] John Vukovich Teacher 301.922.8971
[email protected] [email protected] John S. Weske Neighbor 301.774.7564
No ITEM 3‐01 Topic of the meeting: To discuss the design going forward on the park site next door to the school. 3‐02 The site plan was reviewed. The plan has been revised: building has been moved South; a larger tree buffer has been added at North property line; parking and bus loop have been switched. It was discussed how far back the school is from the road and views to the school from the park site through the trees. 3‐03 Trash and recycling are stored inside the building and moved out at time of collection only. 3‐04 The floor plans were reviewed. It is preferred to locate Guidance within Administration. Suggested to switch Staff Lounge with Guidance. 3‐05 The proposed locker bays were reviewed. This arrangement allows better supervision and more windows from the classrooms into the corridor. 3‐06 The exterior design was reviewed. The view from Batchellor’s Forest Rd south of the site will be softened by trees along the stream buffer and new trees planted along the road. Proposed design provides a building that is consistent with a rural, rustic community. Design was well received. Like the rustic look. 3‐07 MCPS stated that Construction Documents are scheduled to be completed Fall 2013; construction summer 2014 to summer of 2016. 3‐08 HVAC will include rooftop units that will be screened from view. Site lighting will be cutoff type so light does not affect neighbors. 3‐09 Site will require handicap access. 3‐10 Porous paving will be used where possible. 3‐11 Trellis next to Media Center to be removed. 3‐12 A staff member requested the weather vane depict the school mascot.
2‐13 The guard rail above the open stair should allow for supervision of that space from below, glass preferred . 2‐14 The western facing vestibule glass should include shading devices, i.e. translucent glass, metal panel. 2‐15 Library‐ perforated shades could be provided to shade the western glass and still allow vision through the shade. 2‐16 The heavy timber entry frame will have a roof. 2‐17 Next Meeting: Meeting #4: Thursday, June 28, 2012; 7:00 – 8:30 PM Page 2 of 3 www.hcm2.com These meeting notes were prepared by Hord Coplan Macht, Inc for the purpose of recording the information covered during this meeting. Should anyone object to any statement or interpretation contained herein, please inform Hord Coplan Macht, Inc. within seven days or the meeting notes shall stand as written. Issued by, Hord Coplan Macht, Inc. Jeffrey R. Hagan, AIA Senior Associate Page 3 of 3 www.hcm2.com 